{"metadata":{"schemaVersion":1,"title":"US data-center discovery inventory","description":"A licensed, dated inventory of source-defined sites and campuses. Imported locations and lifecycle reports are research leads, not environmental audits or a complete national census.","sourceName":"Compute Atlas by Edward Kubiak","sourceUrl":"https://www.compute-atlas.com","sourceVersion":"v1.35.1","sourceCommit":"85cd69d93a7a4e194f3a4d7e3723a4caebd88dde","sourceFile":"https://raw.githubusercontent.com/ek33450505/compute-atlas/85cd69d93a7a4e194f3a4d7e3723a4caebd88dde/data/facilities.json","sourceSha256":"af6dc924c904ca1d76f80b1c3e2ac7d293005adb044c699a262889a17182ae88","sourceRecordUpdatedRange":["2026-07-16","2026-10-31"],"retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","attribution":"Data from Compute Atlas by Edward Kubiak (https://www.compute-atlas.com), licensed under CC BY 4.0. Filtered to data centers; fields normalized. This site's assessments are separate and are not endorsed by Compute Atlas.","changes":["Excluded crypto-mining and dedicated power-generation records.","Normalized location, provenance and lifecycle fields.","Retained source citations and confidence without treating them as independent verification.","Did not infer environmental performance, exact coordinates or building counts."],"recordCount":2219,"stateCount":50,"includesDistrictOfColumbia":true,"territories":["GU","MP","PR","VI"],"territoryRecordCount":9,"byStatus":{"cancelled":139,"operational":1066,"permitted":150,"proposed":602,"under_construction":262},"byState":{"AK":12,"AL":29,"AR":15,"AZ":55,"CA":137,"CO":42,"CT":14,"DC":10,"DE":14,"FL":70,"GA":85,"GU":4,"HI":17,"IA":66,"ID":17,"IL":87,"IN":48,"KS":21,"KY":29,"LA":22,"MA":30,"MD":29,"ME":10,"MI":64,"MN":37,"MO":32,"MP":2,"MS":17,"MT":13,"NC":60,"ND":9,"NE":25,"NH":16,"NJ":54,"NM":18,"NV":61,"NY":60,"OH":117,"OK":57,"OR":55,"PA":77,"PR":2,"RI":6,"SC":31,"SD":8,"TN":50,"TX":130,"UT":53,"VA":153,"VI":1,"VT":10,"WA":54,"WI":39,"WV":25,"WY":20},"bySourceConfidence":{"confirmed":833,"reported":1359,"rumored":27},"byCoordinatePrecision":{"approximate":1820,"exact":394,"representative_multi_site":5},"excludedByType":{"crypto_mining":226,"power_generation":478},"completeness":"Unknown; no verified national denominator. Presence in all 50 states is geographic reach, not complete coverage.","deduplication":"Unique upstream IDs checked. Campuses, phases, and representative multi-site records have not been independently reconciled; do not call this a unique building count."},"facilities":[{"id":"compute-alasconnect-anchorage-ak","sourceRecordId":"alasconnect-anchorage-ak","name":"AlasConnect Anchorage Data Center","operator":"AlasConnect","city":"Anchorage","county":"Anchorage Municipality","address":"3403 Minnesota Dr","state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":61.189365,"longitude":-149.912829,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/alasconnect-anchorage-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/alasconnect-anchorage-data-center/","label":"Alasconnect Anchorage Data Center","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-28"},{"url":"https://alasconnect.com/services/data-center-hosting-services/","label":"Data Center Hosting Services in Alaska","publisher":"AlasConnect","kind":"other","retrievedAt":"2026-09-28"}]},{"id":"compute-alasconnect-fairbanks-ak","sourceRecordId":"alasconnect-fairbanks-ak","name":"AlasConnect Fairbanks Data Center","operator":"AlasConnect","city":"Fairbanks","county":"Fairbanks North Star Borough","address":"612 Illinois St","state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":64.851425,"longitude":-147.718958,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/alasconnect-fairbanks-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/alasconnect-fairbanks-data-center/","label":"Alasconnect Fairbanks Data Center","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-28"},{"url":"https://alasconnect.com/services/data-center-hosting-services/","label":"Data Center Hosting Services in Alaska","publisher":"AlasConnect","kind":"other","retrievedAt":"2026-09-28"}]},{"id":"compute-alaska-communications-anchorage-ak","sourceRecordId":"alaska-communications-anchorage-ak","name":"Alaska Communications Data Center","operator":"Alaska Communications","city":"Anchorage","county":null,"address":"600 East 36th Ave, Suite 100","state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":61.188009403546,"longitude":-149.87239078076,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/alaska-communications-anchorage-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/alaska-communications-systems-anchorage-data-center/","label":"Alaska Communications Systems - Anchorage Data Center - Cloud and Colocation","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-28"}]},{"id":"compute-deepgreen-cook-inlet-nikiski-ak","sourceRecordId":"deepgreen-cook-inlet-nikiski-ak","name":"Cook Inlet Subsea-Compute & Infrastructure Hub","operator":"DeepGreen Cook Inlet SPV LLC","city":"Nikiski","county":"Kenai Peninsula Borough","address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":60.6903,"longitude":-151.2889,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/deepgreen-cook-inlet-nikiski-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.adn.com/business-economy/2026/08/19/underwater-data-center-proposed-for-alaskas-cook-inlet-by-east-coast-company/","label":"Underwater data center proposed for Alaska's Cook Inlet by East Coast company","publisher":"Anchorage Daily News","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://www.peninsulaclarion.com/2026/09/14/federal-review-advances-for-subsea-data-center-off-nikiski/","label":"Federal review advances for subsea data center off Nikiski","publisher":"Peninsula Clarion","kind":"press","retrievedAt":"2026-09-28"}]},{"id":"compute-usaf-eielson-ai-data-center-eul-ak","sourceRecordId":"usaf-eielson-ai-data-center-eul-ak","name":"Eielson Air Force Base AI Data Center Enhanced Use Lease Site","operator":"U.S. Department of the Air Force (lessor; developer not selected)","city":null,"county":"Fairbanks North Star Borough","address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":64.6657,"longitude":-147.1015,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/usaf-eielson-ai-data-center-eul-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newsminer.com/news/local_news/proposed-air-force-data-center-land-leases-raise-some-concerns/article_98cbed0c-6574-464a-8097-c054c46cb699.html","label":"Proposed Air Force data center land leases raise some concerns","publisher":"Fairbanks Daily News-Miner","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.airandspaceforces.com/usaf-land-ai-data-centers-three-alaska-bases/","label":"USAF Offers Land for AI Data Centers on Three Alaska Bases","publisher":"Air & Space Forces Magazine","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-gci-anchorage-ak","sourceRecordId":"gci-anchorage-ak","name":"GCI Anchorage Data Center","operator":"GCI","city":"Anchorage","county":null,"address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":61.2163129,"longitude":-149.894852,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/gci-anchorage-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.gci.com/business/products/managed-services/data-center-colocation","label":"Data Center & Colocation | GCI Business","publisher":"GCI","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://business.anchoragechamber.org/list/member/gci-1497","label":"GCI | Communications - Anchorage Chamber","publisher":"Anchorage Chamber of Commerce","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-greensparc-cordova-ak","sourceRecordId":"greensparc-cordova-ak","name":"Greensparc Cordova Data Center (Humpback Creek Hydro)","operator":"Greensparc","city":"Cordova","county":"Chugach Census Area","address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":60.6099,"longitude":-145.644,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/greensparc-cordova-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://thecordovatimes.com/2024/04/29/new-data-center-launched-at-cec-hydro-plant-bringing-data-hosting-cloud-service-opportunities-to-community/","label":"New data center launched at CEC hydro plant","publisher":"The Cordova Times","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://www.akbizmag.com/industry/telecom-tech/greensparc-brings-reliable-powerful-computing-infrastructure-to-cordova/","label":"Greensparc Brings Reliable, Powerful Computing Infrastructure to Cordova","publisher":"Alaska Business Magazine","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://cleantechnica.com/2026/03/09/in-alaska-a-data-center-inside-a-power-plant-inside-a-microgrid/","label":"In Alaska, a Data Center Inside a Power Plant, Inside a Microgrid","publisher":"CleanTechnica","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://www.sdxcentral.com/news/greensparc-hpe-take-on-digital-divide-with-edge-data-center/","label":"Greensparc, HPE take on digital divide with edge data center","publisher":"SDxCentral","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-greensparc-petersburg-ak","sourceRecordId":"greensparc-petersburg-ak","name":"Greensparc Petersburg Data Center (former Ocean Beauty cannery)","operator":"Greensparc","city":"Petersburg","county":"Petersburg Borough","address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":56.8125,"longitude":-132.9556,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/greensparc-petersburg-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kfsk.org/2026/05/01/private-developer-plans-small-scale-data-center-project-on-petersburg-waterfront/","label":"Private developer plans small-scale data center project on Petersburg waterfront","publisher":"KFSK","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.petersburgpilot.com/story/2026/04/30/news/small-scale-data-center-proposed-at-former-ocean-beauty-cannery/15750.html","label":"Small-scale data center proposed at former Ocean Beauty cannery","publisher":"Petersburg Pilot","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-greensparc-wrangell-ak","sourceRecordId":"greensparc-wrangell-ak","name":"Greensparc Wrangell Data Center (6-Mile Mill site)","operator":"Greensparc","city":"Wrangell","county":"City and Borough of Wrangell","address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":56.4708,"longitude":-132.3767,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/greensparc-wrangell-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ketchikandailynews.com/news/alaska/data-center-lease-recommended-wrangell-planning-group-votes/article_55efe7dc-592f-4c6a-8606-21dd936f063a.html","label":"Data center lease recommended by Wrangell planning group (Wrangell Sentinel)","publisher":"Ketchikan Daily News / Wrangell Sentinel","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.kstk.org/2026/06/18/wrangell-borough-assembly-votes-no-on-data-center-proposal","label":"Wrangell Borough Assembly votes no on data center proposal","publisher":"KSTK","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-usaf-jber-ai-data-center-eul-anchorage-ak","sourceRecordId":"usaf-jber-ai-data-center-eul-anchorage-ak","name":"Joint Base Elmendorf-Richardson AI Data Center Enhanced Use Lease Site","operator":"U.S. Department of the Air Force (lessor; developer not selected)","city":"Anchorage","county":"Municipality of Anchorage","address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":61.251,"longitude":-149.8065,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/usaf-jber-ai-data-center-eul-anchorage-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.airandspaceforces.com/usaf-land-ai-data-centers-three-alaska-bases/","label":"USAF Offers Land for AI Data Centers on Three Alaska Bases","publisher":"Air & Space Forces Magazine","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.adn.com/alaska-news/military/2026/05/05/the-military-wants-to-host-data-centers-in-alaska-raising-questions-about-whether-theres-enough-gas-to-power-them/","label":"The military wants to host data centers in Alaska, raising questions about whether there's enough gas to power them","publisher":"Anchorage Daily News","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-stak-energy-north-slope-ak","sourceRecordId":"stak-energy-north-slope-ak","name":"Stak Energy North Slope Data Center","operator":"Stak Energy","city":null,"county":"North Slope","address":null,"state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":69.84,"longitude":-148.5,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stak-energy-north-slope-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://alaskapublic.org/news/economy/energy/2026-05-26/alaskas-north-slope-proposed-as-home-for-massive-ai-data-center","label":"Alaska's North Slope Proposed as Home for Massive AI Data Center","publisher":"Alaska Public Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.adn.com/business-economy/2026/05/18/a-huge-data-center-could-rise-on-alaskas-north-slope/","label":"A Huge Data Center Could Rise on Alaska's North Slope","publisher":"Anchorage Daily News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957","label":"STAK Energy Corporation ADL 422741 Preliminary Decision (Director's Decision, May 12, 2026)","publisher":"Alaska Department of Natural Resources, Division of Oil and Gas","kind":"permit","retrievedAt":"2026-09-28"},{"url":"https://www.petroleumnews.com/story/2026/06/28/utilities/data-center-in-play/50228.html","label":"Data center in play","publisher":"Petroleum News","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://northern.org/news/stak-energy-campus-what-the-states-lease-documents-reveal-about-scale-risk-and-unanswered-questions/","label":"STAK Energy Campus: What the State's Lease Documents Reveal About Scale, Risk, and Unanswered Questions","publisher":"Northern Alaska Environmental Center","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-uaf-butrovich-data-center-fairbanks-ak","sourceRecordId":"uaf-butrovich-data-center-fairbanks-ak","name":"UAF Butrovich Data Center","operator":"University of Alaska","city":"Fairbanks","county":"Fairbanks North Star Borough","address":"2025 Yukon Drive","state":"AK","stateName":"Alaska","jurisdictionType":"state","latitude":64.859,"longitude":-147.843,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/uaf-butrovich-data-center-fairbanks-ak","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.alaska.edu/news/it/2024-butrovich-datafacility-upgrades.php","label":"2024 Butrovich Data Center facility upgrades","publisher":"University of Alaska","kind":"other","retrievedAt":"2026-10-18"},{"url":"https://service.alaska.edu/TDClient/39/Portal/Requests/Service/336/Data-Center-Rack-Management","label":"Data Center Rack Management (Butrovich Data Center service description)","publisher":"University of Alaska","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-alabama-supercomputer-center-huntsville-al","sourceRecordId":"alabama-supercomputer-center-huntsville-al","name":"Alabama Supercomputer Center","operator":"Alabama Supercomputer Authority","city":"Huntsville","county":"Madison","address":"686 Discovery Drive NW","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":34.73652,"longitude":-86.6731271,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/alabama-supercomputer-center-huntsville-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://asc.edu/alabama-supercomputer-center","label":"Alabama Supercomputer Center","publisher":"Alabama Supercomputer Authority","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-applied-digital-delta-forge-2-brookwood-al","sourceRecordId":"applied-digital-delta-forge-2-brookwood-al","name":"Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)","operator":"Applied Digital","city":"Brookwood","county":"Tuscaloosa","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.2556719,"longitude":-87.3208336,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/applied-digital-delta-forge-2-brookwood-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2","label":"Applied Digital Signs 210 MW Lease at Delta Forge 2","publisher":"Applied Digital","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/","label":"County Board Unanimously OKs Incentives for $3.2 Billion Applied Digital Data Center in Brookwood","publisher":"Tuscaloosa Thread","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://abc3340.com/newsletter-daily/alabama-32-billion-ai-data-center-campus-announced-in-brookwood-brookwood-mayor-joe-barger-september-2026","label":"$3.2 Billion AI Data Center Campus Announced in Brookwood","publisher":"ABC 33/40","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://birminghamfreepress.com/2026/09/26/tuscaloosa-county-approves-incentives-for-3-2-billion-ai-data-center-near-brookwood/","label":"Tuscaloosa County Approves Incentives for $3.2 Billion AI Data Center Near Brookwood","publisher":"Birmingham Free Press","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://baxtel.com/news/applied-digital-picks-brookwood-alabama-for-3-2bn-210mw-delta-forge-2-campus","label":"Applied Digital picks Brookwood, Alabama for $3.2bn, 210MW Delta Forge 2 campus","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://spectrumlocalnews.com/al/alabama/news/2026/10/02/brookwood-hosts-data-center-town-hall","label":"Brookwood leaders host new hall for proposed data center","publisher":"Spectrum News","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-att-hoover-data-center-al","sourceRecordId":"att-hoover-data-center-al","name":"AT&T Hoover Data Center","operator":"AT&T","city":"Hoover","county":"Jefferson","address":"1876 Data Drive","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.3749483,"longitude":-86.7962283,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/att-hoover-data-center-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/data-center-construction/-60m-in-alabama-data-center-development","label":"$60M in Alabama Data Center Development (June 2, 2008)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.metalconstruction.org/index.php/case-studies/att-data-center","label":"AT&T Data Center in Hoover, AL case study","publisher":"Metal Construction Association","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-beacon-calvert-al","sourceRecordId":"beacon-calvert-al","name":"Calvert Infrastructure Hub","operator":"Beacon Data Centers","city":"Calvert","county":"Mobile","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":31.1551748,"longitude":-88.0099997,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/beacon-calvert-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://beacondatacenters.com/campuses/calvert/","label":"Calvert - Beacon Data Centers (developer's campus page)","publisher":"Beacon Data Centers","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://nominatim.openstreetmap.org/search?q=Calvert%2C+Alabama&format=json&limit=2","label":"Nominatim geocode of Calvert, Alabama — returns both a census place spanning Mobile and Washington counties and a village node (31.1551748, -88.0099997) in Washington County","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://mynbc15.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact","label":"Proposed $6B data center campus in Calvert draws questions over growth, utilities, impact","publisher":"NBC 15 (WPMI)","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact","label":"Proposed $6B data center campus in Calvert draws questions over growth, utilities, impact","publisher":"NBC 15 / UTV44","kind":"press","retrievedAt":"2026-09-28"}]},{"id":"compute-construction-partners-dothan-al","sourceRecordId":"construction-partners-dothan-al","name":"Construction Partners Corporate Headquarters and Data Processing Center","operator":"Construction Partners, Inc.","city":"Dothan","county":"Houston","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":31.2237285,"longitude":-85.3934375,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/construction-partners-dothan-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/","label":"Construction Partners to invest $20 million in new Dothan headquarters","publisher":"Made in Alabama (Alabama Department of Commerce)","kind":"press","retrievedAt":"2026-09-15"}]},{"id":"compute-core-scientific-auburn-al","sourceRecordId":"core-scientific-auburn-al","name":"Core Scientific Auburn Data Center (AUBix)","operator":"Core Scientific","city":"Auburn","county":"Lee","address":"1571 West Samford Avenue","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":32.6089,"longitude":-85.4879,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/core-scientific-auburn-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/107/core-scientific-announces-expansion-into-auburn-alabama-with-new-high-performance-computing-facility","label":"Core Scientific Announces Expansion into Auburn, Alabama with New High-Performance Computing Facility","publisher":"Core Scientific IR (BusinessWire-syndicated)","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://alabamanewscenter.com/2025/02/20/core-scientific-bringing-high-performance-computing-operation-to-auburn-alabama/","label":"Core Scientific bringing high-performance computing operation to Auburn, Alabama","publisher":"Alabama News Center","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://www.datacentermap.com/usa/alabama/auburn/aubix-data-center/","label":"AUBix Data Center in Auburn | 1571 W Samford Ave (3 MW)","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://corescientific.com/high-density-data-centers/auburn-al/","label":"Alabama Data Center | High-Density in Auburn","publisher":"Core Scientific","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.madeinalabama.com/2025/02/core-scientific-bringing-high-performance-computing-operation-to-auburn/","label":"Core Scientific bringing high-performance computing operation to Auburn","publisher":"Made in Alabama (Alabama Dept. of Commerce)","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.wtvm.com/2026/02/25/data-center-expansion-manufacturing-project-expected-bring-hundreds-jobs-lee-county/","label":"Data center expansion and manufacturing project expected to bring hundreds of jobs to Lee County","publisher":"WTVM","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.peeringdb.com/api/fac/12120","label":"PeeringDB facility record 12120 - AUBix Auburn, 1571 W Samford Ave, Auburn AL 36832","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-dc-blox-birmingham-al","sourceRecordId":"dc-blox-birmingham-al","name":"DC BLOX Birmingham Data Center Campus","operator":"DC BLOX","city":"Birmingham","county":"Jefferson","address":"433 6th Street South","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.5006652,"longitude":-86.8208315,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-birmingham-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/data-centers/birmingham/","label":"Birmingham Data Center - Alabama Colocation","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=433+6th+Street+South%2C+Birmingham%2C+AL+35233&format=json&limit=1","label":"Nominatim geocode of 433 6th Street South, Birmingham AL 35233 — returns OSM way 1019816009, building tagged type=data_center, name \"DC Blox Data Center\"","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://www.peeringdb.com/api/fac/7219","label":"PeeringDB facility record 7219 - DC BLOX BHM1, 433 6th St S, Birmingham AL 35233","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-dc-blox-huntsville-al","sourceRecordId":"dc-blox-huntsville-al","name":"DC BLOX Huntsville Data Center","operator":"DC BLOX","city":"Huntsville","county":"Madison","address":"333 Diamond Drive NW","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":34.7104202,"longitude":-86.6921561,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-huntsville-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/data-centers/huntsville/","label":"Huntsville Data Center - Alabama Colocation","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=333+Diamond+Drive+NW%2C+Huntsville%2C+AL+35806&format=json&limit=1","label":"Nominatim geocode of 333 Diamond Drive NW, Huntsville AL 35806 (Madison County)","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://www.peeringdb.com/api/fac/7218","label":"PeeringDB facility record 7218 - DC BLOX HSV1, 333 Diamond Drive NW, Huntsville AL 35806","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-dc-blox-montgomery-al","sourceRecordId":"dc-blox-montgomery-al","name":"DC BLOX Montgomery Data Center","operator":"DC BLOX","city":"Montgomery","county":"Montgomery","address":"7610 Bill Joseph Pkwy","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":32.2641207,"longitude":-86.3728761,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-montgomery-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.montgomerychamber.com/blog/press-releases-3604/post/dc-blox-announces-30m-investment-in-new-montgomery-data-center-40072","label":"DC BLOX announces $30M investment in new Montgomery data center","publisher":"Montgomery Regional Chamber of Commerce","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.madeinalabama.com/2024/11/dc-blox-plans-new-advanced-data-centers-in-montgomery-and-huntsville/","label":"DC BLOX plans new advanced data centers in Montgomery and Huntsville","publisher":"Made in Alabama (Alabama Department of Commerce)","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.dcblox.com/data-center-map/","label":"DC BLOX Data Center Locations in Southeastern US (operator location map)","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://www.dcblox.com/wp-content/uploads/2025/01/2025-DC-BLOX-Hyperscale-Data-Center-Campuses.pdf","label":"DC BLOX Southeastern Hyperscale-Ready Digital Infrastructure campus brochure (Montgomery MGM1, 7610 Bill Joseph Pkwy)","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://www.wsfa.com/2024/11/27/new-data-center-coming-montgomery/","label":"New data center coming to Montgomery","publisher":"WSFA","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://nominatim.openstreetmap.org/search?q=Bill+Joseph+Parkway+Montgomery+Alabama&format=json&limit=3","label":"Nominatim geocode of Bill Joseph Parkway, Montgomery AL 36043","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-10-30"}]},{"id":"compute-digi-power-x-columbiana-al","sourceRecordId":"digi-power-x-columbiana-al","name":"Digi Power X Columbiana AI Data Center","operator":"Digi Power X","city":"Columbiana","county":"Shelby","address":"130 Industrial Parkway","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.1810918,"longitude":-86.622753,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digi-power-x-columbiana-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.shelbycountyreporter.com/news/columbiana-data-center-signs-1b-agreement-future-plans-revealed-f520ff1b/","label":"Columbiana data center signs $1B agreement, future plans revealed (29 May 2026)","publisher":"Shelby County Reporter","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://nominatim.openstreetmap.org/search?q=130+Industrial+Parkway%2C+Columbiana%2C+AL+35051&format=json&limit=2","label":"Nominatim geocode of 130 Industrial Parkway, Columbiana AL 35051 (Shelby County) — resolves to OSM way 471834867, landuse=industrial \"Industrial Parkway\"","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://www.sec.gov/Archives/edgar/data/1854368/000121390026053566/ea028958501ex99-1.htm","label":"Digi Power X Inc. 8-K Exhibit 99.1 — AI colocation agreement for a 40 MW Columbiana, Alabama data center","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-09-22"},{"url":"https://finance.yahoo.com/technology/ai/articles/digi-power-x-announces-200-113000058.html","label":"Digi Power X Announces $200 Million Debt Financing Commitment to Support Completion of Alabama AI Data Center (Oct 13, 2026)","publisher":"Yahoo Finance (company release)","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://bhamnow.com/2026/06/29/data-center-columbiana-building-permits/","label":"Data center project in Columbiana among new $1M+ building permits","publisher":"Bham Now","kind":"permit","retrievedAt":"2026-10-18"},{"url":"https://www.wbrc.com/2026/07/24/columbiana-receive-35m-data-center-deal-heres-how-it-could-change-your-neighborhood/","label":"Columbiana to receive $3.5M from data center deal","publisher":"WBRC","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-edged-gateway-prichard-al","sourceRecordId":"edged-gateway-prichard-al","name":"Edged Prichard Data Center (Project Gateway)","operator":"Edged US","city":"Prichard","county":"Mobile","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":30.7387998,"longitude":-88.0788889,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edged-gateway-prichard-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://projectgatewayal.com/","label":"Project Gateway | Sustainable Data Center Development in Prichard, AL (developer's project site)","publisher":"Edged US","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.fox10tv.com/2026/06/01/proposed-data-center-prichard-draws-mixed-reactions/","label":"Proposed data center in Prichard draws mixed reactions (1 June 2026)","publisher":"FOX10 News (WALA)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://nominatim.openstreetmap.org/search?q=Prichard%2C+Mobile+County%2C+Alabama&format=json&limit=1","label":"Nominatim geocode of Prichard, Mobile County, Alabama (municipal centroid)","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://www.wkrg.com/news/93m-proposed-data-center-to-bring-20-jobs-to-prichard/amp/","label":"$93M proposed data center to bring 20 jobs to Prichard","publisher":"WKRG","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-bcbs-alabama-pope-technology-center-birmingham-al","sourceRecordId":"bcbs-alabama-pope-technology-center-birmingham-al","name":"G. Phillip Pope Technology Center (Blue Cross and Blue Shield of Alabama Data Center)","operator":"Blue Cross and Blue Shield of Alabama","city":"Birmingham","county":"Jefferson","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.4084384,"longitude":-86.9094153,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bcbs-alabama-pope-technology-center-birmingham-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenterknowledge.com/business/another-data-center-for-birmingham-alabama","label":"Another Data Center for Birmingham, Alabama (June 16, 2008)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://uptimeinstitute.com/uptime-institute-awards/datacenter/g-phillip-pope-technology-center/261","label":"Uptime Institute Awards: G. Phillip Pope Technology Center","publisher":"Uptime Institute","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-google-jackson-county-stevenson-al","sourceRecordId":"google-jackson-county-stevenson-al","name":"Google Jackson County Campus","operator":"Google","city":"Stevenson","county":"Jackson","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":34.8842,"longitude":-85.755,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-jackson-county-stevenson-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/","label":"Google Blog: Alabama Investment - Jackson County Campus Expansion (June 2026)","publisher":"Google","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.datacenterdynamics.com/en/news/google-to-spend-15bn-expanding-its-data-center-campus-in-jackson-county-alabama/","label":"Google to spend $1.5bn expanding Jackson County campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.alreporter.com/2026/06/16/google-plans-1-5-billion-jackson-county-data-center-expansion/","label":"Google plans $1.5B Jackson County data center expansion","publisher":"Alabama Reporter","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://9to5google.com/2026/06/15/google-announces-one-point-five-billion-dollar-data-center-expansion/","label":"Google announces $1.5B Alabama data center expansion","publisher":"9to5Google","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://en.wikipedia.org/wiki/Widows_Creek_Fossil_Plant","label":"Widows Creek Fossil Plant - coordinates and site history","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://yellowhammernews.com/googles-jackson-county-expansion-shows-how-data-centers-can-work-for-alabama/","label":"Google's Jackson County expansion shows how data centers can work for Alabama","publisher":"Yellowhammer News","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://huntsvillebusinessjournal.com/news/2026/09/23/are-more-data-centers-coming-to-north-alabama-what-local-leaders-are-saying/","label":"Are More Data Centers Coming To North Alabama? What Local Leaders Are Saying","publisher":"Huntsville Business Journal","kind":"press","retrievedAt":"2026-09-28"}]},{"id":"compute-meta-huntsville-al","sourceRecordId":"meta-huntsville-al","name":"Meta Huntsville Data Center Campus","operator":"Meta","city":"Huntsville","county":"Madison","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":34.726,"longitude":-86.647,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-huntsville-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/metas-huntsville-alabama-data-center-expansion-next-to-be-stopped-amid-ai-pivot/","label":"Meta's Huntsville, Alabama, data center expansion next to be stopped amid AI pivot","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://baxtel.com/data-center/meta-huntsville-campus","label":"Meta Huntsville Campus Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://whnt.com/news/huntsville/facebook-parent-company-meta-invests-1-5-billion-in-huntsville-data-center/","label":"Facebook parent company Meta invests $1.5 billion in Huntsville Data Center","publisher":"WHNT","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/","label":"Meta Huntsville Data Center info sheet (PDF)","publisher":"Meta Data Centers","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://huntsvillebusinessjournal.com/news/2026/09/23/are-more-data-centers-coming-to-north-alabama-what-local-leaders-are-saying/","label":"Are More Data Centers Coming To North Alabama? What Local Leaders Are Saying","publisher":"Huntsville Business Journal","kind":"press","retrievedAt":"2026-09-28"}]},{"id":"compute-meta-montgomery-al","sourceRecordId":"meta-montgomery-al","name":"Meta Montgomery Data Center","operator":"Meta","city":"Montgomery","county":"Montgomery","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":32.185,"longitude":-86.273,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-montgomery-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://governor.alabama.gov/newsroom/2024/05/governor-ivey-announces-meta-plans-to-build-800-million-next-generation-data-center-in-montgomery/","label":"Governor Ivey Announces Meta Plans to Build $800 Million Data Center in Montgomery","publisher":"Office of the Governor, Alabama","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.alreporter.com/2025/09/24/meta-to-expand-montgomery-data-center-upping-local-investments-to-1-5-billion/","label":"Meta to expand Montgomery data center, upping local investments to $1.5 billion","publisher":"Alabama Reporter","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://datacenters.atmeta.com/2025/09/montgomery-were-growing/","label":"Montgomery, we're growing!","publisher":"Meta Data Centers","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-mill-creek-data-center-auburn-al","sourceRecordId":"mill-creek-data-center-auburn-al","name":"Mill Creek Data Center","operator":"Undisclosed end user (applicant: LBYD, Inc.)","city":"Auburn","county":"Lee","address":"406 West Veterans Boulevard","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":32.5582505,"longitude":-85.5192388,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mill-creek-data-center-auburn-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/authorization-of-a-new-data-facility-in-auburn-alabama","label":"Authorization of a New Data Facility in Auburn, Alabama","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-nebius-bhm01-birmingham-al","sourceRecordId":"nebius-bhm01-birmingham-al","name":"Nebius Birmingham AI Factory (BHM01)","operator":"Nebius Group","city":"Birmingham","county":"Jefferson","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.4556,"longitude":-86.8131,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nebius-bhm01-birmingham-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nebius.com/birminghamal","label":"Nebius x Birmingham, Alabama - Official Project Page","publisher":"Nebius Group","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/nebius-targets-data-center-development-in-birmingham-alabama/","label":"Nebius targets data center development in Birmingham, Alabama","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://northwiseproject.com/nbis-alabama-data-center/","label":"NBIS Alabama Data Center: Inside the Birmingham AI Factory","publisher":"Northwise Project","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://yellowhammernews.com/permit-filed-for-multibillion-dollar-75-acre-data-center-in-birmingham/","label":"Permit filed for multibillion-dollar, 75-acre data center in Birmingham","publisher":"Yellowhammer News","kind":"permit","retrievedAt":"2026-09-09"},{"url":"https://birminghamwatch.org/2026/06/29/new-lawsuit-against-nebius-data-center-challenges-validity-of-regs-and-decisions/","label":"New Lawsuit Against Nebius Data Center Challenges Validity of Regs and Decisions","publisher":"Birmingham Watch","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/nebius-birmingham-alabama","label":"Nebius Birmingham, Alabama - Baxtel (Site Code BHM01)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://birminghamwatch.org/2026/04/24/battle-against-oxmoor-valley-data-center-fizzles-but-residents-left-with-concerns/","label":"Battle Against Oxmoor Valley Data Center Fizzles but Residents Left With Concerns","publisher":"BirminghamWatch","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://www.govtech.com/artificial-intelligence/birmingham-ala-resident-sues-over-data-center-tax-abatements","label":"Birmingham, Ala., Resident Sues Over Data Center Tax Abatements","publisher":"GovTech","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://bhamnow.com/2026/05/18/40-million-permits-birmingham-data-center/","label":"$40 million in permits issued for new Birmingham data center","publisher":"Bham Now","kind":"permit","retrievedAt":"2026-09-28"}]},{"id":"compute-patmos-fairfield-al","sourceRecordId":"patmos-fairfield-al","name":"Patmos Fairfield Colocation Data Center","operator":"Patmos","city":"Fairfield","county":"Jefferson","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.4916836,"longitude":-86.9150283,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/patmos-fairfield-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/","label":"Hundreds pack Fairfield town hall over proposed data center inside former Walmart (13 Aug 2026)","publisher":"WBRC FOX6 News","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://nominatim.openstreetmap.org/search?q=Fairfield%2C+Jefferson+County%2C+Alabama&format=json&limit=1","label":"Nominatim geocode of Fairfield, Jefferson County, Alabama (municipal centroid)","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://www.wbhm.org/local-news/2026-08-14/new-data-center-plans-to-move-quickly-in-fairfield-residents-have-questions","label":"New data center plans to move quickly in Fairfield. Residents have questions","publisher":"WBHM","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://baxtel.com/data-center/patmos-fairfield-al","label":"Patmos: Fairfield, AL","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-youngwoo-project-brookwood-al","sourceRecordId":"youngwoo-project-brookwood-al","name":"Project Brookwood Data Center Campus","operator":"Youngwoo & Associates","city":"Brookwood","county":"Tuscaloosa","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.2112238,"longitude":-87.2715693,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/youngwoo-project-brookwood-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tuscaloosathread.com/second-brookwood-data-center/","label":"Meeting Confirms Plans for Second Major Brookwood Data Center","publisher":"Tuscaloosa Thread","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.wbrc.com/2026/09/16/brookwood-council-approves-rezoning-annexation-project-brookwood-llc/","label":"Brookwood council approves rezoning, annexation for 'Project Brookwood, LLC'","publisher":"WBRC","kind":"press","retrievedAt":"2026-09-22"}]},{"id":"compute-cloverleaf-red-clay-lowndes-al","sourceRecordId":"cloverleaf-red-clay-lowndes-al","name":"Project Red Clay","operator":"Cloverleaf Infrastructure","city":null,"county":"Lowndes","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":32.2700221,"longitude":-86.5128035,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-red-clay-lowndes-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://redclaydatacenter.com/","label":"Home - Project Red Clay (developer's project site)","publisher":"Cloverleaf Infrastructure","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.wsfa.com/2026/06/04/cloverleaf-responds-lowndes-county-data-center-concerns-after-weeks-resident-pushback/","label":"Cloverleaf responds to Lowndes County data center concerns after weeks of resident pushback (4 June 2026)","publisher":"WSFA 12 News","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.route-fifty.com/artificial-intelligence/2026/08/lowndes-county-residents-demand-transparency-hyperscale-data-center-development/415617/","label":"Lowndes County residents demand transparency in hyperscale data center development (25 Aug 2026)","publisher":"Route Fifty","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://yellowhammernews.com/mystery-data-center-could-receive-30-year-tax-break-beside-sacred-selma-march-ground/","label":"Mystery data center could receive 30-year tax break beside sacred Selma march ground","publisher":"Yellowhammer News","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://overpass-api.de/api/interpreter","label":"Overpass API query confirming the U.S. 80 / Alabama 21 junction in Lowndes County at 32.2700221, -86.5128035 (OSM ways 7795301 \"AL 21\", 107723832 \"US 80;AL 21\", 990934473 \"US 80\")","publisher":"OpenStreetMap / Overpass API","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://www.wbhm.org/local-news/2026-08-22/proposed-data-centers-could-use-more-electricity-than-all-alabama-homes-combined-who-will-pay","label":"Proposed data centers could use more electricity than all Alabama homes combined. Who will pay?","publisher":"WBHM 90.3","kind":"press","retrievedAt":"2026-09-28"},{"url":"https://insideclimatenews.org/news/19082026/alabama-power-proposed-data-centers-utility-bills/","label":"Proposed Data Centers Could Use More Electricity Than All Alabama Homes Combined, Analysis Shows. Who Will Pay?","publisher":"Inside Climate News","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://govtech.com/artificial-intelligence/lowndes-county-ala-approves-1-1b-in-data-center-tax-breaks","label":"Lowndes County, Ala., approves $1.1B in data center tax breaks","publisher":"GovTech (via AL.com)","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-qts-marvel-bessemer-al","sourceRecordId":"qts-marvel-bessemer-al","name":"QTS Bessemer (Project Marvel)","operator":"QTS Data Centers","city":"Bessemer","county":"Jefferson","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.44,"longitude":-86.97,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wbrc.com/2026/07/02/qts-confirms-plans-proposed-data-center-campus-bessemer/","label":"QTS confirms plans for proposed data center campus in Bessemer","publisher":"WBRC Fox6","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://constructionreviewonline.com/purported-developer-of-14bn-project-marvel-data-center-in-bessemer-alabama-unveiled-as-qts/","label":"Purported Developer of $14bn Project Marvel Data Center in Bessemer Unveiled as QTS","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.wbrc.com/2025/11/19/bessemer-city-council-approves-149-billion-data-center-project-despite-transparency-concerns/","label":"Bessemer City Council approves data center project despite transparency concerns (November 2025)","publisher":"WBRC Fox6","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://abc3340.com/news/local/alabama-bessemer-approves-rezoning-of-914-acres-for-project-marvel-data-center-april-2026","label":"Bessemer approves rezoning of 914 acres for Project Marvel data center","publisher":"ABC 3340","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/alabamas-planned-14bn-project-marvel-data-center-could-double-in-size/","label":"Alabama's planned $14bn Project Marvel data center could double in size","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://abc3340.com/news/local/qts-data-centers-behind-bessemer-project-marvel-plans","label":"QTS Data Centers behind Bessemer Project Marvel plans","publisher":"ABC 3340","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://tuscaloosathread.com/bessemer-data-center-concerns/","label":"How Will Project Marvel Affect Bessemer And Surrounding Areas?","publisher":"Tuscaloosa Thread","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://communitysentinel.media/2026/02/18/bessemer-residents-are-speaking-out-against-ai-data-center-development/","label":"Bessemer Residents Are Speaking Out Against AI Data Center Development","publisher":"Community Sentinel","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-rsa-dexter-avenue-montgomery-al","sourceRecordId":"rsa-dexter-avenue-montgomery-al","name":"RSA Dexter Avenue Datacenter","operator":"The Retirement Systems of Alabama","city":"Montgomery","county":"Montgomery","address":"445 Dexter Avenue","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":32.37803,"longitude":-86.303007,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rsa-dexter-avenue-montgomery-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/","label":"RSA Dexter Avenue Datacenter","publisher":"The Retirement Systems of Alabama","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://www.peeringdb.com/api/fac/2313","label":"PeeringDB facility record 2313 - RSA Dexter Avenue Datacenter","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-scipio-technologies-huntsville-al","sourceRecordId":"scipio-technologies-huntsville-al","name":"Scipio Technologies Huntsville Data Center","operator":"Scipio Technologies","city":"Huntsville","county":"Madison","address":"2104 West Ferry Way","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":34.699841,"longitude":-86.593493,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/scipio-technologies-huntsville-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/14178","label":"PeeringDB facility record 14178 - Peace Communications HSV1, 2104 West Ferry Way, Huntsville AL","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://scipiotech.com/location/","label":"Scipio Technologies - Locations","publisher":"Scipio Technologies","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-simple-helix-huntsville-al","sourceRecordId":"simple-helix-huntsville-al","name":"Simple Helix Data Center","operator":"Simple Helix, LLC","city":"Huntsville","county":"Madison","address":"165 W Park Loop NW","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":34.744816340398,"longitude":-86.691765682048,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/simple-helix-huntsville-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://prnewswire.com/news-releases/simple-helix-announces-opening-of-new-tier-iii-data-center-in-huntsville-alabama-300488165.html","label":"Simple Helix Announces Opening of New Tier III Data Center in Huntsville, Alabama","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/api/fac/5648","label":"PeeringDB facility record 5648 - Simple Helix, 165 West Park Loop, Huntsville AL 35806","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-swift-willow-westover-al","sourceRecordId":"swift-willow-westover-al","name":"Swift Willow Westover Data Center Campus","operator":"Swift Willow Property, LLC","city":"Westover","county":"Shelby","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.3596201,"longitude":-86.5102435,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/swift-willow-westover-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://abc3340.com/news/abc-3340-news-iteam/how-did-westovers-proposed-data-center-get-here-records-show-the-timeline","label":"How did Westover's proposed data center get here? Records show the timeline","publisher":"ABC 33/40","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.wbrc.com/2026/08/21/westover-residents-hear-developers-during-data-center-town-hall/","label":"Westover residents hear from developers during data center town hall","publisher":"WBRC","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/","label":"Westover approves 6-month moratorium on data centers","publisher":"WBRC","kind":"press","retrievedAt":"2026-09-22"}]},{"id":"compute-tallassee-mill-data-center-al","sourceRecordId":"tallassee-mill-data-center-al","name":"Tallassee 1852 Mill Data Center Proposal","operator":"Undisclosed private developers","city":"Tallassee","county":"Elmore","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":32.5333016,"longitude":-85.8901615,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tallassee-mill-data-center-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wsfa.com/2026/04/29/historic-tallassee-mill-could-become-data-center-residents-urge-caution/","label":"Historic Tallassee mill could become data center; residents urge caution","publisher":"WSFA","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.wsfa.com/2026/05/18/tallassee-pulls-plug-data-center-plan-now/","label":"Tallassee pulls plug on data center plan for now","publisher":"WSFA","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://tallasseetimes.com/2026/04/30/wiginton-elaborates-on-mill-property-data-center/","label":"Wiginton Elaborates on Mill Property, Data Center","publisher":"Tallassee Times","kind":"press","retrievedAt":"2026-09-15"}]},{"id":"compute-university-of-alabama-hpc-tuscaloosa-al","sourceRecordId":"university-of-alabama-hpc-tuscaloosa-al","name":"University of Alabama High Performance Computing and Data Center","operator":"University of Alabama","city":"Tuscaloosa","county":"Tuscaloosa","address":"709 Johnny Stallings Drive","state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.2120822,"longitude":-87.5396735,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/university-of-alabama-hpc-tuscaloosa-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://news.ua.edu/2024/11/stage-iv-approval-for-high-performance-computing-center/","label":"High Performance Computing and Data Center Construction Ready to Begin","publisher":"University of Alabama News","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://nominatim.openstreetmap.org/search?q=University+of+Alabama%2C+Tuscaloosa%2C+Alabama&format=json&limit=1","label":"Nominatim geocode of the University of Alabama campus, Tuscaloosa","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-09"},{"url":"https://buildingbama.ua.edu/projects/high-performance-computing-and-data-center/","label":"High Performance Computing and Data Center - Building Bama project page","publisher":"The University of Alabama","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://hpc.ua.edu/about/","label":"About — High Performance Computing and Data Center, The University of Alabama","publisher":"The University of Alabama","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-us-space-command-c2f-redstone-arsenal-al","sourceRecordId":"us-space-command-c2f-redstone-arsenal-al","name":"USSPACECOM Command and Control Facility Secure Data Center (Redstone Arsenal)","operator":"U.S. Space Command","city":"Huntsville","county":"Madison","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":34.6297568,"longitude":-86.6535802,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/us-space-command-c2f-redstone-arsenal-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://app.govly.com/public/opportunities/16287452","label":"Industry Day for USSPACECOM HQ Command and Control Facility Construction and Project Management (SAM notice c09f90fb48d4435086078b67affa24bf)","publisher":"Govly (SAM.gov mirror)","kind":"filing","retrievedAt":"2026-10-18"},{"url":"https://www.irecruit.co/insights/dod-seeks-partner-for-alabama-facility-data-center","label":"DoD seeks partner for Alabama facility and data center","publisher":"iRecruit (citing DatacenterDynamics)","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-western-hospitality-childersburg-al","sourceRecordId":"western-hospitality-childersburg-al","name":"Western Hospitality Childersburg Campus","operator":"Western Hospitality Partners","city":"Childersburg","county":"Talladega","address":null,"state":"AL","stateName":"Alabama","jurisdictionType":"state","latitude":33.2781686,"longitude":-86.3549774,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/western-hospitality-childersburg-al","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/western-hospitality-childersburg-campus","label":"Western Hospitality: Childersburg Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-avaio-digital-leo-little-rock-ar","sourceRecordId":"avaio-digital-leo-little-rock-ar","name":"AVAIO Digital Leo Campus","operator":"AVAIO Digital Partners","city":null,"county":"Pulaski","address":"145th Street","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":34.68,"longitude":-92.296,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/avaio-digital-leo-little-rock-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkansasedc.com/news-events/newsroom/detail/2026/01/12/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock--arkansas","label":"AVAIO Digital Announces New Large-Scale AI-Ready Data Center and Power Campus in Little Rock, Arkansas","publisher":"Arkansas Economic Development Commission","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.prnewswire.com/news-releases/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock-arkansas-302658354.html","label":"AVAIO Digital Announces New Large-Scale AI-Ready Data Center and Power Campus in Little Rock, Arkansas","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.ualrpublicradio.org/local-regional-news/2026-05-27/arkansas-most-populous-county-approves-data-center-moratorium-but-with-exemption","label":"Arkansas's most populous county approves data-center moratorium, but with an AVAIO exemption","publisher":"UALR Public Radio","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arkansasonline.com/news/2026/sep/09/entergy-re-submits-avaio-power-agreement-to/","label":"Entergy re-submits AVAIO power agreement to Arkansas Public Service Commission","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://arktimes.com/arkansas-blog/2026/08/28/giga-what-avaio-comes-clean-about-big-plans-in-wrightsville","label":"Giga-what?! AVAIO comes clean about big plans in Wrightsville","publisher":"Arkansas Times","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.avaiodigital.com/developments/little-rock-arkansas","label":"Little Rock, Arkansas Campus — AVAIO Digital development page","publisher":"AVAIO Digital Partners","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.enr.com/articles/62325-26b-in-datacenter-builds-move-forward-in-arkansas-mississippi","label":"$26B in Data-Center Builds Move Forward in Arkansas, Mississippi","publisher":"Engineering News-Record","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://arktimes.com/arkansas-blog/2026/07/14/avaio-finally-faced-the-wrightsville-community-over-its-6-billion-data-center-pizza-couldnt-quell-the-anger","label":"AVAIO finally faced the Wrightsville community over its $6 billion data center","publisher":"Arkansas Times","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-bentaus-chadbourn-miller-county-ar","sourceRecordId":"bentaus-chadbourn-miller-county-ar","name":"Bentaus Texarkana AI Data Center (Chadbourne Ranch site)","operator":"Bentaus","city":null,"county":"Miller","address":null,"state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":33.4817907,"longitude":-93.9640754,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bentaus-chadbourn-miller-county-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.texarkanagazette.com/news/2026/aug/15/public-records-reveal-site-of-planned-ai-data/","label":"Public records reveal site of planned AI data center north of Texarkana, Arkansas","publisher":"Texarkana Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/","label":"Records reveal planned data center site in Miller County north of Texarkana","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.thefan1079.com/news/local-news/200-megawatt-ai-data-center-planned-north-of-texarkana/","label":"200-Megawatt AI Data Center Planned North of Texarkana","publisher":"KCMC-AM","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Mandeville%2C+Miller+County%2C+Arkansas&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: Mandeville, Miller County, Arkansas","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-forgelight-ventures-conway-ar","sourceRecordId":"forgelight-ventures-conway-ar","name":"ForgeLight Ventures Conway Data Center","operator":"ForgeLight Ventures, LLC","city":"Conway","county":"Faulkner","address":"Lollie Road","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":35.0196304,"longitude":-92.5572891,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/forgelight-ventures-conway-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ualrpublicradio.org/local-regional-news/2026-05-13/conway-residents-comment-on-possible-data-center","label":"Conway residents comment on possible data center","publisher":"UA Little Rock Public Radio","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://conwaydatacenter.com/","label":"Conway Data Center Public Information","publisher":"Conway Data Center (community group)","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Conway+Municipal+Airport%2C+Faulkner+County%2C+Arkansas&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: Conway Municipal Airport at Cantrell Field, Lollie Road, Conway, Faulkner County, Arkansas","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"},{"url":"https://armoneyandpolitics.com/conway-1-billion-data-center-fortune-100/","label":"Conway to Welcome New $1 Billion Data Center for Fortune 100 Company","publisher":"Arkansas Money & Politics","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-google-west-memphis-ar","sourceRecordId":"google-west-memphis-ar","name":"Google West Memphis Data Center Campus","operator":"Google","city":"West Memphis","county":"Crittenden","address":null,"state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":35.156,"longitude":-90.175,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-west-memphis-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment","label":"Google Locating New Data Center in West Memphis, Arkansas with Multi-Billion Dollar Investment","publisher":"Arkansas Economic Development Commission","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://arkansasadvocate.com/2025/10/02/google-state-and-local-officials-mark-start-of-4-billion-ai-data-center-in-west-memphis/","label":"Google, state and local officials mark start of $4 billion AI data center in West Memphis","publisher":"Arkansas Advocate","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/","label":"Google's contribution was at issue in Arkansas regulators' review of Entergy contract","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.energy-storage.news/arkansas-utility-seeks-approval-of-1-4gwh-hybrid-bess-with-financial-support-from-google-as-part-of-data-centre-deal/","label":"Arkansas utility seeks approval of 1.4GWh hybrid BESS, with financial support from Google as part of data centre deal","publisher":"Energy-Storage.news","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.arkansasonline.com/news/2026/sep/15/lawmakers-discuss-the-data-center-industry-in/","label":"Lawmakers discuss the data center industry in Arkansas","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-09-29"}]},{"id":"compute-mainstream-technologies-little-rock-data-center-ar","sourceRecordId":"mainstream-technologies-little-rock-data-center-ar","name":"Mainstream Technologies Little Rock Data Center","operator":"Mainstream Technologies","city":"Little Rock","county":"Pulaski","address":"325 West Capitol Ave., Suite 200","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":34.7445,"longitude":-92.274234,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mainstream-technologies-little-rock-data-center-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mainstream-tech.com/data-center-services/","label":"Mainstream Technologies data center services","publisher":"Mainstream Technologies","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://www.openstreetmap.org/way/837008389","label":"OpenStreetMap: 325 West Capitol Avenue, Little Rock","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-29"}]},{"id":"compute-ozarksgo-fayetteville-data-center-ar","sourceRecordId":"ozarksgo-fayetteville-data-center-ar","name":"OzarksGo Fayetteville Data Center","operator":"OzarksGo, LLC","city":"Fayetteville","county":"Washington","address":"3641 Wedington Drive","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":36.077952,"longitude":-94.212464,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ozarksgo-fayetteville-data-center-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ozarksgo.net/colocation","label":"OzarksGo colocation","publisher":"OzarksGo","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://www.peeringdb.com/fac/5522","label":"PeeringDB facility: OzarksGo Fayetteville","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-29"}]},{"id":"compute-paradox-data-union-county-campus-el-dorado-ar","sourceRecordId":"paradox-data-union-county-campus-el-dorado-ar","name":"Paradox Data Union County Campus","operator":"Paradox Data LLC (definitive agreement for acquisition by Z Squared Inc.)","city":"El Dorado","county":"Union","address":"713 Industrial Road","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":33.207042,"longitude":-92.6137253,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/paradox-data-union-county-campus-el-dorado-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkansasonline.com/news/2026/jun/25/florida-based-firm-details-plans-for-el-dorado/","label":"Florida-based firm details plans for El Dorado data center","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://finviz.com/news/375817/z-squared-inc-signs-definitive-agreement-to-acquire-100-of-paradox-data-and-its-union-county-campus","label":"Z Squared Inc. Signs Definitive Agreement to Acquire 100% of Paradox Data and Its Union County Campus","publisher":"Finviz (company press release)","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-google-port-of-little-rock-data-center-ar","sourceRecordId":"google-port-of-little-rock-data-center-ar","name":"Port of Little Rock Data Center","operator":"Google","city":"Little Rock","county":"Pulaski","address":"Zueber Road","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":34.746,"longitude":-92.29,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-port-of-little-rock-data-center-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkansasbusiness.com/article/google-little-rock-port-data-center/","label":"Google's $1B Port of Little Rock data center","publisher":"Arkansas Business","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arkansasonline.com/news/2026/mar/31/googles-1b-port-of-little-rock-data-center/","label":"Google's $1B Port of Little Rock data center","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.nwaonline.com/news/2026/mar/31/googles-1b-port-of-little-rock-data-center/","label":"Google's $1B Port of Little Rock data center buildings to cover 1.43 million square feet","publisher":"Northwest Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.littlerockdatacenter.com/","label":"Little Rock Data Center (Google project information site)","publisher":"Google","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-dc-devco-project-pulse-gum-springs-ar","sourceRecordId":"dc-devco-project-pulse-gum-springs-ar","name":"Project Pulse Data Center Campus, Southwest Arkansas Mega Site (terminated)","operator":"DC Devco LLC","city":"Gum Springs","county":"Clark","address":null,"state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":34.0642476,"longitude":-93.0957833,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-devco-project-pulse-gum-springs-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://arkadelphian.com/2026/04/16/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/","label":"Data center eyes Clark County, set to buy mega site in $11M deal","publisher":"The Arkadelphian","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://arkadelphian.com/2026/04/30/project-pulse-topic-of-special-edccc-meeting-friday-morning/","label":"Project Pulse flatlines: Agreement terminated after buyer fails to make deposit by deadline","publisher":"The Arkadelphian","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.arkansasonline.com/news/2026/may/03/the-data-centers/","label":"The data centers","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Gum+Springs%2C+Clark+County%2C+Arkansas&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: Gum Springs, Clark County, Arkansas","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-ritter-communications-data-technology-center-jonesboro-ar","sourceRecordId":"ritter-communications-data-technology-center-jonesboro-ar","name":"Ritter Communications Data Technology Center","operator":"Ritter Communications","city":"Jonesboro","county":"Craighead","address":null,"state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":35.81538,"longitude":-90.6893576,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ritter-communications-data-technology-center-jonesboro-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.rittercommunications.com/newsroom/data-technology-center-opens","label":"Ritter Communications Opens Its $8M Data Center","publisher":"Ritter Communications","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.rittercommunications.com/newsroom/ritter-communications-breaks-ground-on-8-million-data-technology-center-in-jonesboro","label":"Ritter Communications Breaks Ground on $8 Million Data Technology Center in Jonesboro","publisher":"Ritter Communications","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=2400+Ritter+Drive%2C+Jonesboro%2C+Arkansas&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: 2400 Ritter Drive, Jonesboro, Craighead County, Arkansas (RightFiber)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-serverfarm-clarksville-ar","sourceRecordId":"serverfarm-clarksville-ar","name":"Serverfarm ARK Clarksville Data Center Campus","operator":"Serverfarm","city":"Clarksville","county":"Johnson","address":null,"state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":35.4673307,"longitude":-93.4405664,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/serverfarm-clarksville-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkansasonline.com/news/2026/aug/12/clarksvilles-data-center-plan-includes-40-natural/","label":"Clarksville's data center plan includes 40 natural gas turbines","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.serverfarmllc.com/arkansas/","label":"ARK - Clarksville Arkansas Data Center Campus","publisher":"Serverfarm","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://www.arkansasonline.com/news/2025/nov/25/data-center-builder-preparing-1-billion-project/","label":"Data center builder preparing $1 billion project in Clarksville","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://arkadelphian.com/2026/07/20/arkansas-advocate-mixed-opinions-limited-information-about-6-6-billion-data-center-in-arkansas-river-valley/","label":"Mixed opinions, limited information about $6.6 billion data center in Arkansas River Valley (Arkansas Advocate reprint)","publisher":"The Arkadelphian / Arkansas Advocate","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Palmer+Road%2C+Clarksville%2C+Johnson+County%2C+Arkansas&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: Palmer Road, Clarksville, Johnson County, Arkansas","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"},{"url":"https://www.arkansasonline.com/news/2026/oct/08/clarksville-data-centers-gas-turbines-ok-arkansas/","label":"Clarksville data center's planned 40 gas turbines OK'd by Arkansas Division of Environmental Quality","publisher":"Arkansas Democrat-Gazette","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-clean-cloud-energy-sheridan-data-center-grant-county-ar","sourceRecordId":"clean-cloud-energy-sheridan-data-center-grant-county-ar","name":"Sheridan Data Center (Clean Cloud Energy, Grant County)","operator":"Clean Cloud Energy (Sheridan Data Center LLC)","city":"Sheridan","county":"Grant","address":null,"state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":34.3100971,"longitude":-92.4013484,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/clean-cloud-energy-sheridan-data-center-grant-county-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://arktimes.com/arkansas-blog/2026/07/21/worldwide-company-has-eye-on-data-center-plan-for-grant-county","label":"Worldwide company has eye on data center plan for Grant County","publisher":"Arkansas Times","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://mahometdaily.com/same-developer-same-playbook-clean-clouds-track-record-in-three-states/","label":"Same developer, same playbook? Clean Cloud's track record in three states","publisher":"Mahomet Daily","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://www.southarkansasreckoning.com/grant-county-data-center-opponents-to-protest-monday/","label":"Grant County Data Center Opponents To Protest Monday","publisher":"South Arkansas Reckoning","kind":"press","retrievedAt":"2026-10-18"},{"url":"https://arktimes.com/arkansas-blog/2026/10/16/word-gets-out-about-second-grant-county-data-center-despite-ndas","label":"Word gets out about second Grant County data center - despite NDAs","publisher":"Arkansas Times","kind":"press","retrievedAt":"2026-10-18"}]},{"id":"compute-sollensys-little-rock-data-center-ar","sourceRecordId":"sollensys-little-rock-data-center-ar","name":"Sollensys Little Rock Data Center","operator":"Sollensys Corp","city":"Little Rock","county":"Pulaski","address":"208 Atkins Road","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":34.7519536,"longitude":-92.4160447,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sollensys-little-rock-data-center-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1519177/000182912622008113/sollensyscorp_ex99-1.htm","label":"Sollensys Corp Exhibit 99.1 - Little Rock data center acquisition","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-10-18"},{"url":"https://baxtel.com/data-center/sollensys-little-rock","label":"Sollensys: Little Rock Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-18"}]},{"id":"compute-tierpoint-little-rock-ar","sourceRecordId":"tierpoint-little-rock-ar","name":"TierPoint Little Rock","operator":"TierPoint","city":"Little Rock","county":"Pulaski","address":null,"state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":34.7562396,"longitude":-92.4447234,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-little-rock-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/arkansas/little-rock/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/388148510","label":"OpenStreetMap way/388148510","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-walmart-bentonville-data-center-ar","sourceRecordId":"walmart-bentonville-data-center-ar","name":"Walmart Bentonville Data Center","operator":"Walmart","city":"Bentonville","county":"Benton","address":"805 SE Moberly Ln","state":"AR","stateName":"Arkansas","jurisdictionType":"state","latitude":36.364241,"longitude":-94.182712,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/walmart-bentonville-data-center-ar","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://adeq.state.ar.us/home/pdssql/p_facil_details.aspx?AFINDash=04-01474&AFIN=0401474","label":"Facility AFIN 04-01474 — \"WAL-MART DGTC/ISD #9280\", alternate name \"EAST DATA CENTER\", 805 Moberly Lane, Bentonville (Benton County); owner WALMART INC; status Active","publisher":"Arkansas Division of Environmental Quality — Permit Data System","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.datacenter.fyi/facility/walmart-ar-ae65a04c","label":"Walmart — Bentonville, AR","publisher":"datacenter.fyi","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-grandilla-foot-creek-491st-thomas-tonopah-az","sourceRecordId":"grandilla-foot-creek-491st-thomas-tonopah-az","name":"491st Avenue and Thomas Road Data Center / Solar Site","operator":"Grandilla (Arizona) Inc. and Foot Creek Corporation","city":"Tonopah","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.481,"longitude":-113.134,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/grandilla-foot-creek-491st-thomas-tonopah-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/maricopa-county-board-approves-rezoning-for-638-acre-data-center-solar-site/","label":"Maricopa County Board Approves Rezoning for 638-Acre Data Center/Solar Site","publisher":"AZBEX","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-5c-data-centers-phx01-phoenix-az","sourceRecordId":"5c-data-centers-phx01-phoenix-az","name":"5C Data Centers PHX01","operator":"5C Data Centers","city":"Phoenix","county":"Maricopa County","address":"2802 W Palm Lane","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4703256,"longitude":-112.1204899,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/5c-data-centers-phx01-phoenix-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/5c-data-centers-announces-new-data-center-region-in-phoenix-arizona-302252217.html","label":"5C Data Centers Announces New Data Center Region in Phoenix, Arizona","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.gpec.org/news/5c-data-centers-new-data-center-region-in-phoenix/","label":"5C Data Centers announces new data center region in Phoenix","publisher":"Greater Phoenix Economic Council","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://baxtel.com/data-center/5cdc-phoenix-phx01","label":"5CDC: Phoenix PHX01 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-23"}]},{"id":"compute-aligned-peoria-campus-az","sourceRecordId":"aligned-peoria-campus-az","name":"Aligned Data Centers Peoria Campus","operator":"Aligned Data Centers","city":"Peoria","county":"Maricopa County","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.5594634,"longitude":-112.2201382,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-peoria-campus-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.abc15.com/news/business/aligned-data-centers-moves-ahead-with-two-building-campus-in-peoria","label":"Aligned Data Centers moves ahead with two-building campus in Peoria","publisher":"ABC15 Arizona","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-aligned-phx-01-02-03-az","sourceRecordId":"aligned-phx-01-02-03-az","name":"Aligned PHX-01/02/03","operator":"Aligned Data Centers","city":"Phoenix","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.6590546,"longitude":-112.1111595,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-phx-01-02-03-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/phoenix/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://www.openstreetmap.org/way/155739337","label":"OpenStreetMap way/155739337","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.datacenterdynamics.com/en/news/phoenix-data-center-will-have-63mw-on-site-generation/","label":"DCD — Phoenix data center will have 63MW on-site generation","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://aligneddc.com/power-reliability-is-a-big-driver-for-aligned-data-centers-in-phoenix/","label":"Aligned — Power Reliability is a Big Driver for Aligned Data Centers in Phoenix","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aligned-phx13-glendale-az","sourceRecordId":"aligned-phx13-glendale-az","name":"Aligned PHX-13","operator":"Aligned Data Centers","city":"Glendale","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.5387,"longitude":-112.186,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-phx13-glendale-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://news.constructconnect.com/aligned-data-centers-breaks-ground-in-glendale-expanding-arizona-infrastructure","label":"Aligned Data Centers breaks ground in Glendale, expanding Arizona infrastructure","publisher":"ConstructConnect","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://dcnnmagazine.com/data-centres/aligned-data-centers-breaks-ground-on-glendale-facility/","label":"Aligned Data Centers breaks ground on Glendale facility (APS 230 kV line; closed-loop cooling)","publisher":"DCNN Magazine","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.glendalestar.com/news/aligned-data-centers-breaks-ground/article_4c7a2620-ccc3-4821-a236-dbfedb40ae85.html","label":"Aligned Data Centers breaks ground - Glendale mayor praises PHX-13","publisher":"Glendale Star","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-data-center-in-phoenix-arizona/","label":"Aligned breaks ground on data center in Phoenix, Arizona ($86.5M for 100 acres)","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.constructconnect.com/construction-economic-news/aligned-data-centers-breaks-ground-on-phx-13-facility-expanding-arizona-infrastructure","label":"ConstructConnect — Aligned Data Centers Breaks Ground on PHX-13 Facility","publisher":"ConstructConnect","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.glendaleaz.gov/Business/Economic-Development/Economic-Development-News/2025/Aligned-Data-Centers-Breaks-Ground-on-Phx-13-Facility","label":"Aligned Data Centers Breaks Ground on Phx-13 Facility","publisher":"City of Glendale, Arizona","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-apple-mesa-az","sourceRecordId":"apple-mesa-az","name":"Apple Mesa Data Center (Global Command Center)","operator":"Apple","city":"Mesa","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3615205,"longitude":-111.6012177,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/apple-mesa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mesanow.org/news/public/article/2149","label":"Grand opening for Apple's Arizona Data and Global Command Center in Mesa — $2B, 1.3M sq ft","publisher":"Mesa Now (Mesa economic development)","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.datacenterknowledge.com/business/step-inside-apple-s-data-center-in-arizona-courtesy-of-the-arizona-republic","label":"Step Inside Apple's Data Center in Arizona — 1.3M sq ft, latest expansion completed April 2018","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.aztechcouncil.org/tech_magazine/apple-plants-crowning-achievement-for-renewable-energy-in-mesa/","label":"Apple plants crowning achievement for renewable energy in Mesa (Arizona Technology Council)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://qz.com/337842/apple-is-building-a-solar-powered-data-command-center-in-arizona","label":"Apple is building a solar-powered data 'command center' in Arizona (Quartz)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.federalregister.gov/documents/full_text/text/2014/01/23/2014-01296.txt","label":"Federal Register, FTZ Board docket S-5-2014 — 'The proposed subzone (83.17 acres) is located at 3740 S. Signal Butte Rd, Mesa, Arizona.'","publisher":null,"kind":"filing","retrievedAt":"2026-08-31"},{"url":"https://www.cultofmac.com/news/apple-data-center-mesa-arizona-details","label":"Cult of Mac — 'Approximately 150 people work at the Mesa facility.'","publisher":null,"kind":"press","retrievedAt":"2026-08-31"},{"url":"https://www.federalregister.gov/documents/full_text/text/2014/03/27/2014-06841.txt","label":"Federal Register — approval of FTZ Subzone 221A for the Mesa site","publisher":null,"kind":"subsidy","retrievedAt":"2026-08-31"}]},{"id":"compute-zinke-arizona-independent-technology-campus-pinal-az","sourceRecordId":"zinke-arizona-independent-technology-campus-pinal-az","name":"Arizona Independent Technology Campus","operator":"Zinke Investments LLC","city":null,"county":"Pinal","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":32.9229,"longitude":-112.0148,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/zinke-arizona-independent-technology-campus-pinal-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/1500-acre-business-and-technology-campus-planned-in-pinal-county/","label":"1,500-Acre Business and Technology Campus Planned in Pinal County","publisher":"AZBEX","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://pinalpost.com/data-center-south-of-maricopa-tech-campus-2026-september-worksession/","label":"Data centers proposed south of Maricopa: County reviews 956-acre land-use change for Arizona Independent Technology Campus","publisher":"Pinal Post","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-prime-avondale-az","sourceRecordId":"prime-avondale-az","name":"Avondale Campus","operator":"Prime Data Centers","city":"Avondale","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.44,"longitude":-112.35,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prime-avondale-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/","label":"Prime Data Centers breaks ground on three buildings at its 240MW Phoenix campus, advancing $3 billion investment in Avondale","publisher":"Prime Data Centers","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://primedatacenters.com/wp-content/uploads/2025/10/PDC_Phoenix_TechSheet_PHX01_04.pdf","label":"Prime Data Centers PHX01 tech sheet — spec table: 'UTILITY PROVIDER SRP', 'ACRES 66.5', 'CRITICAL IT LOAD 240MW'; 'a closed-loop cooling system engineered for zero process water use during operations'","publisher":null,"kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-aws-laveen-az","sourceRecordId":"aws-laveen-az","name":"AWS Laveen Data Center Campus","operator":"Amazon Web Services","city":"Laveen","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3727,"longitude":-112.1669,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-laveen-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-acquires-220-acres-in-phoenix-arizona-for-possible-data-center/","label":"Amazon acquires 220 acres in Phoenix, Arizona for possible data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.aztechcouncil.org/amazon-buys-massive-valley-site-for-potential-data-center/","label":"Arizona Technology Council — Amazon buys massive Valley site","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-arizona-land-consulting-balterra-tonopah-az","sourceRecordId":"arizona-land-consulting-balterra-tonopah-az","name":"Balterra","operator":"Arizona Land Consulting","city":"Tonopah","county":"Maricopa County","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.508197,"longitude":-112.9369267,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/arizona-land-consulting-balterra-tonopah-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/tonopah-mixed-use-development-rezoning/","label":"Dual Plans Will Create Massive W. Valley Mixed-Use","publisher":"AZBEX","kind":"permit","retrievedAt":"2026-09-23"}]},{"id":"compute-tract-buckeye-tech-corridor-az","sourceRecordId":"tract-buckeye-tech-corridor-az","name":"Buckeye Tech Corridor","operator":"Tract","city":"Buckeye","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4136,"longitude":-112.7203,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-buckeye-tech-corridor-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/tract-plans-1700-acre-data-center-campus-in-phoenix-arizona/","label":"Tract plans 1,700-acre data center campus in Phoenix, Arizona","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-15"},{"url":"https://azbigmedia.com/real-estate/2069-acre-parcel-will-become-a20-billion-data-center-park-in-buckeye/","label":"2,069-acre parcel will become a $20 billion data center park in Buckeye","publisher":"AZ Big Media","kind":"press","retrievedAt":"2026-07-15"},{"url":"https://azbex.com/planning-development/tract-planning-1700-acre-buckeye-data-center-campus/","label":"Tract Planning 1,700-acre Buckeye Data Center Campus","publisher":"AZBEX","kind":"press","retrievedAt":"2026-07-15"},{"url":"https://www.tract.com/project/buckeye/","label":"Buckeye — Tract project page","publisher":"Tract","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0","label":"Maricopa County Assessor Parcel Viewer — 'AZLCO BUCKEYE LLC' parcel assemblage","publisher":null,"kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center/","label":"AZFamily: Developer wants to power the future of AI in Buckeye with new data center","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://d3n9y02raazwpg.cloudfront.net/buckeyeaz/0eb9a025-6f87-11ee-b4aa-0050569183fa-8fca9741-32ef-4a0f-b8ad-ee8a00454790-1722900291.pdf","label":"City of Buckeye Regular Council Meeting agenda packet, 6 August 2024 — Ordinance No. 08-24 and the executed Development Agreement with AZLCO Buckeye, LLC (§12 Regional Infrastructure Components and reimbursement terms)","publisher":null,"kind":"filing","retrievedAt":"2026-08-31"},{"url":"https://buckeyeaz.granicus.com/services/minutes/reports/23859ad0-eafd-4e39-b582-796e20fdc9cb/attachment","label":"City of Buckeye council minutes, 6 August 2024 — adoption of Ordinance No. 08-24 approving the development agreement with AZLCO Buckeye, LLC (motion passed unanimously)","publisher":null,"kind":"filing","retrievedAt":"2026-08-31"}]},{"id":"compute-arizona-land-consulting-camelback-creek-tonopah-az","sourceRecordId":"arizona-land-consulting-camelback-creek-tonopah-az","name":"Camelback Creek","operator":"Arizona Land Consulting","city":"Tonopah","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.509,"longitude":-112.962,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/arizona-land-consulting-camelback-creek-tonopah-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/320-acre-warehouse-data-center-master-plan-proposed-in-far-west-valley/","label":"320-Acre Warehouse & Data Center Master Plan Proposed in Far West Valley","publisher":"AZBEX","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-centersquare-phx3-az","sourceRecordId":"centersquare-phx3-az","name":"Centersquare PHX3","operator":"Centersquare (Cyxtera/Evoque)","city":"Mesa","county":"Maricopa","address":"1301 West University Drive","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4212542,"longitude":-111.8590191,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-phx3-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/phoenix","label":"Centersquare (Cyxtera/Evoque) facility directory","publisher":"Centersquare (Cyxtera/Evoque)","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/543117031","label":"OpenStreetMap way/543117031","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-compass-goodyear-campus-az","sourceRecordId":"compass-goodyear-campus-az","name":"Compass Datacenters Goodyear Campus","operator":"Compass Datacenters","city":"Goodyear","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4354446,"longitude":-112.3756856,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/compass-goodyear-campus-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.compassdatacenters.com/news/compass-datacenters-begins-construction-of-first-two-data-centers-on-phoenix-campus/","label":"Compass Datacenters Begins Construction of First Two Data Centers on Phoenix Campus","publisher":"Compass Datacenters","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://azbigmedia.com/business/economic-development/compass-datacenters-will-build-225-acre-goodyear-campus/","label":"Compass Datacenters will build 225-acre Goodyear campus","publisher":"AZ Big Media","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-cyrusone-chandler-phx1-phx8-az","sourceRecordId":"cyrusone-chandler-phx1-phx8-az","name":"CyrusOne Chandler Campus (PHX1–PHX8)","operator":"CyrusOne","city":"Chandler","county":"Maricopa County","address":"2335 S Ellis Street","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.2709074,"longitude":-111.8819248,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-chandler-phx1-phx8-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/chandler-arizona","label":"Chandler, AZ: PHX1–PHX8 | CyrusOne","publisher":"CyrusOne","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://nominatim.openstreetmap.org/search?q=2335+S+Ellis+St%2C+Chandler%2C+AZ&format=json&limit=2&addressdetails=1","label":"OpenStreetMap/Nominatim — buildings named PHX1 and PHX8 at 2335 South Ellis Street, Chandler, AZ","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-23"}]},{"id":"compute-cyrusone-mesa-elliot-ellsworth-az","sourceRecordId":"cyrusone-mesa-elliot-ellsworth-az","name":"CyrusOne Mesa Campus (Mesa Elliot Technology Park)","operator":"CyrusOne","city":"Mesa","county":"Maricopa County","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3500866,"longitude":-111.6358128,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-mesa-elliot-ellsworth-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.commercialsearch.com/news/cyrusone-acquires-70-acre-site-for-2nd-phoenix-facility/","label":"CyrusOne Acquires Site for 2nd Phoenix Facility","publisher":"Commercial Property Executive / CommercialSearch","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://baxtel.com/data-center/cyrusone-mesa","label":"CyrusOne Mesa Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-23"}]},{"id":"compute-digital-realty-phx-tempe-az","sourceRecordId":"digital-realty-phx-tempe-az","name":"Digital Realty PHX (Tempe)","operator":"Digital Realty","city":"Tempe","county":"Maricopa","address":"2055 East Technology Circle","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3446197,"longitude":-111.8992189,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-phx-tempe-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/phoenix","label":"Digital Realty Phoenix metro directory page (facility code PHX, physically in Tempe)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/220518160","label":"OpenStreetMap way/220518160","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-digital-realty-phx15-az","sourceRecordId":"digital-realty-phx15-az","name":"Digital Realty PHX15","operator":"Digital Realty","city":"Chandler","county":"Maricopa","address":"2121 South Price Road","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.2749228,"longitude":-111.8866379,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-phx15-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/phoenix/phx15","label":"Digital Realty official facility page (PHX15, 2121 S Price Road, Chandler)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/300952513","label":"OpenStreetMap way/300952513","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-edgecore-dobson-farms-east-florence-az","sourceRecordId":"edgecore-dobson-farms-east-florence-az","name":"Dobson Farms East","operator":"EdgeCore Digital Infrastructure","city":"Florence","county":"Pinal County","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.1183,"longitude":-111.4733,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgecore-dobson-farms-east-florence-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","label":"Florence Approves Data Centers on 1,619 Acres as Dobson Farms Becomes Major Tech Park","publisher":"Pinal Post","kind":"permit","retrievedAt":"2026-09-23"}]},{"id":"compute-edgeconnex-mesa-campus-phx11-3302-s-hawes-rd-az","sourceRecordId":"edgeconnex-mesa-campus-phx11-3302-s-hawes-rd-az","name":"EdgeConneX Mesa Campus (PHX11 / 3302 S Hawes Rd)","operator":"EdgeConneX","city":"Mesa","county":"Maricopa","address":"8604 East Elliot Road","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3520091,"longitude":-111.6475291,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-mesa-campus-phx11-3302-s-hawes-rd-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/edgeconnex-files-for-new-1-million-sq-ft-data-center-campus-in-mesa-arizona/","label":"DatacenterDynamics: EdgeConneX files for new 1M sq ft data center campus in Mesa, Arizona","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1015704066","label":"OpenStreetMap way/1015704066","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-edgecore-mesa-az","sourceRecordId":"edgecore-mesa-az","name":"EdgeCore Mesa Data Center Campus","operator":"EdgeCore Digital Infrastructure","city":"Mesa","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.375,"longitude":-111.6497,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgecore-mesa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","label":"EdgeCore Announces Metro Phoenix Expansion to 450MW","publisher":"EdgeCore Digital Infrastructure","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","label":"EdgeCore expands Mesa data center campus in Arizona","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://azbigmedia.com/real-estate/edgecore-expands-mesa-data-center-campus-to-over-450-mw/","label":"EdgeCore expands Mesa data center campus to over 450 MW","publisher":"AZ Big Media","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-edged-mesa-az","sourceRecordId":"edged-mesa-az","name":"Edged Mesa Data Center","operator":"Edged US","city":"Mesa","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4152,"longitude":-111.8315,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edged-mesa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor","label":"Edged US Opens Waterless, AI-Ready Data Center in Arizona's Silicon Desert Tech Corridor","publisher":"Edged US","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-w-holdings-energy-generation-technology-campus-maricopa-az","sourceRecordId":"w-holdings-energy-generation-technology-campus-maricopa-az","name":"Energy Generation and Technology Campus","operator":"W Holdings","city":"Maricopa","county":"Pinal","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":32.945,"longitude":-112.035,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/w-holdings-energy-generation-technology-campus-maricopa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inmaricopa.com/data-center-okd/","label":"$10 billion data center campus OK'd south of Maricopa","publisher":"InMaricopa","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://pinalpost.com/commission-recommends-data-center-campus-despite-resident-tribal-pushback/","label":"Commission Recommends Data Center Campus Despite Resident, Tribal Pushback","publisher":"Pinal Post","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-flexential-phoenix-deer-valley-az","sourceRecordId":"flexential-phoenix-deer-valley-az","name":"Flexential Phoenix - Deer Valley","operator":"Flexential","city":"Phoenix","county":"Maricopa","address":"1850 West Deer Valley Road","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.6846775,"longitude":-112.0983398,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-phoenix-deer-valley-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/az/phoenix/deer-valley-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/157362579","label":"OpenStreetMap way/157362579","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-ryan-companies-florence-tech-park-az","sourceRecordId":"ryan-companies-florence-tech-park-az","name":"Florence Tech Park","operator":"Ryan Companies US, Inc.","city":"Florence","county":"Pinal County","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.1477,"longitude":-111.4733,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ryan-companies-florence-tech-park-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","label":"Florence Approves Data Centers on 1,619 Acres as Dobson Farms Becomes Major Tech Park","publisher":"Pinal Post","kind":"permit","retrievedAt":"2026-09-23"}]},{"id":"compute-google-redhawk-mesa-az","sourceRecordId":"google-redhawk-mesa-az","name":"Google Redhawk Mesa Data Center Campus","operator":"Google","city":"Mesa","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3764,"longitude":-111.6199,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-redhawk-mesa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/","label":"Google breaks ground on Mesa data center campus in Arizona","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://azbex.com/planning-development/google-planning-next-phase-of-mesa-data-center-facility/","label":"Google Planning Next Phase of Mesa Data Center Facility","publisher":"AZBEX","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/mesa-council-approves-1bn-google-arizona-data-center-16m-tax-breaks/","label":"Mesa Council approves $1bn Google data center, with $16m in tax breaks","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://mesa.legistar.com/View.ashx?M=F&ID=7431552&GUID=F48E7DF7-C483-4237-8F54-83D08F5E1935","label":"City of Mesa resolution authorising a development agreement and lease with Stone Applications, LLC for ~187 acres at S Sossaman Rd and E Elliot Rd (approved 1 July 2019)","publisher":null,"kind":"subsidy","retrievedAt":"2026-08-31"},{"url":"https://mesa.legistar.com/View.ashx?M=F&ID=7431554&GUID=560CC2A3-8A23-4144-8CCB-CB9D273698B2","label":"City of Mesa Office of Economic Development study-session presentation, 27 June 2019 — GPLET term: ~$32,967,000 excise payable over 25 years vs ~$48,916,134 ad valorem otherwise","publisher":null,"kind":"subsidy","retrievedAt":"2026-08-31"},{"url":"https://legistar1.granicus.com/Mesa/attachments/eb9e229a-330d-417b-bf35-95ed173402fc.doc","label":"Executed GPLET Lease between the City of Mesa and Stone Applications, LLC (City of Mesa matter 19-0809) — states no abatement amount; net annual rent of $10,000 and an express disclaimer that GPLET benefits are not guaranteed during the term","publisher":null,"kind":"filing","retrievedAt":"2026-08-31"},{"url":"https://legistar1.granicus.com/Mesa/attachments/e2e1b966-a066-4ba7-b9a6-ec11167a332d.pdf","label":"Executed Development Agreement with exhibits, City of Mesa and Stone Applications, LLC (matter 19-0809)","publisher":null,"kind":"filing","retrievedAt":"2026-08-31"}]},{"id":"compute-h5-data-centers-chandler-az","sourceRecordId":"h5-data-centers-chandler-az","name":"H5 Data Centers Phoenix (Chandler)","operator":"H5 Data Centers","city":"Chandler","county":"Maricopa","address":"2600 W Germann Rd","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.2769786,"longitude":-111.8860302,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-chandler-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/phoenix-data-center.html","label":"Phoenix Data Center — H5 Data Centers","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-arizona-land-consulting-hassayampa-ranch-tonopah-az","sourceRecordId":"arizona-land-consulting-hassayampa-ranch-tonopah-az","name":"Hassayampa Ranch Data Center","operator":"Arizona Land Consulting","city":"Tonopah","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.511576,"longitude":-112.769387,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/arizona-land-consulting-hassayampa-ranch-tonopah-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.connectcre.com/stories/25b-data-center-greenlit-near-buckeye/","label":"$25B Data Center Greenlit Near Buckeye","publisher":"Connect CRE","kind":"press","retrievedAt":"2026-07-15"},{"url":"https://fortune.com/2025/12/27/ai-data-centers-arizona-hassayampa-ranch/","label":"At the edges of the AI data center boom, rural America is up against Silicon Valley billions (Hassayampa Ranch)","publisher":"Fortune","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.orionprop.com/topfive/maricopa-county-approves-rezoning-for-proposed-25b-data-center-hub/","label":"Maricopa County approves rezoning for proposed $25B data center hub","publisher":"Orion Investment Real Estate","kind":"press","retrievedAt":"2026-07-15"},{"url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0","label":"Maricopa County Assessor Parcel Viewer (GIS parcel data service)","publisher":null,"kind":"other","retrievedAt":"2026-07-18"},{"url":"https://berryriddell.com/25b-data-center-planned-west-of-phoenix-wins-key-approval-from-county/","label":"$25B data center planned west of Phoenix wins key approval from county","publisher":"Berry Riddell (republishing John Leos, azcentral.com)","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-iron-mountain-azp-1-az","sourceRecordId":"iron-mountain-azp-1-az","name":"Iron Mountain AZP-1","operator":"Iron Mountain","city":"Phoenix","county":"Maricopa","address":"615 North 48th Street","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4547261,"longitude":-111.9762182,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-azp-1-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/phoenix-data-center","label":"Iron Mountain facility directory","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1357825755","label":"OpenStreetMap way/1357825755","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-iron-mountain-azp-2-az","sourceRecordId":"iron-mountain-azp-2-az","name":"Iron Mountain AZP-2","operator":"Iron Mountain","city":"Phoenix","county":"Maricopa","address":"4802 East Van Buren Street","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4521575,"longitude":-111.9772945,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-azp-2-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/phoenix-data-center","label":"Iron Mountain facility directory","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/685011021","label":"OpenStreetMap way/685011021","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-iron-mountain-azp-3-az","sourceRecordId":"iron-mountain-azp-3-az","name":"Iron Mountain AZP-3","operator":"Iron Mountain","city":"Phoenix","county":"Maricopa County","address":"5101 E Roosevelt Street","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4565458,"longitude":-111.9719014,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-azp-3-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/na/phoenix","label":"Phoenix Data Centers | Colocation in Phoenix — Iron Mountain","publisher":"Iron Mountain","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://baxtel.com/data-center/iron-mountain-azp3","label":"Iron Mountain: AZP3 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-23"}]},{"id":"compute-iron-mountain-azs-1-az","sourceRecordId":"iron-mountain-azs-1-az","name":"Iron Mountain AZS-1","operator":"Iron Mountain","city":"Scottsdale","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.6446663,"longitude":-111.8960985,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-azs-1-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/scottsdale-data-center","label":"Iron Mountain facility directory","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/11018926315","label":"OpenStreetMap node/11018926315","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-vermaland-la-osa-eloy-az","sourceRecordId":"vermaland-la-osa-eloy-az","name":"La Osa Data Center Park","operator":"Vermaland LLC","city":"Eloy","county":"Pinal","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":32.75,"longitude":-111.55,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vermaland-la-osa-eloy-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/land-developer-vermaland-plans-33bn-data-center-in-arizona/","label":"Land developer Vermaland pitches $33bn data center in Arizona","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://azbigmedia.com/business/33-billion-data-center-industrial-park-coming-to-pinal-county/","label":"$33 billion data center industrial park coming to Pinal County","publisher":"AZ Big Media","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.kjzz.org/fronteras-desk/2026-05-28/largest-proposed-data-center-in-arizona-to-be-scaled-back-80-after-opposition","label":"Largest proposed data center in Arizona to be scaled back 80% after opposition","publisher":"KJZZ (Arizona Public Radio)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://hoodline.com/2026/04/pinal-county-panel-backs-massive-la-osa-data-center-in-eloy-desert/","label":"Pinal County Advances Vermaland's La Osa Data Center Plan","publisher":"Hoodline","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.commercialsearch.com/news/33b-data-center-park-eyed-in-arizona/","label":"$33B Data Center Park Eyed in Arizona","publisher":"Commercial Property Executive","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.kjzz.org/politics/2026-08-26/pinal-county-rejects-massive-la-osa-data-center-residents-want-more-rules-for-future-projects","label":"Pinal County rejects massive La Osa data center. Residents want more rules for future projects","publisher":"KJZZ","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.sonorandesert.org/2026/08/26/data-centers-update/","label":"Data centers in the Sonoran Desert — update (La Osa rezoning denied August 26, 2026)","publisher":"Coalition for Sonoran Desert Protection","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-fremont-peak-luckett-road-marana-az","sourceRecordId":"fremont-peak-luckett-road-marana-az","name":"Luckett Road Data Centers (Fremont Peak Properties)","operator":"Fremont Peak Properties LLC (Beale Infrastructure)","city":"Marana","county":"Pima","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":32.495,"longitude":-111.198,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fremont-peak-luckett-road-marana-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tucson.com/news/local/environment/article_52f0d4ba-aa9e-4c17-b290-ca3c2ad8d011.html","label":"Rezoning approved for Marana data center campus","publisher":"Tucson.com / Arizona Daily Star","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://news.azpm.org/s/102313-marana-planning-commission-backs-rezoning-for-600-acre-data-center-project/","label":"Marana Planning Commission backs rezoning for 600-acre data center project","publisher":"AZPM","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://news.azpm.org/p/azpmnews/2026/2/10/228403-marana-residents-submit-petitions-to-put-data-center-project-to-a-vote/","label":"Marana residents submit petitions to put data center project to a vote","publisher":"AZPM","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.tucsonsentinel.com/local/report/021826_data_referendum_fails/marana-rejects-referendums-against-data-center-center-rezoning/","label":"Marana rejects referendums against data center rezoning","publisher":"Tucson Sentinel","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.kgun9.com/news/community-inspired-journalism/marana/data-center-moves-forward-marana-town-council-approves-land-rezoning","label":"Data center moves forward: Marana Town Council approves land rezoning","publisher":"KGUN9","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://news.azpm.org/p/news-articles/2026/1/8/227908-marana-town-council-approves-rezoning-for-luckett-road-project-600-acre-hyperscale-data-center/","label":"Marana Town Council approves rezoning for Luckett Road Project, 600-acre hyperscale data center","publisher":"Arizona Public Media (AZPM)","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-lumen-phoenix-1-az","sourceRecordId":"lumen-phoenix-1-az","name":"Lumen Phoenix 1","operator":"Lumen Technologies","city":"Phoenix","county":"Maricopa","address":"215 East Indian School Road","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.494309,"longitude":-112.0707916,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-phoenix-1-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/lumen-phoenix-1","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/151179323","label":"OpenStreetMap way/151179323","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-meta-mesa-az","sourceRecordId":"meta-mesa-az","name":"Meta Mesa Data Center","operator":"Meta","city":"Mesa","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3375358,"longitude":-111.6355386,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-mesa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.atmeta.com/2025/01/mesa-we-are-online/","label":"Mesa, we are online! — Meta's Mesa data center serving traffic (Jan 2025), $1B+ in Arizona","publisher":"Meta Data Centers","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://baxtel.com/data-center/meta-mesa-az-campus","label":"Meta Mesa, AZ Campus — came online 2025, redesigned for AI workloads, ~396 acres","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://media.srpnet.com/meta-teams-up-with-srp-and-rsted-to-support-data-center-with-clean-energy-from-new-solar-and-battery--project/","label":"SRP - Meta Teams Up with SRP and Ørsted to Support Data Center with Clean Energy","publisher":null,"kind":"press","retrievedAt":"2026-08-16"},{"url":"https://datacenters.atmeta.com/asset/mesa-data-center-info-sheet/","label":"Meta Data Centers — Meta Mesa Data Center info sheet (Meta's own newsroom)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.aztechcouncil.org/meta-expands-plans-for-proposed-large-scale-mesa-data-center/","label":"Arizona Technology Council — Meta expands plans for proposed large-scale Mesa data center","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://legistar1.granicus.com/Mesa/attachments/7e390610-b558-426d-aa10-c7aa2825530d.doc","label":"City of Mesa Council Report, file 21-0552 (17 May 2021) — Development Agreement and Sustainable Water Service Agreement with Redale LLC for ~396 acres; Water Allowance rising to 1,400 acre-feet/year at Phase 3","publisher":null,"kind":"permit","retrievedAt":"2026-08-31"}]},{"id":"compute-microsoft-el-mirage-az","sourceRecordId":"microsoft-el-mirage-az","name":"Microsoft El Mirage Data Center Campus","operator":"Microsoft","city":"El Mirage","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.5695,"longitude":-112.3204,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-el-mirage-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/microsoft-data-center-new-spec-industrial-planned-in-el-mirage/","label":"Microsoft Data Center Planned in El Mirage — PHX-83 fifth building","publisher":"AZBEX","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.aztechcouncil.org/microsoft-buys-land-el-mirage-data-center/","label":"Microsoft acquires nearly 300 acres for data center growth in El Mirage","publisher":"Arizona Technology Council","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-el-mirage-data-center-campus-in-arizona/","label":"Microsoft files to expand El Mirage data center campus in Arizona","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://local.microsoft.com/communities/americas/greater-phoenix/","label":"Microsoft — Greater Phoenix, Arizona datacenter community","publisher":"Microsoft","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-microsoft-goodyear-az","sourceRecordId":"microsoft-goodyear-az","name":"Microsoft Goodyear Data Center Campus","operator":"Microsoft","city":"Goodyear","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4353,"longitude":-112.39,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-goodyear-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-purchases-100-acres-next-to-existing-data-center-campus-in-goodyear-arizona/","label":"Microsoft purchases 100 acres next to Goodyear campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.goodyearaz.gov/Home/Components/News/News/9847/1127?arch=1","label":"Microsoft Builds World-Class Datacenter Campus in Goodyear","publisher":"City of Goodyear","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://azbex.com/local-news/microsoft-goodyear-update-development-agreement/","label":"Microsoft, Goodyear Update Development Agreement","publisher":"AZBEX","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://local.microsoft.com/communities/americas/greater-phoenix/","label":"Microsoft — Greater Phoenix, Arizona datacenter community","publisher":"Microsoft","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-novva-mesa-az","sourceRecordId":"novva-mesa-az","name":"Novva Mesa Data Center Campus","operator":"Novva Data Centers","city":"Mesa","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3717,"longitude":-111.6747,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/novva-mesa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/","label":"Novva Data Centers Announces New Campus in Mesa","publisher":"Novva Data Centers","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/novva-confirmed-as-behind-project-borealis-data-center-campus-in-phoenix-arizona/","label":"Novva confirmed as behind Project Borealis data center campus in Phoenix","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://legistar1.granicus.com/Mesa/attachments/d6c1b1ca-28ad-400c-8d28-a59aca19080e.pdf","label":"City of Mesa case ZON24-00291 ('Project Borealis') Project Narrative — 'Each of the data hall buildings will utilize a closed-loop water cooling system... Crucially, no evaporative methods are used for reducing air temperature'","publisher":null,"kind":"permit","retrievedAt":"2026-08-31"},{"url":"https://legistar1.granicus.com/Mesa/attachments/a49b6d5a-09db-4b36-845e-756af027c367.doc","label":"City of Mesa Planning Division staff report, ZON24-00291 — 'Site Size: 159± acres', parcel 304-31-141","publisher":null,"kind":"permit","retrievedAt":"2026-08-31"},{"url":"https://www.prnewswire.com/news-releases/novva-data-centers-announces-new-campus-in-mesa-302227476.html","label":"Novva Data Centers Announces New Campus in Mesa","publisher":"PR Newswire / Novva Data Centers","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-ntt-global-mesa-az","sourceRecordId":"ntt-global-mesa-az","name":"NTT Global Data Centers Mesa — Pacific Proving Technology Park","operator":"NTT Global Data Centers","city":"Mesa","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3025,"longitude":-111.62,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-global-mesa-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/ntt-acquires-173-acre-planned-data-center-park-in-mesa-arizona-for-300m/","label":"NTT acquires 173-acre planned data center park in Mesa for $300m","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://coppercourier.com/news/politics/mesa-residents-fight-data-center/","label":"Mesa residents are fighting a Tokyo tech giant's data center","publisher":"Copper Courier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.themesatribune.com/news/big-data-center-in-se-mesa-passes-first-review/article_91081b9b-d2d1-47f6-91d2-b600115e4a55.html","label":"Big data center in SE Mesa passes first review — Planning & Zoning Board recommends approval 4-0 for the 170-acre site at Pecos and Crismon","publisher":"Mesa Tribune","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-ntt-phoenix-ph1-data-center-az","sourceRecordId":"ntt-phoenix-ph1-data-center-az","name":"NTT Phoenix PH1 Data Center","operator":"NTT Global Data Centers","city":"Mesa","county":"Maricopa","address":"10256 East Elliot Road","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.3536663,"longitude":-111.6124114,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-phoenix-ph1-data-center-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/phoenix-ph1-data-center","label":"NTT facility directory","publisher":"NTT","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1356594646","label":"OpenStreetMap way/1356594646","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-phoenixnap-phx02-phoenix-az","sourceRecordId":"phoenixnap-phx02-phoenix-az","name":"phoenixNAP PHX02","operator":"phoenixNAP","city":"Phoenix","county":"Maricopa","address":"3221 E Elwood St","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4165398,"longitude":-112.0116833,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/phoenixnap-phx02-phoenix-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/new-data-center-planned-in-south-phoenix/","label":"New Data Center Planned in South Phoenix","publisher":"AZBEX","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-takanock-project-baccara-maricopa-county-az","sourceRecordId":"takanock-project-baccara-maricopa-county-az","name":"Project Baccara","operator":"Takanock, LLC","city":null,"county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.5685,"longitude":-112.3703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/takanock-project-baccara-maricopa-county-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.abc15.com/news/region-southwest-valley/surprise/maricopa-county-supervisors-approve-controversial-surprise-area-data-center","label":"Maricopa County supervisors approve controversial data center","publisher":"ABC15","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.projectbaccara.com/","label":"Project Baccara - official project site","publisher":"Takanock, LLC","kind":"permit","retrievedAt":"2026-07-09"},{"url":"https://www.azcc.gov/news/home/2026/02/06/february-4--2026-open-meeting-highlights","label":"Arizona Corporation Commission February 4, 2026 Open Meeting Highlights — Certificate of Environmental Compatibility for Project Baccara","publisher":"Arizona Corporation Commission","kind":"permit","retrievedAt":"2026-08-28"},{"url":"https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10264?fileID=100345","label":"Maricopa County Planning and Zoning Hearing Agenda, May 6, 2026 — case MCP250007, Project Baccara Military Compatibility Permit","publisher":"Maricopa County","kind":"permit","retrievedAt":"2026-08-28"},{"url":"https://azbex.com/planning-development/2-data-center-projects-advancing-in-metro-phoenix/","label":"2 Data Center Projects Advancing in Metro Phoenix","publisher":"AZBEX","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.projectbaccara.com/_files/ugd/cbe98b_459cc246ea694c9f99e6fc4e9b79b975.pdf","label":"Certificate of Environmental Compatibility application, Baccara Power LLC (ACC docket L-21369A-25-0222-00253) — APS-owned substation interconnecting at 230 kV; 'closed loop chiller system which, once filled, will reuse water without the need for refilling'; '~100 permanent well-paying jobs'","publisher":null,"kind":"filing","retrievedAt":"2026-08-31"},{"url":"https://www.projectbaccara.com/_files/ugd/cbe98b_7cd257dc576944ffb5f945e9ade851bb.pdf","label":"Maricopa County Air Quality Department, Notice of Public Hearing and Public Comment, Proposed Permit No. P0013417, Takanock Baccara LLC — facility address \"NW Corner W Olive Ave & N 143rd Ave, Waddell, AZ 85355\"","publisher":null,"kind":"permit","retrievedAt":"2026-08-31"},{"url":"https://www.azfamily.com/2026/05/07/massive-data-center-approved-near-luke-air-force-base-despite-opposition/","label":"Massive data center approved near Luke Air Force Base despite opposition","publisher":"Arizona's Family (AZFamily)","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.abc15.com/news/local-news/very-disappointed-maricopa-county-supervisors-approve-controversial-data-center","label":"'Very disappointed': Maricopa County supervisors approve controversial data center","publisher":"ABC15 Arizona","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.watereducation.org/aquafornia-news/controversial-surprise-data-center-clears-environmental-review","label":"Controversial Surprise data center clears environmental review","publisher":"Water Education Foundation (Aquafornia)","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-beale-project-blue-pima-county-az","sourceRecordId":"beale-project-blue-pima-county-az","name":"Project Blue","operator":"Beale Infrastructure","city":null,"county":"Pima","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":32.1,"longitude":-110.75,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/beale-project-blue-pima-county-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azluminaria.org/2025/10/01/pima-county-nda-confirms-amazon-is-behind-project-blue-data-center/","label":"Pima County NDA confirms Amazon is behind Project Blue data center","publisher":"AZ Luminaria","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.kold.com/2026/04/25/construction-begins-first-hyper-scale-data-center-pima-county/","label":"Construction begins on first hyper-scale data center in Pima County","publisher":"KOLD News 13","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.kjzz.org/fronteras-desk/2026-04-27/as-project-blue-data-center-construction-starts-near-tucson-protesters-rally-outside","label":"As Project Blue data center construction starts near Tucson, protesters rally outside","publisher":"KJZZ Fronteras Desk","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://content.civicplus.com/api/assets/2192e865-fe7e-48f4-8a0c-7c1c8b5cd32c","label":"Pima County Administrator memo to the Board of Supervisors, 'Update on Project Blue' (17 Sept 2025), with the Beale Infrastructure letter attached — 'we have selected an air cooling technology that uses a closed-loop system... Beale's air cooled design will consume no water, potable or otherwise, for industrial cooling.'","publisher":null,"kind":"filing","retrievedAt":"2026-08-31"},{"url":"https://www.pima.gov/3552/Project-Blue-FAQ","label":"Pima County official Project Blue FAQ, Economic Impact Study section — \"180 new full-time, permanent jobs created by the third year of operations in 2029.\"","publisher":"Pima County, Arizona","kind":"filing","retrievedAt":"2026-09-23"},{"url":"https://constructionreviewonline.com/construction-begins-on-project-blue-pima-countys-first-hyperscale-data-center/","label":"Construction Begins on Project Blue, Pima County's First Hyperscale Data Center","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-sahuarita-holdings-project-gravel-pima-county-az","sourceRecordId":"sahuarita-holdings-project-gravel-pima-county-az","name":"Project Gravel","operator":"Sahuarita Holdings, LLC","city":null,"county":"Pima County","address":"2480 W Twin Buttes Road","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":31.9357724,"longitude":-110.9997989,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sahuarita-holdings-project-gravel-pima-county-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tucson.com/news/local/government-politics/article_88b66e8c-6502-49de-832e-7cba5f958a77.html","label":"New 160-acre data center proposed in Sahuarita","publisher":"Arizona Daily Star (tucson.com)","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-lpi-group-project-midway-casa-grande-az","sourceRecordId":"lpi-group-project-midway-casa-grande-az","name":"Project Midway Data Center","operator":"LPI Group","city":"Casa Grande","county":"Pinal","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":32.84,"longitude":-111.79,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lpi-group-project-midway-casa-grande-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://pinalpost.com/supervisors-approve-project-midway-data-center-near-casa-grande/","label":"Project Midway Data Center Approved by Pinal County Supervisors","publisher":"Pinal Post","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://pinalpost.com/data-center-hearing-project-midway-rezoning-set-for-july-16/","label":"Data Center Hearing: Project Midway Rezoning Set for July 16","publisher":"Pinal Post","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-tract-project-range-buckeye-goodyear-az","sourceRecordId":"tract-project-range-buckeye-goodyear-az","name":"Project Range","operator":"Tract","city":"Buckeye","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.435,"longitude":-112.512,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-project-range-buckeye-goodyear-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/massive-data-center-master-plan-proposed-in-west-valley/","label":"Massive Data Center Master Plan Proposed in West Valley","publisher":"AZBEX","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-qts-phoenix-2-az","sourceRecordId":"qts-phoenix-2-az","name":"QTS Phoenix 2","operator":"QTS Data Centers","city":"Phoenix","county":"Maricopa","address":"1400 N 40th St","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4644344,"longitude":-111.994808,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-phoenix-2-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/phoenix-2/","label":"Phoenix 2 — QTS Data Centers","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-qts-phoenix-4-tolleson-az","sourceRecordId":"qts-phoenix-4-tolleson-az","name":"QTS Phoenix 4","operator":"QTS Data Centers","city":"Tolleson","county":"Maricopa","address":"11753 W Lower Buckeye Rd","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.420593,"longitude":-112.311771,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-phoenix-4-tolleson-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/phoenix-4/","label":"Phoenix 4 — QTS Data Centers","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-ryan-companies-southwest-crossing-data-park-eloy-az","sourceRecordId":"ryan-companies-southwest-crossing-data-park-eloy-az","name":"Southwest Crossing Data Park","operator":"Ryan Companies US, Inc.","city":"Eloy","county":"Pinal County","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":32.7783292,"longitude":-111.6023,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ryan-companies-southwest-crossing-data-park-eloy-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","label":"Ryan Companies 2MSF Industrial Plan Pivots to $687M Data Center","publisher":"AZBEX","kind":"permit","retrievedAt":"2026-09-23"}]},{"id":"compute-stack-phx01-avondale-az","sourceRecordId":"stack-phx01-avondale-az","name":"STACK Infrastructure PHX01 Campus","operator":"STACK Infrastructure","city":"Avondale","county":"Maricopa","address":"3001 S Litchfield Rd","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.418842,"longitude":-112.357688,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-phx01-avondale-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/phoenix/","label":"Data Centers in Phoenix, Arizona — STACK Infrastructure","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-stack-phx02-phoenix-az","sourceRecordId":"stack-phx02-phoenix-az","name":"STACK Infrastructure PHX02 Campus","operator":"STACK Infrastructure","city":"Phoenix","county":"Maricopa","address":"800 N 40th St","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.456212,"longitude":-111.995301,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-phx02-phoenix-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/phoenix/phx02/","label":"PHX02 — STACK Infrastructure","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://datacenterhawk.com/marketplace/providers/stack-infrastructure/800-n-40th-street/phx02-building-1","label":"STACK Infrastructure PHX02 Building 1, 800 N 40th Street, Phoenix","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az","sourceRecordId":"stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az","name":"Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)","operator":"Stream Data Centers","city":"Goodyear","county":"Maricopa","address":"2950 South Litchfield Road","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4194907,"longitude":-112.3599883,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.streamdatacenters.com/locations/phoenix/","label":"Stream Data Centers - Phoenix/Goodyear locations page","publisher":"Stream Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/468707940","label":"OpenStreetMap way/468707940","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.streamdatacenters.com/news/booming-in-the-desert-stream-commissions-new-phoenix-data-center/","label":"Stream Data Centers — \"Booming in The Desert: Stream Commissions New Phoenix Data Center\"","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterdynamics.com/en/news/stream-data-centers-opens-phoenix-i-facility-goodyear-arizona/","label":"DataCenterDynamics — \"Stream Data Centers opens Phoenix I facility in Goodyear, Arizona\"","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.streamdatacenters.com/wp-content/uploads/2026/01/SDC-Goodyear-CaseStudy-251218.pdf","label":"Stream Data Centers Goodyear campus case study — 'Evaporative cooling is not sustainable in Metro Phoenix, so our design uses air-cooled chillers with a closed-loop water system.'","publisher":null,"kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-vantage-phoenix-campus-goodyear-az-az","sourceRecordId":"vantage-phoenix-campus-goodyear-az-az","name":"Vantage Phoenix Campus (Goodyear, AZ)","operator":"Vantage Data Centers","city":"Goodyear","county":"Maricopa","address":"45 South Bullard Avenue","state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.4463027,"longitude":-112.3738867,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-phoenix-campus-goodyear-az-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/data-center-locations/north-america/phoenix-arizona/","label":"Vantage facility directory","publisher":"Vantage","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1283734104","label":"OpenStreetMap way/1283734104","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-wintersburg-313-tonopah-az","sourceRecordId":"wintersburg-313-tonopah-az","name":"Wintersburg 313","operator":"313 Wintersburg LLC and Wintersburg Four LLC","city":"Tonopah","county":"Maricopa","address":null,"state":"AZ","stateName":"Arizona","jurisdictionType":"state","latitude":33.472,"longitude":-112.911,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wintersburg-313-tonopah-az","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10316?fileID=100604","label":"Maricopa County Board of Supervisors' Hearing Planning and Zoning Agenda, June 10, 2026 (cases CPA250011 and Z250034, Wintersburg 313)","publisher":"Maricopa County","kind":"permit","retrievedAt":"2026-08-28"}]},{"id":"compute-northpoint-1200-graphics-drive-modesto-ca","sourceRecordId":"northpoint-1200-graphics-drive-modesto-ca","name":"1200 Graphics Drive Data Center (reported NorthPoint Development inquiry)","operator":"NorthPoint Development (reported)","city":"Modesto","county":"Stanislaus","address":"1200 Graphics Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.6517569,"longitude":-121.0209601,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/northpoint-1200-graphics-drive-modesto-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.turlockjournal.com/news/local/data-centers-two-toxic-words-that-frighten-stanislaus-leaders-are-they-an-existential-threat-or-unique-opportunity/","label":"'Data centers': two toxic words that frighten Stanislaus leaders","publisher":"Turlock Journal","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-nestory-park-1215-michigan-street-san-francisco-ca","sourceRecordId":"nestory-park-1215-michigan-street-san-francisco-ca","name":"1215 Michigan Street Data Center (Nestory Park Capital proposal)","operator":"Nestory Park Capital","city":"San Francisco","county":"San Francisco","address":"1215 Michigan Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.7532109,"longitude":-122.3853887,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/nestory-park-1215-michigan-street-san-francisco-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/us/articles/exclusive-major-f-waterfront-may-013424462.html","label":"Exclusive: Major S.F. waterfront site may become 160,000-square-foot data center (SF Chronicle via Yahoo News, 2026-09-19)","publisher":"San Francisco Chronicle (via Yahoo News)","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-menlo-equities-300-holger-way-san-jose-ca","sourceRecordId":"menlo-equities-300-holger-way-san-jose-ca","name":"300 Holger Way Data Center (Menlo Equities conversion)","operator":"Menlo Equities (Holger Technology Partners LLC)","city":"San Jose","county":"Santa Clara","address":"300 Holger Way","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4183407,"longitude":-121.9466942,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/menlo-equities-300-holger-way-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ceqanet.lci.ca.gov/2026070652","label":"CEQAnet SCH 2026070652 — SP25-029 / ER25-243 300 Holger Way Data Center Project, Notice of Exemption (posted 2026-07-16)","publisher":"California Office of Land Use and Climate Innovation (CEQAnet)","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://therealdeal.com/san-francisco/2026/07/29/tishman-speyer-buys-santa-clara-data-center-land/","label":"Tishman Speyer grabs Santa Clara land entitled for data center for $65M (2026-07-29)","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-menlo-equities-great-oaks-parkway-san-jose-ca","sourceRecordId":"menlo-equities-great-oaks-parkway-san-jose-ca","name":"5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)","operator":"Menlo Equities","city":"San Jose","county":"Santa Clara","address":"5601 Great Oaks Parkway","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.2503404,"longitude":-121.7944434,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/menlo-equities-great-oaks-parkway-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://therealdeal.com/san-francisco/2026/08/10/menlo-equities-oppidan-planning-data-centers-in-san-jose/","label":"Menlo Equities, Oppidan next in line for data center projects in San Jose (2026-08-10)","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.kqed.org/news/12095008/san-jose-weighs-data-center-benefits-as-residents-raise-environmental-concerns","label":"San José weighs data center benefits as residents raise environmental concerns (2026-08-13)","publisher":"KQED","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-eight-form-750-north-nash-el-segundo-ca","sourceRecordId":"eight-form-750-north-nash-el-segundo-ca","name":"750 North Nash Street Data Center (Hyatt Place site, withdrawn)","operator":"Eight Form (property owner Welcome Group Inc.)","city":"El Segundo","county":"Los Angeles","address":"750 North Nash Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.9262115,"longitude":-118.3869379,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/eight-form-750-north-nash-el-segundo-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://la.urbanize.city/post/data-center-could-replace-hyatt-place-hotel-750-n-nash-street-el-segundo","label":"Data center could replace Hyatt Place hotel at 750 N. Nash Street in El Segundo (2026-07-06)","publisher":"Urbanize LA","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://la.urbanize.city/post/developer-pulls-plug-short-lived-plan-el-segundo-data-center","label":"Developer pulls the plug on short-lived plan for El Segundo data center (2026-07-13)","publisher":"Urbanize LA","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://hoodline.com/2026/09/la-county-freezes-giant-ai-data-centers-as-solis-pushes-permanent-ban/","label":"LA County freezes giant AI data centers as Solis pushes permanent ban (2026-09-19)","publisher":"Hoodline","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-oppidan-rockpoint-865-embedded-way-san-jose-ca","sourceRecordId":"oppidan-rockpoint-865-embedded-way-san-jose-ca","name":"865 Embedded Way Data Center (Oppidan / Rockpoint)","operator":"Oppidan (with Rockpoint Group)","city":"San Jose","county":"Santa Clara","address":"865 Embedded Way","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.2673552,"longitude":-121.7935875,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oppidan-rockpoint-865-embedded-way-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-10-19"},{"url":"https://therealdeal.com/san-francisco/2026/08/10/menlo-equities-oppidan-planning-data-centers-in-san-jose/","label":"Menlo Equities, Oppidan next in line for data center projects in San Jose (2026-08-10)","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://news.theregistrysf.com/rockpoint-oppidan-swap-manufacturing-plans-for-152676-sqft-data-center-in-south-san-jose/","label":"Rockpoint, Oppidan swap manufacturing plans for 152,676 SQFT data center in South San Jose (2026-08-13)","publisher":"The Registry","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.kqed.org/news/12095008/san-jose-weighs-data-center-benefits-as-residents-raise-environmental-concerns","label":"San José weighs data center benefits as residents raise environmental concerns (2026-08-13)","publisher":"KQED","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-amazon-gilroy-ca","sourceRecordId":"amazon-gilroy-ca","name":"Amazon AWS Gilroy Data Center","operator":"Amazon Web Services","city":"Gilroy","county":"Santa Clara","address":"8050 Camino Arroyo","state":"CA","stateName":"California","jurisdictionType":"state","latitude":36.997,"longitude":-121.541,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-gilroy-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-data-services-gains-approval-for-data-center-on-56-acres-in-gilroy-california/","label":"Amazon Data Services Gains Approval for Data Center on 56 Acres in Gilroy, California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS","label":"Gilroy Data Center (by Amazon Web Services) — Official City Project Page","publisher":"City of Gilroy","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://gilroydispatch.com/data-center-set-for-construction-in-east-gilroy/","label":"Data Center Set for Construction in East Gilroy","publisher":"Gilroy Dispatch","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.aboutamazon.com/news/aws/amazon-data-center-investment-community-impact","label":"Amazon data center investment: local jobs, education, sustainability","publisher":"Amazon","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://gilroydispatch.com/guest-view-what-amazon-didnt-tell-you-and-what-happened-when-we-asked/","label":"Guest View: What Amazon didn't tell you (Gilroy data center FEIR water figures)","publisher":"Gilroy Dispatch","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS","label":"Gilroy Data Center (by Amazon Web Services) — City of Gilroy project page","publisher":"City of Gilroy","kind":"permit","retrievedAt":"2026-09-14"}]},{"id":"compute-amazon-sf011-corporate-avenue-hayward-ca","sourceRecordId":"amazon-sf011-corporate-avenue-hayward-ca","name":"Amazon Data Center SF011 (26415 Corporate Avenue)","operator":"Amazon Web Services","city":"Hayward","county":"Alameda","address":"26415 Corporate Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.626012,"longitude":-122.1133978,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-sf011-corporate-avenue-hayward-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","label":"City of Hayward — Data Center Development Applications (lists Amazon Data Center SF09 and SF011 as operating)","publisher":"City of Hayward","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.hayward-ca.gov/sites/default/files/2026-06/CMO-Data-Centers-Amazon-Data-Center-SF011-150312.pdf","label":"City of Hayward Notice of Exemption (filed 2015-03-12), AUP PL-2014-0520: 150,000 sq ft data center for Amazon Web Services on a 4.21-acre parcel at 26415 Corporate Avenue (APN 461-0001-021-01)","publisher":"City of Hayward","kind":"permit","retrievedAt":"2026-09-21"}]},{"id":"compute-amazon-sf09-corporate-avenue-hayward-ca","sourceRecordId":"amazon-sf09-corporate-avenue-hayward-ca","name":"Amazon Data Center SF09 (26464 Corporate Avenue)","operator":"Amazon Web Services (A-100 LLC)","city":"Hayward","county":"Alameda","address":"26464 Corporate Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.6263578,"longitude":-122.1128762,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-sf09-corporate-avenue-hayward-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","label":"City of Hayward — Data Center Development Applications (lists Amazon Data Center SF09 and SF011 as operating)","publisher":"City of Hayward","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.hayward-ca.gov/sites/default/files/2026-06/CMO-Data-Centers-Amazon-Data-Center-SF09-121005.pdf","label":"PG&E GO 131-D notice (2012-10-01): 115 kV tap to A-100 LLC's approved customer-owned substation at 26464 Corporate Avenue, Hayward (PL-2010-0124)","publisher":"City of Hayward / Pacific Gas and Electric","kind":"permit","retrievedAt":"2026-09-21"}]},{"id":"compute-att-redwood-city-ca","sourceRecordId":"att-redwood-city-ca","name":"AT&T Redwood City Data Center","operator":"AT&T","city":"Redwood City","county":"San Mateo","address":"3175 Spring Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4806769,"longitude":-122.2007195,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/att-redwood-city-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/att-redwood-city-data-center/","label":"AT&T - Redwood City Data Center - Cloud and Colocation","publisher":null,"kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-avaio-perseus-pittsburg-ca","sourceRecordId":"avaio-perseus-pittsburg-ca","name":"AVAIO Digital Perseus","operator":"AVAIO Digital Partners","city":"Pittsburg","county":"Contra Costa","address":"2232 Golf Club Rd","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.011358,"longitude":-121.91098,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/avaio-perseus-pittsburg-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.avaiodigital.com/developments/pittsburg-california","label":"AVAIO Perseus (Pittsburg, CA) project page","publisher":"AVAIO Digital Partners","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.avaiodigital.com/updates/avaio-digital-marks-major-milestone-as-cec-approves-99mw-for-bay-area-data-center-project-perseus","label":"AVAIO Digital marks major milestone as CEC approves 99MW for Bay Area data center project Perseus","publisher":"AVAIO Digital Partners","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://ceqanet.lci.ca.gov/2025100607/4","label":"Notice of Determination - Commercial Design Review modification","publisher":"California CEQAnet","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.climatecasechart.com/collections/center-for-biological-diversity-v-city-of-pittsburg_4f57be","label":"Center for Biological Diversity v. City of Pittsburg - case record","publisher":"Sabin Center Climate Litigation Database","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://biologicaldiversity.org/w/news/press-releases/agreement-secures-renewable-energy-recycled-water-for-california-data-center-2025-12-16/","label":"Agreement secures renewable energy, recycled water for California data center","publisher":"Center for Biological Diversity","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://contracosta.news/2026/06/16/residents-blast-pittsburg-city-council-over-data-center-approval/","label":"Residents blast Pittsburg City Council over data center approval","publisher":"Contra Costa News","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-behring-415-20th-street-oakland-ca","sourceRecordId":"behring-415-20th-street-oakland-ca","name":"Behring 415 20th Street Data Center (former LBNL supercomputing building)","operator":"Behring Companies","city":"Oakland","county":"Alameda","address":"415 20th Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.8086782,"longitude":-122.267477,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/behring-415-20th-street-oakland-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kqed.org/news/12095308/developer-councilmember-say-proposed-oakland-data-center-isnt-what-you-might-think","label":"Developer, councilmember say proposed Oakland data center isn't what you might think (2026-08-15)","publisher":"KQED","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://oaklandside.org/2026/09/11/data-center-temporary-moratorium-oakland-carroll-fife/","label":"Data center moratorium sought by Oakland Councilmember Carroll Fife (2026-09-11)","publisher":"The Oaklandside","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-bridgehead-industrial-oakley-data-center-ca","sourceRecordId":"bridgehead-industrial-oakley-data-center-ca","name":"Bridgehead Industrial Project data center option (withdrawn)","operator":"JB2 Partners / Oxfoot Oakley LLC","city":"Oakley","county":"Contra Costa","address":"3231 Main Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.006222,"longitude":-121.739139,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bridgehead-industrial-oakley-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kqed.org/news/12076074/oakley-drops-data-center-plans-approves-massive-industrial-project","label":"Oakley drops data center plans, approves massive industrial project (2026-03-11)","publisher":"KQED","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://ceqanet.lci.ca.gov/2024050471/4","label":"CEQAnet SCH 2024050471 — Bridgehead Industrial Project, Notice of Determination (approved 2026-03-10), 3231 Main Street, Oakley","publisher":"California Office of Land Use and Climate Innovation (CEQAnet)","kind":"permit","retrievedAt":"2026-09-21"}]},{"id":"compute-nygc-buena-vista-ai-factory-ione-ca","sourceRecordId":"nygc-buena-vista-ai-factory-ione-ca","name":"Buena Vista AI Factory","operator":"NewYork GreenCloud","city":"Ione","county":"Amador","address":"4655 Coal Mine Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.2782244,"longitude":-120.9115886,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nygc-buena-vista-ai-factory-ione-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mymotherlode.com/news/local/11078052/biomass-fueled-data-center-project-planned-in-amador-county.html","label":"Biomass-fueled data center project planned in Amador County","publisher":"myMotherLode.com","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://biomassmagazine.com/articles/newyork-greencloud-acquires-buena-vista-biomass-power-facility-to-launch-first-carbon-negative-ai-factory","label":"NewYork GreenCloud acquires Buena Vista Biomass Power facility to launch first carbon-negative AI factory","publisher":"Biomass Magazine","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=4655%20Coal%20Mine%20Road%2C%20Amador%20County%2C%20California","label":"Nominatim geocode of 4655 Coal Mine Road, Amador County, California","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-calethos-lithium-valley-imperial-county-ca","sourceRecordId":"calethos-lithium-valley-imperial-county-ca","name":"CalEthos Lithium Valley Data Center Campus","operator":"CalEthos, Inc.","city":"El Centro","county":"Imperial","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":32.79,"longitude":-115.56,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/calethos-lithium-valley-imperial-county-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/calethos-expands-data-center-plans-for-lithium-valley-california-with-315-acre-land-purchase/","label":"CalEthos expands data center plans for Lithium Valley, California, with 315-acre land purchase","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cdt-vacaville-data-center-ca","sourceRecordId":"cdt-vacaville-data-center-ca","name":"California Department of Technology Vacaville Data Center (1020 Vaquero Circle)","operator":"California Department of Technology","city":"Vacaville","county":"Solano","address":"1020 Vaquero Circle","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.3839859,"longitude":-121.9499907,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cdt-vacaville-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ceqanet.lci.ca.gov/2026020164","label":"Vacaville Data Center-1020 Vaquero Circle (SCH 2026020164), Notice of Exemption","publisher":"CEQAnet / Department of General Services","kind":"permit","retrievedAt":"2026-09-29"}]},{"id":"compute-centersquare-lax3-irvine-ca","sourceRecordId":"centersquare-lax3-irvine-ca","name":"Centersquare LAX3","operator":"Centersquare (Cyxtera/Evoque)","city":"Irvine","county":"Orange","address":"17836 Gillette Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.6870931,"longitude":-117.8479769,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-lax3-irvine-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/los-angeles","label":"Centersquare Los Angeles-market data center directory (LAX3/LAX5)","publisher":"Centersquare","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.peeringdb.com/fac/2641","label":"Centersquare Los Angeles (LAX3) - PeeringDB facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://inflect.com/building/17836-gillette-avenue-irvine/centersquare/datacenter/oc2","label":"Centersquare LAX3-A / OC2, 17836 Gillette Avenue - Inflect listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-centersquare-lax5-irvine-ca","sourceRecordId":"centersquare-lax5-irvine-ca","name":"Centersquare LAX5","operator":"Centersquare (Cyxtera/Evoque)","city":"Irvine","county":"Orange","address":"2681 Kelvin Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.6847703,"longitude":-117.8366956,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-lax5-irvine-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/los-angeles","label":"Centersquare Los Angeles-market data center directory (LAX3/LAX5)","publisher":"Centersquare","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.peeringdb.com/fac/6670","label":"Centersquare Los Angeles (LAX5) - PeeringDB facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/centersquare-irvine-lax2","label":"Centersquare Irvine LAX2/LAX5 - Baxtel facility record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-coachella-valley-technology-campus-ca","sourceRecordId":"coachella-valley-technology-campus-ca","name":"Coachella Valley Technology Campus","operator":"Stronghold Power Systems","city":"Coachella","county":"Riverside","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.671181,"longitude":-116.169492,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coachella-valley-technology-campus-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nbcpalmsprings.com/2026/05/12/coachella-residents-pack-town-hall-over-proposed-ai-data-center-raising-alarms-about-water-power-costs-and-transparency","label":"Coachella residents pack town hall over proposed 'AI data center,' raising alarms about water, power costs and transparency","publisher":"NBC Palm Springs","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://riversiderecord.org/coachella-valley-data-center-town-hall/","label":"Coachella Valley data center town hall","publisher":"Riverside Record","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://kvcr.org/news/local/2026-05-28/coachella-considers-moratorium-on-data-centers-as-community-pushes-back-against-proposed-tech-campus","label":"Coachella considers moratorium on data centers as community pushes back against proposed tech campus","publisher":"KVCR","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.nbcpalmsprings.com/2026/06/04/coachella-approves-data-center-moratorium-ends-stronghold-power-agreement","label":"Coachella approves data center moratorium, ends Stronghold power agreement","publisher":"NBC Palm Springs","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://kesq.com/news/2026/06/04/coachella-moves-closer-to-permanent-data-center-ban-as-it-approves-moratorium-and-terminates-agreement-with-developer/","label":"Coachella moves closer to permanent data center ban as it approves moratorium and terminates agreement with developer","publisher":"KESQ","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://gpsbusinessinsider.com/coachella-power-strategy/","label":"Coachella's power strategy","publisher":"GPS Business Insider","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://dmkprojects.com/coachella-valley-technology-campus/","label":"Coachella Valley Technology Campus - project page","publisher":"DMK Project Solutions Services","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://kesq.com/news/2026/07/08/coachella-city-council-to-extends-45-day-data-center-moratorium-in-preparation-of-permanent-ban/","label":"Coachella City Council extends 45-day data center moratorium in preparation of permanent ban","publisher":"KESQ","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.nbcpalmsprings.com/2026/07/16/coachella-planning-commission-recommends-permanent-data-center-ban-with-two-conditions-attached","label":"Coachella Planning Commission recommends permanent data center ban with two conditions attached","publisher":"NBC Palm Springs","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://patch.com/california/across-ca/massive-water-thirsty-data-centers-proposed-cas-hottest-communities","label":"Massive, water-thirsty data centers proposed in CA's hottest communities (2026-05-08)","publisher":"Patch","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-colocation-america-sfdc1-san-francisco-ca","sourceRecordId":"colocation-america-sfdc1-san-francisco-ca","name":"Colocation America SFDC1 (200 Paul Avenue)","operator":"Colocation America","city":"San Francisco","county":"San Francisco","address":"200 Paul Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.7234595,"longitude":-122.3979578,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/colocation-america-sfdc1-san-francisco-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/colocation-america-san-francisco-data-center-1/","label":"Colocation America - San Francisco Data Center 1 - Cloud and Colocation","publisher":null,"kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-cologix-sv1-ca","sourceRecordId":"cologix-sv1-ca","name":"Cologix SV1","operator":"Cologix","city":"Santa Clara","county":"Santa Clara","address":"2050 Martin Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3654018,"longitude":-121.9616726,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-sv1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/silicon-valley/sv1/","label":"Cologix facility directory","publisher":"Cologix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/40608200","label":"OpenStreetMap way/40608200","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-connect-data-centers-comstock-street-santa-clara-ca","sourceRecordId":"connect-data-centers-comstock-street-santa-clara-ca","name":"Connect Data Centers Santa Clara (715 Comstock Street)","operator":"Connect Data Centers (Oppidan / Harrison Street Real Estate Capital JV)","city":"Santa Clara","county":"Santa Clara","address":"715 Comstock Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3748317,"longitude":-121.9474949,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/connect-data-centers-comstock-street-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/connect-data-centers-santa-clara-ca","label":"Connect Data Centers: Santa Clara, CA","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-coresite-bowers-santa-clara-ca","sourceRecordId":"coresite-bowers-santa-clara-ca","name":"CoreSite Bowers Data Center","operator":"CoreSite","city":"Santa Clara","county":"Santa Clara","address":"2805 Bowers Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.389,"longitude":-121.974,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-bowers-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/gi-partners-secures-planning-permission-for-72mw-data-center-in-santa-clara-california/","label":"GI Partners Secures Planning Permission for 72MW Data Center in Santa Clara","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/coresite-acquires-silicon-valley-office-property-zoned-for-data-center-redevelopment/","label":"CoreSite Acquires Silicon Valley Office Property Zoned for Data Center Redevelopment","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.santaclaraca.gov/Home/Components/BusinessDirectory/BusinessDirectory/491/2495?npage=2","label":"2805 Bowers Avenue — Data Center Project Listing","publisher":"City of Santa Clara","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/bowers-backup-generating-facility","label":"Bowers Backup Generating Facility (22-SPPE-01), 2805 Bowers Avenue","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://hoodline.com/2026/02/coresite-drops-100-million-on-santa-clara-tech-strip/","label":"CoreSite drops $100 million on Santa Clara tech strip","publisher":"Hoodline","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=2805%20Bowers%20Avenue%2C%20Santa%20Clara%2C%20CA","label":"Nominatim geocode of 2805 Bowers Avenue, Santa Clara, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-coresite-la1-los-angeles-ca","sourceRecordId":"coresite-la1-los-angeles-ca","name":"CoreSite LA1 (One Wilshire)","operator":"CoreSite","city":"Los Angeles","county":"Los Angeles","address":"624 South Grand Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0478871,"longitude":-118.2555541,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-la1-los-angeles-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/la1-los-angeles-ca","label":"CoreSite LA1 facility page","publisher":"CoreSite","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.coresite.com/spec-sheets/los-angeles-la1-facility-spec-sheet","label":"CoreSite LA1 facility spec sheet","publisher":"CoreSite","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/gi-partners-refinances-one-wilshire-carrier-hotel-in-los-angeles/","label":"GI Partners refinances One Wilshire carrier hotel in Los Angeles","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterknowledge.com/deals/gi-partners-buys-la-telecom-hub-one-wilshire","label":"GI Partners buys LA telecom hub One Wilshire","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-coresite-la2-los-angeles-ca-ca","sourceRecordId":"coresite-la2-los-angeles-ca-ca","name":"CoreSite LA2 - Los Angeles, CA","operator":"CoreSite","city":"Los Angeles","county":"Los Angeles","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0584789,"longitude":-118.2359144,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-la2-los-angeles-ca-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/la2-los-angeles-ca","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/13042311881","label":"OpenStreetMap node/13042311881","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-coresite-la3-los-angeles-ca","sourceRecordId":"coresite-la3-los-angeles-ca","name":"CoreSite LA3 (200 Bauchet Street)","operator":"CoreSite","city":"Los Angeles","county":"Los Angeles","address":"200 Bauchet Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0595449,"longitude":-118.230318,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-la3-los-angeles-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/la3-los-angeles-ca","label":"CoreSite LA3 Los Angeles data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-coresite-sv1-san-jose-ca-ca","sourceRecordId":"coresite-sv1-san-jose-ca-ca","name":"CoreSite SV1 - San Jose, CA","operator":"CoreSite","city":"San Jose","county":"Santa Clara","address":"55 South Market Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3341181,"longitude":-121.891646,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-sv1-san-jose-ca-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/sv1-san-jose-ca","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/8897151054","label":"OpenStreetMap node/8897151054","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-coresite-sv2-milpitas-ca","sourceRecordId":"coresite-sv2-milpitas-ca","name":"CoreSite SV2 (Milpitas)","operator":"CoreSite","city":"Milpitas","county":"Santa Clara","address":"1656 McCarthy Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.405683,"longitude":-121.9162603,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-sv2-milpitas-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/sv2-milpitas-ca","label":"CoreSite SV2 Milpitas data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-coresite-sv4-santa-clara-ca","sourceRecordId":"coresite-sv4-santa-clara-ca","name":"CoreSite SV4 (2972 Stender Way)","operator":"CoreSite","city":"Santa Clara","county":"Santa Clara","address":"2972 Stender Way","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3762625,"longitude":-121.9706843,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-sv4-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/sv4-santa-clara-ca","label":"CoreSite SV4 Santa Clara data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-coresite-sv7-santa-clara-ca","sourceRecordId":"coresite-sv7-santa-clara-ca","name":"CoreSite SV7 (3020 Coronado Drive)","operator":"CoreSite","city":"Santa Clara","county":"Santa Clara","address":"3020 Coronado Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3760788,"longitude":-121.9730567,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-sv7-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/sv7-santa-clara-ca","label":"CoreSite SV7 Santa Clara data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-coresite-sv8-santa-clara-ca","sourceRecordId":"coresite-sv8-santa-clara-ca","name":"CoreSite SV8 (3035 Stender Way)","operator":"CoreSite","city":"Santa Clara","county":"Santa Clara","address":"3035 Stender Way","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3773826,"longitude":-121.97184,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-sv8-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/sv8-santa-clara-ca","label":"CoreSite SV8 Santa Clara data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-coresite-sv9-santa-clara-ca","sourceRecordId":"coresite-sv9-santa-clara-ca","name":"CoreSite SV9 (2915 Stender Way)","operator":"CoreSite","city":"Santa Clara","county":"Santa Clara","address":"2915 Stender Way","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3756123,"longitude":-121.9696044,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-sv9-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/sv9-santa-clara-ca","label":"CoreSite SV9 Santa Clara data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-global-stack-cow-palace-daly-city-ca","sourceRecordId":"global-stack-cow-palace-daly-city-ca","name":"Cow Palace Edge Data Center (Global Stack proposal)","operator":"Global Stack LLC","city":"Daly City","county":"San Mateo","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.7061821,"longitude":-122.4202102,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/global-stack-cow-palace-daly-city-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/","label":"Amid rising fear over data centers, an S.F. supervisor quietly plans a moratorium (2026-09-10)","publisher":"Mission Local","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.yahoo.com/news/us/articles/california-proposal-build-least-8-001813987.html","label":"California proposal would build 8 data centers in Bay Area. Here's where (SF Chronicle via Yahoo News, 2026-07-08)","publisher":"San Francisco Chronicle (via Yahoo News)","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-csquare-sfo1-ca","sourceRecordId":"csquare-sfo1-ca","name":"Csquare SFO1","operator":"Csquare","city":"Santa Clara","county":"Santa Clara","address":"2401 Walsh Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3714713,"longitude":-121.9696826,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/csquare-sfo1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo1","label":"Csquare facility directory","publisher":"Csquare","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.openstreetmap.org/way/38305568","label":"OpenStreetMap way/38305568","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-csquare-sfo2-ca","sourceRecordId":"csquare-sfo2-ca","name":"Csquare SFO2","operator":"Csquare","city":"Santa Clara","county":"Santa Clara","address":"4700 Old Ironsides Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.397572,"longitude":-121.980963,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/csquare-sfo2-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo2","label":"Csquare facility directory","publisher":"Csquare","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/54119665","label":"OpenStreetMap way/54119665","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-csquare-sfo3-ca","sourceRecordId":"csquare-sfo3-ca","name":"Csquare SFO3","operator":"Csquare","city":"Sunnyvale","county":"Santa Clara","address":"1400 Kifer Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3720542,"longitude":-121.9860407,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/csquare-sfo3-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/silicon-valley#sunnyvale-sfo3","label":"Csquare facility directory","publisher":"Csquare","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/271893323","label":"OpenStreetMap way/271893323","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-csquare-sfo4-ca","sourceRecordId":"csquare-sfo4-ca","name":"Csquare SFO4","operator":"Csquare","city":"Santa Clara","county":"Santa Clara","address":"1500 Space Park Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3757986,"longitude":-121.9551844,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/csquare-sfo4-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo4","label":"Csquare facility directory","publisher":"Csquare","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/209073658","label":"OpenStreetMap way/209073658","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cyrusone-nas-lemoore-ca","sourceRecordId":"cyrusone-nas-lemoore-ca","name":"CyrusOne AI Data Center at NAS Lemoore","operator":"CyrusOne","city":null,"county":"Kings","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":36.303,"longitude":-119.953,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nas-lemoore-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ir.ameresco.com/news-events/press-releases/detail/715/ameresco-and-u-s-navy-partner-to-build-ai-optimized-data","label":"Ameresco and U.S. Navy Partner to Build AI-Optimized Data Center and Energy Infrastructure at NAS Lemoore","publisher":"Ameresco, Inc.","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/ameresco-partners-with-cyrusone-to-develop-offgrid-ai-data-center-at-naval-air-station-lemoore-in-california/","label":"Ameresco Partners with CyrusOne to Develop Offgrid AI Data Center at Naval Air Station Lemoore in California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://hanfordsentinel.com/business/groundbreaking-for-big-nas-lemoore-data-center-and-energy-project-near-john-lindt/article_716c1006-1e5f-46cc-b4e9-eec31a7ee526.html","label":"Groundbreaking for NAS Lemoore data center & energy project","publisher":"Hanford Sentinel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://hanfordsentinel.com/business/agriculture/gilcrease-calls-for-dialogue-over-data-center-john-lindt/article_6a2df66b-4581-4589-9d21-7208d166f35a.html","label":"Gilcrease calls for dialogue over data center","publisher":"Hanford Sentinel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-databank-san1-san-diego-ca","sourceRecordId":"databank-san1-san-diego-ca","name":"DataBank San Diego SAN1","operator":"DataBank","city":"San Diego","county":"San Diego","address":"12270 World Trade Drive, Suite 100","state":"CA","stateName":"California","jurisdictionType":"state","latitude":32.9886013,"longitude":-117.073246,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/databank-san1-san-diego-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/san-diego/12270-world-trade-drive/","label":"DataBank San Diego (SAN1), 12270 World Trade Drive - facility page","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.databank.com/resources/press-releases/databank-expands-capacity-of-san1-data-center-in-san-diego/","label":"DataBank expands capacity of SAN1 data center in San Diego","publisher":"DataBank","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/databank-san-diego-san1","label":"DataBank San Diego SAN1 - Baxtel facility record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-databank-sna1-irvine-ca","sourceRecordId":"databank-sna1-irvine-ca","name":"DataBank SNA1","operator":"DataBank","city":"Irvine","county":"Orange","address":"17222 Von Karman Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.69137,"longitude":-117.84036,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-sna1-irvine-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/irvine/","label":"DataBank Irvine Data Centers","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-databank-sna2-irvine-ca","sourceRecordId":"databank-sna2-irvine-ca","name":"DataBank SNA2","operator":"DataBank","city":"Irvine","county":"Orange","address":"17400 Von Karman Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.68882,"longitude":-117.84289,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-sna2-irvine-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/irvine/","label":"DataBank Irvine Data Centers","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-digico-lax1-monterey-park-ca","sourceRecordId":"digico-lax1-monterey-park-ca","name":"DigiCo LAX1 (1977 Saturn Street)","operator":"DigiCo Infrastructure REIT","city":"Monterey Park","county":"Los Angeles","address":"1977 Saturn Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.03951,"longitude":-118.115058,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digico-lax1-monterey-park-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.montereypark.ca.gov/DocumentCenter/View/18798/26_03_31_SIGNED_LAX---Letter-to-City-of-Monterey-Park","label":"Signed withdrawal letter - HMC StratCap 1977 Saturn, LLC to City of Monterey Park (March 31, 2026)","publisher":"City of Monterey Park","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://www.montereypark.ca.gov/1710/Data-Center-Information","label":"Data Center Information - Ordinance 2279 / Measure NDC","publisher":"City of Monterey Park","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://laist.com/news/politics/developer-pulls-monterey-park-data-center-plan-after-backlash","label":"Developer pulls Monterey Park data center plan after backlash","publisher":"LAist","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.foxbusiness.com/fox-news-tech/monterey-park-permanent-data-center-ban","label":"Monterey Park voters approve permanent data center ban","publisher":"Fox Business","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.nodatacentermpk.org/projectoverview","label":"Project overview - No Data Center MPK","publisher":"No Data Center MPK","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.coloradoboulevard.net/data-center-developer-withdraws-monterey-park-proposal-as-measure-ndc-heads-to-june-ballot/","label":"Data center developer withdraws Monterey Park proposal as Measure NDC heads to June ballot","publisher":"ColoradoBoulevard.net","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.realestatesource.com.au/digico-sells-la-data-centre-sites/","label":"DigiCo sells LA data centre sites","publisher":"Real Estate Source (AU)","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/digico-los-angeles-lax1","label":"DigiCo Los Angeles LAX1 - Baxtel facility record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-digital-realty-727-s-grand-ave-la-ca","sourceRecordId":"digital-realty-727-s-grand-ave-la-ca","name":"Digital Realty 727 S. Grand Avenue (DTLA)","operator":"Digital Realty","city":"Los Angeles","county":"Los Angeles","address":"727 S. Grand Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.046823,"longitude":-118.257149,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-727-s-grand-ave-la-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/colocation/article/33005622/digital-realty-plans-13-story-data-center-in-downtown-los-angeles","label":"Digital Realty Plans 13-Story Data Center in Downtown Los Angeles","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://la.urbanize.city/post/dtla-data-center-727-s-grand-ave-track-start-work-2025","label":"DTLA data center at 727 S. Grand Ave. on track to start work in 2025","publisher":"Urbanize LA","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://la.urbanize.city/post/heres-updated-look-big-data-center-727-s-grand-ave-dtla","label":"Here's the updated look for the big data center at 727 S. Grand Ave.","publisher":"Urbanize LA","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.bisnow.com/los-angeles/news/data-center/727-grand-avenue-downtown-los-angeles-digital-realty-data-center-127124","label":"Digital Realty To Add New Data Center To Downtown LA Block","publisher":"Bisnow","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://downtownla.com/building/727-s-grand-data-center","label":"727 S. Grand (Data Center) project tracker","publisher":"Downtown LA","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://datacenterhawk.com/marketplace/providers/digital-realty/727-south-grand-avenue/lax13","label":"Digital Realty LAX13 - 727 South Grand Avenue","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://therealdeal.com/la/2025/11/07/digital-realty-buys-site-for-data-center-in-la-suburb-vernon/","label":"Digital Realty drops $9M per acre on Vernon data center site (confirms 727 Grand Ave. status as 'unclear' as of Nov 2025)","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-digital-realty-lax10-los-angeles-ca","sourceRecordId":"digital-realty-lax10-los-angeles-ca","name":"Digital Realty LAX10 (600 West 7th Street)","operator":"Digital Realty","city":"Los Angeles","county":"Los Angeles","address":"600 West 7th Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0473298,"longitude":-118.2575439,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-lax10-los-angeles-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax10","label":"Digital Realty LAX10 data center","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-digital-realty-lax11-el-segundo-ca","sourceRecordId":"digital-realty-lax11-el-segundo-ca","name":"Digital Realty LAX11 (200 North Nash Street)","operator":"Digital Realty","city":"El Segundo","county":"Los Angeles","address":"200 North Nash Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.9176631,"longitude":-118.3863556,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-lax11-el-segundo-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax11","label":"Digital Realty LAX11 data center","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-digital-realty-lax12-ca","sourceRecordId":"digital-realty-lax12-ca","name":"Digital Realty LAX12","operator":"Digital Realty","city":"El Segundo","county":"Los Angeles","address":"2260 East El Segundo Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.9156593,"longitude":-118.3846186,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-lax12-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax12","label":"Digital Realty official facility page (LAX12, 2260 E El Segundo Blvd)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/424945852","label":"OpenStreetMap way/424945852","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-oak10-ca","sourceRecordId":"digital-realty-oak10-ca","name":"Digital Realty OAK10","operator":"Digital Realty","city":"Oakland","county":"Alameda","address":"720 2nd Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.7992148,"longitude":-122.2829762,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-oak10-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/oak10","label":"OAK10 Data Center facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.openstreetmap.org/way/377378597","label":"OpenStreetMap way/377378597","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-02"},{"url":"https://datacenterhawk.com/marketplace/providers/digital-realty/720-2nd-street/oak10","label":"DataCenterHawk OAK10 marketplace listing","publisher":"DataCenterHawk","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-digital-realty-sc1-ca","sourceRecordId":"digital-realty-sc1-ca","name":"Digital Realty SC1","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"2220 De La Cruz Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3616469,"longitude":-121.9439784,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sc1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sc1","label":"Digital Realty official facility page (SC1, 2220 De La Cruz Blvd, Santa Clara)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/358455179","label":"OpenStreetMap way/358455179","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/santa-clara-sc-1-data-center","label":"Santa Clara SC-1 Data Center, Phase 2 (11-SPPE-01), 555 Reed Street","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=555%20Reed%20Street%2C%20Santa%20Clara%2C%20CA","label":"Nominatim geocode of 555 Reed Street, Santa Clara, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-digital-realty-sfo10-ca","sourceRecordId":"digital-realty-sfo10-ca","name":"Digital Realty SFO10","operator":"Digital Realty","city":"San Francisco","county":"San Francisco","address":"200 Paul Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.7236272,"longitude":-122.3979543,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sfo10-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sfo10","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/289620443","label":"OpenStreetMap way/289620443","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley","label":"Digital Realty Silicon Valley data centers","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-digital-realty-sfo12-365-main-street-ca","sourceRecordId":"digital-realty-sfo12-365-main-street-ca","name":"Digital Realty SFO12 (365 Main Street)","operator":"Digital Realty","city":"San Francisco","county":"San Francisco","address":"365 Main Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.788731,"longitude":-122.390469,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sfo12-365-main-street-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sfo12","label":"Digital Realty official facility page (SFO12, 365 Main Street)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/460085343","label":"OpenStreetMap way/460085343","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-digital-realty-silicon-valley-sjc10-ca","sourceRecordId":"digital-realty-silicon-valley-sjc10-ca","name":"Digital Realty Silicon Valley SJC10","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"1100 Space Park Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.375822,"longitude":-121.9533359,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc10-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc10","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/209073641","label":"OpenStreetMap way/209073641","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-silicon-valley-sjc11-ca","sourceRecordId":"digital-realty-silicon-valley-sjc11-ca","name":"Digital Realty Silicon Valley SJC11","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"3011 Lafayette Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3763668,"longitude":-121.9485649,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc11-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc11","label":"Digital Realty facility page; corroborated by search results","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/209076412","label":"OpenStreetMap way/209076412","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-silicon-valley-sjc16-ca","sourceRecordId":"digital-realty-silicon-valley-sjc16-ca","name":"Digital Realty Silicon Valley SJC16","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"1525 Comstock Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3749324,"longitude":-121.9559987,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc16-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc16","label":"Digital Realty facility page; corroborated by search results","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/209073653","label":"OpenStreetMap way/209073653","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-silicon-valley-sjc30-ca","sourceRecordId":"digital-realty-silicon-valley-sjc30-ca","name":"Digital Realty Silicon Valley SJC30","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"3105 Alfred Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3782874,"longitude":-121.9581107,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc30-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc30","label":"Digital Realty facility page; corroborated by datacenterhawk/UPSTACK listings","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/209073647","label":"OpenStreetMap way/209073647","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-silicon-valley-sjc31-ca","sourceRecordId":"digital-realty-silicon-valley-sjc31-ca","name":"Digital Realty Silicon Valley SJC31","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"2805 Lafayette Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3722213,"longitude":-121.9482625,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc31-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc31","label":"Digital Realty facility page; corroborated by search results","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/209087373","label":"OpenStreetMap way/209087373","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-sjc15-santa-clara-ca","sourceRecordId":"digital-realty-sjc15-santa-clara-ca","name":"Digital Realty SJC15 (1201 Comstock Street)","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"1201 Comstock Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3749966,"longitude":-121.9540769,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sjc15-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc15","label":"Digital Realty SJC15 data center","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-digital-realty-sjc29-santa-clara-ca","sourceRecordId":"digital-realty-sjc29-santa-clara-ca","name":"Digital Realty SJC29 (1725 Comstock Street)","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"1725 Comstock Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3750235,"longitude":-121.9581011,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sjc29-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc29","label":"Digital Realty SJC29 data center","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-digital-realty-sjc34-ca","sourceRecordId":"digital-realty-sjc34-ca","name":"Digital Realty SJC34","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"2820 Northwestern Parkway","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3724077,"longitude":-121.973647,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sjc34-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc34","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/38305431","label":"OpenStreetMap way/38305431","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-sjc36-lafayette-santa-clara-ca","sourceRecordId":"digital-realty-sjc36-lafayette-santa-clara-ca","name":"Digital Realty SJC36 (Lafayette Data Center, 2825 Lafayette Street)","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"2825 Lafayette Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.37287,"longitude":-121.946796,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sjc36-lafayette-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/reciprocating-engine/lafayette-backup-generating-facility","label":"California Energy Commission — Lafayette Backup Generating Facility (20-SPPE-02)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=249557","label":"CEC staff document, docket 20-SPPE-02: Digital Realty proposes the Lafayette Data Center at 2825 Lafayette Street, Santa Clara (44 x 3.0 MW backup gensets)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-21"}]},{"id":"compute-digital-realty-sjc37-santa-clara-ca","sourceRecordId":"digital-realty-sjc37-santa-clara-ca","name":"Digital Realty SJC37 (641 Walsh Avenue)","operator":"Digital Realty","city":"Santa Clara","county":"Santa Clara","address":"641 Walsh Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3709854,"longitude":-121.9472165,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sjc37-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc37","label":"SJC37 Data Center | 641 Walsh Ave | Digital Realty","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=641%20Walsh%20Avenue%2C%20Santa%20Clara%2C%20CA","label":"Nominatim geocode of 641 Walsh Avenue, Santa Clara, CA — returns the named feature \"Digital Realty Silicon Valley SJC37\"","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-digital-realty-vernon-ca","sourceRecordId":"digital-realty-vernon-ca","name":"Digital Realty Vernon Data Center","operator":"Digital Realty","city":"Vernon","county":"Los Angeles","address":"4400 Pacific Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.99951,"longitude":-118.2252615,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-vernon-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bisnow.com/los-angeles/news/data-center-development/digital-realty-buys-vernon-data-center-site-49m-131715","label":"Digital Realty buys Vernon data center site for $49M","publisher":"Bisnow","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.klabin.com/news/the-klabin-company-represents-digital-realty-in-488-million-land-acquisition-in-vernon","label":"The Klabin Company represents Digital Realty in $48.8 million land acquisition in Vernon","publisher":"The Klabin Company","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.prnewswire.com/news-releases/digital-realty-reports-third-quarter-2025-results-302593261.html","label":"Digital Realty reports third quarter 2025 results","publisher":"Digital Realty / PR Newswire","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://cleanview.co/data-centers/california/1886/digital-realty-vernon-data-center","label":"Digital Realty Vernon Data Center","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-eagle-mountain-data-oc1-anaheim-ca","sourceRecordId":"eagle-mountain-data-oc1-anaheim-ca","name":"Eagle Mountain Data OC1 (Anaheim Data Center)","operator":"Eagle Mountain Data Inc","city":"Anaheim","county":"Orange","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.8366,"longitude":-117.9143,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/eagle-mountain-data-oc1-anaheim-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://eaglemountain.ai/post/eagle-mountain-data-now-offering-high-density-ai-gpu-capacity-at-fully-energized-anaheim-data-center","label":"Eagle Mountain Data Now Offering High Density AI GPU Capacity at Fully Energized Anaheim Data Center","publisher":"Eagle Mountain Data","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-ecl-csc1-santa-clara-ca","sourceRecordId":"ecl-csc1-santa-clara-ca","name":"ECL CSC-1 FlexGrid AI Data Center","operator":"ECL","city":"Santa Clara","county":"Santa Clara","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.354,"longitude":-121.955,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ecl-csc1-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.businesswire.com/news/home/20260421198659/en/ECL-35MW-FlexGrid-Powered-Data-Center-in-Santa-Clara-Builds-Atop-On-Grid-Power-for-High-Density-AI-Delivery","label":"ECL 35MW FlexGrid-Powered Data Center in Santa Clara Builds Atop On-Grid Power for High-Density AI Delivery","publisher":"BusinessWire","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/ecl-plans-35mw-data-center-in-california-that-will-use-some-hydrogen-power/","label":"ECL Plans 35MW Data Center in California That Will Use Some Hydrogen Power","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://convergedigest.com/ecl-unveils-35mw-flexgrid-data-center-in-santa-clara-to-tackle-ai-power-constraints/","label":"ECL Unveils 35MW FlexGrid Data Center in Santa Clara to Tackle AI Power Constraints","publisher":"Converge Digest","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://hoodline.com/2026/07/hydrogen-hustle-ecl-taps-powercell-to-juice-santa-clara-data-center-boom/","label":"Hydrogen hustle: ECL taps PowerCell to juice Santa Clara data center","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-edgeconnex-sac01-ca","sourceRecordId":"edgeconnex-sac01-ca","name":"EdgeConneX SAC01","operator":"EdgeConneX","city":"Rancho Cordova","county":"Sacramento","address":"10980 Gold Center Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.5922987,"longitude":-121.27744,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-sac01-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/sacramento-ca/","label":"EdgeConneX official locations page - Sacramento","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/933393863","label":"OpenStreetMap way/933393863","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-edgeconnex-sdg01-ca","sourceRecordId":"edgeconnex-sdg01-ca","name":"EdgeConneX SDG01","operator":"EdgeConneX","city":"San Diego","county":"San Diego","address":"5761 Copley Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":32.8423554,"longitude":-117.1694226,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-sdg01-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/san-diego-ca/","label":"EdgeConneX official locations page - San Diego","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/31803515","label":"OpenStreetMap way/31803515","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-edgecore-silicon-valley-santa-clara-ca","sourceRecordId":"edgecore-silicon-valley-santa-clara-ca","name":"EdgeCore Silicon Valley Campus (Laurelwood Data Center)","operator":"EdgeCore Digital Infrastructure","city":"Santa Clara","county":"Santa Clara","address":"2201 Laurelwood Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3832941,"longitude":-121.9624766,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgecore-silicon-valley-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edgecore.com/locations/silicon-valley-data-center","label":"Silicon Valley Data Centers — EdgeCore","publisher":"EdgeCore Digital Infrastructure","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://ceqanet.lci.ca.gov/2019089107/2","label":"Laurelwood Data Center — Mitigated Negative Declaration (SCH 2019089107)","publisher":"California Governor's Office of Land Use and Climate Innovation (CEQAnet)","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/laurelwood-data-center","label":"Laurelwood Data Center (19-SPPE-01)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=2201%20Laurelwood%20Road%2C%20Santa%20Clara%2C%20CA","label":"Nominatim geocode of 2201 Laurelwood Road, Santa Clara, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-equinix-great-oaks-south-san-jose-ca","sourceRecordId":"equinix-great-oaks-south-san-jose-ca","name":"Equinix Great Oaks South Data Center (SV12, SV18, SV19)","operator":"Equinix","city":"San Jose","county":"Santa Clara","address":"123 Great Oaks Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.233028,"longitude":-121.7807945,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-great-oaks-south-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/great-oaks-south-generating-facility","label":"Great Oaks South Generating Facility (20-SPPE-01)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=123%20Great%20Oaks%20Boulevard%2C%20San%20Jose%2C%20CA","label":"Nominatim geocode of 123 Great Oaks Boulevard, San Jose, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-equinix-la3-el-segundo-ca","sourceRecordId":"equinix-la3-el-segundo-ca","name":"Equinix LA3","operator":"Equinix","city":"El Segundo","county":"Los Angeles","address":"1920 East Maple Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.9263426,"longitude":-118.3940556,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-la3-el-segundo-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/los-angeles-data-centers/la3","label":"Equinix LA3 official facility page","publisher":"Equinix","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/equinix-el-segundo-la3","label":"Equinix El Segundo LA3 - Baxtel facility record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.peeringdb.com/fac/333","label":"Equinix LA3/LA4 - Los Angeles, El Segundo (PeeringDB facility record)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.openstreetmap.org/way/424945843","label":"OpenStreetMap way/424945843 (1920 East Maple Avenue building)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-02"}]},{"id":"compute-equinix-la4-el-segundo-ca","sourceRecordId":"equinix-la4-el-segundo-ca","name":"Equinix LA4","operator":"Equinix","city":"El Segundo","county":"Los Angeles","address":"445 North Douglas Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.9219979,"longitude":-118.383118,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-la4-el-segundo-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/los-angeles-data-centers/la4","label":"Equinix LA4 official facility page","publisher":"Equinix","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.peeringdb.com/fac/333","label":"Equinix LA3/LA4 - Los Angeles, El Segundo (PeeringDB facility record)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/equinix-el-segundo-la4","label":"Equinix El Segundo LA4 Data Center - Baxtel facility record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://datacenterhawk.com/marketplace/providers/equinix/445-n-douglas-street/la4","label":"Equinix LA4 - datacenterHawk marketplace listing","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-equinix-sv1-ca","sourceRecordId":"equinix-sv1-ca","name":"Equinix SV1","operator":"Equinix","city":"San Jose","county":"Santa Clara","address":"11 Great Oaks Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.2415975,"longitude":-121.7833277,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-sv1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv1","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/35491576","label":"OpenStreetMap way/35491576","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-sv15-ca","sourceRecordId":"equinix-sv15-ca","name":"Equinix SV15","operator":"Equinix","city":"Santa Clara","county":"Santa Clara","address":"2970 Corvin Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3754952,"longitude":-121.9884063,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-sv15-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv15","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/205823968","label":"OpenStreetMap way/205823968","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-sv2-ca","sourceRecordId":"equinix-sv2-ca","name":"Equinix SV2","operator":"Equinix","city":"Santa Clara","county":"Santa Clara","address":"1350 Duane Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3784704,"longitude":-121.9549839,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-sv2-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv2","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/37947314","label":"OpenStreetMap way/37947314","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-sv4-ca","sourceRecordId":"equinix-sv4-ca","name":"Equinix SV4","operator":"Equinix","city":"Sunnyvale","county":"Santa Clara","address":"255 Caspian Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4145109,"longitude":-122.0145563,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-sv4-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv4","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/99813512","label":"OpenStreetMap way/99813512","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-sv8-ca","sourceRecordId":"equinix-sv8-ca","name":"Equinix SV8","operator":"Equinix","city":"Palo Alto","county":"Santa Clara","address":"529 Bryant Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4458951,"longitude":-122.160786,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-sv8-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv8","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/132746406","label":"OpenStreetMap way/132746406","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-blackstart-digital-650-harry-road-san-jose-ca","sourceRecordId":"blackstart-digital-650-harry-road-san-jose-ca","name":"Former IBM Almaden Research Center Data Center Campus (650 Harry Road)","operator":"Blackstart Digital","city":"San Jose","county":"Santa Clara","address":"650 Harry Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.2113478,"longitude":-121.8083246,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blackstart-digital-650-harry-road-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/data-center-firm-set-to-acquire-former-ibm-research-campus-in-silicon-valley","label":"Data center firm set to acquire former IBM research campus in Silicon Valley","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://inforcapital.com/news/former-ibm-research-campus-in-silicon-valley-set-to-be-acquired-by-data-center-firm/","label":"Former IBM research campus in Silicon Valley set to be acquired by data center firm","publisher":"Infor Capital","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-beacon-golden-valley-ca","sourceRecordId":"beacon-golden-valley-ca","name":"Golden Valley Technology Hub","operator":"Beacon Data Centers (w/ California Resources Corp)","city":"Elk Hills","county":"Kern","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":35.36,"longitude":-119.55,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beacon-golden-valley-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/canadas-beacon-dc-targets-275mw-data-center-campus-on-california-oil-field/","label":"Canada's Beacon DC targets 275MW data center campus on California oil field","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.goldenvalleytechhub.com/","label":"Golden Valley Technology Hub","publisher":"goldenvalleytechhub.com","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.bakersfield.com/news/crc-proposes-w-kern-data-center-with-dedicated-power-closed-loop-cooling/article_5f2d14f7-8f86-4478-958d-513b8f9de1da.html","label":"CRC proposes W. Kern data center with dedicated power, closed-loop cooling","publisher":"The Bakersfield Californian","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.turnto23.com/news/in-your-neighborhood/taft-maricopa/massive-ai-data-center-proposed-for-kern-countys-elk-hills","label":"Massive AI data center proposed for Kern County's Elk Hills","publisher":"Turn to 23 (KERO-TV, Bakersfield)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://grist.org/energy/a-solution-to-data-center-backlash-put-them-in-oil-fields/","label":"A solution to data center backlash? Put them in oil fields.","publisher":"Grist","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-goodman-energy-park-vernon-ca","sourceRecordId":"goodman-energy-park-vernon-ca","name":"Goodman Energy Park Data Center","operator":"Goodman Group","city":"Vernon","county":"Los Angeles","address":"3163 East Vernon Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0055798,"longitude":-118.2182202,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/goodman-energy-park-vernon-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf","label":"Vernon Backup Generating Facility (25-SPPE-01)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=3163%20East%20Vernon%20Avenue%2C%20Vernon%2C%20CA","label":"Nominatim geocode of 3163 East Vernon Avenue, Vernon, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-goodman-innovation-centre-san-jose-ca","sourceRecordId":"goodman-innovation-centre-san-jose-ca","name":"Goodman Innovation Centre San Jose (NorthTown Data Center)","operator":"Goodman Group","city":"San Jose","county":"Santa Clara","address":"350 West Trimble Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3806176,"longitude":-121.9337744,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/goodman-innovation-centre-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility","label":"NorthTown Backup Generating Facility (25-SPPE-02)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://irei.com/news/goodman-acquires-prime-silicon-valley-site-for-data-center-redevelopment-3/","label":"Goodman acquires prime Silicon Valley site for data center redevelopment","publisher":"Institutional Real Estate, Inc.","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=350%20West%20Trimble%20Road%2C%20San%20Jose%2C%20CA","label":"Nominatim geocode of 350 West Trimble Road, San Jose, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-google-disk-drive-alviso-san-jose-ca","sourceRecordId":"google-disk-drive-alviso-san-jose-ca","name":"Google 5079–5087 Disk Drive Compute Campus (North San José)","operator":"Google LLC","city":"San Jose","county":"Santa Clara","address":"5079 Disk Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4256515,"longitude":-121.9639616,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-disk-drive-alviso-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M607/K718/607718746.PDF","label":"CPUC Draft Resolution E-5455 (2026-07-16): PG&E exceptional-case agreement to energize a new 250 MW data center load for Google LLC at 5079 Disk Drive, San Jose (230 kV)","publisher":"California Public Utilities Commission","kind":"filing","retrievedAt":"2026-09-21"},{"url":"https://sanjosespotlight.com/is-google-hiding-a-data-center-project-in-north-san-jose/","label":"Is Google hiding a data center project in North San Jose? (2026-07)","publisher":"San José Spotlight","kind":"press","retrievedAt":"2026-09-21"},{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.calregulatory.com/sept-17-cpuc-voting-meeting-results-banked-recs-regional-markets-tribal-land-transfers/","label":"Sept. 17 CPUC voting meeting results — Draft Resolution E-5455 (Google 250 MW San Jose) held to 2026-10-08 (2026-09-18)","publisher":"California Regulatory Intelligence","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-raeden-grand-crossing-south-city-of-industry-ca","sourceRecordId":"raeden-grand-crossing-south-city-of-industry-ca","name":"Grand Crossing South - Building 10","operator":"Raeden","city":"City of Industry","county":"Los Angeles","address":"110 Marcellin Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0051077,"longitude":-117.8333142,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/raeden-grand-crossing-south-city-of-industry-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/","label":"City of Industry discussed data center sites months before zoning vote","publisher":"Investigate LA","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://investigatela.org/2026/02/11/nobody-is-really-paying-attention-city-of-industry-zoning-and-energy-moves-raise-data-center-concerns/","label":"Nobody is really paying attention: City of Industry zoning and energy moves raise data center concerns","publisher":"Investigate LA","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://lataco.com/stop-sgv-data-center-building","label":"How to Stop A Data Center in Your Backyard","publisher":"L.A. TACO","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.majesticrealty.com/projects/grand-crossing-south/","label":"Grand Crossing South project page","publisher":"Majestic Realty Co.","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://raeden.com/data-centers/","label":"Raeden data centers overview","publisher":"Raeden Inc.","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-hines-hayward-exchange-92-ca","sourceRecordId":"hines-hayward-exchange-92-ca","name":"Hayward Exchange @92 Data Center","operator":"Hines","city":"Hayward","county":"Alameda","address":"25800 Clawiter Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.631411,"longitude":-122.119608,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hines-hayward-exchange-92-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","label":"Data Center Development Applications — City of Hayward","publisher":"City of Hayward","kind":"permit","retrievedAt":"2026-10-19"},{"url":"https://www.graywolf.com/projects/data-centers/hayward-exchange-92-data-center/","label":"Hayward Exchange @92 Data Center — GrayWolf project page","publisher":"GrayWolf","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=25800%20Clawiter%20Road%2C%20Hayward%2C%20CA","label":"Nominatim geocode of 25800 Clawiter Road, Hayward, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-ivcm-imperial-county-ca","sourceRecordId":"ivcm-imperial-county-ca","name":"Imperial Valley Computer Manufacturing AI Data Center","operator":"Imperial Valley Computer Manufacturing (IVCM)","city":"Imperial","county":"Imperial","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":32.847,"longitude":-115.569,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ivcm-imperial-county-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inewsource.org/2026/04/05/data-center-developer-imperial-county/","label":"California's Largest Data Center Plan Rouses Imperial County","publisher":"inewsource","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://inewsource.org/2026/06/04/imperial-county-data-center-moratorium-vote-supervisors-ceqa/","label":"Data Center Moratorium? Imperial County Considers It","publisher":"inewsource","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://inewsource.org/2026/04/08/california-data-center-nimby-imperial-county/","label":"AI Data Center Plan Energizes Opposition in California Desert","publisher":"inewsource","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.sfgate.com/california/article/california-data-centers-21331191.php","label":"California community panics as $15 billion in data centers planned (2026-02-05)","publisher":"SFGATE","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://calexicochronicle.com/2026/01/07/where-imperial-data-center-project-and-opposition-stands/","label":"Where Imperial Data Center Project — and Opposition — Stands","publisher":"Calexico Chronicle","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://baxtel.com/news/330mw-google-linked-data-center-proposed-in-southern-california","label":"330MW Google-linked data center proposed in Southern California","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-intel-santa-clara-hpc-data-center-ca","sourceRecordId":"intel-santa-clara-hpc-data-center-ca","name":"Intel Santa Clara High-Performance Computing Data Center","operator":"Intel Corporation","city":"Santa Clara","county":"Santa Clara","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3882663,"longitude":-121.963779,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/intel-santa-clara-hpc-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bloomenergy.com/news/bloom-energy-announces-largest-silicon-valley-data-center-power-capacity-agreement/","label":"Bloom Energy Announces Largest Silicon Valley Data Center Power Capacity Agreement","publisher":"Bloom Energy","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-global-stack-kings-county-fairgrounds-hanford-ca","sourceRecordId":"global-stack-kings-county-fairgrounds-hanford-ca","name":"Kings County Fairgrounds Edge Data Center (Global Stack proposal)","operator":"Global Stack LLC","city":"Hanford","county":"Kings","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":36.3174744,"longitude":-119.6346519,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-stack-kings-county-fairgrounds-hanford-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hanfordsentinel.com/business/agriculture/kings-fairground-ceo-new-project-is-not-a-traditional-data-center/article_90b4f45c-e98e-4077-a585-6e5416581ac3.html","label":"Kings Fairground CEO: New project is not a 'traditional' data center (2026-07-21)","publisher":"Hanford Sentinel","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.yahoo.com/news/us/articles/california-proposal-build-least-8-001813987.html","label":"California proposal would build 8 data centers in Bay Area. Here's where (SF Chronicle via Yahoo News, 2026-07-08)","publisher":"San Francisco Chronicle (via Yahoo News)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://hoodline.com/2026/09/hanford-data-center-fight-turns-into-a-california-midterm-battleground/","label":"Hanford data center fight turns into a California midterm battleground (2026-09-06)","publisher":"Hoodline","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.ourvalleyvoice.com/2026/08/20/agencies-take-action-after-outcry-against-data-center-construction/","label":"Agencies take action after outcry against data center construction (2026-08-20)","publisher":"Valley Voice","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://kmph.com/news/local/global-stack-studies-leasing-2-to-5-acres-at-kings-tulare-fairgrounds-for-emergency-site","label":"Global Stack studies leasing 2 to 5 acres at Kings, Tulare fairgrounds for emergency site","publisher":"KMPH FOX26","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://kmph.com/resources/pdf/6bfe3f89-e9ef-44f7-b1d8-65a4c9527e82-GlobalStack_FAQ.pdf","label":"Global Stack — Frequently Asked Questions (company FAQ, hosted by KMPH FOX26)","publisher":"Global Stack LLC (via KMPH FOX26)","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-lumen-santa-clara-1-ca","sourceRecordId":"lumen-santa-clara-1-ca","name":"Lumen Santa Clara 1","operator":"Lumen Technologies","city":"Santa Clara","county":"Santa Clara","address":"3045 Raymond Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3770332,"longitude":-121.952059,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-santa-clara-1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/lumen-santa-clara-1","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/209073635","label":"OpenStreetMap way/209073635","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-lumen-sunnyvale-1-ca","sourceRecordId":"lumen-sunnyvale-1-ca","name":"Lumen Sunnyvale 1","operator":"Lumen Technologies","city":"Sunnyvale","county":"Santa Clara","address":"1380 Kifer Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3734695,"longitude":-121.9878002,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-sunnyvale-1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/lumen-sunnyvale-1","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/37877544","label":"OpenStreetMap way/37877544","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-martin-data-center-santa-clara-ca","sourceRecordId":"martin-data-center-santa-clara-ca","name":"Martin Data Center","operator":"Martin Avenue Properties, LLC","city":"Santa Clara","county":"Santa Clara","address":"651 Martin Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3663437,"longitude":-121.945885,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/martin-data-center-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/martin-backup-generating-facility-mbgf","label":"Martin Backup Generating Facility (22-SPPE-03)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=651%20Martin%20Avenue%2C%20Santa%20Clara%2C%20CA","label":"Nominatim geocode of 651 Martin Avenue, Santa Clara, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-mdc-sdg1-san-diego-ca","sourceRecordId":"mdc-sdg1-san-diego-ca","name":"MDC SDG1","operator":"MDC Data Centers","city":"San Diego","county":"San Diego","address":"7014 Manya Circle","state":"CA","stateName":"California","jurisdictionType":"state","latitude":32.59374,"longitude":-117.08525,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/mdc-sdg1-san-diego-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mdcdatacenters.com/data-centers/our-locations/san-diego/","label":"MDC Data Centers — San Diego Locations","publisher":"MDC Data Centers","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-mdc-sdg2-san-diego-ca","sourceRecordId":"mdc-sdg2-san-diego-ca","name":"MDC SDG2","operator":"MDC Data Centers","city":"San Diego","county":"San Diego","address":"3180 University Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":32.75,"longitude":-117.123,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/mdc-sdg2-san-diego-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mdcdatacenters.com/data-centers/our-locations/san-diego/","label":"MDC Data Centers — San Diego Locations","publisher":"MDC Data Centers","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-menlo-digital-md-sv1-ross-drive-sunnyvale-ca","sourceRecordId":"menlo-digital-md-sv1-ross-drive-sunnyvale-ca","name":"Menlo Digital MD-SV1 (888–894 Ross Drive)","operator":"Menlo Equities / Menlo Digital (Sunnyvale Technology Partners LLC)","city":"Sunnyvale","county":"Santa Clara","address":"888 Ross Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4009443,"longitude":-122.0324832,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/menlo-digital-md-sv1-ross-drive-sunnyvale-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K365/602365009.pdf","label":"CPUC Resolution E-5433 (2026-03-19): PG&E exceptional-case transmission interconnection for Sunnyvale Technology Partners LLC c/o Menlo Equities — 49 MW data center and computing lab at 888 Ross Drive","publisher":"California Public Utilities Commission","kind":"filing","retrievedAt":"2026-09-21"},{"url":"https://menlo-digital.com/portfolio/md-sv1-sunnyvale/","label":"Menlo Digital — MD-SV1 (Sunnyvale) portfolio page","publisher":"Menlo Digital","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://news.theregistrysf.com/menlo-equities-pivots-entitled-sunnyvale-office-site-to-49mw-244000-sqft-data-center-in-peery-park/","label":"Menlo Equities pivots entitled Sunnyvale office site to 49MW, 244,000 SQFT data center in Peery Park (2026-06-17)","publisher":"The Registry","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-microsoft-alviso-san-jose-ca","sourceRecordId":"microsoft-alviso-san-jose-ca","name":"Microsoft Alviso Data Center Campus","operator":"Microsoft","city":"San Jose (Alviso)","county":"Santa Clara","address":"1657 Alviso-Milpitas Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.428,"longitude":-121.977,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-alviso-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-breaks-ground-on-alviso-data-center-campus-in-san-jose-california/","label":"Microsoft breaks ground on Alviso data center campus in San Jose, California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.nbcbayarea.com/news/local/microsoft-breaks-ground-on-new-data-center-in-san-jose/4097643/","label":"Microsoft breaks ground on new data center in San Jose","publisher":"NBC Bay Area","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://svdaily.com/2026/06/23/microsoft-breaks-ground-on-data-center-in-alviso/","label":"Microsoft breaks ground on data center in Alviso","publisher":"SV Daily","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.connectcre.com/stories/microsoft-breaks-ground-on-long-planned-north-san-jose-data-center-site/","label":"Connect CRE — Microsoft Breaks Ground on Long-Planned North San Jose Data Center Site","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.hitt.com/news-hub/hitt-breaks-ground-microsoft-alviso-datacenter/","label":"HITT Contracting breaks ground on Microsoft Alviso datacenter","publisher":"HITT Contracting","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/san-jose-data-center","label":"San Jose Data Center (19-SPPE-04), applicant Microsoft Corporation, 1657 Alviso-Milpitas Road","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-10-19"},{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M594/K913/594913838.PDF","label":"CPUC Resolution E-5439: PG&E agreements to energize Microsoft's new 90 MW data center (SJC02) at 1657 Alviso-Milpitas Road, San Jose","publisher":"California Public Utilities Commission","kind":"filing","retrievedAt":"2026-09-21"},{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-10-19"},{"url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them","label":"'Full-on Backlash' Against Data Centers Occurring as San José Courts Them","publisher":"KQED","kind":"press","retrievedAt":"2026-09-29"}]},{"id":"compute-microsoft-orchard-parkway-san-jose-ca","sourceRecordId":"microsoft-orchard-parkway-san-jose-ca","name":"Microsoft San Jose Data Center Campus (SJ04)","operator":"Microsoft","city":"San Jose","county":"Santa Clara","address":"2515 Orchard Parkway","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3796338,"longitude":-121.9307551,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-orchard-parkway-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ceqanet.lci.ca.gov/2023020229","label":"San Jose Data Center 04 — Notice of Preparation (SCH 2023020229)","publisher":"California Governor's Office of Land Use and Climate Innovation (CEQAnet)","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264764&DocumentContentId=101543","label":"Microsoft Fourth Revised Project Description — SJ04 (docket 22-SPPE-02, TN 264764)","publisher":"California Energy Commission e-filing","kind":"filing","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=2515%20Orchard%20Parkway%2C%20San%20Jose%2C%20CA","label":"Nominatim geocode of 2515 Orchard Parkway, San Jose, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/san-jose-data-center-04","label":"California Energy Commission — San José Data Center 04 (22-SPPE-02), 97.8 MW, Orchard Parkway & Component Drive","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-10-19"},{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-09-21"}]},{"id":"compute-mission-college-data-center-santa-clara-ca","sourceRecordId":"mission-college-data-center-santa-clara-ca","name":"Mission College Data Center","operator":"Oppidan","city":"Santa Clara","county":"Santa Clara","address":"2305 Mission College Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3887231,"longitude":-121.9668334,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/mission-college-data-center-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/reciprocating-engine/mission-college-data-center","label":"Mission College Data Center (19-SPPE-05)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://ceqanet.lci.ca.gov/2020040254/3","label":"Mission College Data Center — Notice of Determination (SCH 2020040254)","publisher":"California Governor's Office of Land Use and Climate Innovation (CEQAnet)","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=2305%20Mission%20College%20Boulevard%2C%20Santa%20Clara%2C%20CA","label":"Nominatim geocode of 2305 Mission College Boulevard, Santa Clara, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://cleanview.co/data-centers/california/1341/aws-mission-college-dc---building-1","label":"AWS Mission College DC - Building 1","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://baxtel.com/campus/amazon-mission-college-sc-campus","label":"Amazon: Mission College SC Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-nautilus-stockton-1-ca","sourceRecordId":"nautilus-stockton-1-ca","name":"Nautilus Stockton 1 Data Center","operator":"Nautilus Data Technologies","city":"Stockton","county":"San Joaquin","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.9633,"longitude":-121.3681,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nautilus-stockton-1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nautilusdt.com/stockton-data-center/","label":"Stockton Data Center — Nautilus Data Technologies","publisher":"Nautilus Data Technologies","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://stocktonia.org/news/local-government/2026/09/02/stockton-residents-push-back-on-data-centers-the-city-already-relies-on-one/","label":"Stockton residents push back on data centers. The city already relies on one","publisher":"Stocktonia News","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://ceqanet.lci.ca.gov/2016062010/2","label":"Nautilus Data Technology, Inc., Data Storage Facility — Notice of Determination (SCH 2016062010)","publisher":"California Governor's Office of Land Use and Climate Innovation (CEQAnet)","kind":"permit","retrievedAt":"2026-09-14"}]},{"id":"compute-northpoint-fairfield-data-center-solano-ca","sourceRecordId":"northpoint-fairfield-data-center-solano-ca","name":"NorthPoint Fairfield Data Center (Vanden Road Industrial Campus)","operator":"NorthPoint Development","city":"Fairfield","county":"Solano","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.2898329,"longitude":-121.9607882,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/northpoint-fairfield-data-center-solano-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.vallejosun.com/developers-planning-data-center-for-fairfield-industrial-park/","label":"Developers planning data center for Fairfield industrial park","publisher":"Vallejo Sun","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-novva-san-francisco-400-paul-avenue-ca","sourceRecordId":"novva-san-francisco-400-paul-avenue-ca","name":"Novva San Francisco (400 Paul Avenue)","operator":"Novva Data Centers","city":"San Francisco","county":"San Francisco","address":"400 Paul Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.72315,"longitude":-122.398467,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/novva-san-francisco-400-paul-avenue-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.novva.com/data-center-facilities/san-francisco-ca/","label":"Novva — San Francisco data center (36 MW critical load, 182,000 sq ft data hall, 7.5-acre campus)","publisher":"Novva Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/","label":"Amid rising fear over data centers, an S.F. supervisor quietly plans a moratorium (2026-09-10)","publisher":"Mission Local","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://hoodline.com/2026/09/san-francisco-weighs-45-day-freeze-on-data-centers-as-bayview-feels-the-heat/","label":"San Francisco weighs 45-day freeze on data centers as Bayview feels the heat (2026-09-11)","publisher":"Hoodline","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-ntt-sacramento-ca1-data-center-ca","sourceRecordId":"ntt-sacramento-ca1-data-center-ca","name":"NTT Sacramento CA1 Data Center","operator":"NTT Global Data Centers","city":"Sacramento","county":"Sacramento","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.6504319,"longitude":-121.4891868,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-sacramento-ca1-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/sacramento-ca-1-data-center","label":"NTT (RagingWire) facility directory","publisher":"NTT (RagingWire)","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/32560292","label":"OpenStreetMap way/32560292","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ntt-sacramento-ca2-data-center-ca","sourceRecordId":"ntt-sacramento-ca2-data-center-ca","name":"NTT Sacramento CA2 Data Center","operator":"NTT Global Data Centers","city":"Sacramento","county":"Sacramento","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.6504002,"longitude":-121.4919461,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-sacramento-ca2-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/sacramento-data-centers","label":"NTT (RagingWire) facility directory","publisher":"NTT (RagingWire)","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/32560290","label":"OpenStreetMap way/32560290","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ntt-sacramento-ca3-data-center-ca","sourceRecordId":"ntt-sacramento-ca3-data-center-ca","name":"NTT Sacramento CA3 Data Center","operator":"NTT Global Data Centers","city":"Sacramento","county":"Sacramento","address":"1625 National Driveq","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.6442393,"longitude":-121.4987627,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-sacramento-ca3-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/sacramento-data-centers","label":"NTT (RagingWire) facility directory","publisher":"NTT (RagingWire)","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/190868312","label":"OpenStreetMap way/190868312","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ntt-silicon-valley-sv1-data-center-ca","sourceRecordId":"ntt-silicon-valley-sv1-data-center-ca","name":"NTT Silicon Valley SV1 Data Center","operator":"NTT Global Data Centers","city":"Santa Clara","county":"Santa Clara","address":"1160 Walsh Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3690532,"longitude":-121.9553378,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-silicon-valley-sv1-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/silicon-valley-sv1-data-center","label":"NTT facility directory","publisher":"NTT","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/888253616","label":"OpenStreetMap way/888253616","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-one-data-center-america-ontario-ca","sourceRecordId":"one-data-center-america-ontario-ca","name":"One Data Center America (Ontario Campus)","operator":"One Data Center America, LLC","city":"Ontario","county":"San Bernardino","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0633,"longitude":-117.6509,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/one-data-center-america-ontario-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://onedatacenteramerica.com","label":"One Data Center America — homepage","publisher":"One Data Center America, LLC","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-prime-1231-comstock-santa-clara-ca","sourceRecordId":"prime-1231-comstock-santa-clara-ca","name":"Prime Data Centers 1231 Comstock Street","operator":"Prime Data Centers (1231 Comstock Property LLC)","city":"Santa Clara","county":"Santa Clara","address":"1231 Comstock Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.375002,"longitude":-121.9548775,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prime-1231-comstock-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.svvoice.com/another-data-center-coming-to-santa-clara/","label":"Another data center coming to Santa Clara (2024-12-04)","publisher":"The Silicon Valley Voice","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://sfyimby.com/2024/12/data-center-proposed-at-1231-comstock-street-in-santa-clara.html","label":"Data center proposed at 1231 Comstock Street in Santa Clara (2024-12-23)","publisher":"San Francisco YIMBY","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-prime-lax01-vernon-ca","sourceRecordId":"prime-lax01-vernon-ca","name":"Prime Data Centers LAX01","operator":"Prime Data Centers","city":"Vernon","county":"Los Angeles","address":"4701 South Santa Fe Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.0014335,"longitude":-118.2303092,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prime-lax01-vernon-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://primedatacenters.com/news/prime-opens-los-angeles-data-center/","label":"Prime opens Los Angeles data center","publisher":"Prime Data Centers","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.prnewswire.com/news-releases/prime-data-centers-announces-the-opening-of-its-hyperscale-data-center-in-vernon-california-302305195.html","label":"Prime Data Centers announces opening of its hyperscale data center in Vernon, California","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://primedatacenters.com/news/prime-data-centers-and-lambda-partner-to-power-the-next-era-of-superintelligence-with-ai-optimized-infrastructure-in-southern-california/","label":"Prime Data Centers and Lambda partner on AI-optimized infrastructure in Southern California","publisher":"Prime Data Centers","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://lambda.ai/blog/prime-data-centers-and-lambda-partner-to-power-the-next-era-of-superintelligence-with-ai-optimized-infrastructure-in-southern-california","label":"Lambda partners with Prime Data Centers in Southern California","publisher":"Lambda","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/prime-launches-33mw-data-center-in-vernon-california/","label":"Prime launches 33MW data center in Vernon, California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-prime-smf02-sacramento-ca","sourceRecordId":"prime-smf02-sacramento-ca","name":"Prime Data Centers SMF02","operator":"Prime Data Centers","city":"Sacramento","county":"Sacramento","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.671,"longitude":-121.399,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prime-smf02-sacramento-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-second-sacramento-data-center-expanding-regional-campus-footprint/","label":"Prime Data Centers Breaks Ground on Second Sacramento Data Center, Expanding Regional Campus Footprint","publisher":"Prime Data Centers","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/prime-breaks-ground-on-latest-data-center-in-sacramento-california/","label":"Prime Breaks Ground on Latest Data Center in Sacramento, California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.connectcre.com/stories/prime-data-centers-breaks-ground-on-second-sacramento-facility/","label":"Prime Data Centers Breaks Ground on Second Sacramento Facility","publisher":"Connect CRE","kind":"press","retrievedAt":"2026-09-29"}]},{"id":"compute-prime-santa-clara-silicon-valley-campus-ca","sourceRecordId":"prime-santa-clara-silicon-valley-campus-ca","name":"Prime Santa Clara (Silicon Valley campus)","operator":"Prime Data Centers","city":"Santa Clara","county":"Santa Clara","address":"2215 Martin Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3666621,"longitude":-121.9628653,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prime-santa-clara-silicon-valley-campus-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://primedatacenters.com/locations/silicon-valley/","label":"Prime Data Centers facility directory","publisher":"Prime Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12437277166","label":"OpenStreetMap node/12437277166","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-prologis-326-charcot-avenue-san-jose-ca","sourceRecordId":"prologis-326-charcot-avenue-san-jose-ca","name":"Prologis 326 Charcot Avenue Data Center (North San José)","operator":"Prologis","city":"San Jose","county":"Santa Clara","address":"326 Charcot Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.381800835839,"longitude":-121.915780681274,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-326-charcot-avenue-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.pressdemocrat.com/2026/09/25/tech-san-jose-data-pge-ai-property-economy-build-real-estate-prologis/","label":"Data center could open in 2030 in North San Jose pending project approval","publisher":"The Press Democrat","kind":"press","retrievedAt":"2026-09-29"}]},{"id":"compute-prologis-rue-ferrari-san-jose-ca","sourceRecordId":"prologis-rue-ferrari-san-jose-ca","name":"Prologis 5853 Rue Ferrari","operator":"Prologis","city":"San Jose","county":"Santa Clara","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.247993,"longitude":-121.778138,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-rue-ferrari-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ceqanet.lci.ca.gov/2022010266/2","label":"5853 Rue Ferrari Project (CEQAnet record, SCH #2022010266)","publisher":"California State Clearinghouse (CEQAnet)","kind":"filing","retrievedAt":"2026-09-21"},{"url":"https://hoodline.com/2026/07/south-san-jose-warehouse-poised-to-become-49-megawatt-data-beast/","label":"South San Jose warehouse poised to become 49-megawatt data center","publisher":"Hoodline","kind":"press","retrievedAt":"2026-07-11"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.lowvoltagenation.com/posts/project-spotlight-san-jose-office-28e129","label":"Low Voltage Nation — \"$25M San Jose R&D Facility\" project spotlight","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-prologis-silver-creek-valley-san-jose-ca","sourceRecordId":"prologis-silver-creek-valley-san-jose-ca","name":"Prologis Silver Creek Valley Road Data Center","operator":"Prologis","city":"San Jose","county":"Santa Clara","address":"5977 Silver Creek Valley Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.25,"longitude":-121.79,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-silver-creek-valley-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/prologis-files-to-build-99mw-data-center-in-san-jose-california/","label":"Prologis files to build 99MW data center in San Jose, California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://sfyimby.com/2026/07/large-data-center-proposed-to-fill-vacant-site-at-5977-silver-creek-valley-road-in-san-jose.html","label":"Large data center proposed to fill vacant site at 5977 Silver Creek Valley Road in San Jose","publisher":"San Francisco YIMBY","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them","label":"'Full-on Backlash' Against Data Centers Occurring as San José Courts Them","publisher":"KQED","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf","label":"Silver Creek Backup Generating Facility (SCBGF), Docket 26-SPPE-02","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-10-19"},{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José – Data Center and Large Energy-Use Projects (SP26-016), archived 2026-08-13","publisher":"City of San José","kind":"permit","retrievedAt":"2026-10-19"}]},{"id":"compute-prologis-stem-park-zanker-road-san-jose-ca","sourceRecordId":"prologis-stem-park-zanker-road-san-jose-ca","name":"Prologis STEM Park","operator":"Prologis","city":"San Jose","county":"Santa Clara","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.423,"longitude":-121.943,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-stem-park-zanker-road-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/400mw-prologis-data-center-campus-chosen-as-preferred-project-on-city-owned-land-in-san-jose-california/","label":"400MW Prologis data center campus chosen as preferred project on city-owned land in San Jose, California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-11"},{"url":"https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/","label":"Prologis Inc. Wins Bid for One of the Largest Economic Development Projects in South Bay","publisher":"San José Inside","kind":"press","retrievedAt":"2026-07-11"},{"url":"https://therealdeal.com/san-francisco/2025/11/10/prologis-favored-for-san-jose-data-center-site/","label":"Prologis favored for San Jose data center site","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-07-11"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://insider.govtech.com/california/news/san-jose-eyes-30m-windfall-from-proposed-ai-and-manufacturing-campus","label":"GovTech (Government Technology Insider) — \"San Jose Eyes $30M Windfall From Proposed AI and Manufacturing Campus\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-puente-hills-mall-data-center-city-of-industry-ca","sourceRecordId":"puente-hills-mall-data-center-city-of-industry-ca","name":"Puente Hills Mall Redevelopment Data Center","operator":"Puente Hills Land Venture, LLC","city":"City of Industry","county":"Los Angeles","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.9926096,"longitude":-117.9278263,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/puente-hills-mall-data-center-city-of-industry-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/","label":"City of Industry discussed data center sites months before zoning vote (2026-03-02)","publisher":"Investigate LA","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.calonews.com/featured-topics/environmental/san-gabriel-valley-residents-unite-in-fight-against-proposed-puente-hills-mall-data-center/article_92d86ea9-a1fc-42b0-bc9f-249934fc1951.html","label":"San Gabriel Valley residents unite in fight against proposed Puente Hills Mall data center (2026-03-26)","publisher":"CALÓ News","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-qts-sacramento-ca","sourceRecordId":"qts-sacramento-ca","name":"QTS Sacramento","operator":"QTS Data Centers","city":"Sacramento","county":"Sacramento","address":"1100 North Market Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.6463763,"longitude":-121.4862686,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-sacramento-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/sacramento/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/194049551","label":"OpenStreetMap way/194049551","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-qts-santa-clara-1-ca","sourceRecordId":"qts-santa-clara-1-ca","name":"QTS Santa Clara 1","operator":"QTS Data Centers","city":"Santa Clara","county":"Santa Clara","address":"2805 Mission College Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3939862,"longitude":-121.9783207,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-santa-clara-1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/santa-clara/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.openstreetmap.org/way/54121151","label":"OpenStreetMap way/54121151","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-quest-roseville-habc-ca","sourceRecordId":"quest-roseville-habc-ca","name":"Quest Roseville HABC","operator":"Quest Technology Management","city":"Roseville","county":"Placer","address":"9000 Foothills Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.78829,"longitude":-121.313874,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/quest-roseville-habc-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacentercatalog.com/usa/quest-roseville-habc","label":"Quest Roseville HABC Data Center located in California, USA - Data Center Catalog","publisher":null,"kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-rb-inyokern-data-center-ca","sourceRecordId":"rb-inyokern-data-center-ca","name":"RB Inyokern Data Center","operator":"R&L Capital, Inc.","city":"Inyokern","county":"Kern","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":35.631817,"longitude":-117.807864,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/rb-inyokern-data-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center","label":"RB Inyokern Data Center - CEC backup generating system docket page","publisher":"California Energy Commission","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01","label":"CEC Docket Log - 26-SPPE-01","publisher":"California Energy Commission","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=271058&DocumentContentId=108645","label":"CEC filing TN 271058 - site/APN detail, SCE interconnection, phased capacity buildout","publisher":"California Energy Commission","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://www.tehachapinews.com/news/data-center-proposed-in-inyokern-draws-water-other-concerns-in-east-kern/article_dc8cc3da-77d1-5e5f-a1bf-2c22444680a6.html","label":"Data center proposed in Inyokern draws water, other concerns in East Kern","publisher":"Tehachapi News","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://roadrunner395.com/2026/04/26/say-it-isnt-so-an-ai-data-center-is-coming-to-downtown-inyokern/","label":"Say it isn't so: an AI data center is coming to downtown Inyokern","publisher":"Roadrunner395","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.kget.com/news/local-news/proposed-inyokern-data-center-could-use-12-to-16-million-gallons-of-water-annually/amp/","label":"Proposed Inyokern data center could use 12 to 16 million gallons of water annually","publisher":"KGET 17","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://somachlaw.com/policy-alert/ai-data-center-environmental-review-proposed-inyokern-data-center-highlights-water-use-concerns/","label":"AI Data Center Environmental Review: Proposed Inyokern Data Center Highlights Water-Use Concerns","publisher":"Somach Law","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.turnto23.com/news/local-news/ai-data-center-proposal-draws-opposition-from-kern-county-residents","label":"AI data center proposal draws opposition from Kern County residents","publisher":"KERO 23ABC","kind":"press","retrievedAt":"2026-09-29"}]},{"id":"compute-spartan-aemetis-riverbank-industrial-complex-ca","sourceRecordId":"spartan-aemetis-riverbank-industrial-complex-ca","name":"Riverbank Industrial Complex Data Center","operator":"Spartan Data Centers (with Aemetis, Inc.)","city":"Riverbank","county":"Stanislaus","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.7276467,"longitude":-120.922033,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/spartan-aemetis-riverbank-industrial-complex-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/us/articles/stanislaus-city-considers-longer-data-230000804.html","label":"Stanislaus city considers a longer data center moratorium to evaluate new state laws (Modesto Bee)","publisher":"Modesto Bee via Yahoo News","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://www.turlockjournal.com/news/local/data-centers-two-toxic-words-that-frighten-stanislaus-leaders-are-they-an-existential-threat-or-unique-opportunity/","label":"'Data centers': two toxic words that frighten Stanislaus leaders","publisher":"Turlock Journal","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-global-stack-san-mateo-county-event-center-ca","sourceRecordId":"global-stack-san-mateo-county-event-center-ca","name":"San Mateo County Event Center Data Center (Global Stack proposal, dropped)","operator":"Global Stack LLC","city":"San Mateo","county":"San Mateo","address":"1346 Saratoga Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.5466677,"longitude":-122.3020513,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-stack-san-mateo-county-event-center-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.change.org/p/keep-data-centers-out-of-the-san-mateo-county-event-center","label":"Keep Data Centers Out of the San Mateo County Event Center (petition)","publisher":"Change.org","kind":"other","retrievedAt":"2026-09-29"},{"url":"https://www.yahoo.com/news/us/articles/california-proposal-build-least-8-001813987.html","label":"California proposal would build 8 data centers in Bay Area","publisher":"San Francisco Chronicle via Yahoo News","kind":"press","retrievedAt":"2026-09-29"}]},{"id":"compute-scalematrix-san-diego-ca","sourceRecordId":"scalematrix-san-diego-ca","name":"ScaleMatrix San Diego","operator":"ScaleMatrix","city":"San Diego","county":"San Diego","address":"5775 Kearny Villa Road","state":"CA","stateName":"California","jurisdictionType":"state","latitude":32.8377287,"longitude":-117.132639,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/scalematrix-san-diego-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.scalematrix.com/san-diego-data-center.html","label":"ScaleMatrix San Diego data center","publisher":"ScaleMatrix","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.scalematrix.com/press/scalematrix-announces-gpu-service-solution-ideal-hpc-deepmachine-learning-and-artificial.html","label":"ScaleMatrix announces GPU-as-a-Service solution ideal for HPC, deep/machine learning, and AI workloads","publisher":"ScaleMatrix","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.areadevelopment.com/newsItems/11-14-2018/scalematrix-data-center-san-diego-california.shtml","label":"ScaleMatrix / HPE Hybrid HPC Center of Excellence sited at San Diego headquarters","publisher":"Area Development","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://opengovwa.com/corporation/604264407","label":"Scalematrix Management, LLC - business entity filing (5775 Kearny Villa Rd address)","publisher":"Washington State Corporations Registry","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/scalematrix-nearly-doubles-size-of-san-diego-data-center/","label":"ScaleMatrix nearly doubles size of San Diego data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-sequoia-data-center-2600-de-la-cruz-santa-clara-ca","sourceRecordId":"sequoia-data-center-2600-de-la-cruz-santa-clara-ca","name":"Sequoia Data Center (2600 De La Cruz Boulevard)","operator":"Tishman Speyer (site acquired from CyrusOne, July 2026)","city":"Santa Clara","county":"Santa Clara","address":"2600 De La Cruz Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.379478,"longitude":-121.939528,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sequoia-data-center-2600-de-la-cruz-santa-clara-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/sequoia-data-center","label":"California Energy Commission — Sequoia Data Center (19-SPPE-03), Small Power Plant Exemption","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://therealdeal.com/san-francisco/2026/07/29/tishman-speyer-buys-santa-clara-data-center-land/","label":"Tishman Speyer grabs Santa Clara land entitled for data center for $65M (2026-07-29)","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-serverfarm-lax1-el-segundo-ca","sourceRecordId":"serverfarm-lax1-el-segundo-ca","name":"Serverfarm LAX1","operator":"Serverfarm","city":"El Segundo","county":"Los Angeles","address":"444 North Nash Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":33.9217807,"longitude":-118.3864589,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/serverfarm-lax1-el-segundo-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.serverfarmllc.com/los-angeles-data-center/","label":"Serverfarm Los Angeles (LAX1) data center page","publisher":"Serverfarm","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://www.serverfarmllc.com/press-releases/serverfarm-acquires-los-angeles-data-center/","label":"Serverfarm acquires Los Angeles data center (press release)","publisher":"Serverfarm","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://transwestern.com/news-detail/117-000-sf-data-center-trades-in-el-segundo-ca","label":"117,000 SF data center trades in El Segundo, CA","publisher":"Transwestern","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://labusinessjournal.com/real-estate/serverfarm-strikes-71m-el-segundo-hq/","label":"Serverfarm strikes $71M El Segundo HQ deal","publisher":"LA Business Journal","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://ceqanet.lci.ca.gov/2012121003","label":"T5 Data Expansion Project (EA 971), 444 North Nash Street - CEQA filing","publisher":"California CEQAnet","kind":"permit","retrievedAt":"2026-08-02"}]},{"id":"compute-skybox-santa-clara-1200-memorex-drive-ca","sourceRecordId":"skybox-santa-clara-1200-memorex-drive-ca","name":"Skybox Santa Clara (1200 Memorex Drive)","operator":"Skybox Datacenters","city":"Santa Clara","county":"Santa Clara","address":"1200 Memorex Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.36257104275,"longitude":-121.949979903926,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/skybox-santa-clara-1200-memorex-drive-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.corgan.com/projects/skybox-santa-clara-data-center","label":"Skybox Santa Clara Data Center project page","publisher":"Corgan","kind":"other","retrievedAt":"2026-09-29"},{"url":"https://baxtel.com/data-center/skybox-santa-clara","label":"Skybox Santa Clara Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-29"},{"url":"https://cleanview.co/data-centers/california/963/skybox-santa-clara","label":"Skybox Santa Clara","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-29"},{"url":"https://sfyimby.com/2021/03/permits-filed-for-data-center-at-1200-memorex-drive-santa-clara.html","label":"Permits Filed for Data Center at 1200 Memorex Drive, Santa Clara","publisher":"SFYIMBY","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-global-stack-vallejo-fairgrounds-ca","sourceRecordId":"global-stack-vallejo-fairgrounds-ca","name":"Solano County Fairgrounds Data Center (Global Stack proposal)","operator":"Global Stack LLC","city":"Vallejo","county":"Solano","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":38.135514,"longitude":-122.2262112,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-stack-vallejo-fairgrounds-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.pressdemocrat.com/2026/07/13/solano-county-fair-association-will-discuss-proposed-data-center/","label":"Data center proposed in Vallejo fairgrounds","publisher":"The Press Democrat","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://localnewsmatters.org/2026/07/16/solano-fairgrounds-global-stack-ai-emergency-shelter-proposal-pulled/","label":"Solano fairgrounds board drops 'AI-powered emergency shelter' plan after backlash (2026-07-16)","publisher":"Local News Matters (Bay City News)","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-stack-svy01-ca","sourceRecordId":"stack-svy01-ca","name":"STACK SVY01","operator":"STACK Infrastructure","city":"San Jose","county":"Santa Clara","address":"2150 Trade Zone Boulevard","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4027449,"longitude":-121.891051,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-svy01-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/silicon-valley/svy01/","label":"STACK Infrastructure facility directory","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/8238715059","label":"OpenStreetMap node/8238715059","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-svy02-ca","sourceRecordId":"stack-svy02-ca","name":"STACK SVY02","operator":"STACK Infrastructure","city":"Santa Clara","county":"Santa Clara","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3619343,"longitude":-121.9537306,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-svy02-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/silicon-valley/svy02/","label":"STACK Infrastructure facility directory","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1460855151","label":"OpenStreetMap way/1460855151","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-svy03a-hayward-ca","sourceRecordId":"stack-svy03a-hayward-ca","name":"STACK SVY03A","operator":"STACK Infrastructure","city":"Hayward","county":"Alameda","address":"26203 Production Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.6281336,"longitude":-122.1195048,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stack-svy03a-hayward-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ceqanet.lci.ca.gov/2025030999","label":"CEQAnet Mitigated Negative Declaration filing (SCH# 2025030999)","publisher":"California State Clearinghouse (CEQAnet)","kind":"filing","retrievedAt":"2026-08-16"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/stack-svy03a-data-center-campus","label":"STACK SVY03A backup generating system docket (23-SPPE-01)","publisher":"California Energy Commission","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","label":"Data center development applications","publisher":"City of Hayward","kind":"permit","retrievedAt":"2026-09-29"},{"url":"https://tricityvoice.com/who-approved-haywards-largest-data-center/","label":"Who approved Hayward's largest data center?","publisher":"Tri City Voice","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://opgov.news/articles/hayward-data-center-under-public-scrutiny-as-loopholes-pile-up","label":"Hayward data center under public scrutiny as loopholes pile up","publisher":"OpGov News","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-stack-trade-zone-park-san-jose-ca","sourceRecordId":"stack-trade-zone-park-san-jose-ca","name":"STACK Trade Zone Park (SVYDC 05 / SVYDC 06)","operator":"STACK Infrastructure","city":"San Jose","county":"Santa Clara","address":"2400 Ringwood Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.4028987,"longitude":-121.8950398,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-trade-zone-park-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.ca.gov/powerplant/tradezonepark","label":"STACK Trade Zone Park (21-SPPE-02)","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=2400%20Ringwood%20Avenue%2C%20San%20Jose%2C%20CA","label":"Nominatim geocode of 2400 Ringwood Avenue, San Jose, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M598/K895/598895478.PDF","label":"CPUC Resolution E-5447: PG&E EPC agreement (AL 7653-E) supporting energization of STACK Infrastructure's new 90 MW data center load in San Jose","publisher":"California Public Utilities Commission","kind":"filing","retrievedAt":"2026-09-21"},{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-10-19"},{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M603/K293/603293409.PDF","label":"CPUC Resolution E-5447 – PG&E EPC Agreement with STACK Infrastructure (Ringwood Switching Station)","publisher":"California Public Utilities Commission","kind":"filing","retrievedAt":"2026-10-19"}]},{"id":"compute-t5-silicon-valley-newark-ca","sourceRecordId":"t5-silicon-valley-newark-ca","name":"T5@Silicon Valley","operator":"T5 Data Centers","city":"Newark","county":"Alameda","address":"39800 Eureka Drive","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.5461,"longitude":-122.0312,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-silicon-valley-newark-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://t5datacenters.com/resources/t5-data-centers-announces-new-enterprise-data-center-in-silicon-valley-ca/","label":"T5 Data Centers announces new enterprise data center in Silicon Valley, CA","publisher":"T5 Data Centers","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.prnewswire.com/news-releases/t5-data-centers-announces-new-enterprise-data-center-in-silicon-valley-ca-301146933.html","label":"T5 Data Centers announces new enterprise data center in Silicon Valley, CA (PR Newswire)","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.propertyshark.com/mason/Property/38901571/39800-Eureka-Dr-Newark-CA-94560/","label":"39800 Eureka Dr, Newark, CA 94560 - property record","publisher":"PropertyShark","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.loopnet.com/property/39800-eureka-dr-newark-ca-94560/06001-901%20018503300/","label":"39800 Eureka Dr, Newark, CA 94560 - property listing","publisher":"LoopNet","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/t5-silicon-valley-newark","label":"T5@Silicon Valley (Newark) data center listing","publisher":"baxtel","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://ocmcdonald.com/apple-newark-data-facility/","label":"Apple Newark data facility project","publisher":"O.C. McDonald Co.","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.serverfarmllc.com/data-centers/","label":"Serverfarm data center locations","publisher":"Serverfarm","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-terra-data-center-alviso-san-jose-ca","sourceRecordId":"terra-data-center-alviso-san-jose-ca","name":"Terra Data Center","operator":"Terra Ventures","city":"San Jose","county":"Santa Clara","address":"4701 North First Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3807591,"longitude":-121.9236758,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/terra-data-center-alviso-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cleanview.co/data-centers/california/1566/terra-data-center","label":"Terra Data Center — Santa Clara, California","publisher":"CleanView","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://sfyimby.com/2025/04/energy-plant-data-center-proposed-at-4701-north-first-street-san-jose.html","label":"Energy Plant + Data Center Proposed at 4701 North First Street, San Jose","publisher":"SF YIMBY","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.technostatecraft.com/p/powering-silicon-valleys-ai-dreams","label":"Powering Silicon Valley's AI Dreams","publisher":"Technostatecraft (Substack)","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-global-stack-tulare-county-fairgrounds-ca","sourceRecordId":"global-stack-tulare-county-fairgrounds-ca","name":"Tulare County Fairgrounds Edge Data Center (Global Stack proposal)","operator":"Global Stack LLC","city":"Tulare","county":"Tulare","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":36.1991383,"longitude":-119.3420041,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-stack-tulare-county-fairgrounds-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://thebusinessjournal.com/is-it-a-data-center-tulare-fairgrounds-tables-global-stack-proposal/","label":"Is it a data center? Tulare fairgrounds tables Global Stack proposal","publisher":"The Business Journal","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://abc30.com/post/tulare-fair-board-faces-pushback-proposed-high-tech-fairgrounds-project-packed-meeting/19700804/","label":"Tulare Fair board faces pushback over proposed high-tech fairgrounds project","publisher":"ABC30","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://www.yahoo.com/news/us/articles/california-proposal-build-least-8-001813987.html","label":"California proposal would build 8 data centers in Bay Area","publisher":"San Francisco Chronicle via Yahoo News","kind":"press","retrievedAt":"2026-09-29"}]},{"id":"compute-valley-oak-shinn-street-fremont-ca","sourceRecordId":"valley-oak-shinn-street-fremont-ca","name":"Valley Oak Partners Shinn Street Data Center","operator":"Valley Oak Partners","city":"Fremont","county":"Alameda","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.567072,"longitude":-121.983674,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/valley-oak-shinn-street-fremont-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/valley-oak-proposes-90mw-data-center-in-fremont-california/","label":"Valley Oak proposes 90MW data center in Fremont, California","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/news/old-fremont-materials-factory-planned-for-massive-data-center","label":"Old Fremont materials factory planned for massive data center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.datacentermap.com/usa/california/fremont/37887-shinn-street/","label":"37887 Shinn Street, Fremont","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-vantage-santa-clara-i-ca1-ca","sourceRecordId":"vantage-santa-clara-i-ca1-ca","name":"Vantage Santa Clara I (CA1)","operator":"Vantage Data Centers","city":"Santa Clara","county":"Santa Clara","address":"2820 Northwestern Parkway","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3725693,"longitude":-121.9736589,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-santa-clara-i-ca1-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/","label":"Santa Clara I, California Data Center Campus - Vantage Data Centers","publisher":"Vantage Data Centers","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-vantage-santa-clara-ii-ca2-ca","sourceRecordId":"vantage-santa-clara-ii-ca2-ca","name":"Vantage Santa Clara II (CA2)","operator":"Vantage Data Centers","city":"Santa Clara","county":"Santa Clara","address":"737 Mathew Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3640012,"longitude":-121.94689,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-santa-clara-ii-ca2-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/","label":"Vantage facility directory","publisher":"Vantage","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1314010354","label":"OpenStreetMap way/1314010354","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-vantage-santa-clara-iii-ca3-ca","sourceRecordId":"vantage-santa-clara-iii-ca3-ca","name":"Vantage Santa Clara III (CA3)","operator":"Vantage Data Centers","city":"Santa Clara","county":"Santa Clara","address":"2590 Walsh Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3712362,"longitude":-121.9740103,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-santa-clara-iii-ca3-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/data-center/santa-clara-iii-california/","label":"Santa Clara III, California Data Center - Vantage Data Centers","publisher":"Vantage Data Centers","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://datacenterhawk.com/marketplace/providers/vantage-data-centers/2590-walsh-avenue/ca3","label":"Vantage Data Centers CA3 | 2590 Walsh Avenue, Northern California","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/ca3-backup-generating-facility","label":"CA3 Backup Generating Facility (21-SPPE-01), project owner Vantage, 2590 Walsh Avenue","publisher":"California Energy Commission","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=2590%20Walsh%20Avenue%2C%20Santa%20Clara%2C%20CA","label":"Nominatim geocode of 2590 Walsh Avenue, Santa Clara, CA","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-global-stack-ventura-county-fairgrounds-ca","sourceRecordId":"global-stack-ventura-county-fairgrounds-ca","name":"Ventura County Fairgrounds Edge Data Center (Global Stack proposal, dropped)","operator":"Global Stack LLC","city":"Ventura","county":"Ventura","address":null,"state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.2756169,"longitude":-119.3022499,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-stack-ventura-county-fairgrounds-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spectrumnews1.com/ca/la/politics/2026/09/16/ventura-community-speaks-out-against-plan-they-fear-includes-a-data-center","label":"Ventura community speaks out against plan they fear includes a data center","publisher":"Spectrum News 1","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://spectrumnews1.com/ca/la/technology/2026/09/04/company-looks-to-build-data-centers-at-fairgrounds-across-california--including-ventura-county-","label":"Company looks to build data centers at fairgrounds across California, including Ventura County","publisher":"Spectrum News 1","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-databank-vernon-la-ca","sourceRecordId":"databank-vernon-la-ca","name":"Vernon LA Campus (with Goodman Group)","operator":"DataBank","city":"Vernon","county":"Los Angeles","address":"3094 East Vernon Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":34.00543,"longitude":-118.218653,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-vernon-la-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles-302735412.html","label":"DataBank and Goodman Group partner to open new landmark data center in Los Angeles","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-09-29"},{"url":"https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/","label":"DataBank press release — DataBank and Goodman Group Partner to Open New Landmark Data Center in Los Angeles","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/","label":"Los Angeles Vernon Data Center (LAX2), 3094 E. Vernon Avenue","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://hoodline.com/2026/04/vernon-snags-32mw-data-fortress-as-databank-teams-with-goodman/","label":"DataBank, Goodman launch 32MW data center project in Vernon","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://www.connectcre.com/stories/goodman-breaks-ground-on-49-5-mw-data-center-in-vernon/","label":"Goodman breaks ground on 49.5 MW data center in Vernon","publisher":"Connect CRE","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-westbank-180-park-avenue-san-jose-ca","sourceRecordId":"westbank-180-park-avenue-san-jose-ca","name":"Westbank 180 Park Avenue Data Center (Park Habitat site, downtown San José)","operator":"Westbank / Urban Community","city":"San Jose","county":"Santa Clara","address":"180 Park Avenue","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3308869,"longitude":-121.8906767,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/westbank-180-park-avenue-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.kqed.org/news/12095008/san-jose-weighs-data-center-benefits-as-residents-raise-environmental-concerns","label":"San José weighs data center benefits as residents raise environmental concerns (2026-08-13)","publisher":"KQED","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://sfyimby.com/2025/12/new-renderings-for-big-designed-tower-in-downtown-san-jose.html","label":"New renderings for BIG-designed tower in downtown San Jose (2025-12-12)","publisher":"San Francisco YIMBY","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-westbank-300-south-first-street-san-jose-ca","sourceRecordId":"westbank-300-south-first-street-san-jose-ca","name":"Westbank 300 South First Street Data Center (downtown San José)","operator":"Westbank","city":"San Jose","county":"Santa Clara","address":"300 South First Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3314706,"longitude":-121.8865883,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/westbank-300-south-first-street-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.kqed.org/news/12095008/san-jose-weighs-data-center-benefits-as-residents-raise-environmental-concerns","label":"San José weighs data center benefits as residents raise environmental concerns (2026-08-13)","publisher":"KQED","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/","label":"Data center, hundreds of homes coming to downtown San Jose (2025-04-16)","publisher":"San José Spotlight","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-westbank-323-terraine-street-san-jose-ca","sourceRecordId":"westbank-323-terraine-street-san-jose-ca","name":"Westbank 323 Terraine Street Data Center (downtown San José)","operator":"Westbank","city":"San Jose","county":"Santa Clara","address":"323 Terraine Street","state":"CA","stateName":"California","jurisdictionType":"state","latitude":37.3392085,"longitude":-121.897492,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/westbank-323-terraine-street-san-jose-ca","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.kqed.org/news/12095008/san-jose-weighs-data-center-benefits-as-residents-raise-environmental-concerns","label":"San José weighs data center benefits as residents raise environmental concerns (2026-08-13)","publisher":"KQED","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/","label":"Data center, hundreds of homes coming to downtown San Jose (2025-04-16)","publisher":"San José Spotlight","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-eleven-eleven-systems-thornton-co","sourceRecordId":"eleven-eleven-systems-thornton-co","name":"11:11 Systems Thornton Data Center (DEN550)","operator":"11:11 Systems","city":"Thornton","county":"Adams","address":"550 E 84th Ave","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.847081,"longitude":-104.979182,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eleven-eleven-systems-thornton-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/11-11-systems-thornton","label":"11:11 Systems: Thornton","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://www.peeringdb.com/fac/11867","label":"PeeringDB: Sungard AS Thornton","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-365-data-centers-aurora-co1-co","sourceRecordId":"365-data-centers-aurora-co1-co","name":"365 Data Centers Aurora (CO1)","operator":"365 Data Centers","city":"Aurora","county":null,"address":"3431 N Windsor Dr","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.762184,"longitude":-104.760923,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-aurora-co1-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/aurora-data-center/","label":"Aurora, CO Data Center","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://www.peeringdb.com/fac/16128","label":"PeeringDB: 365 Data Centers Aurora (CO1)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-aerotropolis-industrial-development-aurora-co","sourceRecordId":"aerotropolis-industrial-development-aurora-co","name":"Aerotropolis Logistics Center Data Center Campus","operator":"Aerotropolis Industrial Development","city":"Aurora","county":"Adams","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.7704988,"longitude":-104.6782723,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aerotropolis-industrial-development-aurora-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coloradopolitics.com/2026/10/01/second-large-data-center-proposed-for-aurora-highlands-area/","label":"Second large data center proposed for Aurora Highlands area","publisher":"Colorado Politics","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=Aerotropolis+Parkway,+Aurora,+Colorado&format=json","label":"OSM Nominatim geocode: North Aerotropolis Parkway, Aurora (western boundary road of the site)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-blusky-ai-walsenburg-co","sourceRecordId":"blusky-ai-walsenburg-co","name":"BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center","operator":"BluSky AI Inc.","city":"Walsenburg","county":"Huerfano","address":"1 Hwy 69 / Indian Pool Ranch","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":37.6235234,"longitude":-104.780995,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blusky-ai-walsenburg-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://finance.yahoo.com/news/blusky-ai-inc-executes-purchase-141700082.html","label":"BluSky AI Inc. Executes Purchase and Sale Agreement for its Fifth AI Factory Location","publisher":"BluSky AI Inc. (news release)","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","label":"AI data center plans baffle small southern Colorado town (read via Internet Archive)","publisher":"Colorado Springs Gazette","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-undisclosed-brighton-cr4-50th-ave-co","sourceRecordId":"undisclosed-brighton-cr4-50th-ave-co","name":"Brighton Data Center Complex (County Road 4 & 50th Avenue)","operator":"Undisclosed developer (Dewberry-planned rezoning application)","city":"Brighton","county":"Weld","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":40.015,"longitude":-104.7523,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/undisclosed-brighton-cr4-50th-ave-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.denver7.com/news/local-news/in-your-community/north-metro/brighton-residents-uncover-proposal-for-massive-data-center-campus-spurring-potential-moratorium","label":"Brighton residents uncover proposal for massive data center campus, spurring potential moratorium","publisher":"Denver7","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://bizwest.com/2026/09/24/plan-for-massive-data-center-spurs-call-for-brighton-pause/","label":"Plan for massive data center spurs call for Brighton pause","publisher":"BizWest","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.denver7.com/news/local-news/in-your-community/north-metro/plans-for-data-center-campus-in-brighton-halted-after-developers-withdraw-rezoning-application","label":"Plans for data center campus in Brighton halted after developers withdraw rezoning application","publisher":"Denver7","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-coresite-de1-denver-co","sourceRecordId":"coresite-de1-denver-co","name":"CoreSite DE1 (910 15th Street)","operator":"CoreSite","city":"Denver","county":"Denver","address":"910 15th St.","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.745646,"longitude":-104.995336,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-de1-denver-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center-locations/denver","label":"Colocation Data Centers in Denver","publisher":"CoreSite","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-coresite-de2-denver-co","sourceRecordId":"coresite-de2-denver-co","name":"CoreSite DE2 (639 E. 18th Avenue)","operator":"CoreSite","city":"Denver","county":"Denver","address":"639 E. 18th Ave.","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.744914,"longitude":-104.979413,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-de2-denver-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center-locations/denver","label":"Colocation Data Centers in Denver","publisher":"CoreSite","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-coresite-de3-denver-co","sourceRecordId":"coresite-de3-denver-co","name":"CoreSite DE3","operator":"CoreSite","city":"Denver","county":"Denver","address":"4900 Race Street","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.7392,"longitude":-104.9903,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-de3-denver-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.businesswire.com/news/home/20251006047627/en/CoreSite-Achieves-Key-Construction-Milestone-for-New-DE3-Data-Center-in-Denver","label":"CoreSite Achieves Key Construction Milestone for New DE3 Data Center in Denver","publisher":"CoreSite / American Tower","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.coresite.com/data-center/de3-denver-co","label":"CoreSite DE3 — Denver Data Center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://denverite.com/2026/07/21/denver-data-center-noise-coresite/","label":"Denver data center generators draw noise complaints in Elyria-Swansea (read via Internet Archive)","publisher":"Denverite / CPR News","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.cpr.org/2026/07/08/qts-aurora-data-center-diesel-generators/","label":"Colorado's biggest data center wants to add another 98 diesel backup generators — CoreSite water-use figures (read via Internet Archive)","publisher":"Colorado Public Radio","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://coloradosun.com/2026/06/18/colorado-data-center-update-pollution-protests-moratoriums/","label":"What's the status of massive data centers in Colorado? (read via Internet Archive)","publisher":"The Colorado Sun","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.coresite.com/hubfs/-website-documents/Fact%20Sheets/CoreSite_FAQ_DE3.pdf","label":"CoreSite DE3 FAQ","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-centersquare-den1-highlands-ranch-co","sourceRecordId":"centersquare-den1-highlands-ranch-co","name":"Csquare (Centersquare) DEN1 Denver - Highlands Ranch","operator":"Csquare (Centersquare)","city":"Highlands Ranch","county":"Douglas","address":"9110-9180 Commerce Center Circle","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.549201,"longitude":-105.032671,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-den1-highlands-ranch-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","label":"Csquare Denver Market spec sheet (DEN1/DEN2)","publisher":"Csquare","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-centersquare-den2-englewood-co","sourceRecordId":"centersquare-den2-englewood-co","name":"Csquare (Centersquare) DEN2 Denver - Englewood","operator":"Csquare (Centersquare)","city":"Englewood","county":"Douglas","address":"8534 Concord Center Drive","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.561593,"longitude":-104.832547,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-den2-englewood-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","label":"Csquare Denver Market spec sheet (DEN1/DEN2)","publisher":"Csquare","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://www.peeringdb.com/fac/2623","label":"Centersquare Denver (DEN2)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-databank-den1-englewood-co","sourceRecordId":"databank-den1-englewood-co","name":"DataBank DEN1 - Englewood","operator":"DataBank","city":"Englewood","county":"Douglas","address":"393 Inverness Parkway","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.560952,"longitude":-104.865649,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/databank-den1-englewood-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/denver/","label":"Premium Data Centers in Denver","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-databank-den2-centennial-co","sourceRecordId":"databank-den2-centennial-co","name":"DataBank DEN2 — Centennial","operator":"DataBank","city":"Centennial","county":"Arapahoe","address":"6900 South Peoria Street","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.5917924,"longitude":-104.8479857,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-den2-centennial-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/denver/centennial-campus/","label":"Centennial Campus Data Center — Denver (DEN2 and DEN5 specs)","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-databank-den5-centennial-co","sourceRecordId":"databank-den5-centennial-co","name":"DataBank DEN5 — Centennial II","operator":"DataBank","city":"Centennial","county":"Arapahoe","address":"6961 S. Quentin Street","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.5900652,"longitude":-104.8469635,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-den5-centennial-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/denver/centennial-campus/den5/","label":"DEN5 Data Center — Centennial Campus, Denver","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.databank.com/data-centers/denver/centennial-campus/","label":"Centennial Campus Data Center — Denver","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-edgeconnex-den01-denver-co","sourceRecordId":"edgeconnex-den01-denver-co","name":"EdgeConneX DEN01 Denver","operator":"EdgeConneX","city":"Englewood","county":"Douglas","address":"8535 Highfield Pkwy","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.5608526,"longitude":-104.8275475,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-den01-denver-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/denver-co/","label":"Denver, CO Data Center & Colocation — EdgeConneX","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.peeringdb.com/api/fac?country=US&state=CO","label":"PeeringDB facility records, Colorado (EdgeConneX Denver EDCDEN01)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-equinix-de1-centennial-co","sourceRecordId":"equinix-de1-centennial-co","name":"Equinix DE1 Denver","operator":"Equinix","city":"Centennial","county":"Arapahoe","address":"9706 East Easter Avenue, Suite 160","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.587746,"longitude":-104.87629,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-de1-centennial-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/4443","label":"Equinix DE1 - Denver","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-equinix-de2-englewood-co","sourceRecordId":"equinix-de2-englewood-co","name":"Equinix DE2 Denver (Inverness Business Park)","operator":"Equinix","city":"Englewood","county":"Douglas","address":"335 Inverness Drive South","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.561029,"longitude":-104.858662,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-de2-englewood-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/696","label":"Equinix DE2 - Denver","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-nlr-esif-hpc-data-center-golden-co","sourceRecordId":"nlr-esif-hpc-data-center-golden-co","name":"ESIF High-Performance Computing Data Center (Kestrel supercomputer)","operator":"National Laboratory of the Rockies (formerly NREL), U.S. Department of Energy","city":"Golden","county":"Jefferson","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.74024,"longitude":-105.16718,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nlr-esif-hpc-data-center-golden-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.gov/cmei/articles/department-energys-newest-energy-research-dedicated-supercomputer-arrives-nrel","label":"Department of Energy's Newest Energy Research-Dedicated Supercomputer Arrives at NREL","publisher":"U.S. Department of Energy","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.nlr.gov/computational-science/facilities","label":"Computational Science Facilities","publisher":"National Laboratory of the Rockies","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://www.nlr.gov/news/detail/program/2023/nrels-new-high-performance-computer-has-a-tremendous-supporting-cast","label":"NREL's New High-Performance Computer Has a Tremendous Supporting Cast","publisher":"National Laboratory of the Rockies","kind":"press","retrievedAt":"2026-09-30"}]},{"id":"compute-expedient-centennial-co","sourceRecordId":"expedient-centennial-co","name":"Expedient Denver (Centennial) Data Center","operator":"Expedient","city":"Centennial","county":"Arapahoe","address":"7347 S Revere Pkwy","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.5812368,"longitude":-104.8426192,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-centennial-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.builtincolorado.com/articles/expedient-opening-denver-data-center-hiring","label":"Expedient Opens Denver-Area Data Center","publisher":"Built In Colorado","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=7347+South+Revere+Parkway,+Centennial,+CO&format=json","label":"OSM Nominatim geocode: Building C, 7347 South Revere Parkway","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-flexential-denver-aurora-den03-co","sourceRecordId":"flexential-denver-aurora-den03-co","name":"Flexential Denver - Aurora (DEN03)","operator":"Flexential","city":"Aurora","county":"Arapahoe","address":"11900 East Cornell Avenue","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.6610488,"longitude":-104.8488321,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-denver-aurora-den03-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/co/denver/aurora-data-center","label":"Flexential official facility page (corroborated by DataCenterJournal DEN03 listing)","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12112270180","label":"OpenStreetMap node/12112270180","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-denver-centennial-den05-co","sourceRecordId":"flexential-denver-centennial-den05-co","name":"Flexential Denver - Centennial (DEN05)","operator":"Flexential","city":"Centennial","county":"Arapahoe","address":"12500 East Arapahoe Road","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.5938733,"longitude":-104.8431597,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-denver-centennial-den05-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/co/denver/centennial-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/11400893880","label":"OpenStreetMap node/11400893880","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-denver-downtown-champa-co","sourceRecordId":"flexential-denver-downtown-champa-co","name":"Flexential Denver - Downtown (Champa)","operator":"Flexential","city":"Denver","county":"Denver","address":"1500 Champa Street","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.7459702,"longitude":-104.9941589,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-denver-downtown-champa-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/co/denver/downtown-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12112236372","label":"OpenStreetMap node/12112236372","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-denver-englewood-co","sourceRecordId":"flexential-denver-englewood-co","name":"Flexential Denver - Englewood","operator":"Flexential","city":"Englewood","county":"Arapahoe","address":"8636 South Peoria Street","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.558994,"longitude":-104.8375559,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-denver-englewood-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/co/denver/englewood-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/377545385","label":"OpenStreetMap way/377545385","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-parker-co","sourceRecordId":"flexential-parker-co","name":"Flexential Parker (Compark)","operator":"Flexential","city":"Parker","county":"Douglas","address":"Compark Boulevard","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.5620551,"longitude":-104.8119323,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-parker-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coloradopolitics.com/2026/08/11/parker-data-center-could-get-19m-tax-rebate-from-douglas-county/","label":"Parker data center could get $19M tax rebate from Douglas County","publisher":"Colorado Politics","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.denvergazette.com/2026/09/12/to-build-or-to-ban-colorado-municipalities-grapple-with-data-centers/","label":"To build or to ban: Colorado municipalities grapple with data centers","publisher":"Denver Gazette","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.koaa.com/news/local-news/douglas-county-approves-19m-tax-rebate-for-parker-data-center","label":"Douglas County approves $19M tax rebate for Parker data center","publisher":"KOAA","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.rmpbs.org/news/business-economy/parker-colorado-data-center","label":"One of the state's largest data centers is coming to Parker. Some locals aren't happy.","publisher":"Rocky Mountain PBS","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-global-ai-windsor-co","sourceRecordId":"global-ai-windsor-co","name":"Global AI Windsor Data Center (former Kodak/Carestream campus)","operator":"Global AI","city":"Windsor","county":"Weld","address":"2000 Howard Smith Avenue W","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":40.4653149,"longitude":-104.909,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/global-ai-windsor-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cpr.org/2026/08/07/weld-county-ai-data-center/","label":"Weld County officials have told an AI company to stop construction on a new data center. Three times. (read via Internet Archive)","publisher":"Colorado Public Radio","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.windsorco.gov/1452/AI-Data-Center-Project-Information","label":"AI Data Center Project Information — Town of Windsor","publisher":"Town of Windsor, Colorado","kind":"permit","retrievedAt":"2026-08-26"},{"url":"https://www.kunc.org/news/2026-09-12/weld-county-commissioners-approve-permit-for-global-ai-data-center","label":"Weld County commissioners approve permit for Global AI data center","publisher":"KUNC","kind":"press","retrievedAt":"2026-09-30"}]},{"id":"compute-granite-renewables-logan-county-co","sourceRecordId":"granite-renewables-logan-county-co","name":"Granite Renewables Logan County Data Center Campus","operator":"Granite Renewables","city":"Sterling","county":"Logan","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":40.6255415,"longitude":-103.207709,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/granite-renewables-logan-county-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://pagosadailypost.com/2025/12/17/big-pivots-massive-data-center-slated-for-northeastern-colorado-part-one/","label":"BIG PIVOTS: Massive Data Center Slated for Northeastern Colorado? Part One","publisher":"Pagosa Daily Post (Big Pivots)","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://bigpivots.com/geaing-up-for-data-centers/","label":"Gearing up for data centers","publisher":"Big Pivots","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-h5-denver-greenwood-village-co","sourceRecordId":"h5-denver-greenwood-village-co","name":"H5 Data Centers Denver (Denver Tech Center campus)","operator":"H5 Data Centers","city":"Greenwood Village","county":"Arapahoe","address":"5350 S Valentia Way","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.6167549,"longitude":-104.8916814,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-denver-greenwood-village-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/denver-data-center.html","label":"Denver Data Center - H5 Data Centers","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://h5datacenters.com/denver-colocation.html","label":"Denver Colocation - H5 Data Centers","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.peeringdb.com/api/fac?country=US&state=CO","label":"PeeringDB facility records, Colorado (H5 Data Centers Denver)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-honda-longmont-co","sourceRecordId":"honda-longmont-co","name":"Honda Data Center (1601 Dry Creek Drive)","operator":"Honda","city":"Longmont","county":"Boulder","address":"1601 Dry Creek Drive","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":40.139512,"longitude":-105.1361216,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/honda-longmont-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/honda-longmont","label":"Honda Longmont Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-iron-mountain-den1-denver-co","sourceRecordId":"iron-mountain-den1-denver-co","name":"Iron Mountain DEN-1 Denver Data Center","operator":"Iron Mountain Data Centers","city":"Denver","county":"Denver","address":"4300 Brighton Boulevard","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.7773827,"longitude":-104.9695542,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-den1-denver-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://resources.ironmountain.com/solution-guides/d/data-centers-denver-den-1","label":"Denver Data Center (DEN-1) solution guide","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://datacenterhawk.com/marketplace/providers/iron-mountain-data-centers/4300-brighton-boulevard/den-1","label":"Iron Mountain Data Centers DEN-1, 4300 Brighton Boulevard","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-kyndryl-boulder-co","sourceRecordId":"kyndryl-boulder-co","name":"Kyndryl Boulder Data Center (former IBM Boulder campus)","operator":"Kyndryl","city":"Boulder","county":"Boulder","address":"6300 Diagonal Hwy","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":40.0890431,"longitude":-105.1976845,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/kyndryl-boulder-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/kyndryl-boulder","label":"Kyndryl: Boulder","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=6300+Diagonal+Highway,+Boulder,+CO&format=json","label":"OSM Nominatim geocode: Building 1, 6300 Diagonal Highway","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-lumen-denver-1-1850-pearl-co","sourceRecordId":"lumen-denver-1-1850-pearl-co","name":"Lumen Denver 1 (1850 Pearl Street Gateway)","operator":"Lumen Technologies","city":"Denver","county":"Denver","address":"1850 Pearl St","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.745119,"longitude":-104.979669,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-denver-1-1850-pearl-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-denver-1-1850-north-pearl","label":"Lumen Denver 1 (1850 North Pearl)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://www.peeringdb.com/api/fac?country=US&state=CO","label":"PeeringDB facility records, Colorado (Level(3) Denver, 1850 Pearl)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-novva-colorado-springs-co","sourceRecordId":"novva-colorado-springs-co","name":"Novva Colorado Springs Data Center","operator":"Novva Data Centers","city":"Colorado Springs","county":"El Paso","address":"650 Sybilla Lane","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.0130116,"longitude":-104.8164434,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/novva-colorado-springs-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.novva.com/media-center/novva-data-centers-acquires-colorado-springs-campus/","label":"Novva Data Centers Acquires Colorado Springs Campus","publisher":"Novva Data Centers","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.novva.com/data-center-facilities/colorado/","label":"Colorado Springs Data Center | Colocation | NOVVA Data Centers","publisher":"Novva Data Centers","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-broadstone-project-primestone-colorado-springs-co","sourceRecordId":"broadstone-project-primestone-colorado-springs-co","name":"Project Primestone (Vineyards Research Park) GPU Test Facility","operator":"Broadstone Net Lease (developer/owner); operations partner Emergent Data Centers; tenant undisclosed","city":"Colorado Springs","county":"El Paso","address":"3819 Janitell Rd","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":38.7897826,"longitude":-104.7932145,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/broadstone-project-primestone-colorado-springs-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gazette.com/?p=2039973","label":"High-tech graphics card testing facility eyeing former golf course, vineyard for $303M development","publisher":"The Gazette (Colorado Springs)","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://pikespeakbulletin.org/?p=20887","label":"Project Primestone isn't a data center – it will just look and feel like one","publisher":"Pikes Peak Bulletin","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=3819+Janitell+Road,+Colorado+Springs,+CO&format=json","label":"OSM Nominatim geocode: 3819 Janitell Road","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-prometheus-hyperscale-fort-morgan-co","sourceRecordId":"prometheus-hyperscale-fort-morgan-co","name":"Prometheus Hyperscale Fort Morgan","operator":"Prometheus Hyperscale","city":"Fort Morgan","county":"Morgan","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":40.2502582,"longitude":-103.799951,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-fort-morgan-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/wyoming-hyperscale-becomes-prometheus-hyperscale-reveals-pipeline-of-four-additional-sites/","label":"Wyoming Hyperscale becomes Prometheus Hyperscale, reveals pipeline of four additional sites (read via Internet Archive)","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://bigpivots.com/looming-questions-about-data-centers/","label":"Looming questions about data centers","publisher":"Big Pivots","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-prometheus-hyperscale-pueblo-co","sourceRecordId":"prometheus-hyperscale-pueblo-co","name":"Prometheus Hyperscale Pueblo","operator":"Prometheus Hyperscale","city":"Pueblo","county":"Pueblo","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":38.263995,"longitude":-104.6141867,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-pueblo-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/wyoming-hyperscale-becomes-prometheus-hyperscale-reveals-pipeline-of-four-additional-sites/","label":"Wyoming Hyperscale becomes Prometheus Hyperscale, reveals pipeline of four additional sites (read via Internet Archive)","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://bigpivots.com/looming-questions-about-data-centers/","label":"Looming questions about data centers","publisher":"Big Pivots","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-qts-aurora-co","sourceRecordId":"qts-aurora-co","name":"QTS Aurora-Denver Data Center Campus (DEN1)","operator":"QTS Data Centers","city":"Aurora","county":"Arapahoe","address":"1160 N Gun Club Rd","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.7113,"longitude":-104.7241,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-aurora-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/qts-plans-15m-sq-ft-expansion-at-henrico-virginia-campus-and-denver-build-out/","label":"QTS plans Denver build-out at 177MW Aurora campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://milehighcre.com/denver-data-center-market-capturing-growing-interest/","label":"Denver Data Center Market Capturing Growing Interest","publisher":"Mile High CRE","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cpr.org/2026/07/08/qts-aurora-data-center-diesel-generators/","label":"Colorado's biggest data center wants to add another 98 diesel backup generators","publisher":"Colorado Public Radio","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://q.com/data-centers/denver/","label":"QTS Denver 1 (Aurora-Denver) campus","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-qts-colorado-springs-co","sourceRecordId":"qts-colorado-springs-co","name":"QTS Colorado Springs Data Center","operator":"QTS Data Centers","city":"Colorado Springs","county":"El Paso","address":"311 S. Rockrimmon Blvd","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":38.9220674,"longitude":-104.8426568,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-colorado-springs-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/colorado-springs/","label":"Colorado Springs — QTS Data Centers","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-raeden-taurus-colorado-springs-co","sourceRecordId":"raeden-taurus-colorado-springs-co","name":"Raeden Project Taurus","operator":"Raeden","city":"Colorado Springs","county":"El Paso","address":"1565 High Tech Way","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":38.8339,"longitude":-104.8214,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/raeden-taurus-colorado-springs-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/50mw-data-center-could-be-built-in-colorado-springs/","label":"50MW data center could be built in Colorado Springs","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://socodigest.com/2026/07/25/project-taurus-raeden-data-center-appeals-denied-colorado-springs-2026-2/","label":"SoCoDigest","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://gazette.com/2026/06/12/colorado-springs-administratively-approves-data-center-on-garden-of-the-gods-road/","label":"Colorado Springs administratively approves data center on Garden of the Gods Road (read via Internet Archive)","publisher":"Colorado Springs Gazette","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://gazette.com/2026/03/28/large-data-center-may-be-heading-to-former-computer-chip-facility-in-colorado-springs/","label":"Large data center may be heading to former computer chip facility in Colorado Springs (read via Internet Archive)","publisher":"Colorado Springs Gazette","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://krdo.com/news/2026/04/06/data-center-could-come-to-colorado-springs/","label":"AI data center could come to Colorado Springs","publisher":"KRDO","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://krdo.com/news/2026/09/18/project-taurus-decision-postponed/","label":"Data center developer says it is 'evaluating' partnership after tense Colorado Springs City Council meeting","publisher":"KRDO","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-t5-colorado-springs-co","sourceRecordId":"t5-colorado-springs-co","name":"T5@Colorado Data Center Campus","operator":"T5 Data Centers","city":"Colorado Springs","county":"El Paso","address":"3323 Janitell Road","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":38.795985,"longitude":-104.794485,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-colorado-springs-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/t5-colorado","label":"T5 Colorado Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://t5datacenters.com/resources/global-software-company-first-tenant-to-break-ground-at-t5-data-centers-colorado-campus/","label":"Global Software Company First Tenant to Break Ground at T5 Data Centers' T5@Colorado Campus","publisher":"T5 Data Centers","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.datacenterknowledge.com/investing/t5-plans-800-million-campus-in-colorado-springs","label":"T5 Plans $800 Million Campus in Colorado Springs","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-30"}]},{"id":"compute-us-signal-co01-englewood-co","sourceRecordId":"us-signal-co01-englewood-co","name":"US Signal CO01 Denver Data Center","operator":"US Signal","city":"Englewood","county":null,"address":"8675 Concord Center Dr","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.559076,"longitude":-104.833542,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-co01-englewood-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/co01-denver/","label":"CO01 Denver Data Center","publisher":"US Signal","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://www.peeringdb.com/fac/12305","label":"PeeringDB: US Signal CO01 - Denver","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://ussignal.com/?p=4505","label":"US Signal CIO Roundtable & Data Center Tour (Denver)","publisher":"US Signal","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-vantage-co21-aurora-co","sourceRecordId":"vantage-co21-aurora-co","name":"Vantage Data Centers CO21 Campus (Building 3)","operator":"Vantage Data Centers","city":"Aurora","county":"Adams","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.7837993,"longitude":-104.7259922,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-co21-aurora-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/vantage-colorado-co21","label":"Vantage: Colorado CO21 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://datacenterhawk.com/marketplace/providers/vantage-data-centers/48th-avenue-and-e-470/co21-building-3","label":"Vantage Data Centers CO21 (Building 3) | 48th Avenue and E-470, Denver","publisher":"DataCenterHawk","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-visa-occ-highlands-ranch-co","sourceRecordId":"visa-occ-highlands-ranch-co","name":"Visa OCC North & OCC South Data Centers (Highlands Ranch)","operator":"Visa Inc.","city":"Highlands Ranch","county":"Douglas","address":null,"state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":39.5536247,"longitude":-104.9944646,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/visa-occ-highlands-ranch-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://uptimeinstitute.com/uptime-institute-awards/client/visa-inc/41","label":"Uptime Institute awards: Visa Inc. data centers","publisher":"Uptime Institute","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=Visa,+Highlands+Ranch,+Colorado&format=json","label":"OSM Nominatim: Visa Inc., South Ridgeline Boulevard, Highlands Ranch","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-walmart-colorado-springs-co","sourceRecordId":"walmart-colorado-springs-co","name":"Walmart Colorado Springs Data Center","operator":"Walmart","city":"Colorado Springs","county":"El Paso","address":"10625 Federal Dr","state":"CO","stateName":"Colorado","jurisdictionType":"state","latitude":38.985587,"longitude":-104.7874102,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/walmart-colorado-springs-co","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gazette.com/2012/11/23/wal-marts-new-data-center-seen-as-a-big-plus-for-city-36ac2f4a-bd18-5258-9230-6d9568c2fefa/","label":"Wal-Mart's new data center seen as a big plus for city","publisher":"The Gazette (Colorado Springs)","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://baxtel.com/data-center/walmart-colorado-springs","label":"Walmart Colorado Springs","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=Walmart+data+center+Colorado+Springs&format=json","label":"OSM Nominatim: Walmart Colorado Data Center (building, data_center)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-atlas-capital-bloomfield-ct","sourceRecordId":"atlas-capital-bloomfield-ct","name":"Atlas Capital Group Data Center (132 Griffin Road North)","operator":"Atlas Capital Group","city":"Bloomfield","county":"Hartford","address":"132 Griffin Road North","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.8843905,"longitude":-72.7389957,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-capital-bloomfield-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bloomfieldct.gov/CivicAlerts.aspx?AID=201","label":"Town of Bloomfield — Major Data Center Proposed for Bloomfield by NY developer (2025-07-03)","publisher":"Town of Bloomfield, CT","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://baxtel.com/data-center/atlas-capital-connecticut","label":"Atlas Capital: Connecticut Data Center — 132 Griffin Rd N, Bloomfield (44-acre former tobacco field)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?street=132+Griffin+Road+North&city=Bloomfield&state=CT&country=US&format=json&addressdetails=1","label":"OpenStreetMap Nominatim — Griffin Road North (street centroid; exact address not matched)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-30"}]},{"id":"compute-og-industries-beacon-falls-ct","sourceRecordId":"og-industries-beacon-falls-ct","name":"Beacon Falls Data Center Campus (1 Lopus Road)","operator":"O&G Industries","city":"Beacon Falls","county":"New Haven","address":"1 Lopus Road","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.442318,"longitude":-73.064334,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/og-industries-beacon-falls-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://agencycre.com/properties/one-of-the-northeasts-most-significant-planned-ai-digital-infrastructure-developments-beacon-falls-data-center/","label":"Beacon Falls Data Center — 1 Lopus Road, 294,000 SF, 100 MW campus (marketing listing)","publisher":"The Agency CRE","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://www.yahoo.com/news/articles/ct-town-turns-against-data-090000150.html","label":"CT town turns against data centers: 'Yes, please' becomes 'No way' (Hartford Courant, 2026-09-21)","publisher":"Hartford Courant via Yahoo News","kind":"press","retrievedAt":"2026-09-30"},{"url":"http://www.fuelcellenergy.com","label":"Correction source","publisher":null,"kind":"other","retrievedAt":"2026-10-07"}]},{"id":"compute-cigna-windsor-data-center-ct","sourceRecordId":"cigna-windsor-data-center-ct","name":"Cigna Windsor Data Center (9 Griffin Road North)","operator":"Cigna","city":"Windsor","county":"Hartford","address":"9 Griffin Road North","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.879941,"longitude":-72.73157,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cigna-windsor-data-center-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hartfordbusiness.com/article/cigna-plans-386m-renovation-of-windsor-data-center/","label":"Cigna plans $386M renovation of Windsor data center (2022-06-22)","publisher":"Hartford Business Journal","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://insideinvestigator.org/approval-of-connecticut-tax-credits-for-data-center-bypassed-required-review/","label":"Approval of Connecticut tax credits for data center bypassed required review (2026-08-05)","publisher":"CT Inside Investigator","kind":"press","retrievedAt":"2026-09-30"}]},{"id":"compute-cognovum-trumbull-ct","sourceRecordId":"cognovum-trumbull-ct","name":"CogNovum Data Center (80 Merritt Boulevard)","operator":"CogNovum","city":"Trumbull","county":null,"address":"80 Merritt Blvd","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.2407281,"longitude":-73.1474121,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cognovum-trumbull-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://finance.yahoo.com/sectors/technology/articles/trumbull-data-center-eyed-ai-100000924.html","label":"Trumbull data center eyed for AI-driven upgrades in nationwide expansion","publisher":"Hartford Business Journal (via Yahoo Finance)","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.globenewswire.com/news-release/2026/05/06/3288919/0/en/365-data-centers-and-aphorio-carter-launch-200-mw-ai-ready-data-center-pipeline.html","label":"365 Data Centers and Aphorio Carter Launch ~200 MW AI-Ready Data Center Pipeline","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=80%20Merritt%20Blvd%2C%20Trumbull%2C%20CT&benchmark=Public_AR_Current&format=json","label":"US Census Geocoder match: 80 MERRITT BLVD, TRUMBULL, CT, 06611","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.openstreetmap.org/way/122665255","label":"OpenStreetMap building at 80 Merritt Blvd, Trumbull, CT","publisher":null,"kind":"osm","retrievedAt":"2026-09-12"},{"url":"https://westfaironline.com/fairfield/data-center-owner-tells-trumbull-first-selectman-it-will-abide-by-4-conditions/","label":"Data center owner tells Trumbull first selectman it will abide by 4 conditions (2026-08-12)","publisher":"Westfair Communications","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://westfaironline.com/fairfield/proposed-trumbull-ai-data-center-at-nasdaq-site-worrisome-to-residents/","label":"Proposed Trumbull AI data center at Nasdaq site worrisome to residents (2026-07-19)","publisher":"Westfair Communications","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://www.cognovum.com/test-1","label":"CogNovum — CNYC1 Trumbull (80 Merritt Boulevard, Trumbull, CT 06611; 228,000 sq ft; 6.75 MW UPS)","publisher":"CogNovum","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://westfaironline.com/latest-news/trumbull-town-council-oks-moratorium-on-new-data-centers/","label":"Trumbull Town Council OKs moratorium on new data centers (2026-09-11)","publisher":"Westfair Communications","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.ctpublic.org/news/2026-09-11/trumbull-could-become-home-to-one-of-cts-first-ai-data-centers-despite-new-2-year-moratorium","label":"Trumbull could become home to one of CT's first AI data centers despite new 2-year moratorium","publisher":"Connecticut Public","kind":"press","retrievedAt":"2026-10-19"}]},{"id":"compute-cyrusone-nym5-norwalk-ct","sourceRecordId":"cyrusone-nym5-norwalk-ct","name":"CyrusOne NYM5 (Norwalk)","operator":"CyrusOne","city":"Norwalk","county":"Fairfield","address":"6 Norden Place","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.1130924,"longitude":-73.3886495,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nym5-norwalk-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/norwalk-ct","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-10-19"},{"url":"https://www.openstreetmap.org/way/571010571","label":"OpenStreetMap way/571010571","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.peeringdb.com/api/fac?state=CT&limit=250","label":"PeeringDB facility registry API — record 'CyrusOne Norwalk', 6 Norden Place (f/k/a 10 Norden Place), Norwalk 06855","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-eip-energy-innovation-park-new-britain-ct","sourceRecordId":"eip-energy-innovation-park-new-britain-ct","name":"Energy & Innovation Park Data Center (480 Myrtle Street)","operator":"EIP Investment","city":"New Britain","county":"Hartford","address":"480 Myrtle Street","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.669693,"longitude":-72.797359,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eip-energy-innovation-park-new-britain-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hartfordbusiness.com/article/new-britain-data-center-fuel-cell-project-aims-to-move-forward-with-changes/","label":"New Britain data center-fuel cell project aims to move forward, with changes (2022-02-03)","publisher":"Hartford Business Journal","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://ctmirror.org/2025/12/23/walking-myrtle-street-again-how-new-britain-is-rewriting-its-future-shuyue/","label":"Opinion: How New Britain is rewriting its future (Energy & Innovation Park)","publisher":"CT Mirror","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://baxtel.com/data-center/energy-innovation-park","label":"Energy Innovation Park Data Center — 480 Myrtle Street, New Britain (planned)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://hartfordbusiness.com/article/new-britain-kicks-off-first-phase-of-fuel-cell-anchored-energy-innovation-park/","label":"New Britain kicks off first phase of fuel cell-anchored Energy & Innovation Park (2022-12-02)","publisher":"Hartford Business Journal","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://web.archive.org/web/20260104172637/https://ogind.com/project/energy-innovation-park-new-britain-fuel-cell-project/","label":"Energy & Innovation Park, New Britain Fuel Cell Project (O&G Industries; Internet Archive copy of 2026-01-04)","publisher":"O&G Industries","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-global-common-cromwell-ct","sourceRecordId":"global-common-cromwell-ct","name":"Global Common Fuel-Cell Data Center (Geer Street)","operator":"Global Common LLC","city":"Cromwell","county":"Middlesex","address":"Geer Street","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.6260009,"longitude":-72.6611602,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-common-cromwell-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/artificial-intelligence/residents-in-connecticut-town-fear-giant-sized-data-center","label":"Residents in Connecticut town fear giant-sized data center (Hartford Courant via TNS)","publisher":"GovTech / Hartford Courant","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=Geer+Street,+Cromwell,+CT&format=json","label":"OpenStreetMap Nominatim geocode — Geer Street, Cromwell, CT (street-level, not parcel)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-ne-edge-killingly-ct","sourceRecordId":"ne-edge-killingly-ct","name":"NE Edge Killingly Data Center (125 Alexander Parkway)","operator":"NE Edge LLC","city":"Killingly","county":"Windham","address":"125 Alexander Parkway","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.8702555,"longitude":-71.8965095,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ne-edge-killingly-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/ne-edge-purchases-a-parcel-of-land-in-connecticut","label":"NE Edge purchases a parcel of land in Connecticut (Killingly, 125 Alexander Parkway)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=125+Alexander+Parkway,+Killingly,+CT&format=json","label":"OpenStreetMap Nominatim geocode — Alexander Parkway, Killingly, CT (street-level)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-ne-edge-millstone-ct","sourceRecordId":"ne-edge-millstone-ct","name":"NE Edge Millstone Nuclear Data Center","operator":"NE Edge","city":"Waterford","county":"New London","address":null,"state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.3218,"longitude":-72.1582,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ne-edge-millstone-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ctmirror.org/2024/01/19/millstone-power-plant-ct-data-center-nuclear/","label":"Millstone Nuclear Plant Would Power Proposed CT Data Center","publisher":"CT Mirror","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://ctmirror.org/2026/04/15/tale-of-a-defeated-ct-data-center/","label":"Opinion: Tale of a Defeated Data Center in CT","publisher":"CT Mirror","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.yahoo.com/news/waterford-asked-host-data-center-013100998.html","label":"Waterford asked to host data center project at Millstone (The Day, Feb 2023)","publisher":"The Day (via Yahoo News)","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://www.energizect.com/sites/default/files/documents/%234A%20-%20CT%20Data%20Center%20Proposed%20Projects%20Summary_2026-08-11_CI_MM.pdf","label":"Connecticut Data Center Proposed Projects (2026 Summary)","publisher":"Energize Connecticut","kind":"other","retrievedAt":"2026-10-19"}]},{"id":"compute-omega-systems-stamford-ct","sourceRecordId":"omega-systems-stamford-ct","name":"Omega Systems Stamford Data Center (26 Fahey Street, formerly Amnet/Cloudpath CT1)","operator":"Omega Systems","city":"Stamford","county":"Fairfield","address":"26 Fahey Street","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.091473,"longitude":-73.517633,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/omega-systems-stamford-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://omegasystemscorp.com/company/amnet-systems-has-a-new-home/","label":"Amnet Systems is Now Omega Systems — Stamford office and SOC 2 data center, 26 Fahey Street","publisher":"Omega Systems","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://www.peeringdb.com/api/fac?state=CT&limit=250","label":"PeeringDB facility registry API — records 'Omega CT1' (Omega Systems Consultants, LLC) and 'Cloudpath CT1 (26 Fahey St)', Stamford 06907","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-renew-amston-colchester-ct","sourceRecordId":"renew-amston-colchester-ct","name":"ReNew Amston Data Center Campus (42 Old Amston Road)","operator":"ReNew Developers","city":"Colchester","county":"New London","address":"42 Old Amston Road","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.5920812,"longitude":-72.3379585,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/renew-amston-colchester-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hoodline.com/2026/10/colchester-data-center-plan-on-old-amston-road-sparks-resident-pushback/","label":"Colchester data center plan on Old Amston Road sparks resident pushback","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://www.wfsb.com/2026/10/07/colchester-data-center-proposal-draws-resident-pushback-ahead-town-hall-meeting/","label":"Colchester data center proposal draws resident pushback ahead of town hall meeting","publisher":"WFSB","kind":"press","retrievedAt":"2026-10-19"},{"url":"https://portal.ct.gov/CSC/3_Petitions/Petition-Nos-1501-1600/PE1533","label":"CT Siting Council Petition No. 1533 — ReNew Developers, customer-side fuel cell, 42 Old Amston Road, Colchester","publisher":"Connecticut Siting Council","kind":"permit","retrievedAt":"2026-10-19"},{"url":"https://nominatim.openstreetmap.org/search?q=42+Old+Amston+Road,+Colchester,+CT&format=json","label":"OpenStreetMap Nominatim geocode — 42 Old Amston Road, Colchester, CT","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-19"}]},{"id":"compute-renew-riverside-bristol-ct","sourceRecordId":"renew-riverside-bristol-ct","name":"ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue)","operator":"ReNew Developers","city":"Bristol","county":"Hartford","address":"234 Riverside Avenue","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.670002,"longitude":-72.934109,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/renew-riverside-bristol-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://www.bristolct.gov/m/newsflash/Home/Detail/1683","label":"City of Bristol — Data Center Overview from the Mayor (Riverside Avenue micro cloud building, 4 MW fuel cell, approvals timeline)","publisher":"City of Bristol, CT","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://portal.ct.gov/-/media/csc/4_csc_calendarofevents/meetingmaterials/2022/20221208/pe1540-sr--draft_rev2_s.pdf?rev=75458ee8e14249e1a1a03b6e9a70cc96&hash=607BF2906B65A65CFFB6458607F564DD","label":"Connecticut Siting Council — Petition No. 1540 staff report (draft), ReNew Developers LLC, 4.0 MW customer-side fuel cell at 234 Riverside Avenue serving a data center","publisher":"Connecticut Siting Council","kind":"permit","retrievedAt":"2026-09-30"},{"url":"https://bristoledition.org/blog/2026/04/09/inlands-wetlands-approves-permit-for-riverside-venue-data-center/","label":"Inland Wetlands approves permit for Riverside Avenue data center","publisher":"The Bristol Edition","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://bristoledition.org/blog/2026/08/17/zoning-commission-to-take-up-vape-shops-data-center-at-special-meeting/","label":"Zoning Commission to take up vape shops, data center at special meeting","publisher":"The Bristol Edition","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://bristoledition.org/blog/2026/04/20/mayors-column-lets-talk-about-data-center/","label":"Mayor's column: Let's talk about data center","publisher":"The Bristol Edition","kind":"press","retrievedAt":"2026-09-30"}]},{"id":"compute-ct-das-groton-data-center-ct","sourceRecordId":"ct-das-groton-data-center-ct","name":"State of Connecticut Groton Data Center (Pfizer campus Building 230)","operator":"Connecticut Department of Administrative Services","city":"Groton","county":"New London","address":"445 Eastern Point Road","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.334586,"longitude":-72.076516,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ct-das-groton-data-center-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://portal.ct.gov/das/best/platform-services/statewide-data-center-facilities","label":"CT DAS BITS — Statewide Data Center Facilities (Tier II Groton Data Center)","publisher":"Connecticut Department of Administrative Services","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://portal.ct.gov/DECD/Press-Room/Press-Releases/2014/2014-04-12-Gov-Malloy-to-Turn-Vacant-Buildings-Bioscience-Business-Incubator-New-State-Data-Center","label":"Gov. Malloy: Agreement reached to turn vacant Pfizer buildings into bioscience incubator and new state data center (Building 230, $1/yr lease)","publisher":"CT Department of Economic and Community Development","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.carlinconstruction.com/project/state-ct-connecticut-data-center","label":"State of CT — Connecticut Data Center renovation, Pfizer campus Groton (9,000+ sq ft)","publisher":"Carlin Construction","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://portal.ct.gov/das/-/media/das/state-properties-review-board/agendas-and-meetings/2017/2017-07-13m.pdf","label":"State Properties Review Board minutes, July 13, 2017 — PRB #17-183, DAS-BEST State Data Center, Building 230, 445 Eastern Point Road, Groton","publisher":"CT State Properties Review Board","kind":"filing","retrievedAt":"2026-10-19"}]},{"id":"compute-tierpoint-waterbury-ct","sourceRecordId":"tierpoint-waterbury-ct","name":"TierPoint Waterbury","operator":"TierPoint","city":"Waterbury","county":null,"address":"108 Bank Street","state":"CT","stateName":"Connecticut","jurisdictionType":"state","latitude":41.554366,"longitude":-73.0410751,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-waterbury-ct","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/connecticut/waterbury/","label":"Waterbury, CT Data Center — TierPoint","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=108%20Bank%20Street%2C%20Waterbury%2C%20CT%2006702&benchmark=Public_AR_Current&format=json","label":"US Census Geocoder match: 108 BANK ST, WATERBURY, CT, 06702","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.openstreetmap.org/way/657403397","label":"OpenStreetMap building at 108 Bank Street, Waterbury, CT","publisher":null,"kind":"osm","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/api/fac?state=CT&limit=250","label":"PeeringDB facility registry API — record 'TierPoint Waterbury' (TierPoint, LLC), 108 Bank St, Waterbury 06702","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-365-data-centers-washington-dc","sourceRecordId":"365-data-centers-washington-dc","name":"365 Data Centers – Washington, D.C.","operator":"365 Data Centers","city":"Washington","county":null,"address":"1275 K Street NW","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.902580481701,"longitude":-77.029210511723,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-washington-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/facilities-network/","label":"Facilities & Network - 365 Data Centers","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.coresite.com/data-center/dc1-washington-d-c","label":"CoreSite DC1 - Washington, D.C.","publisher":"CoreSite","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=1275%20K%20St%20NW%2C%20Washington%2C%20DC&benchmark=Public_AR_Current&format=json","label":"US Census Bureau geocoder match: 1275 K ST NW, WASHINGTON, DC, 20005","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","label":"Potomac Electric Power Company (Pepco) - ENERGY STAR partner profile","publisher":"U.S. EPA ENERGY STAR","kind":"other","retrievedAt":"2026-10-01"}]},{"id":"compute-ainet-dc-900s-washington-dc","sourceRecordId":"ainet-dc-900s-washington-dc","name":"AiNET DC-900S","operator":"AiNET","city":"Washington","county":"District of Columbia","address":"900 2nd Street NE","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.90077,"longitude":-77.003642,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ainet-dc-900s-washington-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/6543","label":"PeeringDB facility 6543: AiNET DC-900S","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=900%202nd%20St%20NE%2C%20Washington%2C%20DC&benchmark=Public_AR_Current&format=json","label":"US Census Bureau geocoder match: 900 2ND ST NE, WASHINGTON, DC, 20002","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-10-01"}]},{"id":"compute-cogent-washington-dc-2-1050-connecticut-ave-dc","sourceRecordId":"cogent-washington-dc-2-1050-connecticut-ave-dc","name":"Cogent Washington DC 2 Data Center","operator":"Cogent Communications","city":"Washington","county":"District of Columbia","address":"1050 Connecticut Avenue NW","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.903131,"longitude":-77.039741,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-washington-dc-2-1050-connecticut-ave-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-dc","label":"Cogent Washington DC","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.cogentco.com/en/cogent-dc/343-dc-office/4213-dc-office-3","label":"Washington DC 2 Data Center","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.prnewswire.com/news-releases/cogent-communications-announces-closing-of-sale-of-10-data-center-facilities-302813574.html","label":"Cogent Communications Announces Closing of Sale of 10 Data Center Facilities","publisher":"PR Newswire / Cogent Communications","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=1050%20Connecticut%20Ave%20NW%2C%20Washington%2C%20DC&benchmark=Public_AR_Current&format=json","label":"US Census Bureau geocoder match: 1050 CONNECTICUT AVE NW, WASHINGTON, DC, 20036","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","label":"Potomac Electric Power Company (Pepco) - ENERGY STAR partner profile","publisher":"U.S. EPA ENERGY STAR","kind":"other","retrievedAt":"2026-10-01"}]},{"id":"compute-coresite-dc1-washington-d-c-dc","sourceRecordId":"coresite-dc1-washington-d-c-dc","name":"CoreSite DC1 - Washington, D.C.","operator":"CoreSite","city":"Washington","county":"District of Columbia","address":"1275 K Street Northwest","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.9028879,"longitude":-77.0291491,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-dc1-washington-d-c-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/dc1-washington-d-c","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.openstreetmap.org/node/751881301","label":"OpenStreetMap node/751881301","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.coresite.com/data-center-locations/washington-dc","label":"Colocation Data Centers in Washington D.C. - CoreSite","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-01"}]},{"id":"compute-coresite-dc2-washington-d-c-dc","sourceRecordId":"coresite-dc2-washington-d-c-dc","name":"CoreSite DC2 - Washington, D.C.","operator":"CoreSite","city":"Washington","county":"District of Columbia","address":"1099 14th Street NW","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.903679,"longitude":-77.031877,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-dc2-washington-d-c-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/dc2-washington-d-c","label":"CoreSite DC2 - Washington D.C. Data Center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.coresite.com/data-center-locations/washington-dc","label":"Colocation Data Centers in Washington D.C. - CoreSite","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.peeringdb.com/fac/9663","label":"PeeringDB facility 9663: CoreSite - Washington,DC (DC2)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=1099%2014th%20St%20NW%2C%20Washington%2C%20DC&benchmark=Public_AR_Current&format=json","label":"US Census Bureau geocoder match: 1099 14TH ST NW, WASHINGTON, DC, 20005","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","label":"Potomac Electric Power Company (Pepco) - ENERGY STAR partner profile","publisher":"U.S. EPA ENERGY STAR","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.sec.gov/Archives/edgar/data/0001490892/000155837018007845/ex-99d2.htm","label":"CoreSite Realty Q3 2018 earnings release (Form 8-K Ex. 99.2) – DC2: 24,563 sq ft turn-key capacity, $16.7M spent of estimated $22.0M, completion expected Q4 2018","publisher":"CoreSite Realty Corp / SEC EDGAR","kind":"filing","retrievedAt":"2026-10-20"}]},{"id":"compute-dc-octo-reeves-center-data-center-washington-dc","sourceRecordId":"dc-octo-reeves-center-data-center-washington-dc","name":"DC Government OCTO Data Center (Frank D. Reeves Municipal Center)","operator":"District of Columbia Office of the Chief Technology Officer (OCTO)","city":"Washington","county":"District of Columbia","address":"2000 14th Street NW","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.917122,"longitude":-77.032054,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dc-octo-reeves-center-data-center-washington-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://threee60.com/d-c-issues-new-rfp-for-long-delayed-reeves-center-remake/","label":"D.C. Issues New RFP For Long-Delayed Reeves Center Remake (Dec 5, 2022) – relocation of OCTO/DDOT data center functions out of the Reeves Center, approx. $47M","publisher":"Three60","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://dcist.com/story/22/12/05/reeves-center-redevelopment-naacp-rfp-deadline/","label":"D.C. Starts Over On Redevelopment Of Reeves Center – mission-critical IT housed at the Reeves Center","publisher":"DCist","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://dgs.dc.gov/sites/default/files/dc/sites/dgs/event_content/attachments/OCTO%20and%20DDOT%20Relocation%20from%20Reeves%20-%20RFS%20%282021.06.08%29.pdf","label":"DC DGS Request for Space DGS-RFS-2021-11: OCTO and DDOT Data Center (relocation from Reeves), June 2021","publisher":"DC Department of General Services","kind":"filing","retrievedAt":"2026-10-20"},{"url":"https://hoodline.com/2026/02/reeves-center-facelift-d-c-to-rebuild-u-street-giant-in-shifts/","label":"D.C. unveils phased plan for Reeves Center redevelopment (Feb 21, 2026) – Reeves Center at 14th and U streets, parts kept operating during phased rebuild","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=2000+14th+Street+NW,+Washington,+DC&format=json","label":"OpenStreetMap Nominatim geocode for 2000 14th Street NW, Washington, DC 20009","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-dc-octo-ddot-data-center-60-florida-ave-ne-washington-dc","sourceRecordId":"dc-octo-ddot-data-center-60-florida-ave-ne-washington-dc","name":"DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE)","operator":"District of Columbia Office of the Chief Technology Officer (OCTO)","city":"Washington","county":"District of Columbia","address":"60 Florida Avenue NE","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.9102295,"longitude":-77.0067321,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dc-octo-ddot-data-center-60-florida-ave-ne-washington-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://threee60.com/d-c-issues-new-rfp-for-long-delayed-reeves-center-remake/","label":"D.C. Issues New RFP For Long-Delayed Reeves Center Remake (Dec 5, 2022) – data center functions to be rebuilt at 60 Florida Ave. NE, Eckington","publisher":"Three60","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://dgs.dc.gov/sites/default/files/dc/sites/dgs/event_content/attachments/OCTO%20and%20DDOT%20Relocation%20from%20Reeves%20-%20RFS%20%282021.06.08%29.pdf","label":"DC DGS Request for Space DGS-RFS-2021-11: OCTO and DDOT Data Center, June 2021","publisher":"DC Department of General Services","kind":"filing","retrievedAt":"2026-10-20"},{"url":"https://maps2.dcgis.dc.gov/dcgis/rest/services/FEEDS/DCRA/FeatureServer/15/query?where=UPPER(FULL_ADDRESS)+LIKE+%2760+FLORIDA+AVE+NE%25%27&outFields=PERMIT_ID,FULL_ADDRESS,DESC_OF_WORK,ISSUE_DATE,OWNER_NAME,PERMIT_TYPE_NAME,PERMIT_SUBTYPE_NAME&f=json","label":"DC Building Permits 2023 – 60 Florida Ave NE (B2306169 interior renovation of 2-story commercial building, approx. 37,000 sq ft, plus supplemental electrical/mechanical/plumbing permits)","publisher":"DC Department of Buildings via DC GIS","kind":"permit","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=60+Florida+Avenue+NE,+Washington,+DC&format=json","label":"OpenStreetMap Nominatim geocode for 60 Florida Avenue NE, Washington, DC 20002","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-lumen-dc1-1120-vermont-ave-nw-washington-dc","sourceRecordId":"lumen-dc1-1120-vermont-ave-nw-washington-dc","name":"Lumen DC 1 (1120 Vermont Avenue NW)","operator":"Lumen Technologies","city":"Washington","county":"District of Columbia","address":"1120 Vermont Avenue NW, Suite T1000","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.9041623,"longitude":-77.0329395,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-dc1-1120-vermont-ave-nw-washington-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-dc-1","label":"Lumen DC 1 – 1120 Vermont Avenue NW, Suite T1000 (1st Floor), Washington, DC (operational, built 2000)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://assets.lumen.com/is/content/Lumen/colocation-location-data-sheet","label":"Lumen Network Colocation and Data Center data sheet – Lumen Network Colocation Markets (lists Washington, DC)","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=1120+Vermont+Avenue+NW,+Washington,+DC&format=json","label":"OpenStreetMap Nominatim geocode for 1120 Vermont Avenue NW, Washington, DC 20005","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-lumen-dc2-1220-l-street-nw-washington-dc","sourceRecordId":"lumen-dc2-1220-l-street-nw-washington-dc","name":"Lumen DC2 (1220 L Street NW)","operator":"Lumen Technologies","city":"Washington","county":"District of Columbia","address":"1220 L Street NW, Suite 200","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.9033541,"longitude":-77.0290774,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-dc2-1220-l-street-nw-washington-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-dc2","label":"Lumen DC2 Data Center – 1220 L Street NW, Suite 200, Washington, DC (operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://assets.lumen.com/is/content/Lumen/colocation-location-data-sheet","label":"Lumen Network Colocation and Data Center data sheet – Lumen Network Colocation Markets (lists Washington, DC)","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=1220+L+Street+NW,+Washington,+DC&format=json","label":"OpenStreetMap Nominatim geocode for 1220 L Street NW, Washington, DC 20005","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-lumen-dc4-1828-l-street-nw-washington-dc","sourceRecordId":"lumen-dc4-1828-l-street-nw-washington-dc","name":"Lumen DC4 (1828 L Street NW)","operator":"Lumen Technologies","city":"Washington","county":"District of Columbia","address":"1828 L Street NW, Suite 550","state":"DC","stateName":"District of Columbia","jurisdictionType":"federal district","latitude":38.9035119,"longitude":-77.0429399,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-dc4-1828-l-street-nw-washington-dc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-dc4","label":"Lumen DC4 – 1828 L St NW, Suite 550, Washington, DC (operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://assets.lumen.com/is/content/Lumen/colocation-location-data-sheet","label":"Lumen Network Colocation and Data Center data sheet – Lumen Network Colocation Markets (lists Washington, DC)","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=1828+L+Street+NW,+Washington,+DC&format=json","label":"OpenStreetMap Nominatim geocode for 1828 L Street NW, Washington, DC 20036","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-data-canopy-newark-pencader-de","sourceRecordId":"data-canopy-newark-pencader-de","name":"Data Canopy Newark (350 Pencader Drive)","operator":"Data Canopy","city":"Newark","county":"New Castle","address":"350 Pencader Drive","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.612001,"longitude":-75.760335,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/data-canopy-newark-pencader-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacanopy.com/data-centers/newark-de/","label":"Newark, DE data center: 350 Pencader Dr., 6MW building power capacity, 16,085 sq ft white space","publisher":"Data Canopy","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://technical.ly/civic-news/delaware-data-center-project-washington-location/","label":"See where Starwood Digital Holdings is planning its Delaware data center, and where others are already running","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://baxtel.com/data-center/datacanopy-newark","label":"DataCanopy: Newark data center (350 Pencader Dr; Ntirety colocation business acquired July 2023)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-01"}]},{"id":"compute-dastor-new-castle-boulden-circle-de","sourceRecordId":"dastor-new-castle-boulden-circle-de","name":"DāSTOR New Castle (3 Boulden Circle)","operator":"DāSTOR LLC","city":"New Castle","county":"New Castle","address":"3 Boulden Circle","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.68965,"longitude":-75.574117,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dastor-new-castle-boulden-circle-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dastorllc.com/locations/","label":"DāSTOR data center locations: New Castle, DE, 3 Boulden Circle, 61,000 S.F., 8 MW Power","publisher":"DāSTOR","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.delawarebusinessnow.com/news/new_castle_county/d-stor-acquires-new-castle-data-center/article_8b2a8a4e-aad8-5923-ae62-53de779e2c3e.html","label":"DÄSTOR acquires New Castle data center (3 Boulden Circle; more than 30,000 sq ft raised floor)","publisher":"Delaware Business Now","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://technical.ly/civic-news/delaware-data-center-project-washington-location/","label":"See where Starwood Digital Holdings is planning its Delaware data center, and where others are already running","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://delawarebusinesstimes.com/news/new-castle-data-center-campus/","label":"New Castle could be the site of mega data center campus (notes DāSTOR's Boulden Interchange Park addition)","publisher":"Delaware Business Times","kind":"press","retrievedAt":"2026-10-01"}]},{"id":"compute-dastor-wilmington-1201-north-market-de","sourceRecordId":"dastor-wilmington-1201-north-market-de","name":"DāSTOR Wilmington (1201 North Market Street, formerly IPR Wilmington)","operator":"DāSTOR LLC","city":"Wilmington","county":"New Castle","address":"1201 North Market Street","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.747859,"longitude":-75.546753,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dastor-wilmington-1201-north-market-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dastorllc.com/locations/","label":"DāSTOR data center locations: Wilmington, DE, 1201 North Market Street, 23,000 S.F., 4 MW Power","publisher":"DāSTOR","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://www.peeringdb.com/fac/1460","label":"PeeringDB facility record: IPR Wilmington CCC, 1201 N Market Street, Wilmington DE 19801","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://technical.ly/civic-news/delaware-data-center-project-washington-location/","label":"See where Starwood Digital Holdings is planning its Delaware data center, and where others are already running","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-10-01"}]},{"id":"compute-maguire-hayden-harrington-de","sourceRecordId":"maguire-hayden-harrington-de","name":"Harrington Data Center Proposal (Maguire Hayden)","operator":"Maguire Hayden","city":"Harrington","county":"Kent","address":"111 Reese Avenue","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":38.9237244,"longitude":-75.5777033,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/maguire-hayden-harrington-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spotlightdelaware.org/2026/08/19/harrington-denies-data-center-proposal-despite-a-1-million-offer/","label":"Harrington denies data center proposal despite a $1 million offer","publisher":"Spotlight Delaware","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://delawarebusinesstimes.com/news/harrington-data-center/","label":"Harrington denies data center development (Maguire Hayden owns 111 Reese Ave.; listed at 220,973 sq ft on approximately 24.6 acres)","publisher":"Delaware Business Times","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://delawarebusinesstimes.com/insider-only/harrington-data-centers/","label":"Harrington considers possible data centers (cold storage facility at 111 Reese Ave., formerly Burris Logistics)","publisher":"Delaware Business Times","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://technical.ly/civics/harrington-rejects-data-center-while-mystery-delaware-project-lingers","label":"Harrington rejects data center while mystery Delaware project lingers (Aug 20, 2026)","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-10-20"}]},{"id":"compute-jpmorgan-chase-cdc1-bear-de","sourceRecordId":"jpmorgan-chase-cdc1-bear-de","name":"JPMorgan Chase Core Data Center 1 (CDC1), Bear","operator":"JPMorgan Chase Bank, N.A.","city":"Bear","county":"New Castle","address":"501 Bear Christiana Road","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.64975,"longitude":-75.656095,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/jpmorgan-chase-cdc1-bear-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://docs.dnrec.delaware.gov/render/2446576/c1b1b6791dc007b72fdca01fd2ea9fa568f551cf506d18581b522a1ea65cf5e667aa6b87b38cb1b1246515c1c0b04ca1/","label":"DNREC Division of Air Quality: draft permit APC-2003/0285-OPERATION (SM)(NSPS)(A5), twelve emergency generators, JP Morgan Data Center CDC1, 501 Bear Christiana Road (Dec 2021)","publisher":"Delaware DNREC","kind":"permit","retrievedAt":"2026-10-20"},{"url":"https://dnrec.delaware.gov/public-notices/title-v-synthetic-minor-permit-applications-jp-morgan/","label":"Title V Synthetic Minor Permit Applications: JP Morgan (501 Bear Christiana Road), public notice Dec 12, 2021","publisher":"Delaware DNREC","kind":"permit","retrievedAt":"2026-10-01"}]},{"id":"compute-lumen-newark-interchange-blvd-de","sourceRecordId":"lumen-newark-interchange-blvd-de","name":"Lumen Newark (504 Interchange Boulevard)","operator":"Lumen Technologies","city":"Newark","county":"New Castle","address":"504 Interchange Boulevard","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.65969,"longitude":-75.781311,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-newark-interchange-blvd-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://assets.lumen.com/is/content/Lumen/colocation-location-data-sheet","label":"Lumen Network Colocation and Data Center data sheet (2025), Network Colocation Markets list includes Newark, DE","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://inflect.com/building/504-interchange-boulevard-newark/lumen/datacenter/newark","label":"Inflect: Lumen Newark 2, 504 Interchange Boulevard, Newark, DE 19711","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-20"}]},{"id":"compute-lumen-wilmington-jessup-street-de","sourceRecordId":"lumen-wilmington-jessup-street-de","name":"Lumen Wilmington (1603 Jessup Street, formerly Level 3 Wilmington 1)","operator":"Lumen Technologies","city":"Wilmington","county":"New Castle","address":"1603 Jessup Street","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.74953,"longitude":-75.538761,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-wilmington-jessup-street-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://assets.lumen.com/is/content/Lumen/colocation-location-data-sheet","label":"Lumen Network Colocation and Data Center data sheet (2025), Network Colocation Markets list includes Wilmington, DE","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://inflect.com/building/1603-jessup-street-wilmington/lumen/datacenter/wilmington","label":"Inflect: Lumen Wilmington, 1603 Jessup Street, Wilmington, DE 19802","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-20"}]},{"id":"compute-cirrus-delaware-middletown-technology-center-de","sourceRecordId":"cirrus-delaware-middletown-technology-center-de","name":"Middletown Technology Center (Cirrus Delaware LLC)","operator":"Cirrus Delaware, LLC","city":"Middletown","county":"New Castle","address":null,"state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.4497639,"longitude":-75.7166345,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cirrus-delaware-middletown-technology-center-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://delawarebusinesstimes.com/news/plans-afoot-for-middletown-technology-center-data-power-plant/","label":"Plans afoot for Middletown data center, power plant (70 acres, 228,000 sq ft, 40 MW, 52.5 MW co-generation)","publisher":"Delaware Business Times","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://publicmeetings.delaware.gov/Document/35863_Minutes-Draft.pdf","label":"Delaware Infrastructure Investment Committee minutes, May 4, 2016: Cirrus Delaware, LLC request for up to $7,500,000","publisher":"Delaware Economic Development Office","kind":"subsidy","retrievedAt":"2026-10-01"},{"url":"https://www.datacenterknowledge.com/regulations/officials-approve-data-center-and-cogen-plant-project-in-delaware","label":"Officials Approve Data Center and Cogen Plant Project in Delaware","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-01"},{"url":"https://dcmap.us/states/delaware/","label":"Delaware Data Center Map: Cirrus Delaware Middletown Technology Center, 'Paused' (Mar 2016 air-permit application; Oct 2017 put on hold)","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://datacenterknowledge.com/regulations/officials-approve-data-center-and-cogen-plant-project-in-delaware","label":"Officials Approve Data Center and Cogen Plant Project in Delaware (Aug 5, 2015)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://www.delmarvapublicmedia.org/local-news/2016-05-05/middletown-data-center-gets-7-5-million-state-grant","label":"Middletown Data Center Gets $7.5 Million State Grant (AP, May 5, 2016)","publisher":"Delmarva Public Media","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://www.wmdt.com/?p=47480","label":"Panel OKs state funding for Middletown data center project (May 5, 2016)","publisher":"WMDT","kind":"press","retrievedAt":"2026-10-20"}]},{"id":"compute-starwood-digital-project-washington-de","sourceRecordId":"starwood-digital-project-washington-de","name":"Project Washington (Starwood Digital Ventures)","operator":"Starwood Digital Ventures","city":"Delaware City","county":"New Castle","address":"825 Governor Lea Road","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.578,"longitude":-75.593,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/starwood-digital-project-washington-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spotlightdelaware.org/2026/02/04/delaware-city-data-center-faces-major-setback-after-environmental-denial/","label":"Delaware City data center faces major setback after environmental denial","publisher":"Spotlight Delaware","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.delawarepublic.org/politics-government/2026-03-24/starwood-digital-ventures-makes-its-case-to-overturn-coastal-zone-ruling-against-its-data-center-plan","label":"Starwood Digital Ventures makes its case to overturn Coastal Zone ruling against its data center plan","publisher":"Delaware Public Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://dnrec.delaware.gov/public-notices/cce20260043/","label":"DNREC Coastal Zone Status Decision — Starwood Digital Ventures (CZA-448SD)","publisher":"Delaware DNREC","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://spotlightdelaware.org/2026/03/26/delaware-city-data-center-environmental-denial-upheld-by-state-board/","label":"Delaware City data center environmental denial upheld by state board","publisher":"Spotlight Delaware","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/starwood-files-to-develop-12gw-11-building-data-center-campus-in-delaware/","label":"Starwood files to develop 1.2GW, 11-building data center campus in Delaware","publisher":"DataCenterDynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://whyy.org/articles/data-centers-water-usage/","label":"Proposed Delaware City data center could use between 10 to 20 million gallons of water a year","publisher":"WHYY","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.delawarepublic.org/politics-government/2025-08-19/mega-del-city-data-center-awaits-state-level-approval-county-officials-still-have-concerns","label":"Mega Del. City data center awaits state-level approval; county officials still have concerns (Aug 19, 2025)","publisher":"Delaware Public Media","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://documents.dnrec.delaware.gov/Admin/Public-Notices/CCE20260043/Status-Decision.pdf","label":"DNREC Coastal Zone Status Decision, Project Washington (Feb 3, 2026)","publisher":"Delaware DNREC","kind":"permit","retrievedAt":"2026-10-20"},{"url":"https://www.delcog.org/ai/","label":"Data Centers in Delaware (Project Washington South Campus at 825 Governor Lea Road)","publisher":"Delaware Coalition for Open Government","kind":"other","retrievedAt":"2026-10-20"}]},{"id":"compute-parkway-gravel-st-georges-de","sourceRecordId":"parkway-gravel-st-georges-de","name":"St. Georges Business Park & Lighthouse Farms","operator":"Parkway Gravel Inc.","city":"St. Georges","county":"New Castle","address":null,"state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.5593065,"longitude":-75.6542782,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/parkway-gravel-st-georges-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spotlightdelaware.org/2025/12/16/two-new-castle-county-industrial-projects-may-become-data-centers/","label":"Two New Castle County industrial projects may become data centers","publisher":"Spotlight Delaware","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://spotlightdelaware.org/2026/03/11/after-months-of-debate-the-new-castle-county-council-agrees-to-regulate-the-data-center-industry/","label":"After months of debate, New Castle County Council agrees to regulate the data center industry","publisher":"Spotlight Delaware","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://technical.ly/civics/delaware-data-center-foia-reveals-hidden-energy-demands/","label":"Newly public records reveal four pending Delaware data center projects","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://delawarebusinesstimes.com/news/three-sites-data-center-conversions/","label":"Three sites across New Castle explore data center conversions (Parkway Gravel plans for close to 1,500 acres at St. Georges Business Park / Lighthouse Farms)","publisher":"Delaware Business Times","kind":"press","retrievedAt":"2026-10-01"}]},{"id":"compute-the-data-centers-star-campus-newark-de","sourceRecordId":"the-data-centers-star-campus-newark-de","name":"STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC)","operator":"The Data Centers, LLC","city":"Newark","county":"New Castle","address":null,"state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.6655592,"longitude":-75.7541725,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/the-data-centers-star-campus-newark-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www1.udel.edu/udaily/2015/jul/decision071014.html","label":"UD terminates Data Centers project for STAR Campus","publisher":"University of Delaware (UDaily)","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.datacenterknowledge.com/regulations/university-of-delaware-puts-nail-in-coffin-of-data-center-and-power-plant-project","label":"University of Delaware Puts Nail in Coffin of Data Center and Power Plant Project","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://technical.ly/civic-news/university-delaware-star-campus-data-centers/","label":"UD's STAR Campus passed on $1.8B data center project: what to know","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.openstreetmap.org/way/669439186","label":"STAR Campus (OpenStreetMap way)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-12"},{"url":"https://delawarebusinessnow.com/2013/05/more-details-offered-on-proposed-data-center-power-plant-project/","label":"More details offered on proposed data center-power plant project (900,000 sq ft; 'The site would employ 290')","publisher":"Delaware Business Now","kind":"press","retrievedAt":"2026-10-01"}]},{"id":"compute-delaware-dti-biggs-data-center-new-castle-de","sourceRecordId":"delaware-dti-biggs-data-center-new-castle-de","name":"State of Delaware Biggs Data Center (DTI)","operator":"Delaware Department of Technology and Information","city":"New Castle","county":"New Castle","address":"1901 North DuPont Highway","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.697868,"longitude":-75.574992,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/delaware-dti-biggs-data-center-new-castle-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://webfiles.dti.delaware.gov/pdfs/processes/Data-Center-Access.pdf","label":"DTI procedure 110304-P-025 Data Center Access: William Penn Data Center (Dover) and Biggs Data Center (New Castle)","publisher":"Delaware Department of Technology and Information","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf","label":"RFP DTI230047-INTERNET Addendum 1: internet access to the data centers at Biggs Building, 1901 N Dupont Hwy, New Castle and 801 Silver Lake Blvd, Dover","publisher":"State of Delaware, DTI","kind":"filing","retrievedAt":"2026-10-01"}]},{"id":"compute-delaware-dti-william-penn-data-center-dover-de","sourceRecordId":"delaware-dti-william-penn-data-center-dover-de","name":"State of Delaware William Penn Data Center (DTI)","operator":"Delaware Department of Technology and Information","city":"Dover","county":"Kent","address":"801 Silver Lake Boulevard","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.171779,"longitude":-75.536142,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/delaware-dti-william-penn-data-center-dover-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://webfiles.dti.delaware.gov/pdfs/processes/Data-Center-Access.pdf","label":"DTI procedure 110304-P-025 Data Center Access: regulates access to the William Penn Data Center located in Dover and the Biggs Data Center located in New Castle","publisher":"Delaware Department of Technology and Information","kind":"other","retrievedAt":"2026-10-01"},{"url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf","label":"RFP DTI230047-INTERNET Addendum 1: internet access to the data centers at Biggs Building, 1901 N Dupont Hwy, New Castle and 801 Silver Lake Blvd, Dover","publisher":"State of Delaware, DTI","kind":"filing","retrievedAt":"2026-10-01"},{"url":"https://dti.delaware.gov/arpa/it-modernization/data-center-modernization/","label":"DTI Data Center Modernization (ARPA IT modernization), references the William Penn Data Center","publisher":"Delaware Department of Technology and Information","kind":"other","retrievedAt":"2026-10-01"}]},{"id":"compute-shelbourne-white-clay-newark-de","sourceRecordId":"shelbourne-white-clay-newark-de","name":"White Clay Corporate Center Data Center Redevelopment","operator":"Shelbourne","city":"Newark","county":"New Castle","address":"White Clay Center Drive","state":"DE","stateName":"Delaware","jurisdictionType":"state","latitude":39.6828358,"longitude":-75.7515682,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/shelbourne-white-clay-newark-de","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spotlightdelaware.org/2025/12/16/two-new-castle-county-industrial-projects-may-become-data-centers/","label":"Two New Castle County industrial projects may become data centers","publisher":"Spotlight Delaware","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.newarkpostonline.com/news/data-center-complex-proposed-near-newark/article_25f31b5b-71d7-4975-9ace-213c3dbf35ff.html","label":"Data center complex proposed near Newark","publisher":"Newark Post","kind":"press","retrievedAt":"2026-09-12"},{"url":"http://www.newarkpostonline.com/spotlight_delaware/county-councilman-says-newark-data-center-plan-paused-after-deal/article_55cac45c-ba8c-4349-9944-d1dbbdedfbfb.html","label":"County councilman says Newark data center plan paused after deal","publisher":"Newark Post / Spotlight Delaware","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://technical.ly/civics/delaware-data-center-foia-reveals-hidden-energy-demands/","label":"Newly public records reveal four pending Delaware data center projects","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-365-data-centers-boca-raton-fl","sourceRecordId":"365-data-centers-boca-raton-fl","name":"365 Data Centers Boca Raton (BC1)","operator":"365 Data Centers","city":"Boca Raton","county":"Palm Beach","address":"3500 NW Boca Raton Boulevard, Suites 800, 810 & 900","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.3814312,"longitude":-80.0836087,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-boca-raton-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/facilities-network/","label":"Facilities & Network","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://365datacenters.com/colocation-in-south-florida/","label":"Colocation in South Florida","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/560","label":"365 Data Centers Boca Raton (BC1) facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.openstreetmap.org/node/9164670828","label":"OSM node at 3500 NW Boca Raton Boulevard (geocode)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-02"}]},{"id":"compute-365-data-centers-fort-lauderdale-fl","sourceRecordId":"365-data-centers-fort-lauderdale-fl","name":"365 Data Centers Fort Lauderdale (FLL)","operator":"365 Data Centers","city":"Fort Lauderdale","county":"Broward","address":"3250 W Commercial Boulevard, Suite 140","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.184971,"longitude":-80.190819,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-fort-lauderdale-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/facilities-network/","label":"Facilities & Network","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/605","label":"365 Data Centers Ft. Lauderdale (FLL) facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-3ex-hosting-boca-raton-fl","sourceRecordId":"3ex-hosting-boca-raton-fl","name":"3EX Hosting Data Center — Boca Raton","operator":"3EX Hosting","city":"Boca Raton","county":"Palm Beach","address":"6601 Park of Commerce Blvd","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.4075552,"longitude":-80.097877,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/3ex-hosting-boca-raton-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.3exhosting.com/data-center/","label":"3EX Hosting — Data Center","publisher":"3EX Hosting","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-american-tower-pinellas-park-fl","sourceRecordId":"american-tower-pinellas-park-fl","name":"American Tower Pinellas Park Data Processing Facility","operator":"American Tower","city":"Pinellas Park","county":"Pinellas","address":"10700 76th Court North","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.869841,"longitude":-82.743196,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/american-tower-pinellas-park-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fox13news.com/news/boston-developer-files-building-permit-pinellas-park-data-center","label":"FOX 13 Tampa Bay — American Tower files building permit for a data center at 10700 76th Court North, Pinellas Park: half-acre lot, demolition of an existing building, eight-foot security fence, four generator pads","publisher":"FOX 13 Tampa Bay","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://baynews9.com/fl/tampa/news/2026/06/18/data-center-developer-proposes-building-in-pinellas-park","label":"Bay News 9 — American Tower proposes a data center on the northwestern edge of Pinellas Park, east of Belcher Road; under half an acre; at least two public meetings required","publisher":"Spectrum Bay News 9","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=10700+76th+Court+North%2C+Pinellas+Park%2C+FL&format=json&limit=5&addressdetails=1","label":"OpenStreetMap Nominatim geocode of 10700 76th Court North, Pinellas Park, Pinellas County, FL 33777 → 27.8698410, -82.7431960","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://www.businessobserverfl.com/news/2026/aug/29/pinellas-county-closes-door-data-centers/","label":"Pinellas County closes the door on large-scale data centers","publisher":"Business Observer","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-aptum-miami-doral-fl","sourceRecordId":"aptum-miami-doral-fl","name":"Aptum Miami Data Center — Doral","operator":"Aptum Technologies","city":"Doral","county":"Miami-Dade","address":"2300 NW 89th Place","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.795634,"longitude":-80.342656,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aptum-miami-doral-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/2300-northwest-89th-place-doral/peer-1-hosting/datacenter/2300-northwest-89th-place","label":"Aptum Technologies 2300 Northwest 89th Place — building and services listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-atlas-compute-ai-data-center-campus-fort-pierce-fl","sourceRecordId":"atlas-compute-ai-data-center-campus-fort-pierce-fl","name":"Atlas Compute AI Data Center Campus","operator":"Atlas Compute (infrastructure by Penguin Solutions)","city":"Fort Pierce","county":"St. Lucie","address":"Post Office Road, Midway Industrial Park","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.44,"longitude":-80.33,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-compute-ai-data-center-campus-fort-pierce-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.globenewswire.com/news-release/2025/11/06/3182873/0/en/Atlas-Compute-Secures-Land-and-Utilities-for-240-MW-AI-Data-Center-Campus-in-Central-Florida-with-1-GW-Expansion-Capacity.html","label":"Atlas Compute secures land and utilities for 240 MW AI data center campus","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.wflx.com/2026/03/12/florida-based-company-announced-plans-build-ai-data-center-fort-pierce/","label":"Florida-based company announces plans to build AI data center in Fort Pierce","publisher":"WFLX","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://hoodline.com/2026/03/massive-ai-server-farm-sets-sights-on-fort-pierce-neighbors-want-answers/","label":"Massive AI Server Farm Sets Sights On Fort Pierce, Neighbors Want Answers","publisher":null,"kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.yahoo.com/news/articles/data-centers-may-forced-pay-090236013.html","label":"TCPalm via Yahoo News — Atlas Compute's St. Lucie County campus would be powered by its own natural gas-fired power plant, on over 26 acres at Midway Industrial Park bordering the Treasure Coast Energy Center","publisher":"TCPalm / Treasure Coast Newspapers","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-centersquare-tpa1-tampa-fl","sourceRecordId":"centersquare-tpa1-tampa-fl","name":"Centersquare Tampa TPA1","operator":"Centersquare","city":"Tampa","county":"Hillsborough","address":"9310 Florida Palm Drive","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.9455353,"longitude":-82.351102,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-tpa1-tampa-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/tampa","label":"Centersquare — Tampa TPA1 data center page: 19,245 sq ft raised floor, 9MW utility power, 2.5MW UPS, 9MW generator","publisher":"Centersquare","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac?city=Tampa","label":"PeeringDB facility registry — \"Centersquare Tampa (TPA1)\", 9310 Florida Palm Drive, Tampa FL 33619","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%5Btimeout%3A90%5D%3Barea%5B%22ISO3166-2%22%3D%22US-FL%22%5D%5B%22admin_level%22%3D%224%22%5D-%3E.a%3B(nwr%5B%22telecom%22%3D%22data_center%22%5D(area.a)%3Bnwr%5B%22building%22%3D%22data_center%22%5D(area.a)%3B)%3Bout%20center%20tags%3B","label":"OpenStreetMap via Overpass API — way 523886201 \"Cyxtera Tampa TP1\", building footprint centroid 27.9455353, -82.3511020","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-cielo-haines-city-fl","sourceRecordId":"cielo-haines-city-fl","name":"Cielo Haines City Data Center","operator":"Cielo Digital Infrastructure","city":"Haines City","county":"Polk","address":"Marion Road at State Road 544-East","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.1114,"longitude":-81.6198,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cielo-haines-city-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://finance.yahoo.com/technology/ai/articles/florida-data-center-project-stalls-180033586.html","label":"Florida data center project stalls amid water permit fight","publisher":"Yahoo Finance (syndicating Data Center Dynamics)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://thecitrustea.com/2026/07/02/haines-city-data-center-new-documents-show-what-commissioners-were-told-before-the-public-and-when/","label":"Haines City data center: new documents show what commissioners were told before the public, and when","publisher":"The Citrus Tea","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/planned-data-center-in-florida-held-back-by-lack-of-available-water-from-city/","label":"Planned data center in Florida held back by lack of available water from city","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.fox13news.com/news/haines-city-data-center-project-water-capacity-shortage","label":"Haines City data center project stalled by water capacity shortage","publisher":null,"kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baynews9.com/fl/tampa/news/2026/07/10/haines-city-officials-explain-water-capacity-address-data-center-concerns","label":"Haines City water limits puts data center plan on hold","publisher":"Spectrum Bay News 9","kind":"press","retrievedAt":"2026-10-20"}]},{"id":"compute-cloud-south-west-palm-beach-fl","sourceRecordId":"cloud-south-west-palm-beach-fl","name":"Cloud South West Palm Beach 1","operator":"Cloud South","city":"West Palm Beach","county":"Palm Beach","address":"424 Hampton Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.6838049,"longitude":-80.0549592,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloud-south-west-palm-beach-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cloudsouth.com/","label":"Cloud South","publisher":"Cloud South","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://inflect.com/building/424-hampton-road-west-palm-beach/cloud-south/datacenter/cloud-south-data-center","label":"Cloud South West Palm Beach 1","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.datacenterknowledge.com/cloud/cloud-south-opens-south-florida-data-center","label":"Cloud South Opens South Florida Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://nominatim.openstreetmap.org/search?format=json&limit=2&q=424%20Hampton%20Road%2C%20West%20Palm%20Beach%2C%20FL","label":"Geocode of 424 Hampton Road, West Palm Beach, FL","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-10-02"}]},{"id":"compute-cogent-boca-raton-fl","sourceRecordId":"cogent-boca-raton-fl","name":"Cogent Boca Raton Data Center","operator":"Cogent Communications","city":"Boca Raton","county":"Palm Beach","address":"5050 Conference Way North, Suite 100","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.392805,"longitude":-80.109732,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-boca-raton-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-boca-raton","label":"Cogent Boca Raton","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/10473","label":"Cogent Boca Raton facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-cogent-hollywood-pembroke-park-fl","sourceRecordId":"cogent-hollywood-pembroke-park-fl","name":"Cogent Hollywood, FL Data Center","operator":"Cogent Communications","city":"Pembroke Park","county":"Broward","address":"3924 Pembroke Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.9954554,"longitude":-80.1795761,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-hollywood-pembroke-park-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-miami/289-mia-office/2481-hollywood-fl-data-center","label":"Hollywood, FL Data Center","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://nominatim.openstreetmap.org/search?format=json&limit=2&q=3924%20Pembroke%20Road%2C%20Pembroke%20Park%2C%20FL%2033021","label":"Geocode of 3924 Pembroke Road, Pembroke Park, FL 33021","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-10-02"}]},{"id":"compute-cogent-orlando-wewahootee-fl","sourceRecordId":"cogent-orlando-wewahootee-fl","name":"Cogent Orlando Data Center","operator":"Cogent Communications","city":"Orlando","county":"Orange","address":"17401 Wewahootee Rd","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.424645,"longitude":-81.121894,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-orlando-wewahootee-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-orlando/475-orlando-dc","label":"Cogent Orlando-DC","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-cogent-pensacola-edge-fl","sourceRecordId":"cogent-pensacola-edge-fl","name":"Cogent Pensacola Edge Data Center","operator":"Cogent Communications","city":"Pensacola","county":"Escambia","address":"305 N 6th Ave","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.4180951,"longitude":-87.2092315,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-pensacola-edge-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-tampa","label":"Cogent Florida data centers listing: Pensacola Edge Data Center, 305 N 6th Ave","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=305+N+6th+Ave,+Pensacola,+FL+32501&format=json","label":"OpenStreetMap Nominatim geocode of 305 North 6th Avenue, Pensacola","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-cogent-tallahassee-edge-fl","sourceRecordId":"cogent-tallahassee-edge-fl","name":"Cogent Tallahassee Edge Data Center","operator":"Cogent Communications","city":"Tallahassee","county":"Leon","address":"504 Saint Francis St","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.4344984,"longitude":-84.2887565,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-tallahassee-edge-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-tampa","label":"Cogent Florida data centers listing: Tallahassee Edge Data Center, 504 Saint Francis St","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=504+Saint+Francis+St,+Tallahassee,+FL+32301&format=json","label":"OpenStreetMap Nominatim geocode of 504 Saint Francis Street, Tallahassee","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-cogent-tampa-fl","sourceRecordId":"cogent-tampa-fl","name":"Cogent Tampa Data Center","operator":"Cogent Communications","city":"Tampa","county":"Hillsborough","address":"400 North Tampa St","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.947747,"longitude":-82.459056,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-tampa-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-tampa","label":"Cogent Tampa data centers: Tampa Data Center, 400 North Tampa St","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac/8566","label":"PeeringDB facility 8566: Cogent Tampa","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-20"}]},{"id":"compute-colo-solutions-downtown-orlando-fl","sourceRecordId":"colo-solutions-downtown-orlando-fl","name":"Colo Solutions Downtown Orlando","operator":"Colo Solutions, LLC","city":"Orlando","county":"Orange","address":"100 W. Lucerne Circle, Suite 201","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.534496,"longitude":-81.379455,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/colo-solutions-downtown-orlando-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.colosolutions.com/","label":"Carrier-neutral colocation in downtown Orlando","publisher":"Colo Solutions","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/9416","label":"Colo Solutions Downtown Orlando facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-colocsx-jacksonville-fl","sourceRecordId":"colocsx-jacksonville-fl","name":"ColoCSX (CSX Data Center)","operator":"ColoCSX (CSX Transportation)","city":"Jacksonville","county":"Duval","address":"6425 Southpoint Parkway","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.1988,"longitude":-81.5812,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/colocsx-jacksonville-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csx.com/index.cfm/about-us/company-overview/colocation-services/","label":"CSX colocation services overview","publisher":"CSX Corporation","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.datacentermap.com/usa/florida/jacksonville/csx-data-center/","label":"CSX Data Center (ColoCSX), Jacksonville","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://inflect.com/building/6425-southpoint-parkway-jacksonville/colocsx/datacenter/jacksonville","label":"ColoCSX Jacksonville building listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://members.jaxchamber.com/Information-Technology/ColoCSX-16564","label":"ColoCSX member listing","publisher":"Jacksonville Chamber of Commerce","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.city-data.com/duval-county/S/Southpoint-Parkway-4.html","label":"Duval County property tax record, Southpoint Parkway","publisher":"city-data.com (Duval County Property Appraiser)","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-cologix-jax1-fl","sourceRecordId":"cologix-jax1-fl","name":"Cologix JAX1","operator":"Cologix","city":"Jacksonville","county":"Duval","address":"421 West Church Street","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.3314298,"longitude":-81.6624257,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-jax1-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/jacksonville/jax1/","label":"Cologix facility directory","publisher":"Cologix","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.openstreetmap.org/way/497151852","label":"OpenStreetMap way/497151852","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-cologix-jax2-jacksonville-fl","sourceRecordId":"cologix-jax2-jacksonville-fl","name":"Cologix JAX2","operator":"Cologix","city":"Jacksonville","county":"Duval","address":"4800 Spring Park Rd","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.273221,"longitude":-81.613866,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-jax2-jacksonville-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/jacksonville/jax2/","label":"Cologix — JAX2 Jacksonville data center page (4800 Spring Park Road, 125,000 sq ft, N+1 DX cooling, 2N UPS)","publisher":"Cologix","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac?city=Jacksonville","label":"PeeringDB facility registry — \"Cologix JAX2\", 4800 Spring Park Rd, Jacksonville FL 32207","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-cologix-lak1-lakeland-fl","sourceRecordId":"cologix-lak1-lakeland-fl","name":"Cologix LAK1 — Lakeland","operator":"Cologix","city":"Lakeland","county":"Polk","address":"2850 Interstate Drive","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.079624,"longitude":-81.975179,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-lak1-lakeland-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/lakeland/lak1/","label":"Cologix — LAK1 Lakeland data center page (2850 Interstate Drive, 105,000+ sq ft, chilled-water cooling)","publisher":"Cologix","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac?city=Tampa","label":"PeeringDB facility registry — \"Cologix LAK1\", 2850 Interstate Drive, Lakeland FL 33805","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-coresite-mi1-miami-fl","sourceRecordId":"coresite-mi1-miami-fl","name":"CoreSite MI1 — Miami","operator":"CoreSite","city":"Miami","county":"Miami-Dade","address":"2115 NW 22nd St","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.797548,"longitude":-80.230038,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-mi1-miami-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/mi1-miami-fl","label":"CoreSite — MI1 Miami data center page (2115 NW 22nd St, 45,000+ sq ft)","publisher":"CoreSite","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?city=Miami","label":"PeeringDB facility registry — \"CoreSite - Miami (MI1)\", 2115 NW 22nd Street","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-coresite-mi2-doral-fl","sourceRecordId":"coresite-mi2-doral-fl","name":"CoreSite MI2 — Doral","operator":"CoreSite","city":"Doral","county":"Miami-Dade","address":"2100 NW 84th Ave","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.793318,"longitude":-80.333581,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-mi2-doral-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/mi2-miami-fl","label":"CoreSite — MI2 Miami/Doral data center page (2100 NW 84th Ave, 103,000+ sq ft)","publisher":"CoreSite","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?city=Miami","label":"PeeringDB facility registry — \"CoreSite - Miami (MI2)\", 2100 NW 84th Ave, Doral","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-coresite-or1-orlando-fl","sourceRecordId":"coresite-or1-orlando-fl","name":"CoreSite OR1 — Orlando","operator":"CoreSite","city":"Orlando","county":"Orange","address":"9701 S. John Young Parkway","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.429212,"longitude":-81.420781,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-or1-orlando-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.growthspotter.com/2026/06/02/coresite-looks-to-add-second-orlando-data-center-building/","label":"CoreSite looks to add second Orlando data center building","publisher":"GrowthSpotter","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://services9.arcgis.com/Gh9awoU677aKree0/arcgis/rest/services/Florida_Statewide_Cadastral/FeatureServer/0/query?where=PARCEL_ID%3D%27042429000000016%27&outFields=*&f=json","label":"Orange County parcel/GIS record (parcel 042429000000016)","publisher":"Orange County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.peeringdb.com/api/fac?city=Orlando","label":"PeeringDB facility registry — \"CoreSite - Orlando (OR1)\", 9701 S John Young Parkway, Orlando FL 32819","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-databank-mia1-miami-fl","sourceRecordId":"databank-mia1-miami-fl","name":"DataBank MIA1 — Downtown Miami","operator":"DataBank","city":"Miami","county":"Miami-Dade","address":"36 NE 2nd Street Suite 700","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.775811,"longitude":-80.192959,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-mia1-miami-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/miami/","label":"DataBank — Miami (MIA1) data center page: 36 NE 2nd Street Suite 700, 11,030 IT sq ft, 1.6MW critical IT load, 28 on-site carriers","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac?city=Miami","label":"PeeringDB facility registry — \"DataBank Miami (MIA1)\", 36 NE 2nd Street","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-dc-blox-palm-coast-cable-landing-station-fl","sourceRecordId":"dc-blox-palm-coast-cable-landing-station-fl","name":"DC BLOX Palm Coast Cable Landing Station","operator":"DC BLOX","city":"Palm Coast","county":"Flagler","address":"1109 Town Center Blvd","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":29.4858163,"longitude":-81.1959416,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-palm-coast-cable-landing-station-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.palmcoast.gov/cls","label":"Cable Landing Station — project information page (permit 2025100821)","publisher":"City of Palm Coast","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://flaglerlive.com/data-center-records/","label":"Records reveal some details as construction starts on scaled down data center in Palm Coast's Town Center","publisher":"FlaglerLive","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.dcblox.com/data-centers/palm-coast-fl-cable-landing-station/","label":"Palm Coast Cable Landing Station","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.palmcoast.gov/newsroom/home/details/global-tech-leader-invests-in-palm-coast","label":"Global Tech Leader Invests in Palm Coast","publisher":"City of Palm Coast","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.flaglercounty.gov/News-articles/2025-07-10-DC-BLOX-and-Google-to-Bring-Cutting-Edge-Connectivity-to-Flagler-County","label":"DC BLOX and Google Bring Cutting-Edge Connectivity to Flagler County","publisher":"Flagler County","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.wuft.org/business-news/2026-05-12/big-tech-is-coming-to-palm-coast-not-everyone-is-on-board","label":"Big tech is coming to Palm Coast — not everyone is on board","publisher":"WUFT","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.observerlocalnews.com/news/2026/jul/04/dc-blox-responds-to-questions-over-palm-coast-project-as-city-clarifies-approved-plans/","label":"DC BLOX responds to questions over Palm Coast project as city clarifies approved plans","publisher":"Palm Coast Observer","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-dcip-arcadia-roan-street-fl","sourceRecordId":"dcip-arcadia-roan-street-fl","name":"DCIP DeSoto County Data Center (Roan Street)","operator":"DCIP Group (DeSoto County Industrial Park)","city":"Arcadia","county":"DeSoto","address":"3800 NE Roan Street","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.2236505,"longitude":-81.8041159,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dcip-arcadia-roan-street-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://desotobocc.com/431/Data-Center-Applications","label":"DeSoto County, FL — Data Center Applications portal: RZNE-0077-2025 (DCIP, 34.22 ac, 35,134 sq ft, Board approval 24 March 2026); RZNE-0086-2026 (DCIP & 3-F Ranch, 274.26 ac, 3,686,125 sq ft) and RZNE-0087-2026 (Swisher, 553.79 ac, 4,655,000 sq ft) pending hearings","publisher":"DeSoto County Board of County Commissioners","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://www.wgcu.org/top-story/2026-06-25/after-public-outcry-desoto-county-moves-forward-on-data-center-moratorium","label":"WGCU — \"After public outcry, DeSoto County moves forward on data center moratorium\" (DCIP Group, 34 acres rezoned March 2026 at a decommissioned power plant on Roan Street; phase one not yet built; 800+ acre expansion pending)","publisher":"WGCU Public Media","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.yoursun.com/arcadia/news/desoto-county-data-center-defies-negative-image/article_db35f4a1-ab9e-4ef7-8c27-3b769a0b012a.html","label":"DeSoto County data center defies negative image","publisher":"Charlotte Sun (yoursun.com)","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://www.wusf.org/politics-issues/2026-06-25/after-public-outcry-desoto-county-moves-forward-on-data-center-moratorium","label":"After public outcry, DeSoto County moves forward on data center moratorium","publisher":"WUSF / Suncoast Searchlight","kind":"press","retrievedAt":"2026-10-20"}]},{"id":"compute-north-port-holdings-300-deep-park-north-port-fl","sourceRecordId":"north-port-holdings-300-deep-park-north-port-fl","name":"Deep Park Data Center (North Port 300)","operator":"North Port Holdings 300 LLC (end operator undisclosed)","city":"North Port","county":"Sarasota","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.0677773,"longitude":-82.0743791,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/north-port-holdings-300-deep-park-north-port-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mysuncoast.com/2026/08/29/north-port-releases-new-information-proposed-data-center-commission-considers-moratorium/","label":"North Port releases new information on proposed data center as commission considers moratorium","publisher":"ABC7 Suncoast (WWSB)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.sarasotamagazine.com/news-and-profiles/2026/09/new-north-port-data-center-filings-detail-water-use-wetland-impacts-and-more","label":"New North Port data center filings detail water use, wetland impacts and more","publisher":"Sarasota Magazine","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://www.yoursun.com/northport/news/proposed-north-port-data-center-location-found/article_0526ec19-4ab2-4f57-96a6-a8707b7de5d3.html","label":"Proposed North Port data center location found?","publisher":"North Port Sun","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3","label":"City of North Port — Data Center Info (application timeline)","publisher":"City of North Port","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-digital-realty-mia10-fl","sourceRecordId":"digital-realty-mia10-fl","name":"Digital Realty MIA10","operator":"Digital Realty","city":"Miami","county":"Miami-Dade","address":"36 NE 2nd Street","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.7758419,"longitude":-80.1929625,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-mia10-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/miami/mia10","label":"Digital Realty MIA10","publisher":"Digital Realty","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.digitalrealty.com/data-centers/americas/miami","label":"Digital Realty Miami","publisher":"Digital Realty","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.databank.com/data-centers/miami/36-northeast-2nd-street/","label":"DataBank Miami (36 NE 2nd Street)","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-edgeconnex-jax01-jacksonville-fl","sourceRecordId":"edgeconnex-jax01-jacksonville-fl","name":"EdgeConneX Jacksonville JAX01","operator":"EdgeConneX","city":"Jacksonville","county":"Duval","address":"6602 Executive Park Court N","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.254238,"longitude":-81.604183,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-jax01-jacksonville-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/north-america/jacksonville/","label":"EdgeConneX — Jacksonville Edge Data Center page (JAX01: 17,570 sq ft, 6,812 sq ft raised floor, ENERGY STAR certified)","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?city=Jacksonville","label":"PeeringDB facility registry — \"EdgeConneX Jacksonville (EDCJAX01)\", 6602 Executive Park Court N, Unit 105","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-edgeconnex-mia01-miami-fl","sourceRecordId":"edgeconnex-mia01-miami-fl","name":"EdgeConneX MIA01 — Miami","operator":"EdgeConneX","city":"Miami","county":"Miami-Dade","address":"2132 NW 114th Avenue","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.793016,"longitude":-80.38119,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-mia01-miami-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/1923","label":"EdgeConneX Miami (EDCMIA01)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.edgeconnex.com/locations/americas/miami-fl/","label":"Miami, FL Data Center & Colocation (MIA01 & MIA02)","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.edgeconnex.com/wp-content/uploads/2025/07/Miami-Data-Sheet_V2.pdf","label":"Miami MIA01 & MIA02 data sheet","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-edgeconnex-mia02-miami-gardens-fl","sourceRecordId":"edgeconnex-mia02-miami-gardens-fl","name":"EdgeConneX MIA02 — Miami Gardens","operator":"EdgeConneX","city":"Miami Gardens","county":"Miami-Dade","address":"475 NE 185th Street","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.945524,"longitude":-80.191391,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-mia02-miami-gardens-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/5111","label":"EdgeConneX Miami (EDCMIA02)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.edgeconnex.com/locations/americas/miami-fl/","label":"Miami, FL Data Center & Colocation (MIA01 & MIA02)","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.edgeconnex.com/wp-content/uploads/2025/07/Miami-Data-Sheet_V2.pdf","label":"Miami MIA01 & MIA02 data sheet","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-edgeconnex-mia03-beacon-station-medley-fl","sourceRecordId":"edgeconnex-mia03-beacon-station-medley-fl","name":"EdgeConneX MIA03 (Beacon Station, withdrawn)","operator":"EdgeConneX","city":"Medley","county":"Miami-Dade","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.86892,"longitude":-80.379227,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-mia03-beacon-station-medley-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://miamiairportwarehouses.com/miami-dade-data-center-plans-scrapped-for-warehouse/","label":"Miami-Dade data center plans scrapped for warehouse","publisher":"Miami Airport Warehouses","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://miamiairportwarehouses.com/data-center-proposed-at-beacon-station/","label":"Data center proposed at Beacon Station","publisher":"Miami Airport Warehouses (citing South Florida Business Journal)","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-edgeconnex-tal01-tallahassee-fl","sourceRecordId":"edgeconnex-tal01-tallahassee-fl","name":"EdgeConneX TAL01 — Tallahassee","operator":"EdgeConneX","city":"Tallahassee","county":"Leon","address":"1531 Commonwealth Business Drive, Units 404-408","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.471969,"longitude":-84.353232,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-tal01-tallahassee-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/2074","label":"EdgeConneX Tallahassee (EDCTAL01)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.edgeconnex.com/locations/americas/tallahassee-fl/","label":"Tallahassee, FL and Colocation in FL","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Tallahassee-Data-Sheet.pdf","label":"Tallahassee TAL01 data sheet","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-equinix-mi1-nap-of-the-americas-fl","sourceRecordId":"equinix-mi1-nap-of-the-americas-fl","name":"Equinix MI1 (NAP of the Americas)","operator":"Equinix","city":"Miami","county":"Miami-Dade","address":"50 NE 9th Street","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.782359,"longitude":-80.1930886,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-mi1-nap-of-the-americas-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/content/dam/eqxcorp/en_us/documents/resources/ibx-tech-specs/ibx_mi1_en.pdf","label":"Equinix MI1 IBX Technical Specifications","publisher":"Equinix","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/miami-data-centers","label":"Equinix Miami Data Centers","publisher":"Equinix","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from","label":"Equinix Completes Acquisition of 29 Data Centers from Verizon","publisher":"Equinix Investor Relations","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-equinix-mi2-miami-fl","sourceRecordId":"equinix-mi2-miami-fl","name":"Equinix MI2 — Miami","operator":"Equinix","city":"Miami","county":"Miami-Dade","address":"36 NE 2nd St","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.775869,"longitude":-80.19313,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-mi2-miami-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?name__contains=Equinix%20MI","label":"PeeringDB facility registry — \"Equinix MI2 - Miami\", 36 NE 2nd St, Miami FL 33132","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-equinix-mi3-boca-raton-fl","sourceRecordId":"equinix-mi3-boca-raton-fl","name":"Equinix MI3 — Boca Raton","operator":"Equinix","city":"Boca Raton","county":"Palm Beach","address":"4680 Conference Way South","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.387989,"longitude":-80.108267,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-mi3-boca-raton-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investor.equinix.com/news-events/press-releases/detail/641/equinix-opens-new-data-center-in-greater-miami-area","label":"Equinix press release — \"Equinix Opens New Data Center in Greater Miami Area\" (MI3, Boca Raton)","publisher":"Equinix, Inc.","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?name__contains=Equinix%20MI","label":"PeeringDB facility registry — \"Equinix MI3 - Miami, Boca Raton\", 4680 Conference Way South","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-equinix-mi6-doral-fl","sourceRecordId":"equinix-mi6-doral-fl","name":"Equinix MI6 — Doral","operator":"Equinix","city":"Doral","county":"Miami-Dade","address":"1525 NW 98th Court","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.787849,"longitude":-80.354555,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-mi6-doral-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?name__contains=Equinix%20MI6","label":"PeeringDB facility record — Equinix MI6 Miami, Doral","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://inflect.com/building/1525-northwest-98th-court-doral/equinix/datacenter/mi6","label":"Equinix MI6 — building and services listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-flexential-fort-lauderdale-fll01-02-fl","sourceRecordId":"flexential-fort-lauderdale-fll01-02-fl","name":"Flexential Fort Lauderdale (FLL01/02)","operator":"Flexential","city":"Fort Lauderdale","county":"Broward","address":"5301 Northwest 33rd Avenue","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.1900857,"longitude":-80.1932967,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-fort-lauderdale-fll01-02-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/fl/fort-lauderdale/data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/741629998","label":"OpenStreetMap way/741629998","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-jacksonville-fl","sourceRecordId":"flexential-jacksonville-fl","name":"Flexential Jacksonville","operator":"Flexential","city":"Jacksonville","county":"Duval","address":"4905 Belfort Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.2457482,"longitude":-81.5817226,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-jacksonville-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/fl/jacksonville/data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12112266917","label":"OpenStreetMap node/12112266917","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-tampa-north-tpa03-fl","sourceRecordId":"flexential-tampa-north-tpa03-fl","name":"Flexential Tampa - North (TPA03)","operator":"Flexential","city":"Tampa","county":"Hillsborough","address":"8350 Parkedge Drive","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.0738698,"longitude":-82.3683619,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-tampa-north-tpa03-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/fl/tampa/north-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1085608797","label":"OpenStreetMap way/1085608797","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-tampa-west-fl","sourceRecordId":"flexential-tampa-west-fl","name":"Flexential Tampa - West","operator":"Flexential","city":"Tampa","county":"Hillsborough","address":"9417 Corporate Lake Drive","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.0372991,"longitude":-82.5399781,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-tampa-west-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/fl/tampa/west-data-center","label":"Flexential official facility page (corroborated by datacenterHawk address listing)","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/node/12112380995","label":"OpenStreetMap node/12112380995","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-stonebridge-fort-meade-fl","sourceRecordId":"stonebridge-fort-meade-fl","name":"Florida Ecopark AI Data Center Campus","operator":"Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)","city":"Fort Meade","county":"Polk","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.7525,"longitude":-81.8024,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stonebridge-fort-meade-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wusf.org/environment/2026-04-08/fort-meade-is-one-step-closer-to-building-floridas-first-hysperscale-ai-data-center","label":"Fort Meade is one step closer to building Florida's first hyperscale AI data center","publisher":"WUSF","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.tampabay.com/news/florida-politics/2026/04/16/florida-data-center-fort-meade-desantis-utilities-water-ai/","label":"DeSantis admin hits Florida city over hyperscale data center proposal","publisher":"Tampa Bay Times","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.fox13news.com/news/florida-secretary-commerce-concerns-fort-meade-data-center-plan","label":"Florida secretary of commerce raises concerns over $2.6B Fort Meade data center plan","publisher":"FOX 13 Tampa Bay","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://propmodo.com/florida-data-center-plan-advances-amid-local-backlash/","label":"Florida Data Center Plan Advances Amid Local Backlash","publisher":"Propmodo","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-h5-data-centers-tampa-franklin-exchange-fl","sourceRecordId":"h5-data-centers-tampa-franklin-exchange-fl","name":"H5 Data Centers Tampa (Franklin Exchange, formerly 365 Data Centers TA1)","operator":"H5 Data Centers (HyscaleIX JV with Novacap)","city":"Tampa","county":"Hillsborough","address":"655 N Franklin St","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.949508,"longitude":-82.458396,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-tampa-franklin-exchange-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/H5-Data-Centers-Announces-Acquisition-of-Three-Locations-from-365-Data-Centers.html","label":"H5 Data Centers Announces Acquisition of Three Locations from 365 Data Centers","publisher":"H5 Data Centers","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://365datacenters.com/365-data-centers-to-expand-tampa-campus/","label":"365 Data Centers to Expand Tampa Campus","publisher":"365 Data Centers","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/api/fac/2086","label":"PeeringDB facility record — H5 Data Centers Tampa (655 North Franklin St)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-hivelocity-tpa1-tampa-fl","sourceRecordId":"hivelocity-tpa1-tampa-fl","name":"Hivelocity Tampa 1 (TPA1)","operator":"Hivelocity","city":"Tampa","county":"Hillsborough","address":"8010 Woodland Center Blvd Suite 700","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.01989,"longitude":-82.52466,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hivelocity-tpa1-tampa-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hivelocity.net/products/colocation/tampa-1/","label":"Hivelocity — Tampa 1 (TPA1) colocation facility page: 8010 Woodland Center Blvd #700, 15,000 sq ft raised floor, 260 tons N+2 CRAC cooling","publisher":"Hivelocity","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?city=Tampa","label":"PeeringDB facility registry — \"Hivelocity\", 8010 Woodland Center Blvd suite 700, Tampa FL 33614","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-hivelocity-tpa2-tampa-fl","sourceRecordId":"hivelocity-tpa2-tampa-fl","name":"Hivelocity Tampa 2 (TPA2)","operator":"Hivelocity","city":"Tampa","county":"Hillsborough","address":"5908 Hampton Oaks Pkwy, Suite D","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.001197,"longitude":-82.359058,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hivelocity-tpa2-tampa-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hivelocity.net/products/colocation/tampa-2/","label":"Tampa 2 (TPA 2) Colocation Data Center","publisher":"Hivelocity","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-deltona-holder-industrial-park-citrus-county-fl","sourceRecordId":"deltona-holder-industrial-park-citrus-county-fl","name":"Holder Industrial Park Data Center Expansion (withdrawn)","operator":"Deltona Corporation","city":"Lecanto","county":"Citrus","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.86722,"longitude":-82.49444,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/deltona-holder-industrial-park-citrus-county-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baynews9.com/fl/tampa/news/2026/06/18/citrus-county-planning-and-development-commission-vote-down-on-holder-industrial-park-plan","label":"Citrus County panel rejects Holder Industrial Park data center rezoning","publisher":"Bay News 9","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://352today.com/news/257752-company-withdraws-controversial-industrial-park-data-center-proposal-in-citrus-county/","label":"Company Withdraws Controversial Industrial Park Data Center Proposal in Citrus County","publisher":"352Today","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://floridadatacenters.org/citrus-county","label":"Citrus County Data Centers — Deltona Corp Filing","publisher":"FloridaDataCenters.org","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-hostdime-orlando-kennedy-blvd-fl","sourceRecordId":"hostdime-orlando-kennedy-blvd-fl","name":"HostDime Orlando Data Center (Orlando Telecom Center, 440 W Kennedy Blvd)","operator":"HostDime","city":"Orlando","county":"Orange","address":"440 West Kennedy Blvd","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.617526,"longitude":-81.393381,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hostdime-orlando-kennedy-blvd-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://www.hostdime.com/facilities/data-center","label":"HostDime data center facilities: Orlando Data Center, 440 W. Kennedy Blvd, Suite 1","publisher":"HostDime","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac/5211","label":"PeeringDB facility 5211: HostDime Orlando Data Center","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.growthspotter.com/?p=8485","label":"Orlando Telecom Center at 440 West Kennedy Blvd sold to Houston investor (2015)","publisher":"GrowthSpotter","kind":"press","retrievedAt":"2026-10-20"}]},{"id":"compute-hostdime-eatonville-fl","sourceRecordId":"hostdime-eatonville-fl","name":"HostDime Orlando Tier IV Data Center","operator":"HostDime","city":"Eatonville","county":"Orange","address":"1 Innovative Place","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.6106,"longitude":-81.3806,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hostdime-eatonville-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hostdime.com/new-orlando-data-center","label":"HostDime New Orlando Data Center","publisher":"HostDime","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://docs.hostdime.com/data-center-data-sheets/Orlando-Tier-IV-Data-Center-Data-Sheet_74907752/","label":"Orlando Tier IV Data Center data sheet","publisher":"HostDime","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.growthspotter.com/2023/10/16/data-center-along-i-4-in-eatonville-nears-completion-despite-ballooning-construction-costs/","label":"Data center along I-4 in Eatonville nears completion despite ballooning construction costs","publisher":"GrowthSpotter","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.clickorlando.com/news/local/2026/06/16/eatonville-council-weighs-transparency-push-as-data-center-raises-resident-concerns/","label":"Eatonville council weighs transparency push as data center raises resident concerns","publisher":"ClickOrlando","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://hoodline.com/2026/06/eatonville-council-turns-up-heat-on-hostdime-data-center-over-water-power-fears/","label":"Eatonville council turns up heat on HostDime data center over water, power fears","publisher":"Hoodline","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/hostdime-seeks-deadline-extension-for-data-center-in-eatonville-orlando/","label":"HostDime seeks deadline extension for data center in Eatonville, Orlando","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.peeringdb.com/api/fac?city=Orlando","label":"PeeringDB facility registry — \"HostDime Orlando Tier IV Data Center\", 1 Innovative Place, Orlando FL","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-im-critical-miami-fl","sourceRecordId":"im-critical-miami-fl","name":"iM Critical Miami Data Center","operator":"iM Critical (iM Data Centers)","city":"Miami","county":"Miami-Dade","address":"100 NE 80th Terrace","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.848356,"longitude":-80.194926,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/im-critical-miami-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://imcritical.com/about/newsroom/introducing-im-criticals-miami-data-center-miamis-next-gen-hub-for-mission-critical-colocation/","label":"Introducing iM Critical's Miami Data Center: Miami's Next-Gen Hub for Mission-Critical Colocation","publisher":"iM Critical","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac/149","label":"iM Critical Miami (facility record)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.datacenterfrontier.com/cooling/article/55247746/accelsius-and-im-data-centers-demo-next-gen-cooling-and-sustainability-at-miami-data-center","label":"Accelsius and iM Data Centers Demo Next-Gen Cooling and Sustainability at Miami Data Center","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-10-02"}]},{"id":"compute-iron-mountain-mia-1-miami-fl","sourceRecordId":"iron-mountain-mia-1-miami-fl","name":"Iron Mountain MIA-1","operator":"Iron Mountain","city":"Westview","county":"Miami-Dade","address":"2925 NW 120th Terrace","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.88416,"longitude":-80.247556,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-mia-1-miami-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/iron-mountain-breaks-ground-on-first-data-center-in-miami/","label":"Iron Mountain breaks ground on first data center in Miami","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://hoodline.com/2026/04/westview-fumes-as-quiet-ai-fortress-rises-in-miami-backyard/","label":"Westview fumes as quiet AI fortress rises in Miami backyard","publisher":"Hoodline","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://resources.ironmountain.com/solution-guides/d/data-centers-miami-data-center-mia-1","label":"Iron Mountain solution guide — MIA-1 Miami: \"By mid 2026 this 150,000 ft2 AI-ready facility will phase up to support 16 MW of customer IT load based on 26 MVA of redundant operational power\"; Tier III, 3.4-acre site","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.ironmountain.com/data-centers/locations/miami-data-center","label":"Iron Mountain Miami Data Center (MIA-1)","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.beaconcouncil.com/media/miami-news/2025/iron-mountain-breaks-ground-on-its-first-data-center-in-miami/","label":"Iron Mountain breaks ground on its first data center in Miami","publisher":"Miami-Dade Beacon Council","kind":"press","retrievedAt":"2026-10-20"}]},{"id":"compute-la-rosa-holdings-saint-cloud-fl","sourceRecordId":"la-rosa-holdings-saint-cloud-fl","name":"La Rosa Holdings Tier III AI Data Center — St. Cloud","operator":"La Rosa Holdings Corp.","city":"Saint Cloud","county":"Osceola","address":"2570 AmeraTrails Lot 6D","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.1896418,"longitude":-81.2783896,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/la-rosa-holdings-saint-cloud-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1879403/000121390026013369/ea0275797-8k_larosa.htm","label":"La Rosa Holdings Corp. Form 8-K (filed 6 February 2026) — contract to purchase 2570 AmeraTrails Lot 6D, Saint Cloud FL 34772 for $675,000 with a 75-day due diligence period; closing set for 15 June 2026; intent to develop a Tier III AI data center","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-09-14"},{"url":"https://www.globenewswire.com/news-release/2026/02/05/3233097/0/en/La-Rosa-Holdings-Corp-Signs-Contract-to-Acquire-Development-Site-for-Up-to-10-000-Sq-Ft-Tier-III-AI-Data-Center-in-Central-Florida-s-Fastest-Growing-Region.html","label":"La Rosa Holdings Corp. press release, 5 February 2026 — up to 10,000 sq ft Tier III AI data center in Osceola County supporting an estimated IT load of ~1,500 kW","publisher":"GlobeNewswire / La Rosa Holdings Corp.","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?postalcode=34772&country=USA&format=json&limit=3","label":"OpenStreetMap Nominatim — ZIP 34772, Saint Cloud, Osceola County, Florida → 28.1896418, -81.2783896","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-lumen-jacksonville-philips-hwy-fl","sourceRecordId":"lumen-jacksonville-philips-hwy-fl","name":"Lumen Jacksonville (Philips Hwy)","operator":"Lumen Technologies","city":"Jacksonville","county":"Duval","address":"4814 Philips Hwy","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.271996,"longitude":-81.623873,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-jacksonville-philips-hwy-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13510","label":"PeeringDB facility 13510: Lumen Jacksonville","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-20"}]},{"id":"compute-lumen-miami-5th-street-fl","sourceRecordId":"lumen-miami-5th-street-fl","name":"Lumen Miami 1 (5th Street, formerly Level(3) Miami)","operator":"Lumen Technologies","city":"Miami","county":"Miami-Dade","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.779013,"longitude":-80.192962,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-miami-5th-street-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/1731","label":"PeeringDB facility 1731: Level(3) Miami (5th St), Lumen Technologies Inc","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://baxtel.com/data-center/lumen-miami-1-49-northwest-5th","label":"Lumen: Miami 1 (49 Northwest 5th)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-20"}]},{"id":"compute-metrobloks-mia-a1-miami-fl","sourceRecordId":"metrobloks-mia-a1-miami-fl","name":"Metrobloks MIA-A1 (MB01)","operator":"Metrobloks","city":"Miami","county":"Miami-Dade","address":"500 NW 137th Avenue","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.79,"longitude":-80.41,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/metrobloks-mia-a1-miami-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.metrobloks.com/press-release/metrobloks-acquires-land-in-miami-fl-to-build-15-2mw-ai-ready-data-center","label":"Metrobloks acquires land in Miami, FL to build 15.2MW AI-ready data center","publisher":"Metrobloks","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.metrobloks.com/sites/mia-mb01","label":"MIA A1 (MB01) site page","publisher":"Metrobloks","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.cushmanwakefield.com/en/united-states/news/2025/04/represents-metrobloks-in-acquisition-of-developable-land-in-miami","label":"Cushman & Wakefield represents Metrobloks in acquisition of developable land in Miami","publisher":"Cushman & Wakefield","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://ainews.miami/metrobloks-mia-a1-is-quietly-becoming-miami-s-next-ai-data-center/","label":"Metrobloks MIA-A1 Is Quietly Becoming Miami's Next AI Data Center","publisher":"Miami AI News","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-nextnrg-nassau-county-data-center-energy-campus-fl","sourceRecordId":"nextnrg-nassau-county-data-center-energy-campus-fl","name":"NextNRG Nassau County Data Center & Energy Campus","operator":"NextNRG","city":null,"county":"Nassau","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.55,"longitude":-81.68,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nextnrg-nassau-county-data-center-energy-campus-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/nextnrg-secures-lease-for-energy-and-data-center-campus-in-nassau-county-florida/","label":"NextNRG secures lease for energy and data center campus in Nassau County","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.jaxdailyrecord.com/news/2026/apr/06/announced-nassau-county-data-center-details-remain-unknown-to-county/","label":"Announced Nassau County data center details remain unknown to county","publisher":"Jacksonville Daily Record","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://nassaunewsline.net/nassau-county-orders-data-center-pause-after-emails-reveal-confusion-over-1600-acre-site/","label":"Nassau County orders data center pause after emails reveal confusion over 1,600-acre site","publisher":"Nassau NewsLine","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-okee-one-irsc-okeechobee-fl","sourceRecordId":"okee-one-irsc-okeechobee-fl","name":"Okee-One Data Center Campus","operator":"Indian River State College","city":"Okeechobee","county":"Okeechobee","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.24667,"longitude":-80.83028,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/okee-one-irsc-okeechobee-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wlrn.org/government-politics/2026-04-29/scrapped-data-center-in-okeechobee-county-mirrors-rising-opposition-to-data-centers-in-south-florida","label":"Scrapped data center in Okeechobee County mirrors rising opposition to data centers in South Florida","publisher":"WLRN","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.tampabay.com/news/environment/2026/04/24/florida-data-center-desantis-okeechobee-college-campus/","label":"Future uncertain for Florida data center campus project in Okeechobee","publisher":"Tampa Bay Times","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.yahoo.com/news/articles/desantis-officials-gave-1-5m-133000999.html","label":"DeSantis officials gave $1.5M to data center campus. They say they were tricked","publisher":"Tampa Bay Times (via Yahoo News)","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.wptv.com/news/treasure-coast/region-okeechobee-county/vote-by-okeechobee-county-commissioners-kills-controversial-okee-one-data-center-project","label":"Vote by Okeechobee County commissioners kills controversial Okee-One data center project","publisher":"WPTV","kind":"press","retrievedAt":"2026-10-02"}]},{"id":"compute-ryan-companies-project-swan-lakeland-fl","sourceRecordId":"ryan-companies-project-swan-lakeland-fl","name":"Project Swan","operator":"Ryan Companies (end operator TBD)","city":"Lakeland","county":"Polk","address":"923 Wilkinson Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.0305,"longitude":-82.0054,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/ryan-companies-project-swan-lakeland-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.lkldnow.com/hyperscale-data-center-proposed-for-lakeland/","label":"Hyperscale data center proposed for Lakeland","publisher":"LkldNow","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wfla.com/news/polk-county/project-swan-what-is-the-proposed-lakeland-data-center/","label":"Project Swan: what is the proposed Lakeland data center?","publisher":"WFLA","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://gis.polk-county.net/server/rest/services/Map_Property_Appraiser/MapServer/1/query?where=PARCELID%3D%27232822091000000300%27&outFields=*&f=json","label":"Polk County parcel/GIS record (parcel 232822091000000300)","publisher":"Polk County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.fox13news.com/news/lakeland-residents-question-environmental-impact-proposed-project-swan-data-center","label":"Lakeland residents question environmental impact of proposed 'Project Swan' data center","publisher":"FOX 13 Tampa Bay","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://www.tampabay28.com/news/region-polk/after-backlash-over-project-swan-some-call-for-data-center-moratorium-in-lakeland","label":"After backlash over Project Swan, some call for data center moratorium in Lakeland","publisher":"Tampa Bay 28 / WFTS","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://lakelandgazette.info/news/2026/06/01/coalition-rallies-against-lakeland-data-center-proposal/","label":"Coalition Rallies Against Lakeland Data Center Proposal","publisher":"Lakeland Gazette","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://dmnews.com/dmn-lakeland-florida-just-paused-a-600-000-square-foot-100-megawatt-data-center-on-a-4-3-commission-vote-giving-the-city-twelve-months-to-decide-who-pays-for-the-grid-and-water-a-hyperscale-tenant-req/","label":"Lakeland, Florida just paused a 600,000-square-foot, 100-megawatt data center on a 4-3 commission vote","publisher":null,"kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baynews9.com/fl/tampa/news/2026/07/07/data-center-developer-addresses-public-as-lakeland-considers-moratorium","label":"Data center developer addresses public as Lakeland considers moratorium","publisher":"Spectrum Bay News 9","kind":"press","retrievedAt":"2026-10-02"}]},{"id":"compute-project-tango-loxahatchee-fl","sourceRecordId":"project-tango-loxahatchee-fl","name":"Project Tango AI Data Center Campus","operator":"PBA Holdings (end tenant undisclosed)","city":"Loxahatchee","county":"Palm Beach","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.6284,"longitude":-80.39,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-tango-loxahatchee-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/37-million-sq-ft-data-center-campus-gets-initial-ok-from-officials-in-florida/","label":"3.7 million sq ft data center campus gets initial OK from officials in Florida","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wlrn.org/government-politics/2025-12-10/project-tango-ai-data-center-palm-beach-county","label":"Palm Beach County postpones 200-acre Project Tango AI data center after community outrage","publisher":"WLRN","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wlrn.org/government-politics/2026-07-16/project-tango-ai-data-center-palm-beach-rejected","label":"'Not compatible': Palm Beach County rejects controversial Project Tango AI data center","publisher":"WLRN","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-qts-mia1-sweetwater-fl","sourceRecordId":"qts-mia1-sweetwater-fl","name":"QTS Miami (MIA1)","operator":"QTS Data Centers","city":"Sweetwater","county":"Miami-Dade","address":"11234 NW 20th St","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.7915329,"longitude":-80.3795596,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-mia1-sweetwater-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/miami/","label":"QTS Miami (MIA1) facility page","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.datacentermap.com/usa/florida/miami/quality-miami-data-center/","label":"QTS Miami Data Center listing","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterjournal.com/data-centers/florida/miami/qts-miami-mia1/","label":"QTS Miami MIA1 profile","publisher":"Data Center Journal","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.prnewswire.com/news-releases/qts-announces-open-internet-exchange-oix-data-center-certifications-301511386.html","label":"QTS Announces Open Internet Exchange (OIX) Data Center Certifications","publisher":"PR Newswire / QTS Data Centers","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterfrontier.com/featured/article/11428144/blackstone-to-acquire-qts-in-blockbuster-data-center-m038a-deal","label":"Blackstone to Acquire QTS in Blockbuster Data Center M&A Deal","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-radiusdc-miami-i-sweetwater-fl","sourceRecordId":"radiusdc-miami-i-sweetwater-fl","name":"RadiusDC Miami I","operator":"RadiusDC","city":"Sweetwater","county":"Miami-Dade","address":"11300 NW 25th St","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.7871,"longitude":-80.3839,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/radiusdc-miami-i-sweetwater-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/radiusdc-announces-acquisition-of-network-centric-data-center-in-miami-302220596.html","label":"RadiusDC Announces Acquisition of Network-Centric Data Center in Miami","publisher":"PR Newswire / RadiusDC","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.lightwaveonline.com/data-center/article/55132665/radiusdc-acquires-south-florida-data-center","label":"RadiusDC Acquires South Florida Data Center","publisher":"Lightwave","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/ipis-radiusdc-acquires-miami-data-center/","label":"IPI's RadiusDC Acquires Miami Data Center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/radiusdc-miami-i","label":"RadiusDC Miami I facility profile","publisher":"baxtel","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.loopnet.com/property/11300-nw-25th-st-miami-fl-33172/12086-2530310210013/","label":"11300 NW 25th St property record (Miami-Dade parcel 25-3031-021-0013)","publisher":"LoopNet","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-readysetfundgrow-fishbowl-homestead-fl","sourceRecordId":"readysetfundgrow-fishbowl-homestead-fl","name":"ReadySetFundGrow FishBowl AI Edge Micro-Datacenter","operator":"ReadySetFundGrow (subsidiary of Farrington Capital Group)","city":"Homestead","county":"Miami-Dade","address":"23095 S Dixie Hwy","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":25.5525391,"longitude":-80.3947082,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/readysetfundgrow-fishbowl-homestead-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-20","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mediabistro.com/media-news/remergify-farrington-capital-group-announce-plans-to-develop-readysetfundgrow-south-miami-dades-first-micro-datacenter-tech-incubator-ev-charging-hub/","label":"Remergify & Farrington Capital Group announce plans to develop ReadySetFundGrow, South Miami-Dade's first micro-datacenter, tech incubator & EV charging hub (ACCESS Newswire release, Mar 4 2026)","publisher":"ACCESS Newswire via Mediabistro","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://www.mediabistro.com/media-news/readysetfundgrow-announces-south-dade-ai-edge-micro-datacenter-and-opportunity-zone-investment-platform/","label":"ReadySetFundGrow announces South Dade AI edge micro-datacenter and Opportunity Zone investment platform (Mar 20 2026)","publisher":"ACCESS Newswire via Mediabistro","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://nominatim.openstreetmap.org/search?q=23095+S+Dixie+Hwy,+Miami,+FL+33170&format=json","label":"OpenStreetMap Nominatim geocode of 23095 South Dixie Highway, 33170","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-20"}]},{"id":"compute-sd-data-center-melbourne-fl","sourceRecordId":"sd-data-center-melbourne-fl","name":"SD Data Center — Melbourne","operator":"SD Data Center (Gogo Inc.; formerly Satcom Direct)","city":"Melbourne","county":"Brevard","address":"8635 Holiday Springs Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":28.259162,"longitude":-80.694858,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sd-data-center-melbourne-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sddatacenter.com/","label":"SD Data Center","publisher":"SD Data Center","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://bizwest.com/2025/02/25/gogo-updates-branding-following-satcom-direct-acquisition/","label":"Gogo updates branding following Satcom Direct acquisition","publisher":"BizWest","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/2126","label":"SD Data Center facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-sentinel-grove-technology-park-fort-pierce-fl","sourceRecordId":"sentinel-grove-technology-park-fort-pierce-fl","name":"Sentinel Grove Technology Park (Project Jarvis)","operator":"Undisclosed developer (marketed as 'Sentinel Grove Technology Park', county code-named 'Project Jarvis')","city":"Fort Pierce","county":"St. Lucie","address":"Minute Maid Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.4552,"longitude":-80.559,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sentinel-grove-technology-park-fort-pierce-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wptv.com/wptv-investigates/scrapped-developer-of-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation","label":"SCRAPPED? Developer of St. Lucie County data center project may withdraw plan amid new AI legislation","publisher":"WPTV","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://floridadatacenters.org/st-lucie-county","label":"St. Lucie County Data Centers — Sentinel Grove, Project Jarvis, Atlas Compute","publisher":"FloridaDataCenters.org","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.floridapsc.com/pscfiles/library/filings/2025/15001-2025/15001-2025.pdf","label":"Florida Energy for Innovation Association's Post-Hearing Brief, Docket No. 20250011-EI (Document No. 15001-2025)","publisher":"Florida Public Service Commission","kind":"filing","retrievedAt":"2026-09-10"},{"url":"https://nominatim.openstreetmap.org/search?q=Minute+Maid+Road%2C+Saint+Lucie+County%2C+Florida&format=json","label":"Nominatim geocode of the roads the sources name (Minute Maid Road, Orange Avenue/SR 68, West Midway Road, Saint Lucie County FL); the Minute Maid Rd/Orange Ave intersection node and the West Midway Rd/I-95 crossing longitude were then read from OpenStreetMap way geometry via the Overpass API","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-10"}]},{"id":"compute-silver-fox-606-indiantown-fl","sourceRecordId":"silver-fox-606-indiantown-fl","name":"Silver Fox 606 AI Data Center Campus","operator":"Silver Fox 606 LLC","city":"Indiantown","county":"Martin","address":"13820 SW Silver Fox Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.0400025,"longitude":-80.517281,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/silver-fox-606-indiantown-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wptv.com/news/region-martin-county/indiantown/indiantown-data-center-plans-scrapped-as-village-sets-record-straight-on-undeveloped-land","label":"WPTV — Indiantown data center plans scrapped: Silver Fox 606, 13820 Silver Fox Road, 2 million sq ft, withdrawn after community pushback","publisher":"WPTV News Channel 5","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.yahoo.com/news/us/articles/florida-data-center-developers-host-012531808.html","label":"Florida data center developers host open house to praise benefits","publisher":"TCPalm (via Yahoo News)","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.wflx.com/2026/09/22/indiantown-project-silver-fox-data-center-plan-returns-with-changes-resident-concerns-remain/","label":"Indiantown 'Project Silver Fox' data center plan returns with changes, resident concerns remain","publisher":"WFLX","kind":"press","retrievedAt":"2026-10-20"},{"url":"https://cbs12.com/news/local/data-center-developer-sues-indiantown-alleges-village-is-illegally-blocking-25m-project-indiantown-martin-county-data-center-silver-fox-606-llc-data-center-lawsuit-25-million-project-village-of-indiantown-village-council-planning-board-data","label":"Indiantown's data center war escalates as developer takes village to court","publisher":"CBS12 (WPEC)","kind":"press","retrievedAt":"2026-10-20"}]},{"id":"compute-skylink-data-centers-naples-fl","sourceRecordId":"skylink-data-centers-naples-fl","name":"SkyLink Data Centers — Naples","operator":"SkyLink Data Centers","city":"Naples","county":"Collier","address":"801 Orchid Drive","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.167743,"longitude":-81.799835,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/skylink-data-centers-naples-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://skylinkdc.com/colocation/","label":"Colocation Services & Infrastructure - SkyLink Data Centers","publisher":"SkyLink Data Centers","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/13975","label":"SKYLINK DATA CENTERS facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-tierpoint-jacksonville-fl","sourceRecordId":"tierpoint-jacksonville-fl","name":"TierPoint Jacksonville Data Center","operator":"TierPoint","city":"Jacksonville","county":"Duval","address":"8324 Baymeadows Way","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":30.220681,"longitude":-81.585108,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-jacksonville-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/florida/jacksonville/","label":"Jacksonville Data Center | TierPoint","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=8324%20Baymeadows%20Way%2C%20Jacksonville%2C%20FL%2032256&benchmark=Public_AR_Current&format=json","label":"US Census Geocoder match for 8324 Baymeadows Way, Jacksonville, FL 32256","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.peeringdb.com/api/fac?city=Jacksonville","label":"PeeringDB facility registry — \"TierPoint Jacksonville\", 8324 Baymeadows Way, Jacksonville FL 32256","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-university-of-florida-data-center-gainesville-fl","sourceRecordId":"university-of-florida-data-center-gainesville-fl","name":"University of Florida Data Center (East Campus, HiPerGator)","operator":"University of Florida","city":"Gainesville","county":"Alachua","address":null,"state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":29.672262,"longitude":-82.3013842,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/university-of-florida-data-center-gainesville-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.alligator.org/article/2025/04/hipergator-fourth-generation-in-motion","label":"Fourth generation of UF supercomputer, HiPerGator, approved with sustainability in mind","publisher":"The Independent Florida Alligator","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://news.ufl.edu/2025/05/the-fourth-generation-model-of-ufs-hipergator/","label":"The fourth-gen model of UF's HiPerGator, available to users in June, is built to reshape AI education and research","publisher":"University of Florida News","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.whiting-turner.com/projects/mission-critical/university-of-florida-east-campus-data-center/","label":"University of Florida East Campus Data Center","publisher":"Whiting-Turner","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.openstreetmap.org/relation/11768589","label":"University of Florida East Campus (OSM relation)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-02"}]},{"id":"compute-yeehaw-junction-us-development-osceola-fl","sourceRecordId":"yeehaw-junction-us-development-osceola-fl","name":"US Development Yeehaw Junction Data Center Campus","operator":"US Development (end tenant undisclosed)","city":"Yeehaw Junction","county":"Osceola","address":"US 441 north of the Florida's Turnpike / SR 60 interchange","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.69944,"longitude":-80.88694,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/yeehaw-junction-us-development-osceola-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.growthspotter.com/2024/09/15/osceola-is-being-scouted-for-one-of-the-worlds-largest-data-centers/","label":"Osceola is being scouted for one of the world's largest data centers","publisher":"GrowthSpotter (Orlando Sentinel)","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-volico-fll1-pompano-beach-fl","sourceRecordId":"volico-fll1-pompano-beach-fl","name":"Volico FLL1 (500 Green Road)","operator":"Volico (Biznesshosting, Inc.)","city":"Pompano Beach","county":"Broward","address":"500 Green Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":26.289687,"longitude":-80.130014,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/volico-fll1-pompano-beach-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.volico.com/data-centers/deerfield-data-center/","label":"Fort Lauderdale Data Center - FLL1","publisher":"Volico","kind":"other","retrievedAt":"2026-10-20"},{"url":"https://www.peeringdb.com/api/fac/1080","label":"500 Green (AKA VOLICO 2.0) facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://inflect.com/building/500-green-road-pompano-beach/volico/datacenter/volico-broward-data-center","label":"Volico FLL1","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-willow-lakes-west-midway-fort-pierce-fl","sourceRecordId":"willow-lakes-west-midway-fort-pierce-fl","name":"Willow Lakes Data Center (West Midway Road)","operator":"Willow Lakes LLC (end operator undisclosed)","city":"Fort Pierce","county":"St. Lucie","address":"West Midway Road","state":"FL","stateName":"Florida","jurisdictionType":"state","latitude":27.3742,"longitude":-80.4104,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/willow-lakes-west-midway-fort-pierce-fl","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wflx.com/2026/08/31/203-acre-data-center-proposed-western-st-lucie-county-near-interstate-95/","label":"New data center proposed for western St. Lucie County near Interstate 95","publisher":"WFLX","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://nominatim.openstreetmap.org/search?q=Minute+Maid+Road%2C+Saint+Lucie+County%2C+Florida&format=json","label":"Nominatim geocode of the roads the sources name (Minute Maid Road, Orange Avenue/SR 68, West Midway Road, Saint Lucie County FL); the Minute Maid Rd/Orange Ave intersection node and the West Midway Rd/I-95 crossing longitude were then read from OpenStreetMap way geometry via the Overpass API","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-10"},{"url":"https://www.yahoo.com/news/us/articles/florida-data-center-proposal-draws-181305771.html","label":"Florida data center developers table request amid protest, for now","publisher":"TCPalm (via Yahoo News)","kind":"press","retrievedAt":"2026-10-02"}]},{"id":"compute-prime-storage-powers-ferry-place-marietta-ga","sourceRecordId":"prime-storage-powers-ferry-place-marietta-ga","name":"1155 Powers Ferry Place Data Center (Prime Storage conversion)","operator":"Prime Storage (Prime Group Holdings) — end user undisclosed","city":"Marietta","county":"Cobb","address":"1155 Powers Ferry Place","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.926145,"longitude":-84.4857377,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prime-storage-powers-ferry-place-marietta-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.atlantanewsfirst.com/2026/08/13/marietta-city-council-approves-zoning-second-data-center-heated-meeting/","label":"Marietta City Council approves zoning for second data center in heated meeting","publisher":"Atlanta News First","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/","label":"Proposed data center on Powers Ferry Place in Marietta","publisher":"Atlanta Press Collective","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-industrial-vi-75-south-data-center-campus-spalding-ga","sourceRecordId":"industrial-vi-75-south-data-center-campus-spalding-ga","name":"75 South Data Center Campus","operator":"Industrial VI Enterprises LLC (with Hillwood Industrial/Logistics and PowerHouse)","city":"Griffin","county":"Spalding","address":"1221 Tomochichi Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.2468,"longitude":-84.2641,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/industrial-vi-75-south-data-center-campus-spalding-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.griffindailynews.com/news/application-for-4th-data-center-withdrawn/article_3be6cf77-92b9-5a6e-b7b1-e957b9834b23.html","label":"Application for 4th data center withdrawn","publisher":"Griffin Daily News","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-aligned-atl-01-lithia-springs-ga","sourceRecordId":"aligned-atl-01-lithia-springs-ga","name":"Aligned Data Centers ATL-01","operator":"Aligned Data Centers","city":"Lithia Springs","county":"Douglas","address":"1551 N River Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7943,"longitude":-84.6602,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-atl-01-lithia-springs-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/atlanta-data-centers/","label":"Atlanta Data Centers — Aligned Data Centers (ATL-01)","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-08-28"}]},{"id":"compute-atlas-stiles-road-cartersville-ga","sourceRecordId":"atlas-stiles-road-cartersville-ga","name":"Atlas Development Stiles Road Data Center (Euharlee Road)","operator":"Atlas Development LLC","city":"Cartersville","county":"Bartow","address":"208 and 329 Stiles Road SW","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.1354,"longitude":-84.89,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-stiles-road-cartersville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.daily-tribune.com/news/december-hearing-set-for-possible-data-center/article_a52add52-b5b3-58f9-b4b0-3aea7d7552f1.html","label":"December hearing set for possible data center","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/data-center-application-withdrawn/article_80097f5c-8949-5b72-ae12-bf4c10aa3614.html","label":"Data center application withdrawn","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd","label":"Say NO to the Data Center on Euharlee Rd. (petition, 2,225 signatures)","publisher":"change.org","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/euharlee-resident-questions-council-about-data-centers/article_c8d290bc-df63-5c0a-9538-9a22e6777a5b.html","label":"Euharlee resident questions council about data centers","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"}]},{"id":"compute-atlas-avemore-technology-data-park-villa-rica-ga","sourceRecordId":"atlas-avemore-technology-data-park-villa-rica-ga","name":"Avemore Technology and Data Park","operator":"Atlas Development LLC","city":"Villa Rica","county":"Carroll","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.732,"longitude":-84.9191,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-avemore-technology-data-park-villa-rica-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.times-georgian.com/news/local/villa-rica-approves-rezoning-annexation-for-data-center/article_a47cd191-69d1-5843-94e2-255021617364.html","label":"Villa Rica approves rezoning, annexation for data center","publisher":"Times-Georgian","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/project-avemore","label":"Project Avemore (Baxtel)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-aws-butts-county-ga","sourceRecordId":"aws-butts-county-ga","name":"AWS Butts County Data Center Campus","operator":"Amazon Web Services","city":"Jackson","county":"Butts","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.2946,"longitude":-83.9663,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-butts-county-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure","label":"AWS plans to invest at least $11 billion in Georgia to expand infrastructure to support AI and cloud technologies","publisher":"Amazon","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/","label":"Amazon plans $11 billion data center expansion in Georgia","publisher":"The Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-aws-covington-alcovy-road-newton-ga","sourceRecordId":"aws-covington-alcovy-road-newton-ga","name":"AWS Covington Data Center (Alcovy Road)","operator":"Amazon Web Services","city":"Covington","county":"Newton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.5968,"longitude":-83.8602,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-covington-alcovy-road-newton-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://w.media/aws-plans-new-data-center-in-georgia-usa/","label":"AWS plans new Data Center in Georgia, USA","publisher":"W.Media","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-mmm-acquisitions-bells-ferry-marietta-ga","sourceRecordId":"mmm-acquisitions-bells-ferry-marietta-ga","name":"Bells Ferry Road Data Center (MMM Acquisitions)","operator":"MMM Acquisitions LLC (developer; end user undisclosed)","city":"Marietta","county":"Cobb","address":"1751 Bells Ferry Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.9916854,"longitude":-84.5507217,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mmm-acquisitions-bells-ferry-marietta-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wsbtv.com/news/local/cobb-county/marietta-city-council-approves-plan-31-acre-data-center/UIDXM4QEJ5EMDGAQMPLRENRRF4/","label":"Marietta City Council approves plan for 31-acre data center","publisher":"WSB-TV","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-bolingbroke-technology-center-monroe-ga","sourceRecordId":"bolingbroke-technology-center-monroe-ga","name":"Bolingbroke Technology Center","operator":"Bolingbroke Technology Center (developer; landowners Henry Davis Properties, LLC, Ingram Timber Enterprises, L.P. and others)","city":"Bolingbroke","county":"Monroe","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":32.9532,"longitude":-83.8013,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bolingbroke-technology-center-monroe-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/products/monroe-county-ga-officials-shoot-down-new-data-center","label":"Monroe County, Ga., Officials Shoot Down New Data Center","publisher":"Government Technology","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://wgxa.tv/news/local/bolingbroke-property-owners-sue-monroe-county-over-rezoning-denial","label":"Bolingbroke property owners sue Monroe County over rezoning denial","publisher":"WGXA","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-bridgeport-data-center-campus-coweta-ga","sourceRecordId":"bridgeport-data-center-campus-coweta-ga","name":"Bridgeport Data Center Campus","operator":"Undisclosed developer (Bridgeport Industrial Park)","city":"Moreland","county":"Coweta","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.2868748,"longitude":-84.7679526,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bridgeport-data-center-campus-coweta-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.times-herald.com/news/bridgeport-project-revived-with-proposed-data-centers/article_9b7ed33e-fa67-4f36-bd7b-dad42711a39b.html","label":"Bridgeport project revived with proposed data centers","publisher":"Newnan Times-Herald","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","label":"Where Coweta's five proposed data centers stand","publisher":"Newnan Times-Herald","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-4am-development-burkhalter-road-statesboro-ga","sourceRecordId":"4am-development-burkhalter-road-statesboro-ga","name":"Burkhalter Road Data Center (4AM Development)","operator":"4AM Development, LLC (developer; operator undisclosed)","city":"Statesboro","county":"Bulloch","address":"6539 Burkhalter Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":32.4049295,"longitude":-81.7440222,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/4am-development-burkhalter-road-statesboro-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.statesboroherald.com/local/statesboro-mayor-and-council-approve-rezoning-for-burkhalter-data-center-by-3-2-vote/","label":"Mayor and council approve rezoning for Burkhalter data center by 3-2 vote","publisher":"Statesboro Herald","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.statesboroherald.com/local/eleven-citizens-and-nonprofit-group-file-legal-challenge-to-statesboro-data-center-rezoning/","label":"Eleven citizens and nonprofit group file legal challenge to Statesboro data center rezoning","publisher":"Statesboro Herald","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-atlas-coosa-project-gracie-floyd-ga","sourceRecordId":"atlas-coosa-project-gracie-floyd-ga","name":"Coosa Data Center (Project Gracie)","operator":"Atlas Development LLC","city":"Rome","county":"Floyd","address":"Vann Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.257,"longitude":-85.1647,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-coosa-project-gracie-floyd-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.northwestgeorgianews.com/rome/news/local/county-commission-approves-coosa-data-center-request/article_a6062a6a-e6f2-4302-818d-83ee2bb09bf9.html","label":"County Commission Approves Coosa Data Center Request","publisher":"Rome News-Tribune / Northwest Georgia News","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","label":"Developer Pitches 2.4M SF Georgia Data Center Campus","publisher":"Bisnow","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-coresite-at1-atlanta-ga-ga","sourceRecordId":"coresite-at1-atlanta-ga-ga","name":"CoreSite AT1 - Atlanta, GA","operator":"CoreSite","city":"Atlanta","county":"Fulton","address":"55 Marietta Street","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7559857,"longitude":-84.3911712,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-at1-atlanta-ga-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/at1-atlanta-ga","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12331366645","label":"OpenStreetMap node/12331366645","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-coresite-at2-marietta-data-center-ga","sourceRecordId":"coresite-at2-marietta-data-center-ga","name":"CoreSite AT2 - Marietta Data Center","operator":"CoreSite","city":"Marietta","county":"Cobb","address":"1130 Powers Ferry Place Southeast","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.9255145,"longitude":-84.4816338,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-at2-marietta-data-center-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/at2-atlanta-ga","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/284044002","label":"OpenStreetMap way/284044002","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-coreweave-dalton-ii-old-tilton-road-whitfield-ga","sourceRecordId":"coreweave-dalton-ii-old-tilton-road-whitfield-ga","name":"CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center","operator":"Core Scientific","city":"Dalton","county":"Whitfield","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.69265485,"longitude":-84.94183002,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coreweave-dalton-ii-old-tilton-road-whitfield-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://daltoncitizen.com/2025/03/11/whitfield-county-commissioners-approve-rezoning-for-data-center-despite-opposition/","label":"Whitfield County Board of Commissioners rezoning vote, Old Tilton Road (Core Scientific)","publisher":"Dalton Daily Citizen","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://daltoncitizen.com/2026/06/03/court-reviews-15-billion-in-data-center-bonds-thursday-citizens-hold-limited-intervention-rights/","label":"Court reviews $15 billion in data center bonds: Integra SPV A/B/C $1.2B bonds for ~167-acre Tilton Road site owned by Core Scientific, subleased to CoreWeave Dalton II","publisher":"Dalton Daily Citizen","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://daltoncitizen.com/2026/06/04/judge-validates-15-2-billion-in-data-center-related-bonds/","label":"Judge validates $15.2 billion in data center-related bonds","publisher":"Dalton Daily Citizen","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://newschannel9.com/news/local/5-million-a-month-in-power-dalton-ai-data-center-moves-forward-amid-energy-debate-core-scientific-dalton-whitfield-county-rezoning-m-2-ai-data-center-georgia-dalton-utilities-transfer-fee-old-tilton-road-development","label":"Trump highlights AI data center energy use as construction for Dalton facility advances","publisher":"NewsChannel 9","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339","label":"Whitfield County GIS/Tax Assessor parcel detail, parcel 13-060-01-000","publisher":null,"kind":"other","retrievedAt":"2026-07-18"}]},{"id":"compute-cyrusone-douglasville-ga","sourceRecordId":"cyrusone-douglasville-ga","name":"CyrusOne Douglasville Data Center Campus","operator":"CyrusOne","city":"Douglasville","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7515,"longitude":-84.7477,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-douglasville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nathandeal.georgia.gov/press-releases/2017-12-19/deal-cyrusone-invest-more-200-million-douglas-county","label":"Deal: CyrusOne to invest more than $200 million in Douglas County","publisher":"Office of the Governor of Georgia","kind":"subsidy","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/georgia-data-centers/","label":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-databank-indo-cartersville-ga","sourceRecordId":"databank-indo-cartersville-ga","name":"DataBank Project Indo","operator":"DataBank","city":"Cartersville","county":"Bartow","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.1651,"longitude":-84.7996,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/databank-indo-cartersville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/databank-files-for-200mw-data-center-campus-outside-atlanta-georgia/","label":"DataBank files for 200MW data center campus outside Atlanta, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","label":"The Daily Tribune (Cartersville, GA) — Data center eyes Cartersville industrial site","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-dcblox-atlanta-east-conyers-ga","sourceRecordId":"dcblox-atlanta-east-conyers-ga","name":"DC BLOX Atlanta East Hyperscale Data Center Campus","operator":"DC BLOX","city":"Conyers","county":"Rockdale","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.66,"longitude":-84.02,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dcblox-atlanta-east-conyers-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/","label":"DC BLOX announces Rockdale County hyperscale campus (Dec 12 2023)","publisher":"DC BLOX","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/","label":"DC BLOX Atlanta East facility page","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/dc-blox-files-for-data-center-campus-outside-atlanta-georgia/","label":"DC Blox files for data center campus outside Atlanta, Georgia","publisher":"Data Center Dynamics","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://www.fox5atlanta.com/news/epd-launches-comment-period-proposed-rockdale-data-campus","label":"EPD launches comment period for proposed Rockdale data campus","publisher":"Fox 5 Atlanta","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://www.dcblox.com/rockdale-county-ga-community-outreach/","label":"DC BLOX Rockdale County GA community outreach page","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-07-07"}]},{"id":"compute-dc-blox-atlanta-west-ga","sourceRecordId":"dc-blox-atlanta-west-ga","name":"DC BLOX Atlanta West (ATL1)","operator":"DC BLOX","city":"Lithia Springs","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7882,"longitude":-84.6608,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-atlanta-west-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/","label":"DC BLOX Secures $1.15 Billion Green Loan for Atlanta Data Center Campus Development","publisher":"DC BLOX","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.dcblox.com/data-centers/douglas-county-ga-hyperscale-data-center-campus/","label":"Atlanta West Hyperscale Data Center Campus – DC BLOX official page","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/city-approves-98-million-tax-break-for-expanded-data-site/article_7356b1e6-2fd1-548d-9990-ad97c861be9d.html","label":"City approves $98 million tax break for expanded data site","publisher":"Douglas County Sentinel","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-digital-realty-atl11-ga","sourceRecordId":"digital-realty-atl11-ga","name":"Digital Realty ATL11","operator":"Digital Realty","city":"Austell","county":"Cobb","address":"101 Aquila Way","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7465605,"longitude":-84.5797407,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-atl11-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl11","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/975064000","label":"OpenStreetMap way/975064000","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-digital-realty-atlanta-atl13-ga","sourceRecordId":"digital-realty-atlanta-atl13-ga","name":"Digital Realty Atlanta ATL13","operator":"Digital Realty","city":"Atlanta","county":"Fulton","address":"56 Marietta Street","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7555186,"longitude":-84.3914814,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-atlanta-atl13-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl13","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/8109664813","label":"OpenStreetMap node/8109664813","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-fort-gillem-forest-park-ga","sourceRecordId":"digital-realty-fort-gillem-forest-park-ga","name":"Digital Realty Fort Gillem Data Center Campus","operator":"Digital Realty","city":"Forest Park","county":"Clayton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.622,"longitude":-84.3691,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-fort-gillem-forest-park-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/about/projects/fort-gillem","label":"Fort Gillem data center project","publisher":"Digital Realty","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-duos-edge-ai-columbus-campus-ga","sourceRecordId":"duos-edge-ai-columbus-campus-ga","name":"Duos Edge AI Columbus Campus","operator":"Duos Edge AI (Duos Technologies Group)","city":"Columbus","county":"Muscogee","address":"8 Corporate Ridge Pkwy","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":32.461,"longitude":-84.9877,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/duos-edge-ai-columbus-campus-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://finviz.com/news/369071/duos-edge-ai-signs-five-year-10-mw-colocation-agreement-with-investment-grade-hyperscaler-valued-at-111-million-in-contracted-revenue","label":"Duos Edge AI Signs Five-Year 10 MW Colocation Agreement with Investment-Grade Hyperscaler","publisher":"Duos Technologies Group (via Finviz)","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/georgia-data-centers/","label":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://inflect.com/blog/duos-edge-ai-hits-20mw-contracted-deployment-in-2026-with-columbus-georgia-colocation-expansion","label":"Duos Edge AI hits 20MW contracted deployment in 2026 with Columbus, Georgia colocation expansion","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-edged-atlanta-tilford-yard-ga","sourceRecordId":"edged-atlanta-tilford-yard-ga","name":"Edged Atlanta (ATL01)","operator":"Edged Energy (Endeavour)","city":"Atlanta","county":"Fulton","address":"1800 Thomas Street NW","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.749,"longitude":-84.388,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edged-atlanta-tilford-yard-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html","label":"Edged Data Centers Celebrates Grand Opening of New Ultra-Efficient, Sustainable Data Center in Atlanta","publisher":"Edged Energy via PR Newswire","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-equinix-hampton-xscale-campus-henry-ga","sourceRecordId":"equinix-hampton-xscale-campus-henry-ga","name":"Equinix Hampton xScale Campus (AT10x–AT13x)","operator":"Equinix (xScale)","city":"Hampton","county":"Henry","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.36499,"longitude":-84.31697,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-hampton-xscale-campus-henry-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investor.equinix.com/news-events/press-releases/detail/1118/equinix-partners-with-central-georgia-electric-membership","label":"Equinix Partners with Central Georgia Electric Membership Corporation to Protect Ratepayers","publisher":"Equinix","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/campus/equinix-hampton-campus","label":"Equinix: Hampton Campus (Baxtel)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-flexential-atlanta-alpharetta-data-center-ga","sourceRecordId":"flexential-atlanta-alpharetta-data-center-ga","name":"Flexential Atlanta - Alpharetta Data Center","operator":"Flexential","city":"Alpharetta","county":"Fulton","address":"12655 Edison Drive","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.0869864,"longitude":-84.2518184,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-atlanta-alpharetta-data-center-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ga/atlanta/alpharetta-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/39083797","label":"OpenStreetMap way/39083797","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-atlanta-douglasville-1-ga","sourceRecordId":"flexential-atlanta-douglasville-1-ga","name":"Flexential Atlanta - Douglasville 1","operator":"Flexential","city":"Douglasville","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7310574,"longitude":-84.6160809,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-atlanta-douglasville-1-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ga/atlanta/douglasville-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1097502168","label":"OpenStreetMap way/1097502168","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.datacenterdynamics.com/en/news/digitalocean-to-deploy-gpus-at-flexential-data-center-in-atlanta/","label":"Flexential AI/HPC — DigitalOcean GPU Droplets on NVIDIA H200 + AMD Instinct, two data hall","publisher":"datacenterdynamics.com","kind":"press","retrievedAt":"2026-07-23"},{"url":"https://www.datacentermap.com/usa/georgia/atlanta/flexential-atlanta-douglasville/","label":"Flexential Douglasville 1 — datacentermap.com","publisher":null,"kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-flexential-atlanta-douglasville-2-ga","sourceRecordId":"flexential-atlanta-douglasville-2-ga","name":"Flexential Atlanta - Douglasville 2","operator":"Flexential","city":"Douglasville","county":"Douglas","address":"1750 N River Rd","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7307027,"longitude":-84.6112398,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-atlanta-douglasville-2-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center","label":"Flexential official facility page","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1258702591","label":"OpenStreetMap way/1258702591","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-atlanta-norcross-atl01-02-ga","sourceRecordId":"flexential-atlanta-norcross-atl01-02-ga","name":"Flexential Atlanta - Norcross (ATL01/02)","operator":"Flexential","city":"Norcross","county":"Gwinnett","address":"2775 Northwoods Parkway","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.9547396,"longitude":-84.1985246,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-atlanta-norcross-atl01-02-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ga/atlanta/norcross-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/392324240","label":"OpenStreetMap way/392324240","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-google-douglas-county-ga","sourceRecordId":"google-douglas-county-ga","name":"Google Douglasville Data Center","operator":"Google","city":"Douglasville","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7514966,"longitude":-84.7477136,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-douglas-county-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/","label":"Google Data Centers — US locations","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://datacenters.google/locations/georgia/","label":"Google Data Centers — Georgia","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-google-columbia-county-ga","sourceRecordId":"google-columbia-county-ga","name":"Google Evans Data Center","operator":"Google","city":"Evans","county":"Columbia","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.5313102,"longitude":-82.2563979,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-columbia-county-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/","label":"Google Data Centers — US locations","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://datacenters.google/locations/georgia/","label":"Google Data Centers — Georgia","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-google-lagrange-ga","sourceRecordId":"google-lagrange-ga","name":"Google LaGrange Data Center","operator":"Google","city":"LaGrange","county":"Troup","address":"411 Pegasus Parkway","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.039291,"longitude":-85.0313269,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-lagrange-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/","label":"Google Data Centers — US locations","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://datacenters.google/locations/georgia/","label":"Google Data Centers — Georgia","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.irecruit.co/insights/google-files-expand-lagrange-data-center-campus","label":"Google files to expand LaGrange data center campus (DRI for PRL2, filed by KDC)","publisher":"iRecruit","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.atlantanewsfirst.com/2026/04/21/google-build-new-data-center-lagrange/","label":"Google announces new data center in LaGrange","publisher":"Atlanta News First","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-hampton-technology-park-henry-ga","sourceRecordId":"hampton-technology-park-henry-ga","name":"Hampton Technology Park","operator":"Hampton Technology Park Owner, LLC (DRI applicant; end user undisclosed)","city":"Hampton","county":"Henry","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.3871,"longitude":-84.283,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hampton-technology-park-henry-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/4-million-sq-ft-hampton-technology-park-data-center-campus-proposed-outside-atlanta-georgia/","label":"4 million sq ft Hampton Technology Park data center campus proposed outside Atlanta, Georgia","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/hampton-technology-park","label":"Hampton Technology Park (Baxtel listing)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-montana-property-group-high-falls-road-spalding-ga","sourceRecordId":"montana-property-group-high-falls-road-spalding-ga","name":"High Falls Road Data Center Campus (Montana Property Group)","operator":"Montana Property Group LLC (developer; end user undisclosed)","city":"Griffin","county":"Spalding","address":"High Falls Road at Alicia Drive (north side)","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.2468,"longitude":-84.2641,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/montana-property-group-high-falls-road-spalding-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","label":"Data centers could bring high tax revenue to Spalding County","publisher":"Griffin Daily News","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.yahoo.com/news/spalding-county-commissioners-hold-hearing-144445610.html","label":"Spalding County commissioners hold hearing on data center development (Project Spalding)","publisher":"Griffin Daily News (via Yahoo News)","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-thor-equities-kingston-technology-hub-bartow-ga","sourceRecordId":"thor-equities-kingston-technology-hub-bartow-ga","name":"Kingston Technology Hub (Thor Equities)","operator":"Thor Equities","city":"Kingston","county":"Bartow","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.2367172,"longitude":-84.9450325,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/thor-equities-kingston-technology-hub-bartow-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/","label":"Another large data center proposed in Georgia (Thor Equities, Kingston)","publisher":null,"kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/news/thor-equities-plans-150mw-data-center-in-georgia-us","label":"Thor Equities Plans 150MW Data Center In Georgia, US","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-edgeconnex-liberty-road-douglas-county-ga","sourceRecordId":"edgeconnex-liberty-road-douglas-county-ga","name":"Liberty Road Data Center Campus (EdgeConneX)","operator":"EdgeConneX (applicant East Village Dothan LLC)","city":"Villa Rica","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7314864,"longitude":-84.900079,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-liberty-road-douglas-county-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html","label":"County rejects plans for 700-acre data center campus","publisher":"Douglas County Sentinel","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.fox5atlanta.com/news/douglas-county-leaders-just-killed-massive-data-center-project","label":"Douglas County leaders just killed a massive data center project","publisher":"FOX 5 Atlanta","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-stillwater-lovejoy-panhandle-road-clayton-ga","sourceRecordId":"stillwater-lovejoy-panhandle-road-clayton-ga","name":"Lovejoy Data Center Campus (Stillwater Development)","operator":"Stillwater Development","city":"Lovejoy","county":"Clayton","address":"11760 Panhandle Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.4516522,"longitude":-84.343564,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stillwater-lovejoy-panhandle-road-clayton-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/","label":"Proposal for Clayton County data center withdrawn","publisher":"Atlanta News First","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-meta-stanton-springs-newton-ga","sourceRecordId":"meta-stanton-springs-newton-ga","name":"Meta Newton Data Center (Stanton Springs)","operator":"Meta Platforms","city":"Social Circle","county":"Newton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6551,"longitude":-83.7182,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/meta-stanton-springs-newton-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.atmeta.com/2021/03/hello-georgia/","label":"Hello, Georgia! — Meta Data Centers (Newton County / Stanton Springs)","publisher":"Meta","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-canoochee-river-metter-airport-campus-candler-ga","sourceRecordId":"canoochee-river-metter-airport-campus-candler-ga","name":"Metter Airport Data Center Campus","operator":"Canoochee River RV Resort, LLC (applicant; end user undisclosed)","city":"Metter","county":"Candler","address":"2700 Airport Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":32.3971,"longitude":-82.0601,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/canoochee-river-metter-airport-campus-candler-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/anonymous-250000-sq-ft-data-center-campus-proposed-in-metter-georgia-makes-headway/","label":"Anonymous 250,000 sq. ft. Data Center Campus Proposed in Metter, Georgia Makes Headway","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.wtoc.com/2026/10/06/candler-county-commissioners-discuss-possible-data-center-near-metter-airport/","label":"Candler County commissioners discuss possible data center near Metter airport","publisher":"WTOC","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.wtoc.com/2026/09/15/two-groups-propose-data-centers-metter-candler-county/","label":"Two groups propose data centers in Metter, Candler County","publisher":"WTOC","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-microsoft-firecracker-rome-ga","sourceRecordId":"microsoft-firecracker-rome-ga","name":"Microsoft Data Center Campus – Rome, GA","operator":"Microsoft","city":"Rome","county":"Floyd","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.27,"longitude":-85.16,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-firecracker-rome-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-to-develop-350-acre-data-center-campus-in-rome-georgia/","label":"Microsoft to develop 350-acre data center campus in Rome, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.northwestgeorgianews.com/rome/news/local/updated-microsoft-to-invest-1-billion-in-data-center-in-floyd-county/article_128f3c2c-772f-11ee-a991-7fb8d4f28f86.html","label":"Microsoft To Invest $1 Billion In Data Center in Floyd County","publisher":"Northwest Georgia News","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://thegeorgiasun.com/2023/10/30/1-billion-microsoft-data-center-campus-coming-to-northwest-georgia/","label":"$1 Billion Microsoft Data Center Campus Coming to Northwest Georgia","publisher":"The Georgia Sun","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","label":"Microsoft to invest $1 Billion in Rome, GA Data Center Campus","publisher":"AllOnGeorgia","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.northwestgeorgianews.com/rome/news/local/floyd-county-commission-enacts-80-day-moratorium-on-new-data-centers/article_f6a7cc37-9486-42af-85b0-5705c980691e.html","label":"Floyd County Commission enacts 80-day moratorium on new data centers","publisher":"Northwest Georgia News","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-microsoft-douglasville-ga","sourceRecordId":"microsoft-douglasville-ga","name":"Microsoft Douglasville Data Center Campus","operator":"Microsoft","city":"Douglasville","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7547,"longitude":-84.7427,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-douglasville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-to-launch-new-cloud-region-in-atlanta-georgia-in-2027/","label":"Microsoft to launch new cloud region in Atlanta, Georgia, in 2027","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles","label":"Details Emerge On Microsoft's $1.8 Billion Investment In Atlanta Data Centers","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-aiming-to-build-1-million-sq-ft-data-center-in-douglasville-ga-for-east-us-3/","label":"Microsoft aiming to build 1 million sq ft data center in Douglasville, GA — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/commissioner-tax-incentives-arent-free-money/article_ad7fb909-1658-5c71-b502-2356c87ff705.html","label":"Commissioner: Tax incentives aren't 'free money' — Douglas County Sentinel","publisher":"Douglas County Sentinel","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county","label":"Data Centers Sales & Use Tax Exemption — Aggregate Expenditures by County — Georgia DOR","publisher":"Georgia Department of Revenue","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/data-center-moratorium-extended-to-determine-impact-on-ratepayers/article_3d610d7f-cec8-5be2-a4dc-9f3591440adc.html","label":"Data center moratorium extended to determine impact on ratepayers — Douglas County Sentinel","publisher":"Douglas County Sentinel","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/07/25/sustainable-by-design-transforming-datacenter-water-efficiency/","label":"Sustainable by design: Transforming datacenter water efficiency — Microsoft","publisher":"Microsoft","kind":"other","retrievedAt":"2026-07-06"}]},{"id":"compute-microsoft-east-point-ben-hill-road-ga","sourceRecordId":"microsoft-east-point-ben-hill-road-ga","name":"Microsoft East Point Data Center (Ben Hill Road)","operator":"Microsoft","city":"East Point","county":"Fulton","address":"Ben Hill Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6465885,"longitude":-84.5173738,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-east-point-ben-hill-road-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/microsoft-east-point","label":"Microsoft East Point Data Center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/","label":"Understanding Microsoft datacenters in South Fulton County","publisher":"Microsoft Local","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-microsoft-fairwater-fayetteville-ga","sourceRecordId":"microsoft-fairwater-fayetteville-ga","name":"Microsoft Fairwater Atlanta (Azure AI Superfactory)","operator":"Microsoft","city":"Fayetteville","county":"Fayette","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.4487,"longitude":-84.4549,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-fairwater-fayetteville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/","label":"From Wisconsin to Atlanta, Microsoft connects datacenters to build its first AI superfactory","publisher":"Microsoft","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-launches-atlanta-fairwater-data-center-two-stories-no-ups-or-gen-sets/","label":"Microsoft launches Atlanta Fairwater data center, two stories, no UPS or gen sets","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.ajc.com/business/2025/11/microsofts-newest-ai-superfactory-opens-at-sprawling-fayetteville-campus/","label":"Microsoft debuts AI 'superfactory' data center south of Atlanta","publisher":"The Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://thecitizen.com/2026/05/11/behind-fayettes-qts-water-controversy-a-missed-meter-8000-workers-and-a-massive-construction-project/","label":"Behind Fayette's QTS water controversy: a missed meter, 8,000 workers","publisher":"The Citizen","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center","label":"Microsoft Fairwater Atlanta: a grid-only gigawatt AI data center","publisher":"Measured AI","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.wbrc.com/2026/02/22/georgia-data-center-boom-what-its-like-have-one-your-community/","label":"Georgia data center boom: what it's like to have one in your community","publisher":"WBRC","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://fayettega.org/doing-business/incentives-tax-rates/","label":"Incentives & tax rates","publisher":"Fayette County Development Authority","kind":"other","retrievedAt":"2026-07-08"}]},{"id":"compute-microsoft-palmetto-fulton-ga","sourceRecordId":"microsoft-palmetto-fulton-ga","name":"Microsoft Palmetto Data Center","operator":"Microsoft","city":"Palmetto","county":"Fulton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.5178907,"longitude":-84.6696549,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-palmetto-fulton-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://local.microsoft.com/blog/palmetto-datacenter-construction-update/","label":"Palmetto datacenter construction update","publisher":"Microsoft Local","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/","label":"Understanding Microsoft datacenters in South Fulton County","publisher":"Microsoft Local","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-microsoft-tyrone-ga","sourceRecordId":"microsoft-tyrone-ga","name":"Microsoft Tyrone Campus (Project Rita)","operator":"Microsoft","city":"Tyrone","county":"Fayette","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.494,"longitude":-84.588,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-tyrone-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-confirms-plans-for-data-center-in-tyrone-georgia/","label":"Microsoft confirms plans for data center in Tyrone, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/96mw-data-center-campus-proposed-in-tyrone-georgia/","label":"96MW data center campus proposed in Tyrone, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.tyronega.gov/datacenter","label":"Data Center Information - Town of Tyrone, GA","publisher":"Town of Tyrone","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://local.microsoft.com/blog/tyrone-datacenter-update/","label":"Tyrone Datacenter Update - Microsoft Local","publisher":"Microsoft","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/news/microsoft-to-build-data-center-in-tyrone-georgia","label":"Microsoft to Build Data Center in Tyrone, Georgia","publisher":"Baxtel","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://thecitizen.com/2024/03/19/now-its-tyrones-turn-for-a-big-data-center-project/","label":"Now it's Tyrone's turn for a big data center project","publisher":"The Citizen","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-nixon-technology-center-augusta-ga","sourceRecordId":"nixon-technology-center-augusta-ga","name":"Nixon Technology Center","operator":"3 G Investments, LLC (DRI applicant; end user confidential)","city":"Augusta","county":"Richmond","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.3699,"longitude":-81.9645,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nixon-technology-center-augusta-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/application-filed-for-3-3-million-sq-ft-nixon-technology-data-center-campus-in-augusta/","label":"Application Filed for 3.3 Million Sq. Ft. Nixon Technology Data Center Campus in Augusta","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-northern-data-maysville-jackson-ga","sourceRecordId":"northern-data-maysville-jackson-ga","name":"Northern Data Maysville Data Center","operator":"Northern Data Group","city":"Maysville","county":"Jackson","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.2527233,"longitude":-83.5613446,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/northern-data-maysville-jackson-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/","label":"Maysville rezoning controversy just got more controversial","publisher":"97.5 Glory FM (WGTJ)","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.prnewswire.co.uk/news-releases/northern-data-group-to-develop-best-in-class-us-data-center-for-high-performance-computing-302321720.html","label":"Northern Data Group to Develop Best-in-Class U.S. Data Center for High Performance Computing","publisher":"PR Newswire (Northern Data Group)","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-oakley-brown-farm-road-cartersville-ga","sourceRecordId":"oakley-brown-farm-road-cartersville-ga","name":"Oakley Real Estate Partners Brown Farm Road Data Center","operator":"Oakley Real Estate Partners","city":"Cartersville","county":"Bartow","address":"Brown Farm Road SW (west end)","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.1181,"longitude":-84.8698,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oakley-brown-farm-road-cartersville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.daily-tribune.com/news/bcpc-recommends-denial-of-brown-farm-data-center/article_54fd01af-4dd1-556e-9365-80b4b6ac8cc2.html","label":"BCPC recommends denial of Brown Farm data center","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/informal-meeting-draws-opposition-to-proposed-data-center/article_56a2f675-ccc3-52cc-8d42-909299d27f27.html","label":"Informal meeting draws opposition to proposed data center","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/data-center-public-hearing-rescheduled-for-aug-24/article_b273ab7f-6389-5d9a-b7be-53961c942e05.html","label":"Data center public hearing rescheduled for Aug. 24","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.fox5atlanta.com/news/bartow-county-residents-challenge-data-center-plan","label":"Bartow County residents challenge data center plan","publisher":"FOX 5 Atlanta","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","label":"Agenda, Public Meeting, Bartow County Commissioner, September 2, 2026","publisher":"Bartow County Commissioner's Office","kind":"permit","retrievedAt":"2026-09-30"}]},{"id":"compute-fae-clark-old-elberton-road-athens-ga","sourceRecordId":"fae-clark-old-elberton-road-athens-ga","name":"Old Elberton Road Data Center Proposal","operator":"FAE Clark LLC (landowner/applicant; end user undisclosed)","city":"Athens","county":"Clarke","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.9519,"longitude":-83.3576,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fae-clark-old-elberton-road-athens-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wuga.org/local-news/2025-10-21/commissioner-link-calls-for-moratorium-on-data-centers-after-potential-hyperscale-project-denied","label":"Commissioner Link calls for moratorium on data centers after potential hyperscale project denied","publisher":"WUGA","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nearbydatacenters.org/ga/","label":"Georgia data centers: 114 projects by county","publisher":"Nearby Data Centers","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-eagle-rock-pine-ridge-tech-park-twiggs-ga","sourceRecordId":"eagle-rock-pine-ridge-tech-park-twiggs-ga","name":"Pine Ridge Tech Park","operator":"Eagle Rock Partners","city":null,"county":"Twiggs","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":32.6467914,"longitude":-83.4351636,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/eagle-rock-pine-ridge-tech-park-twiggs-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.gpb.org/news/2025/09/19/rural-twiggs-county-approves-rezoning-for-data-center-city-sized-appetite-for-power","label":"Rural Twiggs County approves rezoning for a data center with a city-sized appetite for power","publisher":"Georgia Public Broadcasting","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans","label":"Residents Sue Georgia County Over Data Center Plans","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-premier-project-arrowhead-irwin-ga","sourceRecordId":"premier-project-arrowhead-irwin-ga","name":"Project Arrowhead (Premier Data Center Development Irwin County Campus)","operator":"Premier Data Center Development, LLC","city":"Mystic","county":"Irwin","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":31.6224192,"longitude":-83.3351929,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/premier-project-arrowhead-irwin-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/plans-filed-for-1-2gw-data-center-campus-in-irwin-county-georgia","label":"Plans Filed for 1.2GW Data Center Campus in Irwin County, Georgia","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-project-turbo-llc-project-azalea-thomson-ga","sourceRecordId":"project-turbo-llc-project-azalea-thomson-ga","name":"Project Azalea (Thomson Data Center Campus)","operator":"Project Turbo, LLC (developer; end user undisclosed)","city":"Thomson","county":"McDuffie","address":"Randall Hunt Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.4663248,"longitude":-82.5026089,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-turbo-llc-project-azalea-thomson-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/200-acre-project-azalea-data-center-approved-near-augusta-georgia","label":"200-acre \"Project Azalea\" Data Center Approved Near Augusta, Georgia","publisher":"Baxtel","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.wrdw.com/2026/03/04/mcduffie-county-planning-panel-recommends-data-centers-approval/","label":"McDuffie County planning panel recommends data center's approval","publisher":"WRDW","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.atlantanewsfirst.com/2026/03/18/mcduffie-county-leaders-approve-1b-project-azalea-data-center/","label":"McDuffie County leaders approve $1B Project Azalea data center","publisher":"Atlanta News First","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-taurus-digital-realty-project-bunkhouse-stilesboro-ga","sourceRecordId":"taurus-digital-realty-project-bunkhouse-stilesboro-ga","name":"Project Bunkhouse (Digital Realty Data Center Campus)","operator":"Digital Realty","city":"Stilesboro","county":"Bartow","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.096532,"longitude":-84.911951,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/taurus-digital-realty-project-bunkhouse-stilesboro-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/MINUTES.PUBLIC_MEETING_6-4-2025.pdf","label":"Minutes, Public Meeting, Bartow County Commissioner, June 4, 2025 — rezoning case Z-25-00020 (Taurus DC SPE LLC)","publisher":"Bartow County Commissioner's Office","kind":"permit","retrievedAt":"2026-09-30"},{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433","label":"Development of Regional Impact #4433, Project Bunkhouse — initial form (location, owner, size)","publisher":"Georgia Department of Community Affairs","kind":"filing","retrievedAt":"2026-09-30"},{"url":"https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4433","label":"Development of Regional Impact #4433, Project Bunkhouse — additional information (value, water, sewer, traffic)","publisher":"Georgia Department of Community Affairs","kind":"filing","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/taylor-approves-project-bunkhouse-rezoning/article_cd988e43-8419-51e1-b443-729a16fe9b24.html","label":"Taylor approves Project Bunkhouse rezoning","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/bcpc-recommends-approval-for-project-bunkhouse/article_17f99c56-ae0f-5eab-a253-ee6ddd01c996.html","label":"BCPC recommends approval for Project Bunkhouse","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/new-data-center-eyes-bartow/article_65eb57bd-8406-5afa-80c8-d944a5ec8e94.html","label":"New data center eyes Bartow (county economic development director disputes DRI incentive statement)","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.ajc.com/news/business/19b-data-center-campus-proposed-northwest-of-atlanta/FPMRPJCYERGXLLAND6IZACSVEM/","label":"$19B data center campus proposed northwest of Atlanta (site plan showing 1,830 MW)","publisher":"The Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.datacenterdynamics.com/en/news/application-filed-for-86-million-sq-ft-data-center-project-outside-atlanta-georgia/","label":"Application filed for 8.6 million sq ft data center project outside Atlanta, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://coosavalleynews.com/2025/05/bartow-planning-commission-recommends-approval-of-data-center-near-stilesboro/","label":"Bartow Planning Commission recommends approval of data center near Stilesboro","publisher":"Coosa Valley News","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.mykcountry.com/2026/07/07/bartow-countys-sole-commissioner-discusses-data-centers/","label":"Bartow County's sole commissioner discusses data centers (context on county DC pipeline)","publisher":"My K Country","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/PUBLIC%20RELATIONS_DATA%20CENTERS_BARTOW%20COUNTY%20POLICY%20STATEMENT_8-2026.pdf","label":"Data Centers — Bartow County Policy Statement (August 2026)","publisher":"Bartow County Commissioner's Office","kind":"other","retrievedAt":"2026-09-30"}]},{"id":"compute-atlas-project-bus-temple-ga","sourceRecordId":"atlas-project-bus-temple-ga","name":"Project Bus (Atlas Development Temple Data Center Campus)","operator":"Atlas Development LLC","city":"Temple","county":"Carroll","address":"Vaughn Road / Center Point Road / Terrell Road / Mandeville Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7376,"longitude":-85.0327,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-project-bus-temple-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.times-georgian.com/news/local/data-center-proposed-for-temple/article_843207fd-622f-5c76-b5b9-0a999e07bff5.html","label":"Data center proposed for Temple","publisher":"Times-Georgian","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/","label":"Data Center Planned For Development In Carroll County","publisher":"Gradick Communications","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://gradickcommunications.com/developer-pulls-data-center-proposal-at-least-for-now/","label":"Developer Pulls Data Center Proposal… at least, for now","publisher":"Gradick Communications","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/atlas-development-project-bus","label":"Atlas Development: Project Bus (Baxtel) — listed Withdrawn","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-openai-project-camellia-effingham-ga","sourceRecordId":"openai-project-camellia-effingham-ga","name":"Project Camellia (OpenAI Effingham County Campus)","operator":"OpenAI","city":"Rincon","county":"Effingham","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":32.296,"longitude":-81.2354,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/openai-project-camellia-effingham-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center","label":"Project Camellia (OpenAI Data Center) — official county project page","publisher":"Effingham County, Georgia","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://thecurrentga.org/2026/07/22/20-billion-openai-data-center-to-open-in-effingham-county/","label":"$20 billion OpenAI data center to open in Effingham County","publisher":"The Current","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://thecurrentga.org/2026/07/25/as-effingham-county-data-center-plan-advances-next-step-is-state-evaluation-process/","label":"As Effingham County data center plan advances, next step is state evaluation process","publisher":"The Current","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://w.media/openai-plans-to-build-its-own-3-2-gw-data-center-campus-in-georgia/","label":"OpenAI plans to build its own 3.2 GW data center campus in Georgia","publisher":"W.Media","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.wtoc.com/2026/09/03/effingham-county-residents-sue-county-over-data-center-zoning-ordinance-demand-transparency/","label":"Effingham County residents sue county over data center zoning ordinance, demand transparency","publisher":"WTOC","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wtoc.com/2026/09/16/state-reveals-full-dri-report-openais-data-center-project/","label":"State reveals full DRI report on OpenAI's Effingham County data center project","publisher":"WTOC-TV","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-project-oak-walt-sanders-road-coweta-ga","sourceRecordId":"project-oak-walt-sanders-road-coweta-ga","name":"Project Oak Data Center (Walt Sanders Road)","operator":"Undisclosed developer","city":"Newnan","county":"Coweta","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.4330945,"longitude":-84.7301816,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-oak-walt-sanders-road-coweta-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html","label":"Project Oak data center denied by commissioners","publisher":"Newnan Times-Herald","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","label":"Where Coweta's five proposed data centers stand","publisher":"Newnan Times-Herald","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-cyrusone-project-peach-palmetto-ga","sourceRecordId":"cyrusone-project-peach-palmetto-ga","name":"Project Peach (CyrusOne Palmetto Data Center Campus)","operator":"CyrusOne (joint venture with North Coweta Investors)","city":"Palmetto","county":"Coweta","address":"300 Johnson Circle","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.5182,"longitude":-84.6693,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-project-peach-palmetto-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fox5atlanta.com/news/coweta-county-concerns-project-peach-data-center-palmetto","label":"Coweta County residents concerned over proposed 320-acre data center","publisher":"FOX 5 Atlanta","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/","label":"How Data Center Developers Staked Their Claim in Rural Georgia","publisher":"DeSmog","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","label":"Where Coweta's five proposed data centers stand","publisher":"The Newnan Times-Herald","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-pcc-dekalb-ellenwood-data-center-ga","sourceRecordId":"pcc-dekalb-ellenwood-data-center-ga","name":"Project Preserve (Ellenwood Data Center)","operator":"PCC-DeKalb LLC","city":"Ellenwood","county":"DeKalb","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6265,"longitude":-84.286,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pcc-dekalb-ellenwood-data-center-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://atlanta.capitalbnews.org/dekalb-county-ellenwood-data-center-rejected/","label":"DeKalb County rejects Ellenwood data center","publisher":"Capital B Atlanta","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/georgia-data-centers/","label":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-project-ruby-upatoi-muscogee-ga","sourceRecordId":"project-ruby-upatoi-muscogee-ga","name":"Project Ruby (Upatoi Data Center Campus)","operator":"Undisclosed end user (site pursued by Choose Columbus / Development Authority of Columbus)","city":"Columbus","county":"Muscogee","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":32.5487503,"longitude":-84.7399283,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-ruby-upatoi-muscogee-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.aol.com/articles/columbus-council-votes-rules-allow-144112000.html","label":"Columbus Council votes on rules to allow any hyperscale data center in Muscogee County","publisher":null,"kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-prologis-project-sail-coweta-ga","sourceRecordId":"prologis-project-sail-coweta-ga","name":"Project Sail – Prologis Data Center Campus","operator":"Prologis","city":"Newnan","county":"Coweta","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.3807,"longitude":-84.7974,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-project-sail-coweta-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ajc.com/business/2026/04/coweta-votes-to-turn-this-800-acre-forest-into-17b-data-center-campus/","label":"$17B Project Sail data center project approved south of Atlanta","publisher":"Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://thecitizen.com/2026/05/11/coweta-residents-sue-to-block-project-sail-data-center/","label":"Coweta Residents Sue to Block Project Sail Data Center","publisher":"The Citizen","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cowetaprojectsail.com/coweta-lp/","label":"Project Sail — developer project overview","publisher":"Prologis / Atlas Development","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://propmodo.com/?p=179099","label":"Coweta County approves Project Sail rezoning (Prologis)","publisher":"Propmodo","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","label":"Where Coweta's five proposed data centers stand","publisher":"The Times-Herald","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-atlas-project-sassy-rome-ga","sourceRecordId":"atlas-project-sassy-rome-ga","name":"Project Sassy (Atlas Development Rome Campus)","operator":"Atlas Development LLC","city":"Rome","county":"Floyd","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.257,"longitude":-85.1647,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-project-sassy-rome-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","label":"Developer Pitches 2.4M SF Georgia Data Center Campus (Project Sassy named as Atlas's first Floyd County filing)","publisher":"Bisnow","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-red-wolf-project-splice-cordele-ga","sourceRecordId":"red-wolf-project-splice-cordele-ga","name":"Project Splice (Cordele Technology Campus)","operator":"Red Wolf DCD Properties LLC (developer; end user undisclosed)","city":"Cordele","county":"Crisp","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":31.9635,"longitude":-83.7824,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/red-wolf-project-splice-cordele-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/red-wolf-dcd-project-splice","label":"Red Wolf DCD: Project Splice (Baxtel)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/georgia-data-centers/","label":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-atlas-project-springbank-adairsville-ga","sourceRecordId":"atlas-project-springbank-adairsville-ga","name":"Project Springbank (Atlas Development Bartow County Campus)","operator":"Atlas Development LLC","city":"Adairsville","county":"Bartow","address":"Barnsley Gardens Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.30926,"longitude":-84.96325,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-project-springbank-adairsville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.northwestgeorgianews.com/rome/news/local/new-data-center-proposal-in-bartow-would-require-as-much-power-as-324k-homes/article_05152f0c-ee11-11ef-9470-5b8da755f367.html","label":"New data center proposal in Bartow would require as much power as 324K homes","publisher":"Rome News-Tribune / Northwest Georgia News","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.connectcre.com/stories/data-center-operator-planning-4-5b-bartow-county-campus/","label":"Data Center Operator Planning $4.5B Bartow County Campus","publisher":"Connect CRE","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.daily-tribune.com/news/springbank-data-center-application-withdrawn/article_4038268b-78d8-5d26-9e10-2bf514aac3a3.html","label":"Springbank data center application withdrawn","publisher":"Daily Tribune News (Cartersville)","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.fox5atlanta.com/news/bartow-county-data-center-barnsley-resort-residents-oppose","label":"Bartow County planning commission votes to recommend denying data center rezoning request","publisher":"FOX 5 Atlanta","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403","label":"Development of Regional Impact #4403, Project Springbank — initial form (location, owner, size)","publisher":"Georgia Department of Community Affairs","kind":"filing","retrievedAt":"2026-09-30"},{"url":"https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4403","label":"Development of Regional Impact #4403, Project Springbank — additional information (value, water, sewer)","publisher":"Georgia Department of Community Affairs","kind":"filing","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/petition-started-town-hall-set-regarding-proposed-data-center/article_4fddc487-fe84-578f-b4a0-0e5b2ad1cf8d.html","label":"Petition started, town hall set regarding proposed data center","publisher":"Daily Tribune News (Cartersville)","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/MINUTES.PUBLIC_MEETING_5-14-2025.pdf","label":"Minutes, Public Meeting, Bartow County Commissioner, May 14, 2025 — Z-25-00006 withdrawn","publisher":"Bartow County Commissioner's Office","kind":"permit","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/town-hall-held-public-hearing-postponed-for-proposed-data-center/article_881cdab3-b9b8-587b-9510-77464608a3e7.html","label":"Town hall held, public hearing postponed for proposed data center","publisher":"Daily Tribune News (Cartersville)","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.fox5atlanta.com/news/backlash-over-proposed-data-center-near-adairsville","label":"Backlash over proposed data center near Adairsville","publisher":"FOX 5 Atlanta","kind":"press","retrievedAt":"2026-09-30"}]},{"id":"compute-project-turbo-okelly-road-gainesville-ga","sourceRecordId":"project-turbo-okelly-road-gainesville-ga","name":"Project Turbo (Gainesville Data Center)","operator":"Project Turbo, LLC (developer; end user undisclosed)","city":"Gainesville","county":"Hall","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.2246468,"longitude":-83.783998,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-turbo-okelly-road-gainesville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html","label":"119-acre data center proposed for Hall County","publisher":null,"kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wsbtv.com/news/local/hall-county/plans-12b-data-center-abandoned-hall-county/3T36FITZWRBMXD5USUERFBILRY/","label":"Plans for $1.2B data center abandoned in Hall County","publisher":"WSB-TV","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.mainstreetnews.com/braselton/news/developer-withdraws-plans-for-south-hall-data-center/article_3d5e5338-ef20-44bf-9311-415eac485d39.html","label":"Developer withdraws plans for South Hall data center","publisher":"Mainstreet News","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-project-west-lagrange-troup-ga","sourceRecordId":"project-west-lagrange-troup-ga","name":"Project West (Troup County Data Center Campus)","operator":"Undisclosed data center developer (landowner Joshua Harrelson)","city":"LaGrange","county":"Troup","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.039291,"longitude":-85.0313269,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-west-lagrange-troup-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ajc.com/news/business/massive-97-billion-data-center-proposed-in-troup-county/V7BUTU4FJ5GHRJDIN2XFJ4AWXM/","label":"Massive $9.7 billion data center proposed in Troup County","publisher":"Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/project-west","label":"Project West (Baxtel facility record)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-cloverleaf-pumpkin-technology-campus-harlem-ga","sourceRecordId":"cloverleaf-pumpkin-technology-campus-harlem-ga","name":"Pumpkin Technology Campus","operator":"Cloverleaf Infrastructure (applicant Piedmont DevCo LLC), with Pumpkin Center Properties / the Prather Company","city":"Harlem","county":"Columbia","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.4145834,"longitude":-82.3126237,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-pumpkin-technology-campus-harlem-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://theaugustapress.com/data-center-project-proposed-along-appling-harlem-road/","label":"Data center project proposed along Appling Harlem Road","publisher":"The Augusta Press","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.wrdw.com/2026/02/04/columbia-co-data-centers-get-zoning-approval-face-additional-steps-before-construction/","label":"Columbia Co. data centers get zoning approval, face additional steps before construction","publisher":"WRDW-TV","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://baxtel.com/data-center/cloverleaf-pumpkin-tech-campus","label":"Cloverleaf: Pumpkin Tech Campus Data Center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-qts-atlanta-1-atlanta-metro-dc1-ga","sourceRecordId":"qts-atlanta-1-atlanta-metro-dc1-ga","name":"QTS Atlanta 1 (Atlanta-Metro DC1)","operator":"QTS Data Centers","city":"Atlanta","county":"Fulton","address":"1033 Jefferson Street Northwest","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7776897,"longitude":-84.4211544,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-atlanta-1-atlanta-metro-dc1-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/atlanta/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.openstreetmap.org/way/269847438","label":"OpenStreetMap way/269847438","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-qts-blue-hole-blakely-ga","sourceRecordId":"qts-blue-hole-blakely-ga","name":"QTS Project Blue Hole","operator":"QTS Data Centers","city":"Blakely","county":"Early","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":31.3763,"longitude":-84.9346,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-blue-hole-blakely-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/qts-targets-two-data-center-campuses-in-georgia/","label":"QTS targets two data center campuses in Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://riverdalestandard.com/early-county-georgia-data-center-ordinance-vote/","label":"Riverdale Standard — Early County Georgia Data Center Ordinance Vote","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.wtvy.com/2026/07/14/early-county-approves-new-data-center-ordinance-amid-concerns/","label":"Early County approves new data center ordinance amid concerns","publisher":"WTVY-TV","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/","label":"Blakely approves agreement with QTS Data Centers related to proposed facility","publisher":"WTVY-TV","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-qts-eisenhower-augusta-ga","sourceRecordId":"qts-eisenhower-augusta-ga","name":"QTS Project Eisenhower","operator":"QTS Data Centers","city":"Augusta","county":"Richmond","address":"Gordon Highway","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.4735,"longitude":-82.0105,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-eisenhower-augusta-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wrdw.com/2025/12/26/flying-under-radar-new-data-center-will-twice-big-augusta-mall/","label":"New data center will be twice as big as Augusta Mall","publisher":"WRDW","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.wrdw.com/2026/05/11/qts-data-center-project-raises-questions-about-savannah-river-water-use/","label":"QTS data center project raises questions about Savannah River water use","publisher":"WRDW","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/","label":"Augustans urge city leaders to put data centers on hold","publisher":"WRDW","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.wrdw.com/2026/05/28/luncheon-provides-information-qts-data-center-project-augusta/","label":"Luncheon provides information on QTS data center project in Augusta","publisher":"WRDW","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.yahoo.com/news/articles/2-billion-augusta-data-center-100556100.html","label":"Yahoo News — \"$2 billion Augusta data center project could come online in mid-2026\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-sailfish-investors-social-circle-parkway-walton-ga","sourceRecordId":"sailfish-investors-social-circle-parkway-walton-ga","name":"Sailfish Investors Social Circle Parkway Data Center","operator":"Sailfish Investors","city":"Social Circle","county":"Walton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6562,"longitude":-83.7182,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sailfish-investors-social-circle-parkway-walton-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/sailfish-investors-social-circle-ga","label":"Sailfish Investors: Social Circle, GA (Baxtel)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/georgia-data-centers/","label":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-serverfarm-covington-hazelbrand-ga","sourceRecordId":"serverfarm-covington-hazelbrand-ga","name":"Serverfarm Covington Data Center (Hazelbrand Road)","operator":"Serverfarm","city":"Covington","county":"Newton","address":"Hazelbrand Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.5968,"longitude":-83.8602,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/serverfarm-covington-hazelbrand-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ajc.com/business/2026/07/georgia-agency-orders-data-centers-pop-up-power-plant-to-halt-construction/","label":"Officials order Georgia data center's 'pop-up' power plant to halt construction","publisher":"The Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-07-28"},{"url":"https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law","label":"Data center power plant company from Texas gets warned it may be violating Georgia law","publisher":"Georgia Public Broadcasting","kind":"press","retrievedAt":"2026-07-28"},{"url":"https://www.selc.org/press-release/groups-alert-georgia-regulators-to-unpermitted-construction-of-pop-up-power-plant-data-center/","label":"Groups alert Georgia regulators to unpermitted construction of pop-up power plant, data center","publisher":"Southern Environmental Law Center","kind":"press","retrievedAt":"2026-07-28"},{"url":"https://www.selc.org/wp-content/uploads/2026/06/VoltaGrid-and-Serverfarm-Enforcement-Request.pdf","label":"VoltaGrid and Serverfarm Enforcement Request","publisher":"Southern Environmental Law Center","kind":"filing","retrievedAt":"2026-07-28"},{"url":"https://www.covnews.com/news/cities/georgia-regulators-alerted-to-unpermitted-construction-of-pop-up-power-plant/","label":"Georgia regulators alerted to unpermitted construction of pop-up power plant","publisher":"The Covington News","kind":"press","retrievedAt":"2026-07-28"},{"url":"https://www.wabe.org/data-center-power-plant-accused-of-building-generators-without-permit/","label":"Atlanta-area data center, power plant accused of building generators without permit","publisher":"WABE","kind":"press","retrievedAt":"2026-07-28"}]},{"id":"compute-tpa-social-circle-technology-park-ga","sourceRecordId":"tpa-social-circle-technology-park-ga","name":"Social Circle Technology Park","operator":"TPA Group (developer; end tenant undisclosed)","city":"Social Circle","county":"Newton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6562,"longitude":-83.7182,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tpa-social-circle-technology-park-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605","label":"TPA Group Plans Massive Newton County Data Center Complex","publisher":"Bisnow","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/another-25-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/","label":"Another 2.5 million sq ft data center campus proposed outside Atlanta, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://news.monroelocal.org/social-circle-officials-clear-way-for-second-data-center/","label":"Social Circle officials clear way for second data center","publisher":"Monroe Local News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.covnews.com/news/county/newton-county-enacts-moratoriums-data-centers-convenience-stores/","label":"Newton County enacts moratoriums on data centers","publisher":"The Covington News","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-spalding-investments-high-falls-road-campus-ga","sourceRecordId":"spalding-investments-high-falls-road-campus-ga","name":"Spalding Investments Data Center Campus (High Falls Road)","operator":"Spalding Investments, LLC (developer; end user undisclosed)","city":"Griffin","county":"Spalding","address":"High Falls Road at South McDonough Road (south side)","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.2468,"longitude":-84.2641,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/spalding-investments-high-falls-road-campus-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","label":"Data centers could bring high tax revenue to Spalding County","publisher":"Griffin Daily News","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-t5-atlanta-i-ga","sourceRecordId":"t5-atlanta-i-ga","name":"STACK ATL01 (formerly T5@Atlanta)","operator":"STACK Infrastructure","city":"Alpharetta","county":"Fulton","address":"3200 Webb Bridge Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.0757915,"longitude":-84.264267,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-atlanta-i-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/t5-atlanta-i","label":"Baxtel facility profile — T5@Atlanta I","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/891031651","label":"OpenStreetMap way/891031651","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.stackinfra.com/locations/americas/atlanta/atl01/","label":"STACK Infrastructure ATL01 — 2 buildings, 20MW of critical capacity","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.datacenterknowledge.com/colocation/ipi-combines-infomart-some-t5-assets-to-form-new-data-center-provider","label":"IPI combines Infomart and some T5 assets to form STACK Infrastructure (“Atlanta, Chicago, and Dallas are T5”)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-stack-atl02-lithia-springs-ga","sourceRecordId":"stack-atl02-lithia-springs-ga","name":"STACK ATL02 (Lithia Springs Campus)","operator":"STACK Infrastructure","city":"Lithia Springs","county":"Douglas","address":"808 Factory Shoals Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.76347,"longitude":-84.60241,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-atl02-lithia-springs-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bisnow.com/news/national/data-center/stack-infrastructure-planning-new-data-center-campus-near-atlanta-121126","label":"Stack Infrastructure Planning $380M Data Center Campus Near Atlanta","publisher":"Bisnow","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/campus/stack-lithia-springs-atl02-campus","label":"STACK: Lithia Springs ATL02 Campus (Baxtel)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/georgia-data-centers/","label":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-atlanta-the-keep-ga","sourceRecordId":"switch-atlanta-the-keep-ga","name":"Switch Atlanta: The KEEP","operator":"Switch","city":"Lithia Springs","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7550251,"longitude":-84.5872685,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-atlanta-the-keep-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/georgia/atlanta/switch-the-keep-campus/","label":"Switch facility directory","publisher":"Switch","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/975064004","label":"OpenStreetMap way/975064004","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/sustainable-data-center-designs/","label":"Switch sustainable data center design page (Nevada-specific renewable claim, no GA project named)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.canarymedia.com/articles/data-centers/georgia-power-byo-clean-energy","label":"Canary Media: Georgia Power will now let data centers bring their own clean energy (general utility program context, not Switch-specific)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-keep-2-atlanta-north-cartersville-ga","sourceRecordId":"switch-keep-2-atlanta-north-cartersville-ga","name":"Switch KEEP 2.0 Atlanta North Campus","operator":"Switch","city":"Cartersville","county":"Bartow","address":"South of Old Alabama Road at Bates Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":34.1149,"longitude":-84.7938,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/switch-keep-2-atlanta-north-cartersville-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061","label":"Development of Regional Impact #4061, Switch KEEP 2.0 Atlanta North Campus — initial form (location, owner, size, schedule)","publisher":"Georgia Department of Community Affairs","kind":"filing","retrievedAt":"2026-09-30"},{"url":"https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4061","label":"Development of Regional Impact #4061, Switch KEEP 2.0 Atlanta North Campus — additional information (value, water, sewer)","publisher":"Georgia Department of Community Affairs","kind":"filing","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/700m-plus-tech-center-proposed-in-cartersville/article_702bf210-750c-54f8-92b8-babc04811dca.html","label":"$700M-plus tech center proposed in Cartersville","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/cartersville-approves-rezoning-for-switch-to-build-data-center-campus/article_f8ff705d-9ac7-5180-b4fb-e1daeffcfba9.html","label":"Cartersville approves rezoning for Switch to build data center campus","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/cartersville-approves-rezoning-annexation-for-switch/article_72265042-836b-5bb4-9fef-54039b416a08.html","label":"Cartersville approves rezoning, annexation for Switch","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.daily-tribune.com/news/gtc-conducts-open-house-for-new-transmission-line/article_1b826548-e2ea-57c0-af37-1536dbf15d7b.html","label":"GTC conducts open house for new transmission line (Brandon Farm–Pittman Lake 230 kV)","publisher":"Daily Tribune News","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://www.gpb.org/news/2025/10/22/wave-of-data-center-ordinances-sweep-through-ga-counties-how-strict-are-they","label":"A 'wave' of data center ordinances sweep through GA counties","publisher":"Georgia Public Broadcasting","kind":"press","retrievedAt":"2026-09-30"},{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/PUBLIC%20RELATIONS_DATA%20CENTERS_BARTOW%20COUNTY%20POLICY%20STATEMENT_8-2026.pdf","label":"Data Centers — Bartow County Policy Statement (August 2026)","publisher":"Bartow County Commissioner's Office","kind":"other","retrievedAt":"2026-09-30"},{"url":"https://baxtel.com/data-center/switch-keep-2-0-atlanta-north","label":"Switch: KEEP 2.0 Atlanta North (Baxtel)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-t5-atlanta-iv-palmetto-ga","sourceRecordId":"t5-atlanta-iv-palmetto-ga","name":"T5 @ Atlanta IV","operator":"T5 Data Centers","city":"Palmetto","county":"Fulton","address":"Weldon Road at Palmetto-Tyrone Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.548,"longitude":-84.724,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-atlanta-iv-palmetto-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/t5-files-to-develop-data-center-campus-outside-atlanta-georgia/","label":"T5 files to develop data center campus outside Atlanta, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://t5datacenters.com/locations/t5-atlanta-iv/","label":"T5 @ Atlanta IV - Official Operator Location Page","publisher":"T5 Data Centers","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.prnewswire.com/news-releases/t5-finalizes-land-acquisition-in-atlanta-to-support-a-300-mw-data-center-campus-302232913.html","label":"T5 Finalizes Land Acquisition in Atlanta to Support a 300 MW Data Center Campus","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663","label":"T5 Plotting Data Center Campus In Fairburn","publisher":"Bisnow","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.ajc.com/news/business/t5-data-centers-pursues-495k-square-foot-campus-in-fairburn/UVYQWF3CD5F2NM7JTKVPDX7E3E/","label":"T5 Data Centers pursues 495K square foot campus in Fairburn","publisher":"Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://web.archive.org/web/20260714154314/https://t5datacenters.com/locations/t5-atlanta-iv/","label":"T5 @ Atlanta IV — operator location page (archived 2026-07-14)","publisher":"T5 Data Centers, via Internet Archive Wayback Machine","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","label":"Where Coweta's five proposed data centers stand (Project Pegasus / T5@Atlanta IV, LP)","publisher":"The Newnan Times-Herald","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.intelligentcio.com/north-america/2024/08/30/t5-finalises-land-acquisition-in-atlanta-to-support-300mw-data-centre-campus/","label":"T5 finalises land acquisition in Atlanta to support 300MW data centre campus","publisher":"Intelligent CIO","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-ta-realty-east-tanners-church-ellenwood-ga","sourceRecordId":"ta-realty-east-tanners-church-ellenwood-ga","name":"TA Realty East Tanners Church Road Data Center","operator":"TA Realty","city":"Ellenwood","county":"Clayton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6101096,"longitude":-84.287978,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ta-realty-east-tanners-church-ellenwood-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/policy/clayton-county-ga-agency-approves-tax-break-for-data-center","label":"Clayton County, Ga., Agency Approves Tax Break for Data Center","publisher":"Government Technology (via Atlanta Journal-Constitution)","kind":"subsidy","retrievedAt":"2026-09-10"}]},{"id":"compute-edgeconnex-union-city-campus-fulton-ga","sourceRecordId":"edgeconnex-union-city-campus-fulton-ga","name":"Union City Data Center Campus (EdgeConneX / TA Realty)","operator":"EdgeConneX (campus investment and operations with TA Realty; land owned by Microsoft, site development by Burr Computer Environments)","city":"Union City","county":"Fulton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.5870558,"longitude":-84.5424299,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-union-city-campus-fulton-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/microsoft-union-city-campus","label":"Microsoft: Union City Campus Data Center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles","label":"Details Emerge On Microsoft's $1.8 Billion Investment In Atlanta Data Centers Amid Tax, Development Wrangles","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-23"}]},{"id":"compute-vantage-douglasville-campus-ga","sourceRecordId":"vantage-douglasville-campus-ga","name":"Vantage Data Centers Douglasville Campus","operator":"Vantage Data Centers","city":"Douglasville","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.7515,"longitude":-84.7477,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-douglasville-campus-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bisnow.com/atlanta/news/data-center/two-more-players-planning-major-data-center-campuses-in-metro-atlanta-121440","label":"2 Huge New Data Center Campuses Planned In Metro Atlanta (Vantage filed for a three-building Douglas County campus)","publisher":"Bisnow","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","label":"Vantage Data Centers Plans Two New Sites in Georgia","publisher":"Inside Towers","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-vantage-westlake-south-fulton-ga","sourceRecordId":"vantage-westlake-south-fulton-ga","name":"Vantage Data Centers Westlake","operator":"Vantage Data Centers","city":"South Fulton","county":"Fulton","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6273,"longitude":-84.5646,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-westlake-south-fulton-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","label":"Vantage Data Centers Plans Two New Sites in Georgia (Westlake and Stacks Road, Fulton County)","publisher":"Inside Towers","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-wallace-jackson-data-center-campus-spalding-ga","sourceRecordId":"wallace-jackson-data-center-campus-spalding-ga","name":"Wallace Jackson Data Center Campus","operator":"Wallace Jackson, LLC (developer; end user undisclosed)","city":"Griffin","county":"Spalding","address":"Jackson Road at Wallace Road","state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.2468,"longitude":-84.2641,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wallace-jackson-data-center-campus-spalding-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ajc.com/business/2026/01/whats-37b-and-larger-than-3-malls-georgias-next-potential-data-center/","label":"What's $3.7B and larger than 3 malls? Georgia's next potential data center.","publisher":"The Atlanta Journal-Constitution","kind":"press","retrievedAt":"2026-08-28"},{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","label":"Data centers could bring high tax revenue to Spalding County","publisher":"Griffin Daily News","kind":"press","retrievedAt":"2026-08-28"}]},{"id":"compute-white-oak-technology-park-columbia-county-ga","sourceRecordId":"white-oak-technology-park-columbia-county-ga","name":"White Oak Technology Park","operator":"Trammell Crow Company (CBRE subsidiary)","city":"Appling","county":"Columbia","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.6,"longitude":-82.28,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/white-oak-technology-park-columbia-county-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-8-million-sq-ft-data-center-and-technology-park-outside-augusta-georgia/","label":"Plans filed for 8 million sq ft data center and technology park outside Augusta, Georgia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/","label":"WRDW — Citizen files lawsuits over Columbia County data centers","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-tc-atlanta-development-winston-douglas-ga","sourceRecordId":"tc-atlanta-development-winston-douglas-ga","name":"Winston Data Center (Waldrop Farms)","operator":"TC Atlanta Development","city":"Winston","county":"Douglas","address":null,"state":"GA","stateName":"Georgia","jurisdictionType":"state","latitude":33.725108,"longitude":-84.8249382,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tc-atlanta-development-winston-douglas-ga","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/douglas-county-commissioners-approve-data-210537294.html","label":"Douglas County commissioners approve data center plans with extra conditions","publisher":"WSB-TV (via Yahoo News)","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/county-approves-data-center-against-planner-s-recommendation/article_7e94e50c-504b-52da-9f3f-1e624fd51801.html","label":"County approves data center against planner’s recommendation","publisher":"Douglasville Sentinel","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-docomo-guam-harmon-gu","sourceRecordId":"docomo-guam-harmon-gu","name":"DoCoMo Guam Data Center","operator":"DOCOMO PACIFIC","city":"Dededo","county":null,"address":"467 Harmon Loop Road","state":"GU","stateName":"Guam","jurisdictionType":"territory","latitude":13.5120114,"longitude":144.827566,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/docomo-guam-harmon-gu","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/docomo-guam","label":"DoCoMo Guam Data Center","publisher":null,"kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-gta-gu3-alupang-tamuning-gu","sourceRecordId":"gta-gu3-alupang-tamuning-gu","name":"GTA Alupang Data Center (GU3)","operator":"GTA (Teleguam Holdings LLC)","city":"Tamuning","county":null,"address":"Alupang","state":"GU","stateName":"Guam","jurisdictionType":"territory","latitude":13.4961094,"longitude":144.7745311,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/gta-gu3-alupang-tamuning-gu","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://news.gta.net/218940-gta-breaks-ground-on-alupang-data-center/","label":"GTA Breaks Ground on Alupang Data Center","publisher":"GTA (Teleguam Holdings LLC)","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://news.gta.net/269859-gta-brings-guam-to-batic-2026-advancing-global-connectivity/","label":"GTA Brings Guam to BATIC 2026, Advancing Global Connectivity","publisher":"GTA (Teleguam Holdings LLC)","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-gta-gu1-gu2-piti-gu","sourceRecordId":"gta-gu1-gu2-piti-gu","name":"GTA Guam Data Center (GU1/GU2)","operator":"GTA (Teleguam Holdings LLC)","city":"Piti","county":null,"address":"320 Marine Corps Dr","state":"GU","stateName":"Guam","jurisdictionType":"territory","latitude":13.4672901,"longitude":144.6991934,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/gta-gu1-gu2-piti-gu","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/gta-guam-gu1-gu2","label":"GTA: Guam (GU1 & GU2) Data Center","publisher":null,"kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.gta.net/data-center","label":"Data Center | Colocation Solutions | GTA","publisher":"GTA (Teleguam Holdings LLC)","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.gta.net/cable-landing-station","label":"Cable Landing Station on Guam | GTA","publisher":"GTA (Teleguam Holdings LLC)","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-ite-guam-harmon-gu","sourceRecordId":"ite-guam-harmon-gu","name":"IT&E Guam Data Center","operator":"IT&E","city":"Tamuning","county":null,"address":"122 Harmon Industrial Park Rd","state":"GU","stateName":"Guam","jurisdictionType":"territory","latitude":13.5030828,"longitude":144.8117863,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ite-guam-harmon-gu","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/it-e-guam","label":"IT&E Guam Data Center","publisher":null,"kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-1547-alohanap-kapolei-hi","sourceRecordId":"1547-alohanap-kapolei-hi","name":"AlohaNAP (1547 HAII1)","operator":"fifteenfortyseven Critical Systems Realty (1547)","city":"Kapolei","county":"Honolulu","address":"91-340 Farrington Hwy","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.335728,"longitude":-158.086738,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/1547-alohanap-kapolei-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.1547realty.com/data-center/kapolei-hi-haii1/","label":"Kapolei HI | HAII1 | 1547 Critical Systems Realty","publisher":"fifteenfortyseven Critical Systems Realty (1547)","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/3149","label":"PeeringDB facility 3149: AlohaNAP","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.datacenterknowledge.com/business/hawaii-data-center-alohanap-now-fully-operational","label":"Hawaii Data Center AlohaNAP Now Fully Operational","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://dcnnmagazine.com/uncategorised/acquisition-and-expansion-of-hawaiian-data-centre-announced/","label":"Acquisition and expansion of Hawaiian data centre announced","publisher":"Data Centre & Network News","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://files.hawaii.gov/dbedt/erp/Doc_Library/2025-07-08-OA-FEA-Hawaiki-Submarine-Cable-Landing-Expansion-Project.pdf","label":"Final Environmental Assessment: Hawaiki Cable Landing Expansion Project","publisher":"Hawaiki Submarine Cable USA LLC / State of Hawaii OPSD Environmental Review Program","kind":"filing","retrievedAt":"2026-10-02"}]},{"id":"compute-cogent-pearl-city-waihona-hi","sourceRecordId":"cogent-pearl-city-waihona-hi","name":"Cogent Data Center – Hawaii (96-1402 Waihona Place)","operator":"Cogent Communications","city":"Pearl City","county":"Honolulu","address":"96-1402 Waihona Pl","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.41146,"longitude":-157.97475,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-pearl-city-waihona-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sdxcentral.com/news/cogent-data-center-up-for-sale-in-hawaii/","label":"Cogent data center up for sale in Hawaii","publisher":"SDxCentral","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://nominatim.openstreetmap.org/search?q=96-1402%20Waihona%20Place%2C%20Pearl%20City&format=json&limit=2","label":"OSM Nominatim: 96-1402 Waihona Place, Pearl City (office=telecommunication)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-02"}]},{"id":"compute-drfortress-koapaka-honolulu-hi","sourceRecordId":"drfortress-koapaka-honolulu-hi","name":"DRFortress Data Center","operator":"DRFortress","city":"Honolulu","county":null,"address":"3375 Koapaka Street","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.3344171,"longitude":-157.9171752,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/drfortress-koapaka-honolulu-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.drfortress.com/in-the-news/","label":"In The News - Data Center Colocation & Digital Hub","publisher":"DRFortress","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.drfortress.com/","label":"DRFortress — Data Center Colocation & Digital Hub","publisher":"DRFortress","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.1547realty.com/data-center/honolulu-hi-drfortress/","label":"Honolulu HI | DRFortress","publisher":"fifteenfortyseven Critical Systems Realty (1547)","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/2526","label":"PeeringDB facility 2526: DRFortress HNL","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.drfortress.com/services/colocation/data-center-specifications/","label":"DRFortress Data Center Specifications","publisher":"DRFortress","kind":"other","retrievedAt":"2026-10-21"}]},{"id":"compute-hawaiiantel-endeavor-honolulu-hi","sourceRecordId":"hawaiiantel-endeavor-honolulu-hi","name":"Endeavor Data Center","operator":"Hawaiian Telcom","city":"Honolulu","county":null,"address":"2339 Kamehameha Hwy","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.304547,"longitude":-157.855676,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hawaiiantel-endeavor-honolulu-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hawaiiantel.com/business/Business/Products-Services/Network-Security/Data-Center-Colocation-Services","label":"Data Center Colocation Services | Hawaiian Telcom Business","publisher":"Hawaiian Telcom","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/api/fac/6505","label":"PeeringDB facility 6505: Endeavor Data Center","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.sec.gov/Archives/edgar/data/0001487986/000110465913068218/a13-20242_1ex99d1.htm","label":"Hawaiian Telcom to Acquire SystemMetrics Corporation (Form 8-K Exhibit 99.1)","publisher":"Hawaiian Telcom Holdco, Inc. via SEC EDGAR","kind":"filing","retrievedAt":"2026-10-02"}]},{"id":"compute-google-uh-west-oahu-cable-landing-station-kapolei-hi","sourceRecordId":"google-uh-west-oahu-cable-landing-station-kapolei-hi","name":"Google Cable Landing Station at UH West Oʻahu","operator":"Google","city":"Kapolei","county":"Honolulu","address":null,"state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.35761,"longitude":-158.05734,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-uh-west-oahu-cable-landing-station-kapolei-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hawaii.edu/news/2025/07/09/uh-west-oahu-google-global-fiber-system/","label":"UH West Oʻahu campus proposed gateway for Google's $1B global fiber system","publisher":"University of Hawaiʻi News","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://hnldoc.ehawaii.gov/hnldoc/document-download?id=28669","label":"Committee Report 212(26), Resolution 26-165: SMA Major Permit for the Oʻahu Subsea Cable Telecommunications Project","publisher":"Honolulu City Council, Committee on Zoning & Planning","kind":"permit","retrievedAt":"2026-10-02"},{"url":"https://dlnr.hawaii.gov/wp-content/uploads/2026/04/D-7.pdf","label":"BLNR submittal D-7: Grant of easement to Humuhumu Services, LLC and Starfish Infrastructure, Inc. for submarine communication cables off Kapolei","publisher":"State of Hawaii Department of Land and Natural Resources","kind":"permit","retrievedAt":"2026-10-02"},{"url":"https://nominatim.openstreetmap.org/search?q=University%20of%20Hawaii%20West%20Oahu&format=json&limit=2","label":"OSM Nominatim: University of Hawaii-West Oahu","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-02"}]},{"id":"compute-hawaii-ets-kalanimoku-state-data-center-honolulu-hi","sourceRecordId":"hawaii-ets-kalanimoku-state-data-center-honolulu-hi","name":"Hawaii State Data Center (Kalanimōkū Building)","operator":"State of Hawaii Office of Enterprise Technology Services","city":"Honolulu","county":"Honolulu County","address":"1151 Punchbowl Street","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.3056252,"longitude":-157.8555881,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hawaii-ets-kalanimoku-state-data-center-honolulu-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.civilbeat.org/2023/06/hawaiis-critical-data-is-at-risk-from-flooding-so-why-wait-to-move-it","label":"Hawaii's Critical Data Is At Risk From Flooding. So Why Wait To Move It?","publisher":"Honolulu Civil Beat","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://data.capitol.hawaii.gov/sessions/session2024/Bills/SB284_SD1_.HTM","label":"SB284 SD1 (2024): relocation of the state data center from the Kalanimoku building","publisher":"Hawaii State Legislature","kind":"filing","retrievedAt":"2026-10-21"},{"url":"https://nominatim.openstreetmap.org/search?q=Kalanimoku+Building+Honolulu&format=json","label":"OpenStreetMap: Kalanimoku Building, 1151 Punchbowl Street (way 134104678)","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-10-21"}]},{"id":"compute-southern-cross-kahe-point-cable-landing-station-hi","sourceRecordId":"southern-cross-kahe-point-cable-landing-station-hi","name":"Kahe Point Cable Landing Station (Southern Cross)","operator":"Pacific Carriage Limited (Southern Cross Cable Network)","city":null,"county":"Honolulu County","address":null,"state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.353099,"longitude":-158.13051,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/southern-cross-kahe-point-cable-landing-station-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.submarinenetworks.com/en/stations/north-america/usa-hawaii/kahe-point","label":"Kahe Point Cable Landing Station","publisher":"Submarine Networks","kind":"other","retrievedAt":"2026-10-21"},{"url":"https://www.southerncrosscables.com/access-points/kahe-point","label":"Southern Cross access point: Kahe Point (KAH)","publisher":"Southern Cross Cable Network","kind":"other","retrievedAt":"2026-10-21"}]},{"id":"compute-hawaiki-cable-kapolei-hi","sourceRecordId":"hawaiki-cable-kapolei-hi","name":"Kapolei Cable Landing Station","operator":"Hawaiki Submarine Cable USA LLC (BW Digital)","city":"Kapolei","county":null,"address":"92-384 Farrington Highway","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.349388772017,"longitude":-158.128697947756,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hawaiki-cable-kapolei-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.submarinenetworks.com/en/stations/north-america/usa-hawaii/kapolei","label":"Kapolei Cable Landing Station - Submarine Networks","publisher":null,"kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.1547realty.com/data-center/kapolei-hi-haii1/","label":"Kapolei HI | HAII1 | 1547 Critical Systems Realty","publisher":"1547 Critical Systems Realty","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.bowersandkubota.com/projects/hawaiki-submarine-cable-landing-station","label":"Hawaiki Submarine Cable Landing Station","publisher":"Bowers + Kubota","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://files.hawaii.gov/dbedt/erp/Doc_Library/2025-07-08-OA-FEA-Hawaiki-Submarine-Cable-Landing-Expansion-Project.pdf","label":"Final Environmental Assessment: Hawaiki Cable Landing Expansion Project","publisher":"Hawaiki Submarine Cable USA LLC / State of Hawaii Office of Planning and Sustainable Development (Environmental Review Program)","kind":"filing","retrievedAt":"2026-10-02"}]},{"id":"compute-hawaiiantel-kawaihae-hi","sourceRecordId":"hawaiiantel-kawaihae-hi","name":"Kawaihae Data Center","operator":"Hawaiian Telcom","city":"Kawaihae","county":"Hawaii","address":null,"state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":20.0397244,"longitude":-155.829133,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hawaiiantel-kawaihae-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hawaiiantel.com/business/Business/Products-Services/Network-Security/Data-Center-Colocation-Services","label":"Data Center Colocation Services | Hawaiian Telcom Business","publisher":"Hawaiian Telcom","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-att-keawaula-cable-landing-station-waianae-hi","sourceRecordId":"att-keawaula-cable-landing-station-waianae-hi","name":"Keawaula Cable Landing Station","operator":"AT&T","city":"Waianae","county":"Honolulu County","address":null,"state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.54907,"longitude":-158.238082,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/att-keawaula-cable-landing-station-waianae-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.submarinenetworks.com/en/stations/north-america/usa-hawaii/keawaula","label":"Keawaula Cable Landing Station","publisher":"Submarine Networks","kind":"other","retrievedAt":"2026-10-21"}]},{"id":"compute-lumen-honolulu-paiea-hi","sourceRecordId":"lumen-honolulu-paiea-hi","name":"Lumen Honolulu (550 Paiea Street)","operator":"Lumen Technologies","city":"Honolulu","county":"Honolulu","address":"550 Paiea St","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.33556,"longitude":-157.91629,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-honolulu-paiea-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://assets.lumen.com/is/content/Lumen/colocation-overview-data-sheet?Creativeid=1251e94a-b729-42ac-877d-abf98cc7cef5","label":"Lumen Data Center Overview (colocation data sheet)","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://cloudandcolocation.com/datacenters/tw-telecom-hawaii-data-center/","label":"tw telecom – Hawaii Data Center","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-uh-mhpcc-kihei-hi","sourceRecordId":"uh-mhpcc-kihei-hi","name":"Maui High Performance Computing Center","operator":"University of Hawaiʻi (for Air Force Research Laboratory)","city":"Kihei","county":null,"address":"550 Lipoa Pkwy","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":20.74929227073,"longitude":-156.439610266824,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/uh-mhpcc-kihei-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://afresearchlab.com/news/afrls-maui-site-lowers-barriers-to-high-performance-computing/","label":"AFRL's Maui site lowers barriers to high performance computing","publisher":"Air Force Research Laboratory","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://manoa.hawaii.edu/news/article.php?aId=1522","label":"System: Maui High Performance Computing Center donates supercomputer to UH Hilo","publisher":"University of Hawaii News","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://mauinow.com/2026/01/22/11-9m-dow-air-force-contract-awarded-to-uh-to-support-the-maui-high-performance-computing-center/","label":"$11.9M DOW Air Force contract awarded to UH to support the Maui High Performance Computing Center","publisher":"Maui Now","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.sandia.gov/cs-conferences/?p=829","label":"Speaker bio listing Maui High Performance Computing Center address","publisher":"Sandia National Laboratories","kind":"other","retrievedAt":"2026-10-21"}]},{"id":"compute-servpac-mtp2-mililani-hi","sourceRecordId":"servpac-mtp2-mililani-hi","name":"Servpac MTP Building 2","operator":"Servpac","city":"Mililani","county":"Honolulu","address":null,"state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.448,"longitude":-158.017,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/servpac-mtp2-mililani-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/hawaii-based-cloud-provider-servpac-expands-data-center/","label":"Hawaii-Based Cloud Provider Servpac Expands Data Center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.prnewswire.com/news-releases/servpacs-mtp-data-center-celebrates-groundbreaking-for-building-2-302694909.html","label":"Servpac's MTP Data Center Celebrates Groundbreaking for Building 2","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://servpac.com/mtp-groundbreaking/","label":"Hawaii Tier IV Data Center: MTP Building 2 Groundbreaking","publisher":"Servpac","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://buildingindustryhawaii.com/2026/03/servpac-inc-breaks-ground-on-mtp-data-centers-building-2/","label":"Servpac Inc. breaks ground on MTP Data Center's Building 2","publisher":"Building Industry Hawaii","kind":"press","retrievedAt":"2026-10-02"}]},{"id":"compute-servpac-mtp-building-1-mililani-hi","sourceRecordId":"servpac-mtp-building-1-mililani-hi","name":"Servpac MTP Data Center (Building 1)","operator":"Servpac","city":"Mililani","county":"Honolulu","address":"200 Kahelu Ave","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.47999,"longitude":-158.0202,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/servpac-mtp-building-1-mililani-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://servpac.com/tier_certification/","label":"SERVPAC Cloud Data Center Hawaii's First to Receive Highest Level of Industry Certification, Awarded Uptime Institute Tier IV Certification","publisher":"Servpac","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://servpac.com/mtp-groundbreaking/","label":"Hawaii Tier IV Data Center: MTP Building 2 Groundbreaking","publisher":"Servpac","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.peeringdb.com/api/fac/17093","label":"PeeringDB facility 17093: Servpac MTP DC","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://baxtel.com/data-center/servpac-mtp-mililani-tech-park","label":"Servpac MTP Mililani Tech Park Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.insynergyeng.com/blog/2025/3/10/servpac-mililani-tech-park-data-center","label":"Servpac Mililani Tech Park Data Center","publisher":"InSynergy Engineering, Inc.","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://servpac.com/data-center-colocation/","label":"MTP Data Center | Data Center Colocation","publisher":"Servpac","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-servpac-puahale-honolulu-hi","sourceRecordId":"servpac-puahale-honolulu-hi","name":"Servpac Puahale Data Center","operator":"Servpac","city":"Honolulu","county":"Honolulu","address":"1931 N King St","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.33204,"longitude":-157.87777,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/servpac-puahale-honolulu-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/17094","label":"PeeringDB facility 17094: Servpac Puahale DC","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://baxtel.com/data-center/servpac-puahale","label":"Servpac Puahale Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://servpac.com/data-center-press-release/","label":"Servpac Announces New Data Center and Disaster Recovery Office in Hawaii","publisher":"Servpac","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://servpac.com/data-center-colocation/","label":"MTP Data Center | Data Center Colocation","publisher":"Servpac","kind":"other","retrievedAt":"2026-10-02"}]},{"id":"compute-uh-cancer-center-medai-core-honolulu-hi","sourceRecordId":"uh-cancer-center-medai-core-honolulu-hi","name":"UH Cancer Center Data Center – Medical AI Core (PAC-AID)","operator":"University of Hawaiʻi Cancer Center","city":"Honolulu","county":"Honolulu","address":"701 Ilalo St","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.29525,"longitude":-157.86368,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/uh-cancer-center-medai-core-honolulu-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hawaii.edu/news/article.php?aId=14654","label":"University of Hawaiʻi researchers awarded $12M grant to advance AI, data science in medicine","publisher":"University of Hawaiʻi News","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.govtech.com/education/higher-ed/university-of-hawaii-to-build-data-center-for-healthcare","label":"University of Hawaii to Build Data Center for Healthcare","publisher":"Government Technology (via Honolulu Star-Advertiser)","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.hawaiinewsnow.com/2026/06/22/uh-receives-12-million-grant-new-ai-medical-research-center/","label":"UH receives $12 million grant for new AI medical research center","publisher":"Hawaii News Now","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://www.uhcancercenter.org/about-us","label":"About the University of Hawaii Cancer Center","publisher":"University of Hawaiʻi Cancer Center","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.hawaii.edu/news/2026/06/21/12-million-establishes-pac-aid/","label":"$12 million establishes PAC-AID","publisher":"University of Hawaiʻi News","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-uh-information-technology-center-honolulu-hi","sourceRecordId":"uh-information-technology-center-honolulu-hi","name":"University of Hawaiʻi Information Technology Center Data Center","operator":"University of Hawaiʻi (Information Technology Services)","city":"Honolulu","county":"Honolulu","address":"2520 Correa Rd","state":"HI","stateName":"Hawaii","jurisdictionType":"state","latitude":21.29868,"longitude":-157.81681,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/uh-information-technology-center-honolulu-hi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hawaii.edu/its/leed-about-the-building/","label":"About the Building (Information Technology Center)","publisher":"University of Hawaiʻi Information Technology Services","kind":"other","retrievedAt":"2026-10-02"},{"url":"https://www.hawaii.edu/its/servers-data-center-storage-services/colocation/","label":"Colocation (ITC Data Center)","publisher":"University of Hawaiʻi Information Technology Services","kind":"other","retrievedAt":"2026-10-02"},{"url":"http://www.hawaii.edu/news/2016/03/15/uh-information-technology-center-to-house-portion-of-states-it-systems/","label":"UH Information Technology Center to house portion of state's IT systems","publisher":"University of Hawaiʻi News","kind":"press","retrievedAt":"2026-10-02"},{"url":"https://datascience.hawaii.edu/university-of-hawaii-celebrates-supercomputer-milestone/","label":"University of Hawaii celebrates supercomputer milestone","publisher":"Hawaiʻi Data Science Institute","kind":"press","retrievedAt":"2026-10-02"}]},{"id":"compute-imon-713-nebraska-sioux-city-ia","sourceRecordId":"imon-713-nebraska-sioux-city-ia","name":"713 Nebraska Carrier Hotel (FiberComm)","operator":"ImOn Communications (formerly FiberComm)","city":"Sioux City","county":"Woodbury","address":"713 Nebraska St","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.498104,"longitude":-96.403951,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/imon-713-nebraska-sioux-city-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/data/Sioux-City-Iowa-Turns-Vacant-Building-Into-Data-Center.html","label":"Sioux City, Iowa Turns Vacant Building Into Data Center","publisher":"GovTech (Sioux City Journal)","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://inflect.com/building/713-nebraska-street-sioux-city/fibercomm/datacenter/713-nebraska","label":"Inflect: FiberComm 713 Nebraska","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.peeringdb.com/api/fac/11742","label":"PeeringDB facility record 11742: 713 Nebraska (ImOn Communications)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"}]},{"id":"compute-apple-waukee-ia","sourceRecordId":"apple-waukee-ia","name":"Apple Waukee Data Center","operator":"Apple","city":"Waukee","county":"Dallas","address":"2995 W. Hickman Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6193799,"longitude":-93.9258365,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/apple-waukee-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://appleinsider.com/articles/24/10/16/seven-years-on-iowas-apple-data-center-finally-opens","label":"Seven years on, Iowa's Apple data center finally opens — $1.3B, 2,000 acres, first building operational Oct 2024, announced 2017","publisher":"AppleInsider","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.apple.com/newsroom/2025/02/apple-will-spend-more-than-500-billion-usd-in-the-us-over-the-next-four-years/","label":"Apple $500B U.S. investment release — names Iowa among states for continued data-center capacity expansion","publisher":"Apple Newsroom","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/","label":"Apple's next US data center will be built in Iowa (Apple Newsroom)","publisher":"Apple Newsroom","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.datacenterfrontier.com/cloud/article/11427610/apple-files-plans-for-long-delayed-data-center-campus-in-iowa","label":"Apple Files Plans for Long-Delayed Data Center Campus in Iowa (Data Center Frontier)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.constructiondive.com/news/ia-to-give-apple-208m-in-tax-breaks-for-13b-data-center/503631/","label":"IA to give Apple $208M in tax breaks for $1.3B data center","publisher":"Construction Dive","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-applied-digital-adair-ia","sourceRecordId":"applied-digital-adair-ia","name":"Applied Digital Adair County Data Center","operator":"Applied Digital","city":"Adair","county":"Adair","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5005601,"longitude":-94.6434954,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/applied-digital-adair-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://westerniowatoday.com/2024/04/10/adair-county-supervisors-discuss-proposed-data-center-and-set-public-hearing-on-an-ordinance-creating-setbacks/","label":"Adair County Supervisors Discuss Proposed Data Center and Set Public Hearing on an Ordinance Creating Setbacks","publisher":"Western Iowa Today (KSOM/KS 95.7)","kind":"press","retrievedAt":"2026-09-04"},{"url":"https://cleanview.co/data-centers/iowa","label":"Data Centers in Iowa — Project List & Locations (Applied Digital Adair, Adair County, 200 MW, planned)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-04"}]},{"id":"compute-ark-data-centers-marion-ia","sourceRecordId":"ark-data-centers-marion-ia","name":"Ark Data Centers Marion (Cedar Rapids)","operator":"Ark Data Centers (formerly Involta)","city":"Marion","county":"Linn","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.0341,"longitude":-91.5871,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-marion-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkdna.com/data-centers/iowa/","label":"Visit Our Cedar Rapids, Iowa Data Center | ark data centers","publisher":"Ark Data Centers","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-aureon-616-des-moines-ia","sourceRecordId":"aureon-616-des-moines-ia","name":"Aureon 616 Data Center","operator":"Aureon","city":"Des Moines","county":"Polk","address":"616 10th Street","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5880038,"longitude":-93.6310193,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aureon-616-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aureon.com/solutions/data-center-solutions/","label":"Aureon colocation data center solutions — 616 Data Center","publisher":"Aureon","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://southfront.io/pop","label":"South Front Networks Points of Presence — IA-DSM616 (Aureon), 616 10th St, Des Moines IA 50309","publisher":"South Front Networks","kind":"other","retrievedAt":"2026-09-04"}]},{"id":"compute-aurum-elk-data-center-central-city-ia","sourceRecordId":"aurum-elk-data-center-central-city-ia","name":"Aurum Elk Data Center Project (Central City)","operator":"Aurum Capital Ventures","city":"Central City","county":"Linn","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.2039,"longitude":-91.5243,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aurum-elk-data-center-central-city-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kcrg.com/2026/09/17/central-city-council-supports-proposed-data-center/","label":"Central City council supports proposed data center","publisher":"KCRG","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.kcrg.com/2026/10/01/data-center-company-stays-silent-public-meeting/","label":"Data center company stays silent at public meeting","publisher":"KCRG","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-bluebird-quad-cities-bettendorf-ia","sourceRecordId":"bluebird-quad-cities-bettendorf-ia","name":"Bluebird Quad Cities Data Center","operator":"Bluebird Network","city":"Bettendorf","county":"Scott","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5245,"longitude":-90.5157,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bluebird-quad-cities-bettendorf-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://bluebirdfiber.com/quad-cities-data-center/","label":"Quad Cities Data Center — operator facility page (SOC 2 Type II, 3 utility feeds, 3 generators, dual UPS, >60% green energy)","publisher":"Bluebird Network","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.kwqc.com/2026/03/06/more-than-house-less-than-grocery-store-how-much-electricity-qca-data-centers-uses/","label":"More than a house, less than a grocery store: how much electricity QCA data centers use (names the Bluebird Quad Cities Data Center in Bettendorf as an existing facility)","publisher":"KWQC","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.thegazette.com/news/meta-behind-plans-for-latest-iowa-data-center/article_ddf57b2e-9b35-50b7-8af7-1370978063fa.html","label":"Meta behind plans for latest Iowa data center — 'Iowa has at least 26 data centers, including the Blue Bird Quad Cities Data Center in Bettendorf'","publisher":"The Gazette","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-octopus-investments-fort-madison-ia","sourceRecordId":"octopus-investments-fort-madison-ia","name":"Burlington Hill AI Data Center (Fort Madison)","operator":"Octopus Investments, LLC","city":"Fort Madison","county":"Lee","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":40.63,"longitude":-91.31,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/octopus-investments-fort-madison-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.pencitycurrent.com/stories/spillover-crowd-talks-to-panel-on-data-center-project,178367","label":"Spillover crowd talks to panel on data center project","publisher":"Pen City Current","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://morethanjustparks.com/data-center-tracker/burlington-hill-ai-data-center-octopus-investments-ia--a812c871-415b-4413-bdf1-63eda324ae2d","label":"Burlington Hill AI Data Center (Octopus Investments) tracker listing","publisher":"More Than Just Parks","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-cologix-des-moines-ia","sourceRecordId":"cologix-des-moines-ia","name":"Cologix DSM1 (Financial Center)","operator":"Cologix","city":"Des Moines","county":"Polk","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5868,"longitude":-93.625,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/news/cologix-expands-footprint-acquisition-two-data-centers-iowa-including-des-moines-carrier-hotel/","label":"Cologix Expands U.S. Footprint with Acquisition of Two Data Centers in Iowa, Including Des Moines Carrier Hotel","publisher":"Cologix","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-cologix-cedar-falls-ia","sourceRecordId":"cologix-cedar-falls-ia","name":"Cologix DSM2 (Cedar Falls)","operator":"Cologix","city":"Cedar Falls","county":"Black Hawk","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.5347,"longitude":-92.4453,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-cedar-falls-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/des-moines/dsm2/","label":"Colocation in Des Moines: DSM2 Digital Edge Data Center","publisher":"Cologix","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-cologix-dsm3-altoona-ia","sourceRecordId":"cologix-dsm3-altoona-ia","name":"Cologix DSM3 Altoona","operator":"Cologix","city":"Altoona","county":"Polk County","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6633344,"longitude":-93.5030853,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-dsm3-altoona-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-copt-defense-properties-van-meter-ia","sourceRecordId":"copt-defense-properties-van-meter-ia","name":"COPT Defense Van Meter Data Center Shell Site","operator":"COPT Defense Properties","city":"Van Meter","county":"Dallas","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5031,"longitude":-93.9469,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/copt-defense-properties-van-meter-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell","label":"COPT Defense Acquires Land for Data Center Shell Development near Des Moines, IA","publisher":"COPT Defense Properties (investor relations)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://baxtel.com/data-center/copt-des-moines","label":"COPT: Des Moines Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-cyrusone-ocb1-council-bluffs-ia","sourceRecordId":"cyrusone-ocb1-council-bluffs-ia","name":"CyrusOne OCB1 Council Bluffs Data Center","operator":"CyrusOne","city":"Council Bluffs","county":"Pottawattamie","address":"4700 Gifford Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.2121526,"longitude":-95.8779924,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-ocb1-council-bluffs-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/council-bluffs-ia","label":"Council Bluffs, IA: OCB1 — facility specifications","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/cyrusone-council-bluffs","label":"CyrusOne Council Bluffs Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-04"}]},{"id":"compute-dartpoints-north-liberty-ia","sourceRecordId":"dartpoints-north-liberty-ia","name":"DartPoints North Liberty Edge Data Center","operator":"DartPoints","city":"North Liberty","county":"Johnson","address":"980 N Front St","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.756979,"longitude":-91.596653,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-north-liberty-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/10791","label":"PeeringDB facility record: DartPoints North Liberty","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-29"},{"url":"https://dartpoints.com/edge-colocation-data-center-opens-in-north-liberty","label":"Edge colocation data center opens in North Liberty","publisher":"DartPoints","kind":"press","retrievedAt":"2026-10-29"}]},{"id":"compute-edged-energy-ankeny-ia","sourceRecordId":"edged-energy-ankeny-ia","name":"Edged Ankeny (Des Moines) Data Center","operator":"Edged Energy","city":"Ankeny","county":"Polk","address":"2701 SE 90th Street","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.7297,"longitude":-93.6058,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edged-energy-ankeny-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edged.us/news/des-moines-iowa","label":"Edged Breaks Ground on Data Center in Des Moines, Iowa Optimized for Next-Generation AI Training and Inference","publisher":"Edged Energy","kind":"press","retrievedAt":"2026-08-21"},{"url":"https://www.businessrecord.com/ankeny-council-to-consider-data-center-development-agreement/","label":"Ankeny council approves data center development agreement","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://datacenter.news/story/edged-tops-out-ankeny-data-centre-with-waterless-cooling","label":"Edged tops out Ankeny data centre with waterless cooling","publisher":"Data Center News (TechDay)","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-edged-council-bluffs-ia","sourceRecordId":"edged-council-bluffs-ia","name":"Edged Council Bluffs Data Center Campus (Project Lola)","operator":"Edged Energy","city":"Council Bluffs","county":"Pottawattamie","address":"2801 College Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.278141,"longitude":-95.7940246,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edged-council-bluffs-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.3newsnow.com/council-bluffs/council-bluffs-project-lola-data-center-reduced-in-size-still-planned-near-iowa-western","label":"Council Bluffs 'Project Lola' data center reduced in size, still planned near Iowa Western","publisher":"3 News Now (KMTV)","kind":"press","retrievedAt":"2026-09-04"},{"url":"https://baxtel.com/data-center/edged-energy-council-bluffs-campus","label":"Edged Energy: Council Bluffs Campus (Project Lola)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-04"}]},{"id":"compute-enseva-hiawatha-ia","sourceRecordId":"enseva-hiawatha-ia","name":"Enseva Hiawatha Data Center","operator":"Enseva","city":"Hiawatha","county":"Linn County","address":"755 Metzger Drive","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.0562849,"longitude":-91.6795571,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/enseva-hiawatha-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/enseva-hiawatha-data-center/","label":"Enseva - Hiawatha Data Center","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-16"}]},{"id":"compute-fidium-des-moines-ia","sourceRecordId":"fidium-des-moines-ia","name":"Fidium Des Moines Data Center","operator":"Fidium (Consolidated Communications)","city":"Des Moines","county":"Polk","address":"400 Locust Street, Suite 190","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5868299,"longitude":-93.6227589,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fidium-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fidiumbusiness.com/network/data-center-locations/iowa","label":"Iowa Data Center & Colocation Services — Des Moines","publisher":"Fidium Business (Consolidated Communications)","kind":"other","retrievedAt":"2026-09-04"}]},{"id":"compute-global-reach-ames-ia","sourceRecordId":"global-reach-ames-ia","name":"Global Reach Ames Data Center","operator":"Global Reach Internet Productions","city":"Ames","county":"Story County","address":"2321 North Loop Drive","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.0020484,"longitude":-93.6351121,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-reach-ames-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.globalreach.com/contact/locations/headquarters","label":"Global Reach headquarters - Ames, Iowa","publisher":"Global Reach Internet Productions","kind":"other","retrievedAt":"2026-09-16"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-google-cedar-rapids-ia","sourceRecordId":"google-cedar-rapids-ia","name":"Google Cedar Rapids Data Center Campus","operator":"Google","city":"Cedar Rapids","county":"Linn","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.936,"longitude":-91.723,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-cedar-rapids-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-pledges-7bn-to-expand-iowa-data-center-footprint/","label":"Google pledges $7bn to expand Iowa data center footprint","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement","label":"Google Announces Data Center Project at Big Cedar Industrial Center — Alliant Energy","publisher":"Alliant Energy","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://blog.google/feed/new-7-billion-investment-iowa/","label":"Google announces new $7 billion investment in Iowa","publisher":"Google","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thegazette.com/business/google-announces-7b-investment-in-iowa-to-expand-cloud-ai-infrastructure/article_41e8da2d-0034-5691-81a4-83ae2081f1aa.html","label":"Google announces $7B investment in Iowa; $576M Cedar Rapids data center","publisher":"The Gazette (Cedar Rapids)","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://dailyiowan.com/2025/12/09/cedar-rapids-data-centers-ignite-concern-from-energy-advocates-excitement-from-officials/","label":"Cedar Rapids data centers ignite concern from energy advocates","publisher":"The Daily Iowan","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://revenue.iowa.gov/taxes/tax-guidance/sales-use-excise-tax/data-centers","label":"Data Center Sales and Use Tax Incentives","publisher":"Iowa Department of Revenue","kind":"filing","retrievedAt":"2026-07-06"}]},{"id":"compute-google-council-bluffs-ia","sourceRecordId":"google-council-bluffs-ia","name":"Google Council Bluffs Data Center","operator":"Google","city":"Council Bluffs","county":"Pottawattamie","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.167368,"longitude":-95.792975,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-council-bluffs-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/iowa/","label":"Google Iowa — official location page: Council Bluffs operational since 2007, multi-building campus","publisher":"Google","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.einpresswire.com/article/203308813/google-inc-partners-with-midamerican-energy-to-purchase-407-mw-wind","label":"Google Inc partners with MidAmerican Energy to purchase 407 MW wind","publisher":null,"kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.environmentenergyleader.com/stories/googles-iowa-data-center-buys-407-mw-of-recs,28158","label":"Google's Iowa Data Center Buys 407 MW of RECs","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterknowledge.com/hyperscalers/iowa-officials-approve-tax-breaks-for-google-data-center-expansion","label":"Data Center Knowledge — Iowa officials approve tax breaks for Google data center expansion","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://thecurrentga.org/2025/08/26/data-centers-consume-massive-amounts-of-water-companies-rarely-tell-the-public-exactly-how-much/","label":"Data centers consume massive amounts of water - companies rarely tell the public exactly how much","publisher":"The Current","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-google-palo-ia","sourceRecordId":"google-palo-ia","name":"Google Palo Data Center Campus","operator":"Google","city":"Palo","county":"Linn","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.0611,"longitude":-91.7935,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-palo-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thegazette.com/news/local/google-exploring-data-center-project-near-palo/article_4024241b-0c96-5212-9487-acd2366cbd82.html","label":"Google exploring data center project near Palo","publisher":"The Gazette","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.iowapublicradio.org/ipr-news/2026-03-04/google-data-center-palo-linn-county","label":"Google eyes data center in Palo to bypass Linn County regulations","publisher":"Iowa Public Radio","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.iowapublicradio.org/ipr-news/2026-07-21/palo-linn-county-google-data-center-duane-arnold-nuclear-plant","label":"Linn County considers exception for Google as nearby Palo passes data center regulations","publisher":"Iowa Public Radio","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.linncountyiowa.gov/1862/Data-Centers-in-Unincorporated-Linn-Coun","label":"Data Centers in Unincorporated Linn County (EU-3 district and 18-month moratorium)","publisher":"Linn County, Iowa","kind":"permit","retrievedAt":"2026-08-14"}]},{"id":"compute-great-lakes-colocation-lake-park-ia","sourceRecordId":"great-lakes-colocation-lake-park-ia","name":"Great Lakes Colocation Data Center","operator":"Great Lakes Communication","city":"Lake Park","county":"Dickinson County","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":43.455556,"longitude":-95.3207429,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/great-lakes-colocation-lake-park-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://greatlakescolocation.com/contact-us/","label":"Contact Great Lakes: Advanced Colocation Services in Iowa","publisher":"Great Lakes Communication","kind":"other","retrievedAt":"2026-09-16"},{"url":"https://greatlakescolocation.com/facility/","label":"State-of-the-Art Reliability & Security - Great Lakes Colocation","publisher":"Great Lakes Communication","kind":"other","retrievedAt":"2026-09-16"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-heartland-technology-jesup-ia","sourceRecordId":"heartland-technology-jesup-ia","name":"Heartland Technology Data Center (HTDC)","operator":"Heartland Technology (JDC Data LLC)","city":"Jesup","county":"Buchanan","address":"1151 12th St","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.471271,"longitude":-92.054083,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/heartland-technology-jesup-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/10202","label":"PeeringDB facility record 10202: Heartland Technology Data Center","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://heartlandtechnology.com/data-center/","label":"Heartland Technology: Data Center","publisher":"Heartland Technology","kind":"other","retrievedAt":"2026-10-11"}]},{"id":"compute-infobunker-boone-ia","sourceRecordId":"infobunker-boone-ia","name":"InfoBunker Underground Data Center","operator":"InfoBunker, LLC","city":"Boone","county":"Boone","address":"308 T Avenue","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.16522,"longitude":-93.79436,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/infobunker-boone-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.infobunker.com/overview.shtml","label":"Infobunker — The Most Secure & Reliable Data Center in Iowa","publisher":"InfoBunker, LLC","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://facilityexplorer.iowadnr.gov/FacilityExplorer/SiteDetail.aspx?facID=310505952","label":"Iowa DNR Facility Explorer — Infobunker, 308 T Ave, Boone, IA 50036 (State Facility ID 310505952)","publisher":"Iowa Department of Natural Resources","kind":"permit","retrievedAt":"2026-09-04"},{"url":"https://clui.org/ludb/site/infobunker-att-boone-tower-site","label":"Infobunker AT&T Boone Tower Site","publisher":"Center for Land Use Interpretation","kind":"other","retrievedAt":"2026-09-04"},{"url":"https://www.datacenterknowledge.com/physical-security/infobunker-nuke-proof-iowa-data-center","label":"InfoBunker: Nuke-Proof Iowa Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-04"}]},{"id":"compute-ip-pathways-urbandale-ia","sourceRecordId":"ip-pathways-urbandale-ia","name":"IP Pathways Urbandale Data Center","operator":"IP Pathways","city":"Urbandale","county":"Polk County","address":"3600 109th Street","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6275758,"longitude":-93.7672535,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ip-pathways-urbandale-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ippathways.com/solutions/data-center-and-colocation/","label":"Data Center and Colocation Services - IP Pathways","publisher":"IP Pathways","kind":"other","retrievedAt":"2026-09-16"}]},{"id":"compute-its-monticello-ia","sourceRecordId":"its-monticello-ia","name":"ITS Iowa Data Center (Monticello)","operator":"Infrastructure Technology Solutions (ITS)","city":"Monticello","county":"Jones","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.2382752,"longitude":-91.1869428,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/its-monticello-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://its.tech/about/data-center/","label":"Our Iowa Data Center — SOC 2 Certified Facility","publisher":"Infrastructure Technology Solutions (ITS)","kind":"other","retrievedAt":"2026-09-04"}]},{"id":"compute-karis-dubuque-county-ia","sourceRecordId":"karis-dubuque-county-ia","name":"Karis Dubuque County Data Center","operator":"Karis","city":null,"county":"Dubuque County","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.388,"longitude":-90.67,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/karis-dubuque-county-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.telegraphherald.com/news/tri-state/article_76c9d4f6-6aa1-410a-9073-4be5b479363e.html","label":"Company seeking Dubuque County data center land revealed","publisher":"Telegraph Herald","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://www.kcrg.com/2026/07/10/potential-dubuque-data-center-could-require-3-million-gallons-water-city-seeks-public-input/","label":"Potential Dubuque data center could require 3 million gallons of water, city seeks public input","publisher":"KCRG-TV9","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-karis-peosta-ia","sourceRecordId":"karis-peosta-ia","name":"Karis Peosta Data Center Site (south of U.S. 20)","operator":"Karis","city":"Peosta","county":"Dubuque","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.4508,"longitude":-90.8501,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/karis-peosta-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.telegraphherald.com/news/tri-state/article_254d3b68-c566-4795-aeb5-4e266b9aa72c.amp.html","label":"Developers scouting multiple data center sites in Dubuque County","publisher":"Telegraph Herald","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-lightedge-solutions-altoona-ia","sourceRecordId":"lightedge-solutions-altoona-ia","name":"LightEdge Altoona Data Center Campus","operator":"LightEdge Solutions","city":"Altoona","county":"Polk","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6433,"longitude":-93.4627,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lightedge-solutions-altoona-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lightedge.com/data-centers/des-moines-data-center/","label":"Des Moines, IA Colocation Data Centers | Lightedge","publisher":"LightEdge Solutions","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-lightedge-ames-ia","sourceRecordId":"lightedge-ames-ia","name":"LightEdge Ames Edge Colocation Data Center","operator":"LightEdge Solutions","city":"Ames","county":"Story","address":"Aviation Way","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.0308,"longitude":-93.6319,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lightedge-ames-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lightedge.com/ames/","label":"Ames Data Center Proposal — LightEdge edge colocation project page","publisher":"LightEdge Solutions","kind":"press","retrievedAt":"2026-08-21"}]},{"id":"compute-lightedge-boone-ia","sourceRecordId":"lightedge-boone-ia","name":"LightEdge Boone Colocation Data Center","operator":"LightEdge Solutions","city":"Boone","county":"Boone","address":"1920 Lakewood Drive","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.0597,"longitude":-93.8802,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lightedge-boone-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://amesalliance.com/?p=12072","label":"Boone County Economic Growth Corporation Executive Board Enters Preliminary Agreement for Colocation Facility","publisher":"Ames Economic Development Commission","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://baxtel.com/news/lightedge-considers-data-center-project-near-des-moines-iowa","label":"LightEdge considers data center project near Des Moines, Iowa","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-long-lines-sioux-city-ia","sourceRecordId":"long-lines-sioux-city-ia","name":"Long Lines Secure Data Center","operator":"Long Lines","city":"Sioux City","county":"Woodbury","address":"4647 Stone Ave","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.483287,"longitude":-96.348107,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/long-lines-sioux-city-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.longlines.com/business/data-center","label":"Long Lines Secure Data Center","publisher":"Long Lines","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.peeringdb.com/api/fac?state=IA","label":"PeeringDB facility record 3011: Long Lines Data Center","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"}]},{"id":"compute-lumen-pleasant-hill-ia","sourceRecordId":"lumen-pleasant-hill-ia","name":"Lumen Pleasant Hill Data Center","operator":"Lumen","city":"Pleasant Hill","county":"Polk","address":"4550 Carlisle Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.557628,"longitude":-93.527125,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-pleasant-hill-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/4550-carlisle-road-pleasant-hill/lumen/datacenter/pleasant-hill","label":"Inflect: Lumen Pleasant Hill","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-11"}]},{"id":"compute-maquoketa-industrial-park-data-center-ia","sourceRecordId":"maquoketa-industrial-park-data-center-ia","name":"Maquoketa Industrial Park Data Center Campus","operator":"Undisclosed developer","city":"Maquoketa","county":"Jackson","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.05,"longitude":-90.665,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/maquoketa-industrial-park-data-center-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/46-acre-data-center-campus-planned-in-maquoketa-iowa","label":"46-acre data center campus planned in Maquoketa, Iowa","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.kcrg.com/2026/08/19/maquoketa-halts-early-discussions-potential-data-center-development/","label":"Maquoketa halts early discussions on potential data center development","publisher":"KCRG","kind":"press","retrievedAt":"2026-10-29"},{"url":"https://www.maqnews.com/news/local/data-center-talks-end/article_ff6db502-6467-4f00-b8c4-7140659414f0.html","label":"Data center talks end","publisher":"Maquoketa Sentinel-Press","kind":"press","retrievedAt":"2026-10-29"}]},{"id":"compute-mason-city-south-side-data-center-site-ia","sourceRecordId":"mason-city-south-side-data-center-site-ia","name":"Mason City South Side Data Center Site (43rd Street SW)","operator":"Undisclosed developer","city":"Mason City","county":"Cerro Gordo","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":43.11,"longitude":-93.215,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mason-city-south-side-data-center-site-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://northiowanow.com/2026/03/04/mason-city-council-advances-rezoning-proposal-amid-data-center-concerns/","label":"Mason City council advances rezoning proposal amid data center concerns","publisher":"NorthIowaNow","kind":"press","retrievedAt":"2026-10-29"},{"url":"https://www.kimt.com/news/mason-city-considers-future-of-newly-rezoned-land-data-center-among-possibilities/article_4e0563c0-f0d1-4f7f-a8dc-fb76c2c743a2.html","label":"Mason City considers future of newly rezoned land; data center among possibilities","publisher":"KIMT","kind":"press","retrievedAt":"2026-10-29"}]},{"id":"compute-mcni-concord-township-hancock-county-ia","sourceRecordId":"mcni-concord-township-hancock-county-ia","name":"MCNI Concord Township Data Center (rezoning denied)","operator":"MCNI","city":"Garner","county":"Hancock","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":43.09806,"longitude":-93.60417,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mcni-concord-township-hancock-county-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://kiow.com/2026/09/10/rezoning-change-in-hancock-county-denied/","label":"Rezoning Change in Hancock County Denied","publisher":"Mix 107.3 KIOW","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://kiow.com/2026/10/12/data-center-rezoning-pulled-in-hancock-county/","label":"Data Center Rezoning Pulled in Hancock County","publisher":"KIOW","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-meta-altoona-ia","sourceRecordId":"meta-altoona-ia","name":"Meta Altoona Data Center Campus","operator":"Meta","city":"Altoona","county":"Polk","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6459,"longitude":-93.4696,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-altoona-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/cloud/article/11427725/meta-adds-more-data-centers-in-iowa-pushing-campus-to-5-million-sf","label":"Meta Adds More Data Centers in Iowa, Pushing Campus to 5 Million SF","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://engineering.fb.com/2024/03/12/data-center-engineering/building-metas-genai-infrastructure/","label":"Building Meta's GenAI Infrastructure","publisher":"Engineering at Meta","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/meta-signs-225mw-wind-ppa-in-iowa/","label":"Meta signs 225MW wind PPA in Iowa","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.constructiondive.com/news/facebook-receives-tax-incentive-to-build-fifth-altoona-iowa-data-center/554481/","label":"Facebook receives tax incentive to build fifth Altoona data center","publisher":"Construction Dive","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://kdsm17.com/news/local/how-much-water-do-iowa-data-centers-use","label":"How much water do Iowa data centers use","publisher":"KDSM17 (CBS Iowa)","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.warrencountyrecord.com/stories/trip-to-iowa-gives-officials-close-look-at-meta-data-center,163085","label":"Trip to Iowa gives officials close look at Meta data center","publisher":"Warren County Record","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://datacenters.atmeta.com/2021/12/meta-announces-new-expansion-to-altoona-campus-new-hardhat-in-hand-graduates/","label":"Meta Data Centers blog — Meta Announces New Expansion to Altoona Campus","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://datacenters.atmeta.com/asset/altoona-data-center-info-sheet/","label":"Meta's Altoona Data Center (site info sheet)","publisher":"Meta","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-meta-davenport-ia","sourceRecordId":"meta-davenport-ia","name":"Meta Davenport Data Center","operator":"Meta","city":"Davenport","county":"Scott","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5236,"longitude":-90.5776,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-davenport-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thegazette.com/news/meta-behind-plans-for-latest-iowa-data-center/article_ddf57b2e-9b35-50b7-8af7-1370978063fa.html","label":"Meta behind plans for latest Iowa data center","publisher":"The Gazette","kind":"subsidy","retrievedAt":"2026-08-14"},{"url":"https://www.kwqc.com/2026/03/06/more-than-house-less-than-grocery-store-how-much-electricity-qca-data-centers-uses/","label":"More than a house, less than a grocery store: how much electricity QCA data centers use (reports Meta's 328 acres purchased, construction not started)","publisher":"KWQC","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-microsoft-alluvion-west-des-moines-ia","sourceRecordId":"microsoft-alluvion-west-des-moines-ia","name":"Microsoft Project Alluvion Data Center","operator":"Microsoft","city":"West Des Moines","county":"Polk","address":"550 SE White Crane Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5143718,"longitude":-93.7083034,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-alluvion-west-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wdmchamber.org/economic-development/microsoft-data-centers/","label":"Microsoft Data Centers - West Des Moines Chamber of Commerce","publisher":"West Des Moines Chamber of Commerce","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://nominatim.openstreetmap.org/search?q=White+Crane+Road+West+Des+Moines+IA&format=json","label":"OpenStreetMap Nominatim geocode: SE White Crane Road","publisher":"OpenStreetMap contributors","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-microsoft-ginger-east-ia","sourceRecordId":"microsoft-ginger-east-ia","name":"Microsoft Project Ginger East Data Center","operator":"Microsoft","city":"West Des Moines","county":"Polk","address":"1475 SE Maffitt Lake Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5193146,"longitude":-93.7362003,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-ginger-east-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/microsoft-project-ginger-east","label":"Microsoft: Project Ginger East Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://nominatim.openstreetmap.org/search?q=Maffitt+Lake+Road+West+Des+Moines+IA&format=json","label":"OpenStreetMap Nominatim geocode: Maffitt Lake Road","publisher":"OpenStreetMap contributors","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/","label":"Construction Underway on 4 New Microsoft Data Centers","publisher":"Go West Des Moines (City of West Des Moines economic development)","kind":"press","retrievedAt":"2026-08-21"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-microsoft-ginger-west-ia","sourceRecordId":"microsoft-ginger-west-ia","name":"Microsoft Project Ginger West Data Center","operator":"Microsoft","city":"West Des Moines","county":"Polk","address":"11100 Booneville Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.551,"longitude":-93.782,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-ginger-west-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/","label":"Ginger West datacenter construction update — Microsoft Local","publisher":"Microsoft","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/microsofts-project-ginger-west-data-center-in-west-des-moines-gets-planning-approval/","label":"Microsoft Project Ginger West data center in West Des Moines gets planning approval","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.axios.com/local/des-moines/2026/01/16/microsoft-west-des-moines-data-center-water-zero","label":"Microsoft's next data center buildings to use 'zero-water' technology","publisher":"Axios Des Moines","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.wpr.org/news/microsoft-data-center-iowa-wisconsin-expect","label":"Microsoft built 5 data center campuses in this Iowa city. Here's what Wisconsin can expect.","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/","label":"Construction Underway on 4 New Microsoft Data Centers","publisher":"Go West Des Moines (City of West Des Moines economic development)","kind":"press","retrievedAt":"2026-08-21"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-microsoft-mountain-west-des-moines-ia","sourceRecordId":"microsoft-mountain-west-des-moines-ia","name":"Microsoft Project Mountain Data Center","operator":"Microsoft","city":"West Des Moines","county":"Dallas","address":"8855 Grand Avenue","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5385054,"longitude":-93.8253005,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-mountain-west-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wdmchamber.org/economic-development/microsoft-data-centers/","label":"Microsoft Data Centers - West Des Moines Chamber of Commerce","publisher":"West Des Moines Chamber of Commerce","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://nominatim.openstreetmap.org/search?q=8855+Grand+Ave+West+Des+Moines+IA&format=json","label":"OpenStreetMap Nominatim geocode: 8855 Grand Ave","publisher":"OpenStreetMap contributors","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-microsoft-osmium-west-des-moines-ia","sourceRecordId":"microsoft-osmium-west-des-moines-ia","name":"Microsoft Project Osmium Data Center","operator":"Microsoft","city":"West Des Moines","county":"Warren","address":"5855 SW Kerry Street","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.500537,"longitude":-93.7755662,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-osmium-west-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/","label":"Microsoft Osmium Data Center - Go West Des Moines","publisher":"Go West Des Moines (city economic development)","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://wdmchamber.org/economic-development/microsoft-data-centers/","label":"Microsoft Data Centers - West Des Moines Chamber of Commerce","publisher":"West Des Moines Chamber of Commerce","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://nominatim.openstreetmap.org/search?q=50061+Iowa&format=json&limit=1&addressdetails=1","label":"OpenStreetMap Nominatim geocode: ZIP 50061","publisher":"OpenStreetMap contributors","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","label":"Growth of data centers in Iowa","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-microsoft-ruthenium-west-des-moines-ia","sourceRecordId":"microsoft-ruthenium-west-des-moines-ia","name":"Microsoft Project Ruthenium Data Center","operator":"Microsoft","city":"West Des Moines","county":"Madison","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.4999095,"longitude":-93.8098423,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-ruthenium-west-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/","label":"Microsoft Ruthenium Data Center - Go West Des Moines","publisher":"Go West Des Moines (city economic development)","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.yahoo.com/news/microsoft-wants-bring-sixth-data-120422896.html","label":"Microsoft wants to bring a sixth data center, called Ruthenium, to West Des Moines","publisher":"Yahoo News (via Des Moines Register)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://nominatim.openstreetmap.org/search?q=Woodland+Avenue+Madison+County+Iowa&format=json&addressdetails=1","label":"OpenStreetMap Nominatim geocode: Woodland Avenue, Madison County","publisher":"OpenStreetMap contributors","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-microsoft-van-meter-ia","sourceRecordId":"microsoft-van-meter-ia","name":"Microsoft Van Meter Data Center (Vision Park)","operator":"Microsoft","city":"Van Meter","county":"Dallas","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5332166,"longitude":-93.9548406,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-van-meter-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.aol.com/microsofts-van-meter-data-center-120442101.html","label":"Microsoft's Van Meter data center signals expansion beyond West Des Moines","publisher":"AOL (via Des Moines Register)","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://nominatim.openstreetmap.org/search?q=Van+Meter+IA&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Van Meter, IA","publisher":"OpenStreetMap contributors","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.vanmeteria.gov/wp-content/uploads/3-23-26-Workshop-Packet.pdf","label":"Van Meter City Council workshop packet, March 23, 2026 (Resolution 2026-25, Microsoft development agreement)","publisher":"City of Van Meter, Iowa","kind":"filing","retrievedAt":"2026-10-30"}]},{"id":"compute-microsoft-woodward-ia","sourceRecordId":"microsoft-woodward-ia","name":"Microsoft Woodward Data Center Campus","operator":"Microsoft","city":"Woodward","county":"Dallas","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.857,"longitude":-93.922,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-woodward-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/microsoft-acquires-600-acres-for-eco-business-park-data-center-in-woodward-iowa/","label":"Microsoft Acquires 600 Acres for Eco Business Park Data Center in Woodward, Iowa","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-oppidan-cedar-rapids-ia","sourceRecordId":"oppidan-cedar-rapids-ia","name":"Oppidan Cedar Rapids Data Center","operator":"Oppidan","city":"Cedar Rapids","county":"Linn","address":"1515 33rd Avenue SW","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.9439273,"longitude":-91.6736877,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oppidan-cedar-rapids-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kcrg.com/2026/07/08/cedar-rapids-confirms-third-data-center-planned-southwest-side/","label":"Cedar Rapids confirms third data center planned for southwest side","publisher":"KCRG-TV9","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.thegazette.com/news/local/3rd-cedar-rapids-data-center-ready-for-construction/article_e0973e26-383e-4896-bebc-a4c085b8d4a5.html","label":"Another data center is in the works for Cedar Rapids","publisher":"The Gazette","kind":"press","retrievedAt":"2026-09-04"},{"url":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/","label":"Building permit issued for new Cedar Rapids data center","publisher":"Corridor Business Journal","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-oppidan-des-moines-ia","sourceRecordId":"oppidan-des-moines-ia","name":"Oppidan Des Moines Data Center","operator":"Oppidan","city":"Des Moines","county":"Polk","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5868,"longitude":-93.625,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oppidan-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.weitz.com/projects/oppidan-data-center/","label":"Oppidan Data Center — project page (general contractor)","publisher":"The Weitz Company","kind":"other","retrievedAt":"2026-08-14"},{"url":"http://www.thegazette.com/news/local/3rd-cedar-rapids-data-center-ready-for-construction/article_e0973e26-383e-4896-bebc-a4c085b8d4a5.html","label":"Another data center is in the works for Cedar Rapids (reports Oppidan's completed 60,000 sq ft / 5 MW Des Moines data center)","publisher":"The Gazette","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/","label":"Building permit issued for new Cedar Rapids data center","publisher":"Corridor Business Journal","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-pathone-ida-county-galva-ia","sourceRecordId":"pathone-ida-county-galva-ia","name":"PathOne Ida County Data Center (Galva site)","operator":"PathOne Data Centers","city":"Galva","county":"Ida County","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.5069289,"longitude":-95.4172221,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pathone-ida-county-galva-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ktiv.com/2026/08/11/ida-county-data-center-proposal-path-one-presents-plans-urges-strong-county-rules/","label":"Ida County data center proposal: Path One presents plans, urges strong county rules","publisher":"KTIV","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://www.ktiv.com/2026/08/25/arthur-residents-ask-questions-pathones-data-center-meeting/","label":"Arthur residents question PathOne's data center plans","publisher":"KTIV","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/","label":"Iowa communities grapple with regulating data centers as development spreads","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-pathone-hull-ia","sourceRecordId":"pathone-hull-ia","name":"PathOne Sioux County Data Center (Hull)","operator":"PathOne Data Centers","city":"Hull","county":"Sioux","address":"3071 330th Street","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":43.1888,"longitude":-96.1333,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pathone-hull-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ktiv.com/2026/08/12/residents-seek-more-details-potential-sioux-county-data-center/","label":"Residents seek more details on potential Sioux County data center","publisher":"KTIV","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-qts-cedar-rapids-ia","sourceRecordId":"qts-cedar-rapids-ia","name":"QTS Cedar Rapids Data Center Campus","operator":"QTS Data Centers","city":"Cedar Rapids","county":"Linn","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.932,"longitude":-91.718,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-cedar-rapids-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cedar-rapids.org/news_detail_T6_R2180.php","label":"City of Cedar Rapids, Alliant Energy, and QTS Collaborate on New Data Center Campus","publisher":"City of Cedar Rapids","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/qts-breaks-ground-on-data-center-campus-in-iowa/","label":"QTS breaks ground on data center campus in Iowa","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/site-selection/article/55268088/cedar-rapids-iowa-gets-approval-for-two-major-data-center-investments-by-google-and-qts","label":"Cedar Rapids, Iowa Gets Approval for Two Major Data Center Investments by Google and QTS","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thegazette.com/news/data-center-project-pitched-as-win-for-jobs-rates-in-iowa/article_6ba03ef8-81a2-4215-ba6c-d92188174b31.html","label":"Data center project pitched as win for jobs, rates in Iowa (QTS Co-CEO: campus will ultimately use about 1,050 megawatts)","publisher":"The Gazette (Cedar Rapids)","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/","label":"Iowa communities grapple with regulating data centers as development spreads","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-qts-clinton-clinton-county-ia","sourceRecordId":"qts-clinton-clinton-county-ia","name":"QTS Clinton Data Center Campus","operator":"QTS Data Centers","city":"Clinton","county":"Clinton","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.88,"longitude":-90.24,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-clinton-clinton-county-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/clinton/","label":"QTS Clinton, Iowa - In Consideration","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.kwqc.com/2026/05/26/clinton-discuss-data-center-concerns-amid-ai-growth/","label":"Clinton residents voice concerns on potential AI data center coming to town","publisher":"KWQC","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.radioiowa.com/2026/07/16/clinton-residents-swarm-meeting-to-protest-possible-10b-data-center/","label":"Radio Iowa — \"Clinton residents swarm meeting to protest possible $10B data center\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-router12-brick-and-tile-mason-city-ia","sourceRecordId":"router12-brick-and-tile-mason-city-ia","name":"Router12 Brick and Tile Colocation (Mason City)","operator":"Router12 Networks LLC","city":"Mason City","county":"Cerro Gordo","address":"103 E State St","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":43.151696,"longitude":-93.199328,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/router12-brick-and-tile-mason-city-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13357","label":"PeeringDB facility record: Router12 - Brick and Tile","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-29"}]},{"id":"compute-salix-data-center-site-ia","sourceRecordId":"salix-data-center-site-ia","name":"Salix Data Center Site (Midwest Capital Group)","operator":"Midwest Capital Group (MidAmerican Energy)","city":"Salix","county":"Woodbury","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.3208,"longitude":-96.2872,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/salix-data-center-site-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/","label":"Google is considering a data center in Salix, IA","publisher":"KTIV","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.ktiv.com/2026/08/06/woodbury-county-residents-suing-city-salix-over-annexed-land-involved-data-center-controversy/","label":"Woodbury County landowners looking to void annexation of 900 acres near Salix","publisher":"KTIV","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.iowapublicradio.org/ipr-news/2026-06-17/potential-data-center-sparks-moratorium-push-in-northwest-iowa","label":"Woodbury County moves to pause data center projects for 1 year","publisher":"Iowa Public Radio","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-south-front-networks-davenport-ia","sourceRecordId":"south-front-networks-davenport-ia","name":"South Front Networks IA-Davenport Interconnection Facility","operator":"South Front Networks","city":"Davenport","county":"Scott","address":"2814 N Clark Street","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.5477099,"longitude":-90.620859,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/south-front-networks-davenport-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://southfront.io/pop","label":"South Front Networks Points of Presence — IA-Davenport, 2814 N Clark St, Davenport IA 52804","publisher":"South Front Networks","kind":"other","retrievedAt":"2026-09-04"},{"url":"https://southfront.io/","label":"South Front Networks — carrier-neutral middle-mile and interconnection, Upper Midwest","publisher":"South Front Networks","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-south-front-networks-emery-mason-city-ia","sourceRecordId":"south-front-networks-emery-mason-city-ia","name":"South Front Networks IA-Emery","operator":"South Front Networks","city":"Mason City","county":"Cerro Gordo","address":"16455 Lark Ave","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":43.132695,"longitude":-93.27891,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/south-front-networks-emery-mason-city-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/6480","label":"PeeringDB facility record 6480: SFN IA-Emery","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://inflect.com/building/16455-lark-avenue-mason-city/south-front-networks/datacenter/ia-emery","label":"Inflect: South Front Networks IA-Emery","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://southfront.io/pop","label":"South Front Networks PoP list","publisher":"South Front Networks","kind":"other","retrievedAt":"2026-10-11"}]},{"id":"compute-south-front-networks-waterloo-ia","sourceRecordId":"south-front-networks-waterloo-ia","name":"South Front Networks IA-Waterloo","operator":"South Front Networks","city":"Waterloo","county":"Black Hawk","address":"206 W 13th Street","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.488836,"longitude":-92.330614,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/south-front-networks-waterloo-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/7706","label":"PeeringDB facility record: SFN IA-Waterloo","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-29"},{"url":"https://southfront.io/pop","label":"South Front Networks points of presence","publisher":"South Front Networks","kind":"other","retrievedAt":"2026-10-29"}]},{"id":"compute-swarm-systems-marshalltown-ia","sourceRecordId":"swarm-systems-marshalltown-ia","name":"Swarm Systems Marshalltown Data Center","operator":"Swarm Systems","city":"Marshalltown","county":"Marshall County","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.056,"longitude":-92.897,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/swarm-systems-marshalltown-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.timesrepublican.com/news/todays-news/2026/08/city-council-passes-second-and-third-readings-of-data-center-moratorium-hears-from-prospective-developer/","label":"City council passes second and third readings of data center moratorium, hears from prospective developer","publisher":"Times Republican","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/","label":"Iowa communities grapple with regulating data centers as development spreads","publisher":"Business Record","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-tierpoint-newton-ia","sourceRecordId":"tierpoint-newton-ia","name":"TierPoint Newton Data Center","operator":"TierPoint","city":"Newton","county":"Jasper","address":"403 W 4th St N","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6997,"longitude":-93.0479,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-newton-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/tierpoint-newton-data-center/","label":"TierPoint — Newton Data Center (facility listing: address, Tier I, SSAE 16 SOC I Type II, N+1 HVAC, carrier neutral)","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-tract-altoona-ia","sourceRecordId":"tract-altoona-ia","name":"Tract Altoona Technology Park","operator":"Tract","city":"Altoona","county":"Polk","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6439,"longitude":-93.4649,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-altoona-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tract.com/news/tract-enters-the-des-moines-market-with-the-acquisition-of-453-acres-following-successful-collaboration-with-the-city-of-altoona-ia/","label":"Tract enters the Des Moines market with the acquisition of 453 acres in Altoona, IA","publisher":"Tract","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/","label":"Tract Brings 450-Acre Data Center Campus to Altoona, Iowa","publisher":"Altoona Now (Altoona Area Chamber / economic development)","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-tract-norwalk-ia","sourceRecordId":"tract-norwalk-ia","name":"Tract Norwalk Data Center Park (Project West)","operator":"Tract","city":"Norwalk","county":"Warren","address":null,"state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.460963,"longitude":-93.6978644,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-norwalk-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.norwalk.iowa.gov/news_detail_T5_R273.php","label":"Attention Norwalk Residents — statement on the land developer agreement","publisher":"City of Norwalk, Iowa","kind":"press","retrievedAt":"2026-09-04"},{"url":"https://www.indianola-ia.com/news/norwalk-city-council-approved-data-center-development-agreement-despite-citizen-concerns/article_96dc529d-b4f8-4eaf-83dd-b99d5a768dba.html","label":"Norwalk City Council approved data center development agreement despite citizen concerns","publisher":"Indianola Record-Herald","kind":"press","retrievedAt":"2026-09-04"}]},{"id":"compute-uniti-des-moines-ia","sourceRecordId":"uniti-des-moines-ia","name":"Uniti Des Moines Data Center (formerly Windstream Wholesale)","operator":"Uniti","city":"Des Moines","county":"Polk","address":"3540 SW 61st St","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.552651,"longitude":-93.700416,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/uniti-des-moines-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/3540-southwest-61st-street-des-moines/uniti/datacenter/des-moines","label":"Inflect: Uniti Des Moines (formerly Windstream Wholesale Des Moines)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-11"}]},{"id":"compute-usshc-monticello-ia","sourceRecordId":"usshc-monticello-ia","name":"US Secure Hosting Center (USSHC)","operator":"US Secure Hosting Center","city":"Monticello","county":"Jones","address":"24253 Highway 151","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.284076,"longitude":-91.092129,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/usshc-monticello-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/16034","label":"PeeringDB facility record 16034: USSHC","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.datacenterknowledge.com/business/wikia-search-launches-from-iowa-data-bunker","label":"Wikia Search launches from Iowa data bunker","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-11"}]},{"id":"compute-us-signal-ia01-waukee-ia","sourceRecordId":"us-signal-ia01-waukee-ia","name":"US Signal IA01 Des Moines Data Center (Waukee)","operator":"US Signal","city":"Waukee","county":"Dallas","address":"390 N Alices Road","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":41.6118485,"longitude":-93.8845129,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-ia01-waukee-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/ia01-des-moines/","label":"IA01 Des Moines Data Center — facility specifications","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-04"},{"url":"https://ussignal.com/press-releases/us-signal-to-acquire-oneneck-expanding-nationwide-data-center-footprint-it-infrastructure-network/","label":"US Signal to Acquire OneNeck, Expanding Nationwide Data Center Footprint","publisher":"US Signal","kind":"press","retrievedAt":"2026-09-04"}]},{"id":"compute-wahawk-power-waterloo-ia","sourceRecordId":"wahawk-power-waterloo-ia","name":"Wahawk Power Data Center","operator":"Wahawk Power, LLC","city":"Waterloo","county":"Black Hawk","address":"North of 570 West Shaulis Road, South Waterloo Business Park","state":"IA","stateName":"Iowa","jurisdictionType":"state","latitude":42.4429861,"longitude":-92.4006906,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wahawk-power-waterloo-ia","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hottlerealestate.com/blog/wahawk-power-data-center-blog_2","label":"Wahawk Power Data Center — 80,000 SF, $6M Value in South Waterloo Business Park","publisher":"Hottle Real Estate","kind":"other","retrievedAt":"2026-08-21"},{"url":"https://www.kwwl.com/news/waterloo-data-center-plan-sparks-protest-at-city-hall/article_db0d730e-4c25-4fef-aa9c-3db93a5a3402.html","label":"Waterloo data center plan sparks protest at city hall","publisher":"KWWL","kind":"press","retrievedAt":"2026-08-21"},{"url":"https://www.kcrg.com/2026/08/18/city-waterloo-considering-three-month-data-center-moratorium/","label":"City of Waterloo considering three-month data center moratorium","publisher":"KCRG","kind":"press","retrievedAt":"2026-08-21"}]},{"id":"compute-ark-data-centers-boise-victory-view-id","sourceRecordId":"ark-data-centers-boise-victory-view-id","name":"Ark Data Centers Boise (fka Involta)","operator":"Ark Data Centers (formerly Involta)","city":"Boise","county":"Ada","address":"2653 S Victory View Way","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.579984,"longitude":-116.290797,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-boise-victory-view-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/12234","label":"PeeringDB facility 12234: ark data centers - Boise, ID","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-04"},{"url":"https://inflect.com/building/2653-south-victory-view-way-boise/involta-data-centers/datacenter/idaho-2","label":"Ark Data Centers Idaho 2 (formerly Involta) -- 2653 South Victory View Way","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-04"}]},{"id":"compute-centeris-boise-bethel-court-id","sourceRecordId":"centeris-boise-bethel-court-id","name":"Centeris Boise (former HP / DataSite data center)","operator":"Centeris (The Benaroya Company)","city":"Boise","county":"Ada","address":"9700 W Bethel Court","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.606214,"longitude":-116.303601,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centeris-boise-bethel-court-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://idahobusinessreview.com/?p=45117","label":"Former HP data center in Boise sold to Benaroya partnership (June 2011)","publisher":"Idaho Business Review","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.peeringdb.com/fac/2432","label":"PeeringDB facility 2432: DataSite, Boise (9700 Bethel Court)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-04"},{"url":"https://baxtel.com/data-center/centeris-boise","label":"Centeris Boise","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-04"}]},{"id":"compute-deep-atomic-inl-ai-data-center-id","sourceRecordId":"deep-atomic-inl-ai-data-center-id","name":"Deep Atomic MK60 Nuclear-Powered AI Data Center Campus (Idaho National Laboratory)","operator":"Deep Atomic","city":null,"county":null,"address":null,"state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.53333,"longitude":-112.94472,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/deep-atomic-inl-ai-data-center-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://smr.nucnet.org/news/swiss-reactor-company-submits-nuclear-powered-data-centre-proposal-to-us-doe-12-4-2025","label":"Swiss reactor company submits nuclear-powered data centre proposal to US DOE","publisher":"NucNet","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://www.neimagazine.com/?p=102396","label":"Deep Atomic consortium proposes nuclear-powered AI data centre at INL","publisher":"Nuclear Engineering International","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-fbi-greywolf-pocatello-id","sourceRecordId":"fbi-greywolf-pocatello-id","name":"FBI Grey Wolf Data Center","operator":"Federal Bureau of Investigation (U.S. Department of Justice)","city":"Pocatello","county":"Bannock","address":"Duckett Byrnes Street","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":42.90482,"longitude":-112.46388,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fbi-greywolf-pocatello-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.eastidahonews.com/2019/11/new-100-million-fbi-grey-wolf-data-center-opens-in-eastern-idaho/","label":"New $100 million FBI 'Grey Wolf' data center opens in eastern Idaho","publisher":"East Idaho News","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.idahostatejournal.com/news/local/fbi-cuts-ribbon-on-pocatello-addition/article_0ba8e3c8-5d0e-50a6-b2da-8b75cbf79530.html","label":"FBI cuts ribbon on Pocatello addition","publisher":"Idaho State Journal","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.openstreetmap.org/way/584965860","label":"OpenStreetMap way/584965860 — Federal Bureau of Investigation, Duckett Byrnes Street, Pocatello","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-12"}]},{"id":"compute-diode-ventures-gemstone-kuna-id","sourceRecordId":"diode-ventures-gemstone-kuna-id","name":"Gemstone Technology Park","operator":"Diode Ventures","city":"Kuna","county":"Ada","address":"3250 S Locust Grove Rd","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.44545,"longitude":-116.37335,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/diode-ventures-gemstone-kuna-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.idahopress.com/news/local/another-data-center-in-kuna-city-council-approves-new-facility/article_f419d684-3934-446a-a910-c06ec0753473.html","label":"Another data center in Kuna? City council approves new facility","publisher":"Idaho Press","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.diodeventures.com/projects/kuna-idaho-usa","label":"Kuna, Idaho, USA – Gemstone Technology Park","publisher":"Diode Ventures","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.openstreetmap.org/way/761896168","label":"OpenStreetMap way/761896168 — 3250, South Locust Grove Road, Kuna","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-12"},{"url":"https://www.diodeventures.com/gemstone-project-updates","label":"Gemstone Technology Park Updates","publisher":"Diode Ventures","kind":"press","retrievedAt":"2026-10-04"}]},{"id":"compute-inl-c3-idahofalls-id","sourceRecordId":"inl-c3-idahofalls-id","name":"Idaho National Laboratory Collaborative Computing Center (C3)","operator":"Idaho National Laboratory (U.S. Department of Energy)","city":"Idaho Falls","county":"Bonneville","address":null,"state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.4666,"longitude":-112.0341,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/inl-c3-idahofalls-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://jedunn.com/projects/idaho-national-laboratory-c3-data-centers/","label":"Idaho National Laboratory C3 Data Centers","publisher":"JE Dunn Construction","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://aeieng.com/markets/project/idaho-national-laboratory-the-collaborative-computing-center-c3","label":"Idaho National Laboratory - The Collaborative Computing Center (C3)","publisher":"AEI Engineering","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-lex-developments-pocatello-id","sourceRecordId":"lex-developments-pocatello-id","name":"Lex Developments AI Data Center (former Hoku polysilicon site)","operator":"Lex Developments","city":"Pocatello","county":"Bannock","address":null,"state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":42.8713,"longitude":-112.4455,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lex-developments-pocatello-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.idahostatejournal.com/news/local/pocatello-hearing-examiner-denies-hoku-site-data-center-permit-but-lex-developments-vows-return/article_c80a0e12-3fe8-4ed0-b755-89321377a95d.html","label":"Pocatello hearing examiner denies Hoku site data center permit but Lex Developments vows return","publisher":"Idaho State Journal","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://localnews8.com/news/2026/07/16/pocatello-city-council-upholds-hearing-examiners-decision-says-no-to-proposed-ai-data-center/","label":"Pocatello City Council Upholds Hearing Examiner's Decision, says \"no\" to Proposed AI Data Center","publisher":"KIFI Local News 8","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://web.archive.org/web/20260721123928id_/https://boisedev.com/news/2026/05/14/lex-portneuf-data-center/","label":"Another large Idaho data center proposed, valued at $2 billion+ (archived)","publisher":"BoiseDev (via Internet Archive)","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-lumen-boise-mcgregor-id","sourceRecordId":"lumen-boise-mcgregor-id","name":"Lumen Boise (Level(3) Boise)","operator":"Lumen Technologies","city":"Boise","county":"Ada","address":"435 W. McGregor Dr.","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.56619,"longitude":-116.185889,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-boise-mcgregor-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/1948","label":"PeeringDB facility 1948: Level(3) Boise (Lumen Technologies Inc), 435 W. McGregor Dr., Boise 83705","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-21"},{"url":"https://inflect.com/building/435-west-mcgregor-drive-boise/lumen/datacenter/boise-2","label":"Inflect: Lumen Boise 2 data center listing (colocation, internet access, exchange services)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-21"}]},{"id":"compute-meta-kuna-id","sourceRecordId":"meta-kuna-id","name":"Meta Kuna Data Center","operator":"Meta","city":"Kuna","county":"Ada","address":null,"state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.491,"longitude":-116.418,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-kuna-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/meta-resumes-construction-of-texas-and-idaho-data-centers-with-new-ai-design/","label":"Meta Resumes Construction of Idaho Data Center with New AI Design","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.constructionequipmentguide.com/meta-hits-peak-construction-on-800m-idaho-data-center/70046","label":"Meta Hits Peak Construction on $800M Idaho Data Center","publisher":"Construction Equipment Guide","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://idahobusinessreview.com/2024/10/25/metas-mega-data-center-in-kuna-on-track-to-be-completed-by-2025/","label":"Meta's Mega Data Center in Kuna On Track (completion later revised to 2026)","publisher":"Idaho Business Review","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.deseret.com/magazine/2026/03/04/idaho-data-centers-agriculture-water-future/","label":"How data centers are reshaping Idaho's farm country","publisher":"Deseret News","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive","label":"Meta opens new AI data center in Kuna, hopes to become water positive","publisher":"Idaho News 6 (KIVI)","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.deseret.com/magazine/2026/03/04/idaho-data-centers-agriculture-water-future","label":"How data centers are reshaping Idaho's farm country","publisher":"Deseret News","kind":"press","retrievedAt":"2026-10-04"}]},{"id":"compute-neutron-coeur-dalene-id","sourceRecordId":"neutron-coeur-dalene-id","name":"Neutron Coeur d'Alene","operator":"Neutron LLC","city":"Coeur d'Alene","county":"Kootenai","address":"600 W Appleway Ave","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":47.700339,"longitude":-116.794444,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/neutron-coeur-dalene-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/9515","label":"PeeringDB facility 9515: Neutron - Coeur d'Alene","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-04"},{"url":"https://inflect.com/building/600-west-appleway-avenue-coeur-dalene/neutron-llc/datacenter/coeur-dalene","label":"Neutron Coeur d'Alene -- 600 West Appleway Avenue","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-04"}]},{"id":"compute-orbitcom-coeurdalene-id","sourceRecordId":"orbitcom-coeurdalene-id","name":"OrbitCom Coeur d'Alene Data Center","operator":"OrbitCom","city":"Coeur d'Alene","county":"Kootenai","address":"442 W. Appleway Ave","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":47.70069,"longitude":-116.79227,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/orbitcom-coeurdalene-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/orbitcom-coeur-dalene-data-center/","label":"OrbitCom - Coeur D'Alene Data Center - Cloud and Colocation","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-rhea-data-blacks-creek-campus-ada-county-id","sourceRecordId":"rhea-data-blacks-creek-campus-ada-county-id","name":"Rhea Data Blacks Creek Campus","operator":"Rhea Data (subsidiary of Arevia Power)","city":null,"county":"Ada","address":null,"state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.4593323,"longitude":-116.1412266,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rhea-data-blacks-creek-campus-ada-county-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.eastidahonews.com/2026/09/massive-data-center-with-power-plant-planned-for-public-land-in-idaho/","label":"Massive data center with power plant planned for public land in Idaho","publisher":"East Idaho News","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.yahoo.com/news/us/articles/first-data-center-idaho-proposed-045355190.html","label":"First data center in Idaho proposed on public lands. It would be four times larger than Meta's Kuna facility","publisher":"KTVB (via Yahoo News)","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.boisestatepublicradio.org/politics-government/2026-09-21/idaho-data-center-blacks-creek-blm","label":"Idaho's newest data center could be built on public land","publisher":"Boise State Public Radio","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.washingtonsun.com/climate-environment/trump-administration-data-centers-public-lands-proposals","label":"Trump Is Considering More Data Centers on Public Lands Than Previously Known","publisher":"The Washington Sun","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://localnews8.com/news/top-stories/2026/09/25/massive-south-boise-data-center-proposal/","label":"A 3,700-Acre Data Center Is Proposed for South Boise Public Land","publisher":"KIFI Local News 8","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://nominatim.openstreetmap.org/search?q=Blacks+Creek+Reservoir,+Idaho&format=json&limit=3","label":"OpenStreetMap Nominatim: Blacks Creek Reservoir, Ada County (way 252041493)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-04"}]},{"id":"compute-syringa-networks-boise-id","sourceRecordId":"syringa-networks-boise-id","name":"Syringa Networks Boise","operator":"Syringa Networks","city":"Boise","county":"Ada","address":"3795 S Development Ave","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.567545,"longitude":-116.207057,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/syringa-networks-boise-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/1152","label":"PeeringDB facility 1152: Syringa Networks Boise","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-04"},{"url":"https://inflect.com/building/3795-development-avenue-boise/syringa-networks/datacenter/syringa-networks-boise","label":"Syringa Networks Boise -- 3795 Development Avenue","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-04"}]},{"id":"compute-t5-nampa-id","sourceRecordId":"t5-nampa-id","name":"T5 Nampa","operator":"T5 Data Centers","city":"Nampa","county":"Canyon","address":"8300 Birch Lane","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.5407,"longitude":-116.5635,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-nampa-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/t5-nampa-idaho","label":"T5: Nampa, Idaho Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.cityofnampa.us/AgendaCenter/ViewFile/Agenda/_08262025-3390","label":"City of Nampa notice of public hearings, August 26, 2025 (CUP-00387-2025, T5 Data Centers)","publisher":"City of Nampa","kind":"permit","retrievedAt":"2026-10-04"},{"url":"https://web.archive.org/web/20250926195553id_/https://boisedev.com/news/2025/09/02/data-center-nampa-september-2025/","label":"New data center could use less power, water than average (archived)","publisher":"BoiseDev (via Internet Archive)","kind":"press","retrievedAt":"2026-10-04"}]},{"id":"compute-terravolt-raft-river-cassia-county-id","sourceRecordId":"terravolt-raft-river-cassia-county-id","name":"TerraVolt Southeast Idaho Data Center Campus (Raft River)","operator":"TerraVolt Infrastructure, Inc. (subsidiary of CalEthos, Inc.)","city":null,"county":"Cassia","address":null,"state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":42.5971324,"longitude":-113.2361093,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/terravolt-raft-river-cassia-county-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20260407143944id_/https://boisedev.com/news/2026/03/16/data-micron-exemption/","label":"Data center campus possible in Magic Valley as tax cuts continue (archived)","publisher":"BoiseDev (via Internet Archive)","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.sec.gov/Archives/edgar/data/1174891/000149315226022148/ex99-1.htm","label":"CalEthos, Inc. Form 8-K Exhibit 99.1: TerraVolt natural gas supply agreement for planned Southeast Idaho data center campus (May 11, 2026)","publisher":"CalEthos, Inc. (SEC EDGAR)","kind":"filing","retrievedAt":"2026-10-04"},{"url":"https://www.sec.gov/Archives/edgar/data/0001174891/000149315226022993/form10-q.htm","label":"CalEthos, Inc. Form 10-Q for the period ended March 31, 2026","publisher":"CalEthos, Inc. (SEC EDGAR)","kind":"filing","retrievedAt":"2026-10-04"},{"url":"https://nominatim.openstreetmap.org/search?q=Raft+River,+Cassia+County,+Idaho&format=json&limit=5","label":"OpenStreetMap Nominatim: Raft River locality, Cassia County (node 150941672)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-04"}]},{"id":"compute-valorc3-boise-2-id","sourceRecordId":"valorc3-boise-2-id","name":"ValorC3 Boise 2","operator":"ValorC3 Data Centers","city":"Boise","county":"Ada","address":"9601 W Emerald St","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.60955,"longitude":-116.30185,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/valorc3-boise-2-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20260327204641id_/https://boisedev.com/news/2026/03/26/valorc3-emerald/","label":"Boise data center is set to open next year. Before opening, owners just applied to nearly double it (archived)","publisher":"BoiseDev (via Internet Archive)","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/","label":"ValorC3 plans second Boise data center for 2027","publisher":"Idaho Business Review","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://baxtel.com/news/valorc3-lands-financing-for-10mw-boise-data-center","label":"ValorC3 lands financing for 10MW Boise data center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.commercialsearch.com/news/valorc3-data-centers-eyes-idaho-expansion/","label":"ValorC3 Data Centers Eyes Idaho Expansion","publisher":"CommercialSearch","kind":"press","retrievedAt":"2026-10-04"}]},{"id":"compute-valorc3-boise-emerald-id","sourceRecordId":"valorc3-boise-emerald-id","name":"ValorC3 Boise Data Center (former Fiberpipe)","operator":"ValorC3 Data Centers","city":"Boise","county":"Ada","address":"10215 W Emerald St","state":"ID","stateName":"Idaho","jurisdictionType":"state","latitude":43.60801,"longitude":-116.310153,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/valorc3-boise-emerald-id","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/valorc3-lands-financing-for-10mw-boise-data-center","label":"ValorC3 lands financing for 10MW Boise data center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.commercialsearch.com/news/valorc3-data-centers-eyes-idaho-expansion/","label":"ValorC3 Data Centers Eyes Idaho Expansion","publisher":"CommercialSearch","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/","label":"ValorC3 plans second Boise data center for 2027","publisher":"Idaho Business Review","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.peeringdb.com/fac/9846","label":"PeeringDB facility 9846: Tonaquint Data Center - Boise ID","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-04"}]},{"id":"compute-gabal-300-west-adams-chicago-il","sourceRecordId":"gabal-300-west-adams-chicago-il","name":"300 West Adams Data Center Conversion","operator":"Igor Gabal (affiliated ownership entity)","city":"Chicago","county":"Cook","address":"300 W. Adams St.","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8797481,"longitude":-87.6356964,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/gabal-300-west-adams-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://chicago.suntimes.com/real-estate/2026/08/13/loop-data-center-gabal-landmarked-office-building","label":"Loop data center pitched for landmarked office building","publisher":"Chicago Sun-Times","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.wbez.org/real-estate-development/2026/08/14/loop-data-center-gabal-landmarked-office-building","label":"Loop data center pitched for landmarked office building","publisher":"WBEZ","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://nominatim.openstreetmap.org/search?q=300+West+Adams+Street,+Chicago,+IL&format=json","label":"OpenStreetMap geocode: 300 W Adams, Chicago","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-15"}]},{"id":"compute-aligned-coal-city-il","sourceRecordId":"aligned-coal-city-il","name":"Aligned Coal City Campus","operator":"Aligned Data Centers","city":"Coal City","county":"Grundy","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.2575,"longitude":-88.303,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-coal-city-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city","label":"A Multi-Billion-Dollar Data Center Takes a Step Forward in Coal City","publisher":"Obedio","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.shawlocal.com/daily-journal/2026/08/05/aligned-data-centers-hosts-open-house-to-discuss-coal-city-campus-plans/","label":"Aligned Data Centers Hosts Open House to Discuss Coal City Campus Plans","publisher":"Shaw Local / Daily Journal","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-aligned-ord-01-il","sourceRecordId":"aligned-ord-01-il","name":"Aligned ORD-01","operator":"Aligned Data Centers","city":"Northlake","county":"Cook","address":"505 Northwest Ave","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9140034,"longitude":-87.9175163,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-ord-01-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/chicago/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1217649348","label":"OpenStreetMap way/1217649348","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://aligneddc.com/wp-content/uploads/2024/10/ALI_ChicagoBldgSpecs241015.pdf","label":"Aligned Chicago ORD-01 Spec Sheet","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://aligneddc.com/chicago-data-centers/","label":"Aligned Chicago data centers page","publisher":"Aligned Data Centers","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/aligned-launches-one-chicago-data-center-and-breaks-ground-on-another","label":"Aligned Launches One Chicago Data Center and Breaks Ground on Another","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://www.datacenters.com/aligned-energy-ord-01-chicago","label":"Aligned Energy ORD-01 Chicago (Northlake, IL)","publisher":"Datacenters.com","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://static.datacentermap.com/company/aligned-data-centers/datacenter9222/Aligned%20Chicago%20ORD-01%20Spec%20Sheet.pdf","label":"Aligned Chicago ORD-01 spec sheet (505 Northwest Avenue, Northlake IL; 220,000 gross sq ft; 36 MW)","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-aligned-ord-02-northlake-il","sourceRecordId":"aligned-ord-02-northlake-il","name":"Aligned ORD-02","operator":"Aligned Data Centers","city":"Northlake","county":"Cook","address":"501 Northwest Ave","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9169,"longitude":-87.8956,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-ord-02-northlake-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/chicago/","label":"Aligned Data Centers — Chicago (ORD) campuses","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-08-17"},{"url":"https://aligneddc.com/chicago-data-centers/","label":"Sustainable, AI-Ready Data Centers in Chicago, IL — ORD-02 (501 Northwest Ave, Northlake) specifications","publisher":"Aligned Data Centers","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — Aligned Data Centers, Northlake, 2021 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-25"}]},{"id":"compute-aligned-ord-03-elk-grove-village-il","sourceRecordId":"aligned-ord-03-elk-grove-village-il","name":"Aligned ORD-03","operator":"Aligned Data Centers","city":"Elk Grove Village","county":"Cook","address":"50 NW Point Blvd.","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0039,"longitude":-87.9703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-ord-03-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/chicago/","label":"Aligned Data Centers — Chicago (ORD) campuses","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-08-17"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — Aligned Data Centers (EGV) PropCo, LLC, Elk Grove Village (2023 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"},{"url":"https://aligneddc.com/chicago-data-centers/","label":"Sustainable, AI-Ready Data Centers in Chicago, IL — ORD-03 (50 NW Point Blvd, Elk Grove Village) specifications","publisher":"Aligned Data Centers","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-brennan-barrington-hills-il","sourceRecordId":"brennan-barrington-hills-il","name":"Brennan Barrington Hills Data Center","operator":"Brennan Investment Group","city":"Barrington Hills","county":null,"address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.1049652,"longitude":-88.2408645,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/brennan-barrington-hills-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.shawlocal.com/northwest-herald/news/2026/01/29/2-billion-data-center-proposal-in-barrington-hills-withdrawn/","label":"$2 billion data center proposal in Barrington Hills withdrawn","publisher":"Shaw Local / Northwest Herald","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-centersquare-ord1-chicago-il","sourceRecordId":"centersquare-ord1-chicago-il","name":"Centersquare ORD1 (Chicago Cermak)","operator":"Centersquare (Csquare)","city":"Chicago","county":"Cook","address":"350 E Cermak Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8537537,"longitude":-87.6183798,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-ord1-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","label":"Csquare Chicago market spec sheet — ORD1, 350 East Cermak Road, 58,893 sq ft, 32.8 MW utility","publisher":"Centersquare (Csquare)","kind":"other","retrievedAt":"2026-09-25"},{"url":"https://www.csquare.com/data-centers/chicago","label":"Csquare Chicago data centers — ORD1, ORD2, ORD4","publisher":"Centersquare (Csquare)","kind":"other","retrievedAt":"2026-09-25"}]},{"id":"compute-centersquare-ord2-elk-grove-village-il","sourceRecordId":"centersquare-ord2-elk-grove-village-il","name":"Centersquare ORD2 (Elk Grove Village)","operator":"Centersquare (Csquare)","city":"Elk Grove Village","county":null,"address":"2425 Busse Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9923175,"longitude":-87.9582323,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-ord2-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/chicago","label":"Csquare (Centersquare) Chicago data centers — ORD1, ORD2, ORD4","publisher":"Csquare / Centersquare","kind":"other","retrievedAt":"2026-08-31"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (2425 Busse Road LLC (CenterSquare ORD2), Elk Grove Village, 2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-centersquare-ord4-lisle-il","sourceRecordId":"centersquare-ord4-lisle-il","name":"Centersquare ORD4 (Lisle)","operator":"Centersquare (Csquare)","city":"Lisle","county":"DuPage","address":"4513 Western Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8023406,"longitude":-88.0948856,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-ord4-lisle-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/chicago","label":"Csquare (Centersquare) Chicago data centers — ORD1, ORD2, ORD4","publisher":"Csquare / Centersquare","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (4513 Western Avenue LLC (CenterSquare ORD4), Lisle, 2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-cloudcenters-lisle-711-ogden-il","sourceRecordId":"cloudcenters-lisle-711-ogden-il","name":"CloudCenters Lisle Data Center (711 Ogden Ave, former Lockformer site)","operator":"Cloud Centers, LLC","city":"Lisle","county":"DuPage","address":"711 Ogden Ave","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8022034,"longitude":-88.0667438,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloudcenters-lisle-711-ogden-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://patch.com/illinois/lisle/lisle-data-center-application-withdrawn-developer","label":"Lisle data center application withdrawn by developer","publisher":"Patch","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://patch.com/illinois/lisle/lisle-waiting-hear-data-center-developer-if-they-want-proceed","label":"Lisle waiting to hear from data center developer if they want to proceed","publisher":"Patch","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://patch.com/illinois/lisle/public-hearing-planned-proposed-data-center-lisle","label":"Public hearing planned for proposed data center in Lisle","publisher":"Patch","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://nominatim.openstreetmap.org/search?q=711+Ogden+Avenue,+Lisle,+IL&format=json","label":"OpenStreetMap Nominatim geocode: 711 Ogden Avenue, Lisle, IL","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-15"}]},{"id":"compute-cloudhq-mount-prospect-ord-il","sourceRecordId":"cloudhq-mount-prospect-ord-il","name":"CloudHQ Mount Prospect (ORD) Campus","operator":"CloudHQ","city":"Mount Prospect","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.055,"longitude":-87.935,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cloudhq-mount-prospect-ord-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/cloudhq-breaks-ground-on-15-million-sq-ft-campus-in-mount-prospect-illinois/","label":"CloudHQ breaks ground on 1.5 million sq ft campus in Mount Prospect, Illinois","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.datacenterfrontier.com/featured/article/11427128/cloudhq-breaks-ground-on-25-billion-chicago-data-center-campus","label":"CloudHQ Breaks Ground on $2.5 Billion Chicago Data Center Campus","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://dailyenergyinsider.com/innovation/36434-comed-joins-with-cloudhq-to-build-2-5b-data-center-in-northern-illinois/","label":"ComEd joins with CloudHQ to build $2.5B data center in northern Illinois","publisher":"Daily Energy Insider","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.dailyherald.com/20251117/news/mount-prospect-data-center-developer-prepared-to-donate-3-million-for-recreation-street-upgrades/","label":"Mount Prospect data center developer prepared to donate $3 million for recreation, street upgrades","publisher":"Daily Herald","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.dailyherald.com/20260716/news/mount-prospect-hires-outside-firm-to-handle-data-center-permitting/","label":"Mount Prospect hires outside firm to handle data center permitting","publisher":"Daily Herald","kind":"press","retrievedAt":"2026-07-16"}]},{"id":"compute-cloverleaf-troy-il","sourceRecordId":"cloverleaf-troy-il","name":"Cloverleaf Troy Data Center Campus","operator":"Cloverleaf Infrastructure","city":"Troy","county":"Madison","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":38.719,"longitude":-89.913,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-troy-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.troyil.us/DocumentCenter/View/2026/20260107-Troy-Informative-Slides---No-Site","label":"Proposed Data Center Informational Meeting — Cloverleaf Infrastructure (City of Troy presentation)","publisher":"City of Troy, Illinois","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.yahoo.com/news/articles/troy-residents-grill-city-developer-110000674.html","label":"Troy residents grill city, developer about data centers. What did they learn?","publisher":"Belleville News-Democrat (via Yahoo News)","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-compass-hoffman-estates-il","sourceRecordId":"compass-hoffman-estates-il","name":"Compass Datacenters Hoffman Estates Campus","operator":"Compass Datacenters","city":"Hoffman Estates","county":"Cook","address":"3333 Beverly Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0770709,"longitude":-88.2175155,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/compass-hoffman-estates-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.compassdatacenters.com/news/compass-kicks-off-development-of-its-first-hyperscale-campus-in-illinois/","label":"Compass Kicks Off Development of Its First Hyperscale Campus in Illinois","publisher":"Compass Datacenters","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.datacenterfrontier.com/hyperscale/article/55089460/suburban-chicago-welcomes-compass-datacenters-major-hyperscale-development-on-legacy-sears-hq-site","label":"Suburban Chicago Welcomes Compass Datacenters' Major Hyperscale Development on Legacy Sears HQ Site","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-coresite-ch1-chicago-il","sourceRecordId":"coresite-ch1-chicago-il","name":"CoreSite CH1","operator":"CoreSite","city":"Chicago","county":"Cook","address":"427 S. LaSalle St.","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8763329,"longitude":-87.6314808,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-ch1-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/ch1-chicago-il","label":"CoreSite CH1 — Chicago, IL data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-08-31"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (Coresite, L.P., Chicago, 2020 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-08-31"}]},{"id":"compute-coresite-ch2-chicago-il","sourceRecordId":"coresite-ch2-chicago-il","name":"CoreSite CH2","operator":"CoreSite","city":"Chicago","county":"Cook","address":"1432 S. Clinton St.","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8628,"longitude":-87.6413029,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-ch2-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/ch2-chicago-il","label":"CoreSite CH2 — Chicago, IL data center","publisher":"CoreSite","kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-cyrusone-chi1-chi3-aurora-il","sourceRecordId":"cyrusone-chi1-chi3-aurora-il","name":"CyrusOne CHI1-CHI3 (Aurora)","operator":"CyrusOne","city":"Aurora","county":"Kane","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.7966077,"longitude":-88.2438232,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-chi1-chi3-aurora-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/aurora-il","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/199252950","label":"OpenStreetMap way/199252950","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.cyrusone.com/resources/blogs/cyrusone-intelliscale-design-and-ai-data-center-faq","label":"CyrusOne AI/HPC — Aurora campus AI-optimized via CyrusOne Intelliscale high-density desi","publisher":"cyrusone.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.cyrusone.com/data-centers/north-america/aurora-il-back-up-generator-schedule","label":"CyrusOne Aurora IL back-up generator schedule (ComEd coordination)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-cyrusone-sangamon-talkington-township-il","sourceRecordId":"cyrusone-sangamon-talkington-township-il","name":"CyrusOne Sangamon County Data Center Campus","operator":"CyrusOne","city":null,"county":"Sangamon","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":39.64,"longitude":-89.84,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-sangamon-talkington-township-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.illinoistimes.com/news/sangamon-county-approves-data-center/","label":"Sangamon County approves data center","publisher":"Illinois Times","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.illinoistimes.com/news/area-data-center-updates/","label":"Area data center updates","publisher":"Illinois Times","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.illinoistimes.com/news/first-data-center-in-sangamon-county/","label":"First data center in Sangamon County","publisher":"Illinois Times","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.nprillinois.org/sangamon-county/2026-04-07/sangamon-county-board-approves-a-controversial-data-center-project","label":"Sangamon County Board approves a controversial data center project","publisher":"NPR Illinois","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-cyrusone-chi6-wood-dale-il","sourceRecordId":"cyrusone-chi6-wood-dale-il","name":"CyrusOne Wood Dale Campus","operator":"CyrusOne","city":"Wood Dale","county":"DuPage","address":"Bryn Mawr Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9790594,"longitude":-87.964189,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-chi6-wood-dale-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony","label":"CyrusOne Celebrates Wood Dale Topping Out Ceremony","publisher":"CyrusOne","kind":"press","retrievedAt":"2026-08-31"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (C1 Chicago 1 LLC - C1 Chicago 2 LLC, Wood Dale, 2024 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-cyrusone-yorkville-chi11-il","sourceRecordId":"cyrusone-yorkville-chi11-il","name":"CyrusOne Yorkville Technology Campus (CHI-11)","operator":"CyrusOne","city":"Yorkville","county":"Kendall","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.679,"longitude":-88.48,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-yorkville-chi11-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yorkville.il.us/940/C1-Yorkville-Cyrus-One-CHI-11-Data-Cente","label":"C1 Yorkville – Cyrus One CHI-11 Data Center Campus (Major PUD Amendment & Preliminary PUD Plan), case PZC 2026-03","publisher":"City of Yorkville, Illinois","kind":"permit","retrievedAt":"2026-09-12"},{"url":"https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus","label":"Yorkville Technology Campus","publisher":"CyrusOne","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — C1 Yorkville LLC, Yorkville, 2024 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-databank-ord3-mount-prospect-il","sourceRecordId":"databank-ord3-mount-prospect-il","name":"DataBank ORD3 (Mount Prospect)","operator":"DataBank","city":"Mount Prospect","county":"Cook","address":"800 E. Business Center Drive","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0771274,"longitude":-87.9238121,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-ord3-mount-prospect-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/chicago/","label":"DataBank Chicago data centers (ORD1–ORD4)","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-databank-ord4-oak-brook-il","sourceRecordId":"databank-ord4-oak-brook-il","name":"DataBank ORD4 (Chicago Tri-State)","operator":"DataBank","city":"Oak Brook","county":"DuPage","address":"1808 Swift Drive","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.85392,"longitude":-87.9221234,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-ord4-oak-brook-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/chicago/","label":"DataBank Chicago data centers (ORD1–ORD4)","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-digital-realty-ch2-il","sourceRecordId":"digital-realty-ch2-il","name":"Digital Realty CH2","operator":"Digital Realty","city":"Elk Grove Village","county":"Cook","address":"2299 Busse Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9945332,"longitude":-87.9577513,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ch2-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch2","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/713433204","label":"OpenStreetMap way/713433204","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-ch3-elk-grove-village-il","sourceRecordId":"digital-realty-ch3-elk-grove-village-il","name":"Digital Realty CH3","operator":"Digital Realty","city":"Elk Grove Village","county":"Cook","address":"1400 E Devon Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9927374,"longitude":-87.9968732,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ch3-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch3","label":"Digital Realty CH3 — 1400 East Devon Avenue, Elk Grove Village, IL (305,500 sq ft)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-25"},{"url":"https://www.digitalrealty.com/data-centers/americas/chicago","label":"Digital Realty Chicago metro data center index","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-25"}]},{"id":"compute-digital-realty-chicago-ch1-il","sourceRecordId":"digital-realty-chicago-ch1-il","name":"Digital Realty Chicago CH1","operator":"Digital Realty","city":"Elk Grove Village","county":"Cook","address":"2200 Busse Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9942413,"longitude":-87.961935,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-chicago-ch1-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch1","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/128499684","label":"OpenStreetMap way/128499684","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-ord10-il","sourceRecordId":"digital-realty-ord10-il","name":"Digital Realty ORD10","operator":"Digital Realty","city":"Chicago","county":"Cook","address":"350 East Cermak Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8533507,"longitude":-87.6183067,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ord10-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord10","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/10910879064","label":"OpenStreetMap node/10910879064","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-digital-realty-ord11-il","sourceRecordId":"digital-realty-ord11-il","name":"Digital Realty ORD11","operator":"Digital Realty","city":"Chicago","county":"Cook","address":"600 South Federal Street","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8743036,"longitude":-87.6299404,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ord11-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord11","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/149379943","label":"OpenStreetMap way/149379943","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-ord12-franklin-park-il","sourceRecordId":"digital-realty-ord12-franklin-park-il","name":"Digital Realty ORD12","operator":"Digital Realty","city":"Franklin Park","county":"Cook","address":"9333 Grand Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9283705,"longitude":-87.8592552,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ord12-franklin-park-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord12","label":"Digital Realty ORD12 — 9333 Grand Avenue, Franklin Park","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-digital-realty-ord13-franklin-park-il","sourceRecordId":"digital-realty-ord13-franklin-park-il","name":"Digital Realty ORD13","operator":"Digital Realty","city":"Franklin Park","county":"Cook","address":"9355 W Grand Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9290818,"longitude":-87.8587696,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ord13-franklin-park-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord13","label":"Digital Realty ORD13 — 9355 Grand Avenue, Franklin Park, IL 60131 (224,500 sq ft)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-25"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report (Digital Realty Franklin Park campus addresses incl. 9355 West Grand Avenue)","publisher":"Illinois DCEO","kind":"subsidy","retrievedAt":"2026-09-25"}]},{"id":"compute-digital-realty-ord14-franklin-park-il","sourceRecordId":"digital-realty-ord14-franklin-park-il","name":"Digital Realty ORD14","operator":"Digital Realty","city":"Franklin Park","county":"Cook","address":"9377 W Grand Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9291102,"longitude":-87.8594098,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ord14-franklin-park-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord14","label":"Digital Realty ORD14 — 9377 Grand Avenue, Franklin Park, IL 60131 (130,500 sq ft)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-25"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report (Digital Realty Franklin Park campus addresses incl. 9377 West Grand Avenue)","publisher":"Illinois DCEO","kind":"subsidy","retrievedAt":"2026-09-25"}]},{"id":"compute-digital-realty-ord23-northlake-il","sourceRecordId":"digital-realty-ord23-northlake-il","name":"Digital Realty ORD23","operator":"Digital Realty","city":"Northlake","county":"Cook","address":"505 N Railroad Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9196689,"longitude":-87.9129266,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-ord23-northlake-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord23","label":"Digital Realty ORD23 — 505 North Railroad Avenue, Northlake, IL 60164 (186,500 sq ft)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-25"},{"url":"https://www.digitalrealty.com/data-centers/americas/chicago","label":"Digital Realty Chicago metro data center index","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-25"}]},{"id":"compute-edgeconnex-chi01-elk-grove-village-il","sourceRecordId":"edgeconnex-chi01-elk-grove-village-il","name":"EdgeConneX CHI01","operator":"EdgeConneX","city":"Elk Grove Village","county":"Cook","address":"1800 Nicholas Blvd","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0007753,"longitude":-87.9507686,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-chi01-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edgeconnex.com/wp-content/uploads/2024/09/Chicago-Data-Sheet.pdf","label":"EdgeConneX Chicago (CHI01, CHI02, CHI03) Data Sheet","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://nominatim.openstreetmap.org/search?q=1800+Nicholas+Boulevard,+Elk+Grove+Village,+IL&format=json","label":"OpenStreetMap: EdgeConneX CHI01, 1800 Nicholas Boulevard","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-15"}]},{"id":"compute-edgeconnex-chi02-il","sourceRecordId":"edgeconnex-chi02-il","name":"EdgeConneX CHI02","operator":"EdgeConneX","city":"Elk Grove Village","county":"Cook","address":"2021 Lunt Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0014952,"longitude":-87.9525624,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-chi02-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/chicago-il/","label":"EdgeConneX official locations page - Chicago","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/377032058","label":"OpenStreetMap way/377032058","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/","label":"EdgeConneX AI/HPC — EdgeConneX and Lambda announced a 23MW single-tenant liquid-cooled AI ","publisher":"edgeconnex.com","kind":"press","retrievedAt":"2026-07-23"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://lambda.ai/blog/lambda-edgeconnex-dc-pr","label":"Lambda — \"EdgeConneX and Lambda To Build AI Factory In Chicago\" (official announcement)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://platform.inflect.com/building/2021-lunt-avenue-elk-grove-village/edgeconnex/datacenter/edcchi02","label":"Inflect — EdgeConneX EDCCHI02, 2021 Lunt Avenue, Elk Grove Village IL","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://edgeconnex.com/wp-content/uploads/2024/09/Chicago-Data-Sheet.pdf","label":"EdgeConneX Chicago (CHI01, CHI02, CHI03) Data Sheet","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-edged-aurora-il","sourceRecordId":"edged-aurora-il","name":"Edged Chicago Campus — Aurora (ORD01)","operator":"Edged US","city":"Aurora","county":"DuPage","address":"2835 Bilter Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.79,"longitude":-88.284,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edged-aurora-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edged.us/news/edged-us-expands-chicagoland-campus","label":"Edged US Expands Chicagoland Campus with Second AI Data Center Groundbreaking","publisher":"Edged US","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.nprillinois.org/2026-03-26/aurora-passes-some-of-the-strongest-data-center-regulations-in-illinois","label":"Aurora passes some of the strongest data center regulations in Illinois","publisher":"NPR Illinois","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://datacenter.news/story/edged-opens-high-tech-eco-friendly-data-centre-in-aurora","label":"Edged opens high-tech, eco-friendly data centre in Aurora","publisher":"DataCenterNews US","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://edged.us/news","label":"Edged US news (June 4, 2026: second data center tops out on Edged Chicago Campus)","publisher":"Edged US","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-edged-dekalb-project-vector-il","sourceRecordId":"edged-dekalb-project-vector-il","name":"Edged DeKalb Campus (Project Vector)","operator":"Edged (Endeavour Energy)","city":"DeKalb","county":"DeKalb","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.878256,"longitude":-88.753784,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edged-dekalb-project-vector-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityofdekalb.com/DocumentCenter/View/21222/Development-Projects-List-7-15-26-","label":"City of DeKalb Zoning & Development Projects list as of 7/15/2026 — JJK 343 LLC / Edged (Project Vector), Rt. 23 and Keslinger Rd, 560 acres, approved 12/8/25","publisher":"City of DeKalb","kind":"permit","retrievedAt":"2026-09-25"},{"url":"https://www.shawlocal.com/daily-chronicle/2025/12/09/unanimous-yes-to-560-acre-dekalb-data-center/","label":"Unanimous yes to 560-acre DeKalb data center","publisher":"Shaw Local / Daily Chronicle","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-","label":"City of DeKalb Zoning & Development Projects list as of 3/18/2026","publisher":"City of DeKalb","kind":"permit","retrievedAt":"2026-09-25"}]},{"id":"compute-element-critical-chicago-one-il","sourceRecordId":"element-critical-chicago-one-il","name":"Element Critical Chicago One","operator":"Element Critical","city":"Wood Dale","county":"DuPage","address":"711 North Edgewood Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9757324,"longitude":-87.9646913,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/element-critical-chicago-one-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://elementcritical.com/data-centers/chicago-one/","label":"Element Critical facility directory","publisher":"Element Critical","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/384690290","label":"OpenStreetMap way/384690290","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-element-critical-chicago-two-il","sourceRecordId":"element-critical-chicago-two-il","name":"Element Critical Chicago Two","operator":"Element Critical","city":"Wood Dale","county":"DuPage","address":"341 Haynes Drive","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9742269,"longitude":-87.9671756,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/element-critical-chicago-two-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://elementcritical.com/data-centers/chicago-two/","label":"Element Critical facility directory","publisher":"Element Critical","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/377212693","label":"OpenStreetMap way/377212693","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-ch1-il","sourceRecordId":"equinix-ch1-il","name":"Equinix CH1","operator":"Equinix","city":"Chicago","county":"Cook","address":"350 East Cermak Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8535578,"longitude":-87.6180475,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ch1-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch1","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12695496267","label":"OpenStreetMap node/12695496267","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-equinix-ch3-elk-grove-village-il","sourceRecordId":"equinix-ch3-elk-grove-village-il","name":"Equinix CH3 (Elk Grove Village)","operator":"Equinix","city":"Elk Grove Village","county":"Cook","address":"1905 Lunt Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0010753,"longitude":-87.9552651,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ch3-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/equinix-chicago-ch3","label":"Equinix Chicago CH3","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://nominatim.openstreetmap.org/search?q=1905+Lunt+Avenue,+Elk+Grove+Village,+IL&format=json","label":"OpenStreetMap: Equinix Chicago CH3, 1905 Lunt Avenue, Elk Grove Village","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-15"}]},{"id":"compute-equinix-ch7-il","sourceRecordId":"equinix-ch7-il","name":"Equinix CH7","operator":"Equinix","city":"Westmont","county":"DuPage","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8125627,"longitude":-87.9728504,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ch7-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch7","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/243242167","label":"OpenStreetMap way/243242167","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-ch8-minooka-il","sourceRecordId":"equinix-ch8-minooka-il","name":"Equinix CH8 Minooka","operator":"Equinix","city":"Minooka","county":"Grundy","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.4506,"longitude":-88.262,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ch8-minooka-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx","label":"Equinix proposes billion-dollar data center investment in Minooka","publisher":"Patch","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-hut8-batavia-il","sourceRecordId":"hut8-batavia-il","name":"Hut 8 Batavia Data Center","operator":"Batavia DC Corp (Hut 8 Corp subsidiary)","city":"Batavia","county":"Kane","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.859,"longitude":-88.275,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hut8-batavia-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.shawlocal.com/kane-county-chronicle/2025/08/01/batavia-data-center-gets-nod-as-residents-worry-about-it-gobbling-up-energy-reserves/","label":"Batavia data center gets nod as residents worry about it 'gobbling up' energy reserves","publisher":"Shaw Local / Kane County Chronicle","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.shawlocal.com/kane-county-chronicle/2025/09/02/500m-batavia-data-center-could-be-limited-to-1k-gallons-of-water-per-day/","label":"$500M Batavia data center could be limited to 1K gallons of water per day","publisher":"Shaw Local / Kane County Chronicle","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.globenewswire.com/news-release/2025/08/26/3139102/0/en/Hut-8-Announces-Plans-to-Develop-Four-New-Sites-with-More-Than-1-5-GW-of-Total-Capacity.html","label":"Hut 8 Announces Plans to Develop Four New Sites with More Than 1.5 GW of Total Capacity","publisher":"GlobeNewswire (Hut 8 Corp)","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://il-batavia.civicplus.com/1248/City-of-Batavia-Data-Center-Project","label":"City of Batavia Data Center Project","publisher":"City of Batavia, IL (official)","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://baxtel.com/data-center/hut-8-batavia-il","label":"Hut 8: Batavia, IL Data Center","publisher":"Baxtel (data center directory)","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://poweredbywho.com/projects/hut-8-batavia-data-center-22915976","label":"Hut 8 Batavia Data Center, Illinois","publisher":"PoweredByWho","kind":"press","retrievedAt":"2026-08-03"}]},{"id":"compute-hydravault-chicago-il","sourceRecordId":"hydravault-chicago-il","name":"HydraVault Chicago","operator":"HydraVault","city":"Chicago","county":"Cook","address":"2538 South Wabash Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.846546,"longitude":-87.6254598,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hydravault-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/hydravault-secures-construction-permit-for-downtown-chicagos-first-purpose-built-ai-facility-power-construction-to-commence-work-immediately-302596035.html","label":"HydraVault Secures Construction Permit for Downtown Chicago's First Purpose-Built AI Facility","publisher":"HydraVault via PR Newswire","kind":"press","retrievedAt":"2026-08-31"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (HydraVault LLC, Chicago, 2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-iron-mountain-chi1-des-plaines-il","sourceRecordId":"iron-mountain-chi1-des-plaines-il","name":"Iron Mountain CHI-1","operator":"Iron Mountain Data Centers","city":"Des Plaines","county":"Cook","address":"1680 Touhy Ave","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0116575,"longitude":-87.8811913,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-chi1-des-plaines-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/chicago-data-center","label":"Iron Mountain Chicago data center (CHI-1), Des Plaines","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (Iron Mountain Data Centers, LLC, Des Plaines, 2024 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-joliet-technology-center-il","sourceRecordId":"joliet-technology-center-il","name":"Joliet Technology Center","operator":"HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)","city":"Joliet","county":"Will","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.432,"longitude":-88.128,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/joliet-technology-center-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-planned-on-795-acres-of-farmland-in-south-joliet-illinois/","label":"Data center planned on 795 acres of farmland in south Joliet, Illinois","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.nbcchicago.com/news/local/city-of-joliet-approves-plans-for-what-could-be-the-largest-data-center-in-illinois/3910932/","label":"City of Joliet approves plans for what could be the largest data center in Illinois","publisher":"NBC Chicago","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cbsnews.com/chicago/news/joliet-city-council-approves-data-center-plan/","label":"Joliet City Council approves plans for Illinois' largest data center","publisher":"CBS Chicago","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.constructionowners.com/news/joliet-approves-massive-795-acre-data-center-project","label":"Joliet Approves Illinois' Largest Data Center, 795-Acre Project Moves Forward","publisher":"Construction Owners","kind":"press","retrievedAt":"2026-08-03"}]},{"id":"compute-karis-critical-hoffman-estates-plum-farms-il","sourceRecordId":"karis-critical-hoffman-estates-plum-farms-il","name":"Karis Critical Hoffman Estates Data Center (Plum Farms)","operator":"Karis Critical (H.E. Holdings LLC)","city":"Hoffman Estates","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.074441,"longitude":-88.189834,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/karis-critical-hoffman-estates-plum-farms-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nprillinois.org/economy-business/2026-07-02/developer-withdraws-rezoning-request-for-controversial-data-center-in-hoffman-estates","label":"Developer withdraws rezoning request for controversial data center in Hoffman Estates","publisher":"NPR Illinois / Capitol News Illinois","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-karis-critical-naperville-il","sourceRecordId":"karis-critical-naperville-il","name":"Karis Critical Naperville Data Center","operator":"Karis Critical","city":"Naperville","county":"DuPage","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.809029,"longitude":-88.117382,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/karis-critical-naperville-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cbsnews.com/chicago/news/naperville-city-council-to-vote-on-controversial-data-center/","label":"Naperville City Council votes against proposed data center plan","publisher":"CBS News Chicago","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-karis-dekalb-campus-il","sourceRecordId":"karis-dekalb-campus-il","name":"KARIS DeKalb Campus (Peace and Gurler Roads)","operator":"Karis Acquisitions","city":"DeKalb","county":"DeKalb","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.892979,"longitude":-88.724193,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/karis-dekalb-campus-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityofdekalb.com/DocumentCenter/View/21222/Development-Projects-List-7-15-26-","label":"City of DeKalb Zoning & Development Projects list as of 7/15/2026 — Steven Goldin and Karis Acquisitions, NE Corner of Peace and Gurler Roads, 1,750,000 sq ft data center in seven buildings, approved 7/22/24","publisher":"City of DeKalb","kind":"permit","retrievedAt":"2026-09-25"},{"url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-","label":"City of DeKalb Zoning & Development Projects list as of 3/18/2026 (same entry)","publisher":"City of DeKalb","kind":"permit","retrievedAt":"2026-09-25"}]},{"id":"compute-lambda-chicago-edgeconnex-il","sourceRecordId":"lambda-chicago-edgeconnex-il","name":"Lambda Chicago EdgeConneX AI Factory","operator":"Lambda","city":"Chicago","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8781,"longitude":-87.6298,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lambda-chicago-edgeconnex-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lambda.ai/blog/lambda-edgeconnex-dc-pr","label":"Lambda/EdgeConneX joint press release - AI Factory in Chicago and Atlanta","publisher":"Lambda.ai","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/","label":"EdgeConneX press release - AI Factory in Chicago and Atlanta","publisher":"EdgeConneX","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/edgeconnex-to-build-data-centers-in-chicago-and-atlanta-for-lambda/","label":"EdgeConneX to build data centers in Chicago and Atlanta for Lambda","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/edgeconnex-chi03","label":"EdgeConneX CHI03 - Elk Grove Village campus, Cook County","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-hut8-logan-prairie-latham-il","sourceRecordId":"hut8-logan-prairie-latham-il","name":"Logan Prairie Data Center","operator":"Hut 8 Corp","city":"Latham","county":"Logan","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":39.9672,"longitude":-89.1614,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hut8-logan-prairie-latham-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hut8.com/data-centers/logan-prairie","label":"Logan Prairie Data Center — Hut 8","publisher":"Hut 8 Corp","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.illinoistimes.com/news/future-uncertain-for-logan-county-data-center/","label":"Future uncertain for Logan County data center","publisher":"Illinois Times","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-western-hospitality-partners-pekin-il","sourceRecordId":"western-hospitality-partners-pekin-il","name":"Lutticken Farm Data Center (Pekin)","operator":"Western Hospitality Partners","city":"Pekin","county":"Tazewell","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":40.5847113,"longitude":-89.58595,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/western-hospitality-partners-pekin-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nprillinois.org/illinois/2026-03-09/data-center-wont-be-built-in-pekin","label":"Data center won't be built in Pekin","publisher":"NPR Illinois","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-menlo-digital-chicago-exchange-il","sourceRecordId":"menlo-digital-chicago-exchange-il","name":"Menlo Digital Chicago Exchange (601 West Polk)","operator":"Menlo Digital (Menlo Equities)","city":"Chicago","county":"Cook","address":"601 W Polk Street","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8716062,"longitude":-87.6430697,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/menlo-digital-chicago-exchange-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.menloequities.com/properties/601-polk-west-polk-street/","label":"601 West Polk Street, Chicago — property page (104,000 SF data center, 8 MW installed)","publisher":"Menlo Equities","kind":"other","retrievedAt":"2026-09-25"},{"url":"https://blockclubchicago.org/2026/08/12/data-centers-are-popping-up-everywhere-in-chicago-heres-where-and-why-theyre-controversial/","label":"Block Club Chicago data center map — Menlo Digital Chicago, 601 W. Polk St., open","publisher":"Block Club Chicago","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-eagle-rock-meridian-technology-park-taylorville-il","sourceRecordId":"eagle-rock-meridian-technology-park-taylorville-il","name":"Meridian Technology Park","operator":"Eagle Rock Partners","city":"Clarksdale","county":"Christian","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":39.489771,"longitude":-89.36787,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eagle-rock-meridian-technology-park-taylorville-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mlq.ai/news/eagle-rock-partners-proposes-88b-1gw-data-center-campus-in-christian-county-illinois/","label":"Eagle Rock Partners Proposes $8.8B, 1GW Data Center Campus in Christian County, Illinois","publisher":"MLQ News","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.datacenterdynamics.com/en/news/property-developer-eagle-rock-proposes-1gw-data-center-in-christian-county-illinois/","label":"Property developer Eagle Rock proposes 1GW data center in Christian County, Illinois","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.breezecourier.com/local-news/christian-county-board-approves-agreements-hears-public-comment-a0a72ec2","label":"Christian County Board approves agreements, hears public comment","publisher":"The Breeze Courier","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.illinoistimes.com/news/data-center-developer-abandons-plans-for-christian-county/","label":"Data center developer abandons plans for Christian County","publisher":"Illinois Times","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-meta-dekalb-data-center-il","sourceRecordId":"meta-dekalb-data-center-il","name":"Meta DeKalb Data Center","operator":"Meta","city":"DeKalb","county":"DeKalb","address":"2050 Metaverse Way","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.909,"longitude":-88.792,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-dekalb-data-center-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.atmeta.com/asset/dekalb-data-center-info-sheet/","label":"Meta — DeKalb Data Center info sheet","publisher":"Meta","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.datacenterdynamics.com/en/news/meta-launches-data-center-in-dekalb-illinois/","label":"Meta launches data center in DeKalb, Illinois","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.mystateline.com/news/local-news/meta-announces-dekalb-data-center-is-now-operational/","label":"Meta announces DeKalb Data Center is now operational","publisher":"WTVO/WQRF MyStateline","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — Goldframe LLC, DeKalb (2021 MOU, $800,000,000 commitment, 50 new jobs, underserved area)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"}]},{"id":"compute-metro-edge-imd1-chicago-il","sourceRecordId":"metro-edge-imd1-chicago-il","name":"Metro Edge IMD1","operator":"Metro Edge Development Partners","city":"Chicago","county":"Cook","address":"1951 W Hastings St","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8639696,"longitude":-87.6749686,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/metro-edge-imd1-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://medp.io/news/metro-edge-development-partners-secures-land-in-chicago-for-21mw-data-center","label":"Metro Edge Development Partners Secures Land in Chicago for 21MW Data Center","publisher":"Metro Edge Development Partners","kind":"press","retrievedAt":"2026-08-31"},{"url":"https://medp.io/projects/","label":"Metro Edge projects — IMD1 data center","publisher":"Metro Edge Development Partners","kind":"other","retrievedAt":"2026-08-31"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (MEDP Mission Critical Facility, LLC dba Metro Edge, Chicago, 2023 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-microsoft-elk-grove-village-il","sourceRecordId":"microsoft-elk-grove-village-il","name":"Microsoft Elk Grove Data Center","operator":"Microsoft","city":"Elk Grove Village","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.005,"longitude":-87.96,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-begins-construction-elk-grove-chicago/","label":"Microsoft begins data center construction in Elk Grove, Chicago","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://baxtel.com/data-center/microsoft-elk-grove","label":"Microsoft: Elk Grove Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — Microsoft Corporation, Elk Grove Village (2020 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"}]},{"id":"compute-microsoft-hoffman-estates-il","sourceRecordId":"microsoft-hoffman-estates-il","name":"Microsoft Hoffman Estates Data Center","operator":"Microsoft","city":"Hoffman Estates","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0769632,"longitude":-88.1338875,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-hoffman-estates-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — Microsoft Corporation, Hoffman Estates (2021 MOU, $275,000,000 commitment, 20 new jobs)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/microsoft-hoffman-estates-1","label":"Microsoft Hoffman Estates 1 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://rejournals.com/the-data-center-revolution-microsoft-project-in-hoffman-estates-just-one-of-many-in-illinois/","label":"The data center revolution: Microsoft project in Hoffman Estates just one of many in Illinois","publisher":"REJournals","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-microsoft-northlake-il","sourceRecordId":"microsoft-northlake-il","name":"Microsoft Northlake Data Center","operator":"Microsoft","city":"Northlake","county":"Cook","address":"601 Northwest Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9231062,"longitude":-87.9182633,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-northlake-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — Microsoft Corporation, Northlake (2021 MOU, $388,134,927 commitment, 20 new jobs)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/microsoft-chicago-northlake","label":"Microsoft Chicago Northlake Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-microsoft-plano-il","sourceRecordId":"microsoft-plano-il","name":"Microsoft Plano Data Center Site (Eldamain Road)","operator":"Microsoft","city":"Plano","county":"Kendall","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.685,"longitude":-88.493,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-plano-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://shawlocal.com/kendall-county-now/2024/10/27/next-steps-taken-for-microsoft-data-center-in-plano","label":"Next steps taken for Microsoft data center in Plano","publisher":"Shaw Local (Kendall County Now)","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-tract-morris-technology-park-il","sourceRecordId":"tract-morris-technology-park-il","name":"Morris Technology Park","operator":"Tract","city":"Morris","county":"Grundy","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.36,"longitude":-88.43,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-morris-technology-park-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/site-selection/article/55308975/scaling-up-tracts-master-planned-land-and-infrastructure-approach-to-data-center-development","label":"Scaling up: Tract's master-planned land and infrastructure approach to data center development","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.tract.com/news/tract-enters-greater-chicago-market-with-the-acquisition-of-343-acres-to-be-developed-as-a-1gw-data-center-campus-known-as-the-morris-technology-park/","label":"Tract enters Greater Chicago market with the acquisition of 343 acres to be developed as a 1GW data center campus (Morris Technology Park)","publisher":"Tract","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://morrisil.org/wp-content/uploads/2026_General-FAQs_Morris-Tract.pdf","label":"Frequently Asked Questions – Morris (Tract)","publisher":"City of Morris / Tract","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-netrality-717-south-wells-il","sourceRecordId":"netrality-717-south-wells-il","name":"Netrality 717 South Wells","operator":"Netrality Data Centers","city":"Chicago","county":"Cook","address":"717 South Wells Street","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8728811,"longitude":-87.63344,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/netrality-717-south-wells-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://netrality.com/locations/","label":"Netrality Data Centers facility directory","publisher":"Netrality Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/10537283366","label":"OpenStreetMap node/10537283366","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-ntt-chicago-ch1-data-center-il","sourceRecordId":"ntt-chicago-ch1-data-center-il","name":"NTT Chicago CH1 Data Center","operator":"NTT Global Data Centers","city":"Itasca","county":"DuPage","address":"255 Pierce Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9879619,"longitude":-88.0072217,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-chicago-ch1-data-center-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch1-data-center","label":"NTT facility directory","publisher":"NTT","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1154636644","label":"OpenStreetMap way/1154636644","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ntt-chicago-ch2-data-center-il","sourceRecordId":"ntt-chicago-ch2-data-center-il","name":"NTT Chicago CH2 Data Center","operator":"NTT Global Data Centers","city":"Itasca","county":"DuPage","address":"275 East Pierce Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9890149,"longitude":-88.0072131,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-chicago-ch2-data-center-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch2-data-center","label":"NTT Global Data Centers Americas facility directory","publisher":"NTT Global Data Centers Americas","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1271571726","label":"OpenStreetMap way/1271571726","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://nominatim.openstreetmap.org/search?q=NTT+Itasca+IL&format=json","label":"OpenStreetMap: NTT Chicago CH2, 275 East Pierce Road, Itasca","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-15"}]},{"id":"compute-ntt-chicago-ch3-itasca-il","sourceRecordId":"ntt-chicago-ch3-itasca-il","name":"NTT Chicago CH3 Data Center","operator":"NTT Global Data Centers","city":"Itasca","county":"DuPage","address":"235 East Pierce Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9870811,"longitude":-88.0082623,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-chicago-ch3-itasca-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://itasca.com/2279/NTT","label":"NTT data center campus (Village of Itasca)","publisher":"Village of Itasca","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://nominatim.openstreetmap.org/search?q=NTT+Itasca+IL&format=json","label":"OpenStreetMap: NTT Chicago CH3, 235 East Pierce Road, Itasca","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-15"}]},{"id":"compute-ntt-chicago-ch4-itasca-il","sourceRecordId":"ntt-chicago-ch4-itasca-il","name":"NTT Chicago CH4 Data Center","operator":"NTT Global Data Centers","city":"Itasca","county":"DuPage","address":"1200 Arlington Heights Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9892287,"longitude":-88.0047687,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-chicago-ch4-itasca-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://itasca.com/2279/NTT","label":"NTT data center campus (Village of Itasca)","publisher":"Village of Itasca","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://nominatim.openstreetmap.org/search?q=NTT+Itasca+IL&format=json","label":"OpenStreetMap: NTT Chicago CH4, 1200 Arlington Heights Road, Itasca","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-15"}]},{"id":"compute-oracle-elk-grove-village-il","sourceRecordId":"oracle-elk-grove-village-il","name":"Oracle Elk Grove Village Data Center","operator":"Oracle","city":"Elk Grove Village","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0035588,"longitude":-88.0037711,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oracle-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — Oracle America, Inc., Elk Grove Village (2025 MOU, $555,000,000 commitment, 20 new jobs)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"},{"url":"https://capitolnewsillinois.com/news/here-are-the-illinois-data-centers-on-track-for-more-than-650m-in-tax-credits/","label":"Here are the Illinois data centers on track for more than $650M in tax credits","publisher":"Capitol News Illinois","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://servercountry.org/data/projects/oracle-america-elk-grove-village-data-center-il/","label":"Oracle America — Elk Grove Village Data Center, Cook County","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-savion-plano-skies-data-center-il","sourceRecordId":"savion-plano-skies-data-center-il","name":"Plano Skies Data Center Campus (Rock Creek Road)","operator":"Savion","city":"Plano","county":"Kendall","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.675,"longitude":-88.5286,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/savion-plano-skies-data-center-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wspynews.com/news/local/proposed-plano-solar-project-expands-to-six-building-data-center-aldermen-lacked-details-before-meeting/article_8a61856e-a89d-4331-8251-d42ded175ecc.html","label":"Proposed Plano solar project expands to six-building data center; aldermen lacked details before meeting","publisher":"WSPY News","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-prime-ord-elk-grove-village-il","sourceRecordId":"prime-ord-elk-grove-village-il","name":"Prime ORD Chicago Campus","operator":"Prime Data Centers","city":"Elk Grove Village","county":"Cook","address":"1600 East Higgins Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0224688,"longitude":-87.9621839,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prime-ord-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/prime-data-centers-breaks-ground-on-1b-chicago-data-center-campus-in-elk-grove-village-301681170.html","label":"Prime Data Centers Breaks Ground on $1B Chicago Data Center Campus in Elk Grove Village","publisher":"Prime Data Centers via PR Newswire","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://primedatacenters.com/news/chicago-data-center-campus/","label":"Prime Data Centers — Chicago data center campus","publisher":"Prime Data Centers","kind":"press","retrievedAt":"2026-08-31"}]},{"id":"compute-project-cardinal-yorkville-il","sourceRecordId":"project-cardinal-yorkville-il","name":"Project Cardinal Data Center Campus","operator":"Pioneer Development LLC","city":"Yorkville","county":"Kendall","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.7,"longitude":-88.461,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/project-cardinal-yorkville-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne","label":"Project Cardinal Data Center Campus — City of Yorkville official permit page","publisher":"City of Yorkville, IL","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://www.shawlocal.com/kendall-county-now/2026/03/12/yorkville-data-center-approval-comes-after-nearly-6-hour-contentious-city-council-meeting/","label":"Yorkville data center approval after nearly 6-hour contentious City Council meeting","publisher":"Shaw Local / Kendall County Now","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.shawlocal.com/kendall-county-now/2026/04/29/yorkville-residents-file-lawsuit-against-the-city-to-halt-the-1034-acre-project-cardinal-data-center/","label":"Yorkville residents file lawsuit to halt Project Cardinal data center","publisher":"Shaw Local / Kendall County Now","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.yorkvilleherald.com/articles/yorkville-council-to-consider-settlement-in-project-cardinal-lawsuit","label":"Yorkville council to consider settlement in Project Cardinal lawsuit","publisher":"Yorkville Herald","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://poweredbywho.com/stories/illinois-data-center-boom-2026","label":"Illinois Data Center Boom: $20B+ Approved in Two Weeks","publisher":"PoweredByWho","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://www.yahoo.com/news/articles/illinois-town-approved-could-state-184426082.html","label":"Which Illinois town approved what could be the state's largest data center?","publisher":"Yahoo News","kind":"press","retrievedAt":"2026-08-03"}]},{"id":"compute-white-rose-project-kilo-south-elgin-il","sourceRecordId":"white-rose-project-kilo-south-elgin-il","name":"Project Kilo Data Center (South Elgin)","operator":"White Rose Partners","city":"South Elgin","county":"Kane","address":"33W304 Kenyon Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0007,"longitude":-88.2795,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/white-rose-project-kilo-south-elgin-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.shawlocal.com/kane-county-chronicle/2026/07/28/data-center-developer-launches-website-to-allay-south-elgins-fears/","label":"Data center developer launches website to allay South Elgin's fears","publisher":"Shaw Local / Kane County Chronicle","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-prologis-project-steel-yorkville-il","sourceRecordId":"prologis-project-steel-yorkville-il","name":"Project Steel Data Center Campus","operator":"Prologis","city":"Yorkville","county":"Kendall","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.699,"longitude":-88.484,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-project-steel-yorkville-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A","label":"Project Steel Data Center Campus (Annexation Agreement, Rezone, Preliminary PUD & PUD), case 2025-07","publisher":"City of Yorkville, Illinois","kind":"permit","retrievedAt":"2026-09-12"},{"url":"https://www.yorkvilleherald.com/articles/yorkville-city-council-approves-project-steel-data-center-amid-resident-opposition","label":"Yorkville City Council Approves \"Project Steel\" Data Center Amid Resident Opposition","publisher":"Yorkville Herald","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-qts-chicago-1-il","sourceRecordId":"qts-chicago-1-il","name":"QTS Chicago 1","operator":"QTS Data Centers","city":"Chicago","county":"Cook","address":"2800 S Ashland Ave","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8422152,"longitude":-87.6689701,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-chicago-1-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/chicago/","label":"QTS Chicago data center campus","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (Quality Technology Service (QTS), Chicago, 2021 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"}]},{"id":"compute-related-digital-8080-lake-shore-chicago-il","sourceRecordId":"related-digital-8080-lake-shore-chicago-il","name":"Related Digital South Works Campus (8080 S DuSable Lake Shore Drive)","operator":"Related Digital","city":"Chicago","county":"Cook","address":"8080 S DuSable Lake Shore Drive","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.7466434,"longitude":-87.5379905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/related-digital-8080-lake-shore-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related","label":"Related Companies accelerates push into data centers with capitalization of Related Digital","publisher":"Related Companies","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://blockclubchicago.org/2026/08/12/data-centers-are-popping-up-everywhere-in-chicago-heres-where-and-why-theyre-controversial/","label":"Data Centers Are Popping Up All Over Chicago. Here's Where","publisher":"Block Club Chicago","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://dcmap.us/states/illinois/","label":"Illinois data center map — 8080 S DuSable Lake Shore Drive, Related Digital, 1,000 MW planned","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-25"}]},{"id":"compute-monarch-rock-air-rockford-il","sourceRecordId":"monarch-rock-air-rockford-il","name":"Rock Air Data Center Campus","operator":"Monarch Energy","city":"Rockford","county":null,"address":"8685 Friday Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.1514357,"longitude":-89.101077,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/monarch-rock-air-rockford-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.rockfordnewsfirst.com/2026/07/01/incentive-deal-proposed-rockford-data-center-shows-possible-development-timeline/","label":"Incentive deal for proposed Rockford data center shows possible development timeline","publisher":"Rockford News First","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://dcmap.us/states/illinois/","label":"Illinois Data Center Map — Monarch Rock Air Data Center Campus","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-serverfarm-ch1-chicago-il","sourceRecordId":"serverfarm-ch1-chicago-il","name":"Serverfarm CH1","operator":"Serverfarm","city":"Chicago","county":"Cook","address":"840 South Canal Street","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8717114,"longitude":-87.6392312,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/serverfarm-ch1-chicago-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.serverfarmllc.com/chicago-data-center/","label":"Serverfarm CH1 Chicago data center","publisher":"Serverfarm","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (Serverfarm LLC dba SF CH1, LLC, Chicago, 2023 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-skybox-chicago-i-il","sourceRecordId":"skybox-chicago-i-il","name":"Skybox Chicago I","operator":"Skybox Datacenters","city":"Elk Grove Village","county":"Cook","address":"800 Devon Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9936612,"longitude":-87.973521,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/skybox-chicago-i-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.skyboxdatacenters.com/locations/skybox-chicago","label":"Skybox Datacenters official facility page","publisher":"Skybox Datacenters","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/383545769","label":"OpenStreetMap way/383545769","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-chi01-il","sourceRecordId":"stack-chi01-il","name":"STACK CHI01","operator":"STACK Infrastructure","city":"Elk Grove Village","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.006856,"longitude":-87.9651767,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-chi01-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/chicago/","label":"STACK Infrastructure facility directory","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/863162822","label":"OpenStreetMap way/863162822","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — STACK Infrastructure, Elk Grove Village (2020 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"}]},{"id":"compute-vme-lockport-star-innovation-district-il","sourceRecordId":"vme-lockport-star-innovation-district-il","name":"Star Innovation District Data Center (Lockport)","operator":"VME Developers","city":"Lockport","county":"Will","address":"302 W 2nd Street","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.5970347,"longitude":-88.0552886,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vme-lockport-star-innovation-district-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityoflockport.net/956/Data-Center-Information","label":"Data Center Information — City of Lockport official page","publisher":"City of Lockport","kind":"permit","retrievedAt":"2026-09-25"},{"url":"https://www.illinoisedc.org/vetted-site/star-innovation-district/","label":"Star Innovation District vetted site — 302 W 2nd Street, Lockport, 165 acres, publicly owned","publisher":"Illinois Economic Development Corporation","kind":"other","retrievedAt":"2026-09-25"}]},{"id":"compute-midwest-power-investors-rochelle-il","sourceRecordId":"midwest-power-investors-rochelle-il","name":"Steward Drive Data Center (Rochelle)","operator":"Midwest Power Investors LLC (LFF Industrial)","city":"Rochelle","county":"Ogle","address":"Steward Drive","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.8979132,"longitude":-89.0482469,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/midwest-power-investors-rochelle-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.rockfordnewsfirst.com/2026/04/28/rochelle-city-council-unanimously-rejects-data-center-proposal/","label":"Rochelle City Council unanimously rejects data center proposal","publisher":"Rockford News First","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-stream-chicago-i-orda-elk-grove-village-il","sourceRecordId":"stream-chicago-i-orda-elk-grove-village-il","name":"Stream Chicago I (ORDA)","operator":"Stream Data Centers","city":"Elk Grove Village","county":"Cook","address":"2080 Lunt Avenue","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0039,"longitude":-87.9703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stream-chicago-i-orda-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.streamdatacenters.com/locations/chicago-data-centers/","label":"Stream Data Centers — Chicago data centers","publisher":"Stream Data Centers","kind":"other","retrievedAt":"2026-08-17"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — SDC CHI I, LLC, Elk Grove Village (2021 MOU, underserved area)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"}]},{"id":"compute-stream-chicago-ii-ordb-elk-grove-village-il","sourceRecordId":"stream-chicago-ii-ordb-elk-grove-village-il","name":"Stream Chicago II (ORDB)","operator":"Stream Data Centers","city":"Elk Grove Village","county":"Cook","address":"1925 Busse Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0039,"longitude":-87.9703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stream-chicago-ii-ordb-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.streamdatacenters.com/locations/chicago-data-centers/","label":"Stream Data Centers — Chicago data centers","publisher":"Stream Data Centers","kind":"other","retrievedAt":"2026-08-17"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — SDC CHI II Busse, LLC, Elk Grove Village, 2022 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-stream-chicago-iii-ordc-elk-grove-village-il","sourceRecordId":"stream-chicago-iii-ordc-elk-grove-village-il","name":"Stream Chicago III (ORDC)","operator":"Stream Data Centers","city":"Elk Grove Village","county":"Cook","address":"2000 Landmeier Rd","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0039,"longitude":-87.9703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stream-chicago-iii-ordc-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.streamdatacenters.com/locations/chicago-data-centers/","label":"Stream Data Centers — Chicago data centers","publisher":"Stream Data Centers","kind":"other","retrievedAt":"2026-08-17"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — SDC CHI III, LLC, Elk Grove Village, 2025 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-t5-chicago-iii-northlake-il","sourceRecordId":"t5-chicago-iii-northlake-il","name":"T5 @ Chicago III (Northlake)","operator":"T5 Data Centers","city":"Northlake","county":"Cook","address":"11650 W Grand Ave","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":41.9310571,"longitude":-87.9145933,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/t5-chicago-iii-northlake-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.illinoiscrdc.com/illinoisdatacenters","label":"Illinois data center project table (T5 Chicago III, Northlake — 36 MW, under construction)","publisher":"Coalition for Responsible Data Centers","kind":"other","retrievedAt":"2026-08-31"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report (T5@Chicago III, LP, Northlake, 2024 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"}]},{"id":"compute-t5-chicago-v-elk-grove-village-il","sourceRecordId":"t5-chicago-v-elk-grove-village-il","name":"T5 @ Chicago V (CHI V)","operator":"T5 Data Centers","city":"Elk Grove Village","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0035588,"longitude":-88.0037711,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-chicago-v-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html","label":"T5 Data Centers expands Chicago footprint with acquisition of fifth data center (CHI V) in Elk Grove Village","publisher":"PR Newswire / T5 Data Centers","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-t5-chicago-ii-il","sourceRecordId":"t5-chicago-ii-il","name":"T5 Chicago II","operator":"T5 Data Centers","city":"Elk Grove Village","county":"Cook","address":"200 Innovation Drive","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0230424,"longitude":-87.9755567,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-chicago-ii-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/t5-chicago-ii","label":"Baxtel facility profile — T5 Chicago II","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1219083554","label":"OpenStreetMap way/1219083554","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — T5@Chicago II, LLC, Elk Grove Village (2020 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-12"}]},{"id":"compute-t5-chicago-iv-grayslake-il","sourceRecordId":"t5-chicago-iv-grayslake-il","name":"T5 Chicago IV (CHI IV)","operator":"T5 Data Centers","city":"Grayslake","county":"Lake","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.3442,"longitude":-88.0417,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/t5-chicago-iv-grayslake-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/t5-plans-five-gigawatt-scale-data-center-campuses-announces-chicago-campus/","label":"T5 plans five gigawatt-scale data center campuses, announces Chicago campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.dailyherald.com/20260608/news/despite-village-approvals-legal-action-expected-against-grayslake-data-center/","label":"Despite village approvals, legal action expected against Grayslake data center","publisher":"Daily Herald","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://hoodline.com/2026/05/grayslake-erupts-as-mega-data-campus-plows-ahead/","label":"Grayslake T5 Data Center Moves Ahead Amid Local Protests","publisher":"Hoodline","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.govtech.com/artificial-intelligence/data-center-could-be-largest-lake-county-ill-development","label":"Data Center Could Be Largest Lake County, Ill., Development","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.villageofgrayslake.com/DocumentCenter/View/15282","label":"Approved T5 Data Center Campus FAQ (updated June 5, 2026)","publisher":"Village of Grayslake","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Data Center Investment Program 2025 Annual Report — T5@Chicago IV, LP, Grayslake (2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-09-25"},{"url":"https://www.villageofgrayslake.com/DocumentCenter/View/15282/T5-FAQ-sheet","label":"Approved Village of Grayslake Data Center Campus FAQs (updated 18 August 2026)","publisher":"Village of Grayslake, Illinois","kind":"permit","retrievedAt":"2026-09-12"},{"url":"https://www.illinoiscrdc.com/illinoisdatacenters","label":"Illinois Data Centers — T5 Chicago IV, Grayslake, 1.2 GW IT (Phase 1: 480 MW)","publisher":"Coalition for Responsible Data Centers","kind":"other","retrievedAt":"2026-09-25"},{"url":"https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/","label":"Correction source","publisher":null,"kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-ta-realty-elk-grove-village-il","sourceRecordId":"ta-realty-elk-grove-village-il","name":"TA Realty Elk Grove Village Data Center","operator":"TA Realty","city":"Elk Grove Village","county":"Cook","address":null,"state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.0039,"longitude":-87.9703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ta-realty-elk-grove-village-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.journal-topics.com/articles/demolition-to-clear-way-for-47-acre-data-center-near-higgins-elmhurst/","label":"Demolition To Clear Way For 47-Acre Data Center Near Higgins & Elmhurst","publisher":"Journal & Topics Media Group","kind":"press","retrievedAt":"2026-08-17"}]},{"id":"compute-chirisa-volo-data-center-il","sourceRecordId":"chirisa-volo-data-center-il","name":"Volo Data Center","operator":"Chirisa Technology Parks","city":"Volo","county":"Lake","address":"300 S Fish Lake Road","state":"IL","stateName":"Illinois","jurisdictionType":"state","latitude":42.3486,"longitude":-88.1382,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/chirisa-volo-data-center-il","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/energy/article/55127752/coreweave-chirisa-illinois-data-center-project-taps-bloom-energy-for-fuel-cell-power-leans-into-microgrids","label":"CoreWeave, Chirisa Tap Bloom Energy For Illinois AI Data Center Project","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.microgridknowledge.com/data-center-microgrids/article/55126611/bloom-energy-bringing-fuel-cell-power-to-coreweave-data-center-project-in-illinois","label":"Bloom Energy Bringing Fuel Cell Power to CoreWeave Data Center Project","publisher":"Microgrid Knowledge","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://chirisatechnologyparks.com/bloom-energy-and-coreweave-partner-to-revolutionize-ai-data-center-power-solutions/","label":"Bloom Energy and CoreWeave Partner to Revolutionize AI Data Center Power Solutions","publisher":"Chirisa Technology Parks","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — Chirisa Volo LLC, Volo, 2023 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","kind":"subsidy","retrievedAt":"2026-10-15"}]},{"id":"compute-agincourt-valparaiso-porter-county-in","sourceRecordId":"agincourt-valparaiso-porter-county-in","name":"Agincourt Valparaiso Data Center Campus","operator":"Agincourt Investments, LLC","city":"Valparaiso","county":"Porter","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.5031027,"longitude":-87.0201162,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/agincourt-valparaiso-porter-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/products/valparaiso-ind-mayor-says-data-center-dead-after-outcry","label":"Valparaiso, Ind., Mayor Says Data Center Dead After Outcry","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/","label":"City of Valparaiso Statement on Data Center (March 7, 2025)","publisher":"GreatNews.Life","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-amazon-project-rainier-new-carlisle-in","sourceRecordId":"amazon-project-rainier-new-carlisle-in","name":"Amazon Project Rainier","operator":"Amazon Web Services","city":"New Carlisle","county":"St. Joseph","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.6978,"longitude":-86.5117,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-project-rainier-new-carlisle-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html","label":"Amazon opens $11B AI data center Project Rainier in Indiana — CNBC","publisher":"CNBC","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","label":"Gov. Holcomb announces AWS plans to invest $11B in Northern Indiana — IEDC","publisher":"Indiana Economic Development Corporation","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.insideindianabusiness.com/articles/incentives-approved-for-amazon-data-center-project","label":"Incentives approved for Amazon data center project","publisher":"Inside INdiana Business","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/st-joseph-county-leaders-approve-11bn-amazon-data-center-in-indiana/","label":"St. Joseph County leaders approve $11bn Amazon data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://measuredai.substack.com/p/aws-new-carlisle-data-center-campus","label":"AWS New Carlisle Data Center Campus: Project Rainier","publisher":"Measured AI","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://wsbt.com/news/local/wetland-impact-idem-sends-letter-halts-some-work-over-amazons-data-center-construction-impact","label":"IDEM halts some work over Amazon's unauthorized wetland impacts","publisher":"WSBT","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://wsbt.com/news/local/amazons-project-rainier-starts-operations-create-jobs-ai-billion-dollar-project-near-new-carlisle-st-joseph-county-indiana","label":"Amazon's 'Project Rainier' starts operations in New Carlisle","publisher":"WSBT","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://convergedigest.com/aws-activates-project-rainier-data-center-campus/","label":"AWS Activates Project Rainier Data Center Campus","publisher":"Converge Digest","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle","label":"Anthropic-Amazon New Carlisle | AI data centers","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-american-tower-pike-township-indianapolis-in","sourceRecordId":"american-tower-pike-township-indianapolis-in","name":"American Tower Pike Township Data Center","operator":"American Tower Corporation","city":"Indianapolis","county":"Marion","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.9241559,"longitude":-86.2030783,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/american-tower-pike-township-indianapolis-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/articles/american-tower-corporation-withdraws-data-051459463.html","label":"American Tower Corporation withdraws data center plans in Pike Township","publisher":"Yahoo News","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-aws-hobart-in","sourceRecordId":"aws-hobart-in","name":"AWS Hobart Campus","operator":"Amazon Web Services","city":"Hobart","county":"Lake","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.517,"longitude":-87.263,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-hobart-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-data-center-coming-to-hobart-indiana/","label":"AWS data center coming to Hobart, Indiana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://wsbt.com/news/local/amazon-data-center-15-billion-data-center-jobs-ai-nipsco-electric-grid-governor-mike-braun-northern-indiana-hobart-lake-county-indiana","label":"Newly announced Amazon data center to be built in Hobart","publisher":"WSBT 22","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.21alivenews.com/2025/11/25/hobart-reaches-agreement-with-amazon-next-gen-data-center/","label":"Hobart reaches agreement with Amazon for next-gen data center","publisher":"21Alive News","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.insideindianabusiness.com/articles/hobart-commission-approves-site-plans-for-amazon-data-center","label":"Hobart commission approves site plans for Amazon data center","publisher":"Inside INdiana Business","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://www.nbcchicago.com/news/local/hobart-to-vote-on-property-tax-abatement-on-amazon-data-center-project/3872989/","label":"Hobart to vote on property tax abatement on Amazon data center project","publisher":"NBC Chicago","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.fox32chicago.com/news/lawsuit-seeks-block-amazon-data-center-permit-hobart-ind","label":"Lawsuit seeks to block Amazon data center permit in Hobart","publisher":"Fox 32 Chicago","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","label":"Amazon Invests $15B in Northwest Indiana","publisher":"NWI Forum","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-aws-portage-in","sourceRecordId":"aws-portage-in","name":"AWS Portage Data Center (AmeriPlex at the Port)","operator":"Amazon Web Services","city":"Portage","county":"Porter","address":"West Prairie School Drive","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.6090532,"longitude":-87.170469,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/aws-portage-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage","label":"Amazon building $87M data center in Portage","publisher":"Inside INdiana Business","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-aws-wheatfield-in","sourceRecordId":"aws-wheatfield-in","name":"AWS Wheatfield Campus (Project Rise)","operator":"Amazon Web Services","city":"Wheatfield","county":"Jasper","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.1955,"longitude":-87.0586,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-wheatfield-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-plans-nine-building-data-center-campus-in-wheatfield-indiana/","label":"Amazon plans nine-building data center campus in Wheatfield, Indiana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.insideindianabusiness.com/articles/jasper-county-approves-amazon-web-services-7b-data-center-project","label":"Jasper County approves $7B Amazon Web Services data center project","publisher":"Inside INdiana Business","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/","label":"Officials approve Jasper County Amazon data center","publisher":"Northwest Indiana Business Magazine","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://nwitimes.com/news/local/article_54c53d5c-d0d8-4910-97a7-87b9d5391664.html","label":"Amazon gets greenlight for $7 billion data center bringing 250 jobs to NW Indiana","publisher":"NWI Times","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-province-group-bristol-innovation-park-elkhart-county-in","sourceRecordId":"province-group-bristol-innovation-park-elkhart-county-in","name":"Bristol Innovation Park","operator":"The Province Group","city":"Bristol","county":"Elkhart","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.7203,"longitude":-85.8175,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/province-group-bristol-innovation-park-elkhart-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol","label":"Undisclosed tech firm plans $1 billion data center for Bristol","publisher":"WVPE","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://www.wvpe.org/wvpe-news/2026-07-21/rezoning-for-possible-bristol-data-center-suffers-another-setback","label":"Rezoning for possible Bristol data center suffers another setback","publisher":"WVPE","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://www.wvpe.org/wvpe-news/2026-06-10/elkhart-county-planners-to-consider-proposed-bristol-data-center-project-july-9","label":"Elkhart County planners to consider proposed Bristol data center project July 9","publisher":"WVPE","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://www.wvpe.org/wvpe-news/2026-08-07/landowners-pull-rezoning-request-that-could-have-allowed-for-data-center-in-bristol","label":"Landowners pull rezoning request that could have allowed for data center in Bristol","publisher":"WVPE","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-coreweave-digital-crossroads-hammond-in","sourceRecordId":"coreweave-digital-crossroads-hammond-in","name":"CoreWeave Digital Crossroads","operator":"CoreWeave","city":"Hammond","county":"Lake","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.5836,"longitude":-87.5,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coreweave-digital-crossroads-hammond-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/coreweave-to-develop-180mw-data-center-at-digital-crossroads-campus-in-hammond-indiana/","label":"CoreWeave to develop 180MW data center at Digital Crossroads campus in Hammond, Indiana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/","label":"Hammond announces expiration of data center development agreement","publisher":"City of Hammond","kind":"other","retrievedAt":"2026-07-08"}]},{"id":"compute-dc-blox-warren-township-marion-county-in","sourceRecordId":"dc-blox-warren-township-marion-county-in","name":"DC BLOX Warren Township Data Center","operator":"DC BLOX","city":"Warren Township","county":"Marion","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.78,"longitude":-86.05,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-warren-township-marion-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/dc-blox-data-center-in-eastern-indianapolis-receives-recommendation-for-approval/","label":"DC Blox data center in eastern Indianapolis receives recommendation for approval","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.wfyi.org/wfyi-news/2026-07-15/east-side-data-center-wins-approval-despite-community-opposition","label":"East side data center wins approval, despite community opposition","publisher":"WFYI","kind":"press","retrievedAt":"2026-07-20"},{"url":"https://www.wrtv.com/news/politics/dc-blox-data-center-gets-key-approval-despite-community-opposition","label":"DC Blox data center gets key approval despite community opposition","publisher":"WRTV","kind":"press","retrievedAt":"2026-07-20"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.dcblox.com/indianapolisdatacenter/","label":"Indianapolis Data Center in Marion County, Indianapolis — DC BLOX","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-decennial-akron-fulton-county-in","sourceRecordId":"decennial-akron-fulton-county-in","name":"Decennial Group Akron Data Center","operator":"Decennial Group","city":"Akron","county":"Fulton","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.0387819,"longitude":-86.0282647,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/decennial-akron-fulton-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns","label":"Developer unveils data center plan in Akron amid resident concerns","publisher":"ABC57","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.datacenterbans.com/state/indiana","label":"Indiana — Data Center Moratoriums (Fulton County, 1 year, enacted 3/3/2026)","publisher":"Data Center Bans","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-digital-realty-kokomo-howard-county-in","sourceRecordId":"digital-realty-kokomo-howard-county-in","name":"Digital Realty Kokomo Data Center Campus (Industrial Park North)","operator":"Digital Realty","city":"Kokomo","county":"Howard","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":40.54,"longitude":-86.13,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-kokomo-howard-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wishtv.com/news/local-news/digital-realty-proposes-1-3-billion-data-center-project-in-kokomo/","label":"Digital Realty proposes $1.3 billion data center project in Kokomo","publisher":"WISH-TV","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.wishtv.com/news/i-team/data-center-developer-discusses-multi-billion-dollar-project-planned-in-kokomo/","label":"Data center developer discusses multi-billion dollar project planned in Kokomo","publisher":"WISH-TV","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.inkfreenews.com/2026/10/05/kokomo-mayor-backs-proposed-data-center/","label":"Kokomo Mayor Backs Proposed Data Center","publisher":"InkFreeNews","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-gibson-county-data-center-in","sourceRecordId":"gibson-county-data-center-in","name":"Gibson County Data Center","operator":"Undisclosed","city":null,"county":"Gibson","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":38.3079744,"longitude":-87.5775949,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/gibson-county-data-center-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cleanview.co/data-centers/indiana","label":"Data Centers in Indiana — Project List (Gibson County Data Center, undisclosed, 600 MW, planned)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://ailawtracker.org/data-centers","label":"Indiana Data Center Map | AI Infrastructure Projects (Gibson/Posey County, 600 MW, proposed)","publisher":"AI Law Tracker","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-google-fort-wayne-in","sourceRecordId":"google-fort-wayne-in","name":"Google Fort Wayne Data Center (Project Zodiac)","operator":"Google","city":"Fort Wayne","county":"Allen","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":40.99,"longitude":-85.056,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-fort-wayne-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","label":"Gov. Holcomb announces Google is building a $2B Data Center in Northeast Indiana","publisher":"State of Indiana","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/google-announces-2bn-campus-in-fort-wayne-indiana/","label":"Google announces $2bn data center campus in Fort Wayne, Indiana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wane.com/top-stories/2-billion-google-data-center-now-operational-in-fort-wayne-outlines-its-plans-for-the-community/","label":"$2 billion Google data center now operational in Fort Wayne","publisher":"WANE 15","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-google-franklin-township-indianapolis-in","sourceRecordId":"google-franklin-township-indianapolis-in","name":"Google Franklin Township Data Center (rezoning withdrawn)","operator":"Google","city":"Indianapolis","county":"Marion","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.72,"longitude":-85.97,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-franklin-township-indianapolis-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mirrorindy.org/google-withdraws-southside-data-center-proposal-franklin-township/","label":"Google withdraws southside data center proposal in Franklin Township","publisher":"Mirror Indy","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.wrtv.com/news/local-news/google-withdraws-rezoning-petition-for-proposed-data-center-in-franklin-township","label":"Google withdraws rezoning petition for proposed data center in Franklin Township","publisher":"WRTV","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.yahoo.com/news/articles/google-withdraws-data-center-zoning-003002417.html","label":"Is Franklin Township data center dead? Google withdraws petition just before Council hearing","publisher":"Yahoo News (IndyStar)","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-google-michigan-city-in","sourceRecordId":"google-michigan-city-in","name":"Google Michigan City Data Center","operator":"Google","city":"Michigan City","county":"LaPorte","address":"402 Royal Road","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.7075394,"longitude":-86.8950297,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-michigan-city-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/","label":"Google Data Centers — US locations","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://datacenters.google/locations/indiana/","label":"Google Data Centers — Indiana","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://nwindianabusiness.com/industries/professional-services/information-technology/michigan-city-welcomes-google-as-data-center-owner/77568/","label":"Michigan City welcomes Google as data center owner","publisher":"Northwest Indiana Business Magazine","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://wsbt.com/news/local/breaking-google-confirms-data-center-in-michigan-city-project-oyal-road-project-maize-underway-challenges-site-statement-michigan-city-laporte-county-indiana","label":"Google data center construction underway in Michigan City","publisher":"WSBT","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://www.wndu.com/2026/04/16/google-confirms-acquisition-michigan-city-data-center-site/","label":"Google confirms plans for data center in Michigan City","publisher":"WNDU","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://michigancityin.gov/major-projects/phoenix-investors-project-maize/","label":"Phoenix Investors / Project Maize — City of Michigan City major projects","publisher":"City of Michigan City","kind":"permit","retrievedAt":"2026-09-13"}]},{"id":"compute-google-project-louie-monrovia-in","sourceRecordId":"google-project-louie-monrovia-in","name":"Google Project Louie (Morgan County)","operator":"Google","city":"Monrovia","county":"Morgan","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.57,"longitude":-86.35,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-project-louie-monrovia-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-behind-390-acre-data-center-development-in-morgan-county-indiana/","label":"Google behind 390-acre data center development in Morgan County, Indiana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://specials.idsnews.com/data-center-morgan-county-indiana-billion-dollar/","label":"The billion-dollar neighbor: Data center special report","publisher":"Indiana Daily Student","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://dailyjournal.net/2025/10/22/google-reveals-itself-as-developer-behind-500-acre-morgan-county-data-center-campus/","label":"Google reveals itself as developer behind 500-acre Morgan County data center campus","publisher":"Daily Journal","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.citact.org/news/iurc-must-prioritize-public-interest-aes-indiana-data-center-proposal","label":"IURC Must Prioritize Public Interest in AES Indiana Data Center Proposal","publisher":"Citizens Action Coalition","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf","label":"AES Indiana Lee Direct Testimony, IURC Cause No. 46394 (filed Apr 22 2026)","publisher":"Indiana Utility Regulatory Commission","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://morgancountycorrespondent.com/2026/07/02/google-pressures-monrovia-to-end-annexation-effort/","label":"Google pressures Monrovia to end annexation effort","publisher":"Morgan County Correspondent","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.idsnews.com/article/2026/05/the-billion-dollar-neighbor-coming-to-morgan-county","label":"The billion-dollar neighbor coming to Morgan County","publisher":"Indiana Daily Student","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.wthr.com/article/news/local/morgan-co-data-center-project-advances-county-commissioner-vote-indiana/531-d9e68593-a393-4db9-b04e-292eeddda454","label":"Morgan County data center project advances despite major community pushback","publisher":"WTHR (NBC Indianapolis)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://dailyjournal.net/2025/10/17/aes-indiana-plans-1200-megawatt-substation-for-morgan-county-data-center/","label":"AES Indiana plans 1,200-megawatt substation for Morgan County data center","publisher":"Daily Journal (Johnson County, IN)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.ibj.com/articles/aes-indiana-details-plan-to-power-proposed-google-data-center-southwest-of-indianapolis","label":"AES Indiana details plan to power proposed Google data center southwest of Indianapolis","publisher":"Indianapolis Business Journal","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.insideindianabusiness.com/articles/indiana-regulators-ok-energy-project-tied-to-googles-morgan-county-data-center","label":"Indiana regulators OK energy project tied to Google's Morgan County data center","publisher":"Inside INdiana Business","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.ipm.org/news/2026-07-14/activist-group-blasts-energy-project-related-to-monrovia-data-center","label":"Activist group blasts energy project related to Monrovia data center","publisher":"Indiana Public Media","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-surge-hancock-county-megasite-buck-creek-township-in","sourceRecordId":"surge-hancock-county-megasite-buck-creek-township-in","name":"Hancock County MegaSite","operator":"Surge Development LLC","city":null,"county":"Hancock","address":"3400 W 500 N","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.82722,"longitude":-85.89833,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/surge-hancock-county-megasite-buck-creek-township-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/surge-hancock-county-megasite","label":"Surge: Hancock County MegaSite","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://wibc.com/623821/developer-pulls-application-to-build-data-center-in-hancock-county/","label":"Developer Pulls Application to Build Data Center in Hancock County","publisher":"WIBC","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-heartland-industrial-park-sullivan-county-in","sourceRecordId":"heartland-industrial-park-sullivan-county-in","name":"Heartland Industrial Park (Fluidstack Sullivan County Campus)","operator":"Fluidstack","city":"Merom","county":"Sullivan","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.0694,"longitude":-87.5108,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/heartland-industrial-park-sullivan-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wbiw.com/2026/04/08/potentia-inc-unveils-historic-65-billion-data-center-project-in-sullivan-county/","label":"Potentia Inc. unveils historic $65 Billion data center project in Sullivan County","publisher":"WBIW","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://sullivanenergydata.com/data-centers/heartland-industrial-park/","label":"Heartland Industrial Park — Sullivan County Indiana Energy & Data Centers","publisher":"Sullivan County Energy & Data Center Projects","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.wthitv.com/2026/08/06/fluidstack-hosts-open-house-sullivan-county-data-center-campus/","label":"FluidStack hosts open house for Sullivan County data center campus","publisher":"WTHI-TV","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.sullivanfluidstack.io/","label":"Sullivan County Data Center — Fluidstack project site","publisher":"Fluidstack","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://inforcapital.com/news/fluidstack-shares-details-of-planned-data-center-in-sullivan-county-indiana/","label":"Fluidstack's 2.1GW Indiana AI Data Center Campus","publisher":"Infor Capital","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://sullivanfluidstack.io","label":"Fluidstack Sullivan County campus","publisher":"Fluidstack","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-surge-henry-county-technology-park-knightstown-in","sourceRecordId":"surge-henry-county-technology-park-knightstown-in","name":"Henry County Technology Park","operator":"Surge Development LLC","city":"Knightstown","county":"Henry","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.822,"longitude":-85.533,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/surge-henry-county-technology-park-knightstown-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://indianapublicradio.org/news/2026/01/henry-county-data-center-approved-at-last-commissioners-vote/","label":"Henry County data center approved by last commissioners vote","publisher":"Indiana Public Radio","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.insideindianabusiness.com/articles/developer-behind-withdrawn-hancock-county-data-center-now-eyeing-henry-county-tech-park","label":"Developer behind withdrawn Hancock County data center now eyeing Henry County tech park","publisher":"Inside INdiana Business","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-jefferson-proving-ground-data-center-jefferson-county-in","sourceRecordId":"jefferson-proving-ground-data-center-jefferson-county-in","name":"Jefferson Proving Ground Data Center","operator":"Undisclosed","city":"Madison","county":"Jefferson","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":38.82,"longitude":-85.4,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/jefferson-proving-ground-data-center-jefferson-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.whas11.com/article/news/local/indiana/commissioners-uphold-decision-data-center-550-acres-jefferson-proving-grounds/417-10524221-dc8a-4566-96db-ebcf4cf4bdc2","label":"Commissioners uphold decision to allow a data center on 550 acres at Jefferson Proving Grounds","publisher":"WHAS11","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.wdrb.com/news/zoning-board-allows-controversial-madison-data-center-project-to-move-forward/article_e55a1071-bbe7-425a-98b5-d88c7a94d2b4.html","label":"Zoning board allows controversial Madison data center project to move forward","publisher":"WDRB","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.madisoncourier.com/carroll_news_democrat/news/proposed-jpg-data-center-could-generate-60m-taxes-annually/article_2804a794-5c76-548f-be98-8975b84b2284.html","label":"Proposed JPG data center could generate $60M taxes annually","publisher":"The Madison Courier","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.whas11.com/article/news/investigations/focus/data-center-madison-indiana-power/417-938dcab5-08d5-46d1-9f6a-3100d94e6fa2","label":"Questions persist about who will power the massive data center near Madison, Indiana","publisher":"WHAS11","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-jumping-bison-greensburg-decatur-county-in","sourceRecordId":"jumping-bison-greensburg-decatur-county-in","name":"Jumping Bison Greensburg Data Center","operator":"Jumping Bison LLC","city":"Greensburg","county":"Decatur","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.3372,"longitude":-85.4836,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/jumping-bison-greensburg-decatur-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/","label":"Greensburg Council Approves ERA Establishment, Data Center Abatement","publisher":"WRBI Radio","kind":"subsidy","retrievedAt":"2026-09-01"},{"url":"https://www.yahoo.com/news/development-coming-greensburg-011600861.html","label":"New development coming to Greensburg","publisher":"Greensburg Daily News via Yahoo","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-karis-critical-deep-river-merrillville-in","sourceRecordId":"karis-critical-deep-river-merrillville-in","name":"Karis Critical Deep River Campus","operator":"Karis Critical","city":"Merrillville","county":"Lake","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.47,"longitude":-87.27,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/karis-critical-deep-river-merrillville-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","label":"$2B+ in Data Center Projects Planned for Merrillville, Ind.","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-logix-reality-frankfort-clinton-county-in","sourceRecordId":"logix-reality-frankfort-clinton-county-in","name":"Logix Reality Frankfort Data Center","operator":"Logix Reality LLC","city":"Frankfort","county":"Clinton","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":40.2792,"longitude":-86.5108,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/logix-reality-frankfort-clinton-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.clintoncountytoday.com/commissioners-say-no-to-the-rezoning-of-land-for-data-center/","label":"Commissioners Say 'No' to the Rezoning of Land for Data Center","publisher":"Clinton County Today","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-province-group-merrillville-technology-park-in","sourceRecordId":"province-group-merrillville-technology-park-in","name":"Merrillville Technology Park","operator":"The Province Group","city":"Merrillville","county":"Lake","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.46,"longitude":-87.29,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/province-group-merrillville-technology-park-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","label":"$2B+ in Data Center Projects Planned for Merrillville, Ind.","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-meta-jeffersonville-in","sourceRecordId":"meta-jeffersonville-in","name":"Meta Jeffersonville Data Center","operator":"Meta","city":"Jeffersonville","county":"Clark","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":38.33,"longitude":-85.715,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-jeffersonville-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","label":"Hello, Jeffersonville! - Meta Data Centers","publisher":"Meta Data Centers","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.bloomberg.com/news/articles/2024-01-25/meta-building-new-800-million-ai-focused-data-center-in-indiana","label":"Meta Building New $800 Million AI-Focused Data Center in Indiana","publisher":"Bloomberg","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wave3.com/2025/10/05/jeffersonville-community-pushes-back-against-meta-data-center/","label":"Jeffersonville community pushes back against Meta data center","publisher":"WAVE 3 News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.facilitiesdive.com/news/meta-solar-energy-indiana-data-center-operations/716453/","label":"Facilities Dive - Meta to bring 210 MW of solar energy to Indiana","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-in-jeffersonville-indiana/","label":"Meta to develop data center campus in Jeffersonville, Indiana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-meta-lebanon-in","sourceRecordId":"meta-lebanon-in","name":"Meta Lebanon (Project Domino)","operator":"Meta","city":"Lebanon","county":"Boone","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":40.07,"longitude":-86.45,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-lebanon-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","label":"Meta's New Data Center in Lebanon, Indiana Marks a Milestone AI Investment","publisher":"Meta (about.fb.com)","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://indianacapitalchronicle.com/2026/02/11/details-on-long-expected-meta-data-center-campus-unveiled/","label":"Details on long-expected Meta data center campus unveiled","publisher":"Indiana Capital Chronicle","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/","label":"Meta Makes Lebanon Data Center Announcement Official","publisher":"City of Lebanon, IN","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://finance.yahoo.com/news/meta-announces-plans-to-build-1-gigawatt-data-center-in-indiana-as-part-of-ai-build-out-180052467.html","label":"Meta announces plans to build 1-gigawatt data center in Indiana as part of AI build-out","publisher":"Yahoo Finance","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-metrobloks-martindale-brightwood-indianapolis-in","sourceRecordId":"metrobloks-martindale-brightwood-indianapolis-in","name":"Metrobloks Martindale-Brightwood Data Center","operator":"Metrobloks","city":"Indianapolis","county":"Marion","address":"2505 N. Sherman Ave.","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.7975,"longitude":-86.1197,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/metrobloks-martindale-brightwood-indianapolis-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/metrobloks-pitches-500m-data-center-in-indianapolis-indiana/","label":"Metrobloks pitches $500m data center in Indianapolis, Indiana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-20"},{"url":"https://www.wfyi.org/wfyi-news/2026-04-01/controversial-data-center-is-approved-for-martindale-brightwood","label":"Controversial data center is approved for Martindale-Brightwood","publisher":"WFYI","kind":"press","retrievedAt":"2026-07-20"},{"url":"https://www.wrtv.com/news/local-news/metrobloks-500-million-data-center-approved-despite-neighborhood-concerns","label":"Metrobloks' $500 million data center approved despite neighborhood concerns","publisher":"WRTV","kind":"press","retrievedAt":"2026-07-20"},{"url":"https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan","label":"Martindale-Brightwood residents cite environmental concerns in suit against data center plan","publisher":"The Indiana Lawyer","kind":"press","retrievedAt":"2026-07-20"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","label":"Indianapolis council approves data center for Martindale-Brightwood","publisher":"WFYI","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-microsoft-granger-in","sourceRecordId":"microsoft-granger-in","name":"Microsoft Granger Data Center","operator":"Microsoft","city":"Granger","county":"St. Joseph","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.73,"longitude":-86.13,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-granger-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-buys-900-acre-st-joe-farm-indiana-for-data-center-build/","label":"Microsoft buys 900-acre St. Joe Farm, Indiana, for data center build","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wndu.com/2026/03/17/microsoft-data-center-mou-approved-st-joseph-county-amid-resident-concerns/","label":"Microsoft data center MOU approved in St. Joseph County amid resident concerns","publisher":"WNDU NBC South Bend","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://wsbt.com/news/local/town-hall-held-for-900-acre-microsoft-granger-data-center-capital-avenue-cleveland-road-construction-st-joe-farm-development-power-cost-water-usage-traffic-environmental-concerns-economic","label":"Granger meeting draws crowd for update on large Microsoft data center planned","publisher":"WSBT CBS South Bend","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://wsbt.com/news/local/construction-microsoft-data-center-could-begin-in-late-april-or-early-may-farm-granger-mishawaka-water","label":"Construction of Microsoft data center could begin in late April or early May","publisher":"WSBT","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting","label":"Microsoft data center concerns spark crowded Granger meeting","publisher":"WVPE","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.wvpe.org/wvpe-news/2026-05-30/st-joseph-county-officials-respond-to-data-center-construction-concerns","label":"St. Joseph County officials respond to data center construction concerns (construction underway)","publisher":"WVPE (NPR member station)","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.wndu.com/2026/05/19/microsoft-holds-open-house-granger-data-center-project/","label":"Microsoft holds open house for Granger data center project","publisher":"WNDU","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.953mnc.com/2026/03/19/microsoft-data-center-project-moves-forward-in-granger/","label":"Microsoft data center project moves forward in Granger","publisher":"95.3 MNC","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-microsoft-laporte-in","sourceRecordId":"microsoft-laporte-in","name":"Microsoft La Porte Data Center","operator":"Microsoft","city":"La Porte","county":"La Porte","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.595,"longitude":-86.735,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-laporte-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana","label":"Gov. Holcomb announces plans for new $1B Microsoft Data Center in Northwest Indiana","publisher":"City of La Porte, IN","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-expands-plans-for-la-porte-indiana-data-center-campus/","label":"Microsoft expands plans for La Porte, Indiana, data center campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-eqt-mt-comfort-technology-park-hancock-county-in","sourceRecordId":"eqt-mt-comfort-technology-park-hancock-county-in","name":"Mt. Comfort Technology Park","operator":"EQT Real Estate","city":"Mount Comfort","county":"Hancock","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.862,"longitude":-85.868,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eqt-mt-comfort-technology-park-hancock-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.greenfieldreporter.com/2026/08/14/developer-files-letter-of-intent-for-130-acre-multi-billion-dollar-data-center-campus/","label":"Developer files letter of intent for 130-acre, multi-billion-dollar data center campus","publisher":"The Daily Reporter (Greenfield)","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-new-carlisle-chicago-trail-data-center-st-joseph-county-in","sourceRecordId":"new-carlisle-chicago-trail-data-center-st-joseph-county-in","name":"New Carlisle Chicago Trail Data Center (rezoning denied)","operator":"Undisclosed","city":"New Carlisle","county":"St. Joseph","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.7003,"longitude":-86.5089,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/new-carlisle-chicago-trail-data-center-st-joseph-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","label":"Council denies rezoning for data center near New Carlisle","publisher":"WVPE","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-outrigger-washington-daviess-county-in","sourceRecordId":"outrigger-washington-daviess-county-in","name":"Outrigger Industrial Washington Data Center","operator":"Outrigger Industrial","city":"Washington","county":"Daviess","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":38.65,"longitude":-87.05,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/outrigger-washington-daviess-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ipm.org/news/2026-03-24/new-data-center-proposed-near-washington-ind","label":"New data center proposed near Washington, Ind.","publisher":"Indiana Public Media","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.ipm.org/news/2026-05-12/washington-city-council-cancels-data-center-development-will-explore-moratorium","label":"Washington city council cancels data center development, will explore moratorium","publisher":"Indiana Public Media","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.washtimesherald.com/news/local_news/washington-city-council-says-no-to-data-center/article_9e635735-d823-46b1-9c83-3c89b04934e5.html","label":"Washington City Council says no to data center","publisher":"Washington Times-Herald","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.vincennespbs.org/2026/03/24/data-center-proposal-presented-to-washington-council/","label":"Data center proposal presented to Washington council","publisher":"Vincennes PBS (WVUT)","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-posey-county-boberg-road-data-center-in","sourceRecordId":"posey-county-boberg-road-data-center-in","name":"Posey County Boberg Road Data Center","operator":"Undisclosed","city":null,"county":"Posey","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":38.033661,"longitude":-87.7368008,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/posey-county-boberg-road-data-center-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/","label":"Posey Co. commissioners vote no on proposed data center near Boberg, Hoenert Rd","publisher":"14 News (WFIE)","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-powerhouse-hobart-lake-county-in","sourceRecordId":"powerhouse-hobart-lake-county-in","name":"PowerHouse Hobart","operator":"PowerHouse Data Centers","city":"Hobart","county":"Lake","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.5322592,"longitude":-87.2550353,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-hobart-lake-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","label":"PowerHouse Hobart — site specifications","publisher":"PowerHouse Data Centers","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.cleanview.co/data-centers/indiana","label":"Data Centers in Indiana — Project List & Locations (PowerHouse Hobart, Lake County, 450 MW, 2027)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-project-riverjump-marion-grant-county-in","sourceRecordId":"project-riverjump-marion-grant-county-in","name":"Project Riverjump","operator":"Undisclosed","city":"Marion","county":"Grant","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":40.56,"longitude":-85.7,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-riverjump-marion-grant-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.chronicle-tribune.com/opinion/mack-up-your-mind-we-should-care-about-more-than-just-data-centers/article_e9bf2826-5f8f-5daf-8590-13f3c4712310.html","label":"Mack: Up your mind, we should care about more than just data centers","publisher":"Chronicle-Tribune (Marion)","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-project-shirley-eagle-creek-township-lake-county-in","sourceRecordId":"project-shirley-eagle-creek-township-lake-county-in","name":"Project Shirley","operator":"Sentinel Data Centers","city":"Eagle Creek Township","county":"Lake","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.31,"longitude":-87.3,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-shirley-eagle-creek-township-lake-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/","label":"In Indiana, an anatomy of data center opposition","publisher":"Latitude Media","kind":"press","retrievedAt":"2026-07-09"}]},{"id":"compute-project-zora-warrick-county-in","sourceRecordId":"project-zora-warrick-county-in","name":"Project Zora","operator":"Undisclosed","city":null,"county":"Warrick","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":38.17,"longitude":-87.32,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-zora-warrick-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.14news.com/2026/07/31/warrick-county-commissioners-schedule-special-meeting-data-center-zoning/","label":"Warrick County Commissioners schedule special meeting on data center zoning","publisher":"WFIE 14 News","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-prologis-shelbyville-in","sourceRecordId":"prologis-shelbyville-in","name":"Prologis Shelbyville Data Center Campus","operator":"Prologis","city":"Shelbyville","county":"Shelby","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.5214,"longitude":-85.7769,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-shelbyville-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364","label":"Shelbyville City Council Approves Annexation and Rezoning Request","publisher":"City of Shelbyville, Indiana","kind":"permit","retrievedAt":"2026-09-01"},{"url":"https://fox59.com/news/shelbyville-city-council-advances-data-center-plan/amp/","label":"Shelbyville city council advances data center plan","publisher":"FOX59","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-provident-burns-harbor-porter-county-in","sourceRecordId":"provident-burns-harbor-porter-county-in","name":"Provident Burns Harbor Data Center Campus (Worthington Steel property)","operator":"Provident Realty Advisors","city":"Burns Harbor","county":"Porter","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.61,"longitude":-87.12,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/provident-burns-harbor-porter-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.in.gov/towns/burns-harbor/files/plan-commission/Meetings-and-Agendas/_07082024-901.pdf","label":"Burns Harbor Advisory Plan Commission minutes, July 8, 2024","publisher":"Town of Burns Harbor","kind":"permit","retrievedAt":"2026-10-16"}]},{"id":"compute-provident-chesterton-porter-county-in","sourceRecordId":"provident-chesterton-porter-county-in","name":"Provident Chesterton Data Center Campus (former Brassie Golf Club)","operator":"Provident Realty Advisors","city":"Chesterton","county":"Porter","address":"1110 Pearson Road","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.6006171,"longitude":-87.0910251,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/provident-chesterton-porter-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/provident-chesterton-in","label":"Provident: Chesterton, IN Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-qlevr-charlestown-clark-county-in","sourceRecordId":"qlevr-charlestown-clark-county-in","name":"QLEVR Charlestown Data Center","operator":"QLEVR LLC","city":"Charlestown","county":"Clark","address":"1600 Cristiani Parkway","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":38.4517,"longitude":-85.67,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qlevr-charlestown-clark-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html","label":"Data center proposed for Charlestown's Shadow Lake Park","publisher":"News and Tribune","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://www.lpm.org/news/2026-07-21/charlestown-board-advances-data-center-proposal-with-stipulations","label":"Charlestown board advances data center proposal with stipulations","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-qts-project-jeremiah-wheeler-porter-county-in","sourceRecordId":"qts-project-jeremiah-wheeler-porter-county-in","name":"QTS Project Jeremiah (Jeremiah A and B), Wheeler","operator":"QTS Data Centers","city":"Wheeler","county":"Porter","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.53,"longitude":-87.19,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-project-jeremiah-wheeler-porter-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://solwd.net/qts-withdraws-proposal-for-two-union-township-data-centers/","label":"QTS withdraws proposal for two Union Township data centers","publisher":"Post-Tribune (via solwd.net)","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-radiusdc-plainfield-hendricks-county-in","sourceRecordId":"radiusdc-plainfield-hendricks-county-in","name":"RadiusDC Plainfield Campus (Indy I / Indy II)","operator":"RadiusDC","city":"Plainfield","county":"Hendricks","address":"9323 AllPoints Parkway","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.7416036,"longitude":-86.35343,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/radiusdc-plainfield-hendricks-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.radius-dc.com/location/indianapolis","label":"Indianapolis Data Center | RadiusDC Location","publisher":"RadiusDC","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://dcmap.us/states/indiana/","label":"Indiana Data Center Map (RadiusDC Plainfield Campus, 24 MW, planned)","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-sabey-decatur-technology-park-marion-county-in","sourceRecordId":"sabey-decatur-technology-park-marion-county-in","name":"Sabey Decatur Technology Park","operator":"Sabey Data Centers","city":"Decatur Township","county":"Marion","address":"Kentucky Avenue & Camby Road","state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.7,"longitude":-86.28,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-decatur-technology-park-marion-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/sabey-targets-indianapolis-for-250mw-data-center-campus/","label":"Sabey targets Indianapolis for 250MW data center campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.yahoo.com/news/articles/indy-commission-clears-way-first-092737761.html","label":"Indy commission clears way for first hyperscale data center in city","publisher":"Yahoo News / IBJ","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-takanock-goshen-elkhart-county-in","sourceRecordId":"takanock-goshen-elkhart-county-in","name":"Takanock Goshen Data Center","operator":"Takanock","city":"Goshen","county":"Elkhart","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.5850394,"longitude":-85.8344491,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/takanock-goshen-elkhart-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cleanview.co/data-centers/indiana","label":"Data Centers in Indiana — Project List (Takanock Goshen Data Center, Elkhart, 1,500 MW, planned)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://ailawtracker.org/data-centers","label":"Indiana Data Center Map | AI Infrastructure Projects (Takanock, Goshen, 1,500 MW, proposed)","publisher":"AI Law Tracker","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-vantage-pittsboro-in","sourceRecordId":"vantage-pittsboro-in","name":"Vantage Pittsboro Campus","operator":"Vantage Data Centers","city":"Pittsboro","county":"Hendricks","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":39.8656,"longitude":-86.4675,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-pittsboro-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county","label":"Data center developer eyeing 618-acre site in Hendricks County","publisher":"Inside INdiana Business","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://www.insideindianabusiness.com/articles/pittsboro-officials-ok-rezoning-of-626-acre-site-for-proposed-data-center-campus","label":"Pittsboro officials OK rezoning of 626 acre-site for proposed data center campus","publisher":"Inside INdiana Business","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-blue-ladder-wolcott-white-county-in","sourceRecordId":"blue-ladder-wolcott-white-county-in","name":"Wolcott Data Center","operator":"Blue Ladder Development","city":"Wolcott","county":"White","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":40.7581,"longitude":-87.0281,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blue-ladder-wolcott-white-county-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wolcottdatacenter.com/","label":"Wolcott Data Center — project site","publisher":"Blue Ladder Development","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.aol.com/articles/white-county-data-center-plans-183828000.html","label":"White County data center plans move forward with community open house","publisher":"InkFreeNews via AOL","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-wylie-capital-broadway-merrillville-in","sourceRecordId":"wylie-capital-broadway-merrillville-in","name":"Wylie Capital Broadway Data Center","operator":"Wylie Capital","city":"Merrillville","county":"Lake","address":null,"state":"IN","stateName":"Indiana","jurisdictionType":"state","latitude":41.4828,"longitude":-87.3328,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wylie-capital-broadway-merrillville-in","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","label":"$2B+ in Data Center Projects Planned for Merrillville, Ind.","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-beale-gardner-johnson-county-ks","sourceRecordId":"beale-gardner-johnson-county-ks","name":"Beale Infrastructure Gardner Campus","operator":"Beale Infrastructure","city":"Gardner","county":"Johnson","address":"Near the NE corner of 191st Street & South Clare Road, eastern Gardner, KS","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.81,"longitude":-94.93,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beale-gardner-johnson-county-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://bealeinfra.com/gardner-kansas/","label":"Gardner, Kansas project page","publisher":"Beale Infrastructure","kind":"other","retrievedAt":"2026-07-09"},{"url":"https://www.kcur.org/housing-development-section/2026-05-07/gardner-data-center-plan-withdrawn-by-company-after-resident-opposition","label":"KCUR","publisher":"KCUR / Johnson County Post","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://fox4kc.com/news/new-hyperscale-data-center-could-be-coming-to-johnson-county-kansas/amp/","label":"New hyperscale data center could be coming to Johnson County, Kansas","publisher":"FOX4 Kansas City (WDAF-TV)","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://baxtel.com/data-center/beale-gardner-campus","label":"Beale: Gardner Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-04"},{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/beale-infrastructure-withdraws-application-for-gardner-data-center","label":"Beale Infrastructure withdraws application for Gardner data center","publisher":"KSHB 41","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-beale-project-pilot-de-soto-ks","sourceRecordId":"beale-project-pilot-de-soto-ks","name":"Beale Project Pilot (De Soto)","operator":"Beale Infrastructure","city":"De Soto","county":"Johnson","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.966,"longitude":-94.967,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/beale-project-pilot-de-soto-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/","label":"De Soto advances $3.1B data center project near Panasonic plant","publisher":"Johnson County Post","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/beale-targets-two-campuses-outside-kansas-city-kansas/","label":"Beale targets two campuses outside Kansas City, Kansas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://johnsoncountypost.com/2026/07/07/beale-de-soto-data-center-update-290529/","label":"De Soto's approved data center project doubles in size from initial designs","publisher":"Johnson County Post","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-cormor-data-shelter-wellington-ks","sourceRecordId":"cormor-data-shelter-wellington-ks","name":"Cormor / Data Shelter Wellington Data Center","operator":"Cormor and Data Shelter","city":"Wellington","county":"Sumner County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":37.29,"longitude":-97.4,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cormor-data-shelter-wellington-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kwch.com/2026/03/17/wellington-officials-discuss-proposed-data-center-power-agreement/","label":"Wellington officials to discuss proposed data center, power agreement","publisher":"KWCH","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://foxkansas.com/news/local/new-data-center-proposal-draws-optimism-in-wellington-despite-pushback-elsewhere","label":"New data center proposal draws optimism in Wellington despite pushback elsewhere","publisher":"FOX Kansas","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-damac-heartland-edgerton-ks","sourceRecordId":"damac-heartland-edgerton-ks","name":"DAMAC Digital Heartland Data Center (Project Heartland)","operator":"DAMAC Digital Solutions Kansas LLC","city":"Edgerton","county":"Johnson County","address":"31800 W. 196th St.","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.77374,"longitude":-94.953635,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/damac-heartland-edgerton-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edgertonks.org/damac-data-center/","label":"DAMAC Data Center – City of Edgerton","publisher":"City of Edgerton","kind":"permit","retrievedAt":"2026-10-21"},{"url":"https://ingrams.com/article/dubai-company-860m-data-center-edgerton-ks/","label":"Dubai company's $860M data center in Edgerton, KS","publisher":"Ingram's","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://www.kshb.com/news/local-news/data-centers/edgerton-city-council-overrides-data-center-development-denial-pushing-project-forward","label":"Edgerton City Council overrides data center development denial","publisher":"KSHB 41","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-colossus-bullock-spring-hill-ks","sourceRecordId":"colossus-bullock-spring-hill-ks","name":"Data Center Proposal at 191st & Renner, Spring Hill — cancelled","operator":"Bullock Capital / Colossus Data Center Advisors","city":"Spring Hill","county":"Johnson County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.7430646,"longitude":-94.8255166,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/colossus-bullock-spring-hill-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/developers-drop-application-to-develop-possible-data-center-in-spring-hill","label":"Developers drop application to develop possible data center in Spring Hill","publisher":"KSHB","kind":"press","retrievedAt":"2026-10-04"}]},{"id":"compute-databank-overland-park-ks","sourceRecordId":"databank-overland-park-ks","name":"DataBank MCI2 Pine Ridge Data Center","operator":"DataBank","city":"Overland Park","county":"Johnson","address":"10605 W 84th Ter","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.975738717441,"longitude":-94.708635080112,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-overland-park-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/kansas-city/","label":"Kansas City Data Center and Colocation Solutions","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-databank-lenexa-ks","sourceRecordId":"databank-lenexa-ks","name":"DataBank MCI3 South Lake Campus Data Center","operator":"DataBank","city":"Lenexa","county":"Johnson","address":"11200 Lakeview Ave","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.925685125075,"longitude":-94.769520334995,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-lenexa-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/kansas-city/","label":"Kansas City Data Center and Colocation Solutions","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-21"},{"url":"https://baxtel.com/data-center/databank-kansas-city-mci3","label":"DataBank Kansas City MCI3","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-04"}]},{"id":"compute-digital-realty-astra-north-de-soto-ks","sourceRecordId":"digital-realty-astra-north-de-soto-ks","name":"Digital Realty Astra North (Project Jayhawk)","operator":"Digital Realty","city":"De Soto","county":"Johnson County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.945,"longitude":-94.965,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-astra-north-de-soto-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/about/projects/de-soto","label":"Bringing long-term investment to De Soto","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-10-21"},{"url":"https://ingrams.com/article/digital-realty-wants-to-build-600mw-data-center-campus-in-de-soto/","label":"Digital Realty wants to build data center campus in De Soto","publisher":"Ingram's","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/second-hyper-scale-data-center-moves-forward-in-de-soto-amid-petition-efforts-to-ban-development","label":"Second hyper-scale data center moves forward in De Soto amid petition efforts","publisher":"KSHB 41","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-kanza-park-flint-hills-emporia-ks","sourceRecordId":"kanza-park-flint-hills-emporia-ks","name":"Flint Hills Digital Campus","operator":"Kanza Park Place LLC","city":"Emporia","county":"Lyon County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.4040054,"longitude":-96.181623,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/kanza-park-flint-hills-emporia-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/","label":"Flint Hills Digital Campus proposed for Emporia and Lyon County","publisher":"WIBW","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://baxtel.com/news/proposed-gigawatt-scale-data-center-campus-planned-for-kansas","label":"Gigawatt-Scale Data Center Campus Planned for Kansas","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.emporiagazette.com/free/article_fc7fa6b2-01c1-49f0-9588-613c39a721b4.html","label":"City Commission approves data center zoning measures, water policies after hours of public comment","publisher":"Emporia Gazette","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-google-project-helium-sharon-ks","sourceRecordId":"google-project-helium-sharon-ks","name":"Google Data Center (Project Helium)","operator":"Google","city":"Sharon","county":"Barber County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":37.2486335,"longitude":-98.4206316,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-project-helium-sharon-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kwch.com/2026/08/31/barber-county-commission-approves-agreement-google-data-center/","label":"Barber County Commission approves agreement for Google data center","publisher":"KWCH","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://barber.ks.gov/data-center.html","label":"Barber County, Kansas — Data Center","publisher":"Barber County, Kansas","kind":"filing","retrievedAt":"2026-10-04"},{"url":"https://barber.ks.gov/uploads/5/6/1/9/56198487/deal_summary.pdf","label":"Summary of Agreement Terms with Google Regarding Project Helium","publisher":"Board of Barber County Commissioners","kind":"filing","retrievedAt":"2026-10-21"}]},{"id":"compute-hyperdatagrid-parsons-ks","sourceRecordId":"hyperdatagrid-parsons-ks","name":"HyperDataGrid Parsons Data Center","operator":"HyperDataGrid","city":"Parsons","county":"Labette County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":37.3407838,"longitude":-95.2596295,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hyperdatagrid-parsons-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/20mw-data-center-project-proposed-in-parsons-kansas","label":"20MW data center project proposed in Parsons, Kansas","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-04"}]},{"id":"compute-lightedge-lenexa-ks","sourceRecordId":"lightedge-lenexa-ks","name":"LightEdge Lenexa Data Center","operator":"LightEdge","city":"Lenexa","county":"Johnson County","address":"17501 West 98th Street","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.951691,"longitude":-94.789276,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lightedge-lenexa-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.lightedge.com/data-centers/lenexa/","label":"Lenexa, KS Colocation Data Center","publisher":"LightEdge","kind":"other","retrievedAt":"2026-10-21"}]},{"id":"compute-lightfield-energy-proximity-park-ottawa-ks","sourceRecordId":"lightfield-energy-proximity-park-ottawa-ks","name":"Lightfield Energy Proximity Park Technology Campus (Ottawa) — cancelled","operator":"Lightfield Energy LLC","city":"Ottawa","county":"Franklin County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.5856,"longitude":-95.2494,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lightfield-energy-proximity-park-ottawa-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kshb.com/news/local-news/data-centers/ottawa-residents-push-back-against-300-acre-technology-campus-plan","label":"Ottawa residents push back against 300-acre technology campus plan","publisher":"KSHB 41","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://www.kshb.com/news/local-news/data-centers/out-of-time-ottawa-ends-data-center-contract-as-ballot-fight-continues","label":"'Out of time': Ottawa ends data center contract as ballot fight continues","publisher":"KSHB 41","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://www.kshb.com/news/local-news/kansas/douglas-county/ottawa-data-center-question-is-on-the-ballot-and-in-court","label":"Ottawa data center question is on the ballot and in court","publisher":"KSHB 41","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-monarch-energy-colwich-ks","sourceRecordId":"monarch-energy-colwich-ks","name":"Monarch Energy Colwich/Andale Site","operator":"Monarch Energy","city":"Colwich","county":"Sedgwick County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":37.78,"longitude":-97.56,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/monarch-energy-colwich-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kcur.org/housing-development-section/2026-03-17/two-data-center-companies-are-trying-to-buy-more-than-1-000-acres-of-kansas-land","label":"Two data center companies are trying to buy more than 1,000 acres of Kansas land","publisher":"KMUW / KCUR","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-cloverleaf-bluestem-tonganoxie-ks","sourceRecordId":"cloverleaf-bluestem-tonganoxie-ks","name":"Project Bluestem","operator":"Cloverleaf Infrastructure","city":"Tonganoxie","county":"Leavenworth","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":39.1097,"longitude":-95.0877,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-bluestem-tonganoxie-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://bluestemdatacenter.com/","label":"Home - Project Bluestem","publisher":"Cloverleaf Infrastructure","kind":"other","retrievedAt":"2026-09-23"},{"url":"https://bluestemdatacenter.com/faqs/","label":"FAQs - Project Bluestem","publisher":"Cloverleaf Infrastructure","kind":"other","retrievedAt":"2026-09-23"},{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/leavenworth-county-to-host-special-meeting-for-neighbor-input-on-1-000-acre-data-center-proposal","label":"Leavenworth County to host special meeting for neighbor input on 1,000-acre data center proposal","publisher":"KSHB 41 Kansas City","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www2.ljworld.com/news/general-news/2026/sep/18/more-than-1000-people-attend-tonganoxie-meeting-to-oppose-proposed-data-center/","label":"More than 1,000 people attend Tonganoxie meeting to oppose proposed data center","publisher":"Lawrence Journal-World","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://hoodline.com/2026/09/tonganoxie-neighbors-brace-as-data-center-plan-doubles-its-power-demand/","label":"Tonganoxie neighbors brace as data center plan doubles its power demand","publisher":"Hoodline","kind":"press","retrievedAt":"2026-09-23"},{"url":"https://www.tonganoxiemirror.com/top-news/2026/may/07/proposed-data-centers-near-tonganoxie-de-soto-raise-slew-of-questions/","label":"Proposed data centers near Tonganoxie, De Soto raise slew of questions","publisher":"Tonganoxie Mirror","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://fox4kc.com/news/project-bluestem-paves-way-for-data-center-in-leavenworth-county/amp/","label":"Project Bluestem paves way for data center in Leavenworth County","publisher":"FOX4 Kansas City","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-alcove-project-catalyst-osawatomie-ks","sourceRecordId":"alcove-project-catalyst-osawatomie-ks","name":"Project Catalyst (Osawatomie)","operator":"Alcove Development","city":"Osawatomie","county":"Miami County","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.5016,"longitude":-94.9522,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/alcove-project-catalyst-osawatomie-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kctv5.com/2026/05/29/osawatomie-moves-forward-with-500-megawatt-data-center-campus/","label":"Osawatomie moves forward with 500-megawatt data center campus","publisher":"KCTV5","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://www.kshb.com/news/local-news/kansas/miami-county/project-catalyst-data-center-developer-in-osawatomie-offers-update-touting-economic-opportunity","label":"Project Catalyst data center developer in Osawatomie offers update","publisher":"KSHB 41","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-red-wolf-dcd-properties-project-red-wolf-ks","sourceRecordId":"red-wolf-dcd-properties-project-red-wolf-ks","name":"Project Red Wolf","operator":"Red Wolf DCD Properties LLC","city":"Kansas City","county":"Wyandotte","address":null,"state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":39.132358,"longitude":-94.88035,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/red-wolf-dcd-properties-project-red-wolf-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/600mw-data-center-campus-proposed-outside-kansas-city-kansas/","label":"600MW data center campus proposed outside Kansas City, Kansas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://wyandottenewsdaily.com/large-data-center-project-prompts-special-planning-commission-meeting/","label":"Large data center project prompts special planning commission meeting","publisher":"Wyandotte News Daily","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://constructionreviewonline.com/news/redwolf-proposes-12b-data-center-campus-in-wyandotte-county-kansas/","label":"RedWolf proposes $12B data center campus in Wyandotte County, Kansas","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://gisweb.wycokck.org/arcgis/rest/services/GISPUB/UGMAPS_4_V02/MapServer/0/query?where=PARCEL%3D%27957402%27&outFields=*&returnGeometry=true&outSR=4326&f=json","label":"Wyandotte County parcel/GIS record (parcel 957402)","publisher":"Wyandotte County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www2.ljworld.com/news/state-region/2025/may/29/kansas-city-kansas-planning-commission-advances-proposed-12-6b-data-center/","label":"Kansas City, Kansas, planning commission advances proposed $12.6B data center","publisher":"Lawrence Journal-World","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://www.kcur.org/housing-development-section/2026-01-29/wyandotte-county-data-centers-would-require-a-lot-of-power-will-that-raise-your-energy-bill","label":"Wyandotte County data centers would require a lot of power","publisher":"KCUR","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-powertransitions-project-yardbird-ks","sourceRecordId":"powertransitions-project-yardbird-ks","name":"Project Yardbird","operator":"PowerTransitions","city":"Kansas City","county":"Wyandotte","address":"3601 N. 12th Street","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":39.147,"longitude":-94.635,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powertransitions-project-yardbird-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kcur.org/housing-development-section/2026-01-29/wyandotte-county-data-centers-would-require-a-lot-of-power-will-that-raise-your-energy-bill","label":"Wyandotte County data centers would require a lot of power","publisher":"KCUR","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","label":"PowerTransitions Quindaro Data Center Opportunity","publisher":"PowerTransitions","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://newprojectmedia.com/origination-wyandotte-county-ks-considering-sale-of-former-power-plant-for-192-mw-data-center-development/","label":"Wyandotte County, KS considering sale of former power plant for 192 MW data center development","publisher":"New Project Media","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-qts-new-century-ks","sourceRecordId":"qts-new-century-ks","name":"QTS New Century Commerce Center (Building B1)","operator":"QTS Data Centers","city":"New Century","county":"Johnson County","address":"16175 John Glenn Pkwy","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.8357,"longitude":-94.8761,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-new-century-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/qts-new-century-commerce-center","label":"QTS: New Century Commerce Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-21"},{"url":"https://thetechcapital.com/qts-signs-major-lease-near-kansas-city-as-data-centre-development-expands/","label":"QTS signs major lease near Kansas City as data centre development expands","publisher":"The Tech Capital","kind":"press","retrievedAt":"2026-10-21"}]},{"id":"compute-qts-overland-park-ks","sourceRecordId":"qts-overland-park-ks","name":"QTS Overland Park Data Center (OVP1)","operator":"QTS Data Centers","city":"Overland Park","county":"Johnson","address":"12851 Foster St","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.896635385342,"longitude":-94.673564928144,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-overland-park-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/qts-overland-park","label":"QTS Overland Park Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.datacenterjournal.com/data-centers/kansas/overland-park/qts-overland-park-ovp1/","label":"QTS Overland Park (OVP1) Data Center","publisher":"Data Center Journal","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-tierpoint-kansas-city-lenexa-ks","sourceRecordId":"tierpoint-kansas-city-lenexa-ks","name":"TierPoint Kansas City - Lenexa","operator":"TierPoint","city":"Lenexa","county":"Johnson","address":"14500 West 105th Street","state":"KS","stateName":"Kansas","jurisdictionType":"state","latitude":38.9406295,"longitude":-94.7552326,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-kansas-city-lenexa-ks","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/kansas/kansas-city-lenexa/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-10-21"},{"url":"https://www.openstreetmap.org/way/880052062","label":"OpenStreetMap way/880052062","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-bluegrassnet-louisville-jefferson-ky","sourceRecordId":"bluegrassnet-louisville-jefferson-ky","name":"BluegrassNet Louisville Data Center","operator":"Intermart, Inc. (BluegrassNet)","city":"Louisville","county":"Jefferson","address":"321 E Breckinridge St","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.241182,"longitude":-85.74932,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bluegrassnet-louisville-jefferson-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=KY","label":"PeeringDB facility registry - Kentucky facilities (API query)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://cloudandcolocation.com/state/kentucky/","label":"Kentucky Data Center Location Map - BluegrassNet Louisville #1, 321 E. Breckinridge St","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-deca-ghent-carroll-county-ky","sourceRecordId":"deca-ghent-carroll-county-ky","name":"Carroll County Digital Campus (Ghent)","operator":"Deca Companies","city":"Ghent","county":"Carroll","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.7375625,"longitude":-85.0582835,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/deca-ghent-carroll-county-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.madisoncourier.com/carroll_news_democrat/news/deca-proposing-4b-data-center-in-carroll-county/article_dcc68a89-aafd-5c7e-922c-2fd96bc32921.html","label":"DECA proposing $4B data center in Carroll County","publisher":"Carroll News-Democrat / Madison Courier","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://ghentdc.com/","label":"Carroll County Digital Campus — project information site (Deca)","publisher":"Deca","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://www.yahoo.com/news/us/articles/louisville-developer-eyes-second-9-090000833.html","label":"Louisville developer eyes second $9.6B hyperscale data center in Carroll County (describes the separate DECA project east of Ghent, $4B, Owen Electric Cooperative)","publisher":"Louisville Business First (via Yahoo News)","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://hoptownchronicle.org/see-where-data-center-developers-are-looking-to-build-in-kentucky","label":"See where data center developers are looking to build in Kentucky (project tracker: Carroll County, Deca Companies, planned)","publisher":"Hoptown Chronicle / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Ghent%2C+Carroll+County%2C+Kentucky&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode of Ghent, Carroll County, KY","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-powerhouse-poe-carrollton-industrial-campus-carroll-county-ky","sourceRecordId":"powerhouse-poe-carrollton-industrial-campus-carroll-county-ky","name":"Carrollton Industrial Campus","operator":"PowerHouse Data Centers / Poe Companies","city":"Carrollton","county":"Carroll","address":"Greens Bottom Road","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.68,"longitude":-85.16583,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-poe-carrollton-industrial-campus-carroll-county-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://finance.yahoo.com/technology/articles/louisville-based-developer-plans-9-144212137.html","label":"Louisville-based developer plans $9.6B data center in Carroll County","publisher":null,"kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wdrbwave.com/2026/07/25/carroll-county-residents-push-back-against-data-center-project-ghent-community/","label":"Carroll County residents push back against data center project in Ghent community","publisher":"WAVE3","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.lpm.org/news/2026-08-24/neighbors-to-kentucky-hyperscale-data-centers-demand-transparency","label":"Neighbors to Kentucky hyperscale data centers demand transparency","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.yahoo.com/news/us/articles/louisville-developer-eyes-second-9-090000833.html","label":"Louisville developer eyes second $9.6B hyperscale data center in Carroll County — 550 acres (300 used), 800 MW from Kentucky Utilities, 2,100 construction jobs, 320 permanent positions, $93.2 million annual tax revenue","publisher":"Louisville Business First (via Yahoo News)","kind":"press","retrievedAt":"2026-09-15"}]},{"id":"compute-kentucky-industrial-alliance-cave-point-cave-city-ky","sourceRecordId":"kentucky-industrial-alliance-cave-point-cave-city-ky","name":"Cave Point Commerce Center","operator":"Kentucky Industrial Alliance LLC","city":"Cave City","county":"Barren","address":"Doyle Avenue","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.1367544,"longitude":-85.9562169,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/kentucky-industrial-alliance-cave-point-cave-city-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wbko.com/2026/06/10/kentucky-industrial-alliance-says-proposed-cave-city-data-center-could-bring-millions-tax-revenue/","label":"Kentucky Industrial Alliance says proposed Cave City data center could bring millions in tax revenue","publisher":"WBKO","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.wbko.com/2026/06/09/developer-sues-cave-city-over-data-center-zoning-moratorium/","label":"Developer sues Cave City over data center zoning moratorium","publisher":"WBKO","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://bgdailynews.com/2026/08/27/barren-data-center-suits-proceed/","label":"Barren data center suits proceed","publisher":"Bowling Green Daily News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://techstrong.it/featured/ai-developer-sues-kentucky-town-that-tried-to-stop-data-center-project/","label":"AI developer sues Kentucky town that tried to stop data center project","publisher":"Techstrong IT","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.wsmv.com/2026/06/09/developer-sues-cave-city-over-data-center-zoning-moratorium/","label":"Developer sues Cave City over data center zoning moratorium","publisher":"WSMV / WBKO","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-cyrusone-cin6-florence-boone-ky","sourceRecordId":"cyrusone-cin6-florence-boone-ky","name":"CyrusOne CIN6 (Florence)","operator":"CyrusOne","city":"Florence","county":"Boone","address":"7190 Industrial Road","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.9795695,"longitude":-84.6153236,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-cin6-florence-boone-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/florence-ky","label":"Florence, KY: CIN6 — CyrusOne data center specifications","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://inflect.com/building/7190-industrial-road-florence/cyrusone/datacenter/cyrusone-florence","label":"CyrusOne CIN6, 7190 Industrial Road, Florence, KY 41042 — facility listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=7190+Industrial+Road%2C+Florence%2C+KY+41042&format=json&limit=3","label":"OpenStreetMap/Nominatim geocode of 7190 Industrial Road, Florence, Boone County, KY 41042","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-dartpoints-lexington-fayette-ky","sourceRecordId":"dartpoints-lexington-fayette-ky","name":"DartPoints Lexington Data Center Campus","operator":"DartPoints","city":"Lexington","county":"Fayette","address":"745 West New Circle Road","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.0747519,"longitude":-84.4876212,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-lexington-fayette-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/dartpoints-acquires-lexington-kentucky-data-center-campus-to-support-ai-neo-cloud-hyperscale-and-enterprise-demand-302782916.html","label":"DartPoints Acquires Lexington, Kentucky Data Center Campus to Support AI, Neo-Cloud, Hyperscale, and Enterprise Demand","publisher":"PR Newswire (DartPoints)","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.weku.org/lexington-richmond/2026-06-04/data-center-company-plans-to-expand-former-lexmark-property-for-cloud-ai-computing","label":"Data center company plans to expand former Lexmark property for cloud, AI computing","publisher":"WEKU","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://smileypete.com/business/dartpoints-acquires-lexington-data-center-campus/","label":"DartPoints Acquires Lexington Data Center Campus for $29 Million","publisher":"Smiley Pete Publishing","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.wkyt.com/2026/06/08/dartpoints-data-center-coming-lexington-wont-get-city-incentives/","label":"DartPoints data center coming to Lexington won't get city incentives","publisher":"WKYT","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=745+West+New+Circle+Road%2C+Lexington%2C+KY&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode of 745 West New Circle Road, Lexington, Fayette County, KY","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-dermody-kramers-lane-louisville-jefferson-ky","sourceRecordId":"dermody-kramers-lane-louisville-jefferson-ky","name":"Dermody Properties Kramers Lane Data Center","operator":"Dermody Properties (DPIF4 KY 6 KRAMERS, LLC)","city":"Louisville","county":"Jefferson","address":"3615 Kramers Lane","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.2044592,"longitude":-85.8420564,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dermody-kramers-lane-louisville-jefferson-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.lpm.org/news/2026-08-12/images-another-data-center-proposed-for-louisvilles-rubbertown-neighborhood","label":"IMAGES: Another data center proposed for Louisville's Rubbertown neighborhood","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.lpm.org/news/2026-08-13/louisville-metro-council-approves-data-center-moratorium-as-new-proposal-sparks-controversy","label":"Louisville Metro Council approves data center moratorium as new proposal sparks controversy","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=3615+Kramers+Lane%2C+Louisville%2C+KY&format=json&limit=3","label":"OpenStreetMap/Nominatim geocode of 3615 Kramers Lane, Louisville, Jefferson County, KY 40216","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-east-kentucky-network-ivel-floyd-ky","sourceRecordId":"east-kentucky-network-ivel-floyd-ky","name":"East Kentucky Network Data Center","operator":"East Kentucky Network, LLC","city":"Ivel","county":"Floyd","address":"271 Technology Trail","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.596989,"longitude":-82.68065,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/east-kentucky-network-ivel-floyd-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/15681","label":"PeeringDB facility record 15681 - East Kentucky Network Data Center","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-hopkinsville-electric-energynet-datacenter-christian-ky","sourceRecordId":"hopkinsville-electric-energynet-datacenter-christian-ky","name":"Energynet Datacenter","operator":"Hopkinsville Electric System","city":"Hopkinsville","county":"Christian","address":"1820 E 9th St","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":36.847841,"longitude":-87.465157,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hopkinsville-electric-energynet-datacenter-christian-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13628","label":"PeeringDB facility 13628: Energynet Datacenter (Hopkinsville Electric System)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-22"}]},{"id":"compute-flexential-louisville-downtown-ky","sourceRecordId":"flexential-louisville-downtown-ky","name":"Flexential Louisville - Downtown","operator":"Flexential","city":"Louisville","county":"Jefferson","address":"752 Barret Avenue","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.242501,"longitude":-85.733336,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-louisville-downtown-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ky/louisville/downtown-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/330276516","label":"OpenStreetMap way/330276516","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-louisville-east-nas-equivalent-lou-east-ky","sourceRecordId":"flexential-louisville-east-nas-equivalent-lou-east-ky","name":"Flexential Louisville - East (NAS-equivalent LOU-East)","operator":"Flexential","city":"Louisville","county":"Jefferson","address":"2101 Nelson Miller Parkway","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.2771906,"longitude":-85.5072402,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-louisville-east-nas-equivalent-lou-east-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ky/louisville/east-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/329551673","label":"OpenStreetMap way/329551673","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-terawulf-hawesville-ky","sourceRecordId":"terawulf-hawesville-ky","name":"Justified Data Campus","operator":"TeraWulf","city":"Hawesville","county":"Hancock","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.8999,"longitude":-86.7569,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/terawulf-hawesville-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack","label":"TeraWulf Announces Anthropic Lease at Justified Data Campus","publisher":"TeraWulf Inc.","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.globenewswire.com/news-release/2026/07/06/3322382/0/en/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack","label":"TeraWulf Announces Anthropic Lease at Justified Data Campus (GlobeNewswire)","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland","label":"TeraWulf Expands Digital and Power Infrastructure Portfolio — Kentucky and Maryland Acquisitions","publisher":"TeraWulf Inc.","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.globenewswire.com/news-release/2026/2/2/3230607/0/en/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland","label":"TeraWulf Expands Digital and Power Infrastructure Portfolio (GlobeNewswire, Feb 2026)","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://psc.ky.gov/trf4/uploadedFiles/900_Big_Rivers_Electric_Corporation/04142026121035/Cover_Letter_Redacted.pdf","label":"Big Rivers Electric Corporation — PSC Retail Service Agreement Filing for Justified Data Project","publisher":"Kentucky Public Service Commission","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://spectrumnews1.com/ky/louisville/news/2026/02/14/ai-database-hawesville","label":"Hawesville smelter to become AI data center; community split on economic impact","publisher":"Spectrum News 1","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://blockspace.media/insight/terawulf-signs-anthropic-lease-sells-abernathy/","label":"TeraWulf signs 20-year Anthropic lease for 401 MW at Kentucky data campus","publisher":"Blockspace","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/anthropic-signs-19bn-20-year-lease-for-kentucky-data-center-with-terawulf/","label":"Anthropic signs $19bn, 20-year lease for Kentucky data center with TeraWulf","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://spectrumnews1.com/ky/louisville/news/2026/07/06/ai-company-anthropic-commits-to-long-term-hawesville-campus","label":"AI company Anthropic commits to long-term Hawesville campus","publisher":"Spectrum News 1","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.constructiondive.com/news/terawulf-fluor-data-center-preconstruction-kentucky-megaproject/815027/","label":"Construction Dive — Terawulf taps Fluor for preconstruction on $3B Kentucky data center","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus","label":"Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus","publisher":"TeraWulf Inc.","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://hoptownchronicle.org/data-centers-need-massive-power-theyre-eyeing-kentuckys-idle-industrial-sites-to-get-it","label":"Data centers need massive power. They're eyeing Kentucky's idle industrial sites to get it. (Century Aluminum smelter site, Hancock County, 482 MW, wholesale power via the MISO market)","publisher":"Hoptown Chronicle / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://psc.ky.gov/pscscf/2026%20cases/2026-00115/20260414_Big%20Rivers%20Electric%20Corporation%20Contract%20Filing.pdf","label":"Big Rivers Electric Corporation filing: Justified DataPower LLC / TeraWulf Inc. Retail Electric Service Agreement, PSC Case 2026-00115 (April 14, 2026)","publisher":"Big Rivers Electric Corporation / Kentucky Public Service Commission","kind":"filing","retrievedAt":"2026-09-22"},{"url":"https://www.globenewswire.com/news-release/2026/08/24/3349687/0/en/kentucky-psc-approves-482-mw-power-agreement-for-terawulf-s-justified-data-campus.html","label":"Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus","publisher":"TeraWulf Inc. via GlobeNewswire","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.weku.org/the-commonwealth/2026-08-21/ky-utility-regulator-oks-electricity-contract-for-terawulfs-hancock-county-data-center-project","label":"KY utility regulator OKs electricity contract for TeraWulf's Hancock County data center project","publisher":"WEKU","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-md-squared-power-pikeville-pike-ky","sourceRecordId":"md-squared-power-pikeville-pike-ky","name":"Kentucky Enterprise Industrial Park Data Center","operator":"MD Squared Power LLC","city":"Pikeville","county":"Pike","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.4792672,"longitude":-82.5187629,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/md-squared-power-pikeville-pike-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wymt.com/2026/06/05/pikeville-signs-agreement-explore-data-center-development/","label":"Pikeville signs agreement to explore data center development","publisher":"WYMT","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-wku-bgmu-lost-river-data-center-bowling-green-ky","sourceRecordId":"wku-bgmu-lost-river-data-center-bowling-green-ky","name":"Lost River Data Center","operator":"WKU Research Foundation / Bowling Green Municipal Utilities (joint venture)","city":"Bowling Green","county":"Warren","address":"2413 Nashville Rd","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":36.962312,"longitude":-86.470939,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/wku-bgmu-lost-river-data-center-bowling-green-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13629","label":"PeeringDB facility 13629: Lost River Data Center (Western Kentucky University)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-22"},{"url":"https://www.lightwaveonline.com/data-center/article/55268994/accelecom-expands-services-with-new-presence-at-lost-river-data-center","label":"Accelecom expands services with new presence at Lost River Data Center","publisher":"Lightwave","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-mason-county-hyperscale-campus-maysville-ky","sourceRecordId":"mason-county-hyperscale-campus-maysville-ky","name":"Mason County Data Center Campus","operator":"Undisclosed (Fortune 100 end user; rezoning sought through Mason County officials)","city":"Maysville","county":"Mason","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.6856147,"longitude":-83.8517119,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mason-county-hyperscale-campus-maysville-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.weku.org/the-commonwealth/2026-05-26/mason-county-gives-final-approval-on-rezoning-properties-for-data-center-construction","label":"Mason County gives final approval on rezoning properties for data center construction","publisher":"WEKU","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.wvxu.org/local-news/2026-08-04/data-center-maysville-kentucky-land-use-debate","label":"Data center near Maysville sparks debate about land use","publisher":"WVXU","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.lex18.com/news/covering-kentucky/mason-county-residents-weigh-billion-dollar-data-center-proposal-amid-growing-concerns","label":"Mason County residents weigh billion-dollar data center proposal amid growing concerns","publisher":"LEX18","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.wcpo.com/news/state/state-kentucky/ruin-peace-and-quiet-potential-for-1-billion-data-center-sparks-debate-in-rural-mason-county","label":"Potential for $1 billion data center sparks debate in rural Mason County","publisher":"WCPO","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.kentuckynewera.com/news/state/article_dd29c763-154a-510d-b88a-c5f4510e8f70.html","label":"Data centers are being proposed – and sometimes approved – all over state (Kentucky Lantern project tracker: Mason County, undisclosed Fortune 100 company, 1.2 GW, planned)","publisher":"Kentucky New Era / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://kentuckylantern.com/wp-content/uploads/2026/06/EPIC-REPORT-NO-2026-001-FINAL.pdf","label":"EPIC Report No. 2026-001, Data Centers in Kentucky (§I.B lists Mason County among counties with projects under consideration)","publisher":"Kentucky Energy Planning and Inventory Commission","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Big+Pond+Pike%2C+Mason+County%2C+Kentucky&format=json&limit=3","label":"OpenStreetMap/Nominatim geocode of Big Pond Pike, Mason County, KY","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"},{"url":"https://www.wvxu.org/local-news/2026-10-15/meta-facebook-data-center-maysville-mason-county-kentucky","label":"Meta to build data center outside Maysville, Kentucky","publisher":"WVXU","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.fox19.com/2026/10/16/meta-revealed-partner-2000-acre-nky-data-center-residents-pushback/","label":"Meta revealed as partner in 2,000-acre NKY data center as residents push back","publisher":"FOX19","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-meade-county-joe-prather-highway-data-center-ky","sourceRecordId":"meade-county-joe-prather-highway-data-center-ky","name":"Meade County Data Center (Joe Prather Highway)","operator":"Undisclosed applicant","city":null,"county":"Meade","address":"25025 Joe Prather Hwy","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.8250181,"longitude":-86.0198152,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/meade-county-joe-prather-highway-data-center-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wdrbwave.com/2025/10/14/meade-county-zoning-commission-votes-against-data-center","label":"Meade County zoning commission votes against data center","publisher":"WDRB/WAVE","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://baxtel.com/data-center/meade-county-data-center","label":"Meade County Data Center (25025 Joe Prather Hwy), listed as withdrawn","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-22"},{"url":"https://nominatim.openstreetmap.org/search?q=Joe+Prather+Highway%2C+Meade+County%2C+Kentucky&format=json&limit=3","label":"OpenStreetMap/Nominatim point for Joe Prather Highway, Meade County, KY","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-22"}]},{"id":"compute-murray-industries-pineville-bell-ky","sourceRecordId":"murray-industries-pineville-bell-ky","name":"Murray Industries Pineville Data Center","operator":"Murray Industries","city":"Pineville","county":"Bell","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":36.7620301,"longitude":-83.6949176,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/murray-industries-pineville-bell-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wymt.com/2026/06/26/bell-county-residents-pack-courthouse-oppose-data-center-construction/","label":"Bell County residents pack courthouse to oppose data center construction","publisher":"WYMT","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.yahoo.com/news/us/articles/bell-county-passed-data-center-093027684.html","label":"Bell County passed a data center moratorium. Residents worry that work continues.","publisher":"Kentucky Lantern (via Yahoo News)","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.yahoo.com/news/us/articles/bell-county-residents-pack-courthouse-184600018.html","label":"Bell County residents pack courthouse, vow to fight data center over water, noise, and roads","publisher":"Yahoo News","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://hoptownchronicle.org/see-where-data-center-developers-are-looking-to-build-in-kentucky","label":"See where data center developers are looking to build in Kentucky (project tracker: Bell County, Murray Industries, planned)","publisher":"Hoptown Chronicle / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Pineville%2C+Bell+County%2C+Kentucky&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode of Pineville, Bell County, KY","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"},{"url":"https://www.wkyt.com/2026/07/09/wkyt-investigates-bell-county-family-fights-proposed-data-center/","label":"WKYT Investigates: Bell County family fights proposed data center","publisher":"WKYT","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-north-campbell-land-hopkinsville-50mw-christian-ky","sourceRecordId":"north-campbell-land-hopkinsville-50mw-christian-ky","name":"North Campbell Land Co. Hopkinsville 50 MW Data Center","operator":"North Campbell Land Co. (Sphere 3D)","city":"Hopkinsville","county":"Christian","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":36.8657852,"longitude":-87.489412,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/north-campbell-land-hopkinsville-50mw-christian-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/","label":"Hopkinsville weighs limits on data centers as crypto mine proposes expansion","publisher":"Hoptown Chronicle","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.sec.gov/Archives/edgar/data/1591956/000106299326004391/exhibit99-1.htm","label":"Sphere 3D Corp. Exhibit 99.1 — 'a new 50 MW data center' and 'a new 65 MW Hopkinsville substation'","publisher":"U.S. Securities and Exchange Commission","kind":"filing","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Hopkinsville%2C+Christian+County%2C+Kentucky&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode of Hopkinsville, Christian County, KY","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"},{"url":"https://theenergymag.com/news/2026-07-31/sphere-kentucky-data-center","label":"Sphere 3D Plans 50 MW Kentucky Data Center as City Weighs Zoning Rules","publisher":"The Energy Mag","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-brookfield-nextera-paducah-site-mccracken-ky","sourceRecordId":"brookfield-nextera-paducah-site-mccracken-ky","name":"Paducah Site AI Data Center Campus","operator":"Brookfield","city":"Kevil","county":"McCracken","address":"5501 Hobbs Road","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.11389,"longitude":-88.81028,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/brookfield-nextera-paducah-site-mccracken-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power","label":"Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky","publisher":"U.S. Department of Energy","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wbko.com/2026/07/29/ai-data-center-coming-western-kentucky/","label":"AI data center coming to Western Kentucky","publisher":"WBKO","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://cumulis.epa.gov/supercpad/cursites/csitinfo.cfm?id=0404794","label":"Paducah Gaseous Diffusion Plant (USDOE) | Superfund Site Profile","publisher":"U.S. EPA","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.prnewswire.com/news-releases/doe-site-in-western-kentucky-revitalized-with-data-center-campus-and-dedicated-energy-project-creating-jobs-and-protecting-residents-and-businesses-from-costs-302837752.html","label":"DOE Site in Western Kentucky Revitalized with Data Center Campus and Dedicated Energy Project","publisher":"PR Newswire (Brookfield / NextEra Energy / Big Rivers Electric / Jackson Purchase Energy / Paducah Power System)","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.project.nexteraenergyresources.com/paducah-american-energy-hub","label":"Paducah American Energy Hub — project site (1.8 GW utility load, 4.6 GW dedicated generation, 2032)","publisher":"NextEra Energy Resources","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://newsroom.nexteraenergy.com/2026-07-29-DOE-Site-in-Western-Kentucky-Revitalized-with-Data-Center-Campus-and-Dedicated-Energy-Project,-Creating-Jobs-and-Protecting-Residents-and-Businesses-from-Costs","label":"DOE Site in Western Kentucky Revitalized with Data Center Campus and Dedicated Energy Project","publisher":"NextEra Energy / Brookfield (newsroom release, July 29, 2026)","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.rigzone.com/news/doe_private_partners_launch_100b_data_center_project_in_kentucky-31-jul-2026-184268-article/","label":"DOE, Private Partners Launch $100B Data Center Project in Kentucky","publisher":"Rigzone","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.eenews.net/articles/100b-data-center-campus-coming-to-doe-land-in-kentucky/","label":"$100B data center campus coming to DOE land in Kentucky","publisher":"E&E News","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-panattoni-burgin-mercer-county-ky","sourceRecordId":"panattoni-burgin-mercer-county-ky","name":"Panattoni Burgin Data Center Campus","operator":"Panattoni","city":"Burgin","county":"Mercer","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.75444,"longitude":-84.76333,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/panattoni-burgin-mercer-county-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wkms.org/2026-08-17/hyperscale-data-centers-provoke-bipartisan-outrage-across-kentucky","label":"Hyperscale data centers provoke bipartisan outrage across Kentucky","publisher":"WKMS","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/panattoni-project-bluegrass","label":"Panattoni: Project Bluegrass","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-04"}]},{"id":"compute-powerhouse-louisville-ky","sourceRecordId":"powerhouse-louisville-ky","name":"PowerHouse Data Centers – Louisville (Camp Ground Road)","operator":"PowerHouse Data Centers","city":"Louisville","county":"Jefferson","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.1953,"longitude":-85.8485,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-louisville-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/planning-commission-recommends-approval-for-16m-sq-ft-planned-data-center-in-louisville-kentucky/","label":"Planning Commission recommends approval for 1.6m sq ft planned data center in Louisville, Kentucky","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.lpm.org/news/2026-03-05/west-louisville-data-center-approved-despite-opposition","label":"West Louisville data center approved despite opposition","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.powerhousedata.com/news/developers-unveil-plans-for-large-tech-data-center-in-louisville","label":"Developers unveil plans for large tech data center in Louisville","publisher":"PowerHouse Data Centers","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://kentuckylantern.com/wp-content/uploads/2026/06/EPIC-REPORT-NO-2026-001-FINAL.pdf","label":"EPIC Report No. 2026-001, Data Centers in Kentucky §I.B — 335 MW initial capacity, near-term expansion to 402 MW, first 130 MW phase targeted for commercial operation late 2026, projected lifetime investment approximately $11 billion","publisher":"Kentucky Energy Planning and Inventory Commission","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer","label":"LG&E announces first major data center electric customer","publisher":"LG&E and KU","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.poecompanies.com/press-releases/new-150-acre-data-center-campus-aims-to-attract-big-tech-companies-to-louisville/","label":"New 150-acre data center campus aims to attract big tech companies to Louisville","publisher":"Poe Companies","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf","label":"EPIC Report No. 2026-001 - Data Centers in Kentucky (June 2026)","publisher":"Kentucky Energy Planning and Inventory Commission","kind":"filing","retrievedAt":"2026-09-22"}]},{"id":"compute-western-hospitality-partners-project-lincoln-oldham-county-ky","sourceRecordId":"western-hospitality-partners-project-lincoln-oldham-county-ky","name":"Project Lincoln: OC Data Center","operator":"Western Hospitality Partners","city":"La Grange","county":"Oldham","address":"3557 North Highway 53","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.39861,"longitude":-85.375,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/western-hospitality-partners-project-lincoln-oldham-county-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.pmg-ky1.com/oldham_era/news/6-billion-oc-data-center-planned-on-highway-53/article_af7b318a-fb9e-58fb-9b6f-c86c63b14f4d.html","label":"$6 billion OC Data Center planned on Highway 53","publisher":"Oldham Era","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.lpm.org/news/2025-07-02/oldham-county-passes-sweeping-data-center-moratorium-executive-fired-over-recording","label":"Oldham County passes sweeping data center moratorium, executive fired over recording","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/project-lincoln","label":"Project Lincoln Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-quad-state-internet-pah1-paducah-mccracken-ky","sourceRecordId":"quad-state-internet-pah1-paducah-mccracken-ky","name":"Quad State Internet PAH1 Colocation","operator":"Quad State Internet LLC","city":"Paducah","county":"McCracken","address":"1212 Helen St","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":37.09402,"longitude":-88.634104,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/quad-state-internet-pah1-paducah-mccracken-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13029","label":"PeeringDB facility 13029: Quad State Internet PAH1 Colocation","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-22"}]},{"id":"compute-qx-net-lexington-fayette-ky","sourceRecordId":"qx-net-lexington-fayette-ky","name":"QX.Net Lexington Data Center","operator":"QX.Net","city":"Lexington","county":"Fayette","address":"333 West Vine St","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.047912,"longitude":-84.499563,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qx-net-lexington-fayette-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=KY","label":"PeeringDB facility registry - Kentucky facilities (API query)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-rubix-ashland-works-russell-greenup-ky","sourceRecordId":"rubix-ashland-works-russell-greenup-ky","name":"Rubix Ashland Works Data Center Campus","operator":"Rubix Data Centers (Submer Group)","city":"Russell","county":"Greenup","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.5173028,"longitude":-82.6976631,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/rubix-ashland-works-russell-greenup-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.route-fifty.com/artificial-intelligence/2026/07/developer-proposes-hyperscale-data-center-former-eastern-kentucky-steel-mill/414960/","label":"Developer proposes hyperscale data center at former Eastern Kentucky steel mill","publisher":"Route Fifty / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://hoptownchronicle.org/data-centers-need-massive-power-theyre-eyeing-kentuckys-idle-industrial-sites-to-get-it","label":"Data centers need massive power. They're eyeing Kentucky's idle industrial sites to get it. (AK Steel mill, Boyd and Greenup counties, 2 GW, Spain-based developer)","publisher":"Hoptown Chronicle / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.floydct.com/news/data-centers-eyeing-kentucky-s-idle-industrial-sites-to-get-massive-power/article_a929bb8d-80b8-4cca-ad87-57a62bdd5490.html","label":"Data centers eyeing Kentucky's idle industrial sites to get massive power","publisher":"Floyd County Times / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Russell%2C+Greenup+County%2C+Kentucky&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode of Russell, Greenup County, KY","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-russellville-epb-smartnet-logan-ky","sourceRecordId":"russellville-epb-smartnet-logan-ky","name":"Russellville EPB Smartnet","operator":"Russellville Electric Plant Board","city":"Russellville","county":"Logan","address":"165 East Fourth Street","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":36.846023,"longitude":-86.88624,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/russellville-epb-smartnet-logan-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13664","label":"PeeringDB facility 13664: Russellvile EPB Smartnet (Russellville Electric Plant Board)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-22"}]},{"id":"compute-tenkey-franklin-ky","sourceRecordId":"tenkey-franklin-ky","name":"TenKey LandCo Project Lionsgate – Franklin Data Center","operator":"TenKey LandCo I LLC","city":"Franklin","county":"Simpson","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":36.703,"longitude":-86.591,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tenkey-franklin-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wkyufm.org/news/2026-04-14/second-lawsuit-filed-over-proposed-data-center-in-simpson-county","label":"Second lawsuit filed over proposed data center in Simpson County","publisher":"WKYU Public Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.lpm.org/news/2026-01-28/data-center-developer-sues-simpson-county-government-over-land-use-ordinance","label":"Data center developer sues Simpson County government over land use ordinance","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-terawulf-muskie-eastpark-ky","sourceRecordId":"terawulf-muskie-eastpark-ky","name":"TeraWulf Muskie Data Campus (EastPark)","operator":"TeraWulf","city":"Ashland","county":"Greenup","address":null,"state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.4042,"longitude":-82.79,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/terawulf-muskie-eastpark-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wowktv.com/news/kentucky/boyd-county-ky/new-ai-data-center-coming-to-eastern-kentucky/","label":"New AI data center coming to eastern Kentucky","publisher":"WOWK-TV","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus","label":"TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus","publisher":"TeraWulf Inc.","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.lpm.org/news/2026-05-28/massive-new-data-center-project-announced-in-northeastern-kentucky","label":"Massive new data center project announced in northeastern Kentucky","publisher":"Louisville Public Media","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.weku.org/the-commonwealth/2026-05-26/new-data-center-project-announced-in-northeastern-kentucky","label":"New data center project announced in northeastern Kentucky","publisher":"WEKU Public Radio","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://wchstv.com/news/local/boyd-county-leaders-counting-the-economic-impact-of-proposed-data-center","label":"Boyd County leaders on the economic impact of the proposed data center","publisher":"WCHS-TV","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://en.wikipedia.org/wiki/EastPark,_Kentucky","label":"EastPark, Kentucky - Wikipedia","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.herald-dispatch.com/news/terawulf-details-data-center-planned-for-east-kentucky/article_1f76fe0c-0d0c-42c7-82a2-9e9961da73a5.html","label":"Herald-Dispatch — TeraWulf details data center planned for east Kentucky","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-western-hospitality-partners-commerce-parkway-oldham-ky","sourceRecordId":"western-hospitality-partners-commerce-parkway-oldham-ky","name":"Western Hospitality Partners Commerce Parkway Data Center","operator":"Western Hospitality Partners","city":"La Grange","county":"Oldham","address":"3210 D.W. Griffith Lane","state":"KY","stateName":"Kentucky","jurisdictionType":"state","latitude":38.3939431,"longitude":-85.4092775,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/western-hospitality-partners-commerce-parkway-oldham-ky","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/oldham-county-data-center-replace-160523680.html","label":"Will an Oldham County data center replace Sauerbeck Family Drive-In? What we know","publisher":"Louisville Courier Journal (via Yahoo News)","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://kentuckylantern.com/wp-content/uploads/2026/06/EPIC-REPORT-NO-2026-001-FINAL.pdf","label":"EPIC Report No. 2026-001, Data Centers in Kentucky (§I.B lists Oldham County among counties with projects under consideration)","publisher":"Kentucky Energy Planning and Inventory Commission","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://hoptownchronicle.org/see-where-data-center-developers-are-looking-to-build-in-kentucky","label":"See where data center developers are looking to build in Kentucky (project tracker: Oldham County, Western Hospitality Partners, planned, relocated after resident pushback)","publisher":"Hoptown Chronicle / Kentucky Lantern","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Sauerbeck+Drive-In%2C+Oldham+County%2C+Kentucky&format=json&limit=3","label":"OpenStreetMap/Nominatim record for Sauerbeck Family Drive In, 3210 D. W. Griffith Lane, Oldham County, KY 40032","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"},{"url":"https://www.wdrbwave.com/2025/07/03/plans-oldham-county-data-center-project-withdrawn/","label":"Plans for Oldham County data center project withdrawn","publisher":"WDRB/WAVE","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-aws-benton-bossier-parish-la","sourceRecordId":"aws-benton-bossier-parish-la","name":"Amazon Web Services Bossier Parish Campus (Benton)","operator":"Amazon Web Services","city":"Benton","county":"Bossier","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":32.77,"longitude":-93.74,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-benton-bossier-parish-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","label":"Amazon Selects Louisiana for $12 Billion Data Center Campuses in Major U.S. Expansion","publisher":"Louisiana Economic Development","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","label":"Campuses for newly announced Amazon data center spanning Bossier & Caddo parishes confirmed","publisher":"KSLA News 12","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-aws-blanchard-caddo-parish-la","sourceRecordId":"aws-blanchard-caddo-parish-la","name":"Amazon Web Services Caddo Parish Campus (Blanchard)","operator":"Amazon Web Services","city":"Blanchard","county":"Caddo","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":32.6,"longitude":-94.04,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-blanchard-caddo-parish-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","label":"Amazon Selects Louisiana for $12 Billion Data Center Campuses in Major U.S. Expansion","publisher":"Louisiana Economic Development","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","label":"Campuses for newly announced Amazon data center spanning Bossier & Caddo parishes confirmed","publisher":"KSLA News 12","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-aws-resilient-technology-park-shreveport-la","sourceRecordId":"aws-resilient-technology-park-shreveport-la","name":"Amazon Web Services Shreveport Campus (Resilient Technology Park)","operator":"Amazon Web Services","city":"Shreveport","county":"Caddo","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":32.5135356,"longitude":-93.7477839,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-resilient-technology-park-shreveport-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://thehayride.com/2026/08/amazon-announces-6b-data-center-investment-in-shreveport/","label":"Amazon announces $6B data center investment in Shreveport","publisher":"The Hayride","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.ktbs.com/news/louisiana/amazon-announces-6b-data-center-investment-in-shreveport/article_b675ab68-f5cf-5376-b3e1-87a79fd38202.html","label":"Amazon announces $6B data center investment in Shreveport","publisher":"KTBS","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.opportunitylouisiana.gov/news/amazon-grows-northwest-louisiana-planned-investment-to-18-billion-with-new-shreveport-campus","label":"Amazon Grows Northwest Louisiana Planned Investment to $18 Billion With New Shreveport Campus","publisher":"Louisiana Economic Development","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://rebusinessonline.com/amazon-to-invest-6b-to-build-new-data-center-campus-in-shreveport-louisiana/","label":"Amazon to Invest $6B to Build New Data Center Campus in Shreveport, Louisiana","publisher":"REBusinessOnline","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-applied-digital-delta-forge-1-la","sourceRecordId":"applied-digital-delta-forge-1-la","name":"Applied Digital Delta Forge 1 AI Factory Campus","operator":"Applied Digital Corporation","city":"Boyce","county":"Rapides","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":31.4,"longitude":-92.65,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/applied-digital-delta-forge-1-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","label":"Central Louisiana secures $3.6B Applied Digital AI Factory Campus","publisher":"Louisiana Economic Development","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://rapidesparishjournal.com/2026/05/27/rapides-parish-lands-massive-3-6-billion-ai-data-center-project/","label":"Rapides Parish lands massive $3.6B AI data center project","publisher":"Rapides Parish Journal","kind":"press","retrievedAt":"2026-07-06"},{"url":"http://thehayride.com/2026/07/cleco-plans-756-mw-gas-plant-alongside-rapides-data-center/","label":"Cleco plans 756-MW gas plant alongside Rapides data center","publisher":"The Hayride","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.kalb.com/2026/07/30/cleco-looks-fast-track-new-generator-data-center/","label":"Cleco looks to fast-track new generator for data center","publisher":"KALB","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.kalb.com/2026/05/26/live-2-gov-landry-announces-new-multi-billion-dollar-ai-data-center-rapides-parish/","label":"Gov. Landry announces new multi-billion-dollar Applied Digital AI data center in Rapides Parish","publisher":"KALB","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/149/applied-digital-announces-new-u-s-based-high","label":"Applied Digital Announces New U.S. Based High Investment-Grade Hyperscaler Tenant at Delta Forge 1, a 430 MW AI Factory Campus (April 23, 2026)","publisher":"Applied Digital Corporation (investor relations)","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai","label":"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus in a Southern U.S. State (January 22, 2026)","publisher":"Applied Digital Corporation (investor relations)","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-stack-bossier-parish-la","sourceRecordId":"stack-bossier-parish-la","name":"Bossier Parish Campus (with Amazon)","operator":"STACK Infrastructure","city":"Benton","county":"Bossier","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":32.69,"longitude":-93.74,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stack-bossier-parish-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","label":"Campuses of newly-announced Amazon data center spanning Bossier, Caddo parishes confirmed","publisher":"KSLA","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","label":"Louisiana Economic Development (LED) — official announcement","publisher":"Louisiana Economic Development","kind":"subsidy","retrievedAt":"2026-09-15"}]},{"id":"compute-walker-buddy-ellis-road-data-center-livingston-la","sourceRecordId":"walker-buddy-ellis-road-data-center-livingston-la","name":"Buddy Ellis Road Data Center Site (Walker)","operator":"Undisclosed (tract rezoned at the request of Juban Land Holdings, LLC)","city":"Walker","county":"Livingston","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.4541822,"longitude":-90.8767224,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/walker-buddy-ellis-road-data-center-livingston-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://louisianavoice.com/2026/08/31/louisianavoice-learns-new-data-center-on-tap-for-livingston-parish-everything-was-done-in-secrecy-via-use-of-ndas/","label":"LouisianaVoice learns new data center on tap for Livingston Parish; everything was done in secrecy through use of NDAs","publisher":"LouisianaVoice","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://louisianavoice.com/2026/09/01/livingston-parish-president-denies-signing-nda-for-data-center-but-does-not-say-whether-a-deal-in-the-works-or-not/","label":"Livingston Parish President denies signing NDA for data center but does not say whether a deal is in the works or not","publisher":"LouisianaVoice","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Buddy+Ellis+Road%2C+Walker%2C+Livingston+Parish%2C+Louisiana&format=json&addressdetails=1&limit=3","label":"OpenStreetMap / Nominatim record for Buddy Ellis Road, Walker, Livingston Parish, Louisiana","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-stack-caddo-parish-la","sourceRecordId":"stack-caddo-parish-la","name":"Caddo Parish Campus (with Amazon)","operator":"STACK Infrastructure","city":"Blanchard","county":"Caddo","address":"7340 Greenwood Road","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":32.58,"longitude":-93.9,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stack-caddo-parish-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","label":"Campuses of newly-announced Amazon data center spanning Bossier, Caddo parishes confirmed","publisher":"KSLA","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","label":"Amazon selects Louisiana for $12 billion data center campuses in major U.S. expansion","publisher":"Opportunity Louisiana","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://baxtel.com/data-center/stack-resilient-tech-park","label":"Stack: Resilient Tech Park Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-20"},{"url":"https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/","label":"Amazon Web Services announces a third data center campus is coming to Shreveport","publisher":"KSLA","kind":"press","retrievedAt":"2026-08-20"}]},{"id":"compute-cogent-650-poydras-new-orleans-la","sourceRecordId":"cogent-650-poydras-new-orleans-la","name":"Cogent Communications New Orleans (650 Poydras)","operator":"Cogent Communications","city":"New Orleans","county":"Orleans","address":"650 Poydras St","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":29.9496125,"longitude":-90.0699355,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-650-poydras-new-orleans-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/new-orleans","label":"New Orleans Data Centers & Colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://nominatim.openstreetmap.org/search?q=650+Poydras+St+New+Orleans+LA&format=json","label":"OpenStreetMap Nominatim geocode: 650 Poydras Street, New Orleans","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-10"},{"url":"https://www.peeringdb.com/api/fac?city=New%20Orleans","label":"PeeringDB facility record 12396 (New Orleans)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.peeringdb.com/api/fac?state=LA&country=US","label":"PeeringDB facility records for Louisiana (fac 12396, Cogent New Orleans)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-dartpoints-btr1-baton-rouge-la","sourceRecordId":"dartpoints-btr1-baton-rouge-la","name":"DartPoints BTR1 Baton Rouge","operator":"DartPoints","city":"Baton Rouge","county":"East Baton Rouge","address":"7127 Florida Blvd","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.4539942,"longitude":-91.115481,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-btr1-baton-rouge-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/locations/btr01-baton-rouge-la/","label":"DartPoints Baton Rouge 1 (BTR1) data center","publisher":"DartPoints","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://dartpoints.com/press/dartpoints-acquires-venyu-adding-three-louisiana-data-centers-to-portfolio/","label":"DartPoints acquires Venyu, adding three Louisiana data centers to portfolio","publisher":"DartPoints","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.peeringdb.com/api/fac?state=LA&country=US","label":"PeeringDB facility records for Louisiana (fac 13669, DartPoints Baton Rouge, LA - BTR1)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=7127+Florida+Blvd%2C+Baton+Rouge%2C+LA+70806&format=json&addressdetails=1&limit=3","label":"OpenStreetMap / Nominatim geocode for 7127 Florida Blvd, Baton Rouge, LA 70806","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-dartpoints-btr2-baton-rouge-la","sourceRecordId":"dartpoints-btr2-baton-rouge-la","name":"DartPoints BTR2 Baton Rouge","operator":"DartPoints","city":"Baton Rouge","county":"East Baton Rouge","address":"7139 Florida Blvd","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.4514445,"longitude":-91.1156117,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-btr2-baton-rouge-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/press/dartpoints-acquires-venyu-adding-three-louisiana-data-centers-to-portfolio/","label":"DartPoints acquires Venyu, adding three Louisiana data centers to portfolio","publisher":"DartPoints","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.peeringdb.com/api/fac?state=LA&country=US","label":"PeeringDB facility records for Louisiana (fac 15844, DartPoints Baton Rouge, LA - BTR2)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://baxtel.com/data-center/baton-rouge","label":"Baton Rouge data centers and colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=7139+Florida+Blvd%2C+Baton+Rouge%2C+LA+70806&format=json&addressdetails=1&limit=3","label":"OpenStreetMap / Nominatim geocode for 7139 Florida Blvd, Baton Rouge, LA 70806","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-dartpoints-shv01-shreveport-la","sourceRecordId":"dartpoints-shv01-shreveport-la","name":"DartPoints SHV01 Shreveport","operator":"DartPoints","city":"Shreveport","county":"Caddo","address":"601 Milam St","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":32.5135356,"longitude":-93.7477839,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-shv01-shreveport-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/locations/shv01-shreveport-la/","label":"DartPoints SHV01 — Shreveport, LA facility page","publisher":"DartPoints","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://brightlio.com/louisiana-data-centers/","label":"Louisiana Data Centers & Colocation — Venyu/DartPoints Shreveport, 87,000 sq ft, Tier III","publisher":"Brightlio","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.peeringdb.com/api/fac?state=LA&country=US","label":"PeeringDB facility records for Louisiana (fac 15892, DartPoints Shreveport, LA - SHV1)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-edgeconnex-sli01-slidell-la","sourceRecordId":"edgeconnex-sli01-slidell-la","name":"EdgeConneX SLI01 (Slidell)","operator":"EdgeConneX","city":"Slidell","county":"St. Tammany","address":"2070 Gause Blvd E","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.287098,"longitude":-89.737403,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-sli01-slidell-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/new-orleans-la/","label":"EdgeConneX New Orleans (SLI01) location page","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://nominatim.openstreetmap.org/search?q=Slidell+Louisiana&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Slidell, LA","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-10"},{"url":"https://www.peeringdb.com/api/fac?city=New%20Orleans","label":"PeeringDB facility record 11786 (New Orleans)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-fogo-data-centers-new-orleans-la","sourceRecordId":"fogo-data-centers-new-orleans-la","name":"Fogo Data Centers New Orleans","operator":"Fogo Solutions","city":"New Orleans","county":"Orleans","address":"935 Gravier Street, Floor 10","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":29.9529522,"longitude":-90.0730531,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fogo-data-centers-new-orleans-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenterhawk.com/marketplace/providers/fogo-data-centers/935-gravier-street-floor-10/1029683","label":"Fogo Data Centers, 935 Gravier Street, Floor 10, New Orleans, LA","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://fogosolutions.com/data-center-new-orleans-la/","label":"Secure Data Center New Orleans, LA — FOGO Solutions","publisher":"FOGO Solutions","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://baxtel.com/data-center/louisiana","label":"Louisiana data centers — Fogo New Orleans listing","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-hut8-river-bend-west-feliciana-la","sourceRecordId":"hut8-river-bend-west-feliciana-la","name":"Hut 8 River Bend AI Data Center Campus","operator":"Hut 8","city":"St. Francisville","county":"West Feliciana","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.79,"longitude":-91.38,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hut8-river-bend-west-feliciana-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","label":"Hut 8 selects Southeast Louisiana for $10B AI data center","publisher":"Louisiana Economic Development","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/planned-hut-8-data-center-in-west-feliciana-parish-louisiana-gets-green-light/","label":"Planned Hut 8 data center in West Feliciana Parish gets green light","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center","label":"Hut 8 selects Entergy, Southeast Louisiana for $10 billion artificial intelligence data center","publisher":"Entergy","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.hut8.com/data-centers/river-bend","label":"River Bend | Hut 8","publisher":"Hut 8","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://canada.hut8.com/resources/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-usd7-0-billion","label":"Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus","publisher":"Hut 8","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://technical.ly/entrepreneurship/hut-8-water-upgrades-west-feliciana/","label":"Hut 8 water upgrades in West Feliciana","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-lumen-baton-rouge-2-la","sourceRecordId":"lumen-baton-rouge-2-la","name":"Lumen Baton Rouge 2 (445 North Boulevard)","operator":"Lumen Technologies","city":"Baton Rouge","county":"East Baton Rouge","address":"445 North Boulevard","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.4473276,"longitude":-91.186149,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-baton-rouge-2-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-baton-rouge-2","label":"Lumen Baton Rouge 2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-17"},{"url":"https://nominatim.openstreetmap.org/search?q=445+North+Boulevard,+Baton+Rouge,+LA&format=json","label":"OSM Nominatim geocode of 445 North Boulevard, Baton Rouge","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-17"}]},{"id":"compute-lumen-metairie-1-la","sourceRecordId":"lumen-metairie-1-la","name":"Lumen Metairie 1 (3220 Lausat Street)","operator":"Lumen Technologies","city":"Metairie","county":"Jefferson","address":"3220 Lausat Street","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":29.9722948,"longitude":-90.1578452,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-metairie-1-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-metairie-1","label":"Lumen Metairie 1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-17"},{"url":"https://nominatim.openstreetmap.org/search?q=3220+Lausat+Street,+Metairie,+LA&format=json","label":"OSM Nominatim geocode of 3220 Lausat Street, Metairie","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-17"}]},{"id":"compute-lumen-new-orleans-1-la","sourceRecordId":"lumen-new-orleans-1-la","name":"Lumen New Orleans 1 (639 Loyola)","operator":"Lumen Technologies","city":"New Orleans","county":"Orleans","address":"639 Loyola Avenue","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":29.9489047,"longitude":-90.0768165,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-new-orleans-1-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-new-orleans-1","label":"Lumen New Orleans 1 data center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://baxtel.com/data-center/new-orleans","label":"New Orleans data centers and colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=639+Loyola+Avenue%2C+New+Orleans%2C+LA&format=json&addressdetails=1&limit=3","label":"OpenStreetMap / Nominatim geocode for 639 Loyola Avenue, New Orleans (Entergy Tower)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-lumen-new-orleans-2-la","sourceRecordId":"lumen-new-orleans-2-la","name":"Lumen New Orleans 2 (1250 Poydras)","operator":"Lumen Technologies","city":"New Orleans","county":"Orleans","address":"1250 Poydras Street, Suite 500","state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":29.9512765,"longitude":-90.076594,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-new-orleans-2-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-new-orleans-2","label":"Lumen New Orleans 2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-17"},{"url":"https://nominatim.openstreetmap.org/search?q=1250+Poydras+Street,+New+Orleans,+LA&format=json","label":"OSM Nominatim geocode of 1250 Poydras Street, New Orleans","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-17"}]},{"id":"compute-meta-hyperion-richland-parish-la","sourceRecordId":"meta-hyperion-richland-parish-la","name":"Meta Hyperion","operator":"Meta","city":"Delhi vicinity","county":"Richland","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":32.4442,"longitude":-91.4906,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/meta-hyperion-richland-parish-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.reuters.com/technology/meta-build-ai-data-center-louisiana-2025-01-24/","label":"Meta to build AI data center in Louisiana — Reuters","publisher":"Reuters","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state","label":"Meta Selects Northeast Louisiana as Site of $10 Billion AI-Optimized Data Center","publisher":"Louisiana Economic Development","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://datacenters.atmeta.com/richland-parish-data-center/","label":"Richland Parish Data Center","publisher":"Meta","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://fortune.com/2026/05/14/meta-data-center-tax-break-hyperion-louisiana/","label":"Meta's $10 billion Louisiana data center is getting $3.3 billion in tax breaks","publisher":"Fortune","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings","label":"Entergy Louisiana announces new agreement with Meta","publisher":"Entergy Louisiana","kind":"filing","retrievedAt":"2026-07-06"},{"url":"https://www.sierraclub.org/sierra/rural-louisiana-meta-s-new-data-center-promises-growth-what-cost","label":"In Rural Louisiana, Meta's New Data Center Promises Growth — But at What Cost?","publisher":"Sierra Club","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.entergy.com/news/entergy-louisiana-receives-lpsc-approval-for-major-infrastructure-investments-to-support-metas-data-center-and-improve-reliability","label":"Entergy Louisiana receives LPSC approval for major infrastructure investments to support Meta's data center","publisher":"Entergy","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=kt5JixLAYFY%3D","label":"Direct Testimony of Laura K. Beauchamp, Entergy Louisiana (Project Evest), March 2026 — seven additional 754 MW CCCTs and 400 MW of battery storage","publisher":"Louisiana Public Service Commission","kind":"filing","retrievedAt":"2026-08-26"},{"url":"https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/","label":"Teachers and Local Businesses Win as Meta Expands Louisiana Data Center","publisher":"Meta","kind":"press","retrievedAt":"2026-09-03"},{"url":"https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history","label":"Meta Commits More Than $50 Billion for North Louisiana Project","publisher":"Louisiana Economic Development","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-azimuth-moss-bluff-data-center-calcasieu-parish-la","sourceRecordId":"azimuth-moss-bluff-data-center-calcasieu-parish-la","name":"Moss Bluff Data Center Site (Coffey Road)","operator":"Azimuth Renewables","city":"Moss Bluff","county":"Calcasieu","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.3398227,"longitude":-93.2473893,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/azimuth-moss-bluff-data-center-calcasieu-parish-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html","label":"Data center planned for north of Lake Charles, developer confirms","publisher":"The Advocate","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-ms-solar-grid-data-new-orleans-east-la","sourceRecordId":"ms-solar-grid-data-new-orleans-east-la","name":"MS Solar Grid Data (New Orleans East)","operator":"MS Solar Grid Data","city":"New Orleans","county":"Orleans","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":30.0406363,"longitude":-89.9786145,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ms-solar-grid-data-new-orleans-east-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wwno.org/economy/2026-01-29/new-orleans-city-council-bans-data-center-development-for-a-year-heres-why","label":"New Orleans City Council bans data center development for a year; here's why","publisher":"WWNO","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-fortalis-vidalia-data-center-concordia-parish-la","sourceRecordId":"fortalis-vidalia-data-center-concordia-parish-la","name":"Vidalia Data Center (former Fruit of the Loom building)","operator":"Fortalis Vidalia, LLC","city":"Vidalia","county":"Concordia","address":null,"state":"LA","stateName":"Louisiana","jurisdictionType":"state","latitude":31.5654441,"longitude":-91.4259495,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fortalis-vidalia-data-center-concordia-parish-la","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://listenupyall.com/2026/09/22/vidalia-approves-occupational-license-for-proposed-data-center/","label":"Vidalia Approves Occupational License for Proposed Data Center","publisher":"Listen Up Y'all","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.knoe.com/2026/09/23/vidalia-approves-new-data-center-former-fruit-loom-site/","label":"Vidalia approves new data center at former Fruit of the Loom site","publisher":"KNOE","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-365datacenters-marlborough-ma","sourceRecordId":"365datacenters-marlborough-ma","name":"365 Data Centers Marlborough (MA1)","operator":"365 Data Centers","city":"Marlborough","county":"Middlesex","address":"250 Locke Drive","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.3527,"longitude":-71.58411,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365datacenters-marlborough-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-06","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/marlborough-data-center/","label":"Marlborough Data Center - 365 Data Centers","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-06"},{"url":"https://365datacenters.com/greater-boston/","label":"Greater Boston - 365 Data Centers","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/16129","label":"PeeringDB facility record: 365 Data Centers Marlboro (MA1), 250 Locke Drive, Marlboro MA 01752","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-aws-grafton-ma","sourceRecordId":"aws-grafton-ma","name":"Amazon Data Services Grafton","operator":"Amazon Data Services","city":"Grafton","county":"Worcester","address":"8 Centennial Drive","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.25013,"longitude":-71.68772,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-grafton-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/amazon-buys-two-data-centers-in-massachusetts-for-26-7m","label":"Amazon Buys Two Data Centers in Massachusetts For $26.7m","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-06"},{"url":"https://cleanview.co/data-centers/massachusetts/3713/aws-grafton-data-center","label":"AWS Grafton Data Center","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://wbjournal.com/article/amazon-buys-properties-in-grafton-and-westborough-for-267m/","label":"Worcester Business Journal, 2022-11-22 - \"In Grafton, Amazon bought a 155,000-square-foot flex building on a 1.8-acre lot at 8 Centennial Drive for $15.1 million\"","publisher":"Worcester Business Journal","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.yahoo.com/news/amazon-pays-26-7-million-191235276.html","label":"Amazon pays $26.7 million for properties in Grafton, Shrewsbury and Westborough (Telegram & Gazette via Yahoo)","publisher":"Telegram & Gazette","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-aws-westborough-ma","sourceRecordId":"aws-westborough-ma","name":"Amazon Data Services Westborough","operator":"Amazon Data Services","city":"Westborough","county":"Worcester","address":"600 & 800 Friberg Parkway","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.28296,"longitude":-71.58339,"coordinatePrecision":"representative_multi_site","recordUnit":"representative multi-site record","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-westborough-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/amazon-buys-two-data-centers-in-massachusetts-for-26-7m","label":"Amazon Buys Two Data Centers in Massachusetts For $26.7m","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-06"},{"url":"https://cleanview.co/data-centers/massachusetts/3714/aws-westborough-data-center","label":"AWS Westborough Data Center","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://wbjournal.com/article/amazon-buys-properties-in-grafton-and-westborough-for-267m/","label":"Worcester Business Journal, 2022-11-22 - \"In Westborough, Amazon bought 600 and 800 Friberg Parkway for $11.6 million. The building at 600 Friberg, a State Street data center, is 99,160 square feet.\"","publisher":"Worcester Business Journal","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.yahoo.com/news/amazon-pays-26-7-million-191235276.html","label":"Amazon pays $26.7 million for properties in Grafton, Shrewsbury and Westborough (Telegram & Gazette via Yahoo)","publisher":"Telegram & Gazette","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-chestnut-river-holyoke-ma","sourceRecordId":"chestnut-river-holyoke-ma","name":"Chestnut River Holyoke Data Center (former Hampden Papers complex)","operator":"Chestnut River Power and Infrastructure","city":"Holyoke","county":"Hampden","address":"100 Water Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.1975752,"longitude":-72.600908,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/chestnut-river-holyoke-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wamc.org/news/2026-06-16/holyoke-councilors-mull-data-center-ban-as-developer-seeks-former-complex","label":"WAMC, 2026-06-16 - Holyoke councilors mull data center ban as developer seeks former complex; \"20-megawatt 'micro facility'\", $200 million, 100 Water Street","publisher":"WAMC Northeast Public Radio","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://gazettenet.com/2026/06/17/holyoke-first-in-state-to-ban-development-of-ai-data-centers/","label":"Daily Hampshire Gazette, 2026-06-17 - Holyoke first in state to ban development of AI data centers; developer Chestnut River, 20 MW, $200M, adaptive reuse of the former mill","publisher":"Daily Hampshire Gazette","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=100+Water+Street%2C+Holyoke%2C+Massachusetts&format=jsonv2","label":"OpenStreetMap/Nominatim - \"Former Hampden Paper Co, 100, Water Street, The Flats, Holyoke, Hampden County, Massachusetts, 01040\" (OSM way 213616074)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-cogent-boston-waltham-ma","sourceRecordId":"cogent-boston-waltham-ma","name":"Cogent Boston Data Center (Waltham)","operator":"Cogent Communications","city":"Waltham","county":"Middlesex","address":"100 Fifth Ave, Ste 1030","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.393191,"longitude":-71.255728,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-boston-waltham-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-boston","label":"Cogent Boston / Springfield data centers page","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.peeringdb.com/api/fac/10474","label":"PeeringDB facility 10474: Cogent Boston","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-24"}]},{"id":"compute-cogent-springfield-ma","sourceRecordId":"cogent-springfield-ma","name":"Cogent Springfield Data Center","operator":"Cogent Communications","city":"Springfield","county":"Hampden","address":"400 Taylor Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.112956,"longitude":-72.583699,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-springfield-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-boston","label":"Cogent Boston / Springfield data centers page","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.peeringdb.com/api/fac/16353","label":"PeeringDB facility 16353: Cogent Springfield MA","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-24"}]},{"id":"compute-commonwealth-springfield-data-center-ma","sourceRecordId":"commonwealth-springfield-data-center-ma","name":"Commonwealth of Massachusetts Springfield Data Center","operator":"Commonwealth of Massachusetts (state IT division)","city":"Springfield","county":"Hampden","address":"Elliot Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.1077,"longitude":-72.5857,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/commonwealth-springfield-data-center-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wamc.org/new-england-news/2012-10-15/springfield-data-center-to-provide-municipal-services","label":"Springfield data center to provide municipal services","publisher":"WAMC","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.datacenterknowledge.com/investing/massachusetts-picks-site-for-76m-facility","label":"Massachusetts picks site for $76M facility","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.bisnow.com/news/boston/commercial-real-estate/state-from-renter-to-owner-6344","label":"State: From Renter to Owner","publisher":"Bisnow","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://servercountry.org/data/states/massachusetts/","label":"Massachusetts Data Center Projects tracker","publisher":"ServerCountry","kind":"other","retrievedAt":"2026-10-24"}]},{"id":"compute-coresite-bo1-boston-ma-ma","sourceRecordId":"coresite-bo1-boston-ma-ma","name":"CoreSite BO1 - Boston, MA","operator":"CoreSite","city":"Somerville","county":"Middlesex","address":"70 Innerbelt Rd","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.3767059,"longitude":-71.0797577,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-bo1-boston-ma-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-centers/locations","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/29827954","label":"OpenStreetMap way/29827954","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.coresite.com/data-center/bo1-boston-ma","label":"CoreSite AI/HPC — Site page: BO1 Boston offers liquid cooling capabilities","publisher":"coresite.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.peeringdb.com/fac/584","label":"PeeringDB facility record: CoreSite - Boston (BO1), 70 Innerbelt Rd, Somerville MA 02143","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-crown-castle-worcester-ma","sourceRecordId":"crown-castle-worcester-ma","name":"Crown Castle Worcester (474 Main Street)","operator":"Crown Castle","city":"Worcester","county":"Worcester","address":"474 Main Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.262556,"longitude":-71.802963,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crown-castle-worcester-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/3490","label":"PeeringDB facility record: Crown Castle Worcester (474 Main), 474 Main St, Worcester MA - note \"Previously Lightower\"","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-csquare-bos1-waltham-ma","sourceRecordId":"csquare-bos1-waltham-ma","name":"Csquare BOS1 (Waltham)","operator":"Csquare (formerly Centersquare)","city":"Waltham","county":"Middlesex","address":"580 Winter Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.396785,"longitude":-71.267452,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/csquare-bos1-waltham-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","label":"Csquare Boston Market spec sheet (BOS1 / BOS4)","publisher":"Csquare","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.peeringdb.com/api/fac/4049","label":"PeeringDB facility 4049: Centersquare Boston (BOS1-A)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.csquare.com/data-centers/boston","label":"Csquare Boston data centers page","publisher":"Csquare","kind":"other","retrievedAt":"2026-10-24"}]},{"id":"compute-csquare-bos4-watertown-ma","sourceRecordId":"csquare-bos4-watertown-ma","name":"Csquare BOS4 (Watertown)","operator":"Csquare (formerly Centersquare)","city":"Watertown","county":"Middlesex","address":"486 Arsenal Way","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.365768,"longitude":-71.158084,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/csquare-bos4-watertown-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","label":"Csquare Boston Market spec sheet (BOS1 / BOS4)","publisher":"Csquare","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.peeringdb.com/api/fac/6678","label":"PeeringDB facility 6678: Centersquare Boston (BOS4-A)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-24"}]},{"id":"compute-databank-bos1-boston-ma","sourceRecordId":"databank-bos1-boston-ma","name":"DataBank BOS1 - Downtown Boston","operator":"DataBank","city":"Boston","county":"Suffolk","address":"1 Summer Street Suite 704","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.354699,"longitude":-71.060271,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-bos1-boston-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/boston/1-summer-street/","label":"DataBank Boston BOS1 - \"1 Summer Street Suite #704\", \"7,760 IT Square Feet\", \"0.5MW Critical IT Load\"","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/fac/2250","label":"PeeringDB facility record: DataBank Boston (BOS1), 1 Summer St, Boston","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-digitalrealty-bos14-needham-ma","sourceRecordId":"digitalrealty-bos14-needham-ma","name":"Digital Realty BOS14","operator":"Digital Realty","city":"Needham","county":"Norfolk","address":"128 First Avenue","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.30177,"longitude":-71.22184,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digitalrealty-bos14-needham-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/boston","label":"Boston Data Center & Colocation | Digital Realty","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.digitalrealty.com/data-centers/americas/boston/bos14","label":"BOS14 Data Center | 128 First Avenue | Digital Realty","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/2251","label":"PeeringDB facility record: Digital Realty BOS14 - Boston, 128 First Avenue, Needham MA 02494","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-edgeconnex-edcbos01-billerica-ma","sourceRecordId":"edgeconnex-edcbos01-billerica-ma","name":"EdgeConneX Boston (EDCBOS01)","operator":"EdgeConneX","city":"Billerica","county":"Middlesex","address":"22 Linnell Circle","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.528505,"longitude":-71.249495,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-edcbos01-billerica-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2026/03/Boston-Data-Sheet-Q1-update.pdf","label":"EdgeConneX Boston BOS01 data sheet (Q1 2026 update)","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.peeringdb.com/api/fac/2073","label":"PeeringDB facility 2073: EdgeConneX Boston (EDCBOS01)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.edgeconnex.com/locations/americas/boston-ma","label":"EdgeConneX Boston location page","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-24"}]},{"id":"compute-equinix-bo1-waltham-ma","sourceRecordId":"equinix-bo1-waltham-ma","name":"Equinix BO1","operator":"Equinix","city":"Waltham","county":"Middlesex","address":"74 West Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.39635,"longitude":-71.26906,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-bo1-waltham-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/equinix-boston-bo1","label":"Equinix Boston BO1 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/281","label":"PeeringDB facility registry — Equinix BO1 - Boston, Waltham (org Equinix, Inc.; 74 West Street, Waltham, MA 02451)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-equinix-bo2-billerica-ma","sourceRecordId":"equinix-bo2-billerica-ma","name":"Equinix BO2 - Boston, Billerica","operator":"Equinix","city":"Billerica","county":"Middlesex","address":"41-43 Alexander Road","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.55167,"longitude":-71.215669,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-bo2-billerica-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/boston-data-centers","label":"Equinix Boston data centers - \"BO2 data center in Billerica\"","publisher":"Equinix","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://www.peeringdb.com/fac/4666","label":"PeeringDB facility record: Equinix BO2 - Boston, Billerica, 41-43 Alexander Road","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-evocative-bos1-somerville-ma","sourceRecordId":"evocative-bos1-somerville-ma","name":"Evocative BOS1 (Somerville)","operator":"Evocative","city":"Somerville","county":"Middlesex","address":"50 Inner Belt Road","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.377932,"longitude":-71.080419,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/evocative-bos1-somerville-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.evocative.com/data-centers/boston/","label":"Evocative Boston (BOS1) - \"46,000 sq ft\", \"21,600 sq ft raised floor\", \"6 MW\"","publisher":"Evocative","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://www.peeringdb.com/fac/9460","label":"PeeringDB facility record: Evocative BOS1, 50 Inner Belt Road, Somerville","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-expedient-boston-medford-ma","sourceRecordId":"expedient-boston-medford-ma","name":"Expedient Boston","operator":"Expedient","city":"Medford","county":"Middlesex","address":"1 Cabot Road","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.405414,"longitude":-71.074978,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-boston-medford-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://expedient.com/about/media/2017-03-20-expedient-celebrates-4-million-expansion-in-boston/","label":"Expedient press release, 2017-03-20 - $4 million Boston expansion, 8,000 sq ft of added raised floor at 1 Cabot Road, Medford","publisher":"Expedient","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.peeringdb.com/fac/8469","label":"PeeringDB facility record: Expedient Boston, 1 Cabot Road, Medford","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-firstlight-rockland-ma","sourceRecordId":"firstlight-rockland-ma","name":"FirstLight Rockland Data Center (formerly ColoSpace)","operator":"FirstLight Fiber","city":"Rockland","county":"Plymouth","address":"1050 Hingham Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.166264,"longitude":-70.898347,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-rockland-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/3459","label":"PeeringDB facility record: ColoSpace - Rockland, MA, 1050 Hingham Street (org: FirstLight Fiber, Inc.)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-ironmountain-bos1-northborough-ma","sourceRecordId":"ironmountain-bos1-northborough-ma","name":"Iron Mountain Boston Data Center (BOS-1)","operator":"Iron Mountain","city":"Northborough","county":"Worcester","address":"171 Bearfoot Road","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.34088,"longitude":-71.63706,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ironmountain-bos1-northborough-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/boston-data-center","label":"Boston Data Center | Boston Colocation | Iron Mountain United States","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/6339","label":"PeeringDB facility record: Iron Mountain Data Center - Boston (BOS-1), 171 Bearfoot Rd, Northborough MA 01532","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-lightwave-networks-needham-ma","sourceRecordId":"lightwave-networks-needham-ma","name":"LightWave Networks Needham Data Center","operator":"LightWave Networks","city":"Needham","county":"Norfolk","address":"105 Cabot Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.302267,"longitude":-71.219577,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lightwave-networks-needham-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/5951","label":"PeeringDB facility record: LightWave Networks, 105 Cabot St, Needham MA","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-lumen-boston-cambridge-ma","sourceRecordId":"lumen-boston-cambridge-ma","name":"Lumen Boston (300 Bent Street)","operator":"Lumen Technologies","city":"Cambridge","county":"Middlesex","address":"300 Bent Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.367691,"longitude":-71.086779,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-boston-cambridge-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/519","label":"PeeringDB facility record: Lumen Boston, 300 Bent St., Cambridge MA (org: Lumen Technologies Inc)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-markley-boston-summer-street-ma","sourceRecordId":"markley-boston-summer-street-ma","name":"Markley Group Boston (One Summer Street / BOSIX)","operator":"Markley Group","city":"Boston","county":"Suffolk","address":"1 Summer Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.3545151,"longitude":-71.0595422,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/markley-boston-summer-street-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-06","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/massachusetts/boston/one-summer-st/","label":"One Summer St, Boston","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.bostonglobe.com/2025/05/20/business/macys-closing-stores-downtown-boston-data-center/","label":"Macy's closing stores in downtown Boston data center building","publisher":"The Boston Globe","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.wbur.org/news/2026/04/06/data-centers-ai-massachusetts-pollution-pushback","label":"Data centers, AI, and Massachusetts pollution pushback","publisher":"WBUR","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.peeringdb.com/fac/219","label":"PeeringDB facility record: Markley Group One Summer Street Boston, 1 Summer Street, Boston MA 02110","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://www.markleygroup.com/data-center","label":"Markley Group Data Center","publisher":"Markley Group","kind":"other","retrievedAt":"2026-10-06"}]},{"id":"compute-markley-lowell-ma","sourceRecordId":"markley-lowell-ma","name":"Markley Group One Lowell Data Center","operator":"Markley Group","city":"Lowell","county":"Middlesex","address":"2 Prince Ave","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.6334,"longitude":-71.3162,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/markley-lowell-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.boston.com/news/local-news/2026/05/07/lowell-residents-file-massachusetts-first-lawsuit-against-a-data-center/","label":"Lowell Residents File Massachusetts' First Lawsuit Against a Data Center","publisher":"Boston.com","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thecrimson.com/article/2026/5/5/ai-data-center-lowell-water/","label":"Lessons From Lowell: How a Data Center's Expansion Has Choked a Small Town","publisher":"The Harvard Crimson","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cbsnews.com/boston/news/inside-lowell-markley-data-center/","label":"Take a rare look inside the largest data center in Massachusetts","publisher":"CBS Boston","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://working-mass.com/2026/06/10/the-dungeon-over-lowell-how-the-data-center-boom-has-divided-one-citys-working-people/","label":"The Dungeon Over Lowell: How the Data Center Boom Divided One City's Working People","publisher":"Working Mass","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterknowledge.com/business/markley-building-out-50mw-boston-metro-data-center","label":"Markley Building Out 50MW Boston-Metro Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-06"},{"url":"https://www.govtech.com/analytics/massachusetts-residents-protest-data-farm-expansion","label":"Massachusetts Residents Protest Data Farm Expansion","publisher":"GovTech","kind":"press","retrievedAt":"2026-10-06"},{"url":"https://www.peeringdb.com/api/fac?state=MA&country=US","label":"PeeringDB Massachusetts facility list (fac 3096: Markley Group Lowell)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://www.wbur.org/news/2026/09/08/proposed-data-centers-local-approvals-healey-massachusetts","label":"Proposed data centers subjected to local approvals under Gov. Healey's order","publisher":"WBUR","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-mass-general-brigham-marlborough-ma","sourceRecordId":"mass-general-brigham-marlborough-ma","name":"Mass General Brigham Enterprise Data Center (Marlborough)","operator":"Mass General Brigham","city":"Marlborough","county":"Middlesex","address":null,"state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.3459,"longitude":-71.5523,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mass-general-brigham-marlborough-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.lmp.com/?p=1796","label":"Leggat McCall Properties project page: Partners Healthcare Data Center","publisher":"Leggat McCall Properties","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://servercountry.org/data/states/massachusetts/","label":"Massachusetts Data Center Projects tracker","publisher":"ServerCountry","kind":"other","retrievedAt":"2026-10-24"}]},{"id":"compute-mghpcc-holyoke-ma","sourceRecordId":"mghpcc-holyoke-ma","name":"Massachusetts Green High Performance Computing Center","operator":"MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)","city":"Holyoke","county":"Hampden","address":"100 Bigelow Street","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.20285,"longitude":-72.60693,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/mghpcc-holyoke-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://en.wikipedia.org/wiki/Massachusetts_Green_High_Performance_Computing_Center","label":"Massachusetts Green High Performance Computing Center","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-10-06"},{"url":"https://mghpcc.org/","label":"MGHPCC","publisher":"mghpcc.org","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://arcgisserver.digital.mass.gov/arcgisserver/rest/services/AGOL/L3_Parcels_FeatureService_4326/FeatureServer/1/query?where=MAP_PAR_ID%3D%27020-02-003%27&outFields=*&f=json","label":"Hampden County parcel/GIS record (parcel 020-02-003 (MAP_PAR_ID); LOC_ID F_355950_2900713)","publisher":"Hampden County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.mghpcc.org/directions-map/","label":"MGHPCC Directions & Map - \"100 Bigelow Street, Holyoke, MA 01040\"","publisher":"MGHPCC","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://tig.csail.mit.edu/hardware/mghpcc/","label":"MIT CSAIL Infrastructure Group, Holyoke Data Center (MGHPCC) - \"a 15-megawatt utility connection\", \"10 MW is dedicated to computing systems\", \"about 70% of which is sourced locally from hydroelectric facilities on the Connecticut River\", \"90,000-square-foot data center facility\"","publisher":"MIT CSAIL","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://theshoestring.org/2026/07/02/ban-ban-ban-data-center-discontent-reaches-western-massachusetts/","label":"Ban, ban, ban: data center discontent reaches western Massachusetts","publisher":"The Shoestring","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-provnet-chf1-chelmsford-ma","sourceRecordId":"provnet-chf1-chelmsford-ma","name":"Prov.net CHF1 (Boston North)","operator":"Prov.net","city":"Chelmsford","county":"Middlesex","address":"187 Billerica Road","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.597085,"longitude":-71.331383,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/provnet-chf1-chelmsford-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/3347","label":"PeeringDB facility record: Prov.net CHF1 (Boston North), 187 Billerica Road, Chelmsford MA (org: Provdotnet LLC)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-servistar-westfield-ma","sourceRecordId":"servistar-westfield-ma","name":"Servistar Realties Westfield Data Center Campus","operator":"Servistar Realties","city":"Westfield","county":"Hampden","address":"Servistar Industrial Way","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.157077,"longitude":-72.741619,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/servistar-westfield-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/westfield-data-center-campus","label":"Westfield Data Center Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-06"},{"url":"https://www.nbcboston.com/news/local/massive-multi-billion-dollar-data-center-campus-planned-in-western-massachusetts/3795016/","label":"Massive, multi-billion-dollar data center campus planned in western Massachusetts","publisher":"NBC Boston","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://theshoestring.org/2026/07/02/ban-ban-ban-data-center-discontent-reaches-western-massachusetts/","label":"Ban, ban, ban: data center discontent reaches western Massachusetts","publisher":"The Shoestring","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.bostonglobe.com/2026/05/18/business/data-centers-lowell-massachusetts-towns/","label":"Data centers, AI, and Massachusetts towns","publisher":"The Boston Globe","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://thereminder.com/local-news/hampden-county/westfield/westfield-city-council-approves-data-center-moratorium/","label":"The Reminder (Hampden County)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.wamc.org/news/2026-07-13/pioneer-valley-communities-rally-against-data-centers","label":"Pioneer Valley communities rally against data centers","publisher":"WAMC","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://thewestfieldnews.com/council-approves-tax-break-for-data-center-project/","label":"Council approves tax break for data center project","publisher":"The Westfield News","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.boston.com/news/local-news/2026/10/16/westfield-planning-board-kills-3-billion-data-center-project/","label":"Westfield planning board kills $3 billion data center project","publisher":"Boston.com","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.nhpr.org/2026-10-14/westfield-planning-board-denies-permit-extension-for-hyperscale-data-center-project","label":"Westfield planning board denies permit extension for hyperscale data center project","publisher":"New England Public Media / NHPR","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.boston.com/news/local-news/2026/10/16/westfield-planning-board-kills-3-billion-data-center-project/","label":"Westfield planning board kills $3 billion data center project","publisher":"Boston.com","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-tierpoint-boston-andover-ma","sourceRecordId":"tierpoint-boston-andover-ma","name":"TierPoint Boston - Andover","operator":"TierPoint","city":"Andover","county":"Essex","address":"15 Shattuck Road","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.6857078,"longitude":-71.2086024,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-boston-andover-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/massachusetts/boston-andover/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/211832626","label":"OpenStreetMap way/211832626","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-tierpoint-marlborough-ma","sourceRecordId":"tierpoint-marlborough-ma","name":"TierPoint Boston Data Center (Marlborough)","operator":"TierPoint","city":"Marlborough","county":"Middlesex","address":"34 St. Martin Drive","state":"MA","stateName":"Massachusetts","jurisdictionType":"state","latitude":42.31391,"longitude":-71.58139,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-marlborough-ma","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/massachusetts/","label":"Massachusetts Data Centers - TierPoint","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/11364","label":"PeeringDB facility record: TierPoint Boston - Marlborough, 34 Saint Martin Dr, Marlborough MA 01752-3021","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-priseda-prosperity-drive-silver-spring-md","sourceRecordId":"priseda-prosperity-drive-silver-spring-md","name":"12401 Prosperity Drive Data Center","operator":"Sansone Group / Priseda","city":"Silver Spring","county":"Montgomery","address":"12401 Prosperity Drive","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.058994201626,"longitude":-76.965681665201,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/priseda-prosperity-drive-silver-spring-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.pdcproperty-silverspring.com/","label":"12401 Prosperity Drive Data Center - Property Site","publisher":null,"kind":"other","retrievedAt":"2026-09-21"},{"url":"https://rebusinessonline.com/sansone-group-priseda-acquire-214000-sf-data-center-in-metro-d-c/","label":"Sansone Group, Priseda Acquire 214,000 SF Data Center in Metro D.C.","publisher":"REBusinessOnline","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-security-land-woodlawn-baltimore-county-md","sourceRecordId":"security-land-woodlawn-baltimore-county-md","name":"1500 Woodlawn Drive Data Center Campus","operator":"Security Land and Development LP","city":"Woodlawn","county":"Baltimore","address":"1500 Woodlawn Drive","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.3196,"longitude":-76.7448,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/security-land-woodlawn-baltimore-county-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://natureforward.org/woodlawn-data-center-baltimore-md-maryland-data-center-series-pt-2/","label":"Woodlawn Data Center, Baltimore, MD: Maryland Data Center Series Pt. 2","publisher":"Nature Forward","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://foxbaltimore.com/news/local/data-centers-energy-woodlawn-baltimore-county-maryland","label":"New data center could be coming to Woodlawn area in Baltimore County","publisher":"FOX45 Baltimore","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.patch.com/maryland/towson/woodlawn-data-center-proposal-meets-pushback-over-power-water-concerns","label":"Woodlawn data center proposal meets pushback over power, water concerns","publisher":"Patch","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-ainet-beltsville-wdc1-md","sourceRecordId":"ainet-beltsville-wdc1-md","name":"AiNET Beltsville WDC-1","operator":"AiNET","city":"Beltsville","county":"Prince George's County","address":"11700 Montgomery Road","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.0528524,"longitude":-76.9258808,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ainet-beltsville-wdc1-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-06","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/11700-montgomery-road-beltsville/ainet/datacenter/ainet-corporation-beltsville","label":"AiNET Corporation – Beltsville data center listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-06"},{"url":"https://baxtel.com/data-center/ainet-beltsville-wdc-1","label":"AiNET Beltsville WDC-1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-06"}]},{"id":"compute-ainet-cybernap-glen-burnie-md","sourceRecordId":"ainet-cybernap-glen-burnie-md","name":"AiNET CyberNAP","operator":"AiNET","city":"Glen Burnie","county":"Anne Arundel","address":"7900 Ritchie Highway","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.169,"longitude":-76.612,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ainet-cybernap-glen-burnie-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ai.net/cybernap/","label":"CyberNAP — AiNET","publisher":"AiNET","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://cloudandcolocation.com/datacenters/ainet-glen-burnie-cybernap-data-center/","label":"AiNET — Glen Burnie CyberNAP Data Center","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-ainet-one-market-center-baltimore-md","sourceRecordId":"ainet-one-market-center-baltimore-md","name":"AiNET One Market Center (Baltimore Carrier Hotel)","operator":"AiNET","city":"Baltimore","county":null,"address":"300 West Lexington Street","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.291652966378,"longitude":-76.619738877727,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ainet-one-market-center-baltimore-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ai.net/carrierhotel/","label":"Carrier Hotel | AiNET","publisher":"AiNET","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-ainet-wdc11-laurel-md","sourceRecordId":"ainet-wdc11-laurel-md","name":"AiNET WDC11 (Laurel)","operator":"AiNET","city":"Laurel","county":null,"address":"312 Laurel Ave","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.101379,"longitude":-76.847997,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ainet-wdc11-laurel-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/6537","label":"AiNET WDC11 (PeeringDB facility 6537)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-22"}]},{"id":"compute-aligned-quantum-frederick-md","sourceRecordId":"aligned-quantum-frederick-md","name":"Aligned Data Centers IAD-04 Frederick","operator":"Aligned Data Centers","city":"Adamstown","county":"Frederick","address":"5601 Manor Woods Road","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.263,"longitude":-77.387,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-quantum-frederick-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-72mw-maryland-data-center-in-quantum-frederick-park/","label":"Aligned breaks ground on 72MW Maryland data center in Quantum Frederick Park","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/hyperscale/article/55261511/circling-back-what-now-for-quantum-loophole-and-the-quantum-frederick-data-center-campus","label":"What Now for Quantum Loophole and the Quantum Frederick Data Center Campus?","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://baxtel.com/data-center/aligned-maryland-campus-iad04","label":"Aligned Maryland Campus IAD04","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://aligneddc.com/maryland-data-centers/","label":"Aligned Maryland Data Centers","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://commerce.maryland.gov/fund/data-center-maryland-sales-and-use-tax-exemption-incentive-program","label":"Maryland Data Center Sales & Use Tax Exemption Program","publisher":"Maryland Dept. of Commerce","kind":"filing","retrievedAt":"2026-07-06"},{"url":"https://finance.yahoo.com/news/quantum-frederick-data-center-campus-001700328.html","label":"Quantum Frederick data center campus","publisher":"Frederick News-Post via Yahoo Finance","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/","label":"Quantum Frederick, Frederick County, MD: Maryland Data Center Series, Pt. 3","publisher":"Nature Forward","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-aligned-iad-06-frederick-md","sourceRecordId":"aligned-iad-06-frederick-md","name":"Aligned Data Centers IAD-06 Frederick","operator":"Aligned Data Centers","city":"Frederick","county":"Frederick","address":"5601 Manor Woods Road","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.3417,"longitude":-77.5089,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-iad-06-frederick-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.turnerconstruction.com/insights/turner-celebrates-topping-out-of-aligned-iad-06-data-center-in-frederick-maryland","label":"Turner Celebrates Topping Out of Aligned IAD-06 Data Center in Frederick, Maryland","publisher":"Turner Construction Company","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/","label":"Quantum Frederick, Frederick County, MD: Maryland Data Center Series, Pt. 3","publisher":"Nature Forward","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://aligneddc.com/maryland-data-centers/","label":"Adaptive Data Centers in Frederick County, Maryland","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://baxtel.com/news/aligned-tops-out-new-maryland-data-center","label":"Aligned tops out new Maryland data center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-natelli-appeal-digital-park-lusby-md","sourceRecordId":"natelli-appeal-digital-park-lusby-md","name":"Appeal Digital Park","operator":"Natelli Holdings","city":"Lusby","county":"Calvert","address":"10475 Solomons Island Road","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":38.39,"longitude":-76.435,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/natelli-appeal-digital-park-lusby-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.choosecalvert.com/4058/Natelli-Communities","label":"Natelli Communities — Calvert County official project page","publisher":"Calvert County Government","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.appealdigitalparkcalvertmd.com/fa-qs-and-fact-sheet/","label":"Appeal Digital Park FAQs and Fact Sheet","publisher":"Natelli Holdings","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.appealdigitalparkcalvertmd.com/","label":"Appeal Digital Park — proposed data center in Lusby, Calvert County, MD","publisher":"Natelli Holdings","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.calvertcountymd.gov/3880/Data-Centers","label":"Data Centers — Calvert County official page (no site plan applications pending; six-month moratorium effective Aug. 28, 2026)","publisher":"Calvert County Government","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-aws-calvert-cliffs-md","sourceRecordId":"aws-calvert-cliffs-md","name":"AWS Calvert County Data Center Campus","operator":"Amazon Web Services","city":"Lusby","county":"Calvert","address":"1650 Calvert Cliffs Parkway","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":38.437,"longitude":-76.443,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-calvert-cliffs-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-proposes-data-center-campus-next-to-nuclear-plant-in-calvert-county-maryland/","label":"AWS proposes data center campus next to nuclear plant in Calvert County, Maryland","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://thebaynet.com/amazon-introduces-potential-calvert-county-data-center-emphasizes-infrastructure-workforce-and-growth/","label":"Amazon Introduces Potential Calvert County Data Center, Emphasizes Infrastructure, Workforce And Growth","publisher":"The BayNet","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://thebaynet.com/calvert-county-strikes-down-data-center-moratorium-in-2-3-vote/","label":"Calvert County Strikes Down Data Center Moratorium In 2-3 Vote","publisher":"The BayNet","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.calvertcountymd.gov/ArchiveCenter/ViewFile/Item/2925","label":"AWS Withdraws Proposed Calvert County Data Center Project — Calvert County News release, Aug. 4, 2026","publisher":"Calvert County Government","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.calvertcountymd.gov/3880/Data-Centers","label":"Data Centers — Calvert County official page (Calvert Technology Center application withdrawn Aug. 4, 2026; six-month moratorium effective Aug. 28, 2026)","publisher":"Calvert County Government","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.baltimoresun.com/2026/08/05/calvert-county-amazon-data-center/","label":"Amazon abandons plans to develop data centers in Maryland county","publisher":"The Baltimore Sun","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.calvertcountymd.gov/CivicAlerts.aspx?AID=3192","label":"Calvert County: AWS Withdraws Proposed Calvert County Data Center Project","publisher":"Calvert County Government","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://southernmarylandchronicle.com/2026/05/27/aws-calvert-technology-center-site-plan-filed/","label":"Calvert County Receives AWS Data Center Site Plan","publisher":"The Southern Maryland Chronicle","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-lerner-brightseat-tech-park-md","sourceRecordId":"lerner-brightseat-tech-park-md","name":"Brightseat Tech Park","operator":"Lerner Enterprises / The Tower Companies (Brightseat Associates LLC)","city":"Landover","county":"Prince George's","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":38.931,"longitude":-76.868,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lerner-brightseat-tech-park-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/lerners-maryland-data-center-campus-could-total-820mw/","label":"Lerner's Maryland data center campus could total 820MW","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://afrotech.com/prince-georges-county-pauses-landover-mall-data-center-project","label":"Prince George's County Executive Orders Temporary Halt to Landover Mall Data Center Project","publisher":"AfroTech","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://natureforward.org/brightseat-tech-park/","label":"Brightseat Tech Park, Prince George's County, MD: Maryland Data Center Series, Pt. 4","publisher":"Nature Forward","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://wtop.com/maryland/2026/07/prince-georges-co-extends-pause-on-hyperscale-data-center-development/","label":"Two-year moratorium on data center development passes in Prince George's Co.","publisher":"WTOP News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://pgccouncil.us/m/newsflash","label":"Chair Oriadha Announces Two-Year Moratorium to Prevent New Data Centers from Operating in the County","publisher":"Prince George's County Council","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-cogent-elkridge-howard-md","sourceRecordId":"cogent-elkridge-howard-md","name":"Cogent Data Center – Elkridge","operator":"Cogent Communications","city":"Elkridge","county":"Howard","address":"6050 Race Road","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.204016181007,"longitude":-76.711386050454,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-elkridge-howard-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/files/docs/network/colocation/Elkridge_Data_Center_Brochure.pdf","label":"Cogent Elkridge, MD Data Center Brochure","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-databank-bwi1-baltimore-md","sourceRecordId":"databank-bwi1-baltimore-md","name":"DataBank BWI1 (Downtown Baltimore Data Center)","operator":"DataBank","city":"Baltimore","county":null,"address":"300 West Lexington Street","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.291652966378,"longitude":-76.619738877727,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-bwi1-baltimore-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_BWI1_Q32020_v2.pdf","label":"Downtown Baltimore Data Center - BWI1 Facility Datasheet","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-atmosphere-dickerson-montgomery-md","sourceRecordId":"atmosphere-dickerson-montgomery-md","name":"Dickerson Data Center","operator":"Atmosphere Data Centers","city":"Dickerson","county":"Montgomery","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.2117,"longitude":-77.4736,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atmosphere-dickerson-montgomery-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://natureforward.org/dickerson-data-center-montgomery-county-md-data-center-series-pt-5/","label":"Dickerson Data Center, Montgomery County, MD: Data Center Series, Pt. 5","publisher":"Nature Forward","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-expedient-baltimore-tide-point-md","sourceRecordId":"expedient-baltimore-tide-point-md","name":"Expedient Baltimore - Tide Point","operator":"Expedient","city":"Baltimore","county":"Baltimore city","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.2746554,"longitude":-76.5916709,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-baltimore-tide-point-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/expedient-baltimore-tide-point","label":"datacenters.com facility profile (corroborated by datacentermap.com and baxtel.com)","publisher":"Expedient","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/11168593094","label":"OpenStreetMap node/11168593094","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-expedient-bwi1-owings-mills-md","sourceRecordId":"expedient-bwi1-owings-mills-md","name":"Expedient BWI1 (Owings Mills)","operator":"Expedient","city":"Owings Mills","county":"Baltimore","address":"11155 Red Run Boulevard","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.4273178,"longitude":-76.8115503,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-bwi1-owings-mills-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.expedient.com/data-centers/baltimore/","label":"Expedient official Baltimore data center page","publisher":"Expedient","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.openstreetmap.org/node/11167641842","label":"OpenStreetMap node/11167641842","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-globalinx-fastnet-cls-ocean-city-md","sourceRecordId":"globalinx-fastnet-cls-ocean-city-md","name":"Globalinx Fastnet Cable Landing Station","operator":"Globalinx (GLX)","city":"Berlin","county":"Worcester","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":38.3117282,"longitude":-75.1228506,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/globalinx-fastnet-cls-ocean-city-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.submarinenetworks.com/en/systems/trans-atlantic/fastnet/globalinx-to-build-a-cable-landing-station-in-maryland-for-aws%E2%80%99s-fastnet-subsea-cable","label":"Globalinx to Build a Cable Landing Station in Maryland for AWS's Fastnet Subsea Cable","publisher":"Submarine Networks","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.telecomramblings.com/2026/01/globalinx-poised-to-construct-a-subsea-cable-landing-station-in-ocean-city-worcester-county-maryland/","label":"Globalinx Poised to Construct a Subsea Cable Landing Station in Ocean City, Worcester County, Maryland","publisher":"Telecom Ramblings","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://worcestermd.gov/news/worcester-county-enacts-moratorium-data-centers-and-cable-landing-stations-while-new","label":"Worcester County Enacts Moratorium on Data Centers and Cable Landing Stations While New Regulations Are Developed","publisher":"Worcester County, Maryland","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.wboc.com/news/worcester-county-approves-one-year-moratorium-on-data-centers-cable-landings/article_809ad634-6f4f-48d6-bb07-a7e6febcde31.html","label":"Worcester County approves one-year moratorium on data centers, cable landings","publisher":"WBOC","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-johns-hopkins-bayview-research-data-center-baltimore-md","sourceRecordId":"johns-hopkins-bayview-research-data-center-baltimore-md","name":"Johns Hopkins Bayview Research Computing Data Center","operator":"Johns Hopkins University","city":"Baltimore","county":"Baltimore City","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.2929,"longitude":-76.5513,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/johns-hopkins-bayview-research-data-center-baltimore-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thebanner.com/economy/data-center-moratorium-johns-hopkins-baltimore-F3Q2CUPMX5EBPAM2IBEV2UQHD4/","label":"Johns Hopkins gets $9M for new data center as Baltimore debates a pause","publisher":"The Baltimore Banner","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.baltimoresun.com/2026/05/07/hopkins-bayview-data-center/","label":"Johns Hopkins advances $192M data center as Baltimore debates moratorium","publisher":"The Baltimore Sun","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-lumen-baltimore-1-md","sourceRecordId":"lumen-baltimore-1-md","name":"Lumen Baltimore 1","operator":"Lumen Technologies","city":"Baltimore","county":"Baltimore city","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.2917592,"longitude":-76.6204024,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-baltimore-1-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/lumen-baltimore-1","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/11168593074","label":"OpenStreetMap node/11168593074","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-microsoft-annapolis-junction-campus-md","sourceRecordId":"microsoft-annapolis-junction-campus-md","name":"Microsoft Annapolis Junction Data Center Campus","operator":"Microsoft","city":"Annapolis Junction","county":"Anne Arundel","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.12389,"longitude":-76.79194,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-annapolis-junction-campus-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thebanner.com/politics-power/local-government/data-center-moratorium-ban-energy-water-defense-P2VUK3R45VH6XP5XY4AYFXXM3M/","label":"Anne Arundel County opts for 15-month data center moratorium over outright ban","publisher":"The Baltimore Banner","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.govtech.com/policy/maryland-county-downgrades-potential-data-center-ban-to-pause","label":"Maryland County Downgrades Potential Data Center Ban to Pause","publisher":"GovTech (Capital Gazette / Tribune Content Agency)","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.kadoa.com/datacenter/state/maryland","label":"Maryland Data Centers: 26 Sites Tracked (2026)","publisher":"Kadoa","kind":"other","retrievedAt":"2026-10-22"}]},{"id":"compute-quantum-frederick-campus-md","sourceRecordId":"quantum-frederick-campus-md","name":"Quantum Frederick","operator":"TPG Real Estate Partners / Catellus Development Corporation","city":"Frederick","county":"Frederick","address":"5601 Manor Woods Rd","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.347656,"longitude":-77.493847,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/quantum-frederick-campus-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.catellus.com/updates/statement-from-tpg-real-estate-and-catellus-development-corporation-on-the-quantum-frederick-project","label":"Statement from TPG Real Estate and Catellus Development Corporation on the Quantum Frederick Project","publisher":"Catellus Development Corporation","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","label":"Quantum Loophole Plans to Develop Data Center Campus in Maryland","publisher":"Maryland Department of Commerce","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/","label":"Quantum Frederick, Frederick County, MD: Maryland Data Center Series, Pt. 3","publisher":"Nature Forward","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://hoodline.com/2026/09/frederick-county-squeezes-110m-from-data-center-giant-but-locks-in-its-zoning/","label":"Frederick County $110M Data Center Deal in Adamstown, MD","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://foxbaltimore.com/news/local/frederick-county-residents-push-referendum-data-center-zoning-plan-passes","label":"Frederick County residents push for referendum after data center zoning plan passes","publisher":"FOX45 News","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-rowan-bauxite-ii-frederick-md","sourceRecordId":"rowan-bauxite-ii-frederick-md","name":"Rowan Digital Infrastructure Bauxite II","operator":"Rowan Digital Infrastructure","city":"Frederick","county":"Frederick","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.34,"longitude":-77.515,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rowan-bauxite-ii-frederick-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/planning-commission-approves-two-more-045900384.html","label":"Planning Commission approves two more Rowan data centers (Frederick News-Post)","publisher":"The Frederick News-Post via Yahoo News","kind":"permit","retrievedAt":"2026-08-26"},{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","label":"Bauxite I, II & III — Hyperscale Data Center Campus, Maryland","publisher":"Rowan Digital Infrastructure","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-rowan-bauxite-iii-frederick-md","sourceRecordId":"rowan-bauxite-iii-frederick-md","name":"Rowan Digital Infrastructure Bauxite III","operator":"Rowan Digital Infrastructure","city":"Frederick","county":"Frederick","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.338,"longitude":-77.506,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rowan-bauxite-iii-frederick-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/planning-commission-approves-two-more-045900384.html","label":"Planning Commission approves two more Rowan data centers (Frederick News-Post)","publisher":"The Frederick News-Post via Yahoo News","kind":"permit","retrievedAt":"2026-08-26"},{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","label":"Bauxite I, II & III — Hyperscale Data Center Campus, Maryland","publisher":"Rowan Digital Infrastructure","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-rowan-digital-frederick-md","sourceRecordId":"rowan-digital-frederick-md","name":"Rowan Digital Infrastructure Frederick Campus (Bauxite I)","operator":"Rowan Digital Infrastructure","city":"Adamstown","county":"Frederick","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.265,"longitude":-77.394,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rowan-digital-frederick-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/rowan-secures-12bn-for-maryland-data-center-campus-build-out/","label":"Rowan secures $1.2bn for Maryland data center campus build-out","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://thetechcapital.com/rowan-digital-infrastructure-is-building-awss-maryland-availability-zone-at-the-quantum-frederick-campus/","label":"Rowan Digital Infrastructure is building AWS's Maryland availability zone at Quantum Frederick Campus","publisher":"The Tech Capital","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.fredericknewspost.com/news/continuing_coverage/quantum_loophole/potomac-edison-granted-waiver-to-connect-doubs-substation-with-rowan-data-center/article_d578a843-2a4a-5461-9ddb-cb03fefceaea.html","label":"Potomac Edison granted waiver to connect Doubs substation with Rowan data center","publisher":"Frederick News-Post","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.yahoo.com/news/amazon-identified-tenant-bauxite-data-231600787.html","label":"Amazon identified as tenant of Bauxite data center","publisher":"Yahoo News","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/","label":"Quantum Frederick, Frederick County, MD: Maryland Data Center Series, Pt. 3 — AWS BWI (Rowan Bauxite I): 151 acres, four buildings, 300 MW","publisher":"Nature Forward","kind":"press","retrievedAt":"2026-08-26"},{"url":"http://rowan.com/?p=264","label":"Five Years In — A message from Rowan CEO Charley Daitch","publisher":"Rowan Digital Infrastructure","kind":"press","retrievedAt":"2026-10-06"}]},{"id":"compute-gi-partners-sandy-farms-severn-md","sourceRecordId":"gi-partners-sandy-farms-severn-md","name":"Sandy Farms Data Center (Severn)","operator":"GI Partners (owner; single unnamed tenant)","city":"Severn","county":"Anne Arundel","address":"7659-7667 Sandy Farm Rd","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.1328,"longitude":-76.694,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/gi-partners-sandy-farms-severn-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thebanner.com/politics-power/local-government/data-center-moratorium-ban-energy-water-defense-P2VUK3R45VH6XP5XY4AYFXXM3M/","label":"Anne Arundel County opts for 15-month data center moratorium over outright ban","publisher":"The Baltimore Banner","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.gipartners.com/news/gi-partners-acquires-two-baltimore-area-data-centers","label":"GI Partners Acquires Two Baltimore-Area Data Centers","publisher":"GI Partners","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.datacentres.com/sales/18","label":"Sale record: 7659-7667 Sandy Farm Rd, Severn, MD","publisher":"datacentres.com","kind":"other","retrievedAt":"2026-10-22"}]},{"id":"compute-terawulf-morgantown-charles-county-md","sourceRecordId":"terawulf-morgantown-charles-county-md","name":"TeraWulf Morgantown Generating Station AI Campus","operator":"TeraWulf","city":null,"county":"Charles","address":null,"state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":38.362,"longitude":-77.129,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/terawulf-morgantown-charles-county-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://technical.ly/entrepreneurship/terawulf-maryland-power-plant-acquistion/","label":"TeraWulf buys Maryland coal plant to fuel AI data centers","publisher":"Technical.ly","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://thebaynet.com/charles-countys-morgantown-plant-being-bought-by-data-infrastructure-company/","label":"Charles County's Morgantown Plant Being Bought By Data Infrastructure Company","publisher":"The BayNet","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://natureforward.org/terawulf-data-center-charles-county-md-maryland-data-center-series-pt-1/","label":"TeraWulf Data Center, Charles County MD: Maryland Data Center Series, Pt. 1","publisher":"Nature Forward","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://thebaynet.com/100-million-in-taxpayer-money-public-citizen-demands-terawulf-reveal-morgantown-power-plant-deal/","label":"$100M in taxpayer money: Public Citizen demands TeraWulf reveal Morgantown deal","publisher":"The BayNet","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-tierpoint-russell-street-baltimore-md","sourceRecordId":"tierpoint-russell-street-baltimore-md","name":"TierPoint Baltimore (Russell Street)","operator":"TierPoint","city":"Baltimore","county":null,"address":"1401 Russell Street","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.275776951529,"longitude":-76.625636130534,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-russell-street-baltimore-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/maryland/","label":"Maryland Data Centers | TierPoint","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://business.maryland.gov/news/tierpoint-expands-to-second-maryland-facility","label":"TierPoint Expands to Second Maryland Facility","publisher":"Maryland Department of Commerce","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-tierpoint-baltimore-bwi-md","sourceRecordId":"tierpoint-baltimore-bwi-md","name":"TierPoint Baltimore - BWI","operator":"TierPoint","city":"Linthicum Heights","county":"Anne Arundel","address":"813 Pinnacle Drive","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.213455,"longitude":-76.682834,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-baltimore-bwi-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/maryland/baltimore-bwi/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/610845529","label":"OpenStreetMap way/610845529","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-tpc-konterra-1-laurel-md","sourceRecordId":"tpc-konterra-1-laurel-md","name":"TPC Konterra 1 Data Center","operator":"TPC Data Centers (TPC DC Mid-Atlantic LLC)","city":"Laurel","county":"Prince George's County","address":"6201 Frost Place","state":"MD","stateName":"Maryland","jurisdictionType":"state","latitude":39.09,"longitude":-76.9,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tpc-konterra-1-laurel-md","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-06","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/tpc-konterra-1","label":"TPC: Konterra 1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-06"},{"url":"https://morethanjustparks.com/data-center-tracker/tpc-konterra-1-data-center-md--98c30314-5bcf-4686-90c6-5ebc841743e6","label":"TPC Konterra 1 Data Center tracker entry","publisher":"More Than Just Parks","kind":"other","retrievedAt":"2026-10-06"}]},{"id":"compute-centra-portland-me","sourceRecordId":"centra-portland-me","name":"CENTRA Digital Interconnect -- 340 Cumberland (PMW01)","operator":"CENTRA Digital Interconnect","city":"Portland","county":"Cumberland","address":"340 Cumberland Ave","state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":43.6578388,"longitude":-70.2613785,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centra-portland-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/maine","label":"Maine Data Centers & Colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/centra-340-cumberland-pmw01","label":"CENTRA: 340 Cumberland (PMW01)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/gwi-portland-maine","label":"GWI Portland Maine Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.centradigital.com/data-centers/pwm1","label":"CENTRA Digital Interconnect — Portland 1 (PWM1), 340 Cumberland Ave","publisher":"CENTRA Digital Interconnect","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-deepgreen-western-passage-eastport-me","sourceRecordId":"deepgreen-western-passage-eastport-me","name":"DeepGreen Western Passage Tidal-Powered Subsea Data Center (Kendall Head, Eastport)","operator":"DeepGreen Western Passage SPV LLC","city":"Eastport","county":"Washington","address":null,"state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":44.9345236,"longitude":-67.011368,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/deepgreen-western-passage-eastport-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bangordailynews.com/2026/03/03/down-east/downeast-business/eastport-maine-ai-data-center-underwater-proposal/","label":"Developer eyes Down East Maine as home for proposed underwater AI data center","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://bangordailynews.com/2026/08/24/down-east/downeast-government/eastport-maine-ferc-underwater-data-center-preliminary-permit-approval/","label":"FERC accepts DeepGreen preliminary permit filing for Eastport underwater data center","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.bostonglobe.com/2026/10/13/science/underwater-data-center-eastport-maine/","label":"A data center. Underwater. Yes, some in this small Maine town are worried.","publisher":"The Boston Globe","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-firstlight-brunswick-me","sourceRecordId":"firstlight-brunswick-me","name":"FirstLight Brunswick Data Center","operator":"FirstLight Fiber","city":"Brunswick","county":"Cumberland","address":"14 Resilient Circle","state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":43.8951809,"longitude":-69.922964,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-brunswick-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/maine","label":"Maine Data Centers & Colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/firstlight-brunswick","label":"FirstLight Brunswick Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.firstlight.net/brunswick-maine-data-center-expansion-results-in-additional-power-and-increased-capacity/","label":"FirstLight — Brunswick, Maine data center expansion","publisher":"FirstLight Fiber","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.sdxcentral.com/news/firstlight-doubles-capacity-at-former-nato-data-center-in-maine/","label":"FirstLight doubles capacity at former NATO data center in Maine","publisher":"SDxCentral","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.pressherald.com/2026/06/01/brunswick-passes-data-center-moratorium/","label":"Brunswick passes data center moratorium","publisher":"Portland Press Herald","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-liquidcool-loring-afb-me","sourceRecordId":"liquidcool-loring-afb-me","name":"Loring LiquidCool Data Center (Green 4 Maine Campus)","operator":"LiquidCool Solutions / Green 4 Maine","city":"Limestone","county":"Aroostook","address":null,"state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":46.9502,"longitude":-67.8849,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/liquidcool-loring-afb-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bangordailynews.com/2025/10/14/aroostook/ai-data-center-loring-air-force-base/","label":"Maine's 1st AI Data Center Planned for Aroostook County","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.bangordailynews.com/2026/03/10/aroostook/aroostook-business/maine-data-center-ban-loring-joam40zk0w/","label":"Maine's Proposed Data Center Ban Could Restrict Facility Planned at Loring","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://thecounty.me/2026/03/10/news/maines-proposed-data-center-ban-could-restrict-facility-planned-at-loring/","label":"Maine's proposed data center ban could restrict facility planned at Loring","publisher":"The County","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://insideclimatenews.org/news/26112025/maine-data-center-green-innovation/","label":"Maine's First Major Data Center Project Touts Green Innovation","publisher":"Inside Climate News","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-millcompute-bates-mill-lewiston-me","sourceRecordId":"millcompute-bates-mill-lewiston-me","name":"MillCompute Bates Mill No. 3 AI Data Center","operator":"MillCompute LLC","city":"Lewiston","county":"Androscoggin","address":"35 Canal Street","state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":44.0970175,"longitude":-70.2183307,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/millcompute-bates-mill-lewiston-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bangordailynews.com/2025/12/12/central-maine/central-maine-business/lewiston-mill-300-m-ai-data-center/","label":"Lewiston mill $300M AI data center","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal","label":"Lewiston city council shoots down data center proposal","publisher":"Maine Public","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://baxtel.com/news/tier-iii-ai-data-center-proposed-for-lewiston-bates-mill-in-maine","label":"Tier III AI data center proposed for Lewiston Bates Mill","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-04"}]},{"id":"compute-nautilus-millinocket-me","sourceRecordId":"nautilus-millinocket-me","name":"Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)","operator":"Nautilus Data Technologies","city":"Millinocket","county":"Penobscot","address":"1 Katahdin Ave","state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":45.6501257,"longitude":-68.7073294,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nautilus-millinocket-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bangordailynews.com/2025/04/09/mainefocus/mainefocus-business/300m-data-center-former-millinocket-paper-mill-canceled/","label":"$300M data center at former Millinocket paper mill is canceled","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.datacenterknowledge.com/colocation/nautilus-will-build-its-next-data-center-on-dry-land-in-maine","label":"Nautilus Will Build Its Next Data Center on Dry Land, in Maine","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site","label":"Investing in Millinocket: EPA, Maine officials highlight former paper mill site revitalization","publisher":"US EPA","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-new-england-energy-sanford-woods-dc-me","sourceRecordId":"new-england-energy-sanford-woods-dc-me","name":"Sanford Woods Data Center","operator":"New England Energy","city":"Sanford","county":"York","address":null,"state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":43.4387179,"longitude":-70.7746224,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/new-england-energy-sanford-woods-dc-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/","label":"Company eyes Sanford site for data center","publisher":"Sanford Spring Vale News","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://sanfordspringvalenews.com/data-center-could-pump-2-billion-into-city/","label":"Data center could pump $2 billion into city","publisher":"Sanford Spring Vale News","kind":"press","retrievedAt":"2026-10-04"},{"url":"https://www.pressherald.com/2026/02/19/sanford-isnt-just-getting-a-data-center-developer-says/","label":"Sanford isn't just getting a data center, developer says","publisher":"Portland Press Herald","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.pressherald.com/2026/08/05/sanford-extends-data-center-moratorium-for-180-days/","label":"Sanford extends data center moratorium for 180 days","publisher":"Portland Press Herald","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.pressherald.com/2026/05/19/sanford-imposes-emergency-data-center-moratorium-halting-mousam-river-project/","label":"Sanford imposes emergency data center moratorium, halting Mousam River project","publisher":"Portland Press Herald","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-dickinson-scarborough-technology-park-me","sourceRecordId":"dickinson-scarborough-technology-park-me","name":"Scarborough Technology Park (Scarborough High Technology Industrial Park) Data Center","operator":"Daniel Dickinson (landowner/developer)","city":"Scarborough","county":"Cumberland","address":null,"state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":43.5899737,"longitude":-70.3346065,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dickinson-scarborough-technology-park-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mainepublic.org/climate/2026-05-06/scarborough-considers-data-center-pause-after-development-proposal","label":"Scarborough considers data center pause after development proposal","publisher":"Maine Public","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.pressherald.com/?p=7653330","label":"Scarborough to vote on data center moratorium","publisher":"Portland Press Herald","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://spectrumnewsnecn.com/necn/maine/news/2026/06/08/brunswick--scarborough-enact-data-center-moratoriums","label":"Brunswick, Scarborough enact data center moratoriums","publisher":"Spectrum News / NECN","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-sentinel-jay-me","sourceRecordId":"sentinel-jay-me","name":"Sentinel Data Centers Androscoggin Mill Campus, Jay","operator":"Sentinel Data Centers","city":"Jay","county":"Franklin","address":null,"state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":44.5024,"longitude":-70.2175,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sentinel-jay-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://themainemonitor.org/jay-backs-data-center-plan/","label":"Jay Approves Town Meeting Warrant, Backs Data Center Plan","publisher":"The Maine Monitor","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.newscentermaine.com/article/tech/science/environment/jay-select-board-approves-town-meeting-warrant-backs-data-center-plan/97-72e12bda-75de-43fe-99ea-a58f7471ee39","label":"Jay Select Board Approves Town Meeting Warrant, Backs Data Center Plan","publisher":"News Center Maine","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.bangordailynews.com/2026/06/12/central-maine/central-maine-business/jay-data-center-on-hold/","label":"Plan for $550M data center in Jay on hold, official says","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.bangordailynews.com/2026/07/06/politics/jay-data-center-developer-cover-janet-mills-veto-emails-show","label":"Jay data center developer was cover for Mills veto, emails show","publisher":"Bangor Daily News","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://siteselection.com/maine-shutdown-2-0-mill-redevelopment-project-stymied-by-data-center-resistance","label":"Maine Shutdown 2.0: mill redevelopment project stymied by data center resistance","publisher":"Site Selection","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-wiscasset-proposed-me","sourceRecordId":"wiscasset-proposed-me","name":"Wiscasset Data Center (Old Ferry Road Site)","operator":"Unnamed developer (NDA with town)","city":"Wiscasset","county":"Lincoln","address":null,"state":"ME","stateName":"Maine","jurisdictionType":"state","latitude":44.0015,"longitude":-69.6553,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wiscasset-proposed-me","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.centralmaine.com/2025/11/03/wiscasset-loses-arpa-funding-after-data-center-proposal-confusion/","label":"Wiscasset Loses ARPA Funding After Data Center Proposal, Confusion","publisher":"Central Maine","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","label":"As Data Centers Look to Rural New England, Maine Considers a Moratorium","publisher":"Maine Morning Star","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.pressherald.com/2026/05/13/how-a-data-center-derailed-240k-for-affordable-housing-in-rural-maine/","label":"How a data center derailed $240K for affordable housing in rural Maine","publisher":"Portland Press Herald (Daily Yonder)","kind":"press","retrievedAt":"2026-10-22"},{"url":"https://www.boothbayregister.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584","label":"Unredacted NDA names Wiscasset's data center inquirer","publisher":"Boothbay Register","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-123net-dc4-byron-center-mi","sourceRecordId":"123net-dc4-byron-center-mi","name":"123NET DC4 Grand Rapids Data Center","operator":"123NET","city":"Byron Center","county":"Kent","address":"400 76th Street SW","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.826202163837,"longitude":-85.67268596115,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/123net-dc4-byron-center-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.123.net/data-center-colocation/","label":"Leading Data Centers in Michigan for Optimal Connectivity - 123NET data center list","publisher":"123NET","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=200","label":"PeeringDB facility API — '123.NET - DC4 - 400 76th St SW', Byron Center 49315 (fac 9381)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://6121234.fs1.hubspotusercontent-na1.net/hubfs/6121234/Data%20Center%20Tech%20Specs-DC4%20(1).pdf","label":"123NET Data Center 4 tech site specs (PDF) — cooling: Direct Expansion (DX), 150 tons, 3 outside pad units, N+1","publisher":"123NET","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-123net-dc1-southfield-mi","sourceRecordId":"123net-dc1-southfield-mi","name":"123NET Southfield DC1","operator":"123NET","city":"Southfield","county":"Oakland","address":"24700 Northwestern Highway","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.4716416,"longitude":-83.2380417,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/123net-dc1-southfield-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.123.net/news/123net-expands-dc1/","label":"123NET Expands Southfield Data Center to Power AI and High-Density Deployments","publisher":"123NET","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"123.NET - DC1 - 24700 Northwestern Hwy.\" registered by 123.Net, LLC., Southfield 48075","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.123.net/data-center-colocation/","label":"123NET — Data Center Colocation (DC1: 24700 Northwestern Hwy, 80,000 sq ft, dedicated 20 MW DTE substation, chilled water + Kyoto wheel cooling)","publisher":"123NET","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://6121234.fs1.hubspotusercontent-na1.net/hubfs/6121234/Data%20Center%20Tech%20Specs-DC1%20(3).pdf","label":"123NET Data Center 1 tech site specs (PDF) — cooling: Kyoto Wheel & Chilled Water, 500 tons per floor; available utility power 16 MW","publisher":"123NET","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-123net-dc2-southfield-mi","sourceRecordId":"123net-dc2-southfield-mi","name":"123NET Southfield DC2 (Southfield Data Center NW)","operator":"123NET","city":"Southfield","county":"Oakland","address":"24275 Northwestern Highway","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.467179479879,"longitude":-83.234668656697,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/123net-dc2-southfield-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.123.net/data-center-colocation/","label":"Leading Data Centers in Michigan for Optimal Connectivity - 123NET data center list","publisher":"123NET","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"123.NET - DC2 - 24275 Northwestern Hwy.\" registered by 123.Net, LLC., Southfield 48075","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://6121234.fs1.hubspotusercontent-na1.net/hubfs/6121234/Data%20Center%20Tech%20Specs-DC2%20(1).pdf","label":"123NET Data Center 2 tech site specs (PDF) — cooling: Direct Expansion (DX), 300 tons, 16 roof top units, N+1","publisher":"123NET","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-123net-dc3-southfield-mi","sourceRecordId":"123net-dc3-southfield-mi","name":"123NET Southfield DC3 (Southfield Data Center W)","operator":"123NET","city":"Southfield","county":"Oakland","address":"24245 Northwestern Highway","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.466994454342,"longitude":-83.234393055905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/123net-dc3-southfield-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.123.net/data-center-colocation/","label":"Leading Data Centers in Michigan for Optimal Connectivity - 123NET data center list","publisher":"123NET","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=200","label":"PeeringDB facility API — '123.NET - DC3 - 24245 Northwestern Hwy.', Southfield 48075 (fac 9403)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://6121234.fs1.hubspotusercontent-na1.net/hubfs/6121234/Data%20Center%20Tech%20Specs-DC3%20(1).pdf","label":"123NET Data Center 3 tech site specs (PDF) — cooling: Direct Expansion (DX), 300 tons, 6 roof top units, N+1","publisher":"123NET","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-365-data-centers-dt1-southfield-mi","sourceRecordId":"365-data-centers-dt1-southfield-mi","name":"365 Data Centers Detroit (DT1)","operator":"365 Data Centers","city":"Southfield","county":"Oakland","address":"24660 Lahser Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.4691728,"longitude":-83.2604844,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-dt1-southfield-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/detroit-data-center/","label":"Detroit Data Center - 365 Data Centers","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://baxtel.com/data-center/365-detroit-dt1","label":"365 Detroit (DT1) Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.peeringdb.com/api/fac?country=US&state__in=MI,Michigan","label":"PeeringDB facility registry (Michigan): 365 Data Centers Detroit (DT1), fac 2021","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-07"}]},{"id":"compute-acd-net-metroix-lansing-mi","sourceRecordId":"acd-net-metroix-lansing-mi","name":"ACD.net MetroIX Lansing Data Center (1800 N. Grand River Ave)","operator":"ACD.net (Advanced Communications & Data)","city":"Lansing","county":"Ingham","address":"1800 N. Grand River Ave.","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.7541772,"longitude":-84.5568307,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/acd-net-metroix-lansing-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/acd-net-lansing-data-center/","label":"Cloud and Colocation — ACD.net Lansing Data Center (42,000 sq ft enclosed; 22,000 sq ft colocation; N+1 UPS, generators, HVAC)","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://en.wikipedia.org/wiki/ACD_(telecommunications_company)","label":"Wikipedia — ACD (telecommunications company): HQ 1800 N Grand River Ave, 40,000 sq ft data center built 2006","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=1800+N+Grand+River+Ave+Lansing+MI&format=json","label":"OpenStreetMap Nominatim geocode — 1800 North Grand River Avenue, Lansing, Ingham County, 48906","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-21"}]},{"id":"compute-solstice-data-allen-park-mi","sourceRecordId":"solstice-data-allen-park-mi","name":"Allen Park Data Center","operator":"Solstice Data","city":"Allen Park","county":"Wayne","address":"Enterprise Drive, south of I-94","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.2830061,"longitude":-83.1947008,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/solstice-data-allen-park-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://planetdetroit.org/2026/06/allen-park-planners-reject-data-center/","label":"Allen Park planners reject proposed data center: 'We're gonna celebrate with one eye open'","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"other","retrievedAt":"2026-10-07"}]},{"id":"compute-alterra-development-marshall-mi","sourceRecordId":"alterra-development-marshall-mi","name":"Alterra Marshall Technology & Energy Center","operator":"Alterra Development","city":"Marshall","county":"Calhoun","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.276,"longitude":-84.955,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/alterra-development-marshall-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wwmt.com/news/local/data-center-gas-generation-plant-proposed-in-marshall-alterra-development-calhoun-county-energy-electricity-water","label":"Data center, gas generation plant proposed in Marshall","publisher":"WWMT","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://marshalladvisor.com/articles/news/data-center-being-proposed-in-marshall-begins-due-dilligence-period-with-city/","label":"Data center being proposed in Marshall begins 'due-diligence' period with city","publisher":"Ad-Visor & Chronicle (Marshall Advisor)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://wwmt.com/news/local/data-centers-michigan-dowagiac-marshall-proposals-track-questions-answers-microsoft-hyperscale-alterra-ai-water-resources-noise-meetings-wwmt","label":"From Dowagiac to Marshall: communities want answers about data centers — “up to 1,400 megawatts”, on-site gas “around 1,000 megawatts”, “up to 400 megawatts from the grid at peak use”","publisher":"WWMT","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://arcwestmichigan.com/news/local/marshall-data-center-proposal-stuart-lake-brooks-nature-area-gas-generation-plant-energy-scott-wolfersberger-calhoun-county-west-michigan","label":"Marshall mayor answers questions on the data center proposal — names the Marshall Technology and Energy Center","publisher":"ARC West Michigan","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://wwmt.com/news/local/story/data-center-gas-generation-plant-proposed-in-marshall-alterra-development-calhoun-county-energy-electricity-water","label":"Data center, gas generation plant proposed in Marshall","publisher":"WWMT Newschannel 3","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://wwmt.com/news/local/marshall-data-center-moratorium-delays-development-one-year-alterra-brooks-industrial-park-acres-wetland-lake-energy-environment-calhoun-county-west-michigan","label":"Marshall data center moratorium delays development by at least one year","publisher":"WWMT Newschannel 3","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-aunalytics-kalamazoo-mi","sourceRecordId":"aunalytics-kalamazoo-mi","name":"Aunalytics Kalamazoo Datacenter","operator":"Aunalytics","city":"Kalamazoo","county":"Kalamazoo","address":"6395 Technology Ave, Suite A","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.246545,"longitude":-85.675111,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aunalytics-kalamazoo-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/5363","label":"PeeringDB — Aunalytics Kalamazoo Datacenter, 6395 Technology Ave, Suite A, Kalamazoo, MI 49009","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"Aunalytics Kalamazoo Datacenter\" with registered coordinates","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=6395+Technology+Ave%2C+Kalamazoo%2C+MI+49009&benchmark=Public_AR_Current&format=json","label":"US Census Bureau geocoder match for 6395 Technology Ave, Kalamazoo, MI 49009","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-benton-township-yore-avenue-ai-data-center-mi","sourceRecordId":"benton-township-yore-avenue-ai-data-center-mi","name":"Benton Township AI Data Center (Yore Avenue, near Lake Michigan College)","operator":"Undisclosed developer","city":"Benton Charter Township","county":"Berrien","address":"Yore Avenue","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.0952439,"longitude":-86.388123,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/benton-township-yore-avenue-ai-data-center-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://abc57.com/news/jackie","label":"$3 billion A.I. data center potentially heading to Michiana","publisher":"ABC57","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://baxtel.com/data-center/benton-harbor-proposed","label":"Benton Harbor (Proposed) data center listing","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-07"}]},{"id":"compute-hillwood-sterling-buick-city-flint-mi","sourceRecordId":"hillwood-sterling-buick-city-flint-mi","name":"Buick City Data Center","operator":"Hillwood-Sterling","city":"Flint","county":"Genesee","address":"902 East Leith Street","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":43.043131,"longitude":-83.6880801,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hillwood-sterling-buick-city-flint-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wnem.com/2026/06/03/flint-city-council-discuss-data-center-moratorium/","label":"Flint City Council to discuss data center moratorium","publisher":"WNEM TV5","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://geneseecountyview.com/articles/burtonview/buick-city-redevelopment-moves-ahead-with-300-million-investment/","label":"Buick City redevelopment moves ahead with $300 million investment","publisher":"Genesee County View","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://epa.gov/newsreleases/epa-reaches-agreement-flint-commerce-center-llc-regarding-redevelopment-portion-former","label":"EPA Reaches Agreement with Flint Commerce Center LLC Regarding Redevelopment of a Portion of the Former Buick City Site","publisher":"U.S. Environmental Protection Agency","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-cogent-detroit-1320-3rd-st-mi","sourceRecordId":"cogent-detroit-1320-3rd-st-mi","name":"Cogent Detroit Data Center (1320 3rd St)","operator":"Cogent Communications","city":"Detroit","county":"Wayne","address":"1320 3rd St","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.330743,"longitude":-83.055773,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-detroit-1320-3rd-st-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cogentco.com/en/cogent-detroit","label":"Cogent Communications -- Detroit and Troy data centers","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-07"},{"url":"https://www.peeringdb.com/fac/15594","label":"PeeringDB facility record: Cogent Detroit","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-07"},{"url":"https://www.prnewswire.com/news-releases/cogent-communications-announces-closing-of-sale-of-10-data-center-facilities-302813574.html","label":"Cogent Communications Announces Closing of Sale of 10 Data Center Facilities","publisher":"Cogent Communications / PR Newswire","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-cogent-troy-big-beaver-mi","sourceRecordId":"cogent-troy-big-beaver-mi","name":"Cogent Troy Data Center (3331 W. Big Beaver Rd)","operator":"Cogent Communications","city":"Troy","county":"Oakland","address":"3331 W. Big Beaver Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.5594738,"longitude":-83.193147,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-troy-big-beaver-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cogentco.com/en/cogent-detroit","label":"Cogent Communications -- Detroit and Troy data centers","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-07"},{"url":"https://www.openstreetmap.org/node/5557517226","label":"OpenStreetMap node: Cogent Communications, 3331 West Big Beaver Road, Troy","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-07"},{"url":"https://www.prnewswire.com/news-releases/cogent-communications-announces-closing-of-sale-of-10-data-center-facilities-302813574.html","label":"Cogent Communications Announces Closing of Sale of 10 Data Center Facilities","publisher":"Cogent Communications / PR Newswire","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-deep-green-lansing-mi","sourceRecordId":"deep-green-lansing-mi","name":"Deep Green Lansing Data Center","operator":"Deep Green","city":"Lansing","county":"Ingham","address":"Cedar Street and Larch Street","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.747831829239,"longitude":-84.544559589342,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/deep-green-lansing-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/articles/lansing-city-planning-commission-recommends-110622234.html","label":"Lansing city planning commission recommends rezoning for downtown data center","publisher":"Lansing State Journal (via Yahoo News)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://web.archive.org/web/20260303102416/https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted. (Internet Archive copy of 3 March 2026)","publisher":"Gander Newsroom (via Internet Archive)","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-edgeconnex-det01-mi","sourceRecordId":"edgeconnex-det01-mi","name":"EdgeConneX DET01","operator":"EdgeConneX","city":"Detroit (Oakland County)","county":"Oakland","address":"21005 Lahser Rd","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.4476693,"longitude":-83.2626336,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-det01-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/detroit-mi/","label":"EdgeConneX official locations page - Detroit","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://www.openstreetmap.org/way/377585075","label":"OpenStreetMap way/377585075","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.peeringdb.com/api/fac?country=US&state__in=MI,Michigan","label":"PeeringDB facility registry (Michigan): EdgeConneX Detroit (EDCDET01), fac 1927","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-07"}]},{"id":"compute-gm-enterprise-data-center-warren-mi","sourceRecordId":"gm-enterprise-data-center-warren-mi","name":"General Motors Enterprise Data Center (Warren Technical Center)","operator":"General Motors","city":"Warren","county":"Macomb","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.5155048,"longitude":-83.0377165,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/gm-enterprise-data-center-warren-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sustainablebrands.com/read/gm-facility-among-5-of-data-centers-to-earn-leed-gold-certification","label":"GM Facility Among 5% of Data Centers to Earn LEED Gold Certification","publisher":"Sustainable Brands","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://www.3blmedia.com/news/gm-data-center-goes-green-leed","label":"GM Data Center Goes Green for LEED","publisher":"3BL Media / General Motors","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://www.informationweek.com/sustainability/why-general-motors-went-green-but-not-cloud-","label":"Why General Motors Went Green (But Not Cloud)","publisher":"InformationWeek","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-genh-lake-billings-dam-manton-mi","sourceRecordId":"genh-lake-billings-dam-manton-mi","name":"GenH Lake Billings Dam Data Services Facility","operator":"GenH","city":"Manton","county":"Wexford","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":44.4137447,"longitude":-85.3944105,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/genh-lake-billings-dam-manton-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cadillacnews.com/news/manton-wary-of-lake-billings-data-center-proposal/article_81fc6587-837e-4e89-a949-b889d28ecd35.html","label":"Manton wary of Lake Billings data center proposal","publisher":"Cadillac News","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-genh-morley-dam-mecosta-mi","sourceRecordId":"genh-morley-dam-mecosta-mi","name":"GenH Morley Dam Data Services Facility","operator":"GenH","city":"Morley","county":"Mecosta","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":43.490861,"longitude":-85.443928,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/genh-morley-dam-mecosta-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thedailynews.cc/articles/just-in-data-center-proposed-for-morley-dam-meeting-postponed-due-to-large-number-of-attendees/","label":"Data center proposed for Morley dam; meeting postponed due to large number of attendees","publisher":"The Daily News (Greenville, MI)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Morley%2C+Mecosta+County%2C+Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for Morley, Mecosta County, Michigan (village-level pin)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-raeden-gibraltar-mclouth-mi","sourceRecordId":"raeden-gibraltar-mclouth-mi","name":"Gibraltar Data Center (former McLouth Steel site)","operator":"Raeden (with Cal Realty / Ferragon Corp.)","city":"Gibraltar","county":"Wayne","address":"27800 W. Jefferson Avenue","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.106282080203,"longitude":-83.196799127817,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/raeden-gibraltar-mclouth-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://planetdetroit.org/2026/08/gibraltar-faces-data-center-lawsuit/","label":"Gibraltar faces data center developer lawsuit after city passes moratorium","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-harbor-farmz-full-circle-drive-kalamazoo-mi","sourceRecordId":"harbor-farmz-full-circle-drive-kalamazoo-mi","name":"Harbor Farmz Inference Data Center Conversion (2839 Full Circle Drive)","operator":"Harbor Farmz","city":"Kalamazoo","county":"Kalamazoo","address":"2839 Full Circle Drive","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.291707,"longitude":-85.5872286,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/harbor-farmz-full-circle-drive-kalamazoo-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://secondwavemedia.com/from-cannabis-to-ai-proposed-kalamazoo-data-center-sparks-questions-about-the-future-in-milwood/","label":"From cannabis to AI: Proposed Kalamazoo data center sparks questions about its future in Milwood","publisher":"Second Wave Media","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-stantec-randee-howell-township-mi","sourceRecordId":"stantec-randee-howell-township-mi","name":"Howell Township Hyperscale Data Center","operator":"Stantec Consulting Michigan / Randee LLC","city":"Howell","county":"Livingston","address":"Grand River Avenue, north of I-96","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.6317633,"longitude":-83.9932682,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stantec-randee-howell-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://planetdetroit.org/2025/12/billion-dollar-data-center-paused/","label":"Data center developers hit pause on $1 billion Howell Township proposal: 'The right thing to do now'","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-hyperscale-data-dowagiac-mi","sourceRecordId":"hyperscale-data-dowagiac-mi","name":"Hyperscale Data Dowagiac Campus","operator":"Hyperscale Data, Inc.","city":"Dowagiac","county":"Cass","address":"415 East Prairie Ronde Street","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":41.984,"longitude":-86.109,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hyperscale-data-dowagiac-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dbusiness.com/daily-news/hyperscale-datas-michigan-ai-data-center-doubles-its-land-holdings","label":"Hyperscale Data's Michigan AI Data Center Doubles its Land Holdings","publisher":"DBusiness","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://wwmt.com/news/local/ai-data-center-expansion-dowagiac-loud-noise-complaints-residents-southwest-michigan-hyperscale-megawatt-bitcoin-wwmt","label":"'Nothing but a noise trap': Dowagiac residents push back against AI data center expansion","publisher":"WWMT","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://seekingalpha.com/pr/20171525-hyperscale-data-targets-full-buildout-of-340-mw-michigan-ai-data-center-campus-in-2029","label":"Hyperscale Data Targets Full Buildout of 340 MW Michigan AI Data Center Campus in 2029","publisher":"Hyperscale Data, Inc. (press release via Seeking Alpha)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://wwmt.com/news/local/hyperscale-data-center-dowagiac-michigan-lawsuit-double-size-acres-acquire-land-noise-sue-ai-alliance-cloud-services-legal-class-action-wwmt","label":"Hyperscale data center to more than double its Dowagiac campus amid class action lawsuit","publisher":"WWMT Newschannel 3","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.tftc.io/hyperscale-data-bitcoin-mining-shutdown-dowagiac-ai-data-center","label":"TFTC — Hyperscale Data kills bitcoin mining at Dowagiac, converts 617K-sq-ft site to AI (address 415 East Prairie Ronde Street; mining ended 2026-09-01)","publisher":"TFTC","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.sec.gov/Archives/edgar/data/0000896493/000121465926009551/ex99_1.htm","label":"Hyperscale Data 8-K exhibit 99.1 (Sept 2026) — ~83-acre campus, ~28–30 MW energized, ~52 MW planned within ~2 years via new gas distribution with on-site generation, >300 MW long-term","publisher":"U.S. SEC EDGAR","kind":"filing","retrievedAt":"2026-09-21"},{"url":"https://www.sec.gov/Archives/edgar/data/0000896493/000121465926007477/ex99_1.htm","label":"Hyperscale Data 8-K exhibit 99.1 (2026-06-15) — MSA with California neocloud provider for 20 MW of AI compute capacity","publisher":"U.S. SEC EDGAR","kind":"filing","retrievedAt":"2026-09-21"}]},{"id":"compute-irongate-the-bunker-warren-mi","sourceRecordId":"irongate-the-bunker-warren-mi","name":"IronGate Detroit \"The Bunker\" (28201 Van Dyke Ave, Warren)","operator":"IronGate Data Centers","city":"Warren","county":"Macomb","address":"28201 Van Dyke Avenue","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.5000995,"longitude":-83.0281942,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/irongate-the-bunker-warren-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/irongate-detroit-the-bunker","label":"IronGate: Detroit, The Bunker (Warren, MI 48093; planned, 2027)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://inflect.com/building/28201-van-dyke-avenue-warren-mi-usa/irongate/datacenter/detroit","label":"Irongate Detroit, 28201 Van Dyke Avenue, Warren, MI (45,000 kW total power)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://nominatim.openstreetmap.org/search?q=28201+Van+Dyke+Avenue,+Warren,+Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for 28201 Van Dyke Avenue, Warren, MI","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-24"}]},{"id":"compute-telkite-aeris-ki-sawyer-marquette-mi","sourceRecordId":"telkite-aeris-ki-sawyer-marquette-mi","name":"K.I. Sawyer Data Center (SAGE building / Greenfield Campus)","operator":"Aeris Energy (with Telkite Enterprises)","city":"K. I. Sawyer","county":"Marquette","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":46.3529764,"longitude":-87.3915429,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/telkite-aeris-ki-sawyer-marquette-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.myupnow.com/news/local/he-wants-to-bring-a-data-center-to-the-upper-peninsula-he-also-says-dont/article_ef82a784-75a0-4bbd-80e3-cec8ad62726d.html","label":"He wants to bring a data center to the Upper Peninsula. He also says don't panic.","publisher":"myUPnow (Upper Peninsula)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=K.I.%20Sawyer%2C%20Forsyth%20Township%2C%20Marquette%20County%2C%20Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for K.I. Sawyer, Marquette County, Michigan","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-rocklocker-kalkaska-go-mi","sourceRecordId":"rocklocker-kalkaska-go-mi","name":"Kalkaska Go","operator":"Rocklocker LLC","city":null,"county":"Kalkaska","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":44.7254528,"longitude":-85.2916494,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rocklocker-kalkaska-go-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.traverseticker.com/news/developer-pulls-plug-on-kalkaska-data-center/","label":"Developer Pulls Plug on Kalkaska Data Center","publisher":"The Ticker (Traverse City)","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://baxtel.com/data-center/rocklocker-kalkaska-township-mi","label":"Rocklocker: Kalkaska Township, MI Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.9and10news.com/2025/11/17/residents-voice-concerns-over-proposed-data-center-in-kalkaska-county/","label":"Residents voice concerns over proposed data center in Kalkaska County","publisher":"9&10 News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://upnorthlive.com/news/local/proposed-kalkaska-county-data-center-halted-after-public-feedback-company-president-says-rocklocker","label":"Proposed Kalkaska County data center halted after public feedback, company president says","publisher":"UpNorthLive (WPBN/WGTU)","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-klever-technology-center-inkster-mi","sourceRecordId":"klever-technology-center-inkster-mi","name":"Klever Technology Center Data Center Proposal (27181 Southern Street, Inkster)","operator":"Klever Technology Center LLC","city":"Inkster","county":"Wayne","address":"27181 Southern Street","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.2921174,"longitude":-83.3065501,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/klever-technology-center-inkster-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.clickondetroit.com/news/local/2026/10/20/inkster-residents-pack-city-hall-to-oppose-data-center-council-declines-to-approve-it/","label":"Inkster residents pack City Hall to oppose data center; council declines to approve it","publisher":"WDIV ClickOnDetroit","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.fox2detroit.com/news/inkster-city-officials-meet-proposed-data-center-hundreds-residents-attend","label":"Inkster city officials meet on proposed data center, hundreds of residents attend ($75M, 40,000 sq ft)","publisher":"FOX 2 Detroit","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://nominatim.openstreetmap.org/search?q=27181+Southern+Street,+Inkster,+Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for 27181 Southern Street, Inkster, MI","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-24"}]},{"id":"compute-liberty-center-one-royal-oak-mi","sourceRecordId":"liberty-center-one-royal-oak-mi","name":"Liberty Center One Royal Oak Data Center","operator":"Liberty Center One","city":"Royal Oak","county":"Oakland","address":"4815 Delemere Ave","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.533508,"longitude":-83.177393,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/liberty-center-one-royal-oak-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://libertycenterone.com/","label":"Liberty Center One — \"4815 Delemere Ave. Royal Oak, MI 48073 USA\"; public and private cloud, colocation, disaster recovery","publisher":"Liberty Center One","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"Liberty Center One\", 4815 Delemere Ave, Royal Oak 48073","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-liquid-web-dc3-lansing-mi","sourceRecordId":"liquid-web-dc3-lansing-mi","name":"Liquid Web Lansing DC3 (2703 Ena Drive)","operator":"Liquid Web","city":"Lansing","county":"Eaton","address":"2703 Ena Drive","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.7053904,"longitude":-84.6660891,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/liquid-web-dc3-lansing-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.liquidweb.com/data-centers/lansing-web-hosting/","label":"Liquid Web — Lansing US-Central data centers (two wholly owned facilities; 32,000 and 90,000 sq ft; 13,500 kVA utility power)","publisher":"Liquid Web","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://cloudandcolocation.com/datacenters/liquid-web-lansing-data-center-3/","label":"Cloud and Colocation — Liquid Web Lansing Data Center #3, 2703 Ena Dr., Lansing, MI 48917","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=2703+Ena+Dr+Lansing+MI&format=json","label":"OpenStreetMap Nominatim geocode — 'Liquid Web, Inc', 2703 Ena Drive, Delta Charter Township, Eaton County, 48917","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=200","label":"PeeringDB facility API — 'Liquid Web DC3', 2703 Ena Dr, Lansing (fac 3524)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-managedway-tym1-troy-mi","sourceRecordId":"managedway-tym1-troy-mi","name":"ManagedWay TYM1 (319 Executive Drive)","operator":"ManagedWay Company","city":"Troy","county":"Oakland","address":"319 Executive Dr","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.537158,"longitude":-83.099861,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/managedway-tym1-troy-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://managedway.com/colocation-facilities","label":"ManagedWay: Server colocation in Troy, Michigan — \"2 facilities\", \"600 and 319 Executive Drive, Troy, Michigan\"","publisher":"ManagedWay","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"ManagedWay TYM1\", 319 Executive Dr, Troy 48083","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-managedway-tym2-troy-mi","sourceRecordId":"managedway-tym2-troy-mi","name":"ManagedWay TYM2 (600 Executive Drive)","operator":"ManagedWay Company","city":"Troy","county":"Oakland","address":"600 Executive Dr","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.540615,"longitude":-83.098459,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/managedway-tym2-troy-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://managedway.com/colocation-facilities","label":"ManagedWay: Server colocation in Troy, Michigan — \"2 facilities\", \"600 and 319 Executive Drive, Troy, Michigan\"","publisher":"ManagedWay","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"ManagedWay TYM2\", 600 Executive, Troy 48083","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-mason-columbia-road-data-center-mi","sourceRecordId":"mason-columbia-road-data-center-mi","name":"Mason / Vevay Township Data Center (unnamed developer)","operator":"Undisclosed developer (represented by Dykema Gossett PLLC)","city":"Mason","county":"Ingham","address":"3388 W. Columbia Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.582234294066,"longitude":-84.479676261494,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mason-columbia-road-data-center-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wilx.com/2026/06/03/data-center-developer-requests-mason-utilities-promises-1b-investment/","label":"Data center developer requests Mason utilities, promises $1B investment","publisher":"WILX News 10","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://baldorilaw.com/resources/michigan-data-center-tracker","label":"Michigan Data Center Tracker (updated June 2026)","publisher":"Baldori Law","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-metrobloks-southfield-mi","sourceRecordId":"metrobloks-southfield-mi","name":"Metrobloks Southfield Data Center","operator":"Metrobloks","city":"Southfield","county":"Oakland","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.474,"longitude":-83.293,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/metrobloks-southfield-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityofsouthfield.com/news/city-southfield-statement-regarding-proposed-data-center","label":"City of Southfield Statement Regarding Proposed Data Center","publisher":"City of Southfield, Michigan","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://planetdetroit.org/2025/12/southfield-data-center-approval/","label":"Southfield City Council greenlights divisive data center plan: 'Too many unknowns'","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.candgnews.com/news/southfield-city-council-approves-data-center-site-plan-9861","label":"Southfield City Council approves data center site plan","publisher":"C & G Newspapers","kind":"permit","retrievedAt":"2026-09-09"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted. — \"LA-based developer Metrobloks LLC has received site plan approval from the Southfield City Council for a 100-megawatt data center\"","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://www.fox2detroit.com/news/southfield-data-center-proposal-city-council-hear-public-input-monday","label":"Southfield data center proposal: City council to hear public input Monday (developer: 'Ours is 100')","publisher":"FOX 2 Detroit","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-microsoft-dorr-township-mi","sourceRecordId":"microsoft-dorr-township-mi","name":"Microsoft Dorr Township Data Center","operator":"Microsoft","city":"Dorr Township","county":"Allegan","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.64,"longitude":-85.652,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-dorr-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wwmt.com/news/local/microsoft-land-farmland-purchase-allegan-kent-dorr-township-gaines-charter-technology-acres","label":"Reactions mixed as Microsoft purchases farmland in Allegan, Kent counties","publisher":"WWMT","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.wmuk.org/wmuk-news/2025-12-22/microsoft-plans-a-data-center-in-allegan-county","label":"Microsoft plans a data center in Allegan County","publisher":"WMUK","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/","label":"Dorr Twp. approves 12-month moratorium on data centers","publisher":"Wilcox Newspapers","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-microsoft-gaines-township-mi","sourceRecordId":"microsoft-gaines-township-mi","name":"Microsoft Gaines Township Data Center","operator":"Microsoft","city":"Gaines Township","county":"Kent","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.802,"longitude":-85.571,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-gaines-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wwmt.com/news/local/data-center-microsoft-rezoning-approval-new-data-center-gaines-township-kent-county-electricity-artificial-intelligence-patterson-avenue","label":"Microsoft seeks rezoning approval for new data center in Gaines Township","publisher":"WWMT","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.wgvunews.org/news/2025-12-16/gaines-township-to-consider-rezoning-for-future-microsoft-data-center","label":"Gaines Township to consider rezoning for future Microsoft data center","publisher":"WGVU News","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://wwmt.com/news/local/gaines-township-proposed-data-center-public-hearing-meeting-microsoft-conditions-rezone-land-noise-water-electricity-community-michigan-wwmt","label":"Gaines Township proposed data center: What to know before the April 15 public hearing","publisher":"WWMT Newschannel 3","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-microsoft-lowell-township-mi","sourceRecordId":"microsoft-lowell-township-mi","name":"Microsoft Lowell Township Data Center","operator":"Microsoft","city":"Lowell Township","county":"Kent","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.93,"longitude":-85.352,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-lowell-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.michiganpublic.org/politics-government/2026-05-20/why-one-michigan-township-just-rejected-data-centers-while-another-stays-open-to-them","label":"Why one Michigan township just rejected data centers, while another stays open to them","publisher":"Michigan Public","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-nexcess-southfield-melrose-mi","sourceRecordId":"nexcess-southfield-melrose-mi","name":"Nexcess Southfield Data Center (21700 Melrose Ave)","operator":"Nexcess (Liquid Web family of brands)","city":"Southfield","county":"Oakland","address":"21700 Melrose Avenue","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.4472933,"longitude":-83.2563487,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nexcess-southfield-melrose-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/nexcess-southfield","label":"Nexcess Southfield, 21700 Melrose Ave, Southfield (fully operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://metromodemedia.com/nexcesssouthfield0430/","label":"Nexcess adds two more data center support facilities in Southfield (April 14, 2016)","publisher":"Metromode","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://nominatim.openstreetmap.org/search?q=21700+Melrose+Avenue,+Southfield,+Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for 21700 Melrose Avenue, Southfield, MI","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-24"}]},{"id":"compute-oakland-university-computing-auburn-hills-mi","sourceRecordId":"oakland-university-computing-auburn-hills-mi","name":"Oakland University Campus Computing Facility","operator":"Fairmount Properties (with Oakland University)","city":"Auburn Hills","county":"Oakland","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.675,"longitude":-83.215,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oakland-university-computing-auburn-hills-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://oakland.edu/data-infrastructure/","label":"Data Infrastructure Project - Oakland University","publisher":"Oakland University","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://oaklandpostonline.com/58898/campus/june-2026-bot-meeting-trustees-vote-to-move-forward-with-data-center-president-ora-pescovitz-declares-it-is-a-project-ou-will-desperately-need/","label":"The Oakland Post — June 2026 BOT: trustees advance data center (20–26 MW; Lot 37; Fairmount Properties with DTE; closed-loop water cooling; 7-0-1 vote 2026-06-26)","publisher":"The Oakland Post","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.clickondetroit.com/news/local/2026/06/26/oakland-university-moves-forward-with-ai-data-center-project-amid-campus-opposition/","label":"WDIV — Oakland University moves forward with AI data center project (~15 acres at Parking Lot 37; due diligence from Oct 2026)","publisher":"WDIV ClickOnDetroit","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-otava-ann-arbor-mi","sourceRecordId":"otava-ann-arbor-mi","name":"Otava Ann Arbor Data Center","operator":"Otava","city":"Ann Arbor","county":"Washtenaw","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.2813722,"longitude":-83.7484616,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/otava-ann-arbor-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.otava.com/data-center-michigan/","label":"Secure Cloud Hosting Data Centers in Michigan — Otava Ann Arbor: located in \"Avis park, south of downtown\"; \"Dual Cummins 937.5 KVA diesel generators with 72-hour capacity\"; \"Dual Eaton 300 KVA UPS battery backup system\"","publisher":"Otava","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Ann%20Arbor%2C%20Washtenaw%20County%2C%20Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for Ann Arbor, Washtenaw County, Michigan (city-level pin)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-otava-metro-detroit-westland-mi","sourceRecordId":"otava-metro-detroit-westland-mi","name":"Otava Metro Detroit Data Center","operator":"Otava","city":"Westland","county":"Wayne","address":"6435 North Hix Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.331172,"longitude":-83.419408,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/otava-metro-detroit-westland-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.otava.com/data-center-michigan/","label":"Secure Cloud Hosting Data Centers in Michigan — Otava Metro Detroit: \"34,500 square-foot standalone data center\", \"1.2 MW\" total building load capacity, eight telecom providers","publisher":"Otava","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"Otava Metro Detroit\", Otava LLC, 6435 North Hix Road, Westland 48185","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-otava-mid-michigan-flint-township-mi","sourceRecordId":"otava-mid-michigan-flint-township-mi","name":"Otava Mid-Michigan Data Center (5225 Exchange Drive)","operator":"Otava","city":"Flint Township","county":"Genesee","address":"5225 Exchange Drive","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.9687373,"longitude":-83.7796697,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/otava-mid-michigan-flint-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.otava.com/data-center-michigan/","label":"Otava — Michigan data centers (Ann Arbor, Metro Detroit, Mid-Michigan)","publisher":"Otava","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.otava.com/blog/colocation-in-flint-michigan/","label":"Colocation in Flint, Michigan — Otava blog (32,500 sq ft; 22,500 sq ft raised floor; former EDS/GM DR site)","publisher":"Otava","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://inflect.com/building/5225-exchange-drive-flint/onlinetech/datacenter/onlinetech-mid-michigan-data-center","label":"Inflect listing — OTAVA Flint, 5225 Exchange Drive, 1.5 MW","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=5225+Exchange+Drive+Flint+MI&format=json","label":"OpenStreetMap Nominatim geocode — 5225 Exchange Drive, Flint, Genesee County, 48507","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-21"}]},{"id":"compute-franklin-partners-pavilion-township-mi","sourceRecordId":"franklin-partners-pavilion-township-mi","name":"Pavilion Township Data Center (S 26th St & E N Ave)","operator":"Franklin Partners","city":"Pavilion Township","county":"Kalamazoo","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.206527,"longitude":-85.4718656,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/franklin-partners-pavilion-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wwmt.com/news/local/residents-concerned-about-major-data-center-proposal-in-pavilion-township-south-26th-st-east-n-avenue-electricity-water-environment-jobs-taxes","label":"Residents concerned about major data center proposal in Pavilion Township","publisher":"WWMT Newschannel 3","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Pavilion%20Township%2C%20Kalamazoo%20County%2C%20Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for Pavilion Township, Kalamazoo County, Michigan (township-level pin)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-project-cannoli-van-buren-township-wayne-county-mi","sourceRecordId":"project-cannoli-van-buren-township-wayne-county-mi","name":"Project Cannoli","operator":"Google","city":"Van Buren Township","county":"Wayne","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.23,"longitude":-83.44,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/project-cannoli-van-buren-township-wayne-county-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://planetdetroit.org/2026/06/whitmer-data-center-backlash-2026-election/","label":"Van Buren Township OKs Google data center substation","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://vbtmi.gov/departments/municipal_services/data_center_faq.php","label":"Van Buren Township — Data Center FAQ","publisher":"Charter Township of Van Buren, Michigan","kind":"permit","retrievedAt":"2026-09-09"},{"url":"https://www.yahoo.com/news/articles/van-buren-township-officials-consider-030235640.html","label":"Van Buren Township officials to consider final site plan for Google data center","publisher":"Detroit Free Press via Yahoo News","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://planetdetroit.org/2026/09/google-dte-van-buren-data-center-contracts/","label":"Google, DTE Van Buren data center contracts: 20-year special contracts before the MPSC, decision requested by September 10, 2026","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://vbtmi.gov/departments/municipal_services/data_center_project.php","label":"Van Buren Township — Data Center Project page (1.0 GW maximum facility load; load begins Dec 2027, maximum Dec 2028; development agreement May 20, 2026)","publisher":"Van Buren Charter Township","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://planetdetroit.org/2026/02/project-cannoli-preliminary-site-plan/","label":"Planet Detroit — Van Buren Township advances 1 GW 'Project Cannoli' (282 acres, 800,000 sq ft, 2–3.6M gallons/day, two air-cooled and one water-cooled building, 156 diesel backup generators)","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/","label":"Planet Detroit — Google, DTE plan 1 gigawatt Michigan data center (2.7 GW new resources: 1.6 GW renewables, 450 MW storage; MPSC contested case filed 2026-03-17)","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.michiganpublic.org/transportation-infrastructure/2026-10-02/google-data-center-michigan-van-buren-township","label":"Michigan regulators OK DTE contracts for Google data center","publisher":"Michigan Public","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://planetdetroit.org/2026/10/dte-google-data-center-contract-approval/","label":"Michigan regulators OK DTE contracts for Google data center","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://planetdetroit.org/2026/10/google-data-center-van-buren-approval/","label":"Google data center secures Van Buren Township approval, with startup expected in late 2027","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://planetdetroit.org/2026/10/google-data-center-van-buren-approval/","label":"Google data center secures Van Buren Township approval, with startup expected in late 2027","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.wxyz.com/news/van-buren-township-officials-approve-plans-for-controversial-google-data-center-campus","label":"Van Buren Township officials approve plans for controversial Google data center campus (construction already underway)","publisher":"WXYZ Detroit","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://themanchestermirror.com/2026/10/19/township-vote-paves-way-for-michigans-second-hyperscale-data-center/","label":"Township vote paves way for Michigan's second hyperscale data center","publisher":"The Manchester Mirror (Bridge Michigan syndication)","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-cloverleaf-cherry-blossom-frenchtown-mi","sourceRecordId":"cloverleaf-cherry-blossom-frenchtown-mi","name":"Project Cherry Blossom","operator":"Cloverleaf Infrastructure","city":"Frenchtown Township","county":"Monroe","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":41.988,"longitude":-83.386,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-cherry-blossom-frenchtown-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cherryblossomdatacenter.com/faqs/","label":"FAQs - Project Cherry Blossom","publisher":"Cloverleaf Infrastructure","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://cherryblossomdatacenter.com/","label":"Project Cherry Blossom - home","publisher":"Cloverleaf Infrastructure","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-verrus-project-flex-lyon-township-oakland-county-mi","sourceRecordId":"verrus-project-flex-lyon-township-oakland-county-mi","name":"Project Flex","operator":"Verrus (Sidewalk Infrastructure Partners)","city":"Lyon Township","county":"Oakland","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.47,"longitude":-83.53,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/verrus-project-flex-lyon-township-oakland-county-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.crainsdetroit.com/technology/cdb-anthropic-projectflex-datacenter-20260414/","label":"Anthropic reported as intended end user of Project Flex data center","publisher":"Crain's Detroit Business","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterdynamics.com/en/news/180-acre-data-center-set-to-be-built-in-lyon-township-michigan/","label":"180-acre data center set to be built in Lyon Township, Michigan (DCD)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://planetdetroit.org/2026/01/lyon-township-data-center-plan/","label":"Lyon Township 'may be revisiting' data center site plan: Residents pack meeting (Planet Detroit)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://projectflexmi.com/faq/","label":"Project Flex — FAQ","publisher":"Verrus (Sidewalk Infrastructure Partners)","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-cloverleaf-ironwood-dundee-township-mi","sourceRecordId":"cloverleaf-ironwood-dundee-township-mi","name":"Project Ironwood","operator":"Cloverleaf Infrastructure","city":"Dundee","county":"Monroe","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":41.9319902,"longitude":-83.6371591,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-ironwood-dundee-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ironwooddatacenter.com/faqs/","label":"Project Ironwood — FAQs (developer project site)","publisher":"Cloverleaf Infrastructure","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Dundee%20Township%2C%20Monroe%20County%2C%20Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for Dundee Township, Monroe County, Michigan (township-level pin)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-raeden-detroit-carrier-hotel-mi","sourceRecordId":"raeden-detroit-carrier-hotel-mi","name":"Raeden Detroit Carrier Hotel (615 W Lafayette)","operator":"Raeden","city":"Detroit","county":"Wayne","address":"615 W Lafayette Blvd","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.32854,"longitude":-83.053799,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/raeden-detroit-carrier-hotel-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bedrockdetroit.com/press-releases/bedrock-and-raeden-partner-to-bring-first-carrier-hotel-to-downtown-detroit/","label":"Bedrock and Raeden Partner to Bring First Carrier Hotel to Downtown Detroit","publisher":"Bedrock Detroit","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://raeden.com/data-centers/detroit/","label":"Detroit Data Centers — RAEDEN (operator site)","publisher":"Raeden","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=MI&limit=250","label":"PeeringDB facility registry API — record \"Raeden Michigan 1\", 615 W Lafayette Blvd, Detroit 48226","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-raeden-one-campus-martius-detroit-mi","sourceRecordId":"raeden-one-campus-martius-detroit-mi","name":"Raeden One Campus Martius (1050 Woodward)","operator":"Raeden","city":"Detroit","county":"Wayne","address":"1050 Woodward Ave","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.332695679242,"longitude":-83.047534477833,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/raeden-one-campus-martius-detroit-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://raeden.com/data-centers/detroit/","label":"Detroit Data Centers — RAEDEN: \"10,000 square feet of enterprise, purpose-built colocation\" with \"3MW of scalable power\" at 1050 Woodward Ave.","publisher":"Raeden","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=1050+Woodward+Ave%2C+Detroit%2C+MI+48226&benchmark=Public_AR_Current&format=json","label":"US Census Bureau geocoder match for 1050 Woodward Ave, Detroit, MI 48226","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-detroit-shoemaker-street-data-center-mi","sourceRecordId":"detroit-shoemaker-street-data-center-mi","name":"Shoemaker Street Data Center Proposal (11031 & 11081 Shoemaker St, Detroit east side)","operator":"Undisclosed developer (respondent to City of Detroit RFP)","city":"Detroit","county":"Wayne","address":"11031 Shoemaker Street","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.3895216,"longitude":-82.9892122,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/detroit-shoemaker-street-data-center-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wxyz.com/news/data-centers/data-center-proposed-for-14-4-acres-on-detroits-east-side-city-council-seeks-moratorium","label":"WXYZ — Data center proposed for 14.4 acres on Detroit's east side; city council seeks moratorium (2026-03-24)","publisher":"WXYZ Detroit","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://planetdetroit.org/2026/09/detroit-data-center-moratorium-push/","label":"Planet Detroit — Environmental groups call for Detroit data center moratorium as city develops ordinance (Shoemaker proposal dropped)","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"Gander Newsroom — How many AI data centers are planned in Michigan? (Detroit: Shoemaker Street site dropped; Packard Plant deemed too small)","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=11031+Shoemaker+St+Detroit+MI&format=json","label":"OpenStreetMap Nominatim geocode — 11031 Shoemaker Street, Detroit, 48213","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-21"}]},{"id":"compute-solon-township-data-center-kent-mi","sourceRecordId":"solon-township-data-center-kent-mi","name":"Solon Township Data Center (16-17 Mile Road, US-131)","operator":"Undisclosed technology company (site search via The Right Place)","city":"Solon Township","county":"Kent","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":43.2612958,"longitude":-85.6119334,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/solon-township-data-center-kent-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fox17online.com/news/local-news/rockford-cedar-springs-sparta/developers-eye-solon-township-farmland-for-potential-data-center","label":"Developers eye Solon Township farmland for potential data center","publisher":"FOX 17 West Michigan","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Solon%20Township%2C%20Kent%20County%2C%20Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for Solon Township, Kent County, Michigan (township-level pin)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-springfield-township-andersonville-road-data-center-mi","sourceRecordId":"springfield-township-andersonville-road-data-center-mi","name":"Springfield Township Data Center Proposal (Andersonville Road & White Lake Road, 84 acres)","operator":"Undisclosed data center development group","city":"Springfield Township","county":"Oakland","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.7033707,"longitude":-83.4491906,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/springfield-township-andersonville-road-data-center-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.springfield-twp.us/departments/supervisor/data_centers/latest_updates.php","label":"Springfield Township — Latest Data Center Updates (parcel 07-36-401-012, ~84.49 acres; Aug 26, 2026 owner pivot to storage/office)","publisher":"Springfield Charter Township","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://planetdetroit.org/2026/01/data-center-moratorium-northville/","label":"Planet Detroit — Northville, Springfield Township pass data center moratoriums (84-acre site; 180-day moratorium)","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"Gander Newsroom — Michigan data center count (Springfield Township: Andersonville Road area, 84 acres, two or three 250,000 sq ft buildings)","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=Andersonville+Road%2C+Springfield+Township%2C+Oakland+County%2C+Michigan&format=json","label":"OpenStreetMap Nominatim geocode — Andersonville Road, Springfield Charter Township (southeast segment, 48346)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-21"}]},{"id":"compute-stargate-saline-township-mi","sourceRecordId":"stargate-saline-township-mi","name":"Stargate The Barn Campus","operator":"OpenAI / Oracle / Related Digital","city":"Saline Township","county":"Washtenaw","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.174,"longitude":-83.8063,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stargate-saline-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/","label":"Oracle and OpenAI start construction on Stargate campus in Saline Township, Michigan — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.cnbc.com/2026/06/01/stargate-project-michigan-live-updates.html","label":"Stargate updates: OpenAI, Oracle building Michigan data center — CNBC","publisher":"CNBC","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.related-digital.com/news/openai-oracle-and-related-digital-announce-stargate-data-center-site-in-michigan","label":"OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan","publisher":"Related Digital","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.prnewswire.com/news-releases/openai-oracle-and-related-digital-announce-stargate-data-center-site-in-michigan-302600302.html","label":"OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan (PR Newswire)","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://fortune.com/2026/05/06/ai-data-center-michigan-saline-politics-farmland/","label":"A Michigan farm town voted down a giant OpenAI-Oracle data center. Weeks later, construction began","publisher":"Fortune","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site","label":"OpenAI, Oracle and Related Digital announce Stargate data center site in Michigan","publisher":"Related Companies","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://cubofmichigan.org/blog/mpsc-grants-expedited-approval-for-dte-contracts-with-hyperscale-data-center/","label":"MPSC grants expedited approval for DTE contracts with hyperscale data center (Case U-21990)","publisher":"Citizens Utility Board of Michigan","kind":"filing","retrievedAt":"2026-09-09"},{"url":"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397","label":"MPSC order, Case No. U-21990 — DTE Electric primary supply agreement and energy storage agreement with Green Chile Ventures LLC (a subsidiary of Oracle Corporation)","publisher":"Michigan Public Service Commission (LARA e-docket)","kind":"filing","retrievedAt":"2026-09-14"},{"url":"https://datacenternews.org/data-center-projects/michigan-data-center-projects/","label":"Michigan Data Center Projects: 2026 Locations & Tracker (Stargate Saline: 1,383 MW contracted maximum load)","publisher":"Data Center News","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://planetdetroit.org/2026/09/dte-gas-plants-data-centers-power-plan/","label":"How data centers factor into DTE's 20-year power plan (Saline Township data center, 1.4 GW, DTE contracts approved)","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-tondu-stronach-township-manistee-mi","sourceRecordId":"tondu-stronach-township-manistee-mi","name":"Stronach Township Data Center (Stronach Road)","operator":"Tondu Corporation","city":"Stronach","county":"Manistee","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":44.2119349,"longitude":-86.171785,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tondu-stronach-township-manistee-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://upnorthlive.com/newsletter-daily/stronach-township-residents-voice-concerns-about-proposed-data-center-development-manistee-water-power-grid","label":"Stronach Township residents voice concerns about proposed data center development","publisher":"UpNorthLive (WPBN/WTOM)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Stronach%20Township%2C%20Manistee%20County%2C%20Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for Stronach Township, Manistee County, Michigan (township-level pin)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-switch-pyramid-campus-grand-rapids-mi","sourceRecordId":"switch-pyramid-campus-grand-rapids-mi","name":"Switch Pyramid Campus","operator":"Switch","city":"Gaines Township","county":"Kent","address":"6100 East Paris Avenue SE","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.823,"longitude":-85.64,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/switch-pyramid-campus-grand-rapids-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/switch-plans-second-expansion-of-pyramid-data-center-campus-in-grand-rapids-michigan/","label":"Switch plans second expansion of pyramid data center campus in Grand Rapids, Michigan","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.switch.com/grand-rapids/","label":"Grand Rapids Data Center - Switch","publisher":"Switch","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/","label":"Switch GRAND RAPIDS Now Open — Switch","publisher":"Switch","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://bridgemi.com/michigan-environment-watch/data-centers-create-few-jobs-michigan-wants-give-them-big-tax-breaks/","label":"Data centers create few jobs; Michigan wants to give them big tax breaks — Bridge Michigan","publisher":"Bridge Michigan","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.governing.com/news/headlines/Has-Switch-Broken-Its-Transformational-Promise-from-2015.html","label":"Has Switch Broken Its Transformational Promise from 2015? — Governing","publisher":"Governing","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://baxtel.com/data-center/switch-grand-rapids-the-pyramid-campus","label":"Switch Grand Rapids (The Pyramid Campus) — Baxtel","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://siteselection.com/pyramid-power/","label":"Site Selection Magazine — Pyramid Power","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.switch.com/switch-leads-consumers-energys-program-bring-100-renewable-energy-michigan-businesses/","label":"Switch Leads Consumers Energy's Program To Bring 100% Renewable Energy to Michigan Businesses","publisher":"Switch","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://cloudandcolocation.com/state/michigan/","label":"Cloud and Colocation — Michigan data centers (Switch Grand Rapids Pyramid Data Center Campus, 6100 East Paris Avenue SE, Caledonia)","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-telesystem-dc2-monroe-mi","sourceRecordId":"telesystem-dc2-monroe-mi","name":"Telesystem DC-2 (1240 Huber Drive, Monroe)","operator":"Telesystem (formerly Buckeye Telesystem, Inc.)","city":"Monroe","county":"Monroe","address":"1240 Huber Drive","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":41.9363672,"longitude":-83.4049082,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/telesystem-dc2-monroe-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.trusttelesystem.com/data-center-2","label":"Telesystem Data Center-2 (DC-2): 8,150 sq ft building on five acres, built 1995","publisher":"Telesystem","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://baxtel.com/data-center/telesystem-dc-2-monroe","label":"Telesystem DC-2 Monroe, 1240 Huber Dr (fully operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-24"},{"url":"https://nominatim.openstreetmap.org/search?q=1240+Huber+Drive,+Monroe,+Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for 1240 Huber Drive (Frenchtown Charter Township, Monroe County)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-24"}]},{"id":"compute-thor-equities-augusta-township-mi","sourceRecordId":"thor-equities-augusta-township-mi","name":"Thor Equities Augusta Township Data Center (Form8tion)","operator":"Thor Equities","city":"Augusta Township","county":"Washtenaw","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.163,"longitude":-83.72,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/thor-equities-augusta-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/local-officials-recommend-denial-of-thor-equities-data-center-in-michigan/","label":"Local officials recommend denial of Thor Equities data center in Michigan","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://planetdetroit.org/2025/08/augusta-data-center-petition/","label":"Can 957 signatures halt a $1 billion data center in Augusta Township?","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://bridgemi.com/michigan-environment-watch/tiny-michigan-town-hopes-to-stop-data-center-with-ballot-initiative/","label":"Tiny Michigan town hopes to stop data center with ballot initiative","publisher":"Bridge Michigan","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://planetdetroit.org/2026/07/augusta-data-center-battle-ballot/","label":"Augusta Township data center battle reaches the ballot — 522 acres, agricultural residential to general industrial, vote set for 2026-08-04","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.wemu.org/wemu-news/2026-08-05/augusta-township-voters-overturn-data-center-rezoning","label":"Augusta Township voters overturn data center rezoning — “about 90% of voters chose to overturn”","publisher":"WEMU-FM","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-umich-lanl-research-computing-ypsilanti-township-mi","sourceRecordId":"umich-lanl-research-computing-ypsilanti-township-mi","name":"U-M / Los Alamos Research Computing Center","operator":"University of Michigan (with Los Alamos National Laboratory)","city":"Ypsilanti","county":"Washtenaw","address":"Textile Road near Bridge Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.202962873437,"longitude":-83.557610942093,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/umich-lanl-research-computing-ypsilanti-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://bridgemi.com/business-watch/u-m-affirms-ypsilanti-1-2b-computing-center-site-township-officials-vow-fight/","label":"U-M affirms Ypsilanti $1.2B computing center site; township officials vow fight","publisher":"Bridge Michigan","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration","label":"UM, LANL launch Michigan AI research center","publisher":"Los Alamos National Laboratory","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-us-signal-mi01-kentwood-mi","sourceRecordId":"us-signal-mi01-kentwood-mi","name":"US Signal MI01 Grand Rapids Data Center","operator":"US Signal","city":"Kentwood","county":"Kent","address":"4765 Barden Court SE","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.87690347654,"longitude":-85.563698606365,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-mi01-kentwood-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/mi01-grand-rapids/","label":"MI01 Grand Rapids Data Center","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://ussignal.com/data-centers","label":"US Signal Data Centers","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-us-signal-mi02-byron-center-mi","sourceRecordId":"us-signal-mi02-byron-center-mi","name":"US Signal MI02 Grand Rapids Data Center","operator":"US Signal","city":"Byron Center","county":"Kent","address":"400 76th Street SW","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.826202163837,"longitude":-85.67268596115,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-mi02-byron-center-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/mi02-grand-rapids/","label":"MI02 Grand Rapids Data Center","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-us-signal-mi03-van-buren-township-mi","sourceRecordId":"us-signal-mi03-van-buren-township-mi","name":"US Signal MI03 Detroit Data Center","operator":"US Signal","city":"Belleville","county":"Wayne","address":"9275 Haggerty Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.2356076,"longitude":-83.4450278,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-mi03-van-buren-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/mi03-detroit/","label":"MI03 Detroit Data Center","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-us-signal-mi04-southfield-mi","sourceRecordId":"us-signal-mi04-southfield-mi","name":"US Signal MI04 Detroit Data Center","operator":"US Signal","city":"Southfield","county":"Oakland","address":"21648 Melrose Avenue","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.4477475,"longitude":-83.2562243,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-mi04-southfield-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/mi04-detroit/","label":"MI04 Detroit Data Center","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-us-signal-mi05-auburn-hills-mi","sourceRecordId":"us-signal-mi05-auburn-hills-mi","name":"US Signal MI05 Detroit Data Center","operator":"US Signal","city":"Auburn Hills","county":"Oakland","address":"1035 W Entrance Drive","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.6529314,"longitude":-83.2148612,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-mi05-auburn-hills-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/mi05-detroit/","label":"MI05 Detroit Data Center","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-prologis-washington-township-mi","sourceRecordId":"prologis-washington-township-mi","name":"Washington Township Technical Campus","operator":"Prologis","city":"Washington","county":"Macomb","address":"South side of 32 Mile Road between M-53 and Powell Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.80333473861,"longitude":-82.980045064045,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-washington-township-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://planetdetroit.org/2026/05/washington-township-data-center-withdrawn/","label":"Washington Township data center developer withdraws application","publisher":"Planet Detroit","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-sansone-wixom-road-mi","sourceRecordId":"sansone-wixom-road-mi","name":"Wixom Road Data Center Campus","operator":"Wixom Industrial One / Sansone Group","city":"Wixom","county":"Oakland","address":"30625 S. Wixom Road","state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.518432572023,"longitude":-83.537488801805,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sansone-wixom-road-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/us/articles/michigan-officials-keep-data-center-083400338.html","label":"Michigan officials keep data center moratorium, call developer's request unreasonable","publisher":"Detroit Free Press (via Yahoo News)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://civicmedia.us/news/2026/07/20/michigan-data-centers-the-weekly-download-2","label":"Michigan Data Centers: The Weekly Download","publisher":"Civic Media","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-sansone-york-township-washtenaw-mi","sourceRecordId":"sansone-york-township-washtenaw-mi","name":"York Township Data Center (Platt Road / former Toyota land)","operator":"Sansone Group","city":"York Township","county":"Washtenaw","address":null,"state":"MI","stateName":"Michigan","jurisdictionType":"state","latitude":42.1276226,"longitude":-83.7163675,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sansone-york-township-washtenaw-mi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wemu.org/wemu-news/2026-04-30/land-purchase-for-planned-data-center-in-york-township-falls-through","label":"Land purchase for planned data center in York Township falls through","publisher":"WEMU-FM","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=York%20Charter%20Township%2C%20Washtenaw%20County%2C%20Michigan&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode for York Charter Township, Washtenaw County, Michigan (township-level pin)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-aaim-data-centers-mountain-lake-mn","sourceRecordId":"aaim-data-centers-mountain-lake-mn","name":"AAIM Data Centers — Mountain Lake (Minnesota 3 Energy Park)","operator":"C-MN Data Centers Inc. / AAIM Data Centers","city":"Mountain Lake","county":"Cottonwood","address":"2203 3rd Avenue","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":43.941966,"longitude":-94.9150665,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aaim-data-centers-mountain-lake-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cityofmountainlakemn.gov/wp-content/uploads/11-17-25-City-Council-Minutes.pdf","label":"Mountain Lake City Council Minutes, November 17, 2025 (CUP Resolution #19-25)","publisher":"City of Mountain Lake","kind":"permit","retrievedAt":"2026-10-13"},{"url":"https://cityofmountainlakemn.gov/wp-content/uploads/10-7-24-City-Council-Minutes.pdf","label":"Mountain Lake City Council Minutes, October 7, 2024","publisher":"City of Mountain Lake","kind":"permit","retrievedAt":"2026-10-13"},{"url":"https://www.keyc.com/2026/07/16/community-raises-concern-about-public-notice-data-center-mountain-lake/","label":"Community raises concern about public notice for data center in Mountain Lake","publisher":"KEYC","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-amazon-becker-mn","sourceRecordId":"amazon-becker-mn","name":"Amazon Becker Data Center (Suspended)","operator":"Amazon Web Services","city":"Becker","county":"Sherburne","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.397,"longitude":-93.876,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-becker-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.startribune.com/amazon-suspends-minnesota-data-center-as-lawmakers-plan-to-reduce-big-tech-tax-breaks/601359665","label":"Amazon suspends Minnesota data center as lawmakers plan to reduce Big Tech tax breaks","publisher":"Star Tribune","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/amazon-web-services-suspends-plans-for-minnesota-data-center/","label":"Amazon Web Services suspends plans for Minnesota data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://knsiradio.com/2024/11/14/amazon-purchases-348-acres-in-becker-for-data-center-development-near-retiring-sherco-plant/","label":"KNSI Radio — Amazon purchases 348 acres in Becker","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-oppidan-apple-valley-technology-park-mn","sourceRecordId":"oppidan-apple-valley-technology-park-mn","name":"Apple Valley Technology Park (Oppidan/Rockport)","operator":"Oppidan Investment Company","city":"Apple Valley","county":"Dakota","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.7546223,"longitude":-93.1731744,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oppidan-apple-valley-technology-park-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hometownsource.com/sun_thisweek/community/apple_valley/apple-valley-continues-to-deny-data-center-use/article_4c1fcb85-2200-4737-8209-31a6b789b138.html","label":"Apple Valley continues to deny data center use","publisher":"Sun Thisweek / Hometown Source","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.limitless-news.com/local/apple-valley-technology-park-update","label":"Apple Valley Planning Commission Recommends Denial of Proposed Data Center Project","publisher":null,"kind":"press","retrievedAt":"2026-08-24"},{"url":"https://southmetroscoop.com/blogs/apple-valley-data-center-denied-full-story","label":"Apple Valley Just Killed a 1-Million-Sq-Ft Data Center","publisher":"South Metro Scoop","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-archer-datacenter-faribault-mn","sourceRecordId":"archer-datacenter-faribault-mn","name":"Archer Datacenter Faribault","operator":"Archer Datacenter","city":"Faribault","county":"Rice","address":"15339 Acorn Trail","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.3654972,"longitude":-93.2871543,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/archer-datacenter-faribault-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.southernminn.com/faribault_daily_news/news/developer-city-officials-outline-plans-for-proposed-faribault-data-center/article_2884e9a7-4b43-4622-b449-fcc37dd56a5e.html","label":"Developer, city officials outline plans for proposed Faribault data center","publisher":"southernminn.com","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.faribaultmn.gov/815/Archer-Datacenters","label":"City of Faribault — Archer Datacenters project page: ~87 acres, up to six buildings and 500,000 sq ft, EAW history, Court of Appeals ruling 2026-06-08, supplemental EAW due 2027-03-31","publisher":"City of Faribault, Minnesota","kind":"permit","retrievedAt":"2026-09-18"},{"url":"https://www.archerdatacenters.com/news-resources/archer-acquires-land-in-faribault-minnesota-for-120mw-data-center-campus-g68bg","label":"Archer Datacenters — \"Archer acquires land in Faribault, Minnesota, for 120MW data center campus\": 84.3 acres, up to 500,000 sq ft","publisher":"Archer Datacenters","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://couriermn.com/news/environment/where-are-data-centers-being-proposed-in-minnesota-we-are-tracking-them/","label":"Where are data centers being proposed in Minnesota? We are tracking them.","publisher":"Courier Minnesota","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-ark-data-centers-duluth-technology-drive-mn","sourceRecordId":"ark-data-centers-duluth-technology-drive-mn","name":"Ark Data Centers Duluth (3401 Technology Drive)","operator":"Ark Data Centers","city":"Duluth","county":"St. Louis","address":"3401 Technology Drive","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":46.827451,"longitude":-92.130338,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-duluth-technology-drive-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — Minnesota (fac 6317, ark data centers - Duluth, MN)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-ark-data-centers-duluth-n-6th-ave-mn","sourceRecordId":"ark-data-centers-duluth-n-6th-ave-mn","name":"Ark Data Centers Duluth (421 N 6th Ave East)","operator":"Ark Data Centers","city":"Duluth","county":"St. Louis","address":"421 N 6th Ave East","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":46.795743,"longitude":-92.096014,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-duluth-n-6th-ave-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — Minnesota (fac 12236, 421 N 6th Ave East)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-atomic-data-minneapolis-central-mn","sourceRecordId":"atomic-data-minneapolis-central-mn","name":"Atomic Data Minneapolis Central (MSP250)","operator":"Atomic Data LLC","city":"Minneapolis","county":"Hennepin","address":"250 Marquette Avenue South","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.9808119,"longitude":-93.2673888,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/atomic-data-minneapolis-central-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.atomicdata.com/infrastructure/","label":"Atomic Data — Infrastructure (Minneapolis Central at 250 Marquette Ave S., chilled water loop, generator, 99.999% uptime)","publisher":"Atomic Data LLC","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — Atomic Data MSP250, 250 Marquette Ave, Minneapolis MN 55401","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?street=250+Marquette+Ave&city=Minneapolis&state=MN&country=US&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode — \"Atomic Data\", 250 Marquette Avenue, Minneapolis MN 55401 (Marquette Plaza)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-tract-cannon-falls-technology-park-mn","sourceRecordId":"tract-cannon-falls-technology-park-mn","name":"Cannon Falls Technology Park (Tract)","operator":"Tract","city":"Cannon Falls","county":"Goodhue","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.5068445,"longitude":-92.9062175,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-cannon-falls-technology-park-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.postbulletin.com/news/local/cannon-falls-city-council-approves-permits-for-data-center-project","label":"Cannon Falls City Council approves permits for data center project","publisher":"Post Bulletin","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://kstp.com/accountability/cannon-falls-pine-island-are-both-discussing-bringing-data-centers-to-their-towns/","label":"Cannon Falls, Pine Island are both discussing bringing data centers to their towns","publisher":"KSTP","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.kttc.com/2025/08/27/cannon-falls-explores-major-data-center-project-following-land-annexation","label":"Cannon Falls explores major data center project following land annexation","publisher":"KTTC","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://couriermn.com/news/environment/where-are-data-centers-being-proposed-in-minnesota-we-are-tracking-them/","label":"Where are data centers being proposed in Minnesota? We are tracking them.","publisher":"Courier Minnesota","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-centersquare-shakopee-mn","sourceRecordId":"centersquare-shakopee-mn","name":"Centersquare Shakopee (MSP1 Campus)","operator":"Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)","city":"Shakopee","county":"Scott","address":"4450 Dean Lakes Blvd.","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.7965,"longitude":-93.482,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-shakopee-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/minneapolis","label":"Top Minneapolis Colocation Data Centers | Power Available | Csquare","publisher":"Centersquare / Csquare (official)","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — Centersquare Minneapolis (MSP1), 4450 Dean Lakes Blvd., Shakopee MN 55379","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"}]},{"id":"compute-centra-msp1-eagan-mn","sourceRecordId":"centra-msp1-eagan-mn","name":"CENTRA MSP1","operator":"CENTRA Digital Interconnect","city":"Eagan","county":"Dakota","address":"610 Opperman Dr","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.8288628,"longitude":-93.1184514,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centra-msp1-eagan-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.centradigital.com/post/centra-breaks-ground-on-msp1","label":"CENTRA Breaks Ground on MSP1","publisher":"CENTRA Digital Interconnect","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/centra-minneapolis","label":"CENTRA Minneapolis (MSP1) Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.centradigital.com/data-centers/msp1","label":"CENTRA MSP1 data center specifications","publisher":"CENTRA Digital Interconnect","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-cloudhq-msp-campus-chaska-mn","sourceRecordId":"cloudhq-msp-campus-chaska-mn","name":"CloudHQ MSP Campus (Chaska)","operator":"CloudHQ","city":"Chaska","county":"Carver","address":"2007 Schoolmaster Dr","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.81068,"longitude":-93.63557,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cloudhq-msp-campus-chaska-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudhq.com/campus/msp-campus/","label":"CloudHQ — MSP Campus specifications (200 MW critical IT load, 1,100,000 SF)","publisher":"CloudHQ","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.chaskamn.gov/841/Cloud-HQ","label":"City of Chaska — Cloud HQ project page (approval dates, water use, no subsidies)","publisher":"City of Chaska, Minnesota","kind":"permit","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?q=2007+Schoolmaster+Drive%2C+Chaska%2C+MN&format=json&limit=2&addressdetails=1","label":"OpenStreetMap/Nominatim geocode — 2007 Schoolmaster Drive, Chaska, Carver County, MN 55318","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-cologix-minneapolis-511-building-mn","sourceRecordId":"cologix-minneapolis-511-building-mn","name":"Cologix Minneapolis (511 Building, MIN1–MIN5)","operator":"Cologix, Inc.","city":"Minneapolis","county":"Hennepin","address":"511 11th Avenue South","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.971127,"longitude":-93.2546167,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-minneapolis-511-building-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/minneapolis/","label":"Cologix — Minneapolis colocation & carrier hotel data centers (MIN1–MIN5, 45K+ sq ft at the 511 Building)","publisher":"Cologix, Inc.","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://cologix.com/data-centers/minneapolis/min5/","label":"Cologix MIN5 — 10K sq ft, 1.5 MW, 300+ networks, air-cooled chiller with fan wall","publisher":"Cologix, Inc.","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — Cologix MIN1, MIN2, MIN3, MIN4, MIN5 at 511 11th Ave S, Minneapolis MN","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?q=511+11th+Ave+S%2C+Minneapolis%2C+MN&format=json&limit=1&addressdetails=1","label":"OpenStreetMap/Nominatim geocode — Minnesota Gateway Data Center, 511 11th Avenue South, Minneapolis MN 55415","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-connect-data-centers-eagan-mn","sourceRecordId":"connect-data-centers-eagan-mn","name":"Connect Data Centers – Eagan (powered by Oppidan)","operator":"Oppidan Investment Company","city":"Eagan","county":"Dakota","address":"550 Opperman Dr","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.8278868,"longitude":-93.1108726,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/connect-data-centers-eagan-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/connect-data-centers-eagan-mn","label":"Connect Data Centers: Eagan, MN Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan","label":"Connect Data Centers powered by Oppidan breaks ground on new data center in Eagan","publisher":"Oppidan Investment Company","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://kstp.com/kstp-news/top-news/eagan-approves-plan-for-1-year-pause-on-data-center-projects-in-the-city/","label":"Eagan approves plan for 1-year pause on data center projects in the city","publisher":"KSTP","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-databank-brooklyn-park-mn","sourceRecordId":"databank-brooklyn-park-mn","name":"DataBank Brooklyn Park Campus","operator":"DataBank","city":"Brooklyn Park","county":"Hennepin","address":"8111 Oxbow Creek N","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.116,"longitude":-93.386,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-brooklyn-park-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","label":"Brooklyn Park Campus Data Center","publisher":"DataBank (official)","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","label":"DataBank's MSP3 Data Center Officially Qualifies for Minnesota Tax Incentives","publisher":null,"kind":"subsidy","retrievedAt":"2026-09-10"},{"url":"https://www.databank.com/data-centers/minneapolis/","label":"DataBank — Minneapolis data centers: MSP3 Brooklyn Park, 8111 Oxbow Creek N, 82,231 IT sq ft, 9 MW critical IT load","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — DataBank Minneapolis (MSP3), 8111 Oxbow Creek N, Brooklyn Park MN 55445","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"}]},{"id":"compute-databank-downtown-minneapolis-msp4-mn","sourceRecordId":"databank-downtown-minneapolis-msp4-mn","name":"DataBank Downtown Minneapolis Data Center (MSP4)","operator":"DataBank","city":"Minneapolis","county":"Hennepin","address":"511 11th Avenue South","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.971127,"longitude":-93.2546167,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-downtown-minneapolis-msp4-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/minneapolis/","label":"DataBank — Minneapolis data centers (MSP4 Downtown: 8,170 IT sq ft, 0.779 MW critical IT load)","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — DataBank Minneapolis (MSP4), 511 11th Ave S, Minneapolis MN","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?q=511+11th+Ave+S%2C+Minneapolis%2C+MN&format=json&limit=1&addressdetails=1","label":"OpenStreetMap/Nominatim geocode — Minnesota Gateway Data Center, 511 11th Avenue South, Minneapolis MN 55415","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-databank-east-twin-cities-eagan-mn","sourceRecordId":"databank-east-twin-cities-eagan-mn","name":"DataBank East Twin Cities Data Center (MSP2)","operator":"DataBank","city":"Eagan","county":"Dakota","address":"3255 Neil Armstrong Blvd","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.8375194,"longitude":-93.1454144,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-east-twin-cities-eagan-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/minneapolis/eagan/","label":"DataBank Eagan, Minnesota Data Center (East Twin Cities / MSP2)","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","label":"DataBank's MSP3 Data Center Officially Qualifies for Minnesota Tax Incentives","publisher":"DataBank","kind":"subsidy","retrievedAt":"2026-09-10"},{"url":"https://www.databank.com/data-centers/minneapolis/","label":"DataBank — Minneapolis data centers: MSP2 East Twin Cities, 3255 Neil Armstrong Blvd, Eagan, 48,860 IT sq ft, 5 MW critical IT load","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-databank-west-twin-cities-edina-mn","sourceRecordId":"databank-west-twin-cities-edina-mn","name":"DataBank West Twin Cities Data Center (MSP1)","operator":"DataBank","city":"Edina","county":"Hennepin","address":"7700 France Avenue South","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.8628296,"longitude":-93.3305557,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-west-twin-cities-edina-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/minneapolis/","label":"DataBank — Minneapolis data centers (MSP1 Edina: 26,240 IT sq ft, 1.35 MW critical IT load)","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — DataBank Minneapolis (MSP1), 7700 France Avenue South, Edina MN 55435","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?street=7700+France+Ave+S&city=Edina&state=MN&country=US&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode — 7700 France Avenue South, Pentagon Park, Edina MN 55435","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-edgeconnex-msp01-eden-prairie-mn","sourceRecordId":"edgeconnex-msp01-eden-prairie-mn","name":"EdgeConneX Minneapolis (EDCMSP01)","operator":"EdgeConneX Inc.","city":"Eden Prairie","county":"Hennepin","address":"6875 Shady Oak Road","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.878844,"longitude":-93.404156,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-msp01-eden-prairie-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — EdgeConneX Minneapolis (EDCMSP01), 6875 Shady Oak Road, Eden Prairie MN 55344","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?q=6875+Shady+Oak+Road%2C+Eden+Prairie%2C+MN&format=json&limit=2&addressdetails=1","label":"OpenStreetMap/Nominatim geocode — 6875 Shady Oak Road, Eden Prairie, Hennepin County, MN 55344","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"},{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Minneapolis-Data-Sheet.pdf","label":"EdgeConneX Minneapolis MSP01 Data Sheet","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-elk-river-capital-swervo-mn","sourceRecordId":"elk-river-capital-swervo-mn","name":"Elk River Data Center (Elk River Capital / Swervo Development)","operator":"Elk River Capital LLC (Swervo Development Corp affiliate)","city":"Elk River","county":"Sherburne","address":"19178 Industrial Blvd NW","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.3187147,"longitude":-93.5864375,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/elk-river-capital-swervo-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thegazette.com/data_centers/across_america/minnesota-elk-river-data-center-developer-withdraws-application/article_61f12c2b-f46b-46e4-8ad9-bd0f86d3ff60.html","label":"MINNESOTA: Elk River data center developer withdraws application","publisher":"The Gazette","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.mprnews.org/story/2026/07/07/elk-river-rejects-changing-rules-to-allow-data-centers","label":"MPR News — Elk River rejects changing rules to allow data centers (2026-07-07): council rejected the ordinance amendment; residents cited noise, energy use, diesel generator pollution and health impacts; staff directed to draft a one-year moratorium","publisher":"MPR News","kind":"press","retrievedAt":"2026-09-18"}]},{"id":"compute-tract-farmington-technology-park-mn","sourceRecordId":"tract-farmington-technology-park-mn","name":"Farmington Technology Park (Tract)","operator":"Tract","city":"Farmington","county":"Dakota","address":"2830 W. 220th St.","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.606,"longitude":-93.152,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-farmington-technology-park-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cbsnews.com/minnesota/news/farmington-hyperscale-data-center-pushback/","label":"Farmington residents push back against massive data center projected to double city's water use","publisher":"CBS Minnesota","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.hometownsource.com/sun_thisweek/community/dakota_county/tract-speaks-about-updated-farmington-technology-park/article_43acd923-b4d8-42ee-a192-b34612835e02.html","label":"Tract speaks about updated Farmington Technology Park","publisher":"Sun Thisweek / Dakota County Tribune (hometownsource.com)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.hometownsource.com/sun_thisweek/community/dakota_county/mayor-breaks-silence-on-data-center-litigation/article_a768aecf-31bc-4f8c-b81c-8fc1fe7ece22.html","label":"Mayor breaks silence on data center, litigation","publisher":"Sun Thisweek / Dakota County Tribune (hometownsource.com)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park","label":"Data Center (Farmington Technology Park)","publisher":"City of Farmington, MN (official)","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.yahoo.com/news/5b-data-center-park-farmington-110700186.html","label":"$5B data center park in Farmington moves forward despite objections from some residents","publisher":"Yahoo News","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.mnlcofarmington.com/","label":"Farmington Technology Park (Tract) — project site: \"275+ permanent, high-quality skilled jobs, with union support\"; entitlements complete, site preparation underway","publisher":"Tract Capital Management, LP","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.govtech.com/infrastructure/farmington-minn-residents-sue-to-stop-data-center-park","label":"Government Technology — Farmington, Minn., residents sue to stop data center park: site at 2830 W. 220th St., 340 acres, up to 12 buildings, ~$5B at full buildout","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-18"}]},{"id":"compute-flexential-minneapolis-chaska-msp01-mn","sourceRecordId":"flexential-minneapolis-chaska-msp01-mn","name":"Flexential Minneapolis - Chaska (MSP01)","operator":"Flexential","city":"Chaska","county":"Carver","address":"3500 Lyman Boulevard","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.8516116,"longitude":-93.5988964,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-minneapolis-chaska-msp01-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/mn/minneapolis/chaska-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/52227492","label":"OpenStreetMap way/52227492","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-google-hermantown-mn","sourceRecordId":"google-hermantown-mn","name":"Google Hermantown Data Center","operator":"Google","city":"Hermantown","county":"St. Louis","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":46.8068852,"longitude":-92.2382464,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-hermantown-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/","label":"Google Data Centers — US locations","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.kaxe.org/local-news/2026-03-03/google-proposed-data-center-hermantown-minnesota-power","label":"Google is behind proposed Hermantown data center","publisher":"KAXE","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.fox21online.com/news/local/minnesota-power-presents-details-on-proposed-data-center-deal/article_92618e5c-5e51-456f-b7d4-dfd7d99434e4.html","label":"Minnesota Power presents details on proposed data center deal","publisher":"Fox21online","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.duluthnewstribune.com/news/local/hermantown-begins-new-downsized-site-review-for-data-center","label":"Hermantown begins new downsized site review for data center","publisher":"Duluth News Tribune","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.kaxe.org/local-news/2026-05-20/more-details-emerge-as-google-hermantown-work-out-data-center-agreements","label":"KAXE — More details emerge as Google, Hermantown work out data center agreements (2026-05-20): waterless/air-cooled design, max 50,000 gal/day, AUAR status, public objections","publisher":"KAXE","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://mn.gov/puc/activities/v-l-e-c/data-centers/","label":"Minnesota PUC — Data centers and the PUC's role: Minnesota Power / Harmony Group, LLC electric service agreement for Hermantown, docket 26-159, filed 2026-03-26","publisher":"Minnesota Public Utilities Commission","kind":"filing","retrievedAt":"2026-09-18"},{"url":"https://www.mprnews.org/story/2026/05/05/hermantown-google-data-center-vote-tabled","label":"Hermantown tables vote on key agreements for contentious Google data center","publisher":"MPR News","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://powermag.com/google-data-center-in-minnesota-would-be-powered-by-wind-energy-storage","label":"Google data center in Minnesota would be powered by wind, energy storage","publisher":"POWER Magazine","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-google-skyway-pine-island-mn","sourceRecordId":"google-skyway-pine-island-mn","name":"Google Project Skyway (Pine Island)","operator":"Google","city":"Pine Island","county":"Goodhue","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.2019,"longitude":-92.6496,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-skyway-pine-island-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://newsroom.xcelenergy.com/news/xcel-energy-to-power-new-google-data-center-in-minnesota","label":"Xcel Energy to power new Google data center in Minnesota","publisher":"Xcel Energy","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-pine-island/","label":"A new data center in Pine Island, Minnesota","publisher":"Google","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://pineislandmn.gov/skyway","label":"City of Pine Island — Project Skyway: ~482 acres, ~$36.5M abatement over 28 years, max 152,000 gal/day at full build-out, Xcel Energy as energy provider","publisher":"City of Pine Island, Minnesota","kind":"permit","retrievedAt":"2026-09-18"},{"url":"https://www.kttc.com/2026/02/05/pine-island-city-council-approves-financial-incentives-data-center-project/","label":"KTTC — council approves $36,578,343 abatement 5-0; agreement requires \"at least 38 full time, on-site jobs, paying at least $31 an hour\"","publisher":"KTTC","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://www.postbulletin.com/business/the-company-building-pine-islands-data-center-is-finally-revealed","label":"Post Bulletin — Ryan Companies building for Google; facility uses \"advanced air-cooling technology\" with water limited to \"domestic needs\"","publisher":"Post Bulletin","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://www.momentumwest.org/media/userfiles/subsite_16/files/data-center/Minnesota%20Google%20Data%20Center_Info%20Sheet.pdf","label":"Xcel Energy's agreement with new Google data center a model for industry (info sheet)","publisher":"Xcel Energy","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-h5-data-centers-st-paul-mn","sourceRecordId":"h5-data-centers-st-paul-mn","name":"H5 Data Centers St. Paul","operator":"H5 Data Centers","city":"St. Paul","county":"Ramsey","address":"1125 Energy Park Drive, Suite 100","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.974,"longitude":-93.167,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-st-paul-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/minneapolis-data-center.html","label":"Minneapolis Center - Minnesota Data Center","publisher":"H5 Data Centers (official)","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — H5 Data Centers Minneapolis, 1125 Energy Park Drive Suite 100, St. Paul MN 55108","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"}]},{"id":"compute-legacy-investing-north-loop-minneapolis-mn","sourceRecordId":"legacy-investing-north-loop-minneapolis-mn","name":"Legacy Investing North Loop (former Star Tribune printing plant)","operator":"Legacy Investing","city":"Minneapolis","county":"Hennepin","address":"800 North 1st Street","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.9906553,"longitude":-93.2766429,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/legacy-investing-north-loop-minneapolis-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cbsnews.com/minnesota/news/data-center-minnesota-star-tribune-downtown-minneapolis/","label":"CBS News Minnesota — Data center company acquires former Star Tribune printing site (address, 13 acres, ~566,000 sq ft, 20 MW)","publisher":"CBS News Minnesota","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://www.fox9.com/news/data-center-poised-replace-star-tribune-printing-facility-north-loop","label":"FOX 9 — Data center proposed for former Star Tribune site sparks debate in Minneapolis","publisher":"FOX 9 Minneapolis-St. Paul","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?q=800+North+1st+Street%2C+Minneapolis%2C+MN&format=json&limit=3&addressdetails=1","label":"OpenStreetMap/Nominatim geocode — Star Tribune Heritage Center, 800 North 1st Street, Minneapolis, MN 55401","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-lightedge-chaska-mn","sourceRecordId":"lightedge-chaska-mn","name":"LightEdge Chaska (fka Stream Data Centers Minneapolis I)","operator":"LightEdge (GI Partners)","city":"Chaska","county":"Carver","address":"1708 West Creek Lane","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.828,"longitude":-93.635,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lightedge-chaska-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/lightedge-acquires-top-tier-high-density-data-center-in-minneapolis-302037017.html","label":"LightEdge Acquires Top-Tier High Density Data Center in Minneapolis","publisher":"PR Newswire / LightEdge (official)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.datacenterdynamics.com/en/news/gi-partners-lightedge-acquires-stream-dc-data-center-in-minneapolis-minnesota/","label":"GI Partners' LightEdge acquires Stream DC data center in Minneapolis, Minnesota","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.lightedge.com/data-center-locations/minneapolis/","label":"LightEdge — Minneapolis data center: \"1708 West Creek Lane, Chaska, MN 55318\"","publisher":"LightEdge","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — Stream Data Centers - MN I, 1708 W Creek Ln, Chaska MN 55318 (the site LightEdge acquired)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"}]},{"id":"compute-lumen-minneapolis-3-mn","sourceRecordId":"lumen-minneapolis-3-mn","name":"Lumen Minneapolis 3","operator":"Lumen Technologies","city":"Minneapolis","county":"Hennepin","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.9887662,"longitude":-93.2766103,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-minneapolis-3-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/lumen-minneapolis-3-2","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/343333944","label":"OpenStreetMap way/343333944","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-meta-rosemount-mn","sourceRecordId":"meta-rosemount-mn","name":"Meta Rosemount Data Center","operator":"Meta","city":"Rosemount","county":"Dakota","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.74,"longitude":-93.115,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-rosemount-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.atmeta.com/2024/03/hello-rosemount/","label":"Hello, Rosemount! — Meta Data Centers blog","publisher":"Meta","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://tcbmag.com/meta-picks-rosemount-for-800m-data-center/","label":"Meta Picks Rosemount for $800M Data Center","publisher":"Twin Cities Business","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://mn.gov/deed/newscenter/press-releases/?id=1045-614051","label":"Governor Walz Announces Meta Will Build New Data Center in Rosemount — MN DEED","publisher":"Minnesota DEED","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/meta-buys-more-land-in-rosemount-minnesota-for-data-center-project/","label":"Meta buys more land in Rosemount, Minnesota, for data center project","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.startribune.com/700m-meta-data-center-in-rosemount-can-move-ahead-after-key-approval/600311735","label":"$700M Meta data center in Rosemount can move ahead after key approval","publisher":"Star Tribune","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.inforum.com/news/minnesota/minnesotas-first-hyperscale-data-center-nearing-completion-in-rosemount","label":"Minnesota's first hyperscale data center nearing completion in Rosemount","publisher":"InForum","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://mn.gov/governor/newsroom/press-releases/?id=1055-614120","label":"Governor Walz Announces Meta Will Build New Data Center in Rosemount","publisher":"Office of Governor Tim Walz","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-microsoft-becker-mn","sourceRecordId":"microsoft-becker-mn","name":"Microsoft Becker Data Center","operator":"Microsoft","city":"Becker","county":"Sherburne","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.3931821,"longitude":-93.8768904,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-becker-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mprnews.org/story/2024/02/21/xcel-energy-sells-land-in-becker-to-microsoft-for-data-center","label":"Xcel Energy sells land in Becker to Microsoft for data center","publisher":"MPR News","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.inforum.com/news/minnesota/as-hyperscale-data-centers-boom-minnesotas-projects-are-confronting-regulatory-and-environmental-realities","label":"As hyperscale data centers boom, Minnesota's projects are confronting regulatory and environmental realities","publisher":"InForum","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-monticello-tech-park-frattalone-mn","sourceRecordId":"monticello-tech-park-frattalone-mn","name":"Monticello Tech Park (Monticello Tech LLC / Frattalone)","operator":"Frattalone Companies (via Monticello Tech, LLC)","city":"Monticello","county":"Wright","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.298583,"longitude":-93.7994056,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/monticello-tech-park-frattalone-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","label":"Two data center proposals on the table in Monticello","publisher":"Monticello Times / Hometown Source","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-geronimo-nobles-county-powered-data-park-mn","sourceRecordId":"geronimo-nobles-county-powered-data-park-mn","name":"Nobles County Powered Data Park","operator":"Geronimo Power (Brookfield Asset Management subsidiary)","city":"Worthington","county":"Nobles","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":43.62,"longitude":-95.6,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/geronimo-nobles-county-powered-data-park-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://minnesotareformer.com/2026/04/27/minnesotas-long-predicted-data-center-boom-is-on-shaky-ground/","label":"Minnesota's long-predicted data center boom is on shaky ground","publisher":"Minnesota Reformer","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://geronimopower.com/in-development/nobles-county-powered-data-park/","label":"Nobles County Powered Data Park","publisher":"Geronimo Power","kind":"other","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.prnewswire.com/news-releases/geronimo-powers-farmer-friendly-and-community-first-approach-receives-warm-welcome-from-minnesotas-nobles-county-community-302672933.html","label":"Geronimo Power's Farmer-Friendly and Community First Approach Receives Warm Welcome (PR Newswire)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.dakotanewsnow.com/2026/03/19/geronimo-power-seeks-feedback-nobles-county-data-center/","label":"Geronimo Power seeks feedback on Nobles County data center","publisher":"Dakota News Now","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-scannell-monticello-tech-park-mn","sourceRecordId":"scannell-monticello-tech-park-mn","name":"Scannell Properties Monticello Tech Park","operator":"Scannell Properties LLC","city":"Monticello","county":"Wright","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.2914854,"longitude":-93.8499172,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/scannell-monticello-tech-park-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","label":"Two data center proposals on the table in Monticello","publisher":"Monticello Times / Hometown Source","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://couriermn.com/news/environment/where-are-data-centers-being-proposed-in-minnesota-we-are-tracking-them/","label":"Where are data centers being proposed in Minnesota? We are tracking them.","publisher":"Courier Minnesota","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-t5-minneapolis-1001-third-avenue-mn","sourceRecordId":"t5-minneapolis-1001-third-avenue-mn","name":"T5@Minneapolis (1001 Third Avenue South)","operator":"T5 Data Centers (asset owned by a Cloud Capital / Arcapita joint venture since January 2026)","city":"Minneapolis","county":"Hennepin","address":"1001 3rd Avenue South","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.9714683,"longitude":-93.2702827,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-minneapolis-1001-third-avenue-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — \"T5@Minneapolis\", T5 Data Centers, 1001 3rd Ave South, Minneapolis MN 55404","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/","label":"Cloud Capital — Cloud Capital and Arcapita acquire a 21-megawatt data center in the US with planned expansion (2026-01-13)","publisher":"Cloud Capital","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://www.arcapita.com/insights/arcapita-announces-a-partnership-with-cloud-capital-to-acquire-a-21-megawatt-data-center-in-the-us/","label":"Arcapita — partnership with Cloud Capital to acquire a 21-megawatt data center in the US (2026-01-14)","publisher":"Arcapita Group Holdings Limited","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://www.fox9.com/news/data-center-poised-replace-star-tribune-printing-facility-north-loop","label":"FOX 9 — notes Legacy Investing previously converted the downtown Sleep Number building into a data center","publisher":"FOX 9 Minneapolis-St. Paul","kind":"press","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?q=1001+3rd+Avenue+South%2C+Minneapolis%2C+MN&format=json&limit=2&addressdetails=1","label":"OpenStreetMap/Nominatim geocode — Sleep Number Building, 1001 3rd Avenue South, Minneapolis, MN","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-tract-rosemount-technology-park-mn","sourceRecordId":"tract-rosemount-technology-park-mn","name":"Tract Rosemount Technology Park (withdrawn)","operator":"Tract","city":"Rosemount","county":"Dakota","address":null,"state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.735,"longitude":-92.985,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-rosemount-technology-park-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district","label":"Massive data centers lay roots in the Ninth District","publisher":"Federal Reserve Bank of Minneapolis","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://baxtel.com/data-center/tract-rosemount-campus","label":"Tract: Rosemount Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-us-signal-mn01-eden-prairie-mn","sourceRecordId":"us-signal-mn01-eden-prairie-mn","name":"US Signal MN01 Minneapolis (Eden Prairie)","operator":"US Signal (site registered by OneNeck IT Solutions LLC)","city":"Eden Prairie","county":"Hennepin","address":"10290 West 70th Street","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":44.877094,"longitude":-93.407686,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-mn01-eden-prairie-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/mn01-minneapolis/","label":"US Signal — MN01 Minneapolis facility page (10290 West 70th Street, Eden Prairie; generator/UPS/utility ratings; 930 tons HVAC N+1; Tier 3 Design Certification)","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://ussignal.com/data-centers","label":"US Signal — data center locations list (MN01 Minneapolis)","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://www.peeringdb.com/api/fac?state=MN&country=US","label":"PeeringDB facility registry — US Signal MN01 - Minneapolis, org OneNeck IT Solutions LLC, 10290 W 70th St, Eden Prairie MN 55344","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?street=10290+West+70th+Street&city=Eden+Prairie&state=MN&country=US&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode — 10290 West 70th Street, Eden Prairie, Hennepin County, MN 55344","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-vaultas-alexandria-mn","sourceRecordId":"vaultas-alexandria-mn","name":"Vaultas Alexandria (ALX1)","operator":"Vaultas","city":"Alexandria","county":"Douglas","address":"720 Hawthorne Street","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.8844516,"longitude":-95.3762121,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vaultas-alexandria-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vaultas.com/data-centers/alexandria-mn/","label":"Vaultas — Alexandria MN data center (720 Hawthorne St; 30kW+ high-density workloads; dual substations with standby generators)","publisher":"Vaultas","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://vaultas.com/data-centers/minnesota/","label":"Vaultas — Minnesota data centers (Alexandria ALX1 at 720 Hawthorne Street, plus Minneapolis, St. Cloud and St. Paul)","publisher":"Vaultas","kind":"other","retrievedAt":"2026-09-18"},{"url":"https://nominatim.openstreetmap.org/search?street=720+Hawthorne+St&city=Alexandria&state=MN&country=US&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode — 720 Hawthorne Street, Alexandria, Douglas County, MN 56308","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-18"}]},{"id":"compute-vaultas-st-cloud-mn","sourceRecordId":"vaultas-st-cloud-mn","name":"Vaultas St. Cloud","operator":"Vaultas","city":"St. Cloud","county":"Stearns","address":"3701 18th St S","state":"MN","stateName":"Minnesota","jurisdictionType":"state","latitude":45.5405392,"longitude":-94.2023528,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vaultas-st-cloud-mn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stcloudlive.com/news/local/to-plug-in-or-not-to-plug-in-that-is-the-question-for-area-cities-about-data-centers-1","label":"To plug in or not to plug in? That is the question for area cities about data centers","publisher":"St. Cloud Live","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-armory-innovation-district-st-louis-mo","sourceRecordId":"armory-innovation-district-st-louis-mo","name":"Armory Innovation District Data Center","operator":"Contour / TerraWatt (with Steadfast City, THO Investments, ARCO, Lewis Rice)","city":"St. Louis","county":null,"address":"Adjacent to The Armory, Midtown (former Macy's/Famous-Barr warehouse site)","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.636,"longitude":-90.237,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/armory-innovation-district-st-louis-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/","label":"Midtown data center wins key approval from St. Louis Board of Public Service","publisher":"St. Louis Magazine","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.stlpr.org/health-science-environment/2026-07-30/st-louis-board-allows-data-center-near-armory-to-move-forward-with-new-rules","label":"St. Louis board upholds Midtown data center permit with new rules","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue","label":"St. Louis OKs Midtown data center plan projected to bring $445M in tax revenue","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city","label":"Developer of St. Louis data center near Armory files lawsuit against city","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-aws-green-new-florence-mo","sourceRecordId":"aws-green-new-florence-mo","name":"AWS Project Green Campus","operator":"Amazon Web Services","city":"New Florence","county":"Montgomery","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.852,"longitude":-91.52,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-green-new-florence-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.komu.com/news/midmissourinews/amazon-missouri-officials-announce-10b-montgomery-county-data-center-plan/article_cb50e268-0d98-48e6-9c0a-3dc1978aa2c5.html","label":"Amazon announces $10B Montgomery County data center plan","publisher":"KOMU","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/amazon-commits-10bn-to-data-center-campus-in-montgomery-city-missouri/","label":"Amazon commits $10bn to data center campus in Montgomery County, Missouri","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/1000-acre-aws-data-center-campus-under-consideration-in-montgomery-county-missouri/","label":"1,000-acre AWS data center campus under consideration in Montgomery County, Missouri","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/","label":"AWS new facilities near New Florence will double tax revenue for Montgomery County","publisher":"The Missouri Times","kind":"subsidy","retrievedAt":"2026-07-07"},{"url":"https://www.kq2.com/news/regional/missouri/2026/06/03/new-florence-aws-data-center-to-tap-local-aquifer-for-water/","label":"New Florence AWS data center to tap local aquifer for water","publisher":"KQ2","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://abc17news.com/news/montgomery/2025/12/03/montgomery-county-approves-land-for-two-large-scale-projects-on-amazon-data-center-campus/","label":"Montgomery County approves land for two large-scale projects on Amazon data center campus","publisher":"ABC17 News","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/amazon-project-green-campus","label":"Amazon Project Green Campus — Baxtel listing","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"}]},{"id":"compute-cloverleaf-troy-mo","sourceRecordId":"cloverleaf-troy-mo","name":"Cloverleaf Troy Campus","operator":"Cloverleaf Infrastructure","city":"Troy","county":"Lincoln","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.9784,"longitude":-90.9832,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-troy-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.blackridgeresearch.com/blog/latest-list-new-ai-proposed-upcoming-data-center-projects-missouri-usa","label":"List of upcoming data center projects in Missouri","publisher":"Blackridge Research","kind":"other","retrievedAt":"2026-07-07"}]},{"id":"compute-crusoe-callaway-county-kingdom-city-mo","sourceRecordId":"crusoe-callaway-county-kingdom-city-mo","name":"Crusoe Callaway County Data Center (proposed)","operator":"Crusoe","city":"Kingdom City","county":"Callaway","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.9427219,"longitude":-91.9417153,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crusoe-callaway-county-kingdom-city-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html","label":"Callaway County hosts open house for proposed data center","publisher":"KOMU 8","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Kingdom+City,+Missouri&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: Kingdom City, Missouri","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-crusoe-warrenton-mo","sourceRecordId":"crusoe-warrenton-mo","name":"Crusoe Warrenton Campus","operator":"Crusoe","city":"Warrenton","county":"Warren","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.8125,"longitude":-91.1432,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crusoe-warrenton-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/crusoe-data-center-could-be-built-west-of-st-louis-missouri/","label":"Crusoe data center could be built west of St. Louis, Missouri","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://fox2now.com/news/missouri/warrenton-aldermen-approve-data-center-site-plan-near-i-70/","label":"Warrenton aldermen approve data center site plan near I-70","publisher":"Fox 2 Now","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.midriversnewsmagazine.com/news/site-plan-for-large-scale-data-center-approved-in-warrenton/article_3d2d80af-c12a-4edf-bad2-753a3c5aed9c.html","label":"Site plan for large-scale data center approved in Warrenton","publisher":"Mid Rivers Newsmagazine","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://mlq.ai/news/meta-signs-16gw-capacity-deal-with-crusoe-spanning-texas-and-missouri-campuses/","label":"Meta signs 1.6GW capacity deal with Crusoe spanning Texas and Missouri campuses","publisher":"MLQ.ai","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoes-contracted-ai-infrastructure-capacity-approaches-5-gigawatts-across-data-centers-and-cloud","label":"Crusoe's Contracted AI Infrastructure Capacity Approaches 5 Gigawatts","publisher":"Crusoe (newsroom)","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.warrencountyrecord.com/stories/crusoe-named-as-developer-for-data-center-project,170695","label":"Crusoe named as developer for data center project","publisher":"Warren County Record","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583","label":"Warrenton Planning and Zoning approves data center site plan, conditional use","publisher":"Warren County Record","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://www.firstalert4.com/2025/12/05/warrenton-planning-commission-approves-data-center-ordinance-amid-resident-concerns/","label":"Warrenton planning commission approves data center ordinance amid resident concerns","publisher":"First Alert 4","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.stlpr.org/health-science-environment/2026-02-12/ameren-missouri-signed-confidential-contracts-with-multiple-big-data-centers-this-week","label":"Ameren Missouri signed confidential contracts with multiple big data centers","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-diamond-farms-gateway-digital-villa-ridge-mo","sourceRecordId":"diamond-farms-gateway-digital-villa-ridge-mo","name":"Diamond Farms (Gateway Digital Campus)","operator":"Provident Data Centers","city":"Villa Ridge","county":"Franklin","address":"Robertsville Road, near I-44","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.484,"longitude":-90.85,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/diamond-farms-gateway-digital-villa-ridge-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ksdk.com/article/news/politics/franklin-county-planning-and-zoning-commission-backs-one-data-center-diamond-farms-rejects-another-crooked-creek/63-89185f2a-d50e-4ac5-bfe9-f5e8209fa9e0","label":"Franklin County Planning and Zoning Commission backs one data center, rejects another","publisher":"KSDK","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/","label":"Franklin County Planning and Zoning Approves Diamond Farms Data Center Project","publisher":"The Missouri Times","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://spectrumlocalnews.com/mo/st-louis/news/2026/09/16/franklin-county-beltline-gateway-digital-campus-data-centers","label":"Franklin County commissioners approve rezoning for two data center projects","publisher":"Spectrum News","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-edged-kansas-city-mo","sourceRecordId":"edged-kansas-city-mo","name":"Edged Kansas City","operator":"Edged Data Centers","city":"Kansas City","county":"Clay","address":"3420 North Arlington Avenue","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.1675448,"longitude":-94.4651703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edged-kansas-city-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million","label":"Edged Data Centers opens new data center in Kansas City, investing more than $143 million","publisher":"Missouri Department of Economic Development","kind":"subsidy","retrievedAt":"2026-10-13"},{"url":"https://ingrams.com/article/edged-kansas-city-143m-data-center-opens-near-north-kc/","label":"Edged Kansas City $143M data center opens near North KC","publisher":"Ingram's","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=3420+N+Arlington+Ave,+Kansas+City,+MO+64161&format=json&limit=3&addressdetails=1","label":"OpenStreetMap Nominatim geocode: North Arlington Avenue, Kansas City, MO","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-crg-festus-data-center-mo","sourceRecordId":"crg-festus-data-center-mo","name":"Festus Data Center Campus","operator":"CRG (Clayco)","city":"Festus","county":"Jefferson","address":"North of Highway 67, west of Highway CC","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.2192,"longitude":-90.399,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crg-festus-data-center-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stlpr.org/government-politics-issues/2026-03-31/festus-data-center-development-approval","label":"Festus council approves $6 billion data center plan despite massive public pushback","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://themissouritimes.com/press-release-crg-unveils-refined-conceptual-design-for-proposed-festus-data-center-launches-community-information-website/","label":"CRG Unveils Refined Conceptual Design for Proposed Festus Data Center","publisher":"The Missouri Times","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://festusdatacenter.org/","label":"Festus Data Center — community information site","publisher":"CRG","kind":"other","retrievedAt":"2026-08-24"},{"url":"https://www.festusmo.gov/","label":"Correction source","publisher":null,"kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-foristell-i70-annexation-data-center-site-mo","sourceRecordId":"foristell-i70-annexation-data-center-site-mo","name":"Foristell I-70 Data Center Site (216-acre annexation)","operator":"Undisclosed developer","city":"Foristell","county":"Warren","address":"North outer road of I-70","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.8150501,"longitude":-90.955972,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/foristell-i70-annexation-data-center-site-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo","label":"Two data centers eye land near St. Charles County, Mo. (St. Louis Post-Dispatch via TNS)","publisher":"GovTech / St. Louis Post-Dispatch","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Foristell,+Missouri&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: Foristell, Missouri","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"},{"url":"https://irp.cdn-website.com/9ed44376/files/uploaded/260420+BOA+Minutes.pdf","label":"City of Foristell Board of Aldermen meeting minutes, April 20, 2026","publisher":"City of Foristell","kind":"filing","retrievedAt":"2026-10-28"}]},{"id":"compute-next-revolution-emerson-campus-ferguson-mo","sourceRecordId":"next-revolution-emerson-campus-ferguson-mo","name":"Former Emerson Campus Data Center (Next Revolution Technologies)","operator":"Next Revolution Technologies LLC","city":"Ferguson","county":"St. Louis","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.744707,"longitude":-90.3038975,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/next-revolution-emerson-campus-ferguson-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stlpr.org/government-politics-issues/2026-09-23/ferguson-city-council-says-yes-to-tax-breaks-for-data-center-development","label":"Ferguson City Council says yes to tax breaks for data center development","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.stlpr.org/economy-business/2026-09-10/ferguson-tax-break-plan-data-center-emerson-redevelopment","label":"Ferguson tax break plan for data center, Emerson redevelopment","publisher":"St. Louis Public Radio","kind":"subsidy","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Ferguson,+Saint+Louis+County,+Missouri&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Ferguson, Missouri","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-google-hunt-midwest-kc-northland-mo","sourceRecordId":"google-hunt-midwest-kc-northland-mo","name":"Google Kansas City Data Center (Hunt Midwest Business Center)","operator":"Google","city":"Kansas City","county":"Clay","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.17256,"longitude":-94.46443,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-hunt-midwest-kc-northland-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://huntmidwest.com/hunt-midwest-newsroom/google-announces-1-billion-data-center-at-hunt-midwest-business-center/","label":"Google announces $1 billion data center at Hunt Midwest Business Center (2024-03-20)","publisher":"Hunt Midwest","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://irei.com/news/google-looks-invest-600m-kansas-city-data-center-development/","label":"Google looks to invest $600m in Kansas City data center development (2019-07-23)","publisher":"Institutional Real Estate, Inc.","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://baxtel.com/news/google-considers-building-a-kansas-city-data-center-in-northland","label":"Google considers building a Kansas City data center in Northland (2019-07-23)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://baxtel.com/news/google-proposes-to-build-a-data-center-in-kansas-city","label":"Google proposes to build a data center in Kansas City (2023-09-11)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.kshb.com/news/local-news/google-announces-1b-data-center-in-kansas-citys-northland","label":"Google announces $1B data center in Kansas City's Northland","publisher":"KSHB","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.yahoo.com/news/articles/google-confirms-10b-500-acre-120000333.html","label":"Google confirms $10B, 500-acre data center in Kansas City's Northland (Kansas City Star, 2026-02-14)","publisher":"Kansas City Star (via Yahoo News)","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://datacenters.google/locations/kansas-city-missouri/","label":"Kansas City, Missouri - Google Data Center Location","publisher":"Google","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://baxtel.com/data-center/google-kansas-city","label":"Google: Project Shale Data Center (listing)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://baxtel.com/news/google-buys-236-acres-of-land-in-kansas-city","label":"Google buys 236 acres of land in Kansas City (2021-12-27)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-google-project-mica-kc-northland-mo","sourceRecordId":"google-project-mica-kc-northland-mo","name":"Google Project Mica","operator":"Google","city":"Kansas City","county":"Clay","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.3097,"longitude":-94.5845,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-project-mica-kc-northland-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/","label":"$10B, 500-acre Google campus gets stamp of approval near Smithville","publisher":"KCTV5","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.kshb.com/news/local-news/missouri/kansas-city/google-announces-construction-underway-for-second-data-center-campus-in-kansas-city","label":"Google announces construction underway for second data center campus in Kansas City","publisher":"KSHB","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.kctv5.com/2026/02/12/google-confirms-new-data-center-development-kansas-citys-northland/","label":"Google confirms new data center development in Kansas City's Northland","publisher":"KCTV5","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://constructionreviewonline.com/google-confirms-project-mica-a-10-billion-data-center-campus-in-kansas-city/","label":"Google confirms Project Mica, a $10 billion data center campus in Kansas City","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-google-spade-new-florence-mo","sourceRecordId":"google-spade-new-florence-mo","name":"Google Project Spade Campus","operator":"Google","city":"New Florence","county":"Montgomery","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.791,"longitude":-91.508,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-spade-new-florence-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-pledges-15bn-investment-in-new-florence-missouri/","label":"Google pledges $15bn investment in New Florence, Missouri","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/google-project-spade-campus","label":"Google Project Spade Campus - Baxtel tracker","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.columbiamissourian.com/news/state_news/two-huge-data-center-projects-in-montgomery-county-are-dividing-the-community/article_cce0a3c1-97f9-4ccc-abb4-b7287a32ad1d.html","label":"Two huge data center projects in Montgomery County are dividing the community","publisher":"Columbia Missourian","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.komu.com/news/midmissourinews/data-center-development-sparks-conflict-in-montgomery-county/article_9a7d8b05-1eff-4757-9ea7-f7c0bb33c43c.html","label":"Montgomery County data center development sparks conflict","publisher":"KOMU 8 News","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","label":"Missouri Governor's Office — Missouri Secures $15 Billion Investment from Google in Montgomery County","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-iron-mountain-kcm-1-kansas-city-mo","sourceRecordId":"iron-mountain-kcm-1-kansas-city-mo","name":"Iron Mountain Kansas City Data Center (KCM-1)","operator":"Iron Mountain","city":"Kansas City","county":"Jackson","address":"6301 Winchester Ave Suite 817","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.0109445,"longitude":-94.5046094,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-kcm-1-kansas-city-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/kansas-city-data-center","label":"Kansas City Data Center (KCM-1)","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=6301+Winchester+Avenue,+Kansas+City,+Missouri&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: 6301 Winchester Avenue, Kansas City, MO","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-geronimo-jasper-county-powered-data-park-mo","sourceRecordId":"geronimo-jasper-county-powered-data-park-mo","name":"Jasper County Powered Data Park","operator":"Geronimo Power","city":null,"county":"Jasper","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":37.1414461,"longitude":-94.0616037,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/geronimo-jasper-county-powered-data-park-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.koamnewsnow.com/news/top-stories/jasper-county-residents-voice-concerns-over-proposed-data-center-development/article_6faf3e40-f7dd-40d1-ad5e-215025dbd4b5.html","label":"Jasper County residents voice concerns over proposed data center development","publisher":"KOAM News Now","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://now.solar/2026/03/31/geronimo-power-presents-solar-farm-plan-to-lawrence-county-commissioners-the-joplin-globe/","label":"Geronimo Power presents solar farm plan to Lawrence County commissioners (The Joplin Globe)","publisher":"The Joplin Globe (via now.solar)","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://cleanview.co/data-centers/missouri/2266/geronimo-jasper-county-powered-data-park","label":"Geronimo Jasper County Powered Data Park (listing)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=La+Russell,+Jasper+County,+Missouri&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: La Russell, Jasper County, Missouri","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-lambda-kansas-city-mo","sourceRecordId":"lambda-kansas-city-mo","name":"Lambda Kansas City AI Supercomputer","operator":"Lambda","city":"Kansas City","county":"Platte","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.33,"longitude":-94.72,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lambda-kansas-city-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/ai-cloud-firm-lambda-targets-data-center-deployment-in-kansas-city-missouri/","label":"AI cloud firm Lambda targets data center deployment in Kansas City, Missouri","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","label":"Lambda to build a 100MW AI factory in Kansas City, MO","publisher":"Lambda","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city","label":"Missouri Department of Economic Development — press release","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-lightedge-kansas-city-subtropolis-mo","sourceRecordId":"lightedge-kansas-city-subtropolis-mo","name":"LightEdge Kansas City (SubTropolis Technology Center)","operator":"LightEdge","city":"Kansas City","county":"Clay","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.1645613,"longitude":-94.4779496,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lightedge-kansas-city-subtropolis-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lightedge.com/lightedge-continues-to-expand-kansas-city-data-center/","label":"LightEdge continues to expand Kansas City data center","publisher":"LightEdge","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=SubTropolis,+Kansas+City,+Missouri&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: SubTropolis, Kansas City, MO","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-lumon-solutions-marshfield-mo","sourceRecordId":"lumon-solutions-marshfield-mo","name":"Marshfield Data Center (Lumon Solutions)","operator":"Lumon Solutions Marshfield, LLC","city":"Marshfield","county":"Webster","address":"Rifle Range Road, north of Marshfield","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":37.36,"longitude":-92.905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumon-solutions-marshfield-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://webstercountymo.gov/commission-data-center-update-may-21/","label":"Commission – Data Center Update – May 21","publisher":"Webster County, MO","kind":"permit","retrievedAt":"2026-08-24"},{"url":"https://www.protectwebstercounty.com/the-project","label":"The Marshfield Data Center Project","publisher":"Protect Webster County","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-beltline-meramec-valley-technology-park-pacific-mo","sourceRecordId":"beltline-meramec-valley-technology-park-pacific-mo","name":"Meramec Valley Technology Park (Beltline Energy)","operator":"Beltline Energy (BLE Landholdings, LLC)","city":null,"county":"Franklin","address":"Phelan Road / Highway O, south of the Meramec River","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.4385316,"longitude":-90.7501765,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/beltline-meramec-valley-technology-park-pacific-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.firstalert4.com/2026/09/15/data-centers-approved-by-franklin-county-commissioners-tuesday-vote/","label":"Data centers approved by Franklin County Commissioners in Tuesday vote","publisher":"First Alert 4 (KMOV)","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://spectrumlocalnews.com/mo/st-louis/news/2026/09/16/franklin-county-beltline-gateway-digital-campus-data-centers","label":"Franklin County commissioners approve rezoning for Beltline and Gateway Digital Campus data centers","publisher":"Spectrum News","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.missourian.com/local_news/beltline-withdraws-rezoning-application-still-committed-to-data-center-project/article_a3317534-13ac-4ab4-82eb-c4b6c49ead00.html","label":"Beltline withdraws rezoning application, still committed to data center project","publisher":"The Missourian","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.stlmag.com/business/pacific-data-center-beltline-energy-proposal/","label":"Pacific residents push back on $16B data center pitched for their slice of Franklin County","publisher":"St. Louis Magazine","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://hoodline.com/2026/02/pacific-erupts-over-16-billion-data-center-invasion/","label":"Pacific erupts over $16 billion data center","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Phelan+Road,+Franklin+County,+Missouri&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: Phelan Road, Franklin County, Missouri","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-meta-kansas-city-northland-mo","sourceRecordId":"meta-kansas-city-northland-mo","name":"Meta Kansas City Northland","operator":"Meta","city":"Kansas City","county":"Clay","address":"Northwest corner of I-435 and US Highway 169, Kansas City, MO","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.247,"longitude":-94.705,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-kansas-city-northland-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://about.fb.com/news/2025/08/metas-kansas-city-data-center/","label":"Meta's Kansas City Data Center and Upcoming AI-Optimized Data Centers","publisher":"Meta Platforms","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.kcur.org/housing-development-section/2025-08-23/meta-kansas-city-data-center-northland","label":"Meta opens $1 billion Kansas City data center","publisher":"KCUR","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.diodeventures.com/projects/gptp","label":"Golden Plains Technology Park - Diode Ventures","publisher":"Diode Ventures","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.diodeventures.com/insights/golden-plains-technology-park-is-online","label":"Golden Plains Technology Park is Online - Diode Ventures","publisher":"Diode Ventures","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99","label":"Kansas City Ordinance 210841 - Golden Plains Technology Park Zone 3 preliminary plat","publisher":"Kansas City, MO City Clerk","kind":"permit","retrievedAt":"2026-09-10"},{"url":"https://ingrams.com/article/kc-council-approval-could-deliver-8-2b-for-golden-plains-technology-park-project/","label":"KC Council sets stage for $8.2 billion in Golden Plains Tech Park incentives","publisher":"Ingram's","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-metrobloks-liberty-mo","sourceRecordId":"metrobloks-liberty-mo","name":"Metrobloks Liberty Campus","operator":"Metrobloks","city":"Liberty","county":"Clay","address":"Old Hughes Road, south of South Liberty Parkway","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.2459,"longitude":-94.4191,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/metrobloks-liberty-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri","label":"Metrobloks announces data center investment in Liberty, Missouri","publisher":"Metrobloks","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.kshb.com/news/local-news/liberty-officials-approve-1-4-billion-in-bonds-and-tax-abatements-for-new-metrobloks-data-center","label":"KSHB (Kansas City)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.kctv5.com/2026/03/24/metrobloks-announces-14-billion-data-center-investment-liberty/","label":"Metrobloks announces $1.4 billion data center coming to Liberty","publisher":"KCTV5","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://datacenter.news/story/lincoln-metrobloks-plan-kansas-city-data-centre-campus","label":"Lincoln & Metrobloks plan Kansas City data centre campus","publisher":"DataCenterNews US","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.kxcv.org/regional-news/2026-03-25/liberty-welcomes-ai-data-center-with-200-million-in-tax-breaks-heres-what-we-know","label":"Liberty welcomes AI data center with $200 million in tax breaks","publisher":"KXCV-KRNW","kind":"subsidy","retrievedAt":"2026-10-13"}]},{"id":"compute-nebius-independence-mo","sourceRecordId":"nebius-independence-mo","name":"Nebius AI Factory (Independence)","operator":"Nebius Group","city":"Independence","county":"Jackson","address":null,"state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.089,"longitude":-94.342,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nebius-independence-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri","label":"Nebius breaks ground on gigawatt-scale AI factory in Independence, Missouri","publisher":"Nebius","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.kshb.com/news/local-news/missouri/jackson-county/nebius-breaks-ground-on-45-acre-ai-data-center-in-independence-amid-community-opposition","label":"Nebius breaks ground on AI data center in Independence amid community opposition","publisher":"KSHB","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/nebius-breaks-ground-on-400-acre-data-center-campus-in-independence-missouri/","label":"Nebius breaks ground on 400-acre data center campus in Independence, Missouri","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arconational.com/nebius-independence-mo/","label":"Nebius AI Factory | Independence, MO","publisher":"ARCO","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-netrality-1102-grand-kansas-city-mo","sourceRecordId":"netrality-1102-grand-kansas-city-mo","name":"Netrality 1102 Grand (Kansas City)","operator":"Netrality Data Centers","city":"Kansas City","county":"Jackson","address":"1102 Grand Blvd., Suite 1900","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.1009164,"longitude":-94.5812414,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/netrality-1102-grand-kansas-city-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://netrality.com/data-center/data-center-kansas-city/","label":"Kansas City, Missouri Data Center 1102 Grand","publisher":"Netrality","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=1102+Grand+Boulevard,+Kansas+City,+Missouri&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: Bryant Building, 1102 Grand Boulevard","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-netrality-210-north-tucker-st-louis-mo","sourceRecordId":"netrality-210-north-tucker-st-louis-mo","name":"Netrality 210 North Tucker (St. Louis)","operator":"Netrality Data Centers","city":"St. Louis","county":"St. Louis city","address":"210 North Tucker Boulevard","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.6292617,"longitude":-90.1971749,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/netrality-210-north-tucker-st-louis-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://netrality.com/data-center/210-north-tucker-st-louis/","label":"Netrality Data Centers facility directory","publisher":"Netrality Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/42323063","label":"OpenStreetMap way/42323063","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-patmos-kansas-city-mo","sourceRecordId":"patmos-kansas-city-mo","name":"Patmos KC Star Building Campus","operator":"Patmos Hosting","city":"Kansas City","county":"Jackson","address":"1601 McGee St","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.0997,"longitude":-94.5786,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/patmos-kansas-city-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.blackridgeresearch.com/blog/latest-list-new-ai-proposed-upcoming-data-center-projects-missouri-usa","label":"List of upcoming data center projects in Missouri","publisher":"Blackridge Research","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://rebusinessonline.com/patmos-receives-100m-c-pace-loan-for-redevelopment-of-kansas-city-star-building-into-data-center/","label":"Patmos Receives $100M C-PACE Loan for Redevelopment of Kansas City Star Building into Data Center","publisher":"REBusinessOnline","kind":"press","retrievedAt":"2026-08-24"},{"url":"https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/","label":"Former Kansas City Star building houses data company Patmos","publisher":"KCTV5","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-crg-project-cumulus-st-charles-mo","sourceRecordId":"crg-project-cumulus-st-charles-mo","name":"Project Cumulus (St. Charles)","operator":"CRG Cumulus (CRG, Clayco's development arm)","city":"St. Charles","county":"St. Charles","address":"Off Missouri Route 370","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.783855,"longitude":-90.481677,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/crg-project-cumulus-st-charles-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles","label":"Developer of controversial St. Charles data center withdraws proposal","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.stlpr.org/government-politics-issues/2026-07-14/st-charles-county-officials-approve-half-year-ban-on-data-center-projects-alter-senior-tax-freeze","label":"St. Charles County officials approve half-year ban on data center projects","publisher":"St. Louis Public Radio","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Saint+Charles,+Saint+Charles+County,+Missouri&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: Saint Charles, Missouri","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-shenandoah-project-kestrel-kc-northland-mo","sourceRecordId":"shenandoah-project-kestrel-kc-northland-mo","name":"Project Kestrel","operator":"Shenandoah Computing LLC","city":"Kansas City","county":"Platte","address":"Southwest corner of Missouri Highway 92 and N. Winan Avenue (KCI 29 Logistics Park)","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":39.3470623,"longitude":-94.7038818,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/shenandoah-project-kestrel-kc-northland-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kshb.com/news/local-news/tech-firm-eyes-development-for-6-data-centers-north-of-kansas-city-international-airport","label":"Tech firm eyes development for 6 data centers north of Kansas City International Airport","publisher":"KSHB","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/","label":"$100 Billion Data Center Development to bring Infrastructure, Investment and Jobs to the Northland","publisher":"Port KC","kind":"subsidy","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/project-kestrel","label":"Project Kestrel Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.openstreetmap.org/way/1526763685","label":"KCI 29 Logistics Park (OpenStreetMap)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-10"},{"url":"https://fox4kc.com/news/platte-county-commissioner-cant-support-100-billion-northland-data-center/amp/","label":"Platte County commissioner can't support $100 billion Northland data center","publisher":"FOX4 Kansas City","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-tierpoint-st-louis-locust-mo","sourceRecordId":"tierpoint-st-louis-locust-mo","name":"TierPoint St. Louis - Locust","operator":"TierPoint","city":"Saint Louis","county":"St. Louis city","address":"2300 Locust Street","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.633535,"longitude":-90.2126613,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-st-louis-locust-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-locust/","label":"St. Louis - Locust Data Center (SLL)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=2300+Locust+Street,+St.+Louis,+Missouri&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: NSI Building, 2300 Locust Street","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-tierpoint-st-louis-millpark-mo","sourceRecordId":"tierpoint-st-louis-millpark-mo","name":"TierPoint St. Louis - Millpark","operator":"TierPoint","city":"Maryland Heights","county":"St. Louis","address":"2315 Millpark Drive, Suite 104","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.6993591,"longitude":-90.4114091,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-st-louis-millpark-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/","label":"St. Louis - Millpark Data Center (SLM)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=2315+Millpark+Drive,+Maryland+Heights,+Missouri&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: 2315 Millpark Drive, Maryland Heights","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-tierpoint-st-louis-olive-mo","sourceRecordId":"tierpoint-st-louis-olive-mo","name":"TierPoint St. Louis - Olive","operator":"TierPoint","city":"Saint Louis","county":"St. Louis city","address":"1111 Olive Street","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":38.6297601,"longitude":-90.1964208,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-st-louis-olive-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-olive/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/253682978","label":"OpenStreetMap way/253682978","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-white-cloud-acres-barnard-mo","sourceRecordId":"white-cloud-acres-barnard-mo","name":"White Cloud Acres","operator":"Scale Microgrids","city":"Barnard","county":"Nodaway","address":"Near 35045 Jet Road, east of Highway 71","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":40.2528,"longitude":-94.9436,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/white-cloud-acres-barnard-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/","label":"Proposed $4 Billion White Cloud Acres AI Data Center in Rural Barnard","publisher":"Nodaway County, MO","kind":"permit","retrievedAt":"2026-08-24"},{"url":"https://www.kxcv.org/news/2026-03-11/with-little-public-notice-data-center-developers-consider-nodaway-county","label":"With little public notice, data center developers consider Nodaway County","publisher":"KXCV-KRNW","kind":"press","retrievedAt":"2026-08-24"}]},{"id":"compute-wildwood-ranch-joplin-mo","sourceRecordId":"wildwood-ranch-joplin-mo","name":"Wildwood Ranch Industrial Complex (potential data center)","operator":"Wildwood Ranch, LLC","city":"Joplin","county":"Jasper","address":"Southwest corner of Central City Rd & 20th Street","state":"MO","stateName":"Missouri","jurisdictionType":"state","latitude":37.0819886,"longitude":-94.583417,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wildwood-ranch-joplin-mo","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mo-joplin2.civicplus.com/1286/Wildwood-Ranch-Industrial-Complex","label":"Wildwood Ranch Industrial Complex","publisher":"City of Joplin","kind":"permit","retrievedAt":"2026-10-13"},{"url":"https://www.joplinglobe.com/news/joplin-city-council-advances-data-center-annexation-zoning/article_e9c57ea7-3cbe-4a50-a7f5-ef805c69502f.html","label":"Joplin City Council advances data center annexation, zoning","publisher":"The Joplin Globe","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://baxtel.com/data-center/wildwood-ranch-joplin-mo","label":"Wildwood Ranch: Joplin, MO (listing)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Central+City+Road,+Jasper+County,+Missouri&format=json&limit=5","label":"OpenStreetMap Nominatim geocode: South Central City Road, Jasper County, Missouri","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-13"}]},{"id":"compute-docomo-saipan-susupe-mp","sourceRecordId":"docomo-saipan-susupe-mp","name":"DoCoMo Pacific Susupe Data Center","operator":"DOCOMO PACIFIC","city":"Susupe","county":null,"address":"Nauru Loop","state":"MP","stateName":"Northern Mariana Islands","jurisdictionType":"territory","latitude":15.1568682,"longitude":145.7051697,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/docomo-saipan-susupe-mp","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/nauru-loop-susupe/docomo-pacific/datacenter/guam-cablevision-llc-mcv-saipan-datacenter","label":"Docomo Pacific Susupe Data Center","publisher":null,"kind":"other","retrievedAt":"2026-09-13"},{"url":"https://business.docomopacific.com/data-center-colocation","label":"Data Center Colocation | DOCOMO PACIFIC","publisher":"DOCOMO PACIFIC","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-ite-saipan-susupe-mp","sourceRecordId":"ite-saipan-susupe-mp","name":"IT&E Saipan Data Center","operator":"IT&E","city":"Susupe","county":null,"address":"Tekken Street","state":"MP","stateName":"Northern Mariana Islands","jurisdictionType":"territory","latitude":15.1587626,"longitude":145.7066756,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ite-saipan-susupe-mp","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/it-e-saipan","label":"IT&E Saipan Data Center","publisher":null,"kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-avaio-taurus-brandon-ms","sourceRecordId":"avaio-taurus-brandon-ms","name":"AVAIO Digital Taurus","operator":"AVAIO Digital Partners","city":"Brandon","county":"Rankin","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.27,"longitude":-89.99,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/avaio-taurus-brandon-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/avaio-digital-to-build-new-ai-ready-6-billion-data-center-hub-in-brandon-mississippi-302533141.html","label":"AVAIO Digital Taurus announcement press release","publisher":"PR Newswire / AVAIO Digital Partners","kind":"press","retrievedAt":"2026-10-24"},{"url":"https://www.avaiodigital.com/developments/brandon-mississippi","label":"AVAIO Digital Taurus official project page","publisher":"AVAIO Digital","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://mississippi.org/news/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county/","label":"Mississippi Development Authority project announcement","publisher":"Mississippi Development Authority","kind":"subsidy","retrievedAt":"2026-09-14"},{"url":"https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/","label":"Governor Reeves office announcement — third-largest project in MS history","publisher":"Office of the Governor of Mississippi","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://brandonms.org/city-of-brandon-welcomes-avaio-digitals-6-billion-investment-in-new-ai-ready-data-center-campus/","label":"City of Brandon welcome announcement","publisher":"City of Brandon, MS","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://mississippitoday.org/2025/09/03/data-center-petition-brandon-mississippi-environment-pollution-energy/","label":"Brandon residents petition — water, power, pollution concerns","publisher":"Mississippi Today","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.prnewswire.com/news-releases/avaio-digital-breaks-ground-on-6-billion-brandon-data-center-campus-leading-mississippi-contractor-begins-site-work-302551238.html","label":"AVAIO Digital Breaks Ground on $6 Billion Brandon Data Center Campus; Leading Mississippi Contractor Begins Site Work","publisher":"AVAIO Digital Partners (PR Newswire)","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-aws-clinton-hinds-ms","sourceRecordId":"aws-clinton-hinds-ms","name":"AWS Clinton Data Center","operator":"Amazon Web Services","city":"Clinton","county":"Hinds","address":"1001 Industrial Park Drive","state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.3415,"longitude":-90.3218,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-clinton-hinds-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","label":"Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs","publisher":"About Amazon","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.entergy.com/blog/amazons-1-billion-investment-in-clinton-celebrated-with-ribbon-cutting","label":"Amazon's $1B investment in Clinton celebrated with ribbon-cutting","publisher":"Entergy","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://clintonms.org/awsdatacenter/","label":"City of Clinton Celebrates $1 Billion AWS Investment","publisher":"City of Clinton, Mississippi","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://www.themississippimonitor.com/aws-marks-1-billion-data-center-investment-in-clinton/","label":"AWS marks $1 billion data center investment in Clinton","publisher":"The Mississippi Monitor","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.wlbt.com/2026/03/04/documents-reveal-incentive-package-750m-clinton-data-center/","label":"Documents reveal incentive package for $750M Clinton data center (1001 Industrial Park Dr.)","publisher":"WLBT","kind":"subsidy","retrievedAt":"2026-09-14"},{"url":"https://desotocountynews.com/mississippi-news/where-do-amazons-data-centers-in-mississippi-stand-company-offers-details-on-project-status-water-and-energy-footprint/","label":"Where do Amazon's data centers in Mississippi stand? Company offers details on project status, water and energy footprint","publisher":"DeSoto County News (republishing Mississippi Today, 2026-06-09)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.wlbt.com/2026/03/02/750m-data-center-coming-clinton/","label":"$750M data center coming to Clinton — FILOT approved by Clinton Board of Aldermen and Hinds County Board of Supervisors on January 15, 2026","publisher":"WLBT","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.wlbt.com/2026/03/04/whos-building-data-center-clinton-records-provide-details/","label":"Who's building the data center in Clinton? Records provide details","publisher":"WLBT","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-aws-costas-ridgeland-ms","sourceRecordId":"aws-costas-ridgeland-ms","name":"AWS Costas Property Campus (Ridgeland)","operator":"Amazon Web Services","city":"Ridgeland","county":"Madison","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.400198,"longitude":-90.1818699,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-costas-ridgeland-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://magnoliatribune.com/?p=118379","label":"Amazon's venture into Mississippi: A detailed overview","publisher":"Magnolia Tribune","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.mississippifreepress.org/madison-county-denies-amazons-valuation-appeal-for-canton-data-centers-preserving-millions-in-tax-revenue/","label":"Madison County Denies Amazon's Valuation Appeal for Canton Data Centers, Preserving Millions in Tax Revenue","publisher":"Mississippi Free Press","kind":"subsidy","retrievedAt":"2026-09-10"}]},{"id":"compute-aws-project-atlas-madison-county-ms","sourceRecordId":"aws-project-atlas-madison-county-ms","name":"AWS Project Atlas – Madison County Mega Site (Canton)","operator":"Amazon Web Services","city":"Canton","county":"Madison","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.6121,"longitude":-90.039,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-project-atlas-madison-county-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/","label":"AWS confirmed as company behind $10bn Mississippi data center development","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","label":"Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs","publisher":"About Amazon","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://siteselection.com/amazon-delivers-record-package-to-mississippi/","label":"Amazon Delivers Record Package to Mississippi","publisher":"Site Selection Magazine","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.mississippifreepress.org/amazons-canton-data-center-promises-prosperity-for-neighbors-its-bringing-dust-noise-and-pollution-fears/","label":"Amazon's Canton AI Data Center Brings Dust, Noise and Pollution Fears for Neighbors","publisher":"Mississippi Free Press","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.mississippifreepress.org/madison-county-denies-amazons-valuation-appeal-for-canton-data-centers-preserving-millions-in-tax-revenue/","label":"Madison County Denies Amazon's Valuation Appeal for Canton Data Centers","publisher":"Mississippi Free Press","kind":"subsidy","retrievedAt":"2026-09-09"},{"url":"https://www.cityofclarksdale.org/wp-content/uploads/2026/03/City-of-Clarksdale-Data-Center-Frequently-Asked-Questions-_FAQ_.pdf","label":"Proposed Hyperscale Data Center Project, Clarksdale, MS: Frequently Asked Questions","publisher":"City of Clarksdale","kind":"other","retrievedAt":"2026-10-07"}]},{"id":"compute-aws-project-steamboat-warren-county-ms","sourceRecordId":"aws-project-steamboat-warren-county-ms","name":"AWS Project Steamboat – Warren County Data Center Campus","operator":"Amazon Web Services","city":"Vicksburg","county":"Warren","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.3526,"longitude":-90.8779,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-project-steamboat-warren-county-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","label":"Amazon plans to invest at least $3 billion in Warren County, Mississippi, for next-generation data center campus","publisher":"About Amazon","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/","label":"Amazon to build $3 billion data center in Warren County, expanding tech footprint in Mississippi","publisher":"Mississippi Public Broadcasting","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","label":"Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs","publisher":"About Amazon","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-eagle-rock-big-woods-technology-park-jefferson-davis-ms","sourceRecordId":"eagle-rock-big-woods-technology-park-jefferson-davis-ms","name":"Big Woods Technology Park","operator":"Eagle Rock Partners","city":null,"county":"Jefferson Davis","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":31.5966,"longitude":-89.8687,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eagle-rock-big-woods-technology-park-jefferson-davis-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.djournal.com/mississippi-today/6b-data-center-planned-for-jefferson-davis-one-of-the-poorest-counties-in-the-country/article_0ce91979-5c29-4eaf-a2bc-993b602c8752.html","label":"$6B data center planned for Jefferson Davis, one of the poorest counties in the country (Mississippi Today, via Daily Journal)","publisher":"Mississippi Today / Northeast Mississippi Daily Journal","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-cspire-starkville-ms","sourceRecordId":"cspire-starkville-ms","name":"C Spire Starkville Data Center","operator":"C Spire","city":"Starkville","county":"Oktibbeha","address":"401 Research Boulevard","state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":33.4709294,"longitude":-88.7927699,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cspire-starkville-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cspire.com/cms/news/wireless/20600007/new-c-spire-world-class-business-enterprise-data-center-built-like-fort-knox","label":"New C Spire world-class business enterprise data center built like Fort Knox","publisher":"C Spire","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.datacenterknowledge.com/archives/2014/11/04/c-spire-opens-tier-iii-mississippi-data-center","label":"C Spire Opens Tier III Mississippi Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-clarksdale-hyperscale-data-center-ms","sourceRecordId":"clarksdale-hyperscale-data-center-ms","name":"Clarksdale Hyperscale Data Center Project","operator":"Undisclosed","city":"Clarksdale","county":"Coahoma","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":34.2006,"longitude":-90.5702,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/clarksdale-hyperscale-data-center-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityofclarksdale.org/wp-content/uploads/2026/03/City-of-Clarksdale-Data-Center-Frequently-Asked-Questions-_FAQ_.pdf","label":"Proposed Hyperscale Data Center Project, Clarksdale, MS: Frequently Asked Questions","publisher":"City of Clarksdale","kind":"other","retrievedAt":"2026-10-07"},{"url":"https://www.actionnews5.com/2026/03/24/clarksdale-passes-motion-that-allows-rezoning-potential-data-center","label":"Clarksdale passes motion that allows rezoning for potential data center","publisher":"Action News 5","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-compass-lauderdale-meridian-ms","sourceRecordId":"compass-lauderdale-meridian-ms","name":"Compass Datacenters Lauderdale County Hyperscale Campus","operator":"Compass Datacenters","city":"Meridian","county":"Lauderdale","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.3644,"longitude":-88.7037,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/compass-lauderdale-meridian-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mississippi.org/news/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","label":"Compass Datacenters Project Generates $10B Investment in Lauderdale County","publisher":"Mississippi Development Authority","kind":"subsidy","retrievedAt":"2026-09-09"},{"url":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","label":"Compass Datacenters Project Generates $10B Investment - Governor's Office","publisher":"Office of Governor Tate Reeves","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/","label":"Compass Project Generates $10B Investment in Lauderdale County","publisher":"Compass Datacenters","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.datacenterdynamics.com/en/news/compass-to-invest-10-billion-in-mississippi-data-center-campus/","label":"Compass to develop $10 billion data center campus in Mississippi","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.wtok.com/2025/01/29/compass-data-centers-hosts-official-groundbreaking-ceremony-lauderdale-county/","label":"Compass Data Centers hosts official groundbreaking ceremony in Lauderdale County","publisher":"WTOK","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://msindy.org/p/mississippis-data-center-boom-and","label":"Mississippi's Data Center Boom","publisher":"Mississippi Independent","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.wtok.com/2026/07/15/lauderdale-county-gives-statement-compass-data-center/","label":"Lauderdale County gives statement on Compass Data Center","publisher":"WTOK-TV","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://siteselection.com/cover-story-data-center-boom-comes-to-mississippi/","label":"COVER STORY: Data Center Boom Comes to Mississippi — Mississippi Power to supply 'about 500 megawatts of power to the site'","publisher":"Site Selection Magazine","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://msbusinessjournal.com/compass-datacenters-to-invest-10-billion-in-lauderdale-county/","label":"Compass Datacenters to Invest $10 Billion in Lauderdale County","publisher":"Mississippi Business Journal","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-echelon-data-centres-meridian-lauderdale-ms","sourceRecordId":"echelon-data-centres-meridian-lauderdale-ms","name":"Echelon Data Centres Meridian (Sonny Montgomery Industrial Park)","operator":"Echelon Data Centres","city":"Meridian","county":"Lauderdale","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.3643,"longitude":-88.7037,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/echelon-data-centres-meridian-lauderdale-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://meridianstar.com/2026/02/15/lauderdale-county-in-talks-for-second-data-center-investment/","label":"Lauderdale County in talks for second data center investment","publisher":"The Meridian Star","kind":"press","retrievedAt":"2026-10-24"}]},{"id":"compute-erdc-dsrc-vicksburg-ms","sourceRecordId":"erdc-dsrc-vicksburg-ms","name":"ERDC DoD Supercomputing Resource Center","operator":"U.S. Army Engineer Research and Development Center (DoD High Performance Computing Modernization Program)","city":"Vicksburg","county":"Warren","address":"3909 Halls Ferry Road","state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.3019615,"longitude":-90.8630294,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/erdc-dsrc-vicksburg-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hpc.mil/?view=article&id=88%3Anew-hpc-systems-at-the-us-army-engineer-research-and-development-center-erdc-dod-supercomputing-resource-center-will-provide-an-additional-9-petaflops-of-computational-capability&catid=2","label":"New HPC Systems at the ERDC DoD Supercomputing Resource Center will Provide an Additional 9 petaFLOPS of Computational Capability","publisher":"DoD High Performance Computing Modernization Program (hpc.mil)","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-xai-macrohardrr-southaven-ms","sourceRecordId":"xai-macrohardrr-southaven-ms","name":"MACROHARDRR (xAI Southaven)","operator":"xAI","city":"Southaven","county":"DeSoto","address":"2400 Stateline Road","state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":34.9935,"longitude":-90.0342,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/xai-macrohardrr-southaven-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","label":"Tech leader xAI investing more than $20 billion in Southaven","publisher":"Office of Governor Tate Reeves","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.desototimes.com/news/xai-buys-building-and-additional-land-in-southaven-for-data-center/article_99b4eb95-e5b1-4cd0-8f36-9ab0021b9cb5.html","label":"xAI buys building and additional land in Southaven for data center","publisher":"DeSoto Times","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://baxtel.com/data-center/xai-macrohardrr","label":"xAI: MACROHARDRR Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.mississippifreepress.org/as-musks-xai-data-centers-encroach-on-southaven-north-mississippi-residents-push-back/","label":"As Musk's xAI Data Centers Encroach on Southaven, North Mississippi Residents Push Back","publisher":"Mississippi Free Press","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/xai-confirms-new-data-center-in-mississippi-elon-musk-pledges-20bn-investment-in-state/","label":"xAI confirms new data center in Mississippi, Elon Musk pledges $20bn investment","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://southaven.org/Blog.aspx?IID=227","label":"Mayor's Report — xAI SOUTHAVEN (Continued Expansion)…, January 7, 2026","publisher":"City of Southaven, Mississippi","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.openstreetmap.org/way/1077131079","label":"OSM building 'xAI Macrohardrr' (way 1077131079), Stateline Road West","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-21"}]},{"id":"compute-msu-hpc2-portera-starkville-ms","sourceRecordId":"msu-hpc2-portera-starkville-ms","name":"Mississippi State University HPC2 — Malcolm A. Portera High Performance Computing Center","operator":"Mississippi State University (High Performance Computing Collaboratory)","city":"Starkville","county":"Oktibbeha","address":"2 Research Boulevard","state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":33.4733639,"longitude":-88.7907511,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/msu-hpc2-portera-starkville-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer","label":"MSU, NOAA celebrate Orion supercomputer","publisher":"Mississippi State University","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.msstate.edu/newsroom/article/2023/05/msu-breaks-ground-new-high-performance-computing-data-center","label":"MSU breaks ground on new High Performance Computing Data Center","publisher":"Mississippi State University","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-navy-dsrc-stennis-space-center-ms","sourceRecordId":"navy-dsrc-stennis-space-center-ms","name":"Navy DoD Supercomputing Resource Center","operator":"U.S. Navy (DoD High Performance Computing Modernization Program)","city":"Stennis Space Center","county":"Hancock","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":30.3776388,"longitude":-89.5978312,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/navy-dsrc-stennis-space-center-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://defensescoop.com/2023/04/27/navys-powerful-new-supercomputer-nautilus-is-officially-open-for-dod-use/","label":"Navy's powerful new supercomputer — Nautilus — is officially open for DOD use","publisher":"DefenseScoop","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-prado-ai-jackson-metro-ms","sourceRecordId":"prado-ai-jackson-metro-ms","name":"Prado AI / PraCon Global AI Industrial Campus","operator":"PraCon Global Investment Group","city":"Ridgeland","county":"Madison","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.4282,"longitude":-90.132,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/prado-ai-jackson-metro-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/","label":"Mississippi developer plans to move forward with data center plans, even as state declines to give ruling (Wayback snapshot 2026-08-19)","publisher":"Mississippi Today","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-saxum-forest-avenue-jackson-ms","sourceRecordId":"saxum-forest-avenue-jackson-ms","name":"Saxum Forest Avenue Data Center Site (Northwest Jackson)","operator":"Saxum Investment Company (end user undisclosed)","city":"Jackson","county":"Hinds","address":null,"state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":32.3705052,"longitude":-90.1998927,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/saxum-forest-avenue-jackson-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wlbt.com/2026/05/20/company-seeking-rezone-forest-avenue-property-jackson-data-center/","label":"Company seeking to rezone Forest Avenue property for Jackson data center","publisher":"WLBT","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.mississippifreepress.org/jackson-data-center-proposal-expands-to-230-acres-amid-mounting-local-opposition/","label":"Jackson Data Center Proposal Expands to 230 Acres Amid Local Opposition","publisher":"Mississippi Free Press","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-xai-tulane-road-southaven-ms","sourceRecordId":"xai-tulane-road-southaven-ms","name":"xAI Tulane Road Data Center (Southaven)","operator":"xAI (SpaceXAI)","city":"Southaven","county":"DeSoto","address":"8325 Tulane Road","state":"MS","stateName":"Mississippi","jurisdictionType":"state","latitude":34.9897,"longitude":-90.043,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/xai-tulane-road-southaven-ms","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-07","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.actionnews5.com/2026/09/02/southaven-approves-new-spacexai-data-center-fifth-location-area/","label":"Southaven approves new SpaceXAI data center, fifth location in area","publisher":"Action News 5","kind":"press","retrievedAt":"2026-10-07"},{"url":"https://www.desototimes.com/news/southaven-approves-new-xai-data-center/article_093ce052-262d-4d77-a0a4-8b9ffe2e09bc.html","label":"Southaven approves new XAI data center","publisher":"DeSoto Times-Tribune","kind":"press","retrievedAt":"2026-10-07"}]},{"id":"compute-act-colstrip-data-center-colstrip-mt","sourceRecordId":"act-colstrip-data-center-colstrip-mt","name":"ACT Colstrip Data Center","operator":"Advanced Communications Technology (Range)","city":"Colstrip","county":"Rosebud","address":"227 Power Rd","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.89347,"longitude":-106.618344,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/act-colstrip-data-center-colstrip-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/2539","label":"PeeringDB facility 2539: ACT Colstrip, 227 Power Rd","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://inflect.com/building/227-power-road-colstrip/advanced-communications-technology/datacenter/advanced-communications-technology-act-colstrip","label":"Range Colstrip, 227 Power Road, Colstrip MT","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-quantica-bsdi-billings-mt","sourceRecordId":"quantica-bsdi-billings-mt","name":"Big Sky Digital Infrastructure Campus","operator":"Quantica Infrastructure","city":"Billings","county":"Yellowstone","address":null,"state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.823,"longitude":-108.7,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/quantica-bsdi-billings-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/encap-backed-quantica-details-plans-for-1gw-campus-in-montana/","label":"EnCap-backed Quantica Details Plans for 1GW Campus in Montana","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://quanticainfra.com/2025/08/04/quantica-infrastructure-introduces-big-sky-digital-infrastructure-as-its-flagship-development-platform-in-montana/","label":"Quantica Introduces Big Sky Digital Infrastructure as Its Flagship Montana Platform","publisher":"Quantica Infrastructure","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/","label":"Agreement between data center developer and union federation thin on details","publisher":"Montana Free Press","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://www.kpax.com/news/montana-news/quantica-seeking-to-boost-energy-capacity-at-broadview-data-center-site-to-7-235-mw","label":"Quantica seeking to boost energy capacity at Broadview data center site to 7,235 MW","publisher":"KPAX","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://montanafreepress.org/2026/02/12/as-ai-investors-eye-montana-for-new-data-centers-communities-brace-for-water-impacts/","label":"As AI investors eye Montana for new data centers, communities brace for water impacts","publisher":"Montana Free Press","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://nbcmontana.com/news/local/deq-seeks-public-comment-on-well-proposal-for-new-data-center-in-yellowstone-co","label":"DEQ seeks public comment on well proposal for new data center in Yellowstone Co.","publisher":"NBC Montana","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.kulr8.com/news/quantica-files-power-request-for-yellowstone-county-data-center/article_65961adc-7dd3-4bfd-82b8-cbe6fe72f72a.html","label":"Quantica files power request for Yellowstone County data center","publisher":"KULR-8","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-cogent-billings-data-center-billings-mt","sourceRecordId":"cogent-billings-data-center-billings-mt","name":"Cogent Billings Data Center","operator":"Cogent Communications","city":"Billings","county":"Yellowstone","address":"3025 Hesper Rd","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.740895,"longitude":-108.591913,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-billings-data-center-billings-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-great-plains","label":"Cogent Great Plains: Billings Data Center, 3025 Hesper Road","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://www.peeringdb.com/api/fac/16447","label":"PeeringDB facility 16447: Cogent Billings, 3025 Hesper Road","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-krambu-bonner-mill-data-center-bonner-mt","sourceRecordId":"krambu-bonner-mill-data-center-bonner-mt","name":"Krambu Bonner Data Center (former UFP Edge building, Bonner Mill Industrial Park)","operator":"Krambu","city":"Bonner","county":"Missoula","address":null,"state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":46.8709014,"longitude":-113.872499,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/krambu-bonner-mill-data-center-bonner-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://montanafreepress.org/2026/07/06/property-owner-of-proposed-bonner-data-center-backs-out/","label":"Property owner of proposed Bonner data center backs out","publisher":"Montana Free Press","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://www.kpax.com/news/proposed-bonner-ai-data-center-now-dead-in-the-water-after-property-owner-removes-signature-on-application","label":"Proposed Bonner AI data center now dead in the water after property owner removes signature on application","publisher":"KPAX","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://missoulacurrent.com/krambu-data-center/","label":"Krambu data center at Bonner Mill","publisher":"Missoula Current","kind":"press","retrievedAt":"2026-10-08"}]},{"id":"compute-montana-opticom-four-corners-bozeman-mt","sourceRecordId":"montana-opticom-four-corners-bozeman-mt","name":"Montana Opticom Data Center (Four Corners)","operator":"Montana Opticom LLC","city":"Bozeman","county":"Gallatin","address":"144 Quail Run Rd","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.673641,"longitude":-111.19004,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/montana-opticom-four-corners-bozeman-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/1895","label":"PeeringDB facility 1895: Montana Opticom, 144 Quail Run Road, Bozeman","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://inflect.com/building/144-quail-run-road-bozeman/montana-opticom/datacenter/montana-opticom","label":"Montana Opticom Bozeman, 144 Quail Run Road, Four Corners MT","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-north-data-center-great-falls-mt","sourceRecordId":"north-data-center-great-falls-mt","name":"North Data Center Great Falls","operator":"North Data Center, LLC","city":"Great Falls","county":"Cascade","address":"417 Central Ave, Suite 328","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":47.505324297557,"longitude":-111.300459399499,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/north-data-center-great-falls-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://www.northdatacenter.com/","label":"North Data Center: N+1 data center in downtown Great Falls, Montana","publisher":"North Data Center, LLC","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://www.peeringdb.com/api/fac/5794","label":"PeeringDB facility 5794: North Data Center, LLC, 417 Central Ave Suite 328","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://inflect.com/building/417-central-avenue-great-falls/north-data-center/datacenter/great-falls","label":"North Data Center Great Falls, 417 Central Avenue","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-parsec-data-management-billings-mt","sourceRecordId":"parsec-data-management-billings-mt","name":"Parsec Data Management Billings","operator":"Parsec Data Management, Inc.","city":"Billings","county":"Yellowstone","address":"3450 Gabel Rd","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.742945,"longitude":-108.602984,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/parsec-data-management-billings-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.parsecdata.com/","label":"Parsec Data Management: Montana Data Center","publisher":"Parsec Data Management","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://www.peeringdb.com/api/fac/1663","label":"PeeringDB facility 1663: Parsec, 3450 Gabel Rd, Billings","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://inflect.com/building/3450-gabel-road-billings/parsec-data-management-inc/datacenter/parsec","label":"Parsec Data Management Billings, 3450 Gabel Road","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-tac-project-cardinal-great-falls-mt","sourceRecordId":"tac-project-cardinal-great-falls-mt","name":"Project Cardinal (TAC Data Centers Great Falls Campus)","operator":"TAC Data Centers (The Ardent Companies)","city":"Great Falls","county":"Cascade","address":null,"state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":47.5048851,"longitude":-111.29189,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tac-project-cardinal-great-falls-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://theelectricgf.com/2025/11/18/proposed-data-center-project-off/","label":"Proposed data center project off","publisher":"The Electric (Great Falls)","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://montanafreepress.org/2025/06/24/for-massive-great-falls-data-center-proposal-energy-supply-is-crucial-to-push-project-forward/","label":"For massive Great Falls data center proposal, energy supply is crucial to push project forward","publisher":"Montana Free Press","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://servercountry.org/data/states/montana/","label":"Montana Data Center Projects (lists TAC Project Cardinal, Great Falls, 600 MW, canceled)","publisher":"ServerCountry","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-sabey-butte-mt","sourceRecordId":"sabey-butte-mt","name":"Sabey Data Centers Butte Campus (Montana Connections)","operator":"Sabey Data Centers","city":"Butte","county":"Silver Bow","address":"German Gulch Rd & Rick Jones Way","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.9965283,"longitude":-112.6981966,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-butte-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/sabey-butte-montana","label":"Sabey: Butte, Montana Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.bozemandailychronicle.com/news/power-drain-a-guide-to-proposed-data-centers-so-far-in-montana/article_a01fd8b1-ba3e-5eeb-8ffa-38b809273906.html","label":"Power Drain: A guide to proposed data centers so far in Montana","publisher":"Bozeman Daily Chronicle","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://bebeez.eu/2025/10/20/sabey-dc-acquires-land-for-data-center-in-butte-montana/","label":"Sabey DC acquires land for data center in Butte, Montana","publisher":"BeBeez","kind":"press","retrievedAt":"2026-10-08"}]},{"id":"compute-vision-net-billings-central-ave-billings-mt","sourceRecordId":"vision-net-billings-central-ave-billings-mt","name":"Vision Net Billings 2 (1030 Central Avenue)","operator":"Vision Net","city":"Billings","county":"Yellowstone","address":"1030 Central Ave","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.76973999352,"longitude":-108.542169482237,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vision-net-billings-central-ave-billings-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/1030-central-avenue-billings/vision-net/datacenter/iconnect-montana-billings","label":"Vision Net Billings 2, 1030 Central Avenue, Billings MT","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-vision-net-billings-fiber-hotel-billings-mt","sourceRecordId":"vision-net-billings-fiber-hotel-billings-mt","name":"Vision Net Billings Fiber Hotel (Granite Tower, formerly iConnect Billings)","operator":"Vision Net","city":"Billings","county":"Yellowstone","address":"222 N 32nd St","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":45.781098,"longitude":-108.512522,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vision-net-billings-fiber-hotel-billings-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/380","label":"PeeringDB facility 380: iConnect Billings Fiber Hotel (Granite Tower)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://inflect.com/building/222-north-32nd-street-billings/vision-net/datacenter/iconnect-montana-billings-fiber-hotel","label":"Vision Net Billings 1, 222 North 32nd Street, Billings MT","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://servercountry.org/data/states/montana/","label":"Montana Data Center Projects (Vision Net, formerly iConnect Montana, Billings, operational)","publisher":"ServerCountry","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-vision-net-helena-hustad-center-helena-mt","sourceRecordId":"vision-net-helena-hustad-center-helena-mt","name":"Vision Net Helena (Hustad Center, formerly iConnect Helena)","operator":"Vision Net","city":"Helena","county":"Lewis and Clark","address":"1084 Helena Ave","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":46.597378163862,"longitude":-112.022845486634,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vision-net-helena-hustad-center-helena-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/379","label":"PeeringDB facility 379: iConnect Helena (Hustad Center, 1084 Helena Avenue)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://inflect.com/building/1084-helena-avenue-helena/vision-net/datacenter/iconnect-montana-helena","label":"Vision Net Helena, 1084 Helena Avenue, Helena MT","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-vision-net-missoula-broadway-center-missoula-mt","sourceRecordId":"vision-net-missoula-broadway-center-missoula-mt","name":"Vision Net Missoula (Broadway Center, formerly iConnect Missoula)","operator":"Vision Net","city":"Missoula","county":"Missoula","address":"110 E Broadway St","state":"MT","stateName":"Montana","jurisdictionType":"state","latitude":46.872113622302,"longitude":-113.993786742356,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vision-net-missoula-broadway-center-missoula-mt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/381","label":"PeeringDB facility 381: iConnect Missoula (Broadway Center, 110 East Broadway)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://inflect.com/building/110-east-broadway-street-missoula/vision-net/datacenter/iconnect-montana-missoula","label":"Vision Net Missoula, 110 East Broadway Street, Missoula MT","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-advanced-internet-technologies-fayetteville-nc","sourceRecordId":"advanced-internet-technologies-fayetteville-nc","name":"Advanced Internet Technologies (AIT) Fayetteville Data Center","operator":"Advanced Internet Technologies, Inc.","city":"Fayetteville","county":"Cumberland","address":"421 Maiden Lane","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.085,"longitude":-78.97722,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/advanced-internet-technologies-fayetteville-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacentercatalog.com/usa/aitcom-fayetteville-nc","label":"AIT.com — Fayetteville, NC Data Center","publisher":"Data Center Catalog","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/","label":"Data Centers Are Eyeing Fayetteville. Here's How to Learn More (names AIT on Hay Street/Maiden Lane as an existing facility)","publisher":"CityView (Fayetteville, NC)","kind":"press","retrievedAt":"2026-08-29"}]},{"id":"compute-aws-richmond-county-nc","sourceRecordId":"aws-richmond-county-nc","name":"Amazon Web Services Richmond County Data Center Campus","operator":"Amazon Web Services","city":"Rockingham","county":"Richmond","address":"Airport Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":34.9445,"longitude":-79.775,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-richmond-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-breaks-ground-on-10bn-data-center-complex-in-richmond-county-north-carolina/","label":"Amazon breaks ground on $10bn data center complex in Richmond County, North Carolina","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://businessnc.com/amazon-plots-state-record-10b-data-center-project-in-richmond-county/","label":"Amazon plots state record $10B data center project in Richmond County","publisher":"Business North Carolina","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://cardinalpine.com/news/secret-deal-amazon-data-center-nc/","label":"Inside the secretive deal for a $10 billion Amazon data center in rural NC","publisher":"Cardinal & Pine (reporting by Inside Climate News)","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond","label":"DEQ announces joint public hearing on Amazon data center and Duke Energy air quality permits in Richmond County","publisher":"North Carolina Department of Environmental Quality","kind":"permit","retrievedAt":"2026-09-24"},{"url":"https://www.wunc.org/2026-08-29/amazons-richmond-county-data-center-gets-green-light-on-air-quality-permits","label":"Amazon's Richmond County data center gets green light on air quality permits","publisher":"WUNC","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://www.wral.com/news/local/why-one-north-carolina-county-said-yes-to-amazon-10-billion-dollar-data-center-july-2026/","label":"Why one North Carolina county said yes to Amazon's $10 billion data center","publisher":"WRAL","kind":"press","retrievedAt":"2026-09-24"}]},{"id":"compute-american-express-whitsett-guilford-county-nc","sourceRecordId":"american-express-whitsett-guilford-county-nc","name":"American Express Whitsett Data Center (IPC2)","operator":"American Express","city":"Whitsett","county":"Guilford County","address":"5301 McConnell Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.0712466,"longitude":-79.5644686,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/american-express-whitsett-guilford-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/american-express-ipc2-whitsett-nc","label":"American Express IPC2 Whitsett NC — facility record (194 acres in Rock Creek Center, operational since 2010, PUE 1.64)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/winston-salem-greensboro","label":"Winston-Salem / Greensboro data center market — facility table (American Express IPC2 Whitsett, 30.0 MW, 493,573 sq ft)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=Whitsett%2C%20Guilford%20County%2C%20North%20Carolina","label":"OpenStreetMap Nominatim — Whitsett, Guilford County, NC","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-american-tower-reedy-creek-charlotte-nc","sourceRecordId":"american-tower-reedy-creek-charlotte-nc","name":"American Tower Reedy Creek Data Center (East Charlotte)","operator":"American Tower","city":"Charlotte","county":"Mecklenburg","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.2703,"longitude":-80.7229,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/american-tower-reedy-creek-charlotte-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wfae.org/energy-environment/2026-04-23/east-charlotte-residents-protest-data-center-development-during-rezoning-hearing","label":"East Charlotte residents protest data center development during rezoning hearing","publisher":"WFAE","kind":"press","retrievedAt":"2026-08-15"}]},{"id":"compute-apple-maiden-nc","sourceRecordId":"apple-maiden-nc","name":"Apple Maiden Data Center (iCloud)","operator":"Apple","city":"Maiden","county":"Catawba","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.588607,"longitude":-81.256686,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/apple-maiden-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.apple.com/newsroom/2025/02/apple-will-spend-more-than-500-billion-usd-in-the-us-over-the-next-four-years/","label":"Apple will spend more than $500 billion in the U.S. over the next four years — names NC among states for continued data-center capacity expansion (Apple Intelligence)","publisher":"Apple Newsroom","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.catawbaedc.org/post/north-carolina-data-center-is-part-of-apple-s-500-billion-expansion-plan-across-the-us","label":"North Carolina data center is part of Apple's $500 billion expansion plan across the US","publisher":"Catawba County Economic Development Corp","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://9to5mac.com/2012/05/17/apples-20-megawatt-solar-farm-near-nc-data-center-gets-ncuc-approval/","label":"Apple's 20-megawatt solar farm near NC data center gets NCUC approval (9to5Mac)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.imore.com/solar-farms-and-fuel-cells-apples-north-carolina-data-center-now-completely-operational","label":"Solar and fuel cell farms for Apple's NC data center now completely operational (iMore)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-compass-statesville-nc","sourceRecordId":"compass-statesville-nc","name":"Compass Statesville Campus","operator":"Compass Datacenters","city":"Statesville","county":"Iredell","address":"Stamey Farm Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.7826,"longitude":-80.8873,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/compass-statesville-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/compass-datacenters-proposes-333-acre-campus-in-statesville-north-carolina/","label":"Compass Datacenters proposes 333-acre campus in Statesville, North Carolina","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.sec.gov/Archives/edgar/data/0001326160/000110465926080476/tm2619723d1_8k.htm","label":"Duke Energy Form 8-K (Feb 2026) — large-load contracts","publisher":"U.S. SEC / Duke Energy","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://www.wbtv.com/2025/09/16/statesville-city-council-approves-rezoning-request-new-data-center/","label":"WBTV — \"Statesville City Council approves rezoning request for new data center\"","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://baxtel.com/data-center/compass-statesville-nc","label":"Compass: Statesville, NC — facility record (Stamey Farm Rd, 333 acres, 1.34M sq ft, powered by adjacent Duke Energy substation)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.governing.com/infrastructure/north-carolina-city-approves-massive-data-center-despite-local-opposition","label":"North Carolina City Approves Massive Data Center Despite Local Opposition","publisher":"Governing","kind":"press","retrievedAt":"2026-09-24"}]},{"id":"compute-cyrusone-raleigh-durham-i-durham-nc","sourceRecordId":"cyrusone-raleigh-durham-i-durham-nc","name":"CyrusOne Raleigh-Durham I (DUR1)","operator":"CyrusOne","city":"Durham","county":"Durham County","address":"2223 Northeast Creek Parkway","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.9353037,"longitude":-78.8810471,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-raleigh-durham-i-durham-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/cyrusone-raleigh-durham-i","label":"CyrusOne Raleigh-Durham I — facility record (420,000 sq ft building, Phase 1 completed September 2013, acquired from Sentinel Data Centers February 2017)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/raleigh","label":"Raleigh data center market — facility table (CyrusOne Raleigh-Durham I, 50.0 MW)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=2223%20Northeast%20Creek%20Parkway%2C%20Durham%2C%20NC","label":"OpenStreetMap Nominatim — 'DUR1', 2223 Northeast Creek Parkway, Research Triangle Park, Durham County, NC 27713","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-dartpoints-asheville-avl01-nc","sourceRecordId":"dartpoints-asheville-avl01-nc","name":"DartPoints Asheville (AVL01)","operator":"DartPoints","city":"Asheville","county":"Buncombe","address":"100 Technology Dr, Suite C","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.488154,"longitude":-82.558062,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-asheville-avl01-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/3668","label":"DartPoints Asheville, NC - AVL1","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://dartpoints.com/locations/north-carolina","label":"DartPoints North Carolina locations","publisher":"DartPoints","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-data-journey-claremont-catawba-county-nc","sourceRecordId":"data-journey-claremont-catawba-county-nc","name":"Data Journey Claremont Data Center (former Bed Bath & Beyond)","operator":"Data Journey","city":"Claremont","county":"Catawba","address":"2436 Penny Rd","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.7146,"longitude":-81.1462,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/data-journey-claremont-catawba-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.catawbaedc.org/post/new-life-for-bed-bath-beyond-data-center-in-catawba-county","label":"New life for Bed Bath & Beyond data center in Catawba County","publisher":"Catawba County Economic Development Corporation","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://baxtel.com/data-center/data-journey-claremont-nc","label":"Data Journey: Claremont, NC","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-dc-blox-high-point-nc","sourceRecordId":"dc-blox-high-point-nc","name":"DC BLOX High Point Data Center","operator":"DC BLOX","city":"High Point","county":"Guilford County","address":"4131 Sheraton Court","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.0537978,"longitude":-79.9518696,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-high-point-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.highpointnc.gov/DocumentCenter/View/16687/DC-BLOX-and-HPEDC_Press-Release_FINAL-5-5-21","label":"DC BLOX Chooses High Point for $305 Million Data Center (High Point EDC news release, May 5, 2021)","publisher":"High Point Economic Development Corporation","kind":"press","retrievedAt":"2026-09-24"},{"url":"https://servercountry.org/data/projects/dc-blox-high-point-data-center-nc/","label":"DC BLOX High Point Data Center — project record, status canceled 2026-07-19","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.dcblox.com/data-centers/high-point/","label":"DC BLOX data center portfolio — current campus list (no North Carolina location)","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=4131%20Sheraton%20Court%2C%20High%20Point%2C%20NC","label":"OpenStreetMap Nominatim — 4131 Sheraton Court, High Point, Guilford County, NC 27410","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-deep-river-data-cumnock-lee-county-nc","sourceRecordId":"deep-river-data-cumnock-lee-county-nc","name":"Deep River Data AI Data Center (Cumnock, Lee County)","operator":"Deep River Data","city":"Cumnock","county":"Lee","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.555,"longitude":-79.23778,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/deep-river-data-cumnock-lee-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.theassemblync.com/business/commercial-natural-gas-well-ai-datacenter/","label":"Natural Gas To Power AI May Be Coming To North Carolina","publisher":"The Assembly","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://cwfnc.org/nofracklee/","label":"Lee County: No Fracking Data Center","publisher":"Clean Water for North Carolina","kind":"other","retrievedAt":"2026-08-29"}]},{"id":"compute-digipower-x-hildebran-burke-county-nc","sourceRecordId":"digipower-x-hildebran-burke-county-nc","name":"DigiPower X Hildebran Data Center (Cline Park Court)","operator":"DigiPower X Inc. (formerly Digihost)","city":"Hildebran","county":"Burke","address":"199 Cline Park Court","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.7179,"longitude":-81.4198,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digipower-x-hildebran-burke-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wsoctv.com/news/local/data-center-company-buys-more-land-burke-county/OUBHZ6QYIFAO3KNNKIQNYJIM74/","label":"Data center company buys more land in Burke County","publisher":"WSOC-TV","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.thepaper.media/followup/digipower-x-quietly-expands-hildebran-land-holdings-amid-unanswered-data-center-plans/article_4e3b8dd6-f695-496d-a1b6-e6fa81521a58.html","label":"DigiPower X quietly expands Hildebran land holdings amid unanswered data center plans","publisher":"The Paper","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://baxtel.com/data-center/digipower-x-hildebran-nc","label":"DigiPower X: Hildebran, NC","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-digital-realty-clt10-charlotte-nc","sourceRecordId":"digital-realty-clt10-charlotte-nc","name":"Digital Realty CLT10 (113 North Myers Street)","operator":"Digital Realty","city":"Charlotte","county":"Mecklenburg County","address":"113 North Myers Street","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.221452,"longitude":-80.8359211,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-clt10-charlotte-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/digital-realty-clt10","label":"Digital Realty CLT10 — facility record (113 North Myers Street, 29,200 sq ft gross colocation)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/charlotte","label":"Charlotte data center market — facility table (Digital Realty CLT10, operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=113%20North%20Myers%20Street%2C%20Charlotte%2C%20NC","label":"OpenStreetMap Nominatim — 113 North Myers Street, Charlotte, Mecklenburg County, NC 28202","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-digital-realty-charlotte-nc","sourceRecordId":"digital-realty-charlotte-nc","name":"Digital Realty Moores Chapel Data Center Campus","operator":"Digital Realty","city":"Charlotte","county":"Mecklenburg","address":"12899 Moores Chapel Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.2422,"longitude":-80.9562,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-charlotte-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/digital-realty-files-to-develop-400mw-data-center-campus-in-charlotte-north-carolina/","label":"Digital Realty files to develop 400MW data center campus in Charlotte, North Carolina","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.govtech.com/products/charlotte-considers-rezoning-for-biggest-data-center-in-n-c","label":"Charlotte Considers Rezoning for Biggest Data Center in N.C. — Government Technology","publisher":"Government Technology","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://qcnerve.com/charlotte-data-centers/","label":"Pushback Grows as Data Centers Proliferate in Charlotte Metro — Queen City Nerve","publisher":"Queen City Nerve","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://edpnc.com/incentives/data-centers-sales-use-tax-exemptions/","label":"Data Centers Sales & Use Tax Exemptions — EDPNC","publisher":"Economic Development Partnership of North Carolina","kind":"subsidy","retrievedAt":"2026-07-06"}]},{"id":"compute-dynamic-quest-greensboro-nc","sourceRecordId":"dynamic-quest-greensboro-nc","name":"Dynamic Quest Greensboro Data Center","operator":"Dynamic Quest","city":"Greensboro","county":"Guilford County","address":"4821 Koger Boulevard","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.0497669,"longitude":-79.881654,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dynamic-quest-greensboro-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/dynamic-quest-greensboro","label":"Dynamic Quest Greensboro — facility record (4821 Koger Blvd, operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/winston-salem-greensboro","label":"Winston-Salem / Greensboro data center market — facility table (Dynamic Quest Greensboro)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=4821%20Koger%20Boulevard%2C%20Greensboro%2C%20NC","label":"OpenStreetMap Nominatim — 4821 Koger Boulevard, Greensboro, Guilford County, NC 27407","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-energy-storage-solutions-fayetteville-cumberland-county-nc","sourceRecordId":"energy-storage-solutions-fayetteville-cumberland-county-nc","name":"Energy Storage Solutions Fayetteville AI Data Center Campus","operator":"Energy Storage Solutions","city":"Fayetteville","county":"Cumberland","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.053,"longitude":-78.878,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/energy-storage-solutions-fayetteville-cumberland-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds","label":"Developer Forges Ahead With $38B in NC Data Centers (Data Center Knowledge)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-07-16"}]},{"id":"compute-energy-storage-solutions-tarboro-edgecombe-county-nc","sourceRecordId":"energy-storage-solutions-tarboro-edgecombe-county-nc","name":"Energy Storage Solutions Tarboro Data Center","operator":"Energy Storage Solutions, LLC","city":"Tarboro","county":"Edgecombe","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.8968,"longitude":-77.5358,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/energy-storage-solutions-tarboro-edgecombe-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.rockymounttelegram.com/news/local/company-that-eyed-land-for-data-center-withdraws-its-offer/article_9d13d619-4014-45b4-9c83-ce5837f84e45.html","label":"Company that eyed land for data center withdraws its offer","publisher":"Rocky Mount Telegram","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds","label":"Developer Forges Ahead With $38B in NC Data Center Builds","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-flexential-charlotte-north-clt04-05-nc","sourceRecordId":"flexential-charlotte-north-clt04-05-nc","name":"Flexential Charlotte - North (CLT04/05)","operator":"Flexential","city":"Charlotte","county":"Mecklenburg","address":"10105 David Taylor Drive","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.329773,"longitude":-80.7657588,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-charlotte-north-clt04-05-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/nc/charlotte/north-data-center","label":"Flexential official facility page (corroborated by DataCenterJournal CLT04/05 listing)","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1307920829","label":"OpenStreetMap way/1307920829","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-charlotte-south-clt01-02-03-nc","sourceRecordId":"flexential-charlotte-south-clt01-02-03-nc","name":"Flexential Charlotte - South (CLT01/02/03)","operator":"Flexential","city":"Charlotte","county":"Mecklenburg","address":"8910 Lenox Pointe Drive","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.1354147,"longitude":-80.9368313,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-charlotte-south-clt01-02-03-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/nc/charlotte/south-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/215630401","label":"OpenStreetMap way/215630401","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-raleigh-ral02-ral03-nc","sourceRecordId":"flexential-raleigh-ral02-ral03-nc","name":"Flexential Raleigh (RAL02/RAL03)","operator":"Flexential","city":"Morrisville","county":"Wake","address":"5150 McCrimmon Parkway","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.8505281,"longitude":-78.8291431,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-raleigh-ral02-ral03-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/nc/raleigh/data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12112361725","label":"OpenStreetMap node/12112361725","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-salisbury-henderson-grove-nc","sourceRecordId":"flexential-salisbury-henderson-grove-nc","name":"Flexential Salisbury (Henderson Grove Church Road)","operator":"Flexential","city":"Salisbury","county":"Rowan","address":"Henderson Grove Church Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.6288,"longitude":-80.5054,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-salisbury-henderson-grove-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.salisburypost.com/2026/08/12/salisbury-planning-recommends-henderson-grove-church-data-center-approval/","label":"Salisbury Planning recommends Henderson Grove Church data center approval","publisher":"Salisbury Post","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://www.salisburypost.com/2026/04/15/salisbury-presents-proposed-henderson-grove-church-road-data-center-to-community-members-faces-concerns/","label":"Salisbury presents proposed Henderson Grove Church Road data center to community members, faces concerns","publisher":"Salisbury Post","kind":"press","retrievedAt":"2026-09-24"}]},{"id":"compute-giga-data-centers-mooresville-nc","sourceRecordId":"giga-data-centers-mooresville-nc","name":"GIGA Data Centers Mooresville Campus","operator":"GIGA Data Centers","city":"Mooresville","county":"Iredell County","address":"1035 Mecklenburg Highway","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.5634941,"longitude":-80.8280378,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/giga-data-centers-mooresville-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/giga-charlotte-mooresville","label":"GIGA Charlotte (Mooresville) — facility record (60 MW, 165,800 sq ft, opened June 2019, 21 acres, PUE 1.15)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=1035%20Mecklenburg%20Highway%2C%20Mooresville%2C%20NC","label":"OpenStreetMap Nominatim — 1035 Mecklenburg Highway, Mooresville, Iredell County, NC 28115","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-google-lenoir-nc","sourceRecordId":"google-lenoir-nc","name":"Google Lenoir Data Center","operator":"Google","city":"Lenoir","county":"Caldwell","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.900163,"longitude":-81.546892,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-lenoir-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/lenoir-north-carolina/","label":"Google Lenoir, North Carolina — official location page: announced 2007, opened 2008, ~$1.2B initial / $4B+ cumulative","publisher":"Google","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://news.duke-energy.com/releases/duke-energy-google-team-up-on-solar-power-project-in-n-c","label":"Duke Energy, Google team up on solar power project in N.C.","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.energytrend.com/news/20151125-9808.html","label":"Google Partners with Duke Energy to Power Data Center by a 61MW PV Plant","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-hb2k-kings-mountain-cleveland-county-nc","sourceRecordId":"hb2k-kings-mountain-cleveland-county-nc","name":"HB2K AI Data Center Campus (Kings Mountain)","operator":"HB2K LLC (Honey Badger Development)","city":"Kings Mountain","county":"Cleveland","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.2451,"longitude":-81.3412,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hb2k-kings-mountain-cleveland-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cbs17.com/news/north-carolina-news/i-regret-selling-every-day-nc-couple-regrets-selling-family-land-for-data-center-project/amp/","label":"'I regret selling every day': NC couple regrets selling family land for data center project","publisher":"CBS17 (WJZY/Queen City News)","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.newsnationnow.com/us-news/southeast/nc-couple-regret-selling-land-data-center-project/amp/","label":"NC couple regrets selling land for data center project","publisher":"NewsNation (WJZY)","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-impactdata-greensboro-nc","sourceRecordId":"impactdata-greensboro-nc","name":"ImpactData Greensboro","operator":"ImpactData","city":"Greensboro","county":"Guilford","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.0726,"longitude":-79.792,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/impactdata-greensboro-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.blackridgeresearch.com/blog/latest-list-of-biggest-largest-upcoming-data-centers-north-carolina-united-states-us","label":"List of upcoming data centers in North Carolina","publisher":"Blackridge Research","kind":"other","retrievedAt":"2026-07-07"}]},{"id":"compute-energy-storage-solutions-kingsboro-edgecombe-county-nc","sourceRecordId":"energy-storage-solutions-kingsboro-edgecombe-county-nc","name":"Kingsboro AI Data Center Campus","operator":"Energy Storage Solutions","city":"Rocky Mount","county":"Edgecombe","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.941,"longitude":-77.734,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/energy-storage-solutions-kingsboro-edgecombe-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.rockymounttelegram.com/news/local/county-oks-amending-ordinance-to-allow-for-a-data-center-at-kingsboro-business-park/article_64e09f70-9b18-48fd-84a9-a6ec6dae950e.html","label":"County OKs amending ordinance to allow for a data center at Kingsboro Business Park (Rocky Mount Telegram)","publisher":"Rocky Mount Telegram","kind":"permit","retrievedAt":"2026-07-16"},{"url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds","label":"Developer Forges Ahead With $38B in NC Data Centers (Data Center Knowledge)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.northcarolinahealthnews.org/2026/07/14/rural-nc-data-centers/","label":"AI data center boom meets rural reality in Edgecombe County","publisher":"North Carolina Health News","kind":"press","retrievedAt":"2026-08-15"}]},{"id":"compute-kyndryl-research-triangle-park-durham-nc","sourceRecordId":"kyndryl-research-triangle-park-durham-nc","name":"Kyndryl Research Triangle Park Data Center","operator":"Kyndryl","city":"Durham","county":"Durham County","address":"3039 East Cornwallis Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.9125498,"longitude":-78.8580709,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/kyndryl-research-triangle-park-durham-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/kyndryl-research-triangle-park","label":"Kyndryl Research Triangle Park — facility record (132,000 sq ft white space, dual 100 kV feeds, eleven 2.5 MW standby generators)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/raleigh","label":"Raleigh data center market — facility table (Kyndryl Research Triangle Park, 7.4 MW)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=3039%20East%20Cornwallis%20Road%2C%20Durham%2C%20NC","label":"OpenStreetMap Nominatim — 3039 East Cornwallis Road, Research Triangle Park, Durham County, NC 27703","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-long-ferry-road-rowan-county-nc","sourceRecordId":"long-ferry-road-rowan-county-nc","name":"Long Ferry Road Data Center Campus (Rowan County)","operator":"Undisclosed developer","city":null,"county":"Rowan","address":"Long Ferry Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.6944,"longitude":-80.3974,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/long-ferry-road-rowan-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.salisburypost.com/2026/04/21/roco-passes-data-center-moratorium-over-100-residents-express-data-center-opposition/","label":"RoCo passes data center moratorium, over 100 residents express data center opposition","publisher":"Salisbury Post","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-lumen-greensboro-1-nc","sourceRecordId":"lumen-greensboro-1-nc","name":"Lumen Greensboro 1","operator":"Lumen Technologies","city":"Greensboro","county":"Guilford County","address":"201 Creek Ridge Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.029221,"longitude":-79.79393,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-greensboro-1-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-greensboro-1","label":"Lumen Greensboro 1 — facility record (201 Creek Ridge Rd, operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/winston-salem-greensboro","label":"Winston-Salem / Greensboro data center market — facility table (Lumen Greensboro 1 and 2)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=201%20Creek%20Ridge%20Road%2C%20Greensboro%2C%20NC","label":"OpenStreetMap Nominatim — 201 Creek Ridge Road, Greensboro, Guilford County, NC 27406","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-mapletree-5150-mccrimmon-morrisville-nc","sourceRecordId":"mapletree-5150-mccrimmon-morrisville-nc","name":"Mapletree 5150 McCrimmon Data Center","operator":"Mapletree Redwood Data Centre Trust","city":"Morrisville","county":"Wake County","address":"5150 McCrimmon Parkway","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.8505281,"longitude":-78.8291431,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mapletree-5150-mccrimmon-morrisville-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/mapletree-5150-mccrimmon","label":"Mapletree 5150 McCrimmon — facility record (5150 McCrimmon Pkwy, operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/raleigh","label":"Raleigh data center market — facility table (Mapletree: 5150 McCrimmon)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=5150%20McCrimmon%20Parkway%2C%20Morrisville%2C%20NC","label":"OpenStreetMap Nominatim — 5150 McCrimmon Parkway, Morrisville, Wake County, NC 27560","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-meta-forest-city-nc","sourceRecordId":"meta-forest-city-nc","name":"Meta Forest City Data Center","operator":"Meta","city":"Forest City","county":"Rutherford","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.317,"longitude":-81.826,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-forest-city-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.atmeta.com/asset/forest-city-data-center-info-sheet/","label":"Meta Forest City Data Center info sheet — broke ground 2010, $750M+ invested in North Carolina","publisher":"Meta Data Centers","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://gis.rutherfordcountync.gov/server/rest/services/Addressing/MapServer/2/query?where=PIN=%271558722267%27&f=json","label":"Rutherford County GIS parcel record (PIN 1558722267, 408 Social Circle — ANDALE LLC, Menlo Park mailing address, $176.9M assessed building value = built)","publisher":"Rutherford County GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.datacenterknowledge.com/archives/2014/09/05/study-facebook-data-center-north-carolina-massive-economic-impact","label":"Data Center Knowledge - Study: Facebook Data Center in NC Has Massive Economic Impact (search-summary, not directly fetched)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterknowledge.com/archives/2010/11/11/facebook-plans-north-carolina-data-center","label":"Data Center Knowledge — Facebook Plans North Carolina Data Center (2010)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://rutherfordncedc.com/newsdetail_T9_R80.php","label":"Rutherford County Economic Development Commission — Data Centers Growing in North Carolina","publisher":null,"kind":"subsidy","retrievedAt":"2026-07-25"},{"url":"https://www.wunc.org/environment/2026-04-10/data-centers-north-carolina-developers","label":"North Carolina data center developers are moving hyperscale projects forward at hyperspeed","publisher":"WUNC","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.vpm.org/news/2026-05-12/wfae-wunc-data-center-duke-energy-demand-load-north-carolina","label":"Developers are moving NC data center projects forward at hyperspeed","publisher":"WFAE/WUNC via VPM","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-microsoft-conover-catawba-county-nc","sourceRecordId":"microsoft-conover-catawba-county-nc","name":"Microsoft Conover Data Center","operator":"Microsoft","city":"Conover","county":"Catawba","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.7065,"longitude":-81.2184,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-conover-catawba-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/cloud/article/21437740/microsoft-plans-1-billion-campus-in-north-carolina-cloud-cluster","label":"Microsoft Plans $1 Billion Campus in North Carolina Cloud Cluster","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/","label":"Joint statement on Microsoft data center development in Catawba County","publisher":"Catawba County, NC","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.gofoothills.com/2026/03/02/microsoft-restarts-1b-data-center-in-catawba-county/","label":"Microsoft restarts $1B data center in Catawba County","publisher":"Go Foothills","kind":"press","retrievedAt":"2026-08-15"}]},{"id":"compute-microsoft-hickory-catawba-county-nc","sourceRecordId":"microsoft-hickory-catawba-county-nc","name":"Microsoft Hickory Data Center","operator":"Microsoft","city":"Hickory","county":"Catawba","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.7333,"longitude":-81.3443,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-hickory-catawba-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/cloud/article/21437740/microsoft-plans-1-billion-campus-in-north-carolina-cloud-cluster","label":"Microsoft Plans $1 Billion Campus in North Carolina Cloud Cluster","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.conovernc.gov/m/newsflash/Home/Detail/41","label":"City Releases Joint Press Statement on Microsoft","publisher":"City of Conover, NC","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.gofoothills.com/2026/03/02/microsoft-restarts-1b-data-center-in-catawba-county/","label":"Microsoft restarts $1B data center in Catawba County","publisher":"Go Foothills","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/","label":"Joint Statement on Microsoft Data Center Development in Catawba County","publisher":"Catawba County","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-microsoft-maiden-catawba-county-nc","sourceRecordId":"microsoft-maiden-catawba-county-nc","name":"Microsoft Maiden Data Center","operator":"Microsoft","city":"Maiden","county":"Catawba","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.5845,"longitude":-81.2255,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-maiden-catawba-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/cloud/article/21437740/microsoft-plans-1-billion-campus-in-north-carolina-cloud-cluster","label":"Microsoft Plans $1 Billion Campus in North Carolina Cloud Cluster","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/","label":"Joint statement on Microsoft data center development in Catawba County","publisher":"Catawba County, NC","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://www.gofoothills.com/2026/03/02/microsoft-restarts-1b-data-center-in-catawba-county/","label":"Microsoft restarts $1B data center in Catawba County","publisher":"Go Foothills","kind":"press","retrievedAt":"2026-08-15"}]},{"id":"compute-microsoft-person-county-roxboro-nc","sourceRecordId":"microsoft-person-county-roxboro-nc","name":"Microsoft Person County Mega Park","operator":"Microsoft","city":"Roxboro","county":"Person","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.396,"longitude":-78.9828,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-person-county-roxboro-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://businessnc.com/microsoft-buys-person-county-mega-park-for-27-million/","label":"Microsoft buys Person County Mega Park for $27 million","publisher":"Business North Carolina","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-to-start-permitting-for-1385-acre-data-center-campus-in-north-carolina/","label":"Microsoft to start permitting for 1,385-acre data center campus in North Carolina","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/","label":"WRAL — \"Microsoft hosts meeting on future Person County data center\" (June 2026)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-tract-mooresville-nc","sourceRecordId":"tract-mooresville-nc","name":"Mooresville Campus","operator":"Tract","city":"Mooresville","county":"Iredell","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.58,"longitude":-80.81,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-mooresville-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/site-selection/article/55308975/scaling-up-tracts-master-planned-land-and-infrastructure-approach-to-data-center-development","label":"Scaling up: Tract's master-planned land and infrastructure approach to data center development","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.wbtv.com/2025/08/13/developers-withdraw-plans-data-center-nascar-legends-land-mooresville/","label":"Developers withdraw plans for data center on NASCAR legend's land in Mooresville","publisher":"WBTV","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.govtech.com/products/n-c-data-center-awaits-approval-to-build-on-earnhardt-land","label":"GovTech — N.C. Data Center Awaits Approval to Build on Earnhardt Land","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-natelli-new-hill-nc","sourceRecordId":"natelli-new-hill-nc","name":"Natelli New Hill Digital Campus","operator":"Natelli Holdings","city":"New Hill","county":"Wake","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.6526,"longitude":-79.0033,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/natelli-new-hill-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.blackridgeresearch.com/blog/latest-list-of-biggest-largest-upcoming-data-centers-north-carolina-united-states-us","label":"List of upcoming data centers in North Carolina","publisher":"Blackridge Research","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.wunc.org/environment/2026-03-05/proposed-data-center-new-hill-digital-campus-wake-county-apex","label":"WUNC — \"Proposed data center in Wake County is withdrawing its application\"","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/","label":"WRAL — Residents near proposed Apex data center relieved project is scrapped, says more work needed","publisher":"WRAL","kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.wral.com/news/investigates/north-carolina-data-center-costs-electricity-water-air-quality-questions-february-2026/","label":"The hidden costs of North Carolina's data center boom (New Hill Digital Campus figures)","publisher":"WRAL","kind":"press","retrievedAt":"2026-09-24"}]},{"id":"compute-natelli-vance-county-henderson-nc","sourceRecordId":"natelli-vance-county-henderson-nc","name":"Natelli Vance County Campus (proposed)","operator":"Natelli Investments","city":"Henderson","county":"Vance","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.3085,"longitude":-78.4709,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/natelli-vance-county-henderson-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-north-carolina-county-give-ok-for-rezoning-potential-data-center-incoming/","label":"Officials in North Carolina county give ok for rezoning, potential data center incoming (DCD)","publisher":"DataCenterDynamics","kind":"press","retrievedAt":"2026-07-16"},{"url":"https://www.wral.com/news/local/vance-county-board-approves-rezoning-potential-data-center-development-april-2026/","label":"Vance Co. board approves rezoning for possible data center development despite residents' opposition (WRAL)","publisher":"WRAL","kind":"press","retrievedAt":"2026-07-16"}]},{"id":"compute-pointone-lower-moncure-road-lee-county-nc","sourceRecordId":"pointone-lower-moncure-road-lee-county-nc","name":"PointOne Lower Moncure Road Data Center (Lee County)","operator":"PointOne","city":"Sanford","county":"Lee","address":"4079 Lower Moncure Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.48778,"longitude":-79.17833,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pointone-lower-moncure-road-lee-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sandhills.news/2026/06/08/lee-county-pointone-data-center/","label":"Lee County to review proposal for PointOne Data Center","publisher":"Sandhills News","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://rantnc.com/2026/06/08/data-center-proposed-in-northern-lee-county/","label":"Data center proposed in northern Lee County","publisher":"The Rant (Sanford, NC)","kind":"press","retrievedAt":"2026-08-29"}]},{"id":"compute-powerhouse-charlotte-nc","sourceRecordId":"powerhouse-charlotte-nc","name":"PowerHouse Charlotte Campus","operator":"PowerHouse Data Centers","city":"Charlotte","county":"Mecklenburg","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.2271,"longitude":-80.8431,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-charlotte-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-acquires-120-acres-in-charlotte-north-carolina-for-300mw-campus/","label":"PowerHouse acquires 120 acres in Charlotte, North Carolina, for 300MW campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.yahoo.com/news/charlotte-leaders-concerned-noise-environmental-022915846.html","label":"Charlotte leaders concerned about noise, environmental impact of proposed data center","publisher":null,"kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.bisnow.com/charlotte/news/data-center-community-relations/charlotte-approves-150-day-pause-data-center-development-134903","label":"Charlotte Approves 150-Day Pause On New Data Center Projects (June 8, 2026)","publisher":"Bisnow","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.wfae.org/energy-environment/2026-10-27/charlotte-extends-its-data-center-moratorium-for-11-more-months","label":"Charlotte extends its data center moratorium for 11 months (October 27, 2026)","publisher":"WFAE","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.wfae.org/energy-environment/2026-08-21/halfway-through-the-charlotte-data-center-moratorium-the-city-still-has-questions","label":"Halfway through the Charlotte data center moratorium, the city still has questions (August 21, 2026)","publisher":"WFAE","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-crosland-southeast-matthews-project-accelerate-nc","sourceRecordId":"crosland-southeast-matthews-project-accelerate-nc","name":"Project Accelerate — Matthews (East John Street)","operator":"Crosland Southeast","city":"Matthews","county":"Mecklenburg","address":"1603 East John Street","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.1015,"longitude":-80.7082,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crosland-southeast-matthews-project-accelerate-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/articles/matthews-data-center-project-withdrawn-132947026.html","label":"Matthews data center project withdrawn because of 'public distaste,' mayor says","publisher":"Charlotte Observer (via Yahoo News)","kind":"press","retrievedAt":"2026-08-16"}]},{"id":"compute-project-delta-walnut-cove-nc","sourceRecordId":"project-delta-walnut-cove-nc","name":"Project Delta Data Center – Stokes County","operator":"Undisclosed (rezoning applicant: Engineered Land Solutions)","city":"Walnut Cove","county":"Stokes","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.282,"longitude":-80.1494,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-delta-walnut-cove-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.northcarolinahealthnews.org/2026/03/25/nc-communities-push-back-ai-data-centers-project-delta-lawsuit/","label":"NC communities push back on AI data centers – Project Delta lawsuit","publisher":"NC Health News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.blackridgeresearch.com/project-profiles/walnut-cove-data-center-project-location-map-status-contractors-latest-updates","label":"Walnut Cove Data Center Project Updates 2026","publisher":"Blackridge Research","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.theassemblync.com/news/environment/data-center-rezoning-stokes-county/","label":"Lawsuit challenges Stokes County data-center rezoning","publisher":"The Assembly NC","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://spectrumlocalnews.com/nc/charlotte/news/2026/01/12/stokes-county-proposed-data-center-creates-backlash","label":"Stokes County proposed data center creates backlash","publisher":"Spectrum News NC","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wunc.org/2026-09-15/inside-stokes-countys-latest-vote-on-the-project-delta-data-center","label":"Inside Stokes County's latest vote on the Project Delta data center","publisher":"WUNC","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-quiet-data-centers-enfield-halifax-county-nc","sourceRecordId":"quiet-data-centers-enfield-halifax-county-nc","name":"Project Q — Quiet Data Centers Enfield (Halifax County)","operator":"Quiet Data Centers Halifax Inc.","city":"Enfield","county":"Halifax","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.18,"longitude":-77.66889,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/quiet-data-centers-enfield-halifax-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.rrdailyherald.com/news/local/data-center-proposal-draws-questions-concerns-at-public-hearing/article_adb332bd-e1fd-52f6-b8af-32e9a86d475e.html","label":"Data center proposal draws questions, concerns at public hearing","publisher":"Rocky Mount / Roanoke Rapids Daily Herald","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wral.com/news/local/central-north-carolina-data-center-plans-april-2026/","label":"Data centers on hold: how each county in central NC is handling data center plans (Halifax County, 251-acre site, Quiet Data Centers)","publisher":"WRAL","kind":"press","retrievedAt":"2026-08-29"}]},{"id":"compute-prsm-group-cumberland-county-nc","sourceRecordId":"prsm-group-cumberland-county-nc","name":"PRSM Group Cumberland County AI Data Center (undisclosed industrial park)","operator":"PRSM Group","city":null,"county":"Cumberland","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.0462,"longitude":-78.8394,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prsm-group-cumberland-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/","label":"New Data Center Emerges as Cumberland Considers Moratorium","publisher":"CityView (Fayetteville, NC)","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-radius-dc-raleigh-1-wake-county-nc","sourceRecordId":"radius-dc-raleigh-1-wake-county-nc","name":"Radius DC Raleigh I","operator":"Undisclosed (annexation petitioner: Radius DC Raleigh I)","city":"Raleigh","county":"Wake","address":"3101 Jones Sausage Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.7289,"longitude":-78.5776,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/radius-dc-raleigh-1-wake-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/AX-009-26.pdf","label":"Petition for Annexation into Raleigh City Limits — Radius DC Raleigh I, 3101 Jones Sausage Road (AX-009-26)","publisher":"City of Raleigh Planning and Development","kind":"permit","retrievedAt":"2026-08-15"},{"url":"https://www.wral.com/news/local/proposed-raleigh-data-center-prompts-dozens-to-sign-up-to-comment-august-2026/","label":"Proposed Raleigh data center prompts dozens to sign up to comment","publisher":"WRAL","kind":"press","retrievedAt":"2026-08-15"}]},{"id":"compute-drox-group-rural-hall-forsyth-county-nc","sourceRecordId":"drox-group-rural-hall-forsyth-county-nc","name":"Rural Hall Data Center (The Drox Group)","operator":"The Drox Group","city":"Rural Hall","county":"Forsyth","address":"8084 Glade Street","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.267,"longitude":-80.267,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/drox-group-rural-hall-forsyth-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wfdd.org/politics-government/2026-06-11/planning-board-recommends-denying-rezoning-for-proposed-rural-hall-data-center","label":"Planning board recommends denying rezoning for proposed Rural Hall data center","publisher":"WFDD","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.ruralhallinfo.com/project-iron-spur/","label":"Project Iron Spur — Rezoning Case F-1669","publisher":"Rural Hall Info","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/drox-greensboro-campus","label":"Drox: Greensboro Campus — facility record (8084 Glade St, Rural Hall; 'Project Iron Spur'; 129 acres; four buildings; dedicated Duke Energy substation)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=8084%20Glade%20Street%2C%20Rural%20Hall%2C%20NC","label":"OpenStreetMap Nominatim — 8084 Glade Street, Rural Hall, Forsyth County, NC 27045","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-segra-charlotte-international-airport-drive-nc","sourceRecordId":"segra-charlotte-international-airport-drive-nc","name":"Segra Charlotte Data Center (International Airport Drive)","operator":"Segra","city":"Charlotte","county":"Mecklenburg","address":"3100 International Airport Drive","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.22722,"longitude":-80.84306,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/segra-charlotte-international-airport-drive-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/segra","label":"Segra Data Centers (facility list, incl. Charlotte at 3100 and 3101 International Airport Drive)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-29"}]},{"id":"compute-segra-raleigh-garner-station-data-center-nc","sourceRecordId":"segra-raleigh-garner-station-data-center-nc","name":"Segra Raleigh Data Center (Garner Station Boulevard)","operator":"Segra","city":"Raleigh","county":"Wake","address":"2100 Garner Station Boulevard","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.85417,"longitude":-78.76194,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/segra-raleigh-garner-station-data-center-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/segra","label":"Segra Data Centers (facility list, incl. Raleigh, 2100 Garner Station Boulevard)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://cloudandcolocation.com/colocation-provider/northstate/","label":"NorthState Data Center Locations (Raleigh Data Center, 2100 Garner Station Blvd, opened 2013)","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-29"}]},{"id":"compute-segra-winston-salem-data-center-nc","sourceRecordId":"segra-winston-salem-data-center-nc","name":"Segra Winston-Salem Data Center","operator":"Segra","city":"Winston-Salem","county":"Forsyth","address":"3310 Old Lexington Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.10278,"longitude":-80.26083,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/segra-winston-salem-data-center-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/segra-winston-salem","label":"Segra: Winston-Salem Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://cloudandcolocation.com/colocation-provider/northstate/","label":"NorthState Data Center Locations (Salem Data Center, 3310 Old Lexington Road)","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://inflect.com/building/3310-old-lexington-road-winston-salem/piedmont-triad-regional-council/datacenter/greensboro","label":"Inflect — 3310 Old Lexington Road, Winston-Salem data center listing (power capacity 1.2 MW)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-charter-spectrum-charlotte-national-data-center-nc","sourceRecordId":"charter-spectrum-charlotte-national-data-center-nc","name":"Spectrum Charlotte National Data Center","operator":"Charter Communications","city":"Charlotte","county":"Mecklenburg County","address":"7910 Crescent Executive Drive","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.1440029,"longitude":-80.918404,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/charter-spectrum-charlotte-national-data-center-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/spectrum-charlotte-national-data-center","label":"Spectrum Charlotte National Data Center — facility record (178,000 sq ft data center, 1,600 racks, four 12,000 sq ft data halls, $82M investment)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/charlotte","label":"Charlotte data center market — facility table (Spectrum Charlotte National Data Center, 15.0 MW)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=7910%20Crescent%20Executive%20Drive%2C%20Charlotte%2C%20NC","label":"OpenStreetMap Nominatim — 7910 Crescent Executive Drive, Charlotte, Mecklenburg County, NC 28217","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-t5-charlotte-nc","sourceRecordId":"t5-charlotte-nc","name":"T5@Charlotte","operator":"T5 Data Centers","city":"Kings Mountain","county":"Cleveland","address":"131 Riverside Court","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.2504249,"longitude":-81.395039,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-charlotte-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/north-carolina/charlotte/t5-kingsmountain/","label":"T5 Data Centers facility directory","publisher":"T5 Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/715098032","label":"OpenStreetMap way/715098032","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-terra-nexus-custer-avenue-fayetteville-cumberland-county-nc","sourceRecordId":"terra-nexus-custer-avenue-fayetteville-cumberland-county-nc","name":"Terra Nexus Custer Avenue Data Center (Fayetteville)","operator":"Terra Nexus Ventures","city":"Fayetteville","county":"Cumberland","address":"Custer Avenue","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.085,"longitude":-78.97722,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/terra-nexus-custer-avenue-fayetteville-cumberland-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/","label":"Data Centers Are Eyeing Fayetteville. Here's How to Learn More","publisher":"CityView (Fayetteville, NC)","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/","label":"Data Center Proposal Emerges as County Holds Hearing on Moratorium","publisher":"CityView (Fayetteville, NC)","kind":"press","retrievedAt":"2026-08-29"}]},{"id":"compute-terra-nexus-rockingham-richmond-county-nc","sourceRecordId":"terra-nexus-rockingham-richmond-county-nc","name":"Terra Nexus Rockingham Data Center (Old Cheraw Highway)","operator":"Terra Nexus Land Fund I, LLC","city":"Rockingham","county":"Richmond","address":"316 Old Cheraw Highway","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":34.9151,"longitude":-79.7948,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/terra-nexus-rockingham-richmond-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yourdailyjournal.com/news/265529/rockingham-council-to-hold-public-hearing-on-data-center-rezoning","label":"Rockingham Council to hold public hearing on data center rezoning","publisher":"Richmond County Daily Journal","kind":"permit","retrievedAt":"2026-08-15"},{"url":"https://wkml.com/2026/08/13/rockingham-planning-board-backs-1-2b-data-center-rezoning-as-residents-raise-concerns/","label":"Rockingham Planning Board Backs $1.2B Data Center Rezoning as Residents Raise Concerns","publisher":"WKML 95.7","kind":"press","retrievedAt":"2026-08-15"},{"url":"https://wsoctv.com/news/local/rockingham-approves-rezoning-request-data-center/WRPPAYICBVE2NNG7B64U5YQZXU","label":"Rockingham approves rezoning request for data center","publisher":"WSOC-TV","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-tierpoint-charlotte-center-park-nc","sourceRecordId":"tierpoint-charlotte-center-park-nc","name":"TierPoint Charlotte - Center Park","operator":"TierPoint","city":"Charlotte","county":"Mecklenburg","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.1731955,"longitude":-80.928121,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-charlotte-center-park-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/charlotte-center-park/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/838817907","label":"OpenStreetMap way/838817907","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-tierpoint-charlotte-north-myers-nc","sourceRecordId":"tierpoint-charlotte-north-myers-nc","name":"TierPoint Charlotte - North Myers","operator":"TierPoint","city":"Charlotte","county":"Mecklenburg County","address":"125 North Myers Street","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.221531,"longitude":-80.8358072,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-charlotte-north-myers-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","label":"TierPoint North Carolina data centers — operator location list (Charlotte North Myers, 125 North Myers Street)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=125%20North%20Myers%20Street%2C%20Charlotte%2C%20NC%2028202","label":"OpenStreetMap Nominatim — 125 North Myers Street, Charlotte, Mecklenburg County, NC 28202","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-tierpoint-raleigh-departure-drive-nc","sourceRecordId":"tierpoint-raleigh-departure-drive-nc","name":"TierPoint Raleigh (Departure Drive)","operator":"TierPoint","city":"Raleigh","county":"Wake County","address":"5301 Departure Drive","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.8543896,"longitude":-78.595815,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-raleigh-departure-drive-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","label":"TierPoint North Carolina data centers — operator location list (Raleigh, 5301 Departure Drive)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=5301%20Departure%20Drive%2C%20Raleigh%2C%20NC%2027616","label":"OpenStreetMap Nominatim — 5301 Departure Drive, Raleigh, Wake County, NC 27616","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-tierpoint-raleigh-rtp-durham-nc","sourceRecordId":"tierpoint-raleigh-rtp-durham-nc","name":"TierPoint Raleigh - RTP","operator":"TierPoint","city":"Durham","county":"Durham County","address":"99 T.W. Alexander Drive","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.9248595,"longitude":-78.852029,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-raleigh-rtp-durham-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","label":"TierPoint North Carolina data centers — operator location list (Raleigh-RTP, 99 TW Alexander Drive, Durham, NC 27709)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/data-center/tierpoint-raleigh-rtp","label":"TierPoint Raleigh-RTP — facility record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=T.W.%20Alexander%20Drive%2C%20Durham%20County%2C%20North%20Carolina","label":"OpenStreetMap Nominatim — T.W. Alexander Drive, Research Triangle Park, Durham County, NC","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"}]},{"id":"compute-eco-tip-west-moncure-chatham-county-nc","sourceRecordId":"eco-tip-west-moncure-chatham-county-nc","name":"Triangle Innovation Point West Data Center Campus","operator":"Eco TIP West LLC","city":"Moncure","county":"Chatham County","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":35.6224994,"longitude":-79.0783143,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eco-tip-west-moncure-chatham-county-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://chathamjournal.com/2026/04/25/developer-sues-chatham-county-the-data-center-pause-that-may-define-ncs-ai-era/","label":"Developer sues Chatham County: the data center pause that may define NC's AI era","publisher":"Chatham Journal Newspaper","kind":"press","retrievedAt":"2026-09-24"},{"url":"https://gpuleaseindex.com/readiness/nc-data-center-moratoriums","label":"North Carolina Data Center Moratorium Map & Tracker — Chatham County entry (Eco TIP West, 750 MW)","publisher":"GPU Lease Index","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://nominatim.openstreetmap.org/search?format=jsonv2&q=Moncure%2C%20Chatham%20County%2C%20North%20Carolina","label":"OpenStreetMap Nominatim — Moncure, Chatham County, NC","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-24"},{"url":"https://www.carolinajournal.com/wp-content/uploads/2026/09/chatham-data-center-091726.pdf","label":"Eco TIP West LLC v. Chatham County, 26CV000456-180: Order Granting Plaintiff's Motion for Summary Judgment","publisher":"Chatham County Superior Court (via Carolina Journal)","kind":"filing","retrievedAt":"2026-10-15"},{"url":"https://nsjonline.com/?p=104974","label":"Chatham County faces lawsuit over data center moratorium","publisher":"North State Journal","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-whitefiber-nc1-madison-nc","sourceRecordId":"whitefiber-nc1-madison-nc","name":"WhiteFiber NC-1 AI Data Center Campus","operator":"WhiteFiber (Bit Digital)","city":"Madison","county":"Rockingham","address":null,"state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.3801,"longitude":-79.9692,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/whitefiber-nc1-madison-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/nscale-agrees-865m-deal-for-40mw-of-space-at-whitefiber-data-center-in-north-carolina/","label":"Nscale agrees $865m deal for 40MW of space at WhiteFiber data center in North Carolina","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.whitefiber.com/blog/nc-1-data-center","label":"Announcing NC-1: New Flagship Data Center in North Carolina","publisher":"WhiteFiber","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://bit-digital.com/press-releases/whitefiber-inc-bit-digitals-ai-unit-acquires-1000000-square-foot-north-carolina-industrial-property-to-support-up-to-200-mw-hpc-data-center-campus/","label":"WhiteFiber (Bit Digital's AI unit) acquires North Carolina property; confirmed qualifying data center","publisher":"Bit Digital","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.wfdd.org/2025-06-03/rockingham-county-set-to-welcome-a-1-billion-ai-data-center","label":"Rockingham County set to welcome a $1 billion AI data center","publisher":"WFDD","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.prnewswire.com/news-releases/whitefiber-inc-reports-second-quarter-2026-results-302848971.html","label":"WhiteFiber, Inc. Reports Second Quarter 2026 Results","publisher":"WhiteFiber, Inc. via PR Newswire","kind":"filing","retrievedAt":"2026-08-15"}]},{"id":"compute-whitefiber-nc2-nc3-yadkinville-nc","sourceRecordId":"whitefiber-nc2-nc3-yadkinville-nc","name":"WhiteFiber NC-2 / NC-3 Data Center Campuses (Yadkinville)","operator":"WhiteFiber (Enovum Data Centers Corp.)","city":"Yadkinville","county":"Yadkin","address":"1032 Unifi Industrial Road","state":"NC","stateName":"North Carolina","jurisdictionType":"state","latitude":36.1346,"longitude":-80.6595,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/whitefiber-nc2-nc3-yadkinville-nc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://finviz.com/news/382722/whitefiber-expands-north-carolina-data-center-footprint-with-agreement-to-acquire-two-new-development-sites","label":"WhiteFiber Expands North Carolina Data Center Footprint with Agreement to Acquire Two New Development Sites","publisher":"WhiteFiber (PR Newswire via Finviz)","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.wfdd.org/politics-government/2026-08-19/whitefiber-yadkin-county-data-center-campuses","label":"WhiteFiber plans Yadkin County data center campuses","publisher":"WFDD","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.yadkinripple.com/news/moratorium-approved-for-yadkin-county-as-potential-yadkinville-data-center-project-announced/article_485d48fb-c61b-4167-b885-3d469e9a6bbe.html","label":"Moratorium approved for Yadkin County as potential Yadkinville data center project announced","publisher":"Yadkin Ripple","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://baxtel.com/data-center/whitefiber-nc-2","label":"WhiteFiber: NC-2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-applied-digital-polaris-forge-1-ellendale-nd","sourceRecordId":"applied-digital-polaris-forge-1-ellendale-nd","name":"Applied Digital Polaris Forge 1","operator":"Applied Digital Corporation","city":"Ellendale","county":"Dickey","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":46.003,"longitude":-98.509,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-1-ellendale-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with","label":"Applied Digital Announces 250MW AI Data Center Lease With CoreWeave in North Dakota","publisher":"Applied Digital Corporation","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-completes-first-data-center-building-at-north-dakota-campus/","label":"Applied Digital completes first data center building at North Dakota campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://northernsentry.com/2024/12/19/a-shot-in-the-arm-for-ellendale/","label":"A shot in the arm for Ellendale","publisher":"Northern Sentry","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.inforum.com/news/north-dakota/applied-digital-plans-to-expand-in-ellendale-nd","label":"InForum — \"Applied Digital plans to expand in Ellendale, ND\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://ir.applieddigital.com/_assets/_f6377ac165e571402492e7df82cea1ee/appliedblockchaininc/news/2026-07-01_Applied_Digital_Delivers_Second_Building_at_157.pdf","label":"Applied Digital Delivers Second Building at Polaris Forge 1","publisher":"Applied Digital Corporation (Investor Relations)","kind":"filing","retrievedAt":"2026-10-10"},{"url":"https://datacenterdynamics.com/en/news/applied-digital-adds-75mw-of-capacity-at-ellendale-data-center-campus-in-north-dakota","label":"Applied Digital adds 75MW of capacity at Ellendale data center campus in North Dakota","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-10-10"}]},{"id":"compute-applied-digital-polaris-forge-2-harwood-nd","sourceRecordId":"applied-digital-polaris-forge-2-harwood-nd","name":"Applied Digital Polaris Forge 2","operator":"Applied Digital Corporation","city":"Harwood","county":"Cass","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":47.02,"longitude":-97.025,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-2-harwood-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge","label":"Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus","publisher":"Applied Digital Corporation","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.minnkota.com/minnkota-website/our-press/data-center-faqs","label":"Minnkota Power Cooperative: Data Center FAQs (Polaris Forge 2)","publisher":"Minnkota Power Cooperative","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.inforum.com/news/north-dakota/data-center-developer-looks-west-backs-power-upgrades-near-fargo","label":"Data center developer looks west, backs power upgrades near Fargo","publisher":"InForum","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.valleynewslive.com/2026/04/30/power-project-ai-data-center-gets-north-dakota-agency-approval/","label":"Power project for AI data center gets North Dakota agency approval","publisher":"Valley News Live","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.valleynewslive.com/2026/03/10/applied-digital-closes-215b-deal-build-out-harwood-ai-campus/","label":"Applied Digital closes $2.15B deal to build out Harwood AI campus","publisher":"Valley News Live","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with","label":"Applied Digital Announces $5 Billion AI Factory Lease with U.S. Based Investment Grade Hyperscaler at Polaris Forge 2 ND Campus","publisher":"Applied Digital Corporation","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-applied-digital-polaris-forge-3-oliver-nd","sourceRecordId":"applied-digital-polaris-forge-3-oliver-nd","name":"Applied Digital Polaris Forge 3","operator":"Applied Digital Corporation","city":"Hanover","county":"Oliver","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":47.111,"longitude":-101.426,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-3-oliver-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.valleynewslive.com/2026/07/13/applied-digital-expands-north-dakota-eyes-oliver-county-third-data-center/","label":"Applied Digital expands North Dakota, eyes Oliver County third data center","publisher":"Valley News Live","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/","label":"Applied Digital submits rezoning application for data center in Oliver County","publisher":"KFYR","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.prnewswire.com/news-releases/montana-dakota-utilities-announces-electric-service-agreement-with-applied-digital-for-proposed-ai-factory-302806791.html","label":"Montana-Dakota Utilities Announces Electric Service Agreement with Applied Digital for Proposed AI Factory","publisher":"MDU Resources via PR Newswire","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000057/apldq127earningsrelease.htm","label":"Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K Ex. 99.1)","publisher":"Applied Digital Corporation (SEC EDGAR)","kind":"filing","retrievedAt":"2026-10-26"},{"url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000057/apldq127earningsrelease.htm","label":"Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K Ex. 99.1)","publisher":"Applied Digital Corporation (SEC EDGAR)","kind":"filing","retrievedAt":"2026-10-26"},{"url":"https://www.nextdcx.com/blog/applied-digital-north-dakota-oliver-county-data-center","label":"Applied Digital Breaks Ground on Polaris Forge 3, a ~300MW HPC Campus in Oliver County, North Dakota","publisher":"NextDC","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-rainbow-energy-coal-creek-data-center-park-nd","sourceRecordId":"rainbow-energy-coal-creek-data-center-park-nd","name":"Coal Creek Data Center Park (Rainbow Energy)","operator":"Rainbow Energy Center","city":"Underwood","county":"McLean","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":47.377,"longitude":-101.157,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/rainbow-energy-coal-creek-data-center-park-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.inforum.com/news/north-dakota/coal-creek-owner-plans-to-power-north-dakota-data-center-park","label":"Coal Creek owner plans to power North Dakota data center park","publisher":"InForum / Bismarck Tribune","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.powermag.com/north-dakotas-largest-coal-plant-could-power-data-centers-industrial-complex/","label":"North Dakota's largest coal plant could power data centers, industrial complex","publisher":"POWER Magazine","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-geronimo-harmony-energy-park-cass-county-nd","sourceRecordId":"geronimo-harmony-energy-park-cass-county-nd","name":"Harmony Energy Park (Geronimo Power data center)","operator":"Geronimo Power","city":"Mapleton","county":"Cass","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":46.8919,"longitude":-97.0498,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/geronimo-harmony-energy-park-cass-county-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://kfgo.com/2026/09/30/2nd-fargo-area-data-center-would-use-double-the-power-of-harwood-site/","label":"2nd Fargo-area data center would use double the power of Harwood site (North Dakota Monitor via KFGO)","publisher":"KFGO / North Dakota Monitor","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.valleynewslive.com/2026/10/07/minnkota-plans-gas-fired-power-plant-cass-county-adding-energy-development/","label":"Minnkota plans gas-fired power plant in Cass County, adding to energy development","publisher":"Valley News Live","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.valleynewslive.com/2026/10/14/cass-county-residents-learn-more-about-proposed-harmony-energy-park-data-center/","label":"Cass County residents learn more about proposed Harmony Energy Park data center","publisher":"Valley News Live","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://kfgo.com/2026/10/22/geronimo-power-ceo-offers-six-month-data-center-pause-ahead-of-disputed-harmony-township-moratorium-vote/","label":"Geronimo Power CEO offers six-month data center pause ahead of disputed Harmony Township moratorium vote","publisher":"KFGO","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-jde-holdings-towner-nd","sourceRecordId":"jde-holdings-towner-nd","name":"JDE Holdings Towner Data Center","operator":"JDE Holdings","city":"Towner","county":"McHenry","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":48.3458,"longitude":-100.4057,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/jde-holdings-towner-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.inforum.com/news/north-dakota/data-centers-are-sprouting-across-north-dakota-how-many-are-there-and-where-will-the-next-ones-be-planted","label":"Data centers are sprouting across North Dakota. How many are there and where will the next ones be planted?","publisher":"InForum / The Forum","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-tachyon9-nixxy-nakota-ai-data-campus-williams-county-nd","sourceRecordId":"tachyon9-nixxy-nakota-ai-data-campus-williams-county-nd","name":"Nakota AI Data Campus","operator":"Tachyon9 Corp. / Nixxy Inc.","city":null,"county":"Williams","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":48.34,"longitude":-103.48,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tachyon9-nixxy-nakota-ai-data-campus-williams-county-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.pgjonline.com/news/2026/june/north-dakota-ai-campus-plans-1-gw-of-gas-fired-power","label":"North Dakota AI campus plans 1 GW of gas-fired power","publisher":"Pipeline & Gas Journal","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-critical-data-house-fighting-pike-williston-nd","sourceRecordId":"critical-data-house-fighting-pike-williston-nd","name":"Project Fighting Pike (Critical Data House, Northstar Center)","operator":"Critical Data House, LLC","city":"Williston","county":"Williams","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":48.147,"longitude":-103.618,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/critical-data-house-fighting-pike-williston-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kfyrtv.com/2024/11/13/developer-showing-early-interest-building-data-center-north-williston/","label":"Developer showing early interest in building data center north of Williston","publisher":"KFYR-TV","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.kfyrtv.com/2025/03/26/williston-commissioners-approve-plans-data-center-north-town/","label":"Williston commissioners approve plans for a data center north of town","publisher":"KFYR-TV","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.willistonherald.com/news/local/williston-protesters-demand-more-transparency-regulation-surrounding-data-centers","label":"Williston protesters demand more transparency, regulation surrounding data centers","publisher":"Williston Herald","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.valleynewslive.com/2026/08/27/where-north-dakotas-data-centers-stand-26-facilities-tracked-statewide/","label":"Where North Dakota's data centers stand: 26 facilities tracked statewide","publisher":"Valley News Live","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-teton-digital-project-trinity-tioga-nd","sourceRecordId":"teton-digital-project-trinity-tioga-nd","name":"Project Trinity (Teton Digital)","operator":"Teton Digital","city":"Tioga","county":"Williams","address":null,"state":"ND","stateName":"North Dakota","jurisdictionType":"state","latitude":48.28,"longitude":-102.9424,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/teton-digital-project-trinity-tioga-nd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kfyrtv.com/2025/02/18/williams-county-commissioners-give-go-ahead-another-data-center-company-apply-conditional-use-permit","label":"Williams County Commissioners give go-ahead for another data center company to apply for a conditional use permit","publisher":"KFYR-TV","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-1623-farnam-omaha-ne","sourceRecordId":"1623-farnam-omaha-ne","name":"1623 Farnam","operator":"1623 Farnam","city":"Omaha","county":"Douglas","address":"1623 Farnam Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.2578,"longitude":-95.9375,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/1623-farnam-omaha-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/","label":"1623 Farnam adds 1.5MW to Omaha data center in Nebraska — nine-story facility, 'around 8MW of capacity across 75,000 sq ft'; final two data halls and 280 racks; $10M fifth-floor expansion 2019, floors six-nine added 2021; OmahaIX and some 60 carriers","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.1623farnam.com/omaha-edge-data-center/","label":"1623 Farnam Omaha Edge Data Center — 1623 Farnam Street, Omaha NE 68102; access to 60+ carriers and seven top IP transit providers; Omaha IX; planning a future OMA2 campus expansion for AI and edge infrastructure growth","publisher":"1623 Farnam","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-binary-net-vault-lincoln-ne","sourceRecordId":"binary-net-vault-lincoln-ne","name":"Binary Net The Vault Data Center","operator":"Binary Net","city":"Lincoln","county":"Lancaster","address":"206 S 13th Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.81209,"longitude":-96.70226,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/binary-net-vault-lincoln-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.binary.net/lincolndatacenters/","label":"Binary Net — Lincoln Data Centers","publisher":"Binary Net","kind":"other","retrievedAt":"2026-09-04"},{"url":"https://dcmap.us/states/nebraska/","label":"Nebraska Data Center Map — Binary.net Lincoln","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-04"}]},{"id":"compute-clop-omaha-papillion-ne","sourceRecordId":"clop-omaha-papillion-ne","name":"CLOP Omaha NE Data Center (5 MW)","operator":"CLOP Omaha NE, LLC","city":"Papillion","county":"Sarpy","address":"11684 S 158th Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.1783633,"longitude":-96.1621103,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/clop-omaha-papillion-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dwee.nebraska.gov/node/5401","label":"Public notice: CLOP Omaha NE, LLC air construction permit (FID 122487)","publisher":"Nebraska Department of Water, Energy, and Environment","kind":"permit","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?street=S+158th+St&county=Sarpy&state=Nebraska&format=json&limit=8","label":"OpenStreetMap: South 158th Street, Sarpy County (68138)","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-coffee-grounds-data-arevia-malcolm-lancaster-ne","sourceRecordId":"coffee-grounds-data-arevia-malcolm-lancaster-ne","name":"Coffee Grounds Data Site (northwest Lincoln, east of Malcolm)","operator":"Coffee Grounds Data LLC (Arevia Power)","city":"Malcolm","county":"Lancaster","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.88,"longitude":-96.8,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coffee-grounds-data-arevia-malcolm-lancaster-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nebraskapublicmedia.org/en/news/news-articles/another-data-center-developer-is-eyeing-land-just-outside-of-lincoln/","label":"Another data center developer is eyeing land just outside of Lincoln","publisher":"Nebraska Public Media","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://klin.com/2026/09/25/developer-eyes-more-than-560-acres-northwest-of-lincoln-for-possible-data-center/","label":"Developer Eyes More Than 560 Acres Northwest of Lincoln for Possible Data Center","publisher":"KLIN","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.yahoo.com/news/us/articles/nebraska-county-weighs-rules-companies-230000852.html","label":"Nebraska county weighs new rules as companies eye rural land for large data centers","publisher":"Yahoo News (syndicated)","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-crusoe-monolith-hallam-lancaster-ne","sourceRecordId":"crusoe-monolith-hallam-lancaster-ne","name":"Crusoe Hallam Data Center (Monolith Olive Creek campus)","operator":"Crusoe","city":"Hallam","county":"Lancaster","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.5485515,"longitude":-96.782795,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/crusoe-monolith-hallam-lancaster-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.1011now.com/2026/07/10/monolith-seeks-build-data-center-hallam-application-be-submitted-by-mid-july/","label":"Monolith seeks to build data center in Hallam, application to be submitted by mid-July","publisher":"1011 NOW (KOLN)","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.wowt.com/2026/07/24/hallam-residents-question-monolith-data-center-proposal-packed-town-hall/","label":"Hallam residents question Monolith data center proposal at packed town hall","publisher":"WOWT","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.wowt.com/2026/10/06/hallam-village-board-approves-zoning-rights-data-center/","label":"Hallam Village Board approves zoning rights for data center","publisher":"WOWT / KOLN","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=Monolith+Olive+Creek,+Hallam,+Nebraska&format=json&limit=5","label":"OpenStreetMap: Monolith Olive Creek 1, Hallam","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-10-12"},{"url":"https://nebraskapublicmedia.org/en/news/news-articles/hallam-village-board-unanimously-approves-monolith-data-center/","label":"Hallam Village Board unanimously approves Monolith data center","publisher":"Nebraska Public Media","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-fidelity-papillion-data-center-ne","sourceRecordId":"fidelity-papillion-data-center-ne","name":"Fidelity Investments Papillion Data Center (Project Photon)","operator":"Fidelity Investments","city":"Papillion","county":"Sarpy","address":"11050 Cornhusker Rd","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.1655405,"longitude":-96.083617,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fidelity-papillion-data-center-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/investing/fidelity-announces-200-million-data-center-in-nebraska","label":"Fidelity Announces $200 Million Data Center in Nebraska","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.kadoa.com/datacenter/state/nebraska","label":"US Datacenter Tracker — Nebraska (FIDELITY INVESTMENTS DATA CTR, 11050 Cornhusker Rd, Papillion, operational)","publisher":"Kadoa","kind":"other","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=Fidelity,+Papillion,+Nebraska&format=json&limit=10","label":"OpenStreetMap: Fidelity building, Cornhusker Road, Papillion","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-fnts-omaha-ne","sourceRecordId":"fnts-omaha-ne","name":"First National Technology Solutions Omaha Data Center","operator":"First National Technology Solutions","city":"Omaha","county":"Douglas","address":"1620 Dodge Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.2614219,"longitude":-95.9364982,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fnts-omaha-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/first-national-technology-solutions","label":"First National Technology Solutions Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-04"},{"url":"https://www.openstreetmap.org/api/0.6/way/256728809.json","label":"OpenStreetMap way 256728809 — First National Technical Center, telecom=data_center, operator=First National of Nebraska","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-04"}]},{"id":"compute-google-lincoln-ne","sourceRecordId":"google-lincoln-ne","name":"Google Lincoln Data Center","operator":"Google","city":"Lincoln","county":"Lancaster","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.8968,"longitude":-96.6437,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-lincoln-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/nebraska/","label":"Nebraska, USA -- Google Data Center Location","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.klkntv.com/google-shares-update-on-lincoln-data-center/","label":"Google shares update on Lincoln data center","publisher":"KLKN-TV (Lincoln)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.1011now.com/2026/06/04/construction-begins-10-million-wastewater-line-transport-cooling-water-lincoln-data-center-recovery-site/","label":"Construction begins on $10 million wastewater line to transport cooling water from Lincoln data center to recovery site","publisher":"1011 NOW (KOLN)","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://www.1011now.com/2026/09/30/more-questions-than-answers-about-lincolns-google-data-center-water-electricity-usage/","label":"Improper redaction reveals Lincoln's Google Data Center water and electricity usage (More questions than answers about Lincoln's Google data center water, electricity usage)","publisher":"1011 NOW (KOLN)","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.industrialinfo.com/iirenergy/industry-news/article/nebraska-to-get-new-data-centers-power-capacity--323234","label":"Nebraska to Get New Data Centers, Power Capacity","publisher":"Industrial Info Resources","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://baxtel.com/news/work-begins-on-a-data-facility-in-lincoln-nebraska","label":"Work begins on a data facility in Lincoln, Nebraska","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-google-nebraska-ai-campus-proposed","sourceRecordId":"google-nebraska-ai-campus-proposed","name":"Google Nebraska AI Campus (proposed)","operator":"Google","city":null,"county":"Otoe","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.474,"longitude":-96.371,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-nebraska-ai-campus-proposed","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://flatwaterfreepress.org/google-proposes-nebraska-data-center-requiring-more-power-than-all-of-lincoln/","label":"Google proposes Nebraska data center requiring more power than all of Lincoln","publisher":"Flatwater Free Press","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://grist.org/accountability/google-data-center-carbon-capture-nebraska/","label":"Google's data-center boom comes to Nebraska","publisher":"Grist","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://nebraskapublicmedia.org/en/news/news-articles/gage-county-planning-and-zoning-commission-approves-18-month-moratorium-on-data-centers/","label":"Gage County Planning and Zoning Commission recommends 18-month moratorium on data centers","publisher":"Nebraska Public Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.1011now.com/2026/05/20/otoe-county-commissioners-pass-moratorium-data-center-or-not/","label":"Otoe County commissioners pass moratorium, data center or not","publisher":"1011 Now (KOLN/KGIN)","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.1011now.com/2026/03/13/google-proposes-nebraska-data-center-requiring-more-power-than-all-lincoln/","label":"Google proposes Nebraska data center requiring more power than all of Lincoln","publisher":"1011 NOW (KOLN)","kind":"press","retrievedAt":"2026-09-16"}]},{"id":"compute-google-omaha-ne","sourceRecordId":"google-omaha-ne","name":"Google Omaha Data Center","operator":"Google","city":"Omaha","county":"Douglas","address":"8425 North 114th Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.334,"longitude":-96.145,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-omaha-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/nebraska/","label":"Nebraska, USA -- Google Data Center Location","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.idc-a.org/news/Google-Has-Filed-Plans-to-Expand-Its-Data-Center-Site-in-Omaha-Nebraska","label":"Google Has Filed Plans to Expand Its Data Center Site in Omaha Nebraska","publisher":"International Data Center Authority (IDC-A)","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://dwee.nebraska.gov/news-events/public-notices/westwood-solutions-llc-0","label":"Public notice: Westwood Solutions, LLC air construction permit (FID 117197) — data processing center, 8425 North 114th Street, Omaha","publisher":"Nebraska Department of Water, Energy, and Environment","kind":"permit","retrievedAt":"2026-10-12"},{"url":"https://patch.com/nebraska/omaha/google-seeks-stretch-farther-northwest-omaha","label":"Google seeks to stretch farther in northwest Omaha (Westwood Solutions LLC representing Google)","publisher":"Patch","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-google-papillion-ne","sourceRecordId":"google-papillion-ne","name":"Google Papillion Data Center","operator":"Google","city":"Papillion","county":"Sarpy","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.13257,"longitude":-96.143728,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-papillion-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/nebraska/","label":"Google Nebraska — official location page: lists Papillion (2019), Omaha, and Lincoln as Google Nebraska data centers","publisher":"Google","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://blog.google/inside-google/infrastructure/our-work-to-build-a-more-sustainable-future-in-nebraska/","label":"Our work to build a more sustainable future in Nebraska (Google blog)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://omaha.com/news/nation-world/business/google-papillion-is-a-go-for-600-million-data-center-sarpy-countys-8th/article_71d55664-45c4-57f9-84b8-7b0c99938bfc.html","label":"Omaha World-Herald — \"Google: Papillion is a go for $600 million data center — Sarpy County's 8th\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.1011now.com/content/news/Groundbreaking-on-Google-data-center-in-Papillion-562163691.html","label":"Groundbreaking launches Google data center in Papillion","publisher":"1011 NOW (KOLN/KGIN)","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.1011now.com/2026/09/30/more-questions-than-answers-about-lincolns-google-data-center-water-electricity-usage/","label":"Improper redaction reveals Lincoln's Google Data Center water and electricity usage (More questions than answers about Lincoln's Google data center water, electricity usage)","publisher":"1011 NOW (KOLN)","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-h5-la-vista-ne","sourceRecordId":"h5-la-vista-ne","name":"H5 Data Centers Omaha (La Vista)","operator":"H5 Data Centers","city":"La Vista","county":"Sarpy","address":"10917 Harry Watanabe Pkwy","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.166,"longitude":-96.075,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-la-vista-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/omaha-data-center.html","label":"H5 Data Centers Omaha — 10917 Harry Watanabe Pkwy, La Vista NE; 234,500 SF on 32 acres; 17.3 MW N+1 critical capacity; Tier III design; N+1 chillers and cooling towers; up to 7 on-net carriers","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-10-30"},{"url":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/","label":"DCD (archived) — names H5 among the operators active in the Omaha data center market alongside TierPoint, LightEdge, Lumen, Cogent and Google","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-lightedge-papillion-ne","sourceRecordId":"lightedge-papillion-ne","name":"LightEdge Omaha Data Center","operator":"LightEdge","city":"Papillion","county":"Sarpy","address":"1148 American Parkway","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.1544,"longitude":-96.0428,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lightedge-papillion-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lightedge.com/data-centers/omaha-data-center/","label":"LightEdge Omaha, NE Colocation Data Center — '1148 American Parkway, Papillion, Nebraska 68046'","publisher":"LightEdge","kind":"other","retrievedAt":"2026-08-14"},{"url":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/","label":"DCD (archived) — 'Other operators in Omaha include H5, TierPoint, LightEdge, Lumen, Cogent, and Google'","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-limitless-north-platte-hershey-lincoln-ne","sourceRecordId":"limitless-north-platte-hershey-lincoln-ne","name":"Limitless North Platte Data Center (near Hershey)","operator":"Limitless North Platte LLC","city":"Hershey","county":"Lincoln","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.1192566,"longitude":-101.0024485,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/limitless-north-platte-hershey-lincoln-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://morethanjustparks.com/data-center-tracker/limitless-north-platte-data-center-hershey-ne--5b41804f-bc44-43fe-86b0-ba9eeb8bfb15","label":"Limitless North Platte Data Center (Hershey), NE: tracker listing","publisher":"More Than Just Parks Data Center Tracker","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-meta-sarpy-springfield-ne","sourceRecordId":"meta-sarpy-springfield-ne","name":"Meta Sarpy Campus (Springfield expansion)","operator":"Meta","city":"Springfield","county":"Sarpy","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.052,"longitude":-96.148,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-sarpy-springfield-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/meta-to-expand-sarpy-data-center-in-nebraska/","label":"Meta to expand Sarpy data center in Nebraska","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacentermap.com/usa/nebraska/papillion/meta-sarpy-data-center/","label":"Meta Sarpy Campus Data Center in Papillion","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://datacenters.atmeta.com/asset/sarpy-data-center-info-sheet/","label":"Meta's Sarpy Data Center (site info sheet)","publisher":"Meta","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://flatwaterfreepress.org/facebook-google-data-centers-among-newest-additions-to-urbanizing-nebraska-farmland/","label":"Facebook, Google data centers among latest developments transforming Nebraska farmland","publisher":null,"kind":"press","retrievedAt":"2026-09-10"},{"url":"https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf","label":"Meta 2025 Environmental Data Index: 3.1 Water Withdrawal by Facility","publisher":"Meta","kind":"filing","retrievedAt":"2026-10-30"}]},{"id":"compute-nebraska-colocation-centers-lincoln-ne","sourceRecordId":"nebraska-colocation-centers-lincoln-ne","name":"Nebraska Colocation Centers — Lincoln (Sharp Building)","operator":"Nebraska Colocation Centers","city":"Lincoln","county":"Lancaster","address":"206 S 13th St","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.8120852,"longitude":-96.7022622,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nebraska-colocation-centers-lincoln-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://strictly-business.com/cover-story/nebraska-colocation-centers-defining-moment-technology-lincoln-nebraska/","label":"Nebraska Colocation Centers — A Defining Moment in Technology for Lincoln, Nebraska","publisher":"Strictly Business Magazine","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://nominatim.openstreetmap.org/search?q=206+S+13th+St%2C+Lincoln%2C+NE+68508&format=json&limit=1","label":"OpenStreetMap geocode — Sharp Building, 206 S 13th St, Lincoln NE 68508","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-09-16"}]},{"id":"compute-starwood-project-horizon-kearney-ne","sourceRecordId":"starwood-project-horizon-kearney-ne","name":"Project Horizon (Tech oNE Crossing)","operator":"Starwood Digital Ventures","city":"Kearney","county":"Buffalo","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.728341,"longitude":-99.045806,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/starwood-project-horizon-kearney-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ksnblocal4.com/2026/08/21/kearney-planning-commission-recommends-approval-proposed-data-center/","label":"Kearney Planning Commission recommends approval of proposed data center","publisher":"KSNB Local4","kind":"press","retrievedAt":"2026-10-12"},{"url":"http://www.centralnebraskatoday.com/2026/08/21/421081/","label":"Project Horizon data center CUP recommended by Kearney Planning Commission (368 MW, three phases)","publisher":"Central Nebraska Today","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://central-ncn.producer.immergo.tv/story/363530628/kearney-city-council-unanimously-approves-project-horizon-data-center","label":"Kearney City Council unanimously approves Project Horizon data center","publisher":"KSNB / Gray Media","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.wowt.com/2026/09/08/kearney-poised-go-all-data-centers-even-many-nebraska-towns-throttle-back/","label":"Kearney poised to go all in on data centers even as many Nebraska towns throttle back","publisher":"WOWT","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-sagebrush-hallam-hyperscale-campus-lancaster-ne","sourceRecordId":"sagebrush-hallam-hyperscale-campus-lancaster-ne","name":"Sagebrush Hallam Hyperscale Campus (proposed)","operator":"Sagebrush Infrastructure Partners","city":"Hallam","county":"Lancaster","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.545,"longitude":-96.7992,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sagebrush-hallam-hyperscale-campus-lancaster-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/","label":"Data center developers eyeing land near Hallam","publisher":"1011 NOW (KOLN)","kind":"press","retrievedAt":"2026-09-16"},{"url":"https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/","label":"Hallam landowners face stark choice on data center","publisher":"Nebraska Public Media","kind":"press","retrievedAt":"2026-09-04"}]},{"id":"compute-scott-data-center-omaha-ne","sourceRecordId":"scott-data-center-omaha-ne","name":"Scott Data Center","operator":"Scott Data","city":"Omaha","county":"Douglas","address":"6825 Pine Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.2406,"longitude":-96.0093,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/scott-data-center-omaha-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.scottdatacenter.com/data-center/","label":"Scott Data — Colocation Built for Confidence; '6825 Pine Street, Suite 141 Omaha, NE 68106'; Tier III design, Energy Star, AICPA SOC, NIST alignment; supports '60+ kW cabinets' and 'kilowatts to multi-megawatt deployments'; 'a nonprofit data center founded by Walter Scott Jr.'","publisher":"Scott Data","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-sequitor-edge-kearney-ne","sourceRecordId":"sequitor-edge-kearney-ne","name":"Sequitor Edge Kearney Data Center","operator":"Sequitor Edge","city":"Kearney","county":"Buffalo","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.6994,"longitude":-99.0817,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sequitor-edge-kearney-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/","label":"Approved Site For Next Generation Data Center in Kearney Nebraska","publisher":"Sequitor Edge","kind":"press","retrievedAt":"2026-08-21"},{"url":"https://metro.newschannelnebraska.com/story/53099125/kearney-secures-new-data-center-after-citys-deal-with-sequitor-edge","label":"Kearney secures new data center after city's deal with Sequitor Edge","publisher":"News Channel Nebraska","kind":"press","retrievedAt":"2026-08-21"}]},{"id":"compute-tierpoint-omaha-bellevue-ne","sourceRecordId":"tierpoint-omaha-bellevue-ne","name":"TierPoint Omaha - Bellevue Data Center","operator":"TierPoint","city":"Bellevue","county":"Sarpy","address":"1001 North Fort Crook Road","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.153,"longitude":-95.925,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-omaha-bellevue-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/nebraska/omaha-bellevue/","label":"TierPoint Omaha - Bellevue Data Center — 1001 North Fort Crook Road, Bellevue NE 68005; '100,000+ total square feet, 21,000+ square feet of raised floor space'; 'Five redundant generators totaling 5.5 MW'","publisher":"TierPoint","kind":"other","retrievedAt":"2026-08-16"}]},{"id":"compute-tierpoint-omaha-midlands-papillion-ne","sourceRecordId":"tierpoint-omaha-midlands-papillion-ne","name":"TierPoint Omaha - Midlands Data Center","operator":"TierPoint","city":"Papillion","county":"Sarpy","address":"11425 South 84th Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.11,"longitude":-96.046,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-omaha-midlands-papillion-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/nebraska/omaha-midlands/","label":"TierPoint Omaha - Midlands Data Center — 11425 South 84th Street, Papillion NE 68046; '63,000+ total square feet', '15,000+ square feet of raised floor space'; 'Two 2.25 MW redundant generators'; LEED Gold and Energy Star certifications","publisher":"TierPoint","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-travelers-data-center-sarpy-ne","sourceRecordId":"travelers-data-center-sarpy-ne","name":"Travelers Data Center (Project Oasis)","operator":"The Travelers Companies","city":null,"county":"Sarpy","address":null,"state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.1278561,"longitude":-96.145074,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/travelers-data-center-sarpy-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tradeandindustrydev.com/industry/back-office-call-centers-data-centers/news/ne-travelers-cuts-ribbon-new-data-center-sarpy-c","label":"NE: Travelers Cuts Ribbon to New Data Center in Sarpy County","publisher":"Trade and Industry Development","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.datacenterknowledge.com/business/mystery-company-behind-project-oasis-is-travelers-insurance","label":"Mystery Company Behind Project Oasis is Travelers Insurance","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=Travelers,+Sarpy+County,+Nebraska&format=json&limit=10&extratags=1","label":"OpenStreetMap: Travelers Insurance building, Sarpy County","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-uniti-lincoln-1440-m-street-ne","sourceRecordId":"uniti-lincoln-1440-m-street-ne","name":"Uniti Lincoln Data Center (former Windstream, 1440 M Street)","operator":"Uniti","city":"Lincoln","county":"Lancaster","address":"1440 M Street","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":40.8117116,"longitude":-96.7002137,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/uniti-lincoln-1440-m-street-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/1440-m-street-lincoln/windstream/datacenter/lincoln","label":"Uniti Lincoln — 1440 M Street, Lincoln, NE 68508","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=1440+M+Street,+Lincoln,+Nebraska&format=json&limit=3","label":"OpenStreetMap: Windstream, 1440 M Street, Lincoln","publisher":"OpenStreetMap / Nominatim","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-uniti-omaha-1721-saint-marys-ne","sourceRecordId":"uniti-omaha-1721-saint-marys-ne","name":"Uniti Omaha Data Center (1721 Saint Marys Avenue)","operator":"Uniti","city":"Omaha","county":"Douglas","address":"1721 Saint Marys Avenue","state":"NE","stateName":"Nebraska","jurisdictionType":"state","latitude":41.254936,"longitude":-95.939421,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/uniti-omaha-1721-saint-marys-ne","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/1721-saint-marys-avenue-omaha","label":"1721 Saint Marys Avenue, Omaha data center building (Uniti Omaha)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-consolidated-communications-manchester-nh","sourceRecordId":"consolidated-communications-manchester-nh","name":"Consolidated Communications Manchester Data Center","operator":"Consolidated Communications","city":"Manchester","county":"Hillsborough","address":"770 Elm St","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":42.9890144,"longitude":-71.4636547,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/consolidated-communications-manchester-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/consolidated-manchester","label":"Consolidated: Manchester Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.datacenterjournal.com/data-centers/new-hampshire/manchester/consolidated-770-elm-st/","label":"Consolidated - 770 Elm St. Data Center","publisher":"Data Center Journal","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/4104","label":"PeeringDB facility record: Consolidated - 770 Elm St., Manchester, NH 03101 (org: Consolidated Communications, Inc.)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://baxtel.com/data-center/fairpoint-manchester","label":"Consolidated: Manchester Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-crown-castle-fiber-nh1-manchester-nh","sourceRecordId":"crown-castle-fiber-nh1-manchester-nh","name":"Crown Castle Fiber NH1 (1 Sundial Ave)","operator":"Crown Castle Fiber (Crown Castle's Fiber Solutions business was sold to Zayo Group on 2026-05-01)","city":"Manchester","county":"Hillsborough","address":"1 Sundial Ave","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":42.972613,"longitude":-71.469472,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crown-castle-fiber-nh1-manchester-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?country=US&state=NH","label":"PeeringDB facility records for NH (fac 13611: Crown Castle Manchester (1 Sundial Ave))","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://inflect.com/datacenters/na/usa/new-hampshire","label":"Data Centers in New Hampshire (Crown Castle Fiber NH1, 1 Sundial Avenue)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://dchub.cloud/facilities/crown-castle-inc-crown-castle-manchester-1-sundial-ave-ef97ffbf","label":"Crown Castle Manchester (1 Sundial Ave)","publisher":"DC Hub","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://crowncastle.com/news/29086-crown-castle-announces-closing-of-sale-of-fiber-and-small-cell-businesses-and-updates-full-year-2026-outlook","label":"Crown Castle Announces Closing of Sale of Fiber and Small Cell Businesses","publisher":"Crown Castle","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-dartmouth-college-data-center-lebanon-nh","sourceRecordId":"dartmouth-college-data-center-lebanon-nh","name":"Dartmouth College Data Center (Etna Road)","operator":"Dartmouth College","city":"Lebanon","county":"Grafton","address":"56 Etna Rd","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.6600753,"longitude":-72.2430802,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dartmouth-college-data-center-lebanon-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kadoa.com/datacenter/state/new-hampshire","label":"New Hampshire data centers: Dartmouth College Data Center, 56 Etna Rd, Lebanon, operational","publisher":"Kadoa US Datacenter Tracker","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://dchub.cloud/facilities/dartmouth-college-data-center-6a8fc01a","label":"DARTMOUTH COLLEGE DATA CENTER, Etna Rd, Lebanon NH: active","publisher":"DC Hub","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://services.dartmouth.edu/TDClient/1806/Portal/Requests/ServiceDet?ID=31708","label":"Dartmouth ITC data center service description","publisher":"Dartmouth College","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-dynamic-internet-salem-nh","sourceRecordId":"dynamic-internet-salem-nh","name":"Dynamic Internet Salem Data Center","operator":"Dynamic Internet","city":"Salem","county":"Rockingham","address":"12 Delaware Dr","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":42.7648858,"longitude":-71.2420671,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dynamic-internet-salem-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/dynamic-internet-salem","label":"Dynamic Internet Salem Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-fairpoint-laconia-nh","sourceRecordId":"fairpoint-laconia-nh","name":"FairPoint Laconia Data Center","operator":"FairPoint Communications","city":"Laconia","county":"Belknap","address":"762 N Main St","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.5317638,"longitude":-71.4728722,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fairpoint-laconia-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/fairpoint-laconia","label":"FairPoint Laconia Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-firstlight-bedford-nh","sourceRecordId":"firstlight-bedford-nh","name":"FirstLight Bedford Data Center (formerly ColoSpace)","operator":"FirstLight Fiber","city":"Bedford","county":"Hillsborough","address":"8 Commerce Drive","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":42.9281915,"longitude":-71.4638354,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-bedford-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacentercatalog.com/usa/colospace-data-center-bedford","label":"Colospace Data Center Bedford, New Hampshire","publisher":"Data Center Catalog","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/new-hampshire","label":"New Hampshire Data Centers & Colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/3457","label":"PeeringDB facility record: ColoSpace - Bedford, NH, 8 Commerce Dr, Bedford, NH 03110 (org: FirstLight Fiber, Inc.)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://www.firstlight.net/services/cloud-data-center/data-center/","label":"FirstLight — Data Center colocation facilities","publisher":"FirstLight Fiber","kind":"other","retrievedAt":"2026-10-21"}]},{"id":"compute-firstlight-keene-nh","sourceRecordId":"firstlight-keene-nh","name":"FirstLight Keene Data Center","operator":"FirstLight Fiber","city":"Keene","county":"Cheshire","address":"310 Marlboro Street","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":42.9258906,"longitude":-72.2672342,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-keene-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/firstlight-keene","label":"FirstLight Keene, 310 Marlboro Street, Keene NH","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://www.firstlight.net/keene-nh-data-center/","label":"Keene, NH Data Center (operator product page)","publisher":"FirstLight Fiber","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://brightlio.com/data-centers-and-colocationin-in-new-hampshire/","label":"Data Centers in New Hampshire: lists FirstLight Keene at 310 Marlboro Street","publisher":"Brightlio","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-firstlight-lebanon-nh","sourceRecordId":"firstlight-lebanon-nh","name":"FirstLight Lebanon Data Center (Dartmouth Regional Technology Center)","operator":"FirstLight Fiber","city":"Lebanon","county":"Grafton","address":"16 Cavendish Court","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.6788826,"longitude":-72.2561477,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-lebanon-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/firstlight-lebanon","label":"FirstLight Lebanon, 16 Cavendish Court, Lebanon NH (Dartmouth Regional Technology Center)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://firstlight.net/lebanon-nh-data-center","label":"Lebanon, NH Data Center (operator product page)","publisher":"FirstLight Fiber","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://brightlio.com/data-centers-and-colocationin-in-new-hampshire/","label":"Data Centers in New Hampshire: lists FirstLight Lebanon at 16 Cavendish Court","publisher":"Brightlio","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-firstlight-manchester-nh","sourceRecordId":"firstlight-manchester-nh","name":"FirstLight Manchester Data Center","operator":"FirstLight Fiber","city":"Manchester","county":"Hillsborough","address":"77 Sundial Ave","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":42.9720295,"longitude":-71.4705697,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-manchester-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/new-hampshire","label":"New Hampshire Data Centers & Colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/firstlight-manchester","label":"FirstLight Manchester Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.firstlight.net/resources/data-center-manchester-nh-specifications/","label":"FirstLight — Manchester, NH data center specifications","publisher":"FirstLight Fiber","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?country=US&state=NH","label":"PeeringDB facility records for NH (fac 1452: ColoCenter.com - Manchester NH, 77 Sundial Avenue)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://inflect.com/datacenters/na/usa/new-hampshire","label":"Data Centers in New Hampshire (Firstlight Fiber Manchester, 77 Sundial Avenue, Manchester, NH 03103)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-firstlight-portsmouth-nh-data-center-nh","sourceRecordId":"firstlight-portsmouth-nh-data-center-nh","name":"FirstLight Portsmouth, NH Data Center","operator":"FirstLight","city":"Portsmouth","county":"Rockingham","address":"359 Corporate Drive","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.0761287,"longitude":-70.8080395,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-portsmouth-nh-data-center-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/","label":"FirstLight facility directory","publisher":"FirstLight","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/87058670","label":"OpenStreetMap way/87058670","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/api/0.6/way/87058670","label":"OpenStreetMap way 87058670 (telecom=data_center, operator=FirstLight, 77 Aviation Avenue, Portsmouth)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-26"},{"url":"https://www.firstlight.net/wp-content/uploads/2017/04/FL-PortsmouthNH-DataCenter.pdf","label":"FirstLight Data Center - Portsmouth, NH spec sheet (v1-18)","publisher":"FirstLight Fiber","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-liberty-mutual-portsmouth-nh","sourceRecordId":"liberty-mutual-portsmouth-nh","name":"Liberty Mutual Portsmouth Data Center","operator":"Liberty Mutual","city":"Portsmouth","county":"Rockingham","address":"225 Borthwick Ave","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.0617779,"longitude":-70.7931847,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/liberty-mutual-portsmouth-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dchub.cloud/facilities/liberty-mutual-data-center-5ac875d5","label":"LIBERTY MUTUAL DATA CENTER, Borthwick Ave, Portsmouth NH: active","publisher":"DC Hub","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://www.kadoa.com/datacenter/state/new-hampshire","label":"New Hampshire data centers: 225 Borthwick Ave, Portsmouth, Liberty Mutual, operational","publisher":"Kadoa US Datacenter Tracker","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-locke-road-micro-data-center-concord-nh","sourceRecordId":"locke-road-micro-data-center-concord-nh","name":"Locke Road Micro Data Center","operator":"Granite Municipal Manufacturing & Sales, LLC","city":"Concord","county":"Merrimack","address":"52 Locke Road","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.2441282,"longitude":-71.5460077,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/locke-road-micro-data-center-concord-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","label":"Concord plans: micro data center proposed at 52 Locke Road","publisher":"Concord Monitor","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://www.concordmonitor.com/2026/09/17/citizens-oppose-new-concord-datacenter/","label":"'Small dogs still bite': Proposed micro data center elicits resistance as development advances through application process","publisher":"Concord Monitor","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://morethanjustparks.com/data-center-tracker/locke-road-micro-data-center-nh--36825728-0139-4548-905f-5f46138a1ea9","label":"Locke Road Micro Data Center (tracker entry; coordinates 43.2441282, -71.5460077)","publisher":"More Than Just Parks","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://www.nhpr.org/nh-news/2026-10-20/ai-micro-data-center-proposal-concord-newhampshire","label":"AI company behind micro data center plan in Concord says its design is 'the way of the future'","publisher":"New Hampshire Public Radio","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.nhpr.org/nh-news/2026-10-26/concord-board-defers-decision-micro-data-center-proposal","label":"Concord Planning Board defers decision on 'micro' data center proposal","publisher":"New Hampshire Public Radio","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-granite-shore-merrimack-station-bow-nh","sourceRecordId":"granite-shore-merrimack-station-bow-nh","name":"Merrimack Station Data Center (proposed, Bow)","operator":"Granite Shore Power (site owner; end developer not publicly identified)","city":"Bow","county":"Merrimack","address":"97 River Rd","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.1411,"longitude":-71.4692,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/granite-shore-merrimack-station-bow-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.concordmonitor.com/wp-content/uploads/2026/09/Eversource-connection-for-data-center.pdf","label":"PSNH/Eversource FERC filing (Accession 20260423-5055, filed 2026-04-23): Viability Assessment Agreement VSA-PSNH-001 with Granite Shore Power, LLC for a potential 350 MW load interconnection","publisher":"Federal Energy Regulatory Commission filing (hosted by Concord Monitor)","kind":"filing","retrievedAt":"2026-10-08"},{"url":"https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center","label":"Could Bow be home to a new data center?","publisher":"New Hampshire Public Radio","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://concordmonitor.com/2026/09/01/bow-ai-data-center-talks/","label":"Bow in talks over AI data center at Merrimack Station","publisher":"Concord Monitor","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/","label":"'Please, do not allow this to happen': Residents call for proactive steps to prevent data center in Bow","publisher":"Concord Monitor","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://www.vermontpublic.org/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers","label":"'We're not willing to trade lower taxes for this': Bow residents speak out against proposed data centers","publisher":"Vermont Public / NHPR","kind":"press","retrievedAt":"2026-10-08"},{"url":"https://www.gridinfo.com/plant/merrimack/2364","label":"Merrimack power plant (EIA plant 2364), 97 River Rd, Bow NH: coordinates 43.1411, -71.4692","publisher":"GridInfo","kind":"other","retrievedAt":"2026-10-08"}]},{"id":"compute-phillips-exeter-academy-data-center-exeter-nh","sourceRecordId":"phillips-exeter-academy-data-center-exeter-nh","name":"Phillips Exeter Academy Information Technology Data Center","operator":"Phillips Exeter Academy","city":"Exeter","county":"Rockingham","address":null,"state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":42.9820886,"longitude":-70.9505947,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/phillips-exeter-academy-data-center-exeter-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/api/0.6/way/589070714","label":"OpenStreetMap way 589070714 (building=data_center, name=Information Technology Data Center, operator=Phillips Exeter Academy)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-26"},{"url":"https://dchub.cloud/facilities/phillips-exeter-academy-information-technology-data-center-c001f606","label":"Phillips Exeter Academy Information Technology Data Center","publisher":"DC Hub","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-sns-littleton-nh","sourceRecordId":"sns-littleton-nh","name":"SNS Littleton Data Center","operator":"Secured Network Services (a Thrive company)","city":"Littleton","county":"Grafton","address":"775 Industrial Park Rd","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":44.2933025,"longitude":-71.7985028,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sns-littleton-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kadoa.com/datacenter/state/new-hampshire","label":"New Hampshire data centers: 775 Industrial Park Rd, Littleton, Secured Network Services, Inc., operational","publisher":"Kadoa US Datacenter Tracker","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://morethanjustparks.com/data-center-tracker/sns-littleton-data-center-nh--ae4bc6af-e610-482f-b335-86441849ac11","label":"SNS Littleton Data Center: operator Secured Network Services (a Thrive Company), operating","publisher":"More Than Just Parks","kind":"other","retrievedAt":"2026-10-08"},{"url":"https://thrivenextgen.com/thrive-acquires-secured-network-services/","label":"Thrive Acquires Secured Network Services (2025-02-13)","publisher":"Thrive","kind":"press","retrievedAt":"2026-10-08"}]},{"id":"compute-unh-data-center-durham-nh","sourceRecordId":"unh-data-center-durham-nh","name":"University of New Hampshire Data Center (1 Leavitt Lane)","operator":"University of New Hampshire","city":"Durham","county":"Strafford","address":"1 Leavitt Lane","state":"NH","stateName":"New Hampshire","jurisdictionType":"state","latitude":43.1436204,"longitude":-70.9524471,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/unh-data-center-durham-nh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/api/0.6/way/79056848","label":"OpenStreetMap way 79056848 (telecom=data_center, operator=University of New Hampshire)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-26"},{"url":"https://dchub.cloud/facilities/university-of-new-hampshire-university-of-new-hampshire-19cf0d94","label":"University of New Hampshire (data center listing, Leavitt Lane)","publisher":"DC Hub","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-jersey-avenue-new-brunswick-data-center-nj","sourceRecordId":"jersey-avenue-new-brunswick-data-center-nj","name":"100 Jersey Avenue Data Center","operator":"Undisclosed (parcels controlled by Amzak Capital Management)","city":"New Brunswick","county":"Middlesex","address":"100 Jersey Avenue","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.4884182,"longitude":-74.4576813,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/jersey-avenue-new-brunswick-data-center-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://jerseyvindicator.org/2026/02/21/new-brunswick-rejects-data-center-plan-following-public-backlash/","label":"'New Brunswick rejects data center plan following public backlash' — Jersey Vindicator, 21 February 2026","publisher":"Jersey Vindicator","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://patch.com/new-jersey/newbrunswick/new-brunswick-city-council-kills-proposal-build-ai-data-center-100-jersey","label":"'New Brunswick Kills Plan To Build AI Data Center At 100 Jersey Avenue' — New Brunswick Patch, 19 February 2026","publisher":"Patch","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://jerseydigs.com/90-jersey-ave-new-brunswick-development/","label":"'New Brunswick Residents Win Fight Against Data Center as Jersey Avenue Redevelopment Plan Gets Amended' — Jersey Digs, 10 March 2026","publisher":"Jersey Digs","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=100+Jersey+Avenue,+New+Brunswick,+New+Jersey&format=json&limit=2","label":"OpenStreetMap address point for 100 Jersey Avenue, New Brunswick NJ 08901, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-165-halsey-street-newark-nj","sourceRecordId":"165-halsey-street-newark-nj","name":"165 Halsey Street","operator":"Tishman Real Estate","city":"Newark","county":"Essex","address":"165 Halsey Street","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7369,"longitude":-74.1739,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/165-halsey-street-newark-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.165halsey.com/about-us/","label":"About Us","publisher":"165 Halsey Street","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.165halsey.com/","label":"165 Halsey Street — official site","publisher":"165 Halsey Street","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/165-halsey-street","label":"165 Halsey Street Data Center and Carrier Hotel","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://en.wikipedia.org/wiki/165_Halsey_Street","label":"165 Halsey Street","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.databank.com/data-centers/new-jersey/","label":"DataBank New Jersey data centers (EWR1 – 165 Halsey Street, Newark)","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-365-data-centers-bridgewater-nj","sourceRecordId":"365-data-centers-bridgewater-nj","name":"365 Data Centers Bridgewater","operator":"365 Data Centers","city":"Bridgewater","county":"Somerset","address":"999 Frontier Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.5814424,"longitude":-74.5738875,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-bridgewater-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/new-jersey-data-center/","label":"365 Data Centers Bridgewater, New Jersey data center page","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=999+Frontier+Road,+Bridgewater,+New+Jersey&format=json&limit=5","label":"OpenStreetMap mapped building '365 Bridgewater NJ', 999 Frontier Road, Bridgewater Township NJ 08807, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?name__contains=365%20Data&state=NJ","label":"PeeringDB facility records 6085 / 10349, '365 Data Centers Bridgewater (BW1)' / '(NJ1)', 999 Frontier Road, Bridgewater NJ 08807","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-365-data-centers-carlstadt-nj","sourceRecordId":"365-data-centers-carlstadt-nj","name":"365 Data Centers Carlstadt (NJ3)","operator":"365 Data Centers","city":"Carlstadt","county":"Bergen","address":"410 Commerce Boulevard","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.827949,"longitude":-74.049418,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-carlstadt-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/carlstadt-data-center/","label":"365 Data Centers Carlstadt, New Jersey data center page","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/api/fac?name__contains=365%20Data&state=NJ","label":"PeeringDB facility record 15701, '365 Data Centers Carlstadt (NJ3)', 410 Commerce Blvd, Carlstadt NJ 07072","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-new-hook-road-data-center-bayonne-nj","sourceRecordId":"new-hook-road-data-center-bayonne-nj","name":"69-71 New Hook Road Data Center (Constable Hook)","operator":"Undisclosed","city":"Bayonne","county":"Hudson","address":"69-71 New Hook Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.6565644,"longitude":-74.0944372,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/new-hook-road-data-center-bayonne-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gathergov.com/articles/bayonne-data-center","label":"Bayonne data center at 69-71 New Hook Road: rezoning and council response","publisher":"GatherGov","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://hudpost.com/bayonne-bans-data-centers-citywide-in-unanimous-council-vote/","label":"Bayonne bans data centers citywide in unanimous council vote","publisher":"HudPost","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://newjerseyglobe.com/campaigns/bayonne-mayoral-candidates-spar-over-data-center-vote/","label":"Bayonne mayoral candidates spar over data center vote","publisher":"New Jersey Globe","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://nominatim.openstreetmap.org/search?street=69+New+Hook+Road&city=Bayonne&state=NJ&format=json&limit=5","label":"OpenStreetMap Nominatim geocode: New Hook Road, Bayonne","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"}]},{"id":"compute-a1-data-center-millville-nj","sourceRecordId":"a1-data-center-millville-nj","name":"A1 Data Center Campus","operator":"A1 Data Center","city":"Millville","county":"Cumberland","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.402,"longitude":-75.043,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/a1-data-center-millville-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.roi-nj.com/2026/05/20/tech/millville-bans-data-centers-rejecting-largest-proposed-facility-in-n-j/","label":"Millville bans data centers, rejecting largest proposed facility in N.J.","publisher":"ROI-NJ","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.a1datacenter.net/","label":"A1 Data Center Campus - developer site","publisher":"A1 Data Center","kind":"other","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-andover-hpc-development-nj","sourceRecordId":"andover-hpc-development-nj","name":"Andover HPC Data Center (former Newton Airport Site)","operator":"Andover HPC Development","city":"Andover","county":"Sussex","address":"248 Stickles Pond Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":41.0419,"longitude":-74.7381,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/andover-hpc-development-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/artificial-intelligence/old-new-jersey-airport-could-house-new-ai-data-center","label":"Old New Jersey Airport Could House New AI Data Center","publisher":"GovTech","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.govtech.com/artificial-intelligence/developer-sues-new-jersey-town-after-data-center-ban","label":"Developer sues New Jersey town after data center ban","publisher":"Government Technology (NJ.com via Tribune Content Agency)","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-bell-works-holmdel-data-center-nj","sourceRecordId":"bell-works-holmdel-data-center-nj","name":"Bell Works Data Center (101 Crawfords Corner Road)","operator":"Somerset Development","city":"Holmdel","county":"Monmouth","address":"101 Crawfords Corner Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.3650934,"longitude":-74.1674935,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bell-works-holmdel-data-center-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://patch.com/new-jersey/holmdel-hazlet/data-center-proposed-bell-works-see-details","label":"'Data Center Proposed At Bell Works: See Details' — Holmdel/Hazlet Patch","publisher":"Patch","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://tworivertimes.com/developer-filed-data-center-proposal-for-bell-works-before-holmdels-ban/","label":"'Developer Filed Data Center Proposal for Bell Works Before Holmdel's Ban' — Two River Times","publisher":"Two River Times","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Bell+Works+Holmdel&format=json&addressdetails=1&limit=5","label":"OpenStreetMap mapped building 'Bell Works', 101 Crawfords Corner Road, Holmdel Township NJ 07733, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-hexa-builders-black-horse-pike-monroe-nj","sourceRecordId":"hexa-builders-black-horse-pike-monroe-nj","name":"Black Horse Pike Data Center (3043 Black Horse Pike)","operator":"Hexa Builders","city":"Monroe Township","county":"Gloucester","address":"3043 Black Horse Pike","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.7005307,"longitude":-75.0041347,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hexa-builders-black-horse-pike-monroe-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://jerseyvindicator.org/2026/08/01/developer-challenges-gloucester-county-data-center-ban-on-free-speech-grounds","label":"'Developer challenges Gloucester County data center ban on free-speech grounds' — Jersey Vindicator, 1 August 2026","publisher":"Jersey Vindicator","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?street=3043+Black+Horse+Pike&city=Williamstown&state=New+Jersey&format=json&limit=3","label":"OpenStreetMap street-level geocode for Black Horse Pike, Williamstown, Monroe Township, Gloucester County NJ 08094, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-centersquare-ewr2-weehawken-nj","sourceRecordId":"centersquare-ewr2-weehawken-nj","name":"Centersquare EWR2 (Weehawken)","operator":"Centersquare","city":"Weehawken","county":"Hudson","address":"300 J F Kennedy Boulevard East","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7615218,"longitude":-74.0260271,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-ewr2-weehawken-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","label":"Centersquare New York / New Jersey data centers (Weehawken EWR2 specs)","publisher":"Centersquare","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://inflect.com/building/300-j-f-kennedy-boulevard-east-weehawken/centersquare/datacenter/centersquare-ewr2-a-b-e-weehawken","label":"Centersquare EWR2-A/B/E Weehawken – 300 J F Kennedy Boulevard East","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","label":"Centersquare New York / New Jersey market spec sheet (EWR2, EWR3, EWR5)","publisher":"Centersquare","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-centersquare-ewr3-piscataway-nj","sourceRecordId":"centersquare-ewr3-piscataway-nj","name":"Centersquare EWR3 (Piscataway)","operator":"Centersquare","city":"Piscataway","county":"Middlesex","address":"3 Corporate Place","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.554537,"longitude":-74.4569,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-ewr3-piscataway-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","label":"Centersquare New York / New Jersey data centers (Piscataway EWR3 specs)","publisher":"Centersquare","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/fac/2638","label":"Centersquare New Jersey (EWR3) – PeeringDB facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","label":"Centersquare New York / New Jersey market spec sheet (EWR2, EWR3, EWR5)","publisher":"Centersquare","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-centersquare-ewr5-secaucus-nj","sourceRecordId":"centersquare-ewr5-secaucus-nj","name":"Centersquare EWR5 (Secaucus)","operator":"Centersquare","city":"Secaucus","county":"Hudson","address":"15 Enterprise Avenue North","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.78617,"longitude":-74.0692821,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-ewr5-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","label":"Centersquare (Csquare) New York/New Jersey colocation data centers page","publisher":"Centersquare","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/api/fac?name__contains=Centersquare&state=NJ","label":"PeeringDB facility record 279, 'Centersquare New Jersey (EWR5)', 15 Enterprise Avenue N, Secaucus NJ 07094","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=15+Enterprise+Avenue+North,+Secaucus,+New+Jersey&format=json&limit=3","label":"OpenStreetMap mapped building 'Centersquare NYC3 Data Center', 15 Enterprise Avenue North, Secaucus","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-cologix-cedar-knolls-campus-nj","sourceRecordId":"cologix-cedar-knolls-campus-nj","name":"Cologix Cedar Knolls Campus","operator":"Cologix","city":"Cedar Knolls","county":"Morris","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.81995,"longitude":-74.427986,"coordinatePrecision":"representative_multi_site","recordUnit":"representative multi-site record","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-cedar-knolls-campus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/new-jersey/","label":"New Jersey Data Centers & Disaster Recovery Facilities","publisher":"Cologix","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-cologix-nnj3-parsippany-nj","sourceRecordId":"cologix-nnj3-parsippany-nj","name":"Cologix NNJ3","operator":"Cologix","city":"Parsippany","county":"Morris","address":"200 Webro Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.859636,"longitude":-74.423348,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-nnj3-parsippany-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/new-jersey/","label":"New Jersey Data Centers & Disaster Recovery Facilities","publisher":"Cologix","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-comcast-clinton-edge-data-center-nj","sourceRecordId":"comcast-clinton-edge-data-center-nj","name":"Comcast Clinton Data Center (92 W. Main Street)","operator":"Comcast Cable","city":"Clinton","county":"Hunterdon","address":"92 West Main Street","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.632509,"longitude":-74.919176,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/comcast-clinton-edge-data-center-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://servercountry.org/data/projects/comcast-clinton-data-center-nj/","label":"Comcast Clinton Data Center – Server Country tracker record (cites Data Center Dynamics and Clinton land use board agenda/minutes)","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-continent-8-atlantic-city-convention-center-nj","sourceRecordId":"continent-8-atlantic-city-convention-center-nj","name":"Continent 8 Atlantic City (Convention Center)","operator":"Continent 8 Technologies","city":"Atlantic City","county":"Atlantic","address":"1 Convention Boulevard","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.3630994,"longitude":-74.4385634,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/continent-8-atlantic-city-convention-center-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.continent8.com/everything-to-know-about-the-new-data-center-in-atlantic-city/","label":"Everything you need to know: The new data center in Atlantic City","publisher":"Continent 8 Technologies","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://porziogov.com/continent-8-technologies-opens-state-of-the-art-data-center-in-atlantic-city/","label":"Continent 8 Technologies Opens State-of-the-Art Data Center in Atlantic City","publisher":"Porzio Governmental Affairs","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://colomap.com/facilities/continent-8-atlantic-city-dc3/","label":"Continent 8 Atlantic City DC3 – Colocation in Atlantic City, NJ","publisher":"Colo Map","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-continent-8-atlantic-city-ocean-casino-resort-nj","sourceRecordId":"continent-8-atlantic-city-ocean-casino-resort-nj","name":"Continent 8 Atlantic City (Ocean Casino Resort)","operator":"Continent 8 Technologies","city":"Atlantic City","county":"Atlantic","address":"500 Boardwalk","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.3624135,"longitude":-74.4147501,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/continent-8-atlantic-city-ocean-casino-resort-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.roi-nj.com/2018/06/26/tech/continent-8-opens-new-data-center-at-ocean-resort-casino/","label":"Continent 8 opens new data center at Ocean Resort Casino","publisher":"ROI-NJ","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.openstreetmap.org/api/0.6/way/624006115","label":"OpenStreetMap way 624006115: Ocean Resort Casino, 500 Boardwalk","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"}]},{"id":"compute-coresite-ny2-secaucus-nj-nj","sourceRecordId":"coresite-ny2-secaucus-nj-nj","name":"CoreSite NY2 - Secaucus, NJ","operator":"CoreSite","city":"Secaucus","county":"Hudson","address":"2 Emerson Lane","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7842844,"longitude":-74.0652426,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-ny2-secaucus-nj-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://coresite.com/data-center/ny2-secaucus-nj","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.openstreetmap.org/way/714139868","label":"OpenStreetMap way/714139868","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-coresite-ny3-secaucus-nj","sourceRecordId":"coresite-ny3-secaucus-nj","name":"CoreSite NY3","operator":"CoreSite","city":"Secaucus","county":"Hudson","address":"2 Emerson Lane","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7849039,"longitude":-74.0653573,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-ny3-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://coresite.com/data-center/ny3-secaucus-nj","label":"CoreSite NY3 Secaucus NJ data center page","publisher":"CoreSite","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=2+Emerson+Lane,+Secaucus,+New+Jersey&format=json&limit=3","label":"OpenStreetMap mapped building 'CoreSite NY3' (building=data_center) via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-coreweave-kenilworth-nj","sourceRecordId":"coreweave-kenilworth-nj","name":"CoreWeave NEST Campus","operator":"CoreWeave","city":"Kenilworth","county":"Union","address":"2000 Galloping Hill Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.6762,"longitude":-74.2913,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coreweave-kenilworth-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/","label":"CoreWeave begins $1.8B data center project in Kenilworth — Real Estate NJ","publisher":"Real Estate NJ","kind":"subsidy","retrievedAt":"2026-09-21"},{"url":"https://newjersey.news12.com/ai-data-center-under-construction-in-kenilworth-draws-mixed-reactions-from-residents","label":"AI Data Center Under Construction in Kenilworth draws mixed reactions — News 12 NJ","publisher":"News 12 New Jersey","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://newjersey.news12.com/2026/04/20/ai-data-center-under-construction-in-kenilworth-draws-mixed-reactions-from-residents/73qGMUnu1BjBupokxeSIjG","label":"AI data center under construction in Kenilworth draws mixed reactions from residents — News 12 New Jersey","publisher":"News 12 New Jersey","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/coreweave-acquires-nest-data-center-for-322m-at-life-sciences-campus-in-new-jersey/","label":"CoreWeave acquires NEST data center for $322m at life-sciences campus in New Jersey — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.njeda.gov/nextnjai/","label":"Next New Jersey Program – AI — NJ Economic Development Authority","publisher":"NJ Economic Development Authority","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://www.realclear.ai/case-studies/coreweave-kenilworth-nj","label":"CoreWeave Kenilworth: $1.8B AI DC, First NJ EDA AI Award","publisher":"RealClear AI","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.coreweave.com/ai-data-center-development/kenilworth-new-jersey","label":"Kenilworth, New Jersey: an existing site, redeveloped for AI","publisher":"CoreWeave","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-cyrusone-nym1-somerset-nj","sourceRecordId":"cyrusone-nym1-somerset-nj","name":"CyrusOne NYM1 (Somerset)","operator":"CyrusOne","city":"Somerset","county":"Somerset","address":"800 Cottontail Lane","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.5379623,"longitude":-74.5457225,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nym1-somerset-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/somerset-nj","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.openstreetmap.org/way/460182320","label":"OpenStreetMap way/460182320","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.cyrusone.com/resources/blogs/cyrusone-intelliscale-design-and-ai-data-center-faq","label":"CyrusOne AI/HPC — Named as an Intelliscale AI-infrastructure-available site","publisher":"cyrusone.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://datacenterhawk.com/marketplace/providers/cyrusone/800-cottontail-lane/nym1-phase-2","label":"datacenterhawk NYM1 Phase 2 listing","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://inflect.com/building/800-cottontail-lane-franklin-township/cyrusone/datacenter/cyrusone-somerset-1","label":"CyrusOne NYM1 – 800 Cottontail Lane, Franklin Township","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-cyrusone-nym2-totowa-nj","sourceRecordId":"cyrusone-nym2-totowa-nj","name":"CyrusOne NYM2 (Totowa)","operator":"CyrusOne","city":"Totowa","county":"Passaic","address":"50 Madison Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.9072095,"longitude":-74.2422211,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nym2-totowa-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/totowa-nj-nym2","label":"CyrusOne Totowa, NJ: NYM2 data center page","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://nominatim.openstreetmap.org/search?q=50+Madison+Road,+Totowa,+New+Jersey&format=json&limit=2","label":"OpenStreetMap mapped building 'NYM2', 50 Madison Road, Totowa NJ 07512, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=NJ&limit=250","label":"PeeringDB facility record 2356, 'CyrusOne Totowa', 50 Madison Road, Totowa NJ 07512","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-databank-ewr2-piscataway-nj","sourceRecordId":"databank-ewr2-piscataway-nj","name":"DataBank EWR2 (Piscataway)","operator":"DataBank","city":"Piscataway","county":"Middlesex","address":"25 Corporate Place South","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.549247,"longitude":-74.458241,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-ewr2-piscataway-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/new-jersey/","label":"DataBank New Jersey data centers page (EWR1 Newark, EWR2 Piscataway)","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/api/fac?name__contains=DataBank&state=NJ","label":"PeeringDB facility record 10922, 'DataBank Piscataway (EWR2)', 25 Corporate Pl S, Piscataway NJ 08854","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-digital-fortress-pnj-piscataway-nj","sourceRecordId":"digital-fortress-pnj-piscataway-nj","name":"Digital Fortress PNJ (Piscataway)","operator":"Digital Fortress","city":"Piscataway","county":"Middlesex","address":"201 Centennial Avenue","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.544144,"longitude":-74.496592,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-fortress-pnj-piscataway-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://digital-fortress.com/piscataway-data-center/","label":"Digital Fortress Piscataway, New Jersey data center page","publisher":"Digital Fortress","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/api/fac?state=NJ&limit=250","label":"PeeringDB facility record 13023, 'Digital Fortress (PNJ)', 201 Centennial Ave Bldg B, Piscataway NJ 08854","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-digital-realty-clifton-campus-nj","sourceRecordId":"digital-realty-clifton-campus-nj","name":"Digital Realty Clifton Campus","operator":"Digital Realty","city":"Clifton","county":"Passaic","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.862137,"longitude":-74.160393,"coordinatePrecision":"representative_multi_site","recordUnit":"representative multi-site record","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-clifton-campus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr20","label":"Digital Realty New Jersey EWR20","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr21","label":"Digital Realty New Jersey EWR21","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.digitalrealty.com/data-centers/americas/new-york","label":"Digital Realty — New York metro data centers","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-digital-realty-new-york-ewr10-nj","sourceRecordId":"digital-realty-new-york-ewr10-nj","name":"Digital Realty New York EWR10","operator":"Digital Realty","city":"Weehawken","county":"Hudson","address":"300 John F. Kennedy Boulevard East","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7618178,"longitude":-74.0250281,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-new-york-ewr10-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://marketplace.upstack.com/data-centers/digital-realty-data-center-new-jersey","label":"UPSTACK Marketplace listing for Digital Realty EWR10, 300 JFK Blvd E, Weehawken NJ (corroborated by Inflect, RebootMonke","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/279410766","label":"OpenStreetMap way/279410766","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-new-york-ewr11-nj","sourceRecordId":"digital-realty-new-york-ewr11-nj","name":"Digital Realty New York EWR11","operator":"Digital Realty","city":"Piscataway Township","county":"Middlesex","address":"3 Corporate Place","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.5537931,"longitude":-74.4571024,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-new-york-ewr11-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr11","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/204460950","label":"OpenStreetMap way/204460950","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-new-york-ewr12-nj","sourceRecordId":"digital-realty-new-york-ewr12-nj","name":"Digital Realty New York EWR12","operator":"Digital Realty","city":"Piscataway Township","county":"Middlesex","address":"365 South Randolphville Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.5529283,"longitude":-74.4592038,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-new-york-ewr12-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr12","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.openstreetmap.org/way/204460903","label":"OpenStreetMap way/204460903","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-somerset-650-randolph-road-nj","sourceRecordId":"digital-realty-somerset-650-randolph-road-nj","name":"Digital Realty Somerset (650 Randolph Road)","operator":"Digital Realty","city":"Franklin Township (Somerset)","county":"Somerset","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.5375265,"longitude":-74.5555236,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-somerset-650-randolph-road-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/data-center-site-selection/wholesale-data-centers-thrive-in-central-nj","label":"Data Center Knowledge — 650 Randolph Road, Somerset section of Franklin Township, NJ","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/460182337","label":"OpenStreetMap way/460182337","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stalwart-earth-station-76-logan-nj","sourceRecordId":"stalwart-earth-station-76-logan-nj","name":"Earth Station-76 (Route 130, Logan Township)","operator":"Stalwart Development","city":"Logan Township","county":"Gloucester","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.7715,"longitude":-75.3155,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/stalwart-earth-station-76-logan-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.scottkompa.com/blog/logan-township-data-center-nj/","label":"Earth Station-76 and the Logan Township data center: what is known (June 11, 2026)","publisher":"Scott Kompa","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://morethanjustparks.com/data-center-tracker/earth-station-76-nj--cf3b445b-13e4-48a6-bf36-eead610af85c","label":"Data Center Tracker: Earth Station-76, Gloucester County, NJ","publisher":"More Than Just Parks","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://dcmap.us/states/new-jersey/","label":"New Jersey Data Center Map: Earth Station 76, Stalwart Development, Logan, Paused","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-equinix-ny11-carteret-nj","sourceRecordId":"equinix-ny11-carteret-nj","name":"Equinix NY11","operator":"Equinix","city":"Carteret","county":"Middlesex","address":"1400 Federal Boulevard","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.58433,"longitude":-74.243607,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny11-carteret-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/1400-federal-boulevard-carteret/equinix/datacenter/ny11","label":"Equinix NY11 — 1400 Federal Boulevard, Carteret","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.datacenterfrontier.com/network/article/33008176/equinix-ny5-ny11-data-centers-generate-digital-economic-magnetism-in-ny-nj","label":"Equinix NY5, NY11 Data Centers Generate Digital, Economic Magnetism in NY-NJ","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-equinix-ny2-secaucus-nj","sourceRecordId":"equinix-ny2-secaucus-nj","name":"Equinix NY2","operator":"Equinix","city":"Secaucus","county":"Hudson","address":"275 Hartz Way","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7775822,"longitude":-74.0759403,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny2-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/2025/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny2","label":"Equinix NY2 IBX data center page (Internet Archive capture of equinix.com; the live page answers 403 to non-browser clients)","publisher":"Equinix","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=275+Hartz+Way,+Secaucus,+New+Jersey&format=json&limit=3","label":"OpenStreetMap mapped building 'Equinix New York Secaucus NY2' (way 193611219, building=data_center) via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-equinix-ny3-secaucus-nj","sourceRecordId":"equinix-ny3-secaucus-nj","name":"Equinix NY3","operator":"Equinix","city":"Secaucus","county":"Hudson","address":"600 Jefferson Avenue","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.774179,"longitude":-74.065868,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny3-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/network/article/33008176/equinix-ny5-ny11-data-centers-generate-digital-economic-magnetism-in-ny-nj","label":"Equinix NY5, NY11 Data Centers Generate Digital, Economic Magnetism in NY-NJ","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://inflect.com/building/600-jefferson-avenue-secaucus-nj-united-states/equinix/datacenter/ny3","label":"Equinix NY3 — 600 Jefferson Avenue, Secaucus","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://baxtel.com/data-center/equinix-ny3","label":"Equinix: NY3 (facility listing)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-equinix-ny4-secaucus-nj","sourceRecordId":"equinix-ny4-secaucus-nj","name":"Equinix NY4","operator":"Equinix","city":"Secaucus","county":"Hudson","address":"755 Secaucus Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.778534,"longitude":-74.072237,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny4-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenterhawk.com/marketplace/providers/equinix/755-secaucus-road/ny4","label":"Equinix NY4 — 755 Secaucus Road","publisher":"DataCenterHawk","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.datacenterknowledge.com/investing/the-nj-trading-hub-powering-the-financial-markets","label":"The NJ Trading Hub Powering the Financial Markets","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.peeringdb.com/fac/36","label":"Equinix NY2/NY4/NY5/NY6 — Secaucus","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-equinix-ny5-nj","sourceRecordId":"equinix-ny5-nj","name":"Equinix NY5","operator":"Equinix","city":"Secaucus","county":"Hudson","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7785845,"longitude":-74.0723242,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny5-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny5","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/193611192","label":"OpenStreetMap way/193611192","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.businesswire.com/news/home/20260123272997/en/Options-Sets-the-Benchmark-for-Liquid-Cooled-High-Density-Infrastructure-as-a-Managed-Service-Provider-in-Equinix-NY5","label":"Equinix AI/HPC — Named MSP (Options Tech) liquid-cooled high-density AI cage live NY5, ","publisher":"businesswire.com","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-ny6-secaucus-nj","sourceRecordId":"equinix-ny6-secaucus-nj","name":"Equinix NY6","operator":"Equinix","city":"Secaucus","county":"Hudson","address":"105 Enterprise Avenue South","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7763898,"longitude":-74.0718595,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny6-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/2025/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny6","label":"Equinix NY6 IBX data center page (Internet Archive capture of equinix.com; the live page answers 403 to non-browser clients)","publisher":"Equinix","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=105+Enterprise+Avenue+South,+Secaucus,+New+Jersey&format=json&limit=3","label":"OpenStreetMap address point for 105 Enterprise Avenue South, Secaucus NJ 07094 via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-equinix-ny7-nj","sourceRecordId":"equinix-ny7-nj","name":"Equinix NY7","operator":"Equinix","city":"North Bergen","county":"Hudson","address":"5851 West Side Avenue","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7968626,"longitude":-74.0311403,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny7-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny7","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/95782052","label":"OpenStreetMap way/95782052","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-evocative-ewr1-secaucus-nj","sourceRecordId":"evocative-ewr1-secaucus-nj","name":"Evocative EWR1 (Secaucus)","operator":"Evocative","city":"Secaucus","county":"Hudson","address":"1 Enterprise Avenue North","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.787662,"longitude":-74.068015,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/evocative-ewr1-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://evocative.com/data-centers/secaucus-nj-data-center-ewr1/","label":"Evocative EWR1 Secaucus NJ data center page","publisher":"Evocative","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/api/fac?state=NJ&limit=250","label":"PeeringDB facility record 2981, 'Evocative EWR1', 1 Enterprise Ave N, Secaucus NJ 07094","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-h5-data-centers-secaucus-nj","sourceRecordId":"h5-data-centers-secaucus-nj","name":"H5 Data Centers Secaucus (NJ01)","operator":"H5 Data Centers","city":"Secaucus","county":"Hudson","address":"200B Meadowlands Parkway","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.784817,"longitude":-74.076264,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-secaucus-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/new-jersey-data-center.html","label":"H5 Data Centers New Jersey (Secaucus) facility page","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/api/fac?name__contains=H5&state=NJ","label":"PeeringDB facility record 3919, 'H5 Data Centers Secaucus (NJ01)', 200B Meadowlands Parkway, Secaucus NJ 07094","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-iron-mountain-nje1-edison-nj","sourceRecordId":"iron-mountain-nje1-edison-nj","name":"Iron Mountain Data Centers NJE-1","operator":"Iron Mountain","city":"Edison","county":"Middlesex","address":"3003 Woodbridge Avenue","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.5210834,"longitude":-74.3473835,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-nje1-edison-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/new-jersey-data-center","label":"New Jersey Data Center | New Jersey Colocation","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://datacenterhawk.com/marketplace/providers/iron-mountain-data-centers/3003-woodbridge-avenue/nje-1","label":"Iron Mountain Data Centers NJE-1 — 3003 Woodbridge Avenue","publisher":"DataCenterHawk","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.openstreetmap.org/way/204316962","label":"OpenStreetMap way/204316962 — IO Datacenter, 3003, Woodbridge Avenue","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-12"}]},{"id":"compute-lumen-weehawken-1-nj","sourceRecordId":"lumen-weehawken-1-nj","name":"Lumen Weehawken 1 Data Center","operator":"Lumen Technologies","city":"Weehawken","county":"Hudson","address":"300 Boulevard East","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.7714,"longitude":-74.0194,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-weehawken-1-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-weehawken-1","label":"Lumen Weehawken 1 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.datacenterknowledge.com/investing/savvis-opens-new-nj2x-financial-trading-hub","label":"Savvis Opens New NJ2X Financial Trading Hub","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-metrobloks-phl-mb01-gibbstown-nj","sourceRecordId":"metrobloks-phl-mb01-gibbstown-nj","name":"Metrobloks PHL-MB01 (285 Swedesboro Road)","operator":"Metrobloks","city":"Gibbstown","county":"Gloucester","address":"285 Swedesboro Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.8202643,"longitude":-75.2610926,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/metrobloks-phl-mb01-gibbstown-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/285-swedesboro-gibbstown-nj-usa/metrobloks/datacenter/phl-mb01-bd2-dh1-dh4","label":"Inflect listing: Metrobloks PHL-MB01-BD2-DH1-DH4, 285 Swedesboro, Greenwich Township, NJ 08027","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://inflect.com/building/285-swedesboro-gibbstown-nj-usa/metrobloks/datacenter/phl-mb01-bd1-dh1-dh","label":"Inflect listing: Metrobloks PHL-MB01-BD1-DH1-DH2 at the same address","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://dcmap.us/states/new-jersey/","label":"New Jersey Data Center Map: Metrobloks PHL MB01 DC2, Gibbstown, Planned","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://nominatim.openstreetmap.org/search?q=285+Swedesboro+Road,+Gibbstown,+NJ&format=json","label":"OpenStreetMap Nominatim geocode of 285 Swedesboro Road, Gibbstown","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-26"}]},{"id":"compute-hekemian-montvale-kpmg-site-data-center-nj","sourceRecordId":"hekemian-montvale-kpmg-site-data-center-nj","name":"Montvale KPMG Site Data Center (3 Chestnut Ridge Road)","operator":"S. Hekemian Group (settlement party: SHG Montvale MB VI, LLC)","city":"Montvale","county":"Bergen","address":"3 Chestnut Ridge Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":41.0474026,"longitude":-74.0694211,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hekemian-montvale-kpmg-site-data-center-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://thepressgroup.net/data-center-option-at-former-kpmg-site-montvales-mayor-affordable-housing-group-clash/","label":"Data center option at former KPMG site? Montvale's mayor, affordable housing group clash","publisher":"Pascack Press (The Press Group)","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.foodandwaterwatch.org/2026/05/18/housing-enviro-advocates-call-on-montvale-to-reject-ai-data-center-plan/","label":"Housing, Enviro Advocates Call on Montvale to Reject AI Data Center Plan","publisher":"Food & Water Watch","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://nominatim.openstreetmap.org/search?q=3+Chestnut+Ridge+Road%2C+Montvale%2C+NJ&format=json&limit=3&addressdetails=1","label":"OpenStreetMap Nominatim geocode: 3 Chestnut Ridge Road, Montvale (Building 1)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"}]},{"id":"compute-american-tower-mount-royal-east-greenwich-nj","sourceRecordId":"american-tower-mount-royal-east-greenwich-nj","name":"Mt. Royal Data Storage Facility","operator":"American Tower","city":"East Greenwich Township","county":"Gloucester","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.8101134,"longitude":-75.2112925,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/american-tower-mount-royal-east-greenwich-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.govtech.com/artificial-intelligence/after-a-data-center-proposal-new-jersey-town-bans-them","label":"'After a Data Center Proposal, New Jersey Town Bans Them' — Government Technology, 12 June 2026","publisher":"Government Technology","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://nominatim.openstreetmap.org/search?q=Mount+Royal,+East+Greenwich+Township,+Gloucester+County,+New+Jersey&format=json&limit=2","label":"OpenStreetMap locality record for Mount Royal, East Greenwich Township, Gloucester County NJ 08061, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-nebius-vineland-nj","sourceRecordId":"nebius-vineland-nj","name":"Nebius Vineland Data Center","operator":"Nebius Group","city":"Vineland","county":"Cumberland","address":"South Lincoln Avenue","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":39.4862,"longitude":-74.992,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nebius-vineland-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey","label":"Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey","publisher":"Nebius","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://nebius.com/blog/posts/300-mw-new-jersey-and-iceland-regions","label":"We're introducing the 300 MW New Jersey region and expanding to Iceland","publisher":"Nebius","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/dataone-to-build-nebius-data-center-in-new-jersey/","label":"DataOne to build Nebius data center in New Jersey","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://whyy.org/articles/data-center-artificial-intelligence-vineland-new-jersey/","label":"Vineland residents are protesting AI data center as concerns mount over emissions","publisher":"WHYY","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://pinelandsalliance.org/dataone-vineland-town-hall/","label":"A Town Hall Too Late – Vineland Data Center","publisher":"Pinelands Alliance","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.inquirer.com/news/new-jersey/ai-data-center-vineland-south-jersey-expansion-20260122.html","label":"South Jersey's largest data center is being built in Vineland. Some residents say they've had no say in the process.","publisher":"Philadelphia Inquirer","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://whyy.org/articles/vineland-data-center-hearing-power-generation/","label":"'Vineland data center makes case for on-site power generation during 6-hour hearing' — WHYY, 6 August 2026","publisher":"WHYY","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://whyy.org/articles/vineland-planning-board-approves-data-center-plan/","label":"'Vineland planning board approves 2nd phase of 300-megawatt data center plan' — WHYY, 18 August 2026","publisher":"WHYY","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://sjclimate.news/8420/essays/what-exactly-is-dataone-building-in-vineland/","label":"What exactly is DataOne building in Vineland?","publisher":"South Jersey Climate News","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://nebius.com/vinelandnj","label":"Nebius x Vineland, New Jersey","publisher":"Nebius","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://whyy.org/articles/vineland-data-center-stop-work-orders/","label":"City of Vineland, N.J. issues stop-work order to parts of data center","publisher":"WHYY","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-njfx-wall-township-nj","sourceRecordId":"njfx-wall-township-nj","name":"NJFX Cable Landing Station Campus","operator":"NJFX","city":"Wall Township","county":"Monmouth","address":null,"state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.1615781,"longitude":-74.0531626,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/njfx-wall-township-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://njfx.net/ecosystem-of-carriers/campus-detail/","label":"NJFX campus detail page (64,000 sq ft, 12 MW, Tier 3, four subsea cables, 35+ network operators)","publisher":"NJFX","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://njfx.net/njfx-advances-campus-for-ai-infrastructure/","label":"NJFX press release, 'NJFX Advances Campus for AI Infrastructure', 2 December 2025","publisher":"NJFX","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=NJFX+Wall+Township+New+Jersey&format=json&addressdetails=1&limit=5","label":"OpenStreetMap mapped building 'New Jersey Fiber Exchange' (way 808909815), Wall Township NJ 07719, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-nyse-mahwah-data-center-nj","sourceRecordId":"nyse-mahwah-data-center-nj","name":"NYSE Data Center (Mahwah)","operator":"New York Stock Exchange","city":"Mahwah","county":"Bergen","address":"1700 MacArthur Boulevard","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":41.078373,"longitude":-74.15293,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nyse-mahwah-data-center-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/1700-macarthur-boulevard-mahwah/new-york-stock-exchange/datacenter/euronextnj1","label":"New York Stock Exchange EuronextNJ1 — marketplace listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.datacenterknowledge.com/colocation/nyse-opens-mahwah-data-center","label":"NYSE Opens Mahwah Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.computerworld.com/article/1433811/in-fortified-data-center-nyse-runs-gated-trading-cloud.html","label":"In fortified data center, NYSE runs 'gated' trading cloud","publisher":"Computerworld","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-prism-on3-nutley-data-center-nj","sourceRecordId":"prism-on3-nutley-data-center-nj","name":"ON3 Data Center (275 Kingsland Street)","operator":"Prism Capital Partners","city":"Nutley","county":"Essex","address":"275 Kingsland Street","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.8300104,"longitude":-74.1535977,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prism-on3-nutley-data-center-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://prismpartners.net/news/press-release/prism-capital-partners-secures-three-key-redevelopment-plan-approvals-for-on3-solidifying-campus-live-work-play-future/","label":"Prism Capital Partners press release, 'Prism Capital Partners Secures Three Key Redevelopment Plan Approvals for ON3', 9 July 2025","publisher":"Prism Capital Partners","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://patch.com/new-jersey/belleville/major-data-center-may-be-coming-on3-site-nutley-other-updates-announced","label":"'Major Data Center May Be Coming To ON3 Site In Nutley' — Belleville Patch, 21 July 2025","publisher":"Patch","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=275+Kingsland+Street,+Nutley,+New+Jersey&format=json&addressdetails=1&limit=5","label":"OpenStreetMap address point for 275 Kingsland Street, Nutley NJ 07110, via Nominatim","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-princeton-university-hpcrc-plainsboro-nj","sourceRecordId":"princeton-university-hpcrc-plainsboro-nj","name":"Princeton University High-Performance Computing Research Center (Forrestal Campus)","operator":"Princeton University","city":"Plainsboro","county":"Middlesex","address":"151 Forrestal Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.3461201,"longitude":-74.6160723,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/princeton-university-hpcrc-plainsboro-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/supercomputers/princeton-u-to-build-new-hpc-data-center","label":"Princeton U. to Build New HPC Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.gensler.com/projects/high-performance-research-computing-center-at-princeton","label":"High-Performance Research Computing Center at Princeton University","publisher":"Gensler","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://paw.princeton.edu/article/research-photo-advancing-ai","label":"Research Photo: Advancing AI","publisher":"Princeton Alumni Weekly","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.openstreetmap.org/api/0.6/way/239801861","label":"OpenStreetMap way 239801861: High Performance Computing Research Center, 151 Forrestal Road","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"},{"url":"https://campustechnology.com/Articles/2013/01/17/Princeton-University-Opens-New-Energy-Efficient-HPC-Research-Center.aspx","label":"Princeton University Opens New Energy-Efficient HPC Research Center","publisher":"Campus Technology","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-qts-east-windsor-nj","sourceRecordId":"qts-east-windsor-nj","name":"QTS East Windsor","operator":"QTS Data Centers","city":"East Windsor","county":"Mercer","address":"159 Princeton-Hightstown Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.279249,"longitude":-74.547551,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-east-windsor-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/east-windsor/","label":"QTS East Windsor, New Jersey data center page","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.peeringdb.com/api/fac?state=NJ&limit=250","label":"PeeringDB facility record 3360, 'QTS Princeton (PJC1)', East Windsor NJ 08520","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://q.com/data-centers/jersey-city/","label":"QTS data center locations listing (East Windsor: 52 acres, 70 MW+)","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-qts-jersey-city-nj","sourceRecordId":"qts-jersey-city-nj","name":"QTS Jersey City (JCY1)","operator":"QTS Data Centers","city":"Jersey City","county":"Hudson","address":"95 Christopher Columbus Drive","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.716892,"longitude":-74.03382,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-jersey-city-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/579","label":"QTS Jersey City (JCY1) – PeeringDB facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.datacenterknowledge.com/operations-and-management/qts-expands-jersey-city-data-center","label":"QTS Expands Jersey City Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-qts-piscataway-1-nj","sourceRecordId":"qts-piscataway-1-nj","name":"QTS Piscataway 1","operator":"QTS Data Centers","city":"Piscataway","county":"Middlesex","address":"101 Possumtown Road","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.5569431,"longitude":-74.4839173,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-piscataway-1-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/piscataway/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.openstreetmap.org/way/362662493","label":"OpenStreetMap way/362662493","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-russo-600-commerce-boulevard-carlstadt-nj","sourceRecordId":"russo-600-commerce-boulevard-carlstadt-nj","name":"Russo Data Center (600 Commerce Boulevard)","operator":"Russo Development (owner/landlord; tenant confidential)","city":"Carlstadt","county":"Bergen","address":"600 Commerce Boulevard","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.8275493,"longitude":-74.0492103,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/russo-600-commerce-boulevard-carlstadt-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://njbiz.com/exclusive-cresa-carlstadt-data-center-lease-russo","label":"Exclusive: Cresa completes 249K-sf Carlstadt data center lease for Russo","publisher":"NJBIZ","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://baxtel.com/data-center/russo-development-carlstadt","label":"Russo Development: Carlstadt (facility listing)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://nominatim.openstreetmap.org/search?street=600+Commerce+Boulevard&city=Carlstadt&state=NJ&format=json&limit=5","label":"OpenStreetMap Nominatim geocode: Commerce Boulevard, Carlstadt","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"}]},{"id":"compute-sentinel-princeton-nurseries-south-brunswick-nj","sourceRecordId":"sentinel-princeton-nurseries-south-brunswick-nj","name":"Sentinel Princeton Nurseries DC-1 (4405 Route 1)","operator":"Sentinel Data Centers (applicant: WRV Nurseries South Brunswick Owner, LLC)","city":"South Brunswick","county":"Middlesex","address":"4405 Route 1","state":"NJ","stateName":"New Jersey","jurisdictionType":"state","latitude":40.363,"longitude":-74.602,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sentinel-princeton-nurseries-south-brunswick-nj","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://patch.com/new-jersey/southbrunswick/massive-data-center-proposed-route-1-south-brunswick","label":"Massive Data Center Proposed On Route 1 In South Brunswick","publisher":"Patch","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://interstatedrywallcorp.com/portfolio-view/sentinel-princeton-nurseries-data-center/","label":"Sentinel – Princeton Nurseries DC-1 Data Center – Core and Shell (contractor portfolio)","publisher":"Interstate Drywall Corp.","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://patch.com/new-jersey/southbrunswick/petition-seeks-stop-proposed-data-center-south-brunswick","label":"Petition Seeks To Stop Proposed Data Center Development In South Brunswick","publisher":"Patch","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://servercountry.org/data/projects/princeton-nurseries-data-center-nj/","label":"Princeton Nurseries Data Center: Middlesex County (tracker record)","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://centraljersey.media/featured/south-brunswick-data-center-rises-amid-growing-opposition/","label":"South Brunswick data center rises amid growing opposition (Oct 6, 2026)","publisher":"Central Jersey Media","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-atterix-raton-digital-hub-nm","sourceRecordId":"atterix-raton-digital-hub-nm","name":"Atterix Raton Advanced Digital Hub","operator":"Atterix LLC","city":"Raton","county":"Colfax","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":36.9033,"longitude":-104.4392,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atterix-raton-digital-hub-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.santafenewmexican.com/news/business/ai-data-center-proposal-in-raton-draws-opposition/article_605c80c8-0a7f-4726-b790-3e2d96f882ed.html","label":"AI data center proposal in Raton draws opposition","publisher":"The Santa Fe New Mexican","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/","label":"Raton residents push back on proposed data center plans","publisher":"KOB 4","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://sourcenm.com/2026/06/10/small-northern-new-mexico-city-postpones-decision-on-data-center-moratorium/","label":"Small northern New Mexico city postpones decision on data center moratorium","publisher":"Source New Mexico","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-centersquare-abq1-albuquerque-nm","sourceRecordId":"centersquare-abq1-albuquerque-nm","name":"Centersquare ABQ1","operator":"Centersquare (formerly Cyxtera Technologies / Evoque Data Center Solutions)","city":"Albuquerque","county":"Bernalillo","address":"400 Tijeras Ave NW","state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35.0844,"longitude":-106.6504,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-abq1-albuquerque-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/centersquare-albuquerque-abq1","label":"Centersquare: Albuquerque ABQ1 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-03"}]},{"id":"compute-connect-data-centers-albuquerque-nm","sourceRecordId":"connect-data-centers-albuquerque-nm","name":"Connect Albuquerque (Westpointe 40)","operator":"Connect Data Centers (Oppidan Investment Company)","city":"Albuquerque","county":"Bernalillo","address":"8351 Daytona Road NW","state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35.0881581,"longitude":-106.7353893,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/connect-data-centers-albuquerque-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/connect-data-centers-albuquerque-nm","label":"Connect Data Centers: Albuquerque, NM Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://servercountry.org/data/projects/connect-data-centers-albuquerque-oppidan-nm/","label":"Connect Data Centers Albuquerque (Oppidan)","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://nominatim.openstreetmap.org/search?q=8351+Daytona+Road+NW,+Albuquerque,+NM+87121&format=json","label":"OpenStreetMap Nominatim geocode of Daytona Road NW, Albuquerque","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-09-10"}]},{"id":"compute-google-lea-county-hobbs-nm","sourceRecordId":"google-lea-county-hobbs-nm","name":"Google Lea County Data Center","operator":"Google","city":"Hobbs","county":"Lea","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":32.7,"longitude":-103.25,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-lea-county-hobbs-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/","label":"We're exploring a potential data center in Lea County, New Mexico","publisher":"Google","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://leacountydatacenter.com/","label":"Lea County Data Center project website","publisher":"Google","kind":"other","retrievedAt":"2026-10-17"},{"url":"https://www.neoteo.com/en/googles-lea-county-data-center-plan-remains-exploratory-amid-water-and-land-scrutiny","label":"Google's Lea County data center plan remains exploratory amid water and land scrutiny","publisher":"Neoteo","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://baxtel.com/news/google-explores-data-center-development-in-new-mexico","label":"Google explores data center development in New Mexico","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-green-data-socorro-county-nm","sourceRecordId":"green-data-socorro-county-nm","name":"Green Data Socorro Campus","operator":"Green Data (Green Data Centers)","city":"Socorro","county":"Socorro","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":34.0584,"longitude":-106.8914,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/green-data-socorro-county-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/plans-for-10000-acre-data-center-scrapped-in-socorro-new-mexico/","label":"Plans for 10,000 acre data center scrapped in Socorro, New Mexico","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://sourcenm.com/2026/06/10/new-mexico-county-adopts-yearlong-data-center-moratorium/","label":"New Mexico county adopts yearlong data center moratorium","publisher":"Source New Mexico","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420","label":"Developer plans 'world's largest' green data center in Socorro","publisher":"El Defensor Chieftain / Albuquerque Journal","kind":"press","retrievedAt":"2026-08-08"}]},{"id":"compute-green-data-spaceport-america-sierra-county-nm","sourceRecordId":"green-data-spaceport-america-sierra-county-nm","name":"Green Data Spaceport America Data Center","operator":"Green Data / Aetherion Inc.","city":null,"county":"Sierra","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":32.9903,"longitude":-106.9698,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/green-data-spaceport-america-sierra-county-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dchieftain.com/news/spaceport-america-data-center-proposal-sparks-curiosity/3086213","label":"Spaceport America data center proposal sparks curiosity","publisher":"El Defensor Chieftain","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://sourcenm.com/2026/07/22/new-mexico-county-adopts-data-center-moratorium-as-residents-protest-spaceport-proposal/","label":"New Mexico county adopts data center moratorium as residents protest Spaceport proposal","publisher":"Source New Mexico","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420","label":"Developer plans 'world's largest' green data center in Socorro (Spaceport America companion-project detail)","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-08-20"},{"url":"https://www.abqjournal.com/news/spaceport-america-data-center-proposal-sparks-curiosity/3084192","label":"Spaceport America in talks with Green Data for data center project in Sierra County","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-09-03"},{"url":"https://www.yahoo.com/news/us/articles/mexico-land-commissioner-shoots-down-203041426.html","label":"New Mexico land commissioner shoots down Canadian data center company's pitch at Spaceport America","publisher":"Source New Mexico (via Yahoo News)","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.abqjournal.com/news/sierra-county-enacts-18-month-data-center-moratorium/3086595","label":"Sierra County enacts 18-month data center moratorium in surprise vote","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-h5-data-centers-albuquerque-nm","sourceRecordId":"h5-data-centers-albuquerque-nm","name":"H5 Data Centers Albuquerque","operator":"H5 Data Centers","city":"Albuquerque","county":"Bernalillo","address":"505 Marquette Avenue NW","state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35.0862,"longitude":-106.6512,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-albuquerque-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/h5-Albuquerque.html","label":"H5 Data Centers Announces Expansion to Albuquerque Edge Data Center","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-03"},{"url":"https://www.peeringdb.com/fac/5092","label":"H5 Data Centers Albuquerque facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-03"}]},{"id":"compute-nova-innova-data-center-albuquerque-nm","sourceRecordId":"nova-innova-data-center-albuquerque-nm","name":"Innova Data Center (Mesa del Sol)","operator":"NOVA Corporation (Diné Development Corporation, Navajo Nation); operated by Innava Data Solutions","city":"Albuquerque","county":"Bernalillo","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35,"longitude":-106.63,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nova-innova-data-center-albuquerque-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/archives/2015/06/29/navajo-owned-data-center-offers-way-to-diversify-tribes-revenue-base-beyond-casinos","label":"Navajo-owned data center offers way to diversify tribe's revenue base beyond casinos","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-15"}]},{"id":"compute-new-era-energy-digital-lea-county-data-center-nm","sourceRecordId":"new-era-energy-digital-lea-county-data-center-nm","name":"Lea County Data Center","operator":"New Era Energy & Digital, Inc.","city":"Lovington","county":"Lea","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":32.7,"longitude":-103.3,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/new-era-energy-digital-lea-county-data-center-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/new-era-plans-7gw-ai-data-center-in-lea-county-new-mexico-powered-by-gas-and-nuclear/","label":"New Era plans 7GW AI data center in Lea County, New Mexico","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.abqjournal.com/business/article_25b63826-6d2c-4b76-9747-e40d9d4d5819.html","label":"New Era Lea County data center coverage","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.powermag.com/nuclear-natural-gas-power-generation-planned-for-massive-new-mexico-data-center-site/","label":"Nuclear, Natural Gas Power Generation Planned for Massive New Mexico Data Center Site","publisher":"POWER Magazine","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://baxtel.com/data-center/new-era-energy-new-mexico","label":"New Era Energy & Digital - Lea County, New Mexico Project","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-03"},{"url":"https://finance.yahoo.com/news/era-energy-digital-enters-land-120000930.html","label":"New Era Energy & Digital enters into land option purchase agreement for 3,500 acres in New Mexico for 7GW AI data center hub","publisher":"Yahoo Finance / Business Wire (New Era Energy & Digital, Inc., Nasdaq: NUAI)","kind":"filing","retrievedAt":"2026-09-15"},{"url":"https://www.newerainfra.ai/","label":"New Era Energy & Digital — project portfolio page (Lea County: 7+ GW planned capacity, 3,500 acres)","publisher":"New Era Energy & Digital, Inc.","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-lanl-strategic-computing-complex-los-alamos-nm","sourceRecordId":"lanl-strategic-computing-complex-los-alamos-nm","name":"Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center)","operator":"Los Alamos National Laboratory (U.S. Department of Energy / NNSA)","city":"Los Alamos","county":"Los Alamos","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35.8755,"longitude":-106.319,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lanl-strategic-computing-complex-los-alamos-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bpce.com/project/los-alamos-national-laboratory","label":"Los Alamos National Laboratory Strategic Computing Complex","publisher":"Bridgers & Paxton Consulting Engineers","kind":"other","retrievedAt":"2026-10-17"},{"url":"https://www.sdxcentral.com/news/los-alamos-national-laboratory-unveils-new-venado-supercomputer-reportedly-capable-of-10-exaflops-of-peak-ai-performance/","label":"Los Alamos National Laboratory unveils new Venado supercomputer reportedly capable of 10 exaflops of peak AI performance","publisher":"SDxCentral","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-meta-los-lunas-ai-nm","sourceRecordId":"meta-los-lunas-ai-nm","name":"Meta Los Lunas AI Expansion","operator":"Meta","city":"Los Lunas","county":"Valencia","address":"4250-4320 Messenger Loop NW","state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":34.8083,"longitude":-106.7296,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-los-lunas-ai-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/","label":"Meta planning expansion of Los Lunas data center campus in New Mexico","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.news-bulletin.com/news/los-lunas-meta-data-center-introduces-expansion-dedicated-to-artificial-intelligence/article_809a47fe-d366-11ef-b76e-470988820678.html","label":"Los Lunas Meta Data Center introduces expansion dedicated to AI","publisher":"News-Bulletin (Valencia County)","kind":"press","retrievedAt":"2026-08-20"},{"url":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","label":"New Mexico utility seeks approval of hybrid BESS offtake contracts to power Meta data centres","publisher":"Energy-Storage.news","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.santafenewmexican.com/news/local_news/similar-to-los-alamos-in-1940s-los-lunas-getting-transformed-by-tech/article_d2a3ca02-4f80-49b6-8af2-e2da8bc378e9.html","label":"Similar to Los Alamos in 1940s, Los Lunas getting transformed by tech","publisher":"The Santa Fe New Mexican","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","label":"The Desert Becomes a Data Center: Meta's $3.3 Billion Bet on Los Lunas, New Mexico","publisher":"MMCG Invest (investment-analysis blog, not a primary operator/government source -- treat address and figures as reported, corroborate before treating as confirmed)","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.prnewswire.com/news-releases/desri-and-tierra-adentro-growth-capital-announce-start-of-construction-on-foxtail-flats-and-four-mile-mesa-solar-and-storage-projects-in-san-juan-county-nm-302781926.html","label":"DESRI and Tierra Adentro Growth Capital announce start of construction on Foxtail Flats and Four Mile Mesa solar and storage projects in San Juan County, NM","publisher":"PR Newswire / DESRI","kind":"press","retrievedAt":"2026-09-15"}]},{"id":"compute-oso-grande-albuquerque-nm","sourceRecordId":"oso-grande-albuquerque-nm","name":"Oso Grande Albuquerque Data Center","operator":"Oso Grande Technologies, Inc.","city":"Albuquerque","county":"Bernalillo","address":"725 6th Street NW","state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35.0897,"longitude":-106.6517,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oso-grande-albuquerque-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.osogrande.com/colocation/","label":"New Mexico Colocation","publisher":"Oso Grande Technologies","kind":"other","retrievedAt":"2026-10-17"}]},{"id":"compute-roswell-information-park-chaves-county-nm","sourceRecordId":"roswell-information-park-chaves-county-nm","name":"Roswell Information Park","operator":"Roswell Information Park LLC (developer Sustany LLC)","city":"Roswell","county":"Chaves","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":33.3943,"longitude":-104.523,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/roswell-information-park-chaves-county-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/desert-mountain-energy-to-support-carbon-capture-at-roswell-data-centre-ceo-appointed-to-advisory-board-302565391.html","label":"Desert Mountain Energy to support carbon capture at Roswell data centre; CEO appointed to advisory board","publisher":"PR Newswire / Desert Mountain Energy Corp.","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html","label":"Desert Mountain Energy signs long-term lease agreement with Roswell Information Park developer","publisher":"The Newswire / Desert Mountain Energy Corp.","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.greenstocknews.com/news/otcmkts/dmehf/desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer","label":"Desert Mountain Energy signs long-term lease agreement with Roswell Information Park developer","publisher":"Green Stock News (Desert Mountain Energy release)","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://pgjonline.com/news/2025/july/desert-mountain-energy-signs-gas-offtake-deal-in-new-mexico","label":"Desert Mountain Energy signs gas offtake deal in New Mexico","publisher":"Pipeline & Gas Journal","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-sandia-725e-hpc-data-center-albuquerque-nm","sourceRecordId":"sandia-725e-hpc-data-center-albuquerque-nm","name":"Sandia National Laboratories 725E High-Performance Computing Data Center","operator":"Sandia National Laboratories (U.S. Department of Energy / NNSA)","city":"Albuquerque","county":"Bernalillo","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35.05,"longitude":-106.54,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sandia-725e-hpc-data-center-albuquerque-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/","label":"Data center earns LEED v4 Gold certification","publisher":"Sandia National Laboratories (Lab News)","kind":"press","retrievedAt":"2026-09-15"}]},{"id":"compute-site-layer-1-playas-grant-county-nm","sourceRecordId":"site-layer-1-playas-grant-county-nm","name":"Site Layer 1 Data Center (Playas)","operator":"Site Layer 1 LLC (Granite Renewables)","city":null,"county":"Grant","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":31.96,"longitude":-108.48,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/site-layer-1-playas-grant-county-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.abqjournal.com/news/in-silver-city-rapid-community-response-to-local-data-center-proposal/3115188","label":"In Silver City, rapid community response to local data center proposal","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://searchlightnm.org/grant-county-residents-raise-alarm-over-secretive-proposed-data-center/","label":"Grant County residents raise alarm over secretive proposed data center","publisher":"Searchlight New Mexico","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.abqjournal.com/news/details-scarce-on-grant-county-data-center-proposal/3138673","label":"Details scarce on Grant County data center proposal","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-stargate-project-jupiter-dona-ana-nm","sourceRecordId":"stargate-project-jupiter-dona-ana-nm","name":"Stargate Project Jupiter","operator":"OpenAI / Oracle / STACK Infrastructure","city":"Santa Teresa","county":"Dona Ana","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":31.8636,"longitude":-106.6895,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stargate-project-jupiter-dona-ana-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/","label":"New Mexico's Project Jupiter data center part of larger Stargate AI initiative — El Paso Matters","publisher":"El Paso Matters","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterdynamics.com/en/news/groups-sue-to-stall-data-center-project-in-do%C3%B1a-ana-county-new-mexico/","label":"Groups sue to stall data center project in Doña Ana County, New Mexico — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://truthout.org/articles/secretive-new-mexico-data-center-plan-races-forward-despite-community-pushback/","label":"Secretive New Mexico Data Center Plan Races Forward Despite Community Pushback","publisher":"Truthout","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.abqjournal.com/business/doa-na-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927","label":"Doña Ana County's Project Jupiter joins $500 billion Stargate initiative","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/","label":"Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Cleaner, Water-Efficient Fuel Cell Technology","publisher":"Oracle","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://sourcenm.com/2026/04/27/nm-project-jupiter-data-center-developers-announce-new-plans-for-generating-power/","label":"NM Project Jupiter data center developers announce new plans for generating power","publisher":"Source New Mexico","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.santafenewmexican.com/news/local_news/project-jupiter-developers-overhaul-data-centers-power-plan/article_d7bb0388-8382-4993-b1db-073d148379ac.html","label":"Project Jupiter developers overhaul data center's power plan","publisher":"Santa Fe New Mexican","kind":"press","retrievedAt":"2026-09-03"},{"url":"https://www.abqjournal.com/business/project-jupiter-permit-applications-forecast-massive-carbon-fuel-use/2932903","label":"Project Jupiter permit applications forecast massive carbon fuel use","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","label":"OpenAI Stargate: where the US sites stand","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-teraplex-gallup-tradeport-mckinley-county-nm","sourceRecordId":"teraplex-gallup-tradeport-mckinley-county-nm","name":"Teraplex Gallup Tradeport Data Center","operator":"Teraplex Data Centers LLC","city":"Gallup","county":"McKinley","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":35.5203,"longitude":-108.8367,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/teraplex-gallup-tradeport-mckinley-county-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gallupsunweekly.com/2026/05/08/data-centerdilemma/","label":"Data center dilemma","publisher":"Gallup Sun","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://servercountry.org/policy/new-mexico/","label":"New Mexico Data Center Policy — Gallup Tradeport entry and local ordinance table","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-15"}]},{"id":"compute-zenith-volts-roswell-chaves-county-data-center-nm","sourceRecordId":"zenith-volts-roswell-chaves-county-data-center-nm","name":"Zenith Volts Roswell / Chaves County Data Center","operator":"Zenith Volts Corp.","city":"Roswell","county":"Chaves","address":null,"state":"NM","stateName":"New Mexico","jurisdictionType":"state","latitude":33.14,"longitude":-104.52,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/zenith-volts-roswell-chaves-county-data-center-nm","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/zenith-volts-corp-secures-county-approval-for-scalable-data-center-20-miles-south-of-roswell-nm-targeting-operation-by-november-2027-302537746.html","label":"Zenith Volts Corp secures county approval for scalable data center 20 miles south of Roswell, NM","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-09-03"},{"url":"https://www.datacenterdynamics.com/en/news/zenith-obtains-planning-approval-for-124gw-data-center-project-in-roswell-new-mexico/","label":"Zenith obtains planning approval for 1.24GW data center project in Roswell, New Mexico","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility","label":"Chaves County (chavescounty.net)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.energy-storage.news/pacifico-zenith-volts-and-fermi-america-propose-gigawatt-scale-energy-solutions-with-bess-to-feed-us-data-centres/","label":"Pacifico, Zenith Volts and Fermi America propose gigawatt-scale energy solutions with BESS to feed US data centres","publisher":"Energy-Storage.news","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.yahoo.com/news/articles/chaves-county-approves-data-center-030700821.html","label":"Chaves County approves data center project amid rising demand for computing infrastructure","publisher":"Yahoo News","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://www.abqjournal.com/business/chaves-county-approves-data-center-project-amid-rising-demand-for-computing-infrastructure/2896546","label":"Chaves County approves data center project amid rising demand for computing infrastructure","publisher":"Albuquerque Journal","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.newswire.ca/news-releases/zenith-volts-corp-secures-county-approval-for-scalable-data-center-20-miles-south-of-roswell-nm-targeting-operation-by-november-2027-822035978.html","label":"Zenith Volts Corp. secures county approval for scalable data center 20 miles south of Roswell, NM","publisher":"Newswire.ca","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-amazon-data-services-reno-storey-county-nv","sourceRecordId":"amazon-data-services-reno-storey-county-nv","name":"Amazon Data Services Reno Data Center Campus","operator":"Amazon Web Services","city":"Sparks","county":"Storey","address":"3800 Peru Drive","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.517683,"longitude":-119.479421,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-data-services-reno-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-4768-proposed-action.pdf","label":"NDEP Notice of Proposed Action - Amazon Data Services, Inc., Class I Air Quality OPTC AP7374-4768, 3800 Peru Drive, Sparks NV","publisher":"Nevada Division of Environmental Protection","kind":"permit","retrievedAt":"2026-09-11"},{"url":"https://www.ndep.nv.gov/uploads/documents/ap7374-4768-directors-review.pdf","label":"NDEP Director's Review and Preliminary Determination - Amazon facility, Storey County, Nevada","publisher":"Nevada Division of Environmental Protection","kind":"permit","retrievedAt":"2026-09-11"},{"url":"https://cdn.prod.website-files.com/68aeb708d74bf84e3f77d2c6/69ab0bd143dbba8b5dc76824_NNDA%20Announces%20Hiring%20Event%20and%20Economic%20Opportunity%20for%20Amazon%20Data%20Center%202026.pdf","label":"NNDA press release: Hiring Event and Economic Opportunity for Amazon Data Center, Storey County (March 6, 2026)","publisher":"Northern Nevada Development Authority","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://newprojectmedia.com/origination-nv-energy-seeks-large-load-approvals-for-aws-prologis-novva-and-fleet-data-centers/","label":"NV Energy seeks large-load approvals for AWS, Prologis, Novva and Fleet data centers","publisher":"New Project Media","kind":"press","retrievedAt":"2026-09-11"}]},{"id":"compute-apple-reno-nv","sourceRecordId":"apple-reno-nv","name":"Apple Reno Data Center (Reno Technology Park)","operator":"Apple","city":"Sparks","county":"Washoe","address":"21905 Reno Technology Parkway East","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.563085,"longitude":-119.554805,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/apple-reno-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf","label":"Apple Inc. Board Packet (Data Center Sales & Use Tax Abatement), July 2024 — Apple's own letter: opened Dec 2012, four buildings + substation across 1,700 acres, 200+ staff","publisher":"Nevada Governor's Office of Economic Development","kind":"filing","retrievedAt":"2026-07-19"},{"url":"https://www.datacenterknowledge.com/hyperscalers/updated-apple-s-reno-data-center-expansion-marches-on","label":"Apple's Reno Data Center Expansion Marches On","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://thenevadaindependent.com/article/apple-nv-energy-apply-for-new-agreement-for-solar-facility-near-reno-to-power-data-center-expansion","label":"Apple, NV Energy apply for new agreement for solar facility near Reno (The Nevada Independent)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.solarpowerworldonline.com/2021/03/61-mw-solar-project-now-supplying-power-to-apple-data-center-in-nevada/","label":"61-MW solar project now supplying power to Apple data center in Nevada (Solar Power World)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://lasvegassun.com/news/2012/jun/27/apple-comes-under-radar-granted-tax-abatement-deal/","label":"Stealthy team effort led to $89M in tax breaks, drew Apple to Reno-Sparks","publisher":"Las Vegas Sun","kind":"subsidy","retrievedAt":"2026-08-14"},{"url":"https://thenevadaindependent.com/article/nevadans-get-few-details-into-data-centers-receiving-tax-breaks-and-it-might-be-illegal","label":"Nevadans get few details into data centers receiving tax breaks — and it might be illegal","publisher":"The Nevada Independent","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.godatacenters.com/data-centers/nevada/reno","label":"Northern Nevada data center directory (Apple Sparks campus, 21905 Reno Technology Pkwy E)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-blusky-ai-wells-elko-county-nv","sourceRecordId":"blusky-ai-wells-elko-county-nv","name":"BluSky AI Wells Modular Data Center","operator":"BluSky AI Inc.","city":"Wells","county":"Elko","address":"1120 Hacienda Ranch Road","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":41.108813,"longitude":-114.956386,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blusky-ai-wells-elko-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.globenewswire.com/news-release/2025/08/28/3140872/29006/en/BluSky-AI-Inc-Announces-Non-Binding-Letter-of-Intent-to-Lease-Strategic-Site-in-Wells-Nevada.html","label":"BluSky AI Inc. Announces Non-Binding Letter of Intent to Lease Strategic Site in Wells, Nevada","publisher":"GlobeNewswire / BluSky AI Inc.","kind":"press","retrievedAt":"2026-09-24"},{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12) — BluSky AI listed as Elko County's sole planned data center, LOI stage","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"}]},{"id":"compute-cc-communications-fallon-churchill-county-nv","sourceRecordId":"cc-communications-fallon-churchill-county-nv","name":"CC Communications Fallon Data Center","operator":"CC Communications","city":"Fallon","county":"Churchill","address":"50 W Williams Avenue","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.474979,"longitude":-118.777657,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cc-communications-fallon-churchill-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacentercatalog.com/usa/cc-communications","label":"CC Communications Data Center, Fallon, Nevada","publisher":"Data Center Catalog","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/reno","label":"Northern Nevada data center directory (CC Communications, 50 W Williams Ave, Fallon)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-centra-rno1-south-virginia-reno-nv","sourceRecordId":"centra-rno1-south-virginia-reno-nv","name":"CENTRA RNO1 (200 South Virginia)","operator":"CENTRA Digital Interconnect","city":"Reno","county":"Washoe","address":"200 S Virginia Street","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.523253,"longitude":-119.811751,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centra-rno1-south-virginia-reno-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=NV&limit=200","label":"PeeringDB facility registry — Nevada (CENTRA RNO01, 200 S Virginia St, status ok)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/reno","label":"Reno, Nevada data center directory (CENTRA Reno RNO1, 200 S Virginia St)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"}]},{"id":"compute-centra-rno2-keystone-reno-nv","sourceRecordId":"centra-rno2-keystone-reno-nv","name":"CENTRA RNO2 (Keystone Data Center)","operator":"CENTRA Digital Interconnect","city":"Reno","county":"Washoe","address":"265 Keystone Avenue","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.525542,"longitude":-119.82612,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centra-rno2-keystone-reno-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300","label":"Keystone Data Center Frequently Asked Questions (updated 2026-07-28)","publisher":"City of Reno","kind":"permit","retrievedAt":"2026-09-24"},{"url":"https://www.centradigital.com/data-centers/rno2","label":"CENTRA RNO2 — Reno, NV facility page","publisher":"CENTRA Digital Interconnect","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/reno","label":"Reno, Nevada data center directory (CENTRA Reno RNO2, 265 Keystone Ave)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/news/centra-completes-structural-topping-out-of-reno-data-center","label":"Centra completes structural topping out of Reno data center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-cobalt-cheyenne-las-vegas-nv","sourceRecordId":"cobalt-cheyenne-las-vegas-nv","name":"Cobalt Cheyenne Data Center","operator":"Cobalt Data Centers","city":"Las Vegas","county":"Clark","address":"7710 W. Cheyenne Ave","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.2183822,"longitude":-115.26296,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cobalt-cheyenne-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/business/cobalt-opens-cheyenne-data-center-in-las-vegas","label":"Cobalt Opens Cheyenne Data Center in Las Vegas - 34,000 sq ft, 5.5 MW of critical power","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://cloudandcolocation.com/state/nevada/","label":"Nevada data center directory - Cobalt Data Centers Cheyenne, 7710 W. Cheyenne, Las Vegas, NV 89129","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://dcmap.us/markets/las-vegas/","label":"dcmap.us Las Vegas market listing - Cobalt Cheyenne, operational","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-11"}]},{"id":"compute-colovore-reno-1-storey-county-nv","sourceRecordId":"colovore-reno-1-storey-county-nv","name":"Colovore Reno 1 (RN01)","operator":"Colovore","city":"McCarran","county":"Storey","address":"100 Italy Drive","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5341121,"longitude":-119.4771513,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/colovore-reno-1-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-5002-directors-review.pdf","label":"Director's review, Class II Air Quality Operating Permit AP7374-5002, Colovore Reno 1 LLC, Storey County","publisher":"Nevada Division of Environmental Protection, Bureau of Air Pollution Control","kind":"permit","retrievedAt":"2026-08-29"},{"url":"https://nevbex.com/2026/08/13/nevada-goed-tax-abatements-nine-companies/","label":"Governor's Office of Economic Development announces tax abatements for nine companies","publisher":"NVBEX","kind":"subsidy","retrievedAt":"2026-08-29"},{"url":"https://www.colovore.com/","label":"Colovore - markets served, including Reno, NV","publisher":"Colovore","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://ndep.nv.gov/uploads/documents/ap7374-5002-class-ii-aqop.pdf","label":"NDEP Class II Air Quality Operating Permit AP7374-5002 issued to Colovore Reno 1 LLC - physical address 100 Italy Drive, McCarran NV 89434, Section 11 T19N R22E, HA 83 Tracy Segment / Storey County","publisher":"Nevada Division of Environmental Protection","kind":"permit","retrievedAt":"2026-09-11"},{"url":"https://goed.nv.gov/wp-content/uploads/2026/07/5-C.-Colovore-Reno-1-LLC-Board-Packet.pdf","label":"Colovore Reno 1 LLC — GOED Board Packet, August 5, 2026 (company profile and EDAWN support letter)","publisher":"Nevada Governor's Office of Economic Development","kind":"subsidy","retrievedAt":"2026-09-24"},{"url":"https://baxtel.com/news/colovore-begins-work-on-reno-data-center","label":"Colovore Begins Work on Reno Data Center (groundbreaking week of 2025-02-19)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-09-24"},{"url":"https://www.colovore.com/news/colovore-completes-first-liquid-cooled-ai-data-center-in-reno-metro-area-to-support-companies-deploying-high-density-computing","label":"Colovore completes first liquid-cooled AI data center in Reno metro area","publisher":"Colovore","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/colovore-reno-nv","label":"Baxtel: Colovore Reno, NV (RNO1, 100 Italy Dr)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-coloxchange-north-las-vegas-nv","sourceRecordId":"coloxchange-north-las-vegas-nv","name":"ColoXchange Las Vegas Data Center","operator":"ColoXchange","city":"North Las Vegas","county":"Clark","address":"3422 Neeham Road","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.231699,"longitude":-115.102555,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coloxchange-north-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/las-vegas","label":"Las Vegas, Nevada data center directory (ColoXchange Las Vegas, 3422 Neeham Rd)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-connect-data-centers-reno-north-valleys-nv","sourceRecordId":"connect-data-centers-reno-north-valleys-nv","name":"Connect Reno Data Center (Oppidan North Valleys)","operator":"Connect Data Centers (Oppidan Investment Company)","city":"Reno","county":"Washoe","address":"9630 N Virginia Street","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.612118,"longitude":-119.87322,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/connect-data-centers-reno-north-valleys-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nevbex.com/2024/12/10/5mw-data-center-planned-near-reno/","label":"5MW Data Center Planned Near Reno","publisher":"NVBEX","kind":"permit","retrievedAt":"2026-09-24"},{"url":"https://www.tmrpa.org/energy-and-data-centers/","label":"Energy and Data Centers — regional engagement (Oppidan listed as approved, evaporative cooling)","publisher":"Truckee Meadows Regional Planning Agency","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/reno","label":"Reno, Nevada data center directory (Connect Reno, N Virginia St & Stead Blvd)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-databank-las1-las-vegas-nv","sourceRecordId":"databank-las1-las-vegas-nv","name":"DataBank LAS1","operator":"DataBank","city":"Las Vegas","county":"Clark","address":"7185 Pollock Drive","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0597501,"longitude":-115.1470938,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/databank-las1-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/las-vegas/","label":"DataBank Las Vegas LAS1 - 7185 Pollock Drive, 57,364 IT sq ft, 3.35 MW critical IT load","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-29"}]},{"id":"compute-edgeconnex-edclas01-las-vegas-nv","sourceRecordId":"edgeconnex-edclas01-las-vegas-nv","name":"EdgeConneX Las Vegas (EDCLAS01)","operator":"EdgeConneX","city":"Las Vegas","county":"Clark","address":"1541 Pama Ln","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0662784,"longitude":-115.1315773,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-edclas01-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=NV&limit=200","label":"PeeringDB facility registry (Nevada) - EdgeConneX Las Vegas (EDCLAS01), 1541 Pama Ln, Las Vegas 89119","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://dcmap.us/markets/las-vegas/","label":"dcmap.us Las Vegas market listing - EdgeConneX Las Vegas EDCLAS01, operational, 0.75 MW","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-11"}]},{"id":"compute-edgecore-reno-campus-storey-county-nv","sourceRecordId":"edgecore-reno-campus-storey-county-nv","name":"EdgeCore Reno Data Center Campus","operator":"EdgeCore Digital Infrastructure","city":"McCarran","county":"Storey","address":"3000 NV-439","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5429755,"longitude":-119.4851422,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgecore-reno-campus-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edgecore.com/locations/reno-data-center","label":"EdgeCore Reno data center campus - 56 acres, 216 MW critical IT load across three buildings in the Tahoe-Reno Industrial Center","publisher":"EdgeCore Digital Infrastructure","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-development-of-reno-nevada-data-center-campus","label":"EdgeCore Digital Infrastructure announces development of Reno, Nevada data center campus","publisher":"EdgeCore Digital Infrastructure","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://baxtel.com/data-center/edgecore-reno","label":"EdgeCore Reno data center - 3000 NV-439, under construction","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://www.peeringdb.com/api/fac?state=NV&limit=200","label":"PeeringDB facility registry (Nevada) - EdgeCore Reno 1, org EdgeCore Digital Infrastructure, 3000 USA Parkway, McCarran 89434","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://ndep.nv.gov/uploads/documents/ap7374-4772_AC12456-class-ii-aqop.pdf","label":"NDEP Class II Air Quality Operating Permit AP7374-4772 issued to MECP1 Reno 1, LLC (RNO1), 3000 USA Parkway, McCarran NV 89437 - Storey County, 126 diesel emergency generators plus 2 fire pumps","publisher":"Nevada Division of Environmental Protection","kind":"permit","retrievedAt":"2026-09-11"},{"url":"https://www.nnbw.com/news/2026/sep/07/development-panel-discusses-data-centers-in-northern-nevada/","label":"Development panel discusses data centers in Northern Nevada","publisher":"Northern Nevada Business Weekly","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-fiberhub-las1-las-vegas-nv","sourceRecordId":"fiberhub-las1-las-vegas-nv","name":"Fiberhub LAS1","operator":"Fiberhub (VegasNAP, LLC)","city":"Las Vegas","county":"Clark","address":"1110 Palms Airport Dr","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.066019,"longitude":-115.138297,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fiberhub-las1-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=NV&limit=200","label":"PeeringDB facility registry (Nevada) - Fiberhub LAS1, org Fiberhub, 1110 Palms Airport Dr, Las Vegas 89119","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://dcmap.us/markets/las-vegas/","label":"dcmap.us Las Vegas market listing - Fiberhub LAS1, operational","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-11"}]},{"id":"compute-fleet-data-centers-storey-county-nv","sourceRecordId":"fleet-data-centers-storey-county-nv","name":"Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)","operator":"Fleet Data Centers","city":"McCarran","county":"Storey","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.53,"longitude":-119.43,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fleet-data-centers-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/fleet-data-centers-closes-46bn-in-senior-secured-notes-for-230mw-storey-county-campus/","label":"Fleet Data Centers closes $4.6bn in senior secured notes for 230MW Storey County campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-30"},{"url":"https://www.nnbw.com/news/2026/jun/02/fleet-data-centers-breaks-ground-on-2-facilities/","label":"Fleet Data Centers breaks ground on 2 facilities","publisher":"Northern Nevada Business Weekly","kind":"press","retrievedAt":"2026-07-30"},{"url":"https://www.nevadaappeal.com/news/2026/jun/09/nevada-data-center-firm-working-on-two-campuses-at-tahoe-reno-industrial-center/","label":"Data center firm working on 2 campuses at Tahoe Reno Industrial Center","publisher":"Nevada Appeal","kind":"press","retrievedAt":"2026-07-30"},{"url":"https://www.kolotv.com/2026/05/20/gov-lombardo-construction-companies-break-ground-2-million-sq-ft-data-center-storey-co/","label":"Gov. Lombardo, construction companies break ground on 2 million sq. ft. data center in Storey Co.","publisher":"KOLO 8 News Now","kind":"press","retrievedAt":"2026-07-30"},{"url":"https://www.carsonnow.org/05/03/2026/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant","label":"Why a Northern Nevada data center wants to build its own temporary natural gas power plant","publisher":"Carson Now","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://thenevadaindependent.com/article/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant","label":"Why a Northern Nevada data center wants to build its own temporary natural gas power plant","publisher":"The Nevada Independent","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-flexential-las-vegas-downtown-nv","sourceRecordId":"flexential-las-vegas-downtown-nv","name":"Flexential Las Vegas - Downtown","operator":"Flexential","city":"Las Vegas","county":"Clark","address":"304 East Carson Avenue","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.1686438,"longitude":-115.1431445,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-las-vegas-downtown-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/nv/las-vegas/downtown-data-center","label":"Flexential official facility page","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1379421123","label":"OpenStreetMap way/1379421123","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-las-vegas-north-las04-nv","sourceRecordId":"flexential-las-vegas-north-las04-nv","name":"Flexential Las Vegas - North (LAS04)","operator":"Flexential","city":"North Las Vegas","county":"Clark","address":"3330 East Lone Mountain Road","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.2481633,"longitude":-115.1012553,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-las-vegas-north-las04-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/nv/las-vegas/north-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/746278786","label":"OpenStreetMap way/746278786","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-google-storey-county-nv","sourceRecordId":"google-storey-county-nv","name":"Google  Data Center","operator":"Google","city":null,"county":"Storey","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.4572167,"longitude":-119.5157991,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/","label":"Google Data Centers — US locations","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://datacenters.google/locations/storey-county-nevada","label":"Google Data Centers — Storey County, Nevada","publisher":"Google","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://datacenters.google/locations/storey-county-nevada/","label":"Storey County, Nevada — Google Data Center Location","publisher":"Google","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://goed.nv.gov/newsroom/google-plans-to-invest-in-nevada-this-year/","label":"Google Plans to Invest in Nevada This Year","publisher":"Nevada Governor's Office of Economic Development","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12), water usage section","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"}]},{"id":"compute-google-henderson-nv","sourceRecordId":"google-henderson-nv","name":"Google Henderson Data Center","operator":"Google","city":"Henderson","county":"Clark","address":"540 West Warm Springs Road","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.056187,"longitude":-115.042545,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-henderson-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/henderson-nevada/","label":"Google Henderson, Nevada — official location page (built 2019)","publisher":"Google","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://lasvegassun.com/news/2019/jul/01/officials-600m-google-facility-boosts-hendersons-p/","label":"Officials: $600M Google facility boosts Henderson's presence — 64 acres on W Warm Springs Rd, July 2019 groundbreaking, online 2020","publisher":"Las Vegas Sun","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.utilitydive.com/news/google-nv-energy-renewable-deal-one-of-the-largest-includes-rare-storage/570131/","label":"Google, NV Energy renewable megadeal includes rare storage component","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterdynamics.com/en/news/googles-nevada-data-center-be-powered-billion-dollar-solar-farm/","label":"Google's Nevada data center to be powered by billion-dollar solar farm","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.openstreetmap.org/api/0.6/way/844359206","label":"OpenStreetMap way 844359206: Google data center building (540 West Warm Springs Road, Henderson)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-isp-net-las-vegas-fremont-nv","sourceRecordId":"isp-net-las-vegas-fremont-nv","name":"isp.net Las Vegas Data Center (DC1)","operator":"isp.net","city":"Las Vegas","county":"Clark","address":"2595 Fremont Street","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.160035,"longitude":-115.119051,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/isp-net-las-vegas-fremont-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.isp.net/colocation-las-vegas","label":"Colocation Las Vegas — isp.net facility page","publisher":"isp.net","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/las-vegas","label":"Las Vegas, Nevada data center directory (isp.net, 2595 Fremont Street)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-jet-ai-moapa-clark-county-nv","sourceRecordId":"jet-ai-moapa-clark-county-nv","name":"Jet.AI Moapa Data Center Campus","operator":"Jet.AI Inc.","city":"Moapa","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.6673648,"longitude":-114.584977,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/jet-ai-moapa-clark-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.globenewswire.com/news-release/2025/12/23/3209946/0/en/jet-ai-inc-jv-for-50mw-data-center-campus-in-moapa-nevada.html","label":"Jet.AI Inc. JV for 50MW Data Center Campus in Moapa, Nevada","publisher":"GlobeNewswire / Jet.AI Inc. (NASDAQ: JTAI)","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://dcmap.us/markets/las-vegas/","label":"dcmap.us Las Vegas market listing - Jet.AI Moapa Data Center, Clark County, planned, 50 MW","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-11"}]},{"id":"compute-lumen-las-vegas-1-aerojet-nv","sourceRecordId":"lumen-las-vegas-1-aerojet-nv","name":"Lumen Las Vegas 1","operator":"Lumen Technologies","city":"North Las Vegas","county":"Clark","address":"1 Aerojet Way","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.237249,"longitude":-115.116814,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-las-vegas-1-aerojet-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/las-vegas","label":"Las Vegas, Nevada data center directory (Lumen Las Vegas 1, 1 Aerojet Way North)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-lumen-reno-1-gardner-street-nv","sourceRecordId":"lumen-reno-1-gardner-street-nv","name":"Lumen Reno 1","operator":"Lumen Technologies","city":"Reno","county":"Washoe","address":"220 Gardner Street","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5245367,"longitude":-119.8272321,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-reno-1-gardner-street-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-reno-1","label":"Baxtel: Lumen Reno 1 (220 Gardner Street)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?street=220+Gardner+Street&city=Reno&state=NV&format=json&limit=5","label":"OSM Nominatim geocode: 220 Gardner Street, Reno","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-manse-technology-campus-pahrump-nv","sourceRecordId":"manse-technology-campus-pahrump-nv","name":"Manse Technology Campus","operator":"Manse Technology Campus LLC","city":"Pahrump","county":"Nye","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.1925194,"longitude":-115.9758446,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/manse-technology-campus-pahrump-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mansetechcampus.com/about","label":"About the Project - Manse Technology Campus (capital investment, taxes, jobs, water)","publisher":"Manse Technology Campus","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://pvc.news/understanding-the-proposed-pahrump-data-center-a-closer-look-at-the-proposal/","label":"Understanding the proposed Pahrump data center: a closer look at the proposal","publisher":"Pahrump Valley Community News","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://mansetechcampus.com/","label":"Manse Technology Campus - project overview (developer site), Manse Road corridor, Pahrump, Nye County","publisher":"Manse Technology Campus","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://kiowacountypress.net/content/nevada-county-totally-bans-data-centers-over-appropriated-water-basin","label":"Nevada county totally bans data centers in over-appropriated water basin (Nevada Current syndication)","publisher":"Kiowa County Press / Nevada Current","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://pvtimes.com/news/data-centers-banned-in-pahrump-189671/","label":"Pahrump data center ban passes unanimously - Nye County Bill No. 2026-11, adopted 5-0 on Aug. 18, 2026","publisher":"Pahrump Valley Times","kind":"press","retrievedAt":"2026-09-11"}]},{"id":"compute-microsoft-silver-springs-lyon-county-nv","sourceRecordId":"microsoft-silver-springs-lyon-county-nv","name":"Microsoft Silver Springs Data Center Campus","operator":"Microsoft","city":"Silver Springs","county":"Lyon","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.373597,"longitude":-119.2267443,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-silver-springs-lyon-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://citizenportal.ai/articles/7417886/nevada/lyon-county/planning-commission-recommends-approval-of-two-microsoft-substations-in-silver-springs-amid-neighbor-concerns","label":"Planning commission recommends approval of two Microsoft substations in Silver Springs amid neighbor concerns","publisher":"Citizen Portal","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://www.basinandrangewatch2.org/data-centers","label":"Data Centers - Silver Springs data center and Silver Springs 345 kV transmission line, ROW application September 2024, revised plan of development April 2026","publisher":"Basin and Range Watch","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold","label":"BLM issues decision for Silver Springs 345kV Fold","publisher":"U.S. Bureau of Land Management","kind":"filing","retrievedAt":"2026-08-29"}]},{"id":"compute-microsoft-fernley-nv","sourceRecordId":"microsoft-fernley-nv","name":"Microsoft Victory Logistics District Campus","operator":"Microsoft","city":"Fernley","county":"Lyon","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.6082,"longitude":-119.2169,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-fernley-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nevadaappeal.com/news/2025/apr/17/microsoft-buy-300-acres-in-fernley-lyon-county-victory-logistics-district/","label":"Microsoft to buy 300 acres in Fernley's Lyon County Victory Logistics District","publisher":"Nevada Appeal","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.nnbw.com/news/2025/apr/16/microsoft-fernley-lyon-county-victory-logistics-district-land-buy/","label":"NNBW / Nevada Appeal (dated Apr 16-17, 2025)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.yahoo.com/news/us/articles/moratorium-data-centers-approved-lyon-010015188.html","label":"Yahoo News","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-monarch-data-center-yerington-nv","sourceRecordId":"monarch-data-center-yerington-nv","name":"Monarch Data Center","operator":"Copia Power","city":"Yerington","county":"Lyon","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":38.9855429,"longitude":-119.162989,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/monarch-data-center-yerington-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kolotv.com/2026/08/07/lyon-county-commissioners-approve-monarch-data-center/","label":"Lyon County Commissioners approve Monarch Data Center","publisher":"KOLO 8 News Now","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://www.carsonnow.org/08/09/2026/massive-data-center-in-lyon-county-is-one-step-closer-to-being-built","label":"Massive data center in Lyon County is one step closer to being built","publisher":"Carson Now / The Nevada Independent","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://nevbex.com/2026/08/12/monarch-data-center-lyon-county-rezoning/","label":"Lyon County Commissioners approve rezoning for Monarch Data Center","publisher":"NVBEX","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://nevbex.com/2026/07/15/lyon-county-new-data-center-power-district/","label":"Lyon County Presses Ahead with Power Improvement District - Monarch described as eight two-story buildings plus an electrical substation","publisher":"NVBEX","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built/","label":"A massive data center in rural Nevada is one step closer to being built","publisher":"The Nevada Independent","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-novva-apex-industrial-park-north-las-vegas-nv","sourceRecordId":"novva-apex-industrial-park-north-las-vegas-nv","name":"Novva Apex Industrial Park Data Center","operator":"Novva Data Centers","city":"North Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.3291,"longitude":-114.9278,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/novva-apex-industrial-park-north-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/novva-data-centers-acquires-205-acres-of-land-in-las-vegas","label":"Novva Data Centers Acquires 205 Acres of Land in Las Vegas","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.reviewjournal.com/business/developer-sells-200-acres-in-apex-industrial-park-3431263/","label":"Big land sale near Las Vegas bags $181M","publisher":"Las Vegas Review-Journal","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-novva-las-vegas-nicco-way-nv","sourceRecordId":"novva-las-vegas-nicco-way-nv","name":"Novva Las Vegas Data Center","operator":"Novva Data Centers","city":"North Las Vegas","county":"Clark","address":"6115 Nicco Way","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.266299,"longitude":-115.0478715,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/novva-las-vegas-nicco-way-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.novva.com/data-center-facilities/las-vegas/","label":"Novva Data Centers - Las Vegas facility specifications","publisher":"Novva Data Centers","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://www.prnewswire.com/news-releases/novva-data-centers-announces-new-data-center-in-north-las-vegas-featuring-water-free-cooling-and-renewable-energy-301623117.html","label":"Novva Data Centers Announces New Data Center in North Las Vegas featuring Water-Free Cooling and Renewable Energy","publisher":"PR Newswire / Novva Data Centers","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://dcmap.us/markets/las-vegas/","label":"dcmap.us Las Vegas market listing - Novva North Las Vegas, operational, 100 MW","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-11"}]},{"id":"compute-novva-tahoe-reno-storey-county-nv","sourceRecordId":"novva-tahoe-reno-storey-county-nv","name":"Novva Tahoe Reno Data Center","operator":"Novva Data Centers","city":"McCarran","county":"Storey","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.53,"longitude":-119.44,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/novva-tahoe-reno-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/novva-data-centers-announces-the-launch-of-tahoe-reno-data-center-302500299.html","label":"Novva Data Centers Announces the Launch of Tahoe Reno Data Center (PR Newswire)","publisher":"Novva Data Centers / PR Newswire","kind":"press","retrievedAt":"2026-07-15"},{"url":"https://www.datacenterdynamics.com/en/news/american-data-center-operator-novva-launches-facility-in-nevada/","label":"American data center operator Novva launches facility in Nevada (DCD)","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-15"},{"url":"https://www.datacentermap.com/usa/nevada/reno/novva-tahoe-reno/","label":"Novva Tahoe Reno Data Center — 1 Astro Way (60 MW), Storey County","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-15"},{"url":"https://www.novva.com/media-center/launch-of-tahoe-reno-data-center/","label":"Novva Data Centers Tahoe Reno — launch of Tahoe Reno data center","publisher":"Novva Data Centers","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://cleanview.co/data-centers/nevada","label":"Data Centers in Nevada — project list (Novva Tahoe Reno, 60 MW, Storey County)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-oppidan-paradise-post-road-clark-county-nv","sourceRecordId":"oppidan-paradise-post-road-clark-county-nv","name":"Oppidan Post Road Data Center (Paradise)","operator":"Oppidan Investment Company","city":"Paradise","county":"Clark","address":"4460 W Post Road","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.07533,"longitude":-115.20061,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oppidan-paradise-post-road-clark-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nevbex.com/2025/03/10/oppidan-paradise-data-center-approval/","label":"Clark County Planning Commission Approves Five-Megawatt Data Center","publisher":"NVBEX","kind":"permit","retrievedAt":"2026-10-14"}]},{"id":"compute-tract-peru-shelf-storey-county-nv","sourceRecordId":"tract-peru-shelf-storey-county-nv","name":"Peru Shelf Technology Park","operator":"Tract","city":null,"county":"Storey","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.545801,"longitude":-119.497162,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-peru-shelf-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tract.com/project/peru-shelf/","label":"Tract - Peru Shelf Technology Park project page (686 total acres, 810 MW, Storey County / Tahoe-Reno Industrial Center)","publisher":"Tract","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.blackridgeresearch.com/blog/upcoming-new-ai-hyperscale-data-center-projects-nevada","label":"Top 5 New Data Center Projects in Nevada (2026) - Tract Peru Shelf Technology Park, Storey County, 810 MW, under construction","publisher":"Blackridge Research","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://dcmap.us/counties/storey-county-nv/","label":"dcmap.us Storey County listing - Peru Shelf Technology Park, Tract, under construction, 810 MW","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-11"}]},{"id":"compute-powerhouse-reno-storey-county-nv","sourceRecordId":"powerhouse-reno-storey-county-nv","name":"PowerHouse Reno Campus","operator":"PowerHouse Data Centers","city":"McCarran","county":"Storey","address":"600 Britain Drive","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5602824,"longitude":-119.4990959,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-reno-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center","label":"PowerHouse breaks ground on Reno data center","publisher":"PowerHouse Data Centers","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.powerhousedata.com/data-center/powerhouse-reno","label":"PowerHouse Reno campus page (49 acres, 900,000 SF, Power: 200 MW)","publisher":"PowerHouse Data Centers","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-roller-network-reno-nv","sourceRecordId":"roller-network-reno-nv","name":"Roller Network Reno Data Center","operator":"Roller Network LLC","city":"Reno","county":"Washoe","address":"3545 Airway Drive, Suite 114","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.469161,"longitude":-119.770958,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/roller-network-reno-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=NV&limit=200","label":"PeeringDB facility registry — Nevada (Roller Network, 3545 Airway Dr Suite 114, status ok)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/reno","label":"Reno, Nevada data center directory (Roller Network, 3545 Airway Dr)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-switch-apex-industrial-park-north-las-vegas-nv","sourceRecordId":"switch-apex-industrial-park-north-las-vegas-nv","name":"Switch Apex Industrial Park Land Position","operator":"Switch","city":"North Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.329138,"longitude":-114.9277774,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-apex-industrial-park-north-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.reviewjournal.com/business/switch-buys-more-land-in-nlv-apex-park-for-95m-3731350/","label":"Las Vegas data-center owner Switch purchased 140 acres in North Las Vegas' Apex Industrial Park for $95M","publisher":"Las Vegas Review-Journal","kind":"press","retrievedAt":"2026-08-29"},{"url":"https://thenevadaindependent.com/article/henderson-considers-data-center-pause-amid-construction-boom-across-clark-county","label":"Henderson considers data center pause amid construction boom across Clark County - notes Switch's 300+ acres in Apex Industrial Park","publisher":"The Nevada Independent","kind":"press","retrievedAt":"2026-08-29"}]},{"id":"compute-switch-armory-campus-enterprise-nv","sourceRecordId":"switch-armory-campus-enterprise-nv","name":"Switch Armory Campus (9380 S Decatur Blvd)","operator":"Switch","city":"Las Vegas","county":"Clark","address":"9380 S Decatur Blvd","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.018,"longitude":-115.205,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-armory-campus-enterprise-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/switch-armory-building-1","label":"Baxtel: Switch Armory Bldg1 (9380 S Decatur Blvd, 55-acre Armory Campus)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/switch-armory-bldg2","label":"Baxtel: Switch Armory Bldg2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=West+Serene+Avenue,+Enterprise,+Nevada&format=json&limit=15","label":"OSM Nominatim geocode of West Serene Avenue (used for the approximate pin)","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-citadel-storey-county-nv","sourceRecordId":"switch-citadel-storey-county-nv","name":"Switch CITADEL Campus","operator":"Switch","city":"McCarran","county":"Storey","address":"1 Superloop Circle","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.6183,"longitude":-119.3732,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/switch-citadel-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.switch.com/citadel/","label":"Switch CITADEL Campus — Switch.com","publisher":"Switch","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterknowledge.com/switch/switch-unveils-650-mw-data-center-campus-in-reno-nevada","label":"Switch unveils 650 MW campus in Reno, Nevada — Data Center Knowledge","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.switch.com/switch-tahoe-reno-data-center-now-open/","label":"Switch TAHOE RENO Now Open — largest, most advanced data-center campus in the world","publisher":"Switch","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://thenevadaindependent.com/article/have-data-center-tax-breaks-helped-nevadas-economy-heres-what-we-found","label":"Have data center tax breaks helped Nevada's economy? — The Nevada Independent","publisher":"The Nevada Independent","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/colocation/article/11427861/switch-will-support-reno-data-center-campus-with-reclaimed-water","label":"Switch Will Support Reno Data Center Campus with Reclaimed Water — Data Center Frontier","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.prnewswire.com/news-releases/switch-tahoe-reno-now-open-largest-most-advanced-data-center-campus-in-the-world-300407648.html","label":"Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World","publisher":"PR Newswire (Switch)","kind":"press","retrievedAt":"2026-09-24"},{"url":"https://ndep.nv.gov/uploads/documents/ap7375-3672-class-i-optc-1.pdf","label":"NDEP Class I Air Quality Operating Permit to Construct AP7375-3672 issued to Switch, Ltd. - physical address 1 Superloop Circle, McCarran NV 89434, HA 83 Tracy Segment / Storey County","publisher":"Nevada Division of Environmental Protection","kind":"permit","retrievedAt":"2026-09-11"},{"url":"https://www.peeringdb.com/api/fac?state=NV&limit=200","label":"PeeringDB facility registry (Nevada) - Switch Tahoe Reno, org Switch, Ltd., 1 Superloop Circle, McCarran 89434","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-11"},{"url":"https://www.switch.com/?p=3631","label":"Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World","publisher":"Switch","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-edge-1-nv","sourceRecordId":"switch-edge-1-nv","name":"Switch Edge 1","operator":"Switch","city":"Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0591345,"longitude":-115.213688,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-edge-1-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/switch","label":"Baxtel facility profile — Switch Edge 1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1017048670","label":"OpenStreetMap way/1017048670","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","label":"Switch AI/HPC — Switch Las Vegas Core Campus, exascale AI/high-density platform","publisher":"switch.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/switch-contracts-for-solar-power-for-its-entire-data-center-footprint","label":"Data Center Knowledge: Switch Contracts for Solar Power for Its Entire Data Center Footprint","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-evo-ai-factories-las-vegas-nv","sourceRecordId":"switch-evo-ai-factories-las-vegas-nv","name":"Switch EVO AI Factories 1 & 2 (Jones Blvd / 215 Beltway)","operator":"Switch","city":"Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0634602,"longitude":-115.2238166,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-evo-ai-factories-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.switch.com/switch-is-building-ai-factories-in-las-vegas/","label":"Switch is building 'AI factories' in Las Vegas","publisher":"Switch (republishing Las Vegas Review-Journal)","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/switch-evo-ai-factory-2","label":"Baxtel: Switch EVO AI Factory 2 (W Maule Ave)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=West+Maule+Avenue,+Clark+County,+Nevada&format=json&limit=10","label":"OSM Nominatim geocode of West Maule Avenue near Jones Blvd (used for the approximate pin)","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-las-19-enterprise-nv","sourceRecordId":"switch-las-19-enterprise-nv","name":"Switch LAS 19","operator":"Switch","city":"Enterprise","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0571,"longitude":-115.2125,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-19-enterprise-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fox5vegas.com/2026/06/18/clark-county-approves-switch-data-center-project-southwest-valley-after-public-opposition/","label":"Clark County approves Switch data center items in southwest Las Vegas after public pushback","publisher":"FOX5 Las Vegas","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://lasvegassun.com/news/2026/jun/23/switch-wins-las-vegas-expansion-approval-even-as-d/","label":"Switch wins Las Vegas expansion approval even as data center backlash sweeps across Nevada","publisher":"Las Vegas Sun","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-switch-las-vegas-10-nv","sourceRecordId":"switch-las-vegas-10-nv","name":"Switch Las Vegas 10","operator":"Switch","city":"Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0555857,"longitude":-115.2230608,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-10-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/switch","label":"Baxtel facility profile — Switch Las Vegas 10","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/984796364","label":"OpenStreetMap way/984796364","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","label":"Switch AI/HPC — Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPU","publisher":"switch.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/switch-contracts-for-solar-power-for-its-entire-data-center-footprint","label":"Data Center Knowledge: Switch Contracts for Solar Power for Its Entire Data Center Footprint","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-las-vegas-11-nv","sourceRecordId":"switch-las-vegas-11-nv","name":"Switch Las Vegas 11","operator":"Switch","city":"Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0558853,"longitude":-115.2141369,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-11-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/switch","label":"Baxtel facility profile — Switch Las Vegas 11","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/617194689","label":"OpenStreetMap way/617194689","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","label":"Switch AI/HPC — Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPU","publisher":"switch.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/switch-contracts-for-solar-power-for-its-entire-data-center-footprint","label":"Data Center Knowledge: Switch Contracts for Solar Power for Its Entire Data Center Footprint","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-las-vegas-12-nv","sourceRecordId":"switch-las-vegas-12-nv","name":"Switch Las Vegas 12","operator":"Switch","city":"Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0617389,"longitude":-115.2132922,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-12-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/nevada/las-vegas/switch-las-vegas-12/","label":"Switch facility directory","publisher":"Switch","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/172739950","label":"OpenStreetMap way/172739950","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","label":"Switch AI/HPC — Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPU","publisher":"switch.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/switch-contracts-for-solar-power-for-its-entire-data-center-footprint","label":"Data Center Knowledge: Switch Contracts for Solar Power for Its Entire Data Center Footprint (Switch Solar/Dry Lake SEZ, NV Energy renewable tariff)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.switch.com/sustainable-data-center-designs/","label":"Switch sustainable data center design page","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-las-vegas-14-nv","sourceRecordId":"switch-las-vegas-14-nv","name":"Switch Las Vegas 14","operator":"Switch","city":"Las Vegas","county":"Clark","address":"5680 Badura Avenue","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0629139,"longitude":-115.2213882,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-14-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/switch-las-vegas-14","label":"Switch: Las Vegas 14 data center - 5680 Badura Ave, Las Vegas, operational, year built 2025","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://www.cleanview.co/data-centers/nevada","label":"Data centers in Nevada - project list (Switch Las Vegas 14, Clark County, operating 2025)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-29"}]},{"id":"compute-switch-las-vegas-15-nv","sourceRecordId":"switch-las-vegas-15-nv","name":"Switch Las Vegas 15","operator":"Switch","city":"Las Vegas","county":"Clark","address":"5660 W Badura Avenue","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.063373,"longitude":-115.220362,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-15-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/switch-las-vegas-15","label":"Switch: Las Vegas 15 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/las-vegas","label":"Las Vegas, Nevada data center directory (Switch LAS VEGAS 15, 5660 Badura Ave)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-switch-las-vegas-16-nv","sourceRecordId":"switch-las-vegas-16-nv","name":"Switch Las Vegas 16 (NAP16)","operator":"Switch","city":"Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0658822,"longitude":-115.218789,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-16-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/api/0.6/way/1558897570","label":"OpenStreetMap way 1558897570: Switch Las Vegas 16 (ref NAP16, telecom=data_center, operator=Switch)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/switch-las-vegas-16","label":"Baxtel: Switch Las Vegas 16 listing","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-las-vegas-4-nv","sourceRecordId":"switch-las-vegas-4-nv","name":"Switch Las Vegas 4","operator":"Switch","city":"Las Vegas","county":"Clark","address":"4495 East Sahara Avenue","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.143646,"longitude":-115.076779,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-4-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/api/0.6/way/1017460713","label":"OpenStreetMap way 1017460713: Switch Las Vegas 4 (telecom=data_center, operator=Switch, 4495 East Sahara Avenue)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"},{"url":"https://www.cleanview.co/data-centers/nevada/4299/switch-las-vegas-4","label":"Cleanview: Switch Las Vegas 4","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-las-vegas-5-nv","sourceRecordId":"switch-las-vegas-5-nv","name":"Switch Las Vegas 5","operator":"Switch","city":"Las Vegas","county":"Clark","address":"4489 East Sahara Avenue","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.1427635,"longitude":-115.0766965,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-5-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/switch","label":"Baxtel facility profile — Switch Las Vegas 5","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1017460715","label":"OpenStreetMap way/1017460715","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","label":"Switch AI/HPC — Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPU","publisher":"switch.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/switch-contracts-for-solar-power-for-its-entire-data-center-footprint","label":"Data Center Knowledge: Switch Contracts for Solar Power for Its Entire Data Center Footprint","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.openstreetmap.org/api/0.6/way/1017460715","label":"OpenStreetMap way 1017460715: Switch Las Vegas 5 (4489 East Sahara Avenue)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-las-vegas-7-nv","sourceRecordId":"switch-las-vegas-7-nv","name":"Switch Las Vegas 7","operator":"Switch","city":"Enterprise","county":"Clark","address":"7135 South Decatur Boulevard","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0599191,"longitude":-115.210197,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-7-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/switch","label":"Baxtel facility profile — Switch Las Vegas 7","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/172739953","label":"OpenStreetMap way/172739953","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","label":"Switch AI/HPC — Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPU","publisher":"switch.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/switch-contracts-for-solar-power-for-its-entire-data-center-footprint","label":"Data Center Knowledge: Switch Contracts for Solar Power for Its Entire Data Center Footprint","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.openstreetmap.org/api/0.6/way/172739953","label":"OpenStreetMap way 172739953: Switch Las Vegas 7 (7135 South Decatur Boulevard)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-las-vegas-8-nv","sourceRecordId":"switch-las-vegas-8-nv","name":"Switch Las Vegas 8","operator":"Switch","city":"Las Vegas","county":"Clark","address":"5225 W Capovilla Ave","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.057834,"longitude":-115.214258,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-8-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/api/0.6/way/585998677","label":"OpenStreetMap way 585998677: Switch Las Vegas 8 (telecom=data_center, operator=Switch)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/switch-las-vegas-8","label":"Baxtel: Switch Las Vegas 8 (5225 W Capovilla Ave)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://www.cleanview.co/data-centers/nevada/4274/switch-las-vegas-8","label":"Cleanview: Switch Las Vegas 8","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-las-vegas-9-nv","sourceRecordId":"switch-las-vegas-9-nv","name":"Switch Las Vegas 9","operator":"Switch","city":"Las Vegas","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.0557074,"longitude":-115.2196277,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-las-vegas-9-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/switch","label":"Baxtel facility profile — Switch Las Vegas 9","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/585998678","label":"OpenStreetMap way/585998678","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","label":"Switch AI/HPC — Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPU","publisher":"switch.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/switch-contracts-for-solar-power-for-its-entire-data-center-footprint","label":"Data Center Knowledge: Switch Contracts for Solar Power for Its Entire Data Center Footprint","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-tahoe-reno-1-the-citadel-campus-nv","sourceRecordId":"switch-tahoe-reno-1-the-citadel-campus-nv","name":"Switch Tahoe Reno 1 (The Citadel Campus)","operator":"Switch","city":"McCarran","county":"Storey","address":"1 Superloop Circle","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5140681,"longitude":-119.4755145,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-tahoe-reno-1-the-citadel-campus-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/nevada/reno/switch-tahoe-reno/","label":"Switch facility directory","publisher":"Switch","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1116775094","label":"OpenStreetMap way/1116775094","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.switch.com/switch-tahoe-reno-data-center-now-open/","label":"Switch TAHOE RENO Now Open press release (130MW renewable figure for TR1)","publisher":null,"kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","label":"Switch/Capital Dynamics groundbreaking release","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-tahoe-reno-2-the-citadel-campus-nv","sourceRecordId":"switch-tahoe-reno-2-the-citadel-campus-nv","name":"Switch Tahoe Reno 2 (The Citadel Campus)","operator":"Switch","city":"McCarran","county":"Storey","address":"1 Superloop Circle","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5138706,"longitude":-119.4848531,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-tahoe-reno-2-the-citadel-campus-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-centers/switch","label":"Baxtel facility profile — Switch Tahoe Reno 2 (The Citadel Campus)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1116775095","label":"OpenStreetMap way/1116775095","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","label":"Switch/Capital Dynamics groundbreaking release","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.switch.com/sustainable-data-center-designs/","label":"Switch sustainable data center design page","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-tahoe-reno-3-the-citadel-campus-nv","sourceRecordId":"switch-tahoe-reno-3-the-citadel-campus-nv","name":"Switch Tahoe Reno 3 (The Citadel Campus)","operator":"Switch","city":"McCarran","county":"Storey","address":"1 Superloop Circle","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5115198,"longitude":-119.4833058,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-tahoe-reno-3-the-citadel-campus-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/switch-breaks-ground-on-second-and-third-tahoe-reno-data-centers-following-multi-megawatt-expansions-with-global-e-commerce-and-semiconductor-clients-301177069.html","label":"Switch facility directory","publisher":"Switch","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1320683840","label":"OpenStreetMap way/1320683840","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","label":"Switch/Capital Dynamics groundbreaking release (127MW behind-the-meter + 240MWh storage, Storey County)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.switch.com/sustainable-data-center-designs/","label":"Switch sustainable data center design page (Nevada-specific 179MW claim, 100% renewable since 2016)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-switch-tahoe-reno-4-the-citadel-campus-nv","sourceRecordId":"switch-tahoe-reno-4-the-citadel-campus-nv","name":"Switch Tahoe Reno 4 (The Citadel Campus)","operator":"Switch","city":"McCarran","county":"Storey","address":"1 Superloop Circle","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.509868,"longitude":-119.4830413,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-tahoe-reno-4-the-citadel-campus-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/api/0.6/way/1494498031","label":"OpenStreetMap way 1494498031: Tahoe Reno 4 (telecom=data_center, operator=Switch)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/switch-tahoe-reno-4","label":"Baxtel: The Citadel Campus Building 4","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-switch-tahoe-reno-5-the-citadel-campus-nv","sourceRecordId":"switch-tahoe-reno-5-the-citadel-campus-nv","name":"Switch Tahoe Reno 5 (The Citadel Campus)","operator":"Switch","city":"McCarran","county":"Storey","address":"1 Superloop Circle","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5080827,"longitude":-119.4832371,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-tahoe-reno-5-the-citadel-campus-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/api/0.6/way/1494498032","label":"OpenStreetMap way 1494498032: Tahoe Reno 5 (telecom=data_center, operator=Switch)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/switch-tahoe-reno-5","label":"Baxtel: The Citadel Campus Building 5","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-townsite-solar-2-boulder-city-nv","sourceRecordId":"townsite-solar-2-boulder-city-nv","name":"Townsite Solar 2 Boulder City Data Center","operator":"Townsite Solar 2 LLC","city":"Boulder City","county":"Clark","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":35.9787649,"longitude":-114.8337574,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/townsite-solar-2-boulder-city-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://bcnv.org/1174/TS2-Data-Center-Proposal","label":"TS2 Data Center Proposal (withdrawn 7.6.2026) - official Boulder City project page","publisher":"City of Boulder City, Nevada","kind":"permit","retrievedAt":"2026-08-29"},{"url":"https://www.cleanview.co/data-centers/nevada","label":"Data centers in Nevada - project list (Townsite Solar 2 Boulder City Data Center, Clark County, 170 MW, planned)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-29"},{"url":"https://biologicaldiversity.org/programs/public_lands/pdfs/2026-0213-Boulder-City-Stay-Granted.pdf","label":"IBLA 2026-0213 / IBLA 2026-0216 stay order (Sept. 1, 2026) - City of Boulder City and Center for Biological Diversity v. BLM, Townsite Data Center amended right-of-way","publisher":"U.S. Department of the Interior, Interior Board of Land Appeals","kind":"filing","retrievedAt":"2026-09-11"},{"url":"https://www.kjzz.org/business/2026-07-28/nevada-city-dubs-itself-a-test-case-for-data-centers-on-federal-lands-near-communities","label":"Nevada city dubs itself a test case for data centers on federal lands near communities - 81-acre BLM parcel in Eldorado Valley, BLM approval released June 26","publisher":"KJZZ","kind":"press","retrievedAt":"2026-09-11"},{"url":"https://www.enr.com/articles/63613-federal-board-halts-167-mw-nevada-data-center-approval","label":"Federal Board Halts 167-MW Nevada Data Center Approval","publisher":"Engineering News-Record","kind":"press","retrievedAt":"2026-09-24"},{"url":"https://biologicaldiversity.org/w/news/press-releases/appeal-challenges-public-lands-data-center-in-nevada-2026-07-27/","label":"Appeal Challenges Public Lands Data Center in Nevada","publisher":"Center for Biological Diversity","kind":"press","retrievedAt":"2026-09-24"},{"url":"https://www.bcnv.org/1170/Data-Centers","label":"Data Centers — Boulder City official page (TS2 city-site application withdrawn 2026-07-06)","publisher":"City of Boulder City, Nevada","kind":"permit","retrievedAt":"2026-09-24"}]},{"id":"compute-tpx-communications-las-vegas-nv","sourceRecordId":"tpx-communications-las-vegas-nv","name":"TPx Las Vegas Data Center","operator":"TPx Communications","city":"Las Vegas","county":"Clark","address":"1181 Grier Drive","state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":36.068452,"longitude":-115.139451,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tpx-communications-las-vegas-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","label":"Memo: Data Centers — Background Information (revised 2026-05-12)","publisher":"Nevada Legislative Counsel Bureau, Research Division","kind":"filing","retrievedAt":"2026-09-24"},{"url":"https://www.godatacenters.com/data-centers/nevada/las-vegas","label":"Las Vegas, Nevada data center directory (TPx Las Vegas, 1181 Grier Dr)","publisher":"goDataCenters","kind":"other","retrievedAt":"2026-09-24"}]},{"id":"compute-tract-silver-springs-nv","sourceRecordId":"tract-silver-springs-nv","name":"Tract Silver Springs Data Center Park","operator":"Tract","city":"Silver Springs","county":"Lyon","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.407,"longitude":-119.229,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-silver-springs-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tract.com/news/tract-expands-its-greater-reno-portfolio-closing-on-1060-acres-in-silver-springs-nevada-following-successful-rezoning-and-development-agreement-with-lyon-county/","label":"Tract Expands Its Greater Reno Portfolio, Closing on 1,060 Acres in Silver Springs, Nevada","publisher":"Tract","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.datacenterdynamics.com/en/news/tract-acquires-1000-acres-in-nevada-for-16gw-data-center-park/","label":"Tract acquires 1,000 acres in Nevada for 1.6GW data center park","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-30"},{"url":"https://citizenportal.ai/articles/2740005/Lyon-County/Nevada/Lyon-County-approves-Tract-Capitals-data-center-project-plan-in-Silver-Springs","label":"Lyon County approves Tract Capital's data center project plan in Silver Springs","publisher":"CitizenPortal.ai","kind":"permit","retrievedAt":"2026-07-30"},{"url":"https://www.datacentermap.com/usa/nevada/reno/tract-silver-springs/","label":"Tract Silver Springs Data Center","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-30"},{"url":"https://baxtel.com/news/tract-acquires-1-000-acres-in-nevada-for-1-6gw-data-center-park","label":"Tract Acquires 1,000 Acres in Nevada for 1.6GW Data Center Park","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-tract-virginia-highlands-storey-county-nv","sourceRecordId":"tract-virginia-highlands-storey-county-nv","name":"Tract Virginia Highlands Technology Park","operator":"Tract","city":"Lockwood","county":"Storey","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5071009,"longitude":-119.6464691,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-virginia-highlands-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tract.com/project/virginia-highlands/","label":"Virginia Highlands - Tract project page (8,590 acres, 11 parcels, 2,500 MW, owned and in development)","publisher":"Tract","kind":"other","retrievedAt":"2026-09-24"},{"url":"https://www.cleanview.co/data-centers/nevada","label":"Data centers in Nevada - project list and locations (Tract Virginia Highlands, Storey County, 2,500 MW, planned)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-29"}]},{"id":"compute-vantage-nv1-storey-county-nv","sourceRecordId":"vantage-nv1-storey-county-nv","name":"Vantage Data Centers NV1","operator":"Vantage Data Centers","city":"McCarran","county":"Storey","address":null,"state":"NV","stateName":"Nevada","jurisdictionType":"state","latitude":39.5311,"longitude":-119.5904,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-nv1-storey-county-nv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/","label":"Vantage Data Centers Invests $3 Billion to Deliver AI Campus in Nevada","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.businesswire.com/news/home/20250715406750/en/Vantage-Data-Centers-Invests-$3-Billion-to-Deliver-AI-Campus-in-Growing-Nevada-Market","label":"Vantage Data Centers NV1 Campus Announcement — BusinessWire","publisher":"BusinessWire","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterfrontier.com/site-selection/article/55305086/nv1-and-the-nevada-hyperscale-boom-vantage-data-centers-bets-3b-on-the-ai-future","label":"NV1 and the Nevada Hyperscale Boom: Vantage Data Centers Bets $3B on the AI Future","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://goed.nv.gov/newsroom/data-center-plans-to-invest-254-million-and-generate-76-million-in-tax-revenue/","label":"Data center plans to invest $254 million and generate $76 million in tax revenue","publisher":"Nevada Governor's Office of Economic Development","kind":"subsidy","retrievedAt":"2026-10-14"}]},{"id":"compute-32-avenue-of-the-americas-ny","sourceRecordId":"32-avenue-of-the-americas-ny","name":"32 Avenue of the Americas","operator":"Multi-tenant carrier hotel (Digital Realty, CoreSite, and other carrier/telecom tenants)","city":"New York","county":"New York","address":"32 Avenue of the Americas","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.720012,"longitude":-74.004641,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/32-avenue-of-the-americas-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk13","label":"Digital Realty JFK13 — New York","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.coresite.com/data-center/ny1-new-york-ny","label":"CoreSite NY1 — New York","publisher":"CoreSite","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://services5.arcgis.com/GfwWNkhOj9bNBqoJ/arcgis/rest/services/MAPPLUTO/FeatureServer/0/query?where=BBL%3D1001920001&outFields=*&f=json","label":"New York County parcel/GIS record (parcel BBL 1001920001 (Block 192, Lot 1))","publisher":"New York County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.peeringdb.com/fac/120","label":"PeeringDB: Digital Realty NYC (32 AofA), 32 6th Ave (Avenue of the Americas), New York NY 10013","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://en.wikipedia.org/wiki/32_Avenue_of_the_Americas","label":"32 Avenue of the Americas — Wikipedia (original 1914 building, 1932 expansion, Rudin purchase 1999)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-netrality-325-hudson-street-ny","sourceRecordId":"netrality-325-hudson-street-ny","name":"325 Hudson Street","operator":"Netrality Properties (JV with Jamestown, LP); H5 Data Centers operates colocation space in the building","city":"New York","county":"New York","address":"325 Hudson Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.7268,"longitude":-74.008,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/netrality-325-hudson-street-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/H5-Expands-NYC.html","label":"H5 Data Centers Announces Expansion to 325 Hudson in New York City","publisher":"H5 Data Centers","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://netrality.com/news/netrality-properties-325-hudson-street-facility-now-home-to-lightpath-point-of-presence/","label":"Netrality Properties' 325 Hudson Street Facility Now Home to Lightpath Point of Presence","publisher":"Netrality Properties","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.peeringdb.com/fac/1816","label":"PeeringDB: H5 Data Centers New York, 325 Hudson Street, New York NY 10013","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-365-data-centers-commack-ny","sourceRecordId":"365-data-centers-commack-ny","name":"365 Data Centers Long Island (Commack)","operator":"365 Data Centers","city":"Commack","county":"Suffolk","address":"500 Commack Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.8242092,"longitude":-73.2929267,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-commack-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/commack/","label":"Commack — 365 Data Centers (operator facility page, 500 Commack Rd, Commack, NY 11725)","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.prnewswire.com/news-releases/365-data-centers-acquires-commack-long-island-data-center-from-mindshift-technologies-300998269.html","label":"365 Data Centers Acquires Commack, Long Island Data Center from mindSHIFT Technologies","publisher":"365 Data Centers (via PR Newswire)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=500+Commack+Road%2C+Commack%2C+NY+11725&format=json&limit=3&addressdetails=1","label":"OpenStreetMap/Nominatim geocode of 500 Commack Road, Commack, NY 11725","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-365-data-centers-ny10-65-broadway-ny","sourceRecordId":"365-data-centers-ny10-65-broadway-ny","name":"365 Data Centers NY10 (65 Broadway)","operator":"365 Data Centers","city":"New York","county":"New York","address":"65 Broadway","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.707335,"longitude":-74.012583,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-ny10-65-broadway-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://365datacenters.com/wp-content/uploads/2023/05/365_CUTSHEET_FINAL_NYC_V3.pdf","label":"365 Data Centers: New York NY10 (65 Broadway) cut sheet","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/fac/2014","label":"PeeringDB: 365 Data Centers New York (NY10), 65 Broadway Floor 3, New York NY 10006","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.storagenewsletter.com/?p=299885","label":"H5 Data Centers Announces Acquisition of Three Locations from 365 Data Centers (Buffalo, Nashville, Tampa)","publisher":"StorageNewsletter (press release)","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-60-hudson-street-ny","sourceRecordId":"60-hudson-street-ny","name":"60 Hudson Street","operator":"Multi-tenant carrier hotel (Hudson Interxchange, Digital Realty, DataBank, Equinix, and 100+ telecom tenants)","city":"New York","county":"New York","address":"60 Hudson Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.71767,"longitude":-74.008348,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/60-hudson-street-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1994342/000153949723001716/n3791_x3-ts.htm","label":"BBCMS Mortgage Trust 2023-C22 FWP (60 Hudson Street building disclosure)","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/hudson-ix-to-add-2mw-of-capacity-at-60-hudson-in-nyc/","label":"Hudson IX to Add 2MW of Capacity at 60 Hudson in NYC","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-09-08"},{"url":"https://services5.arcgis.com/GfwWNkhOj9bNBqoJ/arcgis/rest/services/MAPPLUTO/FeatureServer/0/query?where=BBL%3D1001440040&outFields=*&f=json","label":"New York County parcel/GIS record (parcel BBL 1001440040 (Block 144, Lot 40))","publisher":"New York County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.peeringdb.com/fac/10","label":"PeeringDB: Digital Realty NYC (60 Hudson), 60 Hudson St, New York NY 10013-3315","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-75-broad-street-manhattan-ny","sourceRecordId":"75-broad-street-manhattan-ny","name":"75 Broad Street (Broad Street Connect carrier hotel)","operator":"Multi-tenant carrier hotel — NYI / JEMB Realty 'Broad Street Connect'; tenants include HorizonIQ (Internap NYMEXT1), Evocative, Epsilon and Verizon","city":"New York","county":"New York","address":"75 Broad Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.7045967,"longitude":-74.011221,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/75-broad-street-manhattan-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nyi.net/solutions/colocation-data-centers/new-york/broad-street-connect/","label":"Broad Street Connect — NYI/JEMB Realty interconnection hub at 75 Broad Street (≈12.5 MW electrical potential, Con Edison, 1,000-ton cooling)","publisher":"NYI","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/75-broad-street","label":"75 Broad Data Center — 720,000 sq ft, owner JEMB Realty; operators Epsilon, HorizonIQ NYMEXT1, NYI, Verizon","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-9ldg-niagara-falls-ny","sourceRecordId":"9ldg-niagara-falls-ny","name":"9LDG Niagara AI Data Center","operator":"9 Lives Digital Group (9LDG)","city":"Niagara Falls","county":"Niagara","address":"3807 Highland Ave.","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.0628,"longitude":-79.0175,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/9ldg-niagara-falls-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/9ldg-plans-ai-data-center-at-niagara-falls/","label":"9LDG Plans AI Data Center at Niagara Falls","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.niagara-gazette.com/news/local_news/falls-firm-fronted-by-convicted-money-launderer-eyeing-north-end-data-center/article_80fca10c-4f5d-11ef-89b1-777f94833d22.html","label":"Falls firm fronted by convicted money launderer eyeing North End data center","publisher":"Niagara Gazette","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-arconic-arsenal-data-site-massena-ny","sourceRecordId":"arconic-arsenal-data-site-massena-ny","name":"Arsenal Data Site (Arconic Massena Operations)","operator":"Arconic Corporation (Apollo-owned)","city":"Massena","county":"St. Lawrence","address":"45 County Route 42","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":44.9528,"longitude":-74.883,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/arconic-arsenal-data-site-massena-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20&%20Zoning%20Presentation%20-%20Final.pdf","label":"St. Lawrence County Planning — LGC 2025 Planning & Zoning presentation: NYISO queue excerpt listing Arconic Corporation 'Arsenal Data Site 250/500/1000' (queue #1728–1730, IR 3/7/2025)","publisher":"St. Lawrence County Planning Office","kind":"iso_queue","retrievedAt":"2026-09-21"},{"url":"https://cleanview.co/data-centers/new-york","label":"Data Centers in New York — 'Arsenal Data Site', Arconic Corporation, St. Lawrence, 933 MW planned","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://ordspub.epa.gov/ords/cimc/f?p=CIMC:RCRA:::::P14_RCRA_HANDLER_ID:NYD002232304","label":"EPA RCRA profile — ARCONIC MASSENA OPERATIONS, 45 County Route 42, Massena NY 13662 (~2,700 acres)","publisher":"US EPA","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","label":"NYISO Interconnection Queue, Load Projects: #1728/#1729/#1730 'Arsenal Data Site 250/500/1000', Arconic Corporation, peak MW 233 / 233 / 467 (DAT-AI), status 5","publisher":"New York Independent System Operator","kind":"iso_queue","retrievedAt":"2026-10-09"}]},{"id":"compute-blackrock-amherst-ny","sourceRecordId":"blackrock-amherst-ny","name":"BlackRock Data Center, Amherst (CrossPoint Business Park)","operator":"BlackRock, Inc.","city":"Amherst","county":"Erie","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.0432075,"longitude":-78.7493887,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/blackrock-amherst-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/2012383/000119312526071966/blk-20251231.htm","label":"BlackRock, Inc. Form 10-K (FY2025), Item 2 Properties: owned 43,000 sq ft data center in Amherst, New York","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-10-09"},{"url":"https://www.datacenterknowledge.com/data-center-construction/report-blackrock-s-new-york-state-data-center-construction-set-to-start","label":"Report: BlackRock's New York State Data Center Construction Set to Start (Jan 2015)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://nominatim.openstreetmap.org/search?format=json&limit=5&q=CrossPoint%20Parkway%2C%20Amherst%2C%20NY","label":"OpenStreetMap/Nominatim: Crosspoint Parkway, Crosspoint Business Park, Town of Amherst (OSM way 12311252)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"}]},{"id":"compute-bloomberg-orangeburg-ny","sourceRecordId":"bloomberg-orangeburg-ny","name":"Bloomberg LP Data Center","operator":"Bloomberg LP","city":"Orangeburg","county":"Rockland","address":"155 Corporate Drive","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.036652,"longitude":-73.986828,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bloomberg-orangeburg-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/0001603578/000153949714000486/n306_premktx1.htm","label":"WFRBS Commercial Mortgage Trust 2014-C20 FWP (Bloomberg Orangeburg facility disclosure)","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterknowledge.com/investing/bloomberg-plans-710-million-data-center-in-n-y-suburb","label":"Bloomberg Plans $710 Million Data Center in N.Y. Suburb","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://rocklandtimes.com/2013/06/27/bloomberg-tops-off-new-datacenter/","label":"Bloomberg Tops Off New Datacenter","publisher":"Rockland County Times","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://patch.com/new-york/pearlriver/topping-off-orangeburg-data-center","label":"Topping off of Orangeburg data center (Bloomberg, 155 Corporate Drive)","publisher":"Pearl River Patch","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-wf-industrial-yaphank-ny","sourceRecordId":"wf-industrial-yaphank-ny","name":"Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)","operator":"WF Industrial (Wildflower)","city":"Yaphank","county":"Suffolk","address":"1001 Expressway Drive North","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.832188,"longitude":-72.929969,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wf-industrial-yaphank-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.longislandpress.com/2026/07/15/moratorium-data-centers-state/","label":"The debate about data centers as state leaders place moratorium","publisher":"Long Island Press","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://longisland.news12.com/2026/06/26/proposed-ai-data-center-in-yaphank-meets-opposition-from-residents-and-town-leaders/4dG9mouCvXwvgvC6Mjsvkr","label":"Proposed AI data center in Yaphank meets opposition from residents and town leaders","publisher":"News 12 Long Island","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf","label":"Brookhaven IDA July 15 2026 board packet — June 17 2026 minutes: WF Industrial XII, LLC proposes converting all three buildings to data centers (50 FTE); Board consensus not to support data centers","publisher":"Town of Brookhaven Industrial Development Agency","kind":"subsidy","retrievedAt":"2026-09-21"},{"url":"https://liparks.com/articles/brookhaven-data-center-moratorium-yaphank-2026/_11735/","label":"Brookhaven data center moratorium and the Yaphank (Wildflower) proposal","publisher":"LI Parks","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-bnl-sdcc-b725-upton-ny","sourceRecordId":"bnl-sdcc-b725-upton-ny","name":"Brookhaven National Laboratory Scientific Data and Computing Center (Building 725)","operator":"Brookhaven National Laboratory (U.S. Department of Energy)","city":"Upton","county":"Suffolk","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.8679786,"longitude":-72.876393,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bnl-sdcc-b725-upton-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://indico.jlab.org/event/459/papers/11607/files/718-CHEP-2023-BNL-Data-Center-paper.pdf","label":"Finalizing Transition to the New Data Center at BNL (Latif, Misawa, Zaytsev; CHEP 2023)","publisher":"Brookhaven National Laboratory / CHEP 2023","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.openstreetmap.org/way/471294208","label":"OpenStreetMap way 471294208: '725 - CSI' building, Brookhaven National Laboratory","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"}]},{"id":"compute-centrilogic-rochester-ny","sourceRecordId":"centrilogic-rochester-ny","name":"Centrilogic Rochester Data Center","operator":"Centrilogic","city":"Rochester","county":"Monroe","address":"28 Mansfield Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.1671944,"longitude":-77.6730439,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centrilogic-rochester-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.centrilogic.com/rochester-new-york-data-center/","label":"Rochester, New York (United States Head Office) — Centrilogic (operator facility page: 22,000 sq ft, N+1 cooling, diverse utility feeds from 2 substations)","publisher":"Centrilogic","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.centrilogic.com/centrilogic-launches-u-s-headquarters/","label":"Centrilogic Launches U.S. Headquarters with Rochester Data Center","publisher":"Centrilogic","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://cloudandcolocation.com/datacenters/centrilogic-rochester-data-center/","label":"CentriLogic Rochester Data Center — 28 Mansfield Street, Rochester, NY 14606","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=28+Mansfield+Street%2C+Rochester%2C+NY+14606&format=json&limit=2&addressdetails=1","label":"OpenStreetMap/Nominatim geocode of 28 Mansfield Street, Rochester, NY 14606","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-colocrossing-buf1-buffalo-ny","sourceRecordId":"colocrossing-buf1-buffalo-ny","name":"ColoCrossing BUF1, Buffalo","operator":"ColoCrossing","city":"Buffalo","county":"Erie","address":"325 Delaware Avenue","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.8930043,"longitude":-78.8752659,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/colocrossing-buf1-buffalo-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.colocrossing.com/datacenter/buffalo-ny","label":"Buffalo Data Center (BUF1) — ColoCrossing (operator facility page: 325 Delaware Ave, Buffalo NY 14202; 13,000 sq ft; 1.44 MW utility power; 1.4 MW generator; 130 tons cooling; commissioned 2014)","publisher":"ColoCrossing","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.datacenterknowledge.com/deals/365-data-centers-partners-with-colocrossing-in-buffalo","label":"365 Data Centers Partners with ColoCrossing in Buffalo","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=325+Delaware+Avenue%2C+Buffalo%2C+NY+14202&format=json&limit=2&addressdetails=1","label":"OpenStreetMap/Nominatim geocode of 325 Delaware Avenue, Buffalo, NY 14202","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-cyrusone-nym7-wappingers-falls-ny","sourceRecordId":"cyrusone-nym7-wappingers-falls-ny","name":"CyrusOne NYM7 (Wappingers Falls)","operator":"CyrusOne","city":"Wappingers Falls","county":"Dutchess","address":"155 Myers Corners Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.599043,"longitude":-73.882221,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nym7-wappingers-falls-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/wappingers-falls-ny","label":"CyrusOne: Wappingers Falls, NY (NYM7) data center page","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/fac/2355","label":"PeeringDB: CyrusOne Wappingers Falls (fac 2355), 155 Myers Corners Road, Wappingers Falls NY 12590","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://cleanview.co/data-centers/new-york/5041/cyrusone-nym7---building-1","label":"Cleanview: CyrusOne NYM7 - Building 1 (Dutchess County, year operational 2001)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-databank-lga3-orangeburg-ny","sourceRecordId":"databank-lga3-orangeburg-ny","name":"DataBank LGA3 (Orangeburg Data Center Campus)","operator":"DataBank","city":"Orangeburg","county":"Rockland","address":"2000 Corporate Dr.","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.037331,"longitude":-73.987853,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-lga3-orangeburg-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/new-york/lga3","label":"LGA3 / Orangeburg Data Center","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://www.datacenterfrontier.com/site-selection/article/55056553/databanks-orangeburg-data-center-campus-targets-ai-for-the-empire-state","label":"DataBank's Orangeburg Data Center Campus Targets AI for the Empire State","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.databank.com/data-centers/new-york/","label":"DataBank: New York data centers (LGA3 and LGA4, 2000 Corporate Dr., 10962)","publisher":"DataBank","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://rcbizjournal.com/2026/07/09/a-positive-seqra-declaration-on-databanks-expansion-plans-in-orangeburg-sets-the-stage-for-more-rigorous-environmental-review/","label":"A positive SEQRA declaration on DataBank's expansion plans in Orangeburg sets the stage for more rigorous environmental review (July 9, 2026)","publisher":"Rockland County Business Journal","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://spectrumlocalnews.com/nys/buffalo/politics/2026/08/27/a-data-center-battle-unfolds-30-miles-north-of-manhattan","label":"A data center battle unfolds 30 miles north of Manhattan","publisher":"Spectrum News","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-dataverge-brooklyn-ny","sourceRecordId":"dataverge-brooklyn-ny","name":"DataVerge Brooklyn (Industry City)","operator":"DataVerge","city":"Brooklyn","county":"Kings","address":"882 3rd Avenue","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.6579597,"longitude":-74.0055488,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dataverge-brooklyn-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dataverge.com/interconnected-data-center-brooklyn/","label":"Interconnected Colocation Data Center Brooklyn — DataVerge (operator facility page: 882 3rd Ave, Brooklyn NY; 50,000 sq ft with 40,000 sq ft raised floor; 1.75 MW diesel backup)","publisher":"DataVerge","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/dataverge-brooklyn","label":"DataVerge Brooklyn data center (formerly ColoGuard CGNY1 & CGNY2), 882 3rd Ave, 8th & 9th floors","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=882+3rd+Avenue%2C+Brooklyn%2C+NY+11232&format=json&limit=2&addressdetails=1","label":"OpenStreetMap/Nominatim: building named \"Cologuard\" at 882 3rd Avenue, Sunset Park, Brooklyn NY 11232 (OSM 249605318)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-digital-realty-jfk10-manhattan-ny","sourceRecordId":"digital-realty-jfk10-manhattan-ny","name":"Digital Realty JFK10 (111 Eighth Avenue)","operator":"Digital Realty","city":"New York","county":"New York","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.741369,"longitude":-74.003206,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-jfk10-manhattan-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk10","label":"Digital Realty JFK10 Data Center","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://oqc.tech/company/newsroom/oqc-quantum-ai-data-centre","label":"OQC, Digital Realty and NVIDIA launch Quantum-AI data centre in New York","publisher":"Oxford Quantum Circuits","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.hpcwire.com/off-the-wire/oqc-and-digital-realty-team-with-nvidia-to-launch-new-york-quantum-ai-data-center/","label":"OQC and Digital Realty Team with NVIDIA to Launch New York Quantum-AI Data Center","publisher":"HPCwire","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://services5.arcgis.com/GfwWNkhOj9bNBqoJ/arcgis/rest/services/MAPPLUTO/FeatureServer/0/query?where=BBL%3D1007390001&outFields=*&f=json","label":"New York County parcel/GIS record (parcel BBL 1007390001 (Block 739, Lot 1))","publisher":"New York County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-eco-yotta-oneonta-ny","sourceRecordId":"eco-yotta-oneonta-ny","name":"Eco-Yotta Data Center (proposed, County Route 9)","operator":"Eco-Yotta Inc.","city":"Oneonta","county":"Otsego","address":"357 County Route 9","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.451656,"longitude":-75.115285,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eco-yotta-oneonta-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.thedailystar.com/news/local_news/oneonta-town-board-passes-one-year-data-center-moratorium/article_a68f1baa-9dec-4ac5-8bae-3dd86ba53b1c.html","label":"Oneonta Town Board passes one-year data center moratorium","publisher":"The Daily Star","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.wktv.com/news/focus-economy/12-month-halt-on-oneonta-ai-data-center-construction-plans/article_f78ba803-32be-4331-95ed-c9c8e525ab1d.html","label":"12-month halt on Oneonta AI data center construction plans","publisher":"WKTV","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-empire-ai-beta-buffalo-ny","sourceRecordId":"empire-ai-beta-buffalo-ny","name":"Empire AI Beta","operator":"Empire AI consortium (hosted by the University at Buffalo, SUNY)","city":"Buffalo","county":"Erie","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.8949,"longitude":-78.8677,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/empire-ai-beta-buffalo-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new","label":"Governor Hochul Announces Empire AI Beta Fully Online as Federal Government Takes Inspiration From New York to Launch State and Regional AI Infrastructure Hubs","publisher":"Office of the Governor of New York State","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.buffalo.edu/ubnow/stories/2026/08/empire-ai-beta.html","label":"Empire AI Beta, housed at UB, now fully online","publisher":"University at Buffalo (UBNow)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.governor.ny.gov/news/governor-hochul-announces-40-million-launch-empire-ai-beta-supercomputer","label":"Governor Hochul Announces $40 Million to Launch Empire AI Beta Supercomputer","publisher":"Office of the Governor of New York State","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.buffalo.edu/ubnow/stories/2025/06/empire-ai-supercomputing-funding.html","label":"Empire AI, housed at UB, awarded $40 million, Gov. Hochul says","publisher":"University at Buffalo (UBNow)","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-empire-ai-gamma-buffalo-ny","sourceRecordId":"empire-ai-gamma-buffalo-ny","name":"Empire AI Gamma","operator":"Empire AI consortium (hosted by the University at Buffalo, SUNY)","city":"Buffalo","county":"Erie","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.8864,"longitude":-78.8784,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/empire-ai-gamma-buffalo-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new","label":"Governor Hochul Announces Empire AI Beta Fully Online as Federal Government Takes Inspiration From New York to Launch State and Regional AI Infrastructure Hubs","publisher":"Office of the Governor of New York State","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.buffalo.edu/ubnow/stories/2026/08/empire-ai-beta.html","label":"Empire AI Beta, housed at UB, now fully online","publisher":"University at Buffalo (UBNow)","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-equinix-ny13-elmsford-ny","sourceRecordId":"equinix-ny13-elmsford-ny","name":"Equinix NY13 (401 Fieldcrest Drive, Elmsford)","operator":"Equinix","city":"Elmsford","county":"Westchester","address":"401 Fieldcrest Drive","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.0551,"longitude":-73.8201,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny13-elmsford-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/equinix-elmsford-ny13","label":"Equinix Elmsford NY13","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://www.datacenterhawk.com/marketplace/providers/equinix/401-fieldcrest-drive/ny13","label":"Equinix NY13 – 401 Fieldcrest Drive","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-equinix-ny9-manhattan-ny","sourceRecordId":"equinix-ny9-manhattan-ny","name":"Equinix NY9","operator":"Equinix","city":"New York","county":"New York","address":"111 8th Avenue","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.740907,"longitude":-74.001768,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ny9-manhattan-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/38","label":"Equinix NY9 - New York, 111 8th Avenue","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-evocative-jfk2-chappaqua-ny","sourceRecordId":"evocative-jfk2-chappaqua-ny","name":"Evocative JFK2 (NY2) Chappaqua","operator":"Evocative (formerly VPLS)","city":"Chappaqua","county":"Westchester","address":"480 North Bedford Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.1779776,"longitude":-73.7548848,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/evocative-jfk2-chappaqua-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://evocative.com/news/new-york-data-center-acquisition/","label":"VPLS Acquires New York Data Center — 480 N. Bedford Plaza, Chappaqua (38,000 sq ft), March 9 2021","publisher":"Evocative","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/evocative-chappaqua-jfk2","label":"Evocative Chappaqua JFK2 Data Center — fully operational; acquired from vXchnge/Summit March 2021","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-1547-orny1-orangeburg-ny","sourceRecordId":"1547-orny1-orangeburg-ny","name":"fifteenfortyseven ORNY1 (1 Ramland Road, Orangeburg)","operator":"fifteenfortyseven Critical Systems Realty (1547), in a joint venture with Harrison Street","city":"Orangeburg","county":"Rockland","address":"1 Ramland Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.034512,"longitude":-73.97584,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/1547-orny1-orangeburg-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://1547realty.com/resource/fifteenfortyseven-announces-ribbon-cutting-ceremony-for-flagship-facility-in-orangeburg-ny","label":"Fifteenfortyseven Announces Ribbon Cutting Ceremony For Flagship Facility In Orangeburg, NY","publisher":"fifteenfortyseven Critical Systems Realty","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://rocklandtimes.com/2026/05/08/orangeburg-pre-approved-for-additional-2300000-sq-ft-data-center/","label":"Orangeburg Pre-Approved for Additional 230,000 sq. ft. Data Center","publisher":"Rockland County Times","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/fac/10862","label":"PeeringDB: ORNY1 (1547 Critical Systems Realty), 1 Ramland Rd, Orangeburg NY 10962","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","label":"NYISO Interconnection Queue, Load Projects: #1715 '1547 CSR - Orangeburg LLC', 30 MW, Rockland County, O&R, status 10 (Accepted Cost Allocation / IA in progress)","publisher":"New York Independent System Operator","kind":"iso_queue","retrievedAt":"2026-10-09"}]},{"id":"compute-global-ai-endicott-ny","sourceRecordId":"global-ai-endicott-ny","name":"Global AI Endicott Data Center","operator":"Global AI","city":"Endicott","county":"Broome","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.0987,"longitude":-76.0494,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/global-ai-endicott-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.unite.ai/global-ai-closes-first-debt-raise-to-expand-sovereign-ai-data-centers/","label":"Global AI Secures $441M Senior Secured Credit Facility to Expand Sovereign AI Data Centers","publisher":"Unite.AI","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.unite.ai/?p=450561","label":"Global AI $441M credit facility (Endicott: 16 MW initial critical IT load, ramp to 100 MW)","publisher":"Unite.AI","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-h5-buffalo-i-lockport-ny","sourceRecordId":"h5-buffalo-i-lockport-ny","name":"H5 Data Centers Buffalo I (formerly Yahoo Lockport)","operator":"H5 Data Centers","city":"Lockport","county":"Niagara","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.16879237433895,"longitude":-78.7516290070774,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-buffalo-i-lockport-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/h5-acquires-new-york-data-centers-from-yahoo-in-sale-leaseback-deal/","label":"H5 Acquires New York Data Centers From Yahoo in Sale-Leaseback Deal","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.btpm.org/local/2025-01-22/yahoo-lockport-data-center-sold-for-49-million","label":"Yahoo Lockport Data Center Sold for $49 Million","publisher":"Buffalo Toronto Public Media","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/analysis/yahoos-compute-coop-is-not-for-chickens/","label":"Yahoo's Compute Coop Is Not for Chickens","publisher":"Data Center Dynamics","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://gis.niagaracounty.com/arcgis/rest/services/NC_GIS/NC_GIS/FeatureServer/4/query?where=SBL%3D%271080000001064000%27&outFields=*&outSR=4326&f=json","label":"Niagara County parcel/GIS record (parcel SBL 1080000001064000 (ParcelId 8094))","publisher":"Niagara County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/yahoo-gets-power-for-buffalo-expansion","label":"Yahoo Gets Power for Buffalo Expansion","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.datacenterknowledge.com/build-design/yahoo-launches-second-computing-coop-data-center-in-new-york-state","label":"Yahoo Launches Second 'Computing Coop' Data Center in New York State","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://investigativepost.org/2026/07/21/hochul-wants-ban-on-tax-breaks-for-data-centers/","label":"NY Gov. Hochul says she wants to ban tax breaks for data centers","publisher":"Investigative Post","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.openstreetmap.org/way/220024541","label":"OSM way 220024541 - building, addr 5319 Enterprise Drive, Lockport NY 14094, within the 'Yahoo! Lockport Datacenter' industrial landuse area (way 220024530)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-21"}]},{"id":"compute-h5-buffalo-ii-lockport-ny","sourceRecordId":"h5-buffalo-ii-lockport-ny","name":"H5 Data Centers Buffalo II","operator":"H5 Data Centers","city":"Lockport","county":"Niagara","address":"5369 Crown Drive","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.16967580851366,"longitude":-78.74808845761379,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/h5-buffalo-ii-lockport-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/h5-buffalo-ii","label":"H5 Buffalo II","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/h5-acquires-new-york-data-centers-from-yahoo-in-sale-leaseback-deal/","label":"H5 Acquires New York Data Centers From Yahoo in Sale-Leaseback Deal","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://gis.niagaracounty.com/arcgis/rest/services/NC_GIS/NC_GIS/FeatureServer/4/query?where=PrclNumb%3D%275365%27+AND+PrclStreet+LIKE+%27%25CROWN%25%27&outFields=*&outSR=4326&f=json","label":"Niagara County parcel/GIS record (parcel 108.00-1-34.211/A (SBL 1080000001034211 A))","publisher":"Niagara County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterknowledge.com/build-design/yahoo-launches-second-computing-coop-data-center-in-new-york-state","label":"Yahoo Launches Second 'Computing Coop' Data Center in New York State","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.peeringdb.com/fac/16045","label":"PeeringDB: H5 Data Centers Buffalo II, 5369 Crown Dr, Lockport NY 14094 (H5 Buffalo Campus)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-h5-buffalo-iii-350-main-street-buffalo-ny","sourceRecordId":"h5-buffalo-iii-350-main-street-buffalo-ny","name":"H5 Data Centers Buffalo III (350 Main Street / Main Place Tower)","operator":"H5 Data Centers (joint venture with Novacap)","city":"Buffalo","county":"Erie","address":"350 Main Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.88427,"longitude":-78.875707,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-buffalo-iii-350-main-street-buffalo-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/buffalo-III-colocation.html","label":"H5 Data Centers: Buffalo III Colocation (350 Main Street)","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/fac/2087","label":"PeeringDB: H5 Data Centers Buffalo III (fac 2087), 350 Main Street Suite 102, Buffalo NY 14202","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.storagenewsletter.com/?p=299885","label":"H5 Data Centers Announces Acquisition of Three Locations from 365 Data Centers (Feb 6, 2026)","publisher":"StorageNewsletter (press release)","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-holtec-hi-cloud-indian-point-buchanan-ny","sourceRecordId":"holtec-hi-cloud-indian-point-buchanan-ny","name":"Holtec HI-CLOUD Indian Point data center campus (proposed)","operator":"Holtec International (Holtec Decommissioning International)","city":"Buchanan","county":"Westchester","address":"450 Broadway","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.2697,"longitude":-73.9519,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/holtec-hi-cloud-indian-point-buchanan-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://holtecinternational.com/hh-40-16/","label":"Holtec Announces HI-CLOUD: A Strategic Redevelopment Initiative (Indian Point anchor site, initial 200 MW target)","publisher":"Holtec International","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://peekskillherald.com/21026/environment/holtec-tells-decommissioning-board-it-wants-to-bring-data-center-to-indian-point/","label":"Holtec tells decommissioning board it wants to bring data center to Indian Point (200 MW NYISO request)","publisher":"Peekskill Herald","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.theexaminernews.com/holtecs-indian-point-proposal-draws-community-scrutiny/","label":"Holtec's Indian Point Proposal Draws Community Scrutiny (SMR-300 + 200 MW AI data center; opposition rally)","publisher":"The Examiner News","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://dcmap.us/states/new-york/","label":"New York Data Center Map — 'Proposed Datacenters at 450 Broadway', Holtec Decommissioning International, Buchanan, 200 MW planned","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://thehudsonindependent.com/holtec-has-no-imminent-plans-to-restart-indian-point/","label":"Holtec has no imminent plans to restart Indian Point","publisher":"The Hudson Independent","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-ibm-quantum-data-center-poughkeepsie-ny","sourceRecordId":"ibm-quantum-data-center-poughkeepsie-ny","name":"IBM Quantum Data Center, Poughkeepsie","operator":"IBM","city":"Poughkeepsie","county":"Dutchess","address":"705 River Edge Drive","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.6603798,"longitude":-73.9400178,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ibm-quantum-data-center-poughkeepsie-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/ibm-expands-quantum-data-center-in-poughkeepsie-new-york-to-advance-algorithm-discovery-globally-302259851.html","label":"IBM Expands Quantum Data Center in Poughkeepsie, New York to Advance Algorithm Discovery Globally","publisher":"IBM (via PR Newswire)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=IBM+Poughkeepsie&format=json&limit=5&addressdetails=1","label":"OpenStreetMap/Nominatim: feature named \"IBM Quantum Data Center\", 705 River Edge Drive, Poughkeepsie NY 12601 (OSM way 195803647)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-ipark-84-data-center-east-fishkill-ny","sourceRecordId":"ipark-84-data-center-east-fishkill-ny","name":"iPark 84 Data Center (745 East Drive, former IBM East Fishkill fab building)","operator":"iPark East Fishkill LLC (iPark 84; campus marketed by Lincoln Property Company and Saber-Hightower)","city":"Hopewell Junction","county":"Dutchess","address":"745 East Drive","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.5385513,"longitude":-73.8210084,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ipark-84-data-center-east-fishkill-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","label":"NYISO Interconnection Queue, Load Projects: #1760 'iPark 84 Data Center Interconnection', iPark East Fishkill LLC, 150 MW, Dutchess County","publisher":"New York Independent System Operator","kind":"iso_queue","retrievedAt":"2026-10-09"},{"url":"https://www.commercialcafe.com/commercial-property/us/ny/fishkill/745-east-drive/","label":"CommercialCafe listing: 745 East Drive, Fishkill NY (iPark 84; Lincoln Property Company / Saber-Hightower)","publisher":"CommercialCafe","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://irei.com/news/lincoln-saber-hightower-waterfall-acquire-450m-tri-state-mixed-asset-portfolio/","label":"Lincoln, Saber-Hightower, Waterfall acquire $450M Tri-State mixed-asset portfolio (Aug 19, 2026)","publisher":"IREI","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://cleanview.co/data-centers/new-york/2253/ipark-84-data-center","label":"Cleanview: iPark 84 Data Center (planned, Dutchess County)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.alittlebeaconblog.com/blog/by-unanimous-vote-east-fishkill-town-board-passes-3-year-moratorium-on-data-centers","label":"By Unanimous Vote, East Fishkill Town Board Passes 3 Year Moratorium On Data Centers (June 25, 2026)","publisher":"A Little Beacon Blog","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://nominatim.openstreetmap.org/search?format=json&limit=3&addressdetails=0&q=745%20East%20Drive%2C%20Hopewell%20Junction%2C%20NY","label":"OpenStreetMap/Nominatim geocode of 745 East Drive (OSM node 8448151242, iPark 84, Town of East Fishkill)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-09"}]},{"id":"compute-jpmorgan-chase-orangeburg-ny","sourceRecordId":"jpmorgan-chase-orangeburg-ny","name":"JPMorgan Chase Data Center, Orangeburg","operator":"JPMorgan Chase","city":"Orangeburg","county":"Rockland","address":"140 Old Orangeburg Rd","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.044286,"longitude":-73.973952,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/jpmorgan-chase-orangeburg-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.theregister.com/2026/04/20/chase_77m_tax_subsidy_datacenter_job/","label":"$77M tax subsidy for NY datacenter project will create 1 job","publisher":"The Register","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://baxtel.com/data-center/jpmc-orangeburg","label":"JPMC Orangeburg Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-guild-ventures-kenwood-commons-albany-ny","sourceRecordId":"guild-ventures-kenwood-commons-albany-ny","name":"Kenwood Commons Technology Campus","operator":"Guild Ventures","city":"Albany","county":"Albany","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.6225,"longitude":-73.7601,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/guild-ventures-kenwood-commons-albany-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cbs6albany.com/news/local/kenwood-commons-owner-asks-for-180mw-as-part-of-propertys-pitch-now-includes-data-center-doane-stuart-school-guild-datacenter-mixeduse-hyperscale-colocation-technology-sustainability-cooling-grid-redevelopment-nanotech-infrastructure-emissions","label":"Kenwood Commons owner asks for 180MW as part of property's pitch, now includes data center","publisher":"CBS6 Albany (WRGB)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","label":"Updates on the Cloud: More Moratoriums on Data Centers","publisher":"Rockefeller Institute of Government","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://cbs6albany.com/news/local/albany-data-center-proposal-faces-new-questions-after-hochuls-statewide-moratorium-kenwood-doane-new-york-wrgb","label":"Albany data center proposal faces new questions after Hochul's statewide moratorium (July 14, 2026)","publisher":"CBS6 Albany (WRGB)","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.wamc.org/news/2026-08-06/kenwood-data-center-albany-community-meeting","label":"Kenwood data center developers try to assuage community concerns (Aug 6, 2026)","publisher":"WAMC Northeast Public Radio","kind":"press","retrievedAt":"2026-10-09"},{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","label":"NYISO Interconnection Queue, Load Projects: #1754 'Kenwood Tech Center', EKG Group LLC, 180 MW, POI Albany-Bethlehem 115 kV Line #18, utility National Grid, status 4","publisher":"New York Independent System Operator","kind":"iso_queue","retrievedAt":"2026-10-09"}]},{"id":"compute-long-island-interconnect-westbury-ny","sourceRecordId":"long-island-interconnect-westbury-ny","name":"Long Island Interconnect (formerly 1025Connect)","operator":"Long Island Interconnect, LLC (formerly 1025Connect)","city":"Westbury","county":"Nassau","address":"1025 Old Country Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.755433,"longitude":-73.5578939,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/long-island-interconnect-westbury-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://longislandinterconnect.com/","label":"Long Island Interconnect — carrier-neutral interconnection hub, 1025 Old Country Road, Westbury NY 11590 (formerly 1025Connect; Megaport collaboration announced 2026-09-15)","publisher":"Long Island Interconnect","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/1025connect","label":"1025Connect Data Center — 1025 Old Country Road, Westbury; built 2008; independently operated after Equinix's 2012 Ancotel deal","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-lumen-albany-4-ny","sourceRecordId":"lumen-albany-4-ny","name":"Lumen Albany 4","operator":"Lumen Technologies","city":"Albany","county":"Albany","address":"10 Airline Drive","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.7356308,"longitude":-73.818665,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-albany-4-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/lumen-albany-4","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12682482760","label":"OpenStreetMap node/12682482760","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-lumen-garden-city-1-ny","sourceRecordId":"lumen-garden-city-1-ny","name":"Lumen Garden City 1 (Lumen New York 6, 71 Clinton Road)","operator":"Lumen Technologies","city":"Garden City","county":"Nassau","address":"71 Clinton Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.7268,"longitude":-73.6343,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-garden-city-1-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-garden-city-1","label":"Lumen Garden City 1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://inflect.com/building/71-clinton-road-garden-city/lumen/datacenter/new-york-2","label":"Lumen New York 6 – 71 Clinton Road, Garden City","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-metlife-north-greenbush-ny","sourceRecordId":"metlife-north-greenbush-ny","name":"MetLife Information Systems Computer Center, North Greenbush","operator":"MetLife Services and Solutions, LLC","city":"North Greenbush","county":"Rensselaer","address":"500 Jordan Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.6841786,"longitude":-73.696422,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/metlife-north-greenbush-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/metlife-troy-ny","label":"MetLife: Troy, NY data center — 500 Jordan Rd, North Greenbush (Rensselaer Technology Park), 200,000 sq ft","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.discoverrensselaer.com/projects-2/","label":"Rensselaer County IDA/CRC Projects & Applications — Metropolitan Life Insurance Company and MetLife Services and Solutions, 500 Jordan Road, Town of North Greenbush","publisher":"Rensselaer County Industrial Development Agency","kind":"subsidy","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=500+Jordan+Road%2C+Troy%2C+NY+12180&format=json&limit=3&addressdetails=1","label":"OpenStreetMap/Nominatim: building named \"MetLife\", 500 Jordan Road, Rensselaer Technology Park, North Greenbush NY (OSM way 82789674)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-niagara-digital-campus-niagara-falls-ny","sourceRecordId":"niagara-digital-campus-niagara-falls-ny","name":"Niagara Digital Campus","operator":"Urbacon Data Centre Solutions","city":"Niagara Falls","county":"Niagara","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.0885,"longitude":-79.0603,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/niagara-digital-campus-niagara-falls-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/urbacon-niagara-digital-campus","label":"Urbacon: Niagara Digital Campus Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://niagarafallsreporter.com/niagara-falls-can-power-forward-with-data-center-opportunity/","label":"Niagara Falls Can Power Forward With Data Center Opportunity","publisher":"Niagara Falls Reporter","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/135mw-data-center-campus-proposed-in-view-of-niagara-falls/","label":"135MW data center campus proposed in view of Niagara Falls","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://spectrumlocalnews.com/nys/buffalo/news/2026/06/04/contentious-niagara-falls-city-council-meeting-leads-to-approval-of-new-data-center","label":"Contentious Niagara Falls City Council meeting leads to land deal for potential data center","publisher":"Spectrum News 1 Buffalo","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-nccs-massena-reynolds-ny","sourceRecordId":"nccs-massena-reynolds-ny","name":"North Country Collocation Services Massena Data Center (former Reynolds site)","operator":"North Country Collocation Services (NCCS)","city":"Massena","county":"St. Lawrence","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":44.979,"longitude":-74.73,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nccs-massena-reynolds-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.northcountrypublicradio.org/news/story/53469/20260522/massena-town-planning-board-takes-no-action-at-data-center-meeting","label":"Massena Town Planning Board takes no action at data center meeting","publisher":"North Country Public Radio","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","label":"Updates on the Cloud: More Moratoriums on Data Centers","publisher":"Rockefeller Institute of Government","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://www.northcountrypublicradio.org/news/story/54053/20261007/ny-hit-pause-on-large-data-centers-a-massive-project-in-massena-may-be-exempt","label":"NY hit pause on large data centers. A massive project in Massena may be exempt (Oct 7, 2026)","publisher":"North Country Public Radio","kind":"press","retrievedAt":"2026-10-09"}]},{"id":"compute-opti9-ny1-garden-city-ny","sourceRecordId":"opti9-ny1-garden-city-ny","name":"Opti9 NY1 (formerly Webair NY-1), Garden City","operator":"Opti9 Technologies (formerly Webair)","city":"Garden City","county":"Nassau","address":"501 Franklin Avenue","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.722759,"longitude":-73.631821,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/opti9-ny1-garden-city-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/opti9-ny-1","label":"Baxtel: Opti9 NY-1 (501 Franklin Ave, Garden City)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://www.peeringdb.com/fac/1040","label":"PeeringDB: 501 Franklin Ave (Webair, fac 1040), Garden City NY 11530","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-pontoon-bridge-road-massena-ny","sourceRecordId":"pontoon-bridge-road-massena-ny","name":"Pontoon Bridge Road Data Center (proposed)","operator":"American Data Center Partners LLC","city":"Massena","county":"St. Lawrence","address":"466 Pontoon Bridge Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":44.9593245,"longitude":-74.912909,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pontoon-bridge-road-massena-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://watertownpost.com/massena-faces-massive-data-center-power-requests-in-nyiso-queue/","label":"Massena Faces Massive Data Center Power Requests in NYISO Queue","publisher":"Watertown Post","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://cleanview.co/data-centers/new-york/2243/pontoon-bridge-road-data-center","label":"Pontoon Bridge Road Data Center — planned, American Data Center Partners LLC, St. Lawrence County, New York","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=466+Pontoon+Bridge+Road%2C+Massena%2C+NY&format=json&limit=3&addressdetails=1","label":"OpenStreetMap/Nominatim geocode of 466 Pontoon Bridge Road, Town of Massena, NY 13662 (OSM way 8757750)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","label":"NYISO Interconnection Queue, Load Projects: #1745 'Pontoon Bridge Road Data Center', American Data Center Partners LLC, 250 MW peak load, POI Haverstock-Adirondack 345 kV (NYPA), status 4 (SRIS/SIS pending)","publisher":"New York Independent System Operator","kind":"iso_queue","retrievedAt":"2026-10-09"}]},{"id":"compute-ranalli-lysander-ny","sourceRecordId":"ranalli-lysander-ny","name":"Ranalli Lysander Data Center","operator":"Ranalli","city":"Lysander","county":"Onondaga","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.17,"longitude":-76.39,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/ranalli-lysander-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cleanview.co/public/data-centers/new-york/2042/ranalli-lysander-data-center","label":"Ranalli Lysander Data Center","publisher":"Cleanview","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.yahoo.com/news/politics/articles/lysander-project-paused-hochul-imposes-230024577.html","label":"Yahoo News","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.eaglenewsonline.com/baldwinsville_messenger/possible-massive-data-center-in-lysander-faces-community-opposition-town-attorney-to-draft-moratorium/article_635b1885-9f97-4747-bdf4-604d468fc641.html","label":"Possible massive data center in Lysander faces community opposition, town attorney to draft moratorium","publisher":"Eagle News Online / Baldwinsville Messenger","kind":"iso_queue","retrievedAt":"2026-09-09"},{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","label":"Updates on the Cloud: More Moratoriums on Data Centers","publisher":"Rockefeller Institute of Government","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://cnycentral.com/news/local/onondaga-county-launches-500k-study-to-guide-towns-on-ai-data-centers-executive-mcmahon-lysander-town-board-water-department-environmental-health-economic-planning","label":"Onondaga County launches $500K study to guide towns on AI data centers","publisher":"CNY Central","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-rpi-center-for-computational-innovations-troy-ny","sourceRecordId":"rpi-center-for-computational-innovations-troy-ny","name":"Rensselaer Center for Computational Innovations (CCI), Rensselaer Technology Park","operator":"Rensselaer Polytechnic Institute","city":"Troy","county":"Rensselaer","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.68056,"longitude":-73.69722,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rpi-center-for-computational-innovations-troy-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://foci.rpi.edu/computing-resources/center-computational-innovations","label":"Center for Computational Innovations: RPI Future of Computing Institute","publisher":"Rensselaer Polytechnic Institute","kind":"other","retrievedAt":"2026-10-09"},{"url":"https://en.wikipedia.org/wiki/Center_for_Computational_Innovations","label":"Center for Computational Innovations (Wikipedia)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-riverview-innovation-tech-campus-tonawanda-ny","sourceRecordId":"riverview-innovation-tech-campus-tonawanda-ny","name":"Riverview Innovation & Technology Campus","operator":"Riverview Innovation & Technology Campus","city":"Tonawanda","county":"Erie","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.037,"longitude":-78.887,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/riverview-innovation-tech-campus-tonawanda-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wkbw.com/news/local-news/northtowns/developer-proposed-2b-ai-data-center-on-river-road-not-on-hold-process-temporarily-delayed","label":"Developer: Proposed $2B AI data center on River Road not on hold, process temporarily delayed","publisher":"WKBW","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://buffalonews.com/news/local/article_ffa822d3-0899-4379-9924-44f8167b4e75.html","label":"River Road data center on hold amid outcry from residents scarred by Tonawanda Coke fight","publisher":"Buffalo News","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.btpm.org/local/2026-06-03/data-center-project-at-former-tonawanda-coke-site-on-hold","label":"Data center project at former Tonawanda Coke site 'on hold'","publisher":"Buffalo Toronto Public Media (BTPM NPR)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.btpm.org/local/2026-06-04/residents-pack-meeting-to-oppose-proposed-data-center-at-tonawanda-coke-site","label":"Residents pack meeting to oppose proposed data center at Tonawanda Coke site","publisher":"Buffalo Toronto Public Media (BTPM NPR)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.datacenterdynamics.com/en/news/former-coke-plant-near-buffalo-eyed-for-300mw-data-center/","label":"Former coke plant near Buffalo eyed for 300MW data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","label":"Updates on the Cloud: More Moratoriums on Data Centers","publisher":"Rockefeller Institute of Government","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://hudsonvalleypost.com/ai-data-centers-new-york/","label":"Where In New York AI Data Centers Are Being Discussed","publisher":"Hudson Valley Post","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-rochester-colo-pittsford-ny","sourceRecordId":"rochester-colo-pittsford-ny","name":"Rochester Colo","operator":"Rochester Colo (James Salviski)","city":"Pittsford","county":"Monroe","address":"Pittsford Victor Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.090959,"longitude":-77.515298,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rochester-colo-pittsford-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://rochestercolo.com/contact/","label":"Contact Us - Rochester Colo Data Center","publisher":"Rochester Colo","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://rochestercolo.com/","label":"Home - Rochester Colo Data Center","publisher":"Rochester Colo","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-sabey-intergate-manhattan-ny","sourceRecordId":"sabey-intergate-manhattan-ny","name":"SDC Manhattan (Intergate.Manhattan), 375 Pearl Street","operator":"Sabey Data Centers","city":"New York","county":"New York","address":"375 Pearl Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.7106,"longitude":-74.0013,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-manhattan-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sabeydatacenters.com/locations/new-york-data-center","label":"SDC Manhattan | Sabey Data Centers","publisher":"Sabey Data Centers","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.peeringdb.com/fac/1690","label":"PeeringDB: 375 Pearl, Intergate.Manhattan (Sabey Data Centers), New York NY 10038","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-watchtower-sterling-forest-warwick-ny","sourceRecordId":"watchtower-sterling-forest-warwick-ny","name":"Sterling Forest Business Resiliency Services Center (former IBM/Kyndryl Sterling Forest data center)","operator":"Watchtower Bible and Tract Society of New York (acquired from Kyndryl, June 2026)","city":"Sterling Forest (Town of Warwick)","county":"Orange","address":"300 Long Meadow Road","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.19592,"longitude":-74.255576,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/watchtower-sterling-forest-warwick-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://rcbizjournal.com/2026/07/06/jehovahs-witnesses-buy-data-center-in-warwick-religious-order-continues-to-expand-footprint-in-hudson-valley/","label":"Jehovah's Witnesses Buy Data Center in Warwick (Kyndryl Sterling Forest sale, June 26 2026)","publisher":"Rockland County Business Journal","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://dec.ny.gov/news/environmental-notice-bulletin/2023-11-22/completed-application/town-of-warwick-kyndryl-inc-sterling-forest","label":"NYSDEC ENB — Town of Warwick, KYNDRYL INC – STERLING FOREST, 300 Long Meadow Rd: water-withdrawal application for chilled water / mechanical-draft cooling towers","publisher":"NYS Department of Environmental Conservation","kind":"permit","retrievedAt":"2026-09-21"}]},{"id":"compute-stream-stamp-alabama-ny","sourceRecordId":"stream-stamp-alabama-ny","name":"STREAM U.S. Data Centers at STAMP","operator":"Stream U.S. Data Centers LLC","city":"Alabama","county":"Genesee","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.0837,"longitude":-78.3936,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stream-stamp-alabama-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.gcedc.com/news/article/current/2026/03/05/100160/public-hearing-set-for-stream-us-data-centers-project","label":"Public Hearing Set for STREAM US Data Centers Project","publisher":"Genesee County Economic Development Center (GCEDC)","kind":"subsidy","retrievedAt":"2026-09-09"},{"url":"https://investigativepost.org/2026/03/18/subsidies-for-stamp-data-center-among-largest-ever/","label":"Subsidies for STAMP data center among largest ever","publisher":"Investigative Post","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://orleanshub.com/allies-of-tonawanda-seneca-nation-strongly-oppose-monstrous-data-center-proposed-for-stamp/","label":"Allies of Tonawanda Seneca Nation strongly oppose 'monstrous data center' proposed for STAMP","publisher":"Orleans Hub","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/","label":"A $19.5B data center and a statewide pause: What's at stake in Genesee County","publisher":"Rochester Business Journal","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.thebatavian.com/staff/hochul-enacts-first-statewide-moratorium-on-large-data-centers/648283","label":"Hochul enacts first statewide moratorium on large data centers (July 14, 2026)","publisher":"The Batavian","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-four-winds-sugar-hill-portland-ny","sourceRecordId":"four-winds-sugar-hill-portland-ny","name":"Sugar Hill Data Center (proposed, former Sugar Hill Golf Course)","operator":"Four Winds of Lake Erie LLC","city":"Portland","county":"Chautauqua","address":"7060 Route 5","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.3758232,"longitude":-79.5200432,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/four-winds-sugar-hill-portland-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wkbw.com/chautauqua-county/portland-town-board-addresses-confusion-and-concern-over-proposed-data-center","label":"Portland Town Board addresses confusion and concern over proposed data center","publisher":"WKBW (Buffalo)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.post-journal.com/news/community/2026/03/portland-expresses-support-for-proposed-project-at-sugar-hill/","label":"Portland expresses support for proposed project at Sugar Hill","publisher":"The Post-Journal (Jamestown, NY)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://nominatim.openstreetmap.org/search?q=Sugar+Hill+Golf+Course%2C+Portland%2C+New+York&format=json&limit=3&addressdetails=1","label":"OpenStreetMap/Nominatim: Sugar Hill Golf Course, Town of Portland, Chautauqua County, NY (OSM way 136101486)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"},{"url":"https://www.observertoday.com/news/top-stories/2026/07/area-fully-plugged-in-to-data-center-debate/","label":"Area fully plugged in to data center debate","publisher":"The Observer (Dunkirk, NY)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.stocktitan.net/news/BUDZ/weed-inc-engages-advisors-to-evaluate-strategic-alternatives-for-ax39hv7tpbjt.html","label":"WEED Inc. engages advisors to evaluate strategic alternatives — 44-acre Sugar Hill asset (Four Winds of Lake Erie, LLC), Chautauqua County; data center and infrastructure development opportunities (2026-04-09)","publisher":"WEED Inc. via StockTitan","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-telehouse-staten-island-ny","sourceRecordId":"telehouse-staten-island-ny","name":"Telehouse New York (Staten Island Teleport)","operator":"Telehouse America (KDDI)","city":"Staten Island","county":"Richmond","address":"7 Teleport Drive","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.606205,"longitude":-74.171125,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/telehouse-staten-island-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/7-teleport-drive-staten-island/telehouse/datacenter/telehouse-new-york-teleport","label":"Telehouse New York Teleport building profile","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.telehouse.com/2016/06/07/benefits-colocation-staten-island/","label":"Surprising Benefits to Colocation on Staten Island","publisher":"Telehouse","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.peeringdb.com/fac/737","label":"PeeringDB: Telehouse - Teleport Center (New York), 7 Teleport Drive, Staten Island NY 10311","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-telehouse-chelsea-manhattan-ny","sourceRecordId":"telehouse-chelsea-manhattan-ny","name":"Telehouse New York Chelsea (85 10th Avenue)","operator":"Telehouse America (KDDI)","city":"New York","county":"New York","address":"85 10th Avenue","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":40.743446,"longitude":-74.00734,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/telehouse-chelsea-manhattan-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/telehouse-chelsea-center-85-10th-avenue","label":"Telehouse Chelsea Center (85 10th Avenue) Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.telehouse.com/global-data-centers/america/new-york-datacenters/telehouse-new-york-chelsea/","label":"Telehouse — New York Chelsea data center (85 10th Avenue)","publisher":"Telehouse America","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/fac/1272","label":"PeeringDB: Telehouse - New York Chelsea, 85 10th Avenue, New York NY 10011","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-09"}]},{"id":"compute-terawulf-lansing-ny","sourceRecordId":"terawulf-lansing-ny","name":"TeraWulf AI Data Center Campus, Lansing","operator":"TeraWulf","city":"Lansing","county":"Tompkins","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":42.5453,"longitude":-76.4968,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/terawulf-lansing-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ithaca.com/news/regional_news/tompkins-county-legislature-urges-state-to-deny-water-permit-for-lansing-data-center/article_1d89f22d-fcd0-43b3-97e2-173e08a483ea.html","label":"Tompkins County Legislature Urges State to Deny Water Permit for Lansing Data Center","publisher":"Ithaca.com","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cornellsun.com/article/2025/11/tensions-over-terawulf-data-center-in-tompkins-county-grow-with-threatened-lawsuit","label":"Tensions Over TeraWulf Data Center in Tompkins County Grow With Threatened Lawsuit","publisher":"The Cornell Daily Sun","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cornellsun.com/article/2026/04/terawulf-affiliate-approved-to-draw-1-million-gallons-per-day-from-cayuga-lake","label":"TeraWulf Affiliate Approved to Draw 1 Million Gallons Per Day From Cayuga Lake","publisher":"The Cornell Daily Sun","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.ithaca.com/news/tompkins_county/data-center-developer-secures-long-term-lease-of-cayuga-power-plant/article_af47439f-e785-4519-9018-6ad0a9de5048.html","label":"Data Center Developer Secures Long-Term Lease of Cayuga Power Plant","publisher":"The Ithaca Times","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.fingerlakes1.com/2026/03/15/seneca-supervisors-hear-concerns-about-data-center-approve-funding-and-equipment-purchases/","label":"Seneca supervisors hear concerns about data center, approve funding and equipment purchases","publisher":"FingerLakes1.com","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://finance.yahoo.com/news/terawulf-secures-zoning-approval-ny-153335651.html","label":"TeraWulf secures zoning approval for NY data center","publisher":"Yahoo Finance","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://nystateofpolitics.com/state-of-politics/new-york/environment/2026/07/07/proposed-data-centers-divide-new-yorkers","label":"Proposed data centers dividing New Yorkers — Lake Hawkeye (Lansing): planning board asked for more work; CLEAN lawsuit over runoff/coal ash; ~100 permanent jobs","publisher":"Spectrum News / NY State of Politics","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.wbng.com/2026/01/28/tompkins-county-residents-oppose-ai-data-center-cayuga-lake/","label":"Tompkins County residents oppose AI data center on Cayuga Lake","publisher":"WBNG","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-tierpoint-hawthorne-westchester-ny","sourceRecordId":"tierpoint-hawthorne-westchester-ny","name":"TierPoint Hawthorne (11 & 17 Skyline Drive)","operator":"TierPoint","city":"Hawthorne","county":"Westchester","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.088456,"longitude":-73.815184,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-hawthorne-westchester-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/new-york/new-york-hawthorne/","label":"TierPoint Hawthorne, New York Data Center","publisher":"TierPoint, LLC","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://baxtel.com/data-center/tierpoint-hawthorne","label":"TierPoint: Hawthorne Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://gisservices.its.ny.gov/arcgis/rest/services/NYS_Tax_Parcels_Public/FeatureServer/1/query?where=SBL%3D%2711600700010170000000%27&outFields=*&f=json","label":"Westchester County parcel/GIS record (parcel SBL 116.7-1-17 (11 Skyline Dr))","publisher":"Westchester County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-treetop-east-fishkill-ny","sourceRecordId":"treetop-east-fishkill-ny","name":"Treetop East Fishkill Data Center (proposed, no application filed)","operator":"Treetop Development","city":"East Fishkill","county":"Dutchess","address":null,"state":"NY","stateName":"New York","jurisdictionType":"state","latitude":41.534,"longitude":-73.801,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/treetop-east-fishkill-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cicbca.org/202605-east-fishkill-supervisor-pulls-plug-on-plan-to-build-big-data-center/","label":"East Fishkill Supervisor Pulls Plug On Plan to Build Big Data Center","publisher":"cicbca.org","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.alittlebeaconblog.com/blog/by-unanimous-vote-east-fishkill-town-board-passes-3-year-moratorium-on-data-centers","label":"By Unanimous Vote, East Fishkill Town Board Passes 3 Year Moratorium On Data Centers","publisher":"A Little Beacon Blog","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-turin-hoefler-ilion-ny","sourceRecordId":"turin-hoefler-ilion-ny","name":"Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)","operator":"Turin Hoefler Avenue LLC","city":"Ilion","county":"Herkimer","address":"14 Hoefler Avenue","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.0119,"longitude":-75.0357,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/turin-hoefler-ilion-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wktv.com/news/focus-economy/250-000-square-foot-ai-data-center-planned-for-ilions-remington-site-c/article_ebf3d79e-aeb4-4033-8b0c-558a3749c42e.html","label":"250,000-Square-Foot AI Data Center Planned for Ilion's Remington Site C","publisher":"WKTV","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","label":"Updates on the Cloud: More Moratoriums on Data Centers","publisher":"Rockefeller Institute of Government","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://spectrumlocalnews.com/nys/central-ny/politics/2026/09/29/ilion-data-center-moratorium-vote-tabled","label":"Ilion data center moratorium vote tabled","publisher":"Spectrum News","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-westelcom-plattsburgh-ny","sourceRecordId":"westelcom-plattsburgh-ny","name":"Westelcom Networks Plattsburgh Data Center (24 Margaret Street)","operator":"Westelcom Networks","city":"Plattsburgh","county":"Clinton","address":"24 Margaret Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":44.6995,"longitude":-73.4529,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/westelcom-plattsburgh-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/24-margaret-street-plattsburgh/westelcom-networks/datacenter/westelcom-networks-plattsburgh","label":"Westelcom Networks Plattsburgh","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-westelcom-syracuse-ny","sourceRecordId":"westelcom-syracuse-ny","name":"Westelcom Networks Syracuse Data Center (State Tower Building, 109 South Warren Street)","operator":"Westelcom Networks","city":"Syracuse","county":"Onondaga","address":"109 South Warren Street","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.0505,"longitude":-76.1505,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/westelcom-syracuse-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/109-south-warren-street-syracuse/westelcom-networks/datacenter/westelcom-networks-syracuse","label":"Westelcom Networks Syracuse","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-westelcom-watertown-ny","sourceRecordId":"westelcom-watertown-ny","name":"Westelcom Networks Watertown Data Center (130 Park Place)","operator":"Westelcom Networks","city":"Watertown","county":"Jefferson","address":"130 Park Place","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":43.9748,"longitude":-75.9108,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/westelcom-watertown-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/130-park-place-watertown/westelcom-networks/datacenter/westelcom-networks-watertown","label":"Westelcom Networks Watertown","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"}]},{"id":"compute-petawatt-zeroc-massena-ny","sourceRecordId":"petawatt-zeroc-massena-ny","name":"ZeroC / Petawatt Holdings Data Center Site (417 County Route 42)","operator":"ZeroC Data Centers LLC (majority-owned by Petawatt Holdings, Inc.)","city":"Massena","county":"St. Lawrence","address":"417 County Route 42","state":"NY","stateName":"New York","jurisdictionType":"state","latitude":44.953,"longitude":-74.86,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/petawatt-zeroc-massena-ny","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.massena.us/AgendaCenter/ViewFile/Minutes/_02202025-1061","label":"Massena Town Planning Board minutes, 2025-02-20 — Site Plan Review #2: ZeroC Data Centers LLC & Petawatt Holdings, Inc., 417 County Route 42 (Tax Map 10.001-1-7.21)","publisher":"Town of Massena","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.yahoo.com/news/land-clearing-underway-massena-data-045900706.html","label":"Land clearing underway for new Massena data center substation (Petawatt Holdings, County Route 42, 14-acre parcel)","publisher":"Watertown Daily Times / NNY360 via Yahoo News","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.nny360.com/top_stories/st-lawrence-county-planning-board-makes-recommendations-for-future-data-centers-in-massena/article_c1379df3-06cd-5238-8e9b-814aedaf8e5c.html","label":"St. Lawrence County planning board makes recommendations for future data centers in Massena (references Petawatt Holdings substation site plan)","publisher":"NNY360","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20&%20Zoning%20Presentation%20-%20Final.pdf","label":"St. Lawrence County Planning — LGC 2025 Planning & Zoning presentation: NYISO interconnection queue excerpt (Petawatt Holdings 'St Lawrence Data and Agricultural Center' 200 MW, queue #1213; ZeroC Data Centers 'New York State Artificial Intelligence Data Center' 300 MW, queue #1731; both POI Dennison 115 kV)","publisher":"St. Lawrence County Planning Office","kind":"iso_queue","retrievedAt":"2026-09-21"},{"url":"https://cleanview.co/data-centers/new-york/2049/petawatt-massena-data-center","label":"Petawatt Massena Data Center — planned, 14 acres","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-5c-group-vultr-prime-ohio-springfield-oh","sourceRecordId":"5c-group-vultr-prime-ohio-springfield-oh","name":"5C Group / Vultr Data Center (Prime Ohio)","operator":"5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)","city":"Springfield","county":"Clark","address":"601 Benjamin Drive","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.8664,"longitude":-83.7936,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/5c-group-vultr-prime-ohio-springfield-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wyso.org/news/2025-12-09/new-1-3-billion-data-center-in-springfield-expected-to-open-in-early-2026","label":"New $1.3 billion Springfield data center expected to open in early 2026","publisher":"WYSO","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.jobsohio.com/newsroom/news-press/vultr-announces-1-billion-data-center-investment-in-springfield","label":"Vultr Announces $1 Billion Data Center Investment in Springfield","publisher":"JobsOhio","kind":"subsidy","retrievedAt":"2026-08-02"},{"url":"https://springfieldohio.gov/5c-data-center-faqs/","label":"5C Data Center FAQs","publisher":"City of Springfield","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/hypertec-cloud-acquires-5c-data-centers-forms-5c-group/","label":"Hypertec Cloud acquires 5C Data Centers, forms 5C Group","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.springfieldnewssun.com/local/clark-county-approves-new-zoning-rules-for-data-centers/article_941ca03e-6407-53b8-85b4-e86901b4c0b4.html","label":"Clark County approves new zoning rules for data centers","publisher":"Springfield News-Sun","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.gongwer-oh.com/public/Crusoe_Energy_Systems_LLC_Scope.pdf","label":"Crusoe Energy Systems LLC — Ohio Tax Credit Authority scope of work, City of Springfield, Clark County (approved December 15, 2025)","publisher":"Gongwer Ohio (Ohio Tax Credit Authority exhibit)","kind":"subsidy","retrievedAt":"2026-10-28"},{"url":"https://www.gongwer-oh.com/public/The_Constant_Company_LLC_Scope.pdf","label":"The Constant Company, LLC — Ohio Tax Credit Authority scope of work, City of Springfield, Clark County (approved October 27, 2025)","publisher":"Gongwer Ohio (Ohio Tax Credit Authority exhibit)","kind":"subsidy","retrievedAt":"2026-10-28"}]},{"id":"compute-aligned-conesville-oh","sourceRecordId":"aligned-conesville-oh","name":"Aligned Data Centers – Conesville Industrial Park","operator":"Aligned Data Centers","city":"Conesville","county":"Coshocton","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.27,"longitude":-81.83,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-conesville-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/","label":"Aligned Data Centers official press release – Ohio mega-scale AI campus expansion","publisher":"Aligned Data Centers","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/aligned-to-develop-200-acre-data-center-campus-in-coshocton-ohio/","label":"Aligned to develop 200-acre data center campus in Coshocton, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://frontier-companies.com/aligned-data-centers-expands-with-new-mega-scale-ai-campus-at-conesville-industrial-park/","label":"Aligned Data Centers expands with new mega-scale AI campus at Conesville Industrial Park","publisher":"Frontier Group of Companies","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.yourohionews.com/coshocton/ground-broken-for-new-aligned-data-centers-campus-in-conesville/975588","label":"Ground broken for new Aligned Data Centers campus in Conesville","publisher":"Your Ohio News","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterfrontier.com/site-selection/article/55306993/from-brownfield-to-breakthrough-aligned-data-centers-extends-its-ai-first-infrastructure-vision-from-ohio-to-the-edge-of-innovation","label":"From Brownfield to Breakthrough – Aligned Data Centers extends AI-first vision in Ohio","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://frontier-companies.com/coshocton-port-authority-secures-58-7-million-from-ohio-department-of-development-for-site-redevelopment-at-the-conesville-industrial-park/","label":"Coshocton Port Authority secures $58.7M from Ohio Department of Development – All Ohio Future Fund","publisher":"Frontier Group of Companies","kind":"subsidy","retrievedAt":"2026-07-07"},{"url":"https://egeneration.org/aligned-data-centers-expands-in-ohio-considering-nuclear-power-for-resilience","label":"Aligned Data Centers expands in Ohio, considering nuclear power for resilience","publisher":"eGeneration Foundation","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-aligned-pataskala-licking-oh","sourceRecordId":"aligned-pataskala-licking-oh","name":"Aligned Data Centers — Pataskala","operator":"Aligned Data Centers","city":"Pataskala","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.9956,"longitude":-82.6743,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-pataskala-licking-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://freepress.org/article/pataskala-ohio-zoning-votes-down-data-center-application","label":"Columbus Free Press: 80+ acres, Bloom Energy natural-gas fuel cells, 84 cooling units; Planning & Zoning voted the application down 2026-06-03","publisher":"The Columbus Free Press","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html","label":"AOL/Newark Advocate: 89 acres, 200 MW, 3 buildings (down from 4), Broad St & Mink St; P&Z voted 5-2 to recommend rejection (staff recommended approval); Council hearing 2026-08-25","publisher":"AOL / Newark Advocate","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://abc6onyourside.com/news/local/pataskala-rejects-proposed-data-center-voters-to-decide-potential-ban-in-november","label":"Pataskala rejects proposed data center; voters to decide potential ban in November","publisher":"ABC 6 / WSYX","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://www.thereportingproject.org/pataskala-residents-cheer-city-council-vote-to-reject-site-plan-for-proposed-large-scale-data-center/","label":"The Reporting Project: City Council rejected the site plan 7-0 on 2026-08-25; Aligned GC David Robinson — “We’ll reflect and regroup”; 89 acres, 200 MW, three buildings; Nov. 3 ballot in Pataskala and Granville","publisher":"The Reporting Project (Denison University)","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-aligned-chillicothe-ross-oh","sourceRecordId":"aligned-chillicothe-ross-oh","name":"Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)","operator":"Aligned","city":"Chillicothe","county":"Ross","address":"232 E 8th St","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.3331,"longitude":-82.9824,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-chillicothe-ross-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sciotovalleyguardian.com/2026/07/02/1-5-billion-high-performance-computing-campus-planned-for-former-chillicothe-paper-mill/","label":"$1.5 billion high-performance computing campus planned for former Chillicothe Paper Mill","publisher":"Scioto Valley Guardian","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://www.wosu.org/2026-07-06/data-center-and-more-new-tenants-expected-for-shuttered-chillicothe-paper-mill-site","label":"Data center and more new tenants expected for shuttered Chillicothe paper mill site","publisher":"WOSU Public Media","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-aligned-neo-01-oh","sourceRecordId":"aligned-neo-01-oh","name":"Aligned NEO-01","operator":"Aligned Data Centers","city":"Sandusky (Perkins Township)","county":"Erie","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.4321977,"longitude":-82.7189574,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-neo-01-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/northeast-ohio-data-centers/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://www.openstreetmap.org/way/383796776","label":"OpenStreetMap way/383796776","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacentermap.com/usa/ohio/cleveland/aligned-neo-01/","label":"datacentermap.com — Aligned NEO-01 Cleveland/Sandusky","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-amazon-perry-township-stark-oh","sourceRecordId":"amazon-perry-township-stark-oh","name":"Amazon Perry Township Data Center","operator":"Amazon Web Services","city":"Canton","county":"Stark","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.7517,"longitude":-81.4,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-perry-township-stark-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ideastream.org/environment-energy/2026-04-15/some-stark-county-residents-skeptical-of-developers-answers-on-data-center-project","label":"Ideastream: Perry Township data-center project; 240 MW, Panattoni developer, Clayco GC; residents skeptical","publisher":"Ideastream Public Media","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://bluewaterhealthyliving.com/news/national-news/ohio/open-house-for-perry-township-data-center-sheds-light-on-incoming-user/","label":"Open house sheds light on incoming user (cites Canton Repository confirmation of Amazon as end-user)","publisher":"Bluewater Healthy Living","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.news5cleveland.com/news/local-news/we-follow-through/as-data-center-proposals-spread-across-stark-county-neighbors-fear-whats-next","label":"News 5 Cleveland: data-center proposals across Stark County","publisher":"News 5 Cleveland","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-ardent-technologies-wilmington-clinton-oh","sourceRecordId":"ardent-technologies-wilmington-clinton-oh","name":"Ardent Technologies Wilmington Data Center","operator":"Ardent Technologies","city":"Wilmington","county":"Clinton","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.4453393,"longitude":-83.8285375,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ardent-technologies-wilmington-clinton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.whio.com/news/local/another-500-acres-land-zoned-second-data-center-wilmington/KXXP722G6ZD4LMQV2Z6U4UJUQE/","label":"Another 500 acres of land zoned for second data center in Wilmington","publisher":"WHIO","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-ark-data-centers-akron-i-summit-county-oh","sourceRecordId":"ark-data-centers-akron-i-summit-county-oh","name":"Ark Data Centers Akron I (fka Involta)","operator":"Ark Data Centers (formerly Involta)","city":"Akron","county":"Summit","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.057162,"longitude":-81.521388,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-akron-i-summit-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.involta.com/data-centers/data-center-locations/ohio/akron/","label":"Involta / Ark Data Centers — Akron, Ohio","publisher":"Ark Data Centers","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.datacentermap.com/usa/ohio/akron/involta-akron/","label":"Ark Data Centers Akron 1","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://businessjournaldaily.com/involta-sees-tremendous-market-in-ohio/","label":"Business Journal Daily — \"Involta Sees 'Tremendous Market' in Ohio\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.prnewswire.com/news-releases/involta-llc-announces-plan-to-build-enterprise-data-center-in-akron-ohio-101806913.html","label":"PR Newswire — \"Involta, LLC Announces Plan to Build Enterprise Data Center in Akron, Ohio\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","label":"Signal Akron — \"$4.5 million tax credit will help data center expand in Akron\"","publisher":null,"kind":"subsidy","retrievedAt":"2026-07-25"}]},{"id":"compute-ark-data-centers-akron-ii-summit-county-oh","sourceRecordId":"ark-data-centers-akron-ii-summit-county-oh","name":"Ark Data Centers Akron II (fka Involta)","operator":"Ark Data Centers (formerly Involta)","city":"Akron","county":"Summit","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.057297,"longitude":-81.521336,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-akron-ii-summit-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.involta.com/data-centers/data-center-locations/ohio/akron/","label":"Involta / Ark Data Centers — Akron, Ohio","publisher":"Ark Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.datacentermap.com/usa/ohio/akron/involta-akron-2/","label":"Ark Data Centers Akron 2","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://businessjournaldaily.com/involta-sees-tremendous-market-in-ohio/","label":"Business Journal Daily — \"Involta Sees 'Tremendous Market' in Ohio\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","label":"Signal Akron — \"$4.5 million tax credit will help data center expand in Akron\"","publisher":null,"kind":"subsidy","retrievedAt":"2026-07-25"}]},{"id":"compute-ark-data-centers-canton-oh","sourceRecordId":"ark-data-centers-canton-oh","name":"Ark Data Centers Canton","operator":"Ark Data Centers","city":"Canton","county":"Stark","address":"4726 Hills and Dales Rd NW","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.832529,"longitude":-81.431933,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-canton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkdna.com/data-centers/data-center-locations/ohio/","label":"Ark Data Centers Ohio locations: Canton, OH — 1.5 MW utility power, 5,600 sq ft conditioned space","publisher":"Ark Data Centers","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB facility 12237 'ark data centers - Canton, OH', 4726 Hills and Dales Rd NW, Canton 44708 (also listed as SecureData 365 at the same address)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-ark-data-centers-independence-cuyahoga-county-oh","sourceRecordId":"ark-data-centers-independence-cuyahoga-county-oh","name":"Ark Data Centers Independence (fka Involta)","operator":"Ark Data Centers (formerly Involta)","city":"Independence","county":"Cuyahoga","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.360599,"longitude":-81.632511,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-independence-cuyahoga-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/involta-expands-data-center-in-independence-ohio/","label":"Involta expands data center in Independence, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.independenceohio.org/business_resources/featured_project.php","label":"Featured Project — Involta Data Center","publisher":"City of Independence, Ohio","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.prnewswire.com/news-releases/involta-is-now-ark-data-centers-302145731.html","label":"Involta Is Now Ark Data Centers","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://gis.cuyahogacounty.us/server/rest/services/MyPLACE/Parcels_WMA_GJOIN_WGS84/MapServer/2/query?where=parcelpin=%2756410036%27&outFields=*&f=json&returnGeometry=true&outSR=4326","label":"Cuyahoga County parcel/GIS record (parcel 56410036)","publisher":"Cuyahoga County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://businessjournaldaily.com/involta-to-build-independence-data-center/","label":"Business Journal Daily — \"Involta to Build Data Center in Independence\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","label":"Signal Akron — \"$4.5 million tax credit will help data center expand in Akron\"","publisher":null,"kind":"subsidy","retrievedAt":"2026-07-25"}]},{"id":"compute-edgeconnex-ashville-oh","sourceRecordId":"edgeconnex-ashville-oh","name":"Ashville Campus","operator":"EdgeConneX","city":"Ashville","county":"Pickaway","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.72,"longitude":-83.03,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-ashville-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/proposed-edgeconnex-data-center-in-pickaway-county-ohio-facing-criticism/","label":"Proposed EdgeConneX data center in Pickaway County, Ohio facing criticism","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://opsb.ohio.gov/events/public-info-meeting-1-ashville-energy-center","label":"Public Info Meeting #1 — Ashville Energy Center","publisher":"Ohio Power Siting Board","kind":"filing","retrievedAt":"2026-08-08"}]},{"id":"compute-aws-cosgray-hilliard-oh","sourceRecordId":"aws-cosgray-hilliard-oh","name":"AWS Cosgray Road Campus","operator":"Amazon Web Services","city":"Hilliard","county":"Franklin","address":"4580-4640 Cosgray Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.04946,"longitude":-83.1761,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-cosgray-hilliard-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-planning-third-data-center-campus-in-hilliard-ohio/","label":"AWS Hilliard campuses coverage (Cosgray Road enrichment)","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-011455'&outFields=*&f=json&returnGeometry=true&outSR=4326","label":"Franklin County parcel/GIS record (parcel 050-011455, 4580-4640 Cosgray Rd — AMAZON DATA SERVICES INC, data-center use class, ~95 ac GIS)","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-011455'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor building record — parcel 050-011455 (4580-4640 Cosgray Rd, Amazon Data Services Inc): assessed building area 880,352 sq ft + land-use class 'data center' = built/operational","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://hilliardohio.gov/fuel-cells/","label":"Fuel Cells — City of Hilliard","publisher":"City of Hilliard, Ohio","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://stopohiodatacenters.org/franklin-county","label":"Hilliard, Ohio: Amazon Cosgray Data Center & Bloom Fuel Cells | Franklin County","publisher":"Ohio Data Centers (stopohiodatacenters.org)","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 050-011455, 4580 - 4640 Cosgray Rd, AMAZON DATA SERVICES INC, class 'data center'","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-aws-crosby-court-franklin-county-oh","sourceRecordId":"aws-crosby-court-franklin-county-oh","name":"AWS Crosby Court Campus","operator":"Amazon Web Services","city":"Plain City","county":"Franklin","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.10187,"longitude":-83.198633,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-crosby-court-franklin-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'275-000010'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor parcel/GIS record (parcel 275-000010, 6685 Crosby Ct — VADATA INC, assessed building area 768,498 sq ft = built, 66.8 ac)","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenters.com/amazon-aws-6665-crosby-court","label":"Amazon AWS: 6665 Crosby Court (Datacenters.com)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.aep.com/news/stories/view/10262/","label":"PUCO Approves Onsite Power Project for Data Centers (AEP)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aws-jefferson-township-fayette-oh","sourceRecordId":"aws-jefferson-township-fayette-oh","name":"AWS Fayette County (Jefferson Township)","operator":"Amazon Web Services","city":"Jeffersonville","county":"Fayette","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.6534,"longitude":-83.5677,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-jefferson-township-fayette-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://columbusconstruction.org/amazon-web-services-to-build-new-datacenter-campus-in-fayette-county/","label":"Columbus Construction: ~590 acres, I-71 & US-35, $5B, 30-yr 100% CRA exemption, construction slated early 2025","publisher":"Columbus Construction","kind":"press","retrievedAt":"2026-08-05"},{"url":"https://www.recordherald.com/2024/12/24/aws-officials-confirm-plans-to-invest-5-billion-into-fayette-county-with-new-data-centers/","label":"Record-Herald (2024-12-24): AWS VP Roger Wehner names Jefferson Township as first confirmed locality; $5B by 2030 in a $10B Ohio expansion","publisher":"Washington Court House Record-Herald","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-aws-hayden-run-hilliard-oh","sourceRecordId":"aws-hayden-run-hilliard-oh","name":"AWS Hayden Run Campus","operator":"Amazon Web Services","city":"Hilliard","county":"Franklin","address":"5109-5129 Hayden Run Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.059949,"longitude":-83.134305,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-hayden-run-hilliard-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-011444'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor parcel/GIS record (parcel 050-011444, 5109-5129 Hayden Run Rd — VADATA INC, land-use class 'data center', assessed building area 768,498 sq ft = built, 55.2 ac)","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://baxtel.com/data-center/amazon-hilliard-5109-hayden-run","label":"Amazon Hilliard 5109 Hayden Run — AWS's first US East (Ohio) region data center; broke ground 2015, built ~2018, fully operational, multi-building campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.datacenterdynamics.com/en/news/aws-planning-third-data-center-campus-in-hilliard-ohio/","label":"AWS plans third data center campus in Hilliard, Ohio (DCD)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://hilliardohio.gov/fuel-cells/","label":"Fuel Cells — City of Hilliard","publisher":null,"kind":"permit","retrievedAt":"2026-07-24"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 050-011444, 5109 - 5129 Hayden Run Rd, VADATA INC, class 'data center'","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-aws-industrial-parkway-jerome-township-oh","sourceRecordId":"aws-industrial-parkway-jerome-township-oh","name":"AWS Industrial Parkway Campus (Jerome Township)","operator":"Amazon Web Services","city":"Plain City","county":"Union","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.134553,"longitude":-83.212394,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-industrial-parkway-jerome-township-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500220390010'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","label":"Union County Auditor building record (parcel 1500220390010 / 8565 Industrial Pkwy — Amazon Data Services Inc, building entries built 2024 (215,144 sq ft x2) and 2025 (151,305 sq ft), $254.3M appraised building value, 86.2 ac)","publisher":"Union County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.marysvillejt.com/news/amazonprimed/","label":"Amazon primed: Technology giant plans $200 million data center in Union County (Nov 2019) — the Jerome Township AWS cluster origin announcement, ~125 ac at NW corner of Warner Rd / Industrial Pkwy","publisher":"Marysville Journal-Tribune","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.wosu.org/politics-government/2025-09-09/jerome-township-puts-pause-on-new-data-center-development-for-nine-months","label":"Jerome Township puts pause on new data center development for nine months (Sep 2025) — confirms two operational AWS data centers in Jerome Township; AWS paid $1.1M Union County property tax in 2024","publisher":"WOSU Public Media","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.datacenter.fyi/facility/amazon-aws-industrial-parkway-campus-oh-bccc5d1e","label":"Amazon AWS Industrial Parkway Campus — Plain City, OH (datacenter.fyi)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.datacentermap.com/usa/ohio/columbus/aws-cmh-industrial-parkway-campus/specs/","label":"Amazon AWS CMH - Industrial Parkway Campus (Datacentermap)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-aws-2550-beech-road-new-albany-oh","sourceRecordId":"aws-2550-beech-road-new-albany-oh","name":"AWS New Albany (2550 Beech Road)","operator":"Amazon Web Services","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.094442,"longitude":-82.750086,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-2550-beech-road-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111744-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County parcel/GIS record (parcel 095-111744-00.000, 2550 Beech Rd NW — Vadata Inc, Industrial land-use class 305 'Research/Chemical Labs' = built, 67.27 tax acres)","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://newalbanyohio.org/news/2025/08/amazon-investment-in-new-albany/","label":"Amazon Investment in New Albany Contributes $1.4 Billion to Licking County GDP","publisher":"City of New Albany","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://baxtel.com/data-center/amazon-2570-beech-road","label":"Amazon: 2570 Beech Road Data Center ('Park Two', ~459,000 sq ft, operational since 2017)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://api.openstreetmap.org/api/0.6/ways.json?ways=562775657,1020374277,1020374278,1020374279,1252196801","label":"OpenStreetMap ways for the AWS buildings CMH50, CMH53, CMH56, CMH59 and CMH62 (tagged as data centers operated by Amazon Web Services)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-28"}]},{"id":"compute-aws-3180-beech-road-new-albany-oh","sourceRecordId":"aws-3180-beech-road-new-albany-oh","name":"AWS New Albany (3180 Beech Road)","operator":"Amazon Web Services","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.104129,"longitude":-82.750939,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-3180-beech-road-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County Auditor parcel/GIS record (parcel 095-111618-04.000, Beech Rd NW — Amazon Data Services Inc, Industrial land-use class 305 'Research/Chemical Labs' = built, 106.4 ac)","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://baxtel.com/data-center/amazon-3180-beech-dc1","label":"Amazon 3180 Beech Rd Campus ('North Hub') — fully operational, built 2024; 112-acre parcel bought April 2020 for $21.8M, distinct from the original 2570 Beech campus and the Beech/Miller expansion","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://baxtel.com/data-center/amazon-3180-beech-rd-campus","label":"Amazon: 3180 Beech Rd Campus Data Center (Baxtel)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-24"},{"url":"https://aws.amazon.com/blogs/aws/more-amazon-wind-and-solar-farms-are-live/","label":"AWS News Blog: More Amazon wind and solar farms are live","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aws-beech-road-new-albany-oh","sourceRecordId":"aws-beech-road-new-albany-oh","name":"AWS New Albany (Beech/Miller Road Campus)","operator":"Amazon Web Services","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.11593,"longitude":-82.75731,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-beech-road-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25AMAZON%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County parcel/GIS record (AMAZON DATA SERVICES INC — Beech Rd NW / Miller Rd NW cluster; anchor parcel 095-111408, 199.81 ac)","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://newalbanyohio.org/news/2025/08/amazon-investment-in-new-albany/","label":"Amazon Investment in New Albany Contributes $1.4 Billion to Licking County GDP","publisher":"City of New Albany","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://newalbanyohio.org/news/2023/09/amazon-web-services-announces-plan-to-invest-3-5-billion-in-new-albany-by-2030/","label":"Amazon Web Services Announces Plan to Invest $3.5 Billion in New Albany by 2030","publisher":"City of New Albany","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.datacenterfrontier.com/site-selection/article/33011941/aws-readies-35b-for-5-more-ohio-data-centers-in-booming-columbus-suburb-new-albany","label":"AWS Readies $3.5B for 5 More Ohio Data Centers in New Albany","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-18"}]},{"id":"compute-aws-newton-court-new-albany-oh","sourceRecordId":"aws-newton-court-new-albany-oh","name":"AWS New Albany (Newton Court)","operator":"Amazon Web Services","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.093702,"longitude":-82.72994,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-newton-court-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County Auditor parcel/GIS record (parcel 095-112074-00.000, 2575 Newton Ct — Amazon Data Services Inc, Industrial land-use class 305 'Research/Chemical Labs' = built, 92.7 ac)","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://baxtel.com/data-center/amazon-2575-newton","label":"Amazon 2575 Newton ('Tower Ultra') — fully operational, built 2024, AWS US East (Ohio) region","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://aws.amazon.com/blogs/aws/more-amazon-wind-and-solar-farms-are-live/","label":"AWS News Blog: More Amazon wind and solar farms are live","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aws-project-cosmos-marysville-oh","sourceRecordId":"aws-project-cosmos-marysville-oh","name":"AWS Project Cosmos","operator":"Amazon Web Services","city":"Marysville","county":"Union","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.237,"longitude":-83.35,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-project-cosmos-marysville-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-gets-go-ahead-for-data-center-campus-in-marysville-ohio/","label":"AWS gets go-ahead for data center campus in Marysville, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.growunioncountyohio.com/media-posts/aws-press-release","label":"Amazon Web Services Press Release - Grow Union County Ohio","publisher":"Grow Union County Ohio / AWS","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://marysvilleohio.org/772/Data-Center-FAQs","label":"Data Center FAQs - City of Marysville, OH","publisher":"City of Marysville","kind":"other","retrievedAt":"2026-07-06"}]},{"id":"compute-aws-galaxy-sidney-oh","sourceRecordId":"aws-galaxy-sidney-oh","name":"AWS Project Galaxy — Sidney, OH","operator":"Amazon Web Services","city":"Sidney","county":"Shelby","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.29,"longitude":-84.16,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-galaxy-sidney-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-secures-tax-break-for-3bn-data-center-campus-in-sidney-ohio/","label":"Amazon secures tax break for $3bn data center campus in Sidney, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://stopohiodatacenters.org/shelby-county","label":"Project Galaxy Amazon Data Center — Shelby County","publisher":"Stop Ohio Data Centers","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/amazon-project-galaxy","label":"Amazon: Project Galaxy Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.utilitydive.com/news/ohio-ratepayer-occ-ferc-amazon-data-center-aes/733169/","label":"FERC urged to shield AES Ohio customers from grid costs for 1.5-GW Amazon data center","publisher":"Utility Dive","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://www.sidneyoh.com/526/Proposed-Data-Center-FAQ","label":"Proposed Data Center FAQ","publisher":"City of Sidney, OH","kind":"other","retrievedAt":"2026-07-07"}]},{"id":"compute-aws-scioto-darby-hilliard-oh","sourceRecordId":"aws-scioto-darby-hilliard-oh","name":"AWS Scioto Darby Campus","operator":"Amazon Web Services","city":"Hilliard","county":"Franklin","address":"4120 Scioto Darby Creek Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.01895,"longitude":-83.12439,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-scioto-darby-hilliard-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-planning-third-data-center-campus-in-hilliard-ohio/","label":"AWS planning third data center campus in Hilliard, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/data-center/amazon-scioto-darby-campus","label":"Amazon Scioto Darby Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-002806'&outFields=*&f=json&returnGeometry=true&outSR=4326","label":"Franklin County parcel/GIS record (parcel 050-002806, 4200 Scioto Darby Creek Rd — AMAZON DATA SERVICES INC, data-center use class, ~143 ac GIS)","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-002806'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor building record — parcel 050-002806 (4200 Scioto Darby Creek Rd, Amazon Data Services Inc): assessed building area 695,120 sq ft + land-use class 'data center' = built/operational","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://hilliardohio.gov/fuel-cells/","label":"City of Hilliard: Scioto Darby Creek Road Fuel Cell Project — 72.9 MW, 228 Bloom SOFC units, AEP Ohio-owned, behind the meter for Amazon's Scioto Darby campus","publisher":"City of Hilliard","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 050-002806, 4120 Scioto Darby Crk, AMAZON DATA SERVICES INC, class 'data center'","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-aws-sprigg-township-adams-county-oh","sourceRecordId":"aws-sprigg-township-adams-county-oh","name":"AWS Sprigg Township Data Center Campus (Buck Canyon)","operator":"Amazon Web Services (land held via Buck Canyon Properties)","city":"Manchester","county":"Adams","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":38.63778,"longitude":-83.69306,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-sprigg-township-adams-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://amazon.adamscountyoh.gov/","label":"AWS - Adams County, OH (official project page)","publisher":"Amazon / Adams County, OH","kind":"other","retrievedAt":"2026-08-27"},{"url":"https://www.wcpo.com/news/local-news/i-team/adams-county-data-center-gets-federal-permit-as-voters-sign-petitions-to-block-it","label":"Adams County data center gets federal permit, as voters sign petitions to block it","publisher":"WCPO","kind":"permit","retrievedAt":"2026-08-27"},{"url":"https://www.wvxu.org/local-news/2026-08-25/adams-county-ohio-utility-costs-data-center-amazon","label":"Adams County residents fear environmental and utility costs of possible data center","publisher":"WVXU","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.foodandwaterwatch.org/2026/02/26/sprigg-township-oh-passes-data-center-moratorium/","label":"Sprigg Township, OH Passes Data Center Moratorium","publisher":"Food & Water Watch","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-aws-trenton-madison-st-clair-butler-oh","sourceRecordId":"aws-trenton-madison-st-clair-butler-oh","name":"AWS Trenton / Madison–St. Clair Township Campus","operator":"Amazon Web Services","city":"Trenton","county":"Butler","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.4808905,"longitude":-84.4577222,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-trenton-madison-st-clair-butler-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wcpo.com/news/local-news/in-your-community/butler-county/townships-move-to-capture-future-data-center-tax-revenue-as-trenton-pursues-annexation","label":"Townships move to capture future data center tax revenue as Trenton pursues annexation","publisher":"WCPO","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-aws-warner-road-jerome-township-oh","sourceRecordId":"aws-warner-road-jerome-township-oh","name":"AWS Warner Road Campus (Jerome Township)","operator":"Amazon Web Services","city":"Plain City","county":"Union","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.118607,"longitude":-83.199984,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-warner-road-jerome-township-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500300200000'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","label":"Union County Auditor building record (parcel 1500300200000 / 8567 Warner Rd — Amazon Data Services Inc, year built 2023-2024, multiple buildings ~214k+214k+157k sq ft, $36.7M appraised building value, 92.8 ac)","publisher":"Union County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.marysvillejt.com/2021/02/20/rezoning-approved-for-amazon-data-center/","label":"Rezoning approved for Amazon data center (Feb 2021) — Jerome Township Trustees rezoned 99.5 acres on the south side of Warner Rd, west of Industrial Parkway, for an Amazon data center","publisher":"Marysville Journal-Tribune","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.wosu.org/politics-government/2025-09-09/jerome-township-puts-pause-on-new-data-center-development-for-nine-months","label":"Jerome Township puts pause on new data center development for nine months (Sep 2025) — confirms two operational AWS data centers in Jerome Township; AWS paid $1.1M Union County property tax in 2024","publisher":"WOSU Public Media","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://cleanview.co/data-centers/ohio/3299/aws-warner-road-building-5","label":"AWS Warner Road Building 5 — Union, Ohio (Cleanview)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://aws.amazon.com/blogs/aws/more-amazon-wind-and-solar-farms-are-live/","label":"AWS News Blog: More Amazon wind and solar farms are live","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aws-wilmington-clinton-oh","sourceRecordId":"aws-wilmington-clinton-oh","name":"AWS Wilmington Data Center Campus","operator":"Amazon Web Services","city":"Wilmington","county":"Clinton","address":"1488 S US 68","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.4453393,"longitude":-83.8285375,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-wilmington-clinton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.chooseclintoncountyoh.org/news/data-center-faqs","label":"Data Center FAQs — Clinton County","publisher":"Choose Clinton County","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://www.whio.com/news/local/another-500-acres-land-zoned-second-data-center-wilmington/KXXP722G6ZD4LMQV2Z6U4UJUQE/","label":"Another 500 acres of land zoned for second data center in Wilmington","publisher":"WHIO","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-bitdeer-clarington-oh","sourceRecordId":"bitdeer-clarington-oh","name":"Bitdeer Clarington HPC/AI Campus","operator":"Bitdeer","city":"Clarington","county":"Monroe","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.7748,"longitude":-80.8731,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bitdeer-clarington-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-november-2025-production-and-operations-update","label":"Bitdeer announces November 2025 production and operations update","publisher":"Bitdeer Technologies Group","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://www.globenewswire.com/news-release/2025/10/14/3166667/0/en/Bitdeer-Announces-September-2025-Production-and-Operations-Update.html","label":"Bitdeer announces September 2025 production and operations update","publisher":"GlobeNewswire / Bitdeer","kind":"filing","retrievedAt":"2026-07-08"},{"url":"https://www.globenewswire.com/news-release/2024/06/28/2905800/0/en/Bitdeer-Expands-Power-Capacity-Pipeline-to-2-5-GW-with-570-MW-Strategic-Partnership-with-Monroe-County-Port-Authority-in-Ohio.html","label":"Bitdeer expands power pipeline with 570 MW Monroe County partnership","publisher":"GlobeNewswire / Bitdeer","kind":"filing","retrievedAt":"2026-07-08"},{"url":"https://www.sec.gov/Archives/edgar/data/0001899123/000121390026012756/ea0275775-6k_bitdeer.htm","label":"Bitdeer Form 6-K (American Heavy Plate Solutions leasehold litigation disclosure)","publisher":"U.S. Securities and Exchange Commission","kind":"filing","retrievedAt":"2026-07-08"},{"url":"https://www.globenewswire.com/news-release/2026/03/16/3256231/0/en/Bitdeer-Announces-February-2026-Production-and-Operations-Update.html","label":"Bitdeer Announces February 2026 Production and Operations Update","publisher":"Bitdeer Technologies Group via GlobeNewswire","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-bitdeer-shalersville-portage-county-oh","sourceRecordId":"bitdeer-shalersville-portage-county-oh","name":"Bitdeer Shalersville Data Center Campus","operator":"Bitdeer","city":"Shalersville Township","county":"Portage","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.199,"longitude":-81.245,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bitdeer-shalersville-portage-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.news5cleveland.com/news/local-news/local-developer-global-tech-firm-plan-major-data-center-project-in-portage-county","label":"Local developer, global tech firm plan major data center project in Portage County","publisher":"News 5 Cleveland","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.news5cleveland.com/news/local-news/oh-portage/data-center-discussion-spans-3-hours-as-shalersville-mulls-257-acre-project","label":"Data center discussion spans 3+ hours as Shalersville mulls 257-acre project","publisher":"News 5 Cleveland","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/bitdeer-looks-to-develop-750mw-data-center-campus-in-ohio/","label":"Bitdeer looks to develop 750MW data center campus in Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://theportager.com/asian-crypto-mining-company-and-geis-partner-to-bring-data-center-to-shalersville","label":"Asian crypto mining company and Geis partner to bring data center to Shalersville","publisher":"The Portager","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-bluebridge-networks-mayfield-heights-oh","sourceRecordId":"bluebridge-networks-mayfield-heights-oh","name":"BlueBridge Networks Mayfield Heights Data Center","operator":"BlueBridge Networks","city":"Mayfield Heights","county":"Cuyahoga","address":"5915 Landerbrook Dr","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.501526911909,"longitude":-81.470892518387,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bluebridge-networks-mayfield-heights-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://bluebridgenetworks.com/contact/","label":"BlueBridge Networks — Contact (data center locations: Cleveland, Mayfield Heights, Columbus)","publisher":"BlueBridge Networks","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://bluebridgenetworks.com/cleveland-data-center-services/","label":"BlueBridge Networks — Data Center Services (colocation facilities in Cleveland, Mayfield Heights and Columbus)","publisher":"BlueBridge Networks","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.peeringdb.com/fac/8722","label":"PeeringDB — BlueBridge Networks | Mayfield Heights Data Center (5915 Landerbrook Drive)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-bristolville-25-lordstown-oh","sourceRecordId":"bristolville-25-lordstown-oh","name":"Bristolville 25","operator":"Bristolville 25 Developer LLC / BHGH Properties","city":"Lordstown","county":"Trumbull","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.18,"longitude":-80.87,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bristolville-25-lordstown-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wkbn.com/news/local-news/lordstown-news/data-center-developer-taking-lordstown-to-court/","label":"Data center developer taking Lordstown to court","publisher":"WKBN","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://businessjournaldaily.com/developers-petition-ohio-supreme-court-in-lordstown-data-center-project/","label":"Developers petition Ohio Supreme Court in Lordstown data center project","publisher":"Business Journal Daily","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-centersquare-cmh1-lewis-center-oh","sourceRecordId":"centersquare-cmh1-lewis-center-oh","name":"Centersquare (Csquare) CMH1 Lewis Center","operator":"Centersquare (Csquare)","city":"Lewis Center","county":"Delaware","address":"8180 Green Meadows Dr. North","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.16884,"longitude":-83.010799,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-cmh1-lewis-center-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://csquare.com//data-centers/columbus","label":"Csquare: Lewis Center CMH1 — 18,704 sq ft raised floor, 35.8 MW utility, 1.8 MW UPS, 3.8 MW generator, chilled-water cooling","publisher":"Csquare (Centersquare)","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB facility 2594 'Centersquare Columbus (CMH1)', 8180 Green Meadows Dr. North, Lewis Center OH 43035","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-ceranet-morrison-road-columbus-oh","sourceRecordId":"ceranet-morrison-road-columbus-oh","name":"CeraNet Data Center (Morrison Road)","operator":"CeraNet, Inc.","city":"Columbus","county":"Franklin","address":"826 Morrison Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.995882740484,"longitude":-82.855483773389,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ceranet-morrison-road-columbus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cera.net/about/","label":"CeraNet — About (primary facility just outside I-270 near the airport; 826 Morrison Road)","publisher":"CeraNet, Inc.","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.cera.net/contact/","label":"CeraNet — Contact (826 Morrison Road, Columbus, Ohio 43230)","publisher":"CeraNet, Inc.","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.cera.net/ohio-colocation-data-centers/","label":"CeraNet — Service Locations & Colo Space (Gahanna near the airport, Dublin, Westerville)","publisher":"CeraNet, Inc.","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-cipher-digital-ulysses-center-township-morgan-oh","sourceRecordId":"cipher-digital-ulysses-center-township-morgan-oh","name":"Cipher Digital Ulysses","operator":"Cipher Digital (formerly Cipher Mining)","city":null,"county":"Morgan","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.63028,"longitude":-81.64694,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-digital-ulysses-center-township-morgan-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://theenergymag.com/news/2025-12-23/cipher-ohio-hpc-pjm","label":"Cipher's Ulysses Ohio site: 200MW, 195 acres, AEP power, PJM interconnection, Q4 2027 energization","publisher":null,"kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.facebook.com/MorganCountyHerald/posts/last-nights-meeting-regarding-the-proposed-data-center-in-center-township-morgan/1611931394270139/","label":"Morgan County Herald: public meeting on the proposed Cipher Digital data center in Center Township","publisher":"Morgan County Herald","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-cogent-akron-summit-county-oh","sourceRecordId":"cogent-akron-summit-county-oh","name":"Cogent Data Center Akron","operator":"Cogent Communications","city":"Akron","county":"Summit","address":"120 North Broadway Street","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.0876,"longitude":-81.5183,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-akron-summit-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/en/cogent-cleveland/471-akron-dc","label":"Cogent Communications -- Akron Data Center","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://signalakron.org/where-7-data-centers-operate-in-summit-county-and-why-it-matters/","label":"Where 7 data centers operate in Summit County and why it matters","publisher":"Signal Akron","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.sdxcentral.com/news/cogent-puts-four-data-centers-up-for-sale-in-us/","label":"Cogent Puts Four Data Centers Up for Sale in US","publisher":"SDxCentral","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.prnewswire.com/news-releases/cogent-communications-announces-closing-of-sale-of-10-data-center-facilities-302813574.html","label":"Cogent Communications Announces Closing of Sale of 10 Data Center Facilities","publisher":"Cogent Communications","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-cologix-col1-columbus-oh","sourceRecordId":"cologix-col1-columbus-oh","name":"Cologix COL1 (Columbus)","operator":"Cologix","city":"Columbus","county":"Franklin","address":"535 Scherers Court","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.1164761,"longitude":-83.0021667,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-col1-columbus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/columbus/","label":"Cologix Columbus data centers (COL1–COL8)","publisher":"Cologix","kind":"other","retrievedAt":"2026-08-27"},{"url":"https://cloudandcolocation.com/state/ohio/","label":"Ohio data center location directory","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-cologix-col2-columbus-oh","sourceRecordId":"cologix-col2-columbus-oh","name":"Cologix COL2 (Columbus)","operator":"Cologix","city":"Columbus","county":"Franklin","address":"555 Scherers Court","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.1164691,"longitude":-83.0020077,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-col2-columbus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/columbus/","label":"Cologix Columbus data centers (COL1–COL8)","publisher":"Cologix","kind":"other","retrievedAt":"2026-08-27"},{"url":"https://cloudandcolocation.com/state/ohio/","label":"Ohio data center location directory","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-cologix-col3-columbus-oh","sourceRecordId":"cologix-col3-columbus-oh","name":"Cologix COL3 (Columbus)","operator":"Cologix","city":"Columbus","county":"Franklin","address":"585 Scherers Court","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.1164586,"longitude":-83.0017691,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-col3-columbus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/columbus/","label":"Cologix Columbus data centers (COL1–COL8); COL3 listed as 160K SQFT, 18+ MW","publisher":"Cologix","kind":"other","retrievedAt":"2026-08-27"},{"url":"https://cloudandcolocation.com/state/ohio/","label":"Ohio data center location directory","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-cologix-col4-columbus-oh","sourceRecordId":"cologix-col4-columbus-oh","name":"Cologix COL4 (Columbus)","operator":"Cologix","city":"Columbus","county":"Franklin","address":"7500 Alta View Boulevard","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.1178254,"longitude":-83.0007799,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-col4-columbus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/columbus/","label":"Cologix Columbus data centers (COL1–COL8); COL4 listed at 7500 Alta View","publisher":"Cologix","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-cologix-col5-orange-township-delaware-county-oh","sourceRecordId":"cologix-col5-orange-township-delaware-county-oh","name":"Cologix COL5","operator":"Cologix","city":"Lewis Center","county":"Delaware","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.190863,"longitude":-83.011113,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-col5-orange-township-delaware-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://signalcleveland.org/ohio-approves-last-data-center-exemption-before-moratorium/","label":"Ohio Tax Credit Authority meeting action, June 1, 2026 (reported)","publisher":"Signal Cleveland / Signal Ohio","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.delawaresource.com/2026/06/03/orange-township-data-center-among-last-projects-approved-before-ohio-tax-break-pause/","label":"Orange Township data center among last projects approved before Ohio tax-break pause","publisher":"Delaware Source","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://dam.assets.ohio.gov/image/upload/development.ohio.gov/business/stateincentives/TCA_Meeting_Minutes_6.1.2026.pdf","label":"Ohio Tax Credit Authority Meeting Minutes, June 1, 2026","publisher":"Ohio Department of Development","kind":"subsidy","retrievedAt":"2026-07-17"},{"url":"https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf","label":"Denver company Cologix starts work on Lewis Center AI data center","publisher":"Delaware County Regional Planning Commission (news clipping)","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://maps.delco-gis.org/arcgiswebadaptor/rest/services/AuditorGISWebsite/AuditorMap_CurrentYearParcels_WM/MapServer/0/query?f=json&where=OWNPARCELID%3D%2731823025001002%27&outFields=*&returnGeometry=true&outSR=4326","label":"Delaware County parcel/GIS record (parcel 31823025001002 (ALTPARCELID 318-230-25-001-002))","publisher":"Delaware County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cologix-johnstown-oh","sourceRecordId":"cologix-johnstown-oh","name":"Cologix Johnstown AI-Ready Campus","operator":"Cologix","city":"Johnstown","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.15,"longitude":-82.68,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-johnstown-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/","label":"Cologix Expands Central Ohio Footprint with Land Acquisition for New AI-Ready 800MW Data Center Campus","publisher":"Cologix","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://signalohio.org/ohio-approves-last-data-center-exemption-before-moratorium/","label":"Ohio approves last data-center exemption before moratorium","publisher":"Signal Ohio","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://columbusregion.com/press-release/cologix-expands-in-central-ohio/","label":"Cologix expands in Central Ohio","publisher":"Columbus Region","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.powermag.com/cologix-plans-7-billion-800-mw-data-center-complex-in-ohio/","label":"Cologix plans 800-MW data center complex in Ohio","publisher":"POWER Magazine","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.vorys.com/publication-public-utilities-commission-of-ohio-authorizes-tariff-for-aep-ohios-data-center-customers-requires-end-of-moratorium-on-new-services-for-data-centers","label":"Public Utilities Commission of Ohio Authorizes Tariff for AEP Ohio's Data Center Customers (client alert, July 11, 2025)","publisher":"Vorys, Sater, Seymour and Pease LLP","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://www.powermag.com/regulator-approves-aep-ohios-landmark-data-center-tariff/","label":"Regulator approves AEP Ohio's landmark data center tariff","publisher":"POWER Magazine","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-compugen-new-albany-data-center-oh","sourceRecordId":"compugen-new-albany-data-center-oh","name":"Compugen New Albany Data Center","operator":"Compugen (owner of record Compugen Real Estate Holdings Inc)","city":"New Albany","county":"Franklin","address":"7000 Souder Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.104251,"longitude":-82.805143,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/compugen-new-albany-data-center-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 222-001940, 7000 Souder Rd, COMPUGEN REAL ESTATE HOLDINGS INC, class 'data center', 31,192 sq ft, 7.77 acres","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-crane-data-centers-pierce-township-clermont-oh","sourceRecordId":"crane-data-centers-pierce-township-clermont-oh","name":"Crane Data Centers Pierce Township Campus (near Beckjord)","operator":"Crane Data Centers","city":"New Richmond (Pierce Township)","county":"Clermont","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":38.992083,"longitude":-84.29722,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crane-data-centers-pierce-township-clermont-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvxu.org/local-news/2026-09-02/small-data-center-company-eyes-land-near-beckjord-power-plant-in-pierce-township","label":"WVXU: Small data center company eyes land near Beckjord power plant in Pierce Township (300 MW, ~300 acres, ~150 jobs)","publisher":"WVXU","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://local12.com/news/local/san-francisco-company-pitches-data-center-clermont-county-despite-local-moratorium-pierce-township-tech-technology-beckjord-power-plant-contaminated-soil-issues-residents-complaints-california","label":"Local 12: San Francisco company pitches 300 MW data center on ~300 acres north of Beckjord Road despite moratorium","publisher":"WKRC Local 12","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://en.wikipedia.org/wiki/Walter_C._Beckjord_Generating_Station","label":"Walter C. Beckjord Generating Station (coordinates of adjacent landmark)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-cin2-cincinnati-oh","sourceRecordId":"cyrusone-cin2-cincinnati-oh","name":"CyrusOne CIN2 (Cincinnati)","operator":"CyrusOne","city":"Cincinnati","county":"Hamilton","address":"209-229 West 7th Street","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.1027886,"longitude":-84.5179229,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-cin2-cincinnati-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/cincinnati-ohio","label":"CyrusOne Cincinnati facility page: address, 14 MW, 143,778 sq ft technical space, closed-loop chilled-water cooling","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.datacentermap.com/usa/ohio/cincinnati/cyrusone-cincinnati/","label":"DataCenterMap listing corroborating CyrusOne CIN2 (7th Street carrier hotel)","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB 'CyrusOne Cincinnati 7th St', 209-229 West 7th St, Cincinnati 45202 (coordinates match this record)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-cin3-cincinnati-mason-oh","sourceRecordId":"cyrusone-cin3-cincinnati-mason-oh","name":"CyrusOne CIN3 (Cincinnati-Mason)","operator":"CyrusOne","city":"Mason","county":"Warren","address":"4800 Parkway Dr, Suite 100","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.3038941,"longitude":-84.3116127,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-cin3-cincinnati-mason-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/cyrusone-cin3-cincinnati-mason","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/31250931","label":"OpenStreetMap way/31250931","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB 'CyrusOne Mason', 4800 Parkway Dr suite 100, Mason 45040","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-cin4-hamilton-oh","sourceRecordId":"cyrusone-cin4-hamilton-oh","name":"CyrusOne CIN4 (Hamilton)","operator":"CyrusOne","city":"Hamilton","county":"Butler","address":"103 Knightsbridge Dr","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.386313,"longitude":-84.567161,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-cin4-hamilton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB facility 1471 'CyrusOne Hamilton', 103 Knightsbridge Dr, Hamilton OH 45011","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-lebanon-cin5-cin7-oh","sourceRecordId":"cyrusone-lebanon-cin5-cin7-oh","name":"CyrusOne Lebanon Campus (CIN5 & CIN7)","operator":"CyrusOne","city":"Lebanon","county":"Warren","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.389053,"longitude":-84.220796,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-lebanon-cin5-cin7-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/lebanon-ohio","label":"CyrusOne: CIN5 & CIN7 Lebanon, OH — 35 MW total IT capacity, 400,000 sq ft technical space, 123-acre campus","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB facility 1468 'CyrusOne Lebanon', Lebanon OH 45036 (coordinates)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-new-albany-col1-licking-county-oh","sourceRecordId":"cyrusone-new-albany-col1-licking-county-oh","name":"CyrusOne New Albany COL-1","operator":"CyrusOne","city":"Johnstown","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.09294,"longitude":-82.718059,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-new-albany-col1-licking-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nbc4i.com/news/local-news/new-albany/permits-offer-details-after-groundbreaking-of-150-million-new-albany-data-center/","label":"Permits offer details after groundbreaking of $150 million New Albany data center","publisher":"NBC4 (WCMH)","kind":"permit","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-breaks-ground-on-new-albany-ohio-data-center/","label":"CyrusOne breaks ground on New Albany, Ohio data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=SiteAddress+LIKE+%27%2512181%25%27&outFields=*&returnGeometry=true&outSR=4326&f=json","label":"Licking County parcel/GIS record (parcel 095-112236-00.000 (PID 95785))","publisher":"Licking County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"}]},{"id":"compute-damac-digital-canton-orchard-view-oh","sourceRecordId":"damac-digital-canton-orchard-view-oh","name":"DAMAC Digital Canton Orchard View Data Center","operator":"DAMAC Digital","city":"Canton","county":"Stark","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.776093,"longitude":-81.32096,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/damac-digital-canton-orchard-view-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://orchardviewdata.com/","label":"Canton Orchard View: DAMAC Digital's proposed digital infrastructure development in Canton (two buildings, interior data halls, on-site substation, closed-loop cooling)","publisher":"DAMAC Digital (project site)","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.aol.com/articles/dubai-based-damac-digital-plans-153758000.html","label":"Dubai-based DAMAC Digital plans community forum on data center in southeast Canton (over 80 acres NE of Trump Ave SE & Orchard View Dr SE; demolition permit earlier in 2026; Jul 10, 2026)","publisher":"The Canton Repository (via AOL)","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.whbc.com/canton-developer-explain-data-center-plan/","label":"Canton, Developer Explain Data Center Plan (NE corner of Trump Ave SE and Orchardview; Jul 15, 2026)","publisher":"News-Talk 1480 WHBC","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.citizensforethics.org/reports-investigations/crew-investigations/data-centers-are-spiking-ohio-utility-prices-one-developer-is-trumps-business-partner/","label":"Data centers are spiking Ohio utility prices (DAMAC Digital Solution Ohio bought the land from AIDC Canton 2 for $36.5M, Dec 2025; Mar 12, 2026)","publisher":"Citizens for Responsibility and Ethics in Washington (CREW)","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.yahoo.com/news/us/articles/canton-spare-enough-water-4-095837393.html","label":"Can Canton spare enough water for 4 proposed data centers? (DAMAC Digital: 225 MW, air-cooled, proposed; Oct 9, 2026)","publisher":"The Canton Repository (via Yahoo News)","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-dartpoints-cvg01-cincinnati-oh","sourceRecordId":"dartpoints-cvg01-cincinnati-oh","name":"DartPoints Cincinnati","operator":"DartPoints","city":"Cincinnati","county":"Hamilton","address":"302 W 3rd St, Suite 400","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.098011,"longitude":-84.517282,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-cvg01-cincinnati-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/locations/cvg01-cincinniati-oh/","label":"DartPoints CVG01 – Cincinnati, OH location page: critical IT load 180 kW, 13,200 sq ft data hall","publisher":"DartPoints","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.peeringdb.com/fac/3663","label":"PeeringDB facility 3663: DartPoints Cincinnati, OH - CVG1, 302 W 3rd St Ste 400","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://baxtel.com/data-center/dartpoints-cincinnati-oh","label":"Baxtel: DartPoints: Cincinnati, OH (CVG01), 302 West 3rd Street, previously operated by Immedion","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-dartpoints-cmh01-dublin-oh","sourceRecordId":"dartpoints-cmh01-dublin-oh","name":"DartPoints CMH01 (Dublin)","operator":"DartPoints","city":"Dublin","county":"Franklin","address":"565 Metro Pl S, Suite 300","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.093442,"longitude":-83.129797,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-cmh01-dublin-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/locations/cmh01-dublin-oh/","label":"DartPoints CMH01 – Dublin, OH location page (40,000 sq ft facility, 5,900 sq ft data hall, 345 kW critical IT load, 0.75 MW utility power)","publisher":"DartPoints","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.peeringdb.com/api/fac/9390","label":"PeeringDB facility 9390 – DartPoints Dublin, OH - CMH1, 565 Metro Pl S Ste 300, Dublin OH 43017","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://dartpoints.com/press/dartpoints-acquires-metro-data-centers/","label":"DartPoints acquires Metro Data Centers (Dublin, OH), Oct 28, 2020","publisher":"DartPoints","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-databank-cleveland-cle1-oh","sourceRecordId":"databank-cleveland-cle1-oh","name":"DataBank Cleveland (CLE1)","operator":"DataBank","city":"Cleveland","county":"Cuyahoga","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.4998,"longitude":-81.6829,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-cleveland-cle1-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/cleveland/1255-euclid-ave/","label":"DataBank CLE1 page: 1255 Euclid Ave Suite 200, 7,440 sq ft raised floor, 0.4 MW critical IT load","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://www.datacentermap.com/usa/ohio/cleveland/databank-cleveland/","label":"DataCenterMap DataBank Cleveland listing","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-08-05"}]},{"id":"compute-datayard-dayton-oh","sourceRecordId":"datayard-dayton-oh","name":"DataYard Dayton Data Center","operator":"DataYard","city":"Dayton","county":"Montgomery","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.7602255,"longitude":-84.1953733,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/datayard-dayton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datayard.us/contact/","label":"DataYard official contact page: 130 W Second St, Suite 250, Dayton, OH 45402","publisher":"DataYard","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://www.datayard.us/data-center-co-location/","label":"DataYard colocation page: downtown Dayton facility operating since 1995 (current is 'fourth iteration')","publisher":"DataYard","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-discover-new-albany-data-center-oh","sourceRecordId":"discover-new-albany-data-center-oh","name":"Discover New Albany Data Center","operator":"Discover Properties LLC (Discover Financial Services; owner of record)","city":"New Albany","county":"Franklin","address":"7205 E New Albany Condit Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.103814,"longitude":-82.813811,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/discover-new-albany-data-center-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 222-002056, 7205 E New Albany Condit Rd, DISCOVER PROPERTIES LLC, class 'data center', 100,116 sq ft, 18.97 acres","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-lakeland-equity-east-55th-cleveland-oh","sourceRecordId":"lakeland-equity-east-55th-cleveland-oh","name":"East 55th Street Data Center (Slavic Village)","operator":"Lakeland Equity Group","city":"Cleveland","county":"Cuyahoga","address":"3560 East 55th Street","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.461694,"longitude":-81.651208,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lakeland-equity-east-55th-cleveland-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://neo-trans.blog/2026/05/06/1-6b-data-center-planned-in-cleveland/","label":"$1.6B data center planned in Cleveland","publisher":"NEOtrans","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.yahoo.com/news/articles/city-cleveland-rejects-permit-1-171223986.html","label":"City of Cleveland rejects permit for $1.6B data center in Slavic Village","publisher":"WKYC via Yahoo News","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-edgeconnex-mcn-new-albany-licking-county-oh","sourceRecordId":"edgeconnex-mcn-new-albany-licking-county-oh","name":"EdgeConneX MCN New Albany (South Campus)","operator":"EdgeConneX","city":"New Albany","county":"Licking","address":"9850 Innovation Campus Way","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.08878,"longitude":-82.72274,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-mcn-new-albany-licking-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25EDGECONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County parcel/GIS record (EdgeConneX MCN New Albany South PropCo 2 + North PropCo 1 parcels; anchor 9850 Innovation Campus Way, 33.86 ac, \"Industrial Warehouses\")","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.gongwer-oh.com/public/EDGECONNEX_INC_Scope.pdf","label":"Ohio Tax Credit Authority — Exhibit I Scope of Work, EdgeConneX MCN New Albany South Opco 1 LLC (Phase I 80 MW, Phase II 2×72 MW)","publisher":"Ohio Tax Credit Authority / Gongwer","kind":"filing","retrievedAt":"2026-07-18"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/edgeconnex-plans-more-than-1-million-square-feet-of-data-centers-in-new-albany/","label":"EdgeConneX plans more than 1 million square feet of data centers in New Albany","publisher":"NBC4 WCMH-TV","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://614now.com/2025/hot-topics/1-billion-data-center-development-buys-136-more-acres-in-new-albany","label":"$1 billion data center development buys 136 more acres in New Albany (describes EdgeConneX's separate Piper Farms purchase)","publisher":"614NOW","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25CONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County Auditor GIS: EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC parcels incl. 9850 Innovation Campus Way (33.86 ac)","publisher":"Licking County Auditor","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25PIPER+FARMS%25'&outFields=*&returnCentroid=true&returnGeometry=false&outSR=4326&f=json","label":"Licking County Auditor GIS: EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC parcels (12 parcels, 136.38 ac, Monroe Twp.)","publisher":"Licking County Auditor","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://maps.puco.ohio.gov/arcgis/rest/services/opsb/OPSB_Natural_Gas_Generation_Projects/MapServer/0/query?where=CTS_DISCaseNumber%3D%2726-0361-EL-BGN%27&outFields=*&f=html","label":"OPSB case-tracking map data, case 26-0361-EL-BGN (PowerConneX New Albany 3 Energy Center)","publisher":"Ohio Power Siting Board (case-tracking map data)","kind":"filing","retrievedAt":"2026-10-28"}]},{"id":"compute-edged-columbus-new-albany-oh","sourceRecordId":"edged-columbus-new-albany-oh","name":"Edged Columbus","operator":"Edged (an Endeavour company)","city":"New Albany","county":"Franklin","address":"7600 W Campus Blvd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.10608,"longitude":-82.81578,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edged-columbus-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=UPPER(OWNERNME1)+LIKE+'%25EDGED%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Franklin County parcel/GIS record (parcel 222-002127 — EDGED COLUMBUS LLC, 7600 W Campus Blvd, use-class \"data center\")","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://edged.us/news/columbus-grand-opening","label":"Edged US Opens Ultra-Efficient Data Center Built for AI Training and Inference in Ohio's Silicon Heartland","publisher":"Edged US","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://bluewaterhealthyliving.com/news/national-news/ohio/new-albany-welcomes-246-million-edged-data-center-promising-water-energy-efficiency/","label":"New Albany welcomes $246 million Edged Data Center promising water, energy efficiency","publisher":"Columbus Dispatch (syndicated)","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 222-002127, 7600 W Campus Blvd, EDGED COLUMBUS LLC, class 'data center'","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-encore-technologies-blu1-blue-ash-oh","sourceRecordId":"encore-technologies-blu1-blue-ash-oh","name":"Encore Technologies BLU1 (Blue Ash)","operator":"Encore Technologies","city":"Blue Ash","county":"Hamilton","address":"11515 Grooms Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.277612,"longitude":-84.36949,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/encore-technologies-blu1-blue-ash-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB facility registry — Ohio (API query)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=11515+Grooms+Rd%2C+Cincinnati%2C+OH+45242&benchmark=Public_AR_Current&format=json","label":"U.S. Census Bureau geocoder: 11515 Grooms Rd, Cincinnati, OH 45242","publisher":"U.S. Census Bureau","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://encore.tech/dcpolicies/Infosec_DCPhysAccess_Policy_2026.1.pdf","label":"Encore Data Center Physical Access Policy v2026.1 (lists 11515 Grooms Rd)","publisher":"Encore Technologies","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-encore-technologies-governors-hill-symmes-township-oh","sourceRecordId":"encore-technologies-governors-hill-symmes-township-oh","name":"Encore Technologies Data Center (8700 Governors Hill Dr)","operator":"Encore Technologies","city":"Cincinnati","county":"Hamilton","address":"8700 Governors Hill Dr","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.287622,"longitude":-84.320369,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/encore-technologies-governors-hill-symmes-township-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://encore.tech/dcpolicies/Infosec_DCPhysAccess_Policy_2026.1.pdf","label":"Encore Technologies Data Center Physical Access Policy, version 2026.1 (dated 2025-12-03): scope lists 'the following Encore Data Centers' incl. 8700 Governors Hill Dr, Cincinnati, OH 45249","publisher":"Encore Technologies","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://encore.tech/company","label":"Encore Technologies company page: 'Owned data centers 4'; '4 data center locations' Cincinnati, Blue Ash, Miamisburg and Mason, OH","publisher":"Encore Technologies","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-encore-technologies-msb1-miamisburg-oh","sourceRecordId":"encore-technologies-msb1-miamisburg-oh","name":"Encore Technologies MSB1 (Miamisburg)","operator":"Encore Technologies","city":"Miamisburg","county":"Montgomery","address":"9333 N Springboro Pike","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.616585,"longitude":-84.227261,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/encore-technologies-msb1-miamisburg-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://encore.tech/dcpolicies/Infosec_DCPhysAccess_Policy_2026.1.pdf","label":"Encore Technologies Data Center Physical Access Policy, version 2026.1 (dated 2025-12-03): scope lists 'the following Encore Data Centers' incl. 9333 N Springboro Pike, Miamisburg, OH 45342","publisher":"Encore Technologies","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://encore.tech/company","label":"Encore Technologies company page: 'Owned data centers 4'; '4 data center locations' incl. Miamisburg, OH","publisher":"Encore Technologies","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://www.peeringdb.com/fac/14873","label":"PeeringDB facility 14873: Encore Technologies MSB1, 9333 N Springboro Pike, Miamisburg, OH 45342","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-encore-technologies-nor1-norwood-oh","sourceRecordId":"encore-technologies-nor1-norwood-oh","name":"Encore Technologies NOR1 (Norwood)","operator":"Encore Technologies","city":"Norwood","county":"Hamilton","address":"4620 Wesley Ave","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.1609,"longitude":-84.4504,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/encore-technologies-nor1-norwood-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://encore.tech/dcpolicies/Infosec_DCPhysAccess_Policy_2026.1.pdf","label":"Encore Technologies Data Center Physical Access Policy, version 2026.1 (dated 2025-12-03): scope lists 'the following Encore Data Centers' incl. 4620 Wesley Avenue, Cincinnati, OH 45212","publisher":"Encore Technologies","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://encore.tech/company","label":"Encore Technologies company page: 'Owned data centers 4'; '4 data center locations' Cincinnati, Blue Ash, Miamisburg and Mason, OH","publisher":"Encore Technologies","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://www.peeringdb.com/fac/14871","label":"PeeringDB facility 14871: Encore Technologies NOR1, 4620 Wesley Ave, Norwood, OH 45212","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-expedient-cleveland-neo-oh","sourceRecordId":"expedient-cleveland-neo-oh","name":"Expedient Cleveland (NEO 151 / NEO 152)","operator":"Expedient","city":"Garfield Heights","county":"Cuyahoga","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.428,"longitude":-81.5733,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-cleveland-neo-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/expedient-communications-cleveland-data-center-neo-151/","label":"NEO 151 facility page: 15166 Neo Parkway, 24,000+ sq ft, 900 kVA UPS, dual 2.5 MW generators, 600 tons cooling","publisher":"cloudandcolocation.com","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://www.datacenterknowledge.com/business/expedient-completes-third-data-center-in-hometown-cleveland","label":"Data Center Knowledge: Expedient completes third Cleveland-market data center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-expedient-cmh1-upper-arlington-oh","sourceRecordId":"expedient-cmh1-upper-arlington-oh","name":"Expedient CMH1 (Upper Arlington)","operator":"Expedient","city":"Upper Arlington","county":"Franklin","address":"5000 Arlington Centre Blvd, Building One","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.0578366,"longitude":-83.078426,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-cmh1-upper-arlington-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://expedient.com/data-centers/columbus/","label":"Expedient Columbus data centers — CMH1, CMH2, CMH3","publisher":"Expedient","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-expedient-cmh2-dublin-oh","sourceRecordId":"expedient-cmh2-dublin-oh","name":"Expedient CMH2 (Dublin)","operator":"Expedient","city":"Dublin","county":"Franklin","address":"5700 Innovation Drive","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.0907697,"longitude":-83.1539198,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-cmh2-dublin-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://expedient.com/data-centers/columbus/","label":"Expedient Columbus data centers — CMH2 at 5700 Innovation Drive","publisher":"Expedient","kind":"other","retrievedAt":"2026-08-27"},{"url":"https://cloudandcolocation.com/state/ohio/","label":"Ohio data center location directory","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-expedient-cmh3-lewis-center-oh","sourceRecordId":"expedient-cmh3-lewis-center-oh","name":"Expedient CMH3 (Lewis Center)","operator":"Expedient","city":"Lewis Center","county":"Delaware","address":"281 E. Powell Road","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.1533067,"longitude":-82.9614584,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-cmh3-lewis-center-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://expedient.com/data-centers/columbus/","label":"Expedient Columbus data centers — CMH3 at 281 E. Powell Road","publisher":"Expedient","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-flexential-cincinnati-cin01-02-oh","sourceRecordId":"flexential-cincinnati-cin01-02-oh","name":"Flexential Cincinnati (CIN01/02)","operator":"Flexential","city":"West Chester Township","county":"Butler","address":"5307 Muhlhauser Road","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.3159313,"longitude":-84.4494638,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-cincinnati-cin01-02-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/oh/cincinnati/data-center","label":"Flexential official facility page (corroborated by DataCenterJournal CIN01/02 listing)","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/12112201416","label":"OpenStreetMap node/12112201416","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-google-columbus-rathmell-road-oh","sourceRecordId":"google-columbus-rathmell-road-oh","name":"Google Columbus Data Center (South High St / Rathmell Rd, former Hartman Farm)","operator":"Google (owner of record Magellan Enterprises LLC)","city":"Columbus","county":"Franklin","address":"225 Rathmell Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.852528,"longitude":-82.996809,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-columbus-rathmell-road-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nbc4i.com/news/investigates/20-jobs-but-54-million-in-tax-breaks-for-google-center-in-columbus/amp/","label":"NBC4: Magellan Enterprises LLC was a Google shell; $300M, 150k sq ft data center at 5076 S High St; 20 jobs; $54.3M 15-year abatement (2021)","publisher":"NBC4 WCMH-TV","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 510-180711, 225 Rathmell Rd, MAGELLAN ENTERPRISES LLC, class 'data center', 1,172,656 sq ft, 480.4 acres","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://epoch.ai/data/ai-data-centers/directory/google-columbus","label":"Epoch AI data center directory: Google Columbus (operational; building timeline from satellite imagery)","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://finance.yahoo.com/news/google-add-two-more-data-133018916.html","label":"Columbus Dispatch via Yahoo: Google building at former Hartman Farm, 5076 S. High St. (May 3, 2023)","publisher":"Columbus Dispatch","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-google-lancaster-oh","sourceRecordId":"google-lancaster-oh","name":"Google Lancaster Data Center","operator":"Google","city":"Lancaster","county":"Fairfield","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.72057,"longitude":-82.68839,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-lancaster-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/ohio/","label":"Google Data Centers — Ohio","publisher":"Google","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/google-plans-1bn-new-albany-data-center-expansion-acquires-618-acres-for-more-data-centers/","label":"Google plans $1bn New Albany data center expansion, acquires 618 acres for more data centers","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.constructiondive.com/news/google-plans-2-new-data-centers-ohio-columbus-lancaster/649470/","label":"Google plans 2 new data centers in Ohio: Columbus, Lancaster","publisher":"Construction Dive","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://constructionreviewonline.com/google-constructing-2-new-data-centers-in-ohio/","label":"Google constructing 2 new data centers in Ohio","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://gis.co.fairfield.oh.us/arcgis/rest/services/Fairfield_Data/MapServer/22/query?where=PIN%3D%270571000200%27&outFields=PIN,PARID,OWN1,OWN2,PADDR1,ADRNO,ADRSTR,ACRES,LEGAL1&outSR=4326&returnGeometry=true&f=json","label":"Fairfield County parcel/GIS record (parcel 0571000200)","publisher":"Fairfield County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.nbc4i.com/news/local-news/columbus/google-announced-two-new-data-centers-in-central-ohio-columbus-and-lancaster/","label":"NBC4 WCMH — Google announces two new data centers in central Ohio","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://gis.co.fairfield.oh.us/arcgis/rest/services/Fairfield_Data/MapServer/22/query?where=PIN%3D%270571000230%27&outFields=PIN,PARID,OWN1,OWN2,PADDR1,ADRNO,ADRSTR,ACRES,LEGAL1,SALEDT,PRICE&outSR=4326&returnGeometry=true&f=json","label":"Fairfield County parcel/GIS record (parcel 0571000230)","publisher":"Fairfield County GIS / Assessor","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-google-new-albany-oh","sourceRecordId":"google-new-albany-oh","name":"Google New Albany Data Center","operator":"Google","city":"New Albany","county":"Franklin","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.05832,"longitude":-82.77106,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/ohio/","label":"Google Data Centers — Ohio","publisher":"Google","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/google-plans-1bn-new-albany-data-center-expansion-acquires-618-acres-for-more-data-centers/","label":"Google plans $1bn New Albany data center expansion, acquires 618 acres for more data centers","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://baxtel.com/data-center/google-new-albany-ohio","label":"Google: New Albany, Ohio Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/google-acquires-85-acres-in-new-albany-ohio/","label":"Google acquires 85 acres in New Albany, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'222-004984'&outFields=*&f=json&returnGeometry=true&outSR=4326","label":"Franklin County parcel/GIS record (parcel 222-004984, 5266 Babbitt Rd — MONTAUK INNOVATIONS LLC, data-center use class, 222 ac; the operational parcel of the Google/Montauk New Albany campus, which straddles the county line into Licking County at 1101 Beech Rd SW)","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"}]},{"id":"compute-google-bosc-lima-oh","sourceRecordId":"google-bosc-lima-oh","name":"Google Project BOSC (Lima)","operator":"Google","city":"Lima","county":"Allen","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.744,"longitude":-84.1052,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-bosc-lima-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-confirmed-as-company-behind-500m-data-center-in-lima-ohio/","label":"Google confirmed as company behind $500m data center in Lima, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.aedg.org/data-center-updates/google-to-build-data-center-in-lima-ohio-with-500-million-capital-investment/","label":"Google to Build Data Center in Lima, Ohio with $500 Million Capital Investment","publisher":"Allen Economic Development Group","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.allencountydatacenter.com/","label":"Allen County Data Center - Project Overview","publisher":"Google / Allen County Data Center","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.limaohio.com/top-stories/2026/03/16/google-officially-behind-data-center-project/","label":"Google officially behind data center project","publisher":"The Lima News","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-h5-data-centers-cincinnati-gest-oh","sourceRecordId":"h5-data-centers-cincinnati-gest-oh","name":"H5 Data Centers Cincinnati I","operator":"H5 Data Centers","city":"Cincinnati","county":"Hamilton","address":"360 Gest Street","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.0981558,"longitude":-84.5261021,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-cincinnati-gest-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/cincinnati-data-center.html","label":"H5 Data Centers — Cincinnati I data center","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://cloudandcolocation.com/state/ohio/","label":"Ohio data center location directory","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-h5-data-centers-cincinnati-ii-dalton-oh","sourceRecordId":"h5-data-centers-cincinnati-ii-dalton-oh","name":"H5 Data Centers Cincinnati II","operator":"H5 Data Centers","city":"Cincinnati","county":"Hamilton","address":"925 Dalton Avenue","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.106022,"longitude":-84.536429,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-cincinnati-ii-dalton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/cincinnati-II-data-center.html","label":"H5 Data Centers Cincinnati II page: 925 Dalton Avenue, Cincinnati, OH 45203; 107,000+ sq ft; Tier III design","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-10-15"},{"url":"http://web.archive.org/web/20251117173022/https://www.datacenterdynamics.com/en/news/h5-data-centers-acquires-data-center-in-cincinnati-ohio/","label":"DCD: H5 Data Centers acquires 925 Dalton Avenue (formerly T5@Cincinnati); operates at 2MW, expandable to 6MW","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://lightwaveonline.com/data-center/article/14222325/h5-data-centers-buys-cincinnatis-925-dalton-avenue-data-center","label":"Lightwave: H5 Data Centers buys Cincinnati's 925 Dalton Avenue data center (Dec 14, 2021)","publisher":"Lightwave","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.peeringdb.com/fac/11523","label":"PeeringDB facility 11523: H5 Data Centers Cincinnati II, 925 Dalton Ave","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-h5-data-centers-cleveland-rockwell-oh","sourceRecordId":"h5-data-centers-cleveland-rockwell-oh","name":"H5 Data Centers Cleveland","operator":"H5 Data Centers","city":"Cleveland","county":"Cuyahoga","address":"1625 Rockwell Ave","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.5063269,"longitude":-81.683262,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-cleveland-rockwell-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/cleveland-data-center.html","label":"H5 Data Centers — Cleveland data center","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://cloudandcolocation.com/state/ohio/","label":"Ohio data center location directory","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-logistix-hamilton-innovation-center-butler-county-oh","sourceRecordId":"logistix-hamilton-innovation-center-butler-county-oh","name":"Hamilton Innovation Center","operator":"Logistix Property Group","city":"Hamilton","county":"Butler","address":"1380 University Boulevard","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.3995,"longitude":-84.5613,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/logistix-hamilton-innovation-center-butler-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.journal-news.com/news/hamilton-oks-plan-for-data-center-project-in-riverside-neighborhood/BFSJT4SRYFC5XGE7DKESMRI72U/","label":"Hamilton OKs plan for data center project in Riverside neighborhood","publisher":"Journal-News","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://waremalcomb.com/projects/hamilton-innovation-center/","label":"Hamilton Innovation Center — project page","publisher":"Ware Malcomb","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.thebcfa.org/ignitebutler/featured-news-articles/p/item/64490/1b-hyperscale-data-center-could-break-ground-in-city-of-hamilton-in-2026","label":"$1B hyperscale data center could break ground in City of Hamilton in 2026","publisher":"Butler County Foundation for Advancement","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://local12.com/news/local/plans-1-billion-cincinnati-hamilton-ohio-data-center-advance-despite-environmental-energy-concerns","label":"Plans for $1 billion Cincinnati, Hamilton Ohio data center advance despite environmental, energy concerns","publisher":"Local12/WKRC","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.wvxu.org/environment/2026-01-15/hamilton-data-center-paused-study","label":"Feasibility study for Hamilton data center paused as developer considers next steps","publisher":"WVXU / Cincinnati Public Radio","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.wvxu.org/environment/2026-06-17/butler-county-approves-data-center-moratorium","label":"Butler County Commissioners approve short-term data center moratorium","publisher":"WVXU / Cincinnati Public Radio","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://cleanview.co/data-centers/ohio/922/hamilton-innovation-center","label":"Hamilton Innovation Center","publisher":"CleanView","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-strata-hanging-rock-haverhill-data-center-oh","sourceRecordId":"strata-hanging-rock-haverhill-data-center-oh","name":"Hanging Rock / Haverhill Data Center","operator":"Strata Expense (backed by Supermicro + Ravel)","city":"Hanging Rock","county":"Lawrence","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":38.567639,"longitude":-82.781751,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/strata-hanging-rock-haverhill-data-center-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-project-in-lawrence-county-ohio-sparks-calls-for-moratorium-in-neighboring-city/","label":"Data center project in Lawrence County, Ohio sparks calls for moratorium in neighboring city","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://wchstv.com/news/local/a-i-infrastructure-being-developed-in-lawrence-county-ohio","label":"AI infrastructure being developed in Lawrence County, Ohio","publisher":"WCHS","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-cipher-digital-hashworks-waterford-washington-oh","sourceRecordId":"cipher-digital-hashworks-waterford-washington-oh","name":"HashWorks Powered Land — Waterford Site","operator":"HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)","city":null,"county":"Washington","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.55139,"longitude":-81.64944,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-digital-hashworks-waterford-washington-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://woub.org/2026/05/22/waterford-resident-calls-trustee-step-down-data-center-development/","label":"WOUB: Waterford resident calls for trustee to step down over data center land deals","publisher":"WOUB Public Media","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.newsandsentinel.com/news/community-news/2026/07/waterford-resident-asks-washington-county-commissioners-for-help-regarding-data-center-project/","label":"News and Sentinel: Waterford resident asks Washington County commissioners for help on data center project","publisher":"News and Sentinel","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-iron-mountain-miamisburg-oh","sourceRecordId":"iron-mountain-miamisburg-oh","name":"Iron Mountain OHS-1 (Miamisburg)","operator":"Iron Mountain","city":"Miamisburg","county":"Montgomery","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.6428362,"longitude":-84.2866083,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-miamisburg-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/ohio-data-center","label":"Iron Mountain Ohio data-center page: 3366 S Tech Blvd, Miamisburg; 1.4 MW; 44,000 sq ft; Tier III","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://baxtel.com/data-center/lexisnexis-springboro","label":"Baxtel listing for the same street address under prior LexisNexis branding (confirms same building)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-05"}]},{"id":"compute-karis-critical-smart-farms-new-albany-oh","sourceRecordId":"karis-critical-smart-farms-new-albany-oh","name":"Karis Critical Smart Farms Data Center Campus (New Albany)","operator":"Karis Critical (owner of record Karis Critical CMH Smart LLC)","city":"New Albany","county":"Licking","address":"4500 Beech Rd NW","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.122997,"longitude":-82.746475,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/karis-critical-smart-farms-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25KARIS%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County Auditor GIS: parcel 095-111954-00.000, 4500 Beech Rd NW, KARIS CRITICAL CMH SMART LLC, 113.49 tax acres","publisher":"Licking County Auditor","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nearbydatacenters.org/projects/oh-new-albany-karis-smart-farms/","label":"Nearby Data Centers: Karis Critical 'Smart Farms' campus, eight buildings ~1.6M sq ft, Ohio EPA wetland fill request (Jan 2026)","publisher":"Nearby Data Centers","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-lumen-akron-2-oh","sourceRecordId":"lumen-akron-2-oh","name":"Lumen Akron 2","operator":"Lumen Technologies","city":"Akron","county":"Summit","address":"110 S. Arlington St.","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.0695694,"longitude":-81.4907582,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-akron-2-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://signalakron.org/where-7-data-centers-operate-in-summit-county-and-why-it-matters/","label":"Where 7 data centers operate in Summit County — and why it matters","publisher":"Signal Akron","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://signalakron.org/future-data-centers-in-akron-may-face-new-review-process/","label":"Future data centers in Akron may face new review process","publisher":"Signal Akron","kind":"other","retrievedAt":"2026-08-02"},{"url":"https://baxtel.com/data-center/lumen-akron-2","label":"Lumen Akron 2 data center listing","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.datacenters.com/lumen-akron-2","label":"Lumen Akron 2 data center listing","publisher":"datacenters.com","kind":"other","retrievedAt":"2026-08-02"}]},{"id":"compute-lumen-cincinnati-1-oh","sourceRecordId":"lumen-cincinnati-1-oh","name":"Lumen Cincinnati 1 (400 Pike Street)","operator":"Lumen Technologies","city":"Cincinnati","county":"Hamilton","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.1019019,"longitude":-84.5031833,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-cincinnati-1-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/ohio/cincinnati/level3-cincinnati/","label":"DataCenterMap: 400 Pike St, ~7,059 sq ft raised floor, lineage Global Crossing→TW Telecom→Level 3→CenturyLink→Lumen","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://baxtel.com/data-center/lumen-cincinnati-1-400-pike","label":"Baxtel corroborating address/specs for Lumen Cincinnati 1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://www.peeringdb.com/fac/315","label":"PeeringDB facility registry — Level(3) Cincinnati (org Lumen Technologies Inc; 400 Pike Street)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-lumen-cleveland-1-oh","sourceRecordId":"lumen-cleveland-1-oh","name":"Lumen Cleveland 1","operator":"Lumen Technologies","city":"Cleveland","county":"Cuyahoga","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.5050658,"longitude":-81.6577764,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-cleveland-1-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/ohio/cleveland/level3-cleveland1/","label":"Lumen facility directory","publisher":"Lumen","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/923148801","label":"OpenStreetMap way/923148801","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-meta-middleton-township-oh","sourceRecordId":"meta-middleton-township-oh","name":"Meta Bowling Green (Project Accordion)","operator":"Meta","city":"Bowling Green","county":"Wood","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.432,"longitude":-83.701,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-middleton-township-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-outside-toledo-ohio/","label":"Meta to develop data center campus outside Toledo, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://datacenters.atmeta.com/2025/04/hello-bowling-green/","label":"Hello, Bowling Green! - Meta Data Centers","publisher":"Meta Data Centers","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.constructionowners.com/news/ohio-data-center-gas-plant-sparks-backlash","label":"Ohio Data Center Expansion Faces Opposition Over New 350 MW Gas Plant Approval","publisher":"Construction Owners Association of America","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://opsb.ohio.gov/news/opsb-authorizes-construction-of-wood-county-power-plant","label":"OPSB authorizes construction of Wood County power plant","publisher":"Ohio Power Siting Board","kind":"permit","retrievedAt":"2026-07-06"}]},{"id":"compute-meta-prometheus-new-albany-oh","sourceRecordId":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","operator":"Meta","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.092,"longitude":-82.836,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/meta-prometheus-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-","label":"World's first gigawatt-scale data center coming to Ohio","publisher":"Spectrum News 1","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","label":"Meta will use nuclear power for its New Albany A.I. data center","publisher":"NBC4 WCMH-TV","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://baxtel.com/data-center/meta-prometheus-campus","label":"Meta: Prometheus Campus Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://signalohio.org/ohio-committed-at-least-2-3-billion-dollars-in-sales-tax-breaks-for-data-centers/","label":"Ohio has committed at least $2.3 billion in tax breaks for data centers","publisher":"Signal Ohio","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.sciotopost.com/ohio-regulators-approve-250-megawatt-power-plant-to-fuel-new-albany-meta-data-center/","label":"Ohio regulators approve 250-megawatt power plant to fuel New Albany Meta data center","publisher":"Scioto Post","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://www.farmanddairy.com/news/ohio-power-siting-board-approves-sixth-natural-gas-power-plant-in-new-albany/919826.html","label":"Farm and Dairy: Ohio Power Siting Board approves fifth natural gas power plant in New Albany (also reports Socrates North and South, 200 MW each, under construction for Sidecat LLC data centers)","publisher":"Farm and Dairy","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://www.williams.com/expansion-project/socrates-power-solution-facilities/","label":"Williams Socrates Power Solution Facilities project page (two sites, 200 MW and approximately 20 acres each)","publisher":"Williams Companies","kind":"other","retrievedAt":"2026-10-27"},{"url":"https://stopohiodatacenters.org/licking-county","label":"Licking County report: Ohio data centers in New Albany and Licking County","publisher":"Ohio Data Centers","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-microsoft-heath-oh","sourceRecordId":"microsoft-heath-oh","name":"Microsoft Heath Data Center","operator":"Microsoft","city":"Heath","county":"Licking","address":"975 Thornwood Dr","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.015,"longitude":-82.46,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-heath-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://local.microsoft.com/blog/heath-datacenter-construction-updates/","label":"Heath datacenter construction updates - Microsoft Local","publisher":"Microsoft Local","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://abc6onyourside.com/news/local/heath-columbus-ohio-break-ground-microsoft-data-center-expected-bring-hundreds-jobs-tech-technology-ai-artificial-intelligence-cloud-computing-digital-services","label":"Heath breaks ground on Microsoft data center expected to bring hundreds of jobs","publisher":"ABC 6 WSYX Columbus","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://signalohio.org/ohio-data-centers-tax-breaks/","label":"Ohio data centers exploit tax break","publisher":"Signal Ohio","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-licking-county/","label":"Understanding Microsoft datacenters in Licking County","publisher":"Microsoft Local","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25MICROSOFT%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County Auditor GIS: parcel 097-330018-00.000, 975 Thornwood Dr, Heath, MICROSOFT CORPORATION, 226.33 tax acres","publisher":"Licking County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-microsoft-hebron-oh","sourceRecordId":"microsoft-hebron-oh","name":"Microsoft Hebron Data Center","operator":"Microsoft","city":"Hebron","county":"Licking","address":"323 N High St","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.01,"longitude":-82.5,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-hebron-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://local.microsoft.com/blog/hebron-datacenter-construction-update/","label":"Hebron datacenter construction update - Microsoft Local","publisher":"Microsoft Local","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://spectrumnews1.com/oh/columbus/news/2026/02/21/microsoft-to-built-data-center-in-hebron--ohio","label":"Microsoft to build data center in Hebron, Ohio","publisher":"Spectrum News 1","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-to-invest-1bn-in-data-center-campuses-in-central-ohio/","label":"Microsoft to invest $1bn in data center campuses in Central Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://signalohio.org/ohio-data-centers-tax-breaks/","label":"Ohio data centers exploit tax break","publisher":"Signal Ohio","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-licking-county/","label":"Understanding Microsoft datacenters in Licking County","publisher":"Microsoft Local","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25MICROSOFT%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County Auditor GIS: parcels 078-330000-00.000 / 075-344856-00.000, 323 N High St, Hebron, MICROSOFT CORPORATION","publisher":"Licking County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-microsoft-new-albany-beech-road-oh","sourceRecordId":"microsoft-new-albany-beech-road-oh","name":"Microsoft New Albany Data Center (Beech Road)","operator":"Microsoft","city":"New Albany","county":"Licking","address":"3287 Beech Rd NW","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.106767,"longitude":-82.758644,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-new-albany-beech-road-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://local.microsoft.com/blog/newalbany-datacenter-construction-update/","label":"Microsoft Local: New Albany datacenter construction update (Beech Road; updates through July 2026)","publisher":"Microsoft","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25MICROSOFT%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County Auditor GIS: parcel 095-112206-00.000, 3287 Beech Rd NW, MICROSOFT CORPORATION, 197.34 tax acres","publisher":"Licking County Auditor","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://abc6onyourside.com/news/local/microsoft-buys-over-nearly-300-acres-in-pataskala","label":"ABC6: Microsoft land purchases incl. 184 acres at 3287 Beech Rd NW for $56,984,510","publisher":"ABC6 / WSYX","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-corscale-midwest-digital-gateway-canton-oh","sourceRecordId":"corscale-midwest-digital-gateway-canton-oh","name":"Midwest Digital Gateway (Central Avenue SE, Canton)","operator":"Corscale","city":"Canton","county":"Stark","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.798546,"longitude":-81.374951,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/corscale-midwest-digital-gateway-canton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/2-9-billion-canton-data-center-plan-puts-jobs-power-and-community-concerns-in-spotlight/","label":"$2.9 Billion Canton Data Center Plan Puts Jobs, Power and Community Concerns in Spotlight (Corscale 'Midwest Digital Gateway', ~162 acres near Millerton St SE & Central Ave SE, 312 MW planned; proposed; Sept 24, 2026)","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://spectrumnews1.com/oh/columbus/news/2026/07/28/zoning--canton--data-centers--regulations--stark-county-","label":"Canton data-center zoning regulations; resident says the proposed center 'will be taken up at 161 acres' (Jul 28, 2026; project not named)","publisher":"Spectrum News 1","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.mdgcanton.com/","label":"Midwest Digital Gateway - Canton, Ohio (project site)","publisher":"Corscale","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-db-stu-mount-orab-brown-oh","sourceRecordId":"db-stu-mount-orab-brown-oh","name":"Mount Orab Mega-Site Data Center Campus","operator":"DB Stu LLC","city":"Mount Orab","county":"Brown","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.0275659,"longitude":-83.919652,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/db-stu-mount-orab-brown-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.browncountypress.com/news/19046/mt-orab-council-member-takes-steps-to-stop-possible-data-center-construction","label":"Mt. Orab council member takes steps to stop possible data center construction","publisher":"Brown County Press","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://stopohiodatacenters.org/brown-county","label":"Mt. Orab, Ohio: DB Stu LLC Mega-Site | Brown County","publisher":"Ohio Data Centers (stopohiodatacenters.org)","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-edgeconnex-new-albany-north-campus-oh","sourceRecordId":"edgeconnex-new-albany-north-campus-oh","name":"New Albany North Campus","operator":"EdgeConneX","city":"New Albany","county":"Licking","address":"3356 Clover Valley Rd NW","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.102784,"longitude":-82.715975,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-new-albany-north-campus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/albany-north-campus-new-energy-center/","label":"New Albany North Campus Energy Center (PowerConneX New Albany 3 Energy Center project page)","publisher":"EdgeConneX","kind":"filing","retrievedAt":"2026-10-15"},{"url":"https://www.thereportingproject.org/public-hearing-on-another-gas-fired-power-plant-for-a-data-center-set-for-oct-22-in-new-albany/","label":"Public hearing on another gas-fired power plant for a data center set for Oct. 22 in New Albany","publisher":"The Reporting Project (Denison University)","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D%27095-111720-00.000%27&outFields=Parcel,OwnerName,SiteAddress,TaxAcres,LegalDescription,Class&returnCentroid=true&returnGeometry=false&outSR=4326&f=json","label":"Licking County Auditor parcel 095-111720-00.000: EDGECONNEX MCN NEW ALBANY NORTH PROPCO 1 LLC, 3356 Clover Valley Rd NW, 170.29 ac, Industrial, TIF","publisher":"Licking County Auditor","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.yahoo.com/news/articles/albany-looks-annex-rezone-106-100430497.html","label":"New Albany looks to annex, rezone 106 acres for business park expansion (Columbus Dispatch)","publisher":"The Columbus Dispatch (via Yahoo News)","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-oregon-industrial-park-data-center-lucas-oh","sourceRecordId":"oregon-industrial-park-data-center-lucas-oh","name":"Oregon Industrial Park Data Center Campus","operator":"Capacity LLC","city":"Oregon","county":"Lucas","address":"Corduroy Rd / Wynnscape Dr / Parkway Dr corridor, Oregon Industrial Park","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.649,"longitude":-83.4614,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oregon-industrial-park-data-center-lucas-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://oregonohio.org/oregon-industrial-park-information-on-data-centers/","label":"City of Oregon official Q&A: ~168 acres at Wynn/Corduroy Rds, up to 8 buildings, ~500 MW at build-out, $2–3B, developer Capacity LLC","publisher":"City of Oregon, OH","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.13abc.com/2026/07/29/oregon-officials-eye-vantage-data-centers-proposed-development-near-wynn-corduroy-roads/","label":"13abc (2026-07-29): Oregon officials name Vantage Data Centers as prospective developer; no decision finalized; citizen referendum petition underway","publisher":"13abc WTVG","kind":"press","retrievedAt":"2026-08-05"}]},{"id":"compute-new-day-ports-technology-campus-piketon-oh","sourceRecordId":"new-day-ports-technology-campus-piketon-oh","name":"PORTS-Pike Technology Campus","operator":"SB Energy","city":"Piketon","county":"Pike","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.06,"longitude":-83.02,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/new-day-ports-technology-campus-piketon-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/67-2b-ports-technology-campus-gains-fast-41-status-advancing-ohio-ai-megaproject/","label":"$67.2B PORTS Technology Campus gains FAST-41 status, advancing Ohio AI megaproject","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://sciotovalleyguardian.com/2026/03/20/piketon-set-to-become-ground-zero-for-new-energy-megasite/","label":"Piketon set to become ground zero for new energy megasite","publisher":"Scioto Valley Guardian","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.sec.gov/Archives/edgar/data/0002133037/000162828026059639/sbenergy-sx1.htm","label":"SB Energy, Inc. Form S-1 registration statement (PORTS-Pike Technology Campus)","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-09-01"},{"url":"https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion","label":"CX-270875: Lease of Real Property (Batch 1 Property) at Portsmouth Gaseous Diffusion Plant","publisher":"U.S. Department of Energy (NEPA)","kind":"permit","retrievedAt":"2026-09-01"},{"url":"https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth","label":"CX-270956: Environmental Site Assessment of Batch 1 Leased Property at Portsmouth Gaseous Diffusion Plant","publisher":"U.S. Department of Energy (NEPA)","kind":"permit","retrievedAt":"2026-09-01"},{"url":"https://www.energy.gov/articles/fact-sheet-department-energy-ensuring-affordable-energy-access-ohio-while-powering-future","label":"FACT SHEET: DOE is Ensuring Affordable Energy Access in Ohio While Powering the Future of AI","publisher":"U.S. Department of Energy","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.energy.gov/em/articles/partnership-ensures-affordable-energy-powers-ai-future-portsmouth-site","label":"Partnership Ensures Affordable Energy, Powers AI Future at Portsmouth Site","publisher":"U.S. DOE Office of Environmental Management","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.permitting.gov/newsroom/press-releases/ports-technology-campus-latest-gain-fast-41-coverage","label":"PORTS Technology Campus is Latest to Gain FAST-41 Coverage","publisher":"Federal Permitting Improvement Steering Council","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute","label":"NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute","publisher":"NVIDIA","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://portscampus.com/resources/","label":"PORTS-Pike Technology Campus — project resources","publisher":"PORTS-Pike Technology Campus (project site)","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.statenews.org/government-politics/2026-03-20/feds-announce-huge-natural-gas-plant-data-center-project-in-southern-ohio","label":"Feds announce huge natural gas plant, data center project in southern Ohio","publisher":"Statehouse News Bureau","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://woub.org/2025/12/02/data-center-proposed-site-former-uranium-enrichment-plant-near-piketon/","label":"A data center proposed at site of former uranium enrichment plant near Piketon","publisher":"WOUB Public Media","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://portscampus.com/","label":"PORTS Technology Campus (official site): SoftBank Group / SB Energy, 10 GW data center incl. 9.2 GW gas generation, first 800 MW phase construction 2026","publisher":"PORTS Technology Campus / SB Energy","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=26-0426-EL-BTX","label":"OPSB Case 26-0426-EL-BTX: AEP Ohio TransCo Baku - Gavin 765 kV Transmission Line Project (docket)","publisher":"Public Utilities Commission of Ohio / Ohio Power Siting Board (DIS)","kind":"filing","retrievedAt":"2026-10-15"},{"url":"https://aeptransmission.com/ohio/PiketonArea/","label":"Piketon Area Improvements Project (Baku-Gavin, Hanging Rock-Baku, Pike/Ross/Pickaway feasibility study)","publisher":"AEP Transmission","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://maps.puco.ohio.gov/arcgis/rest/services/opsb/OPSB_Natural_Gas_Generation_Projects/MapServer/0/query?where=CTS_DISCaseNumber%3D%2726-0746-EL-BGN%27&outFields=*&f=html","label":"OPSB case-tracking map data, case 26-0746-EL-BGN (PORTS Energy Center (Piketon))","publisher":"Ohio Power Siting Board (case-tracking map data)","kind":"filing","retrievedAt":"2026-10-28"},{"url":"https://maps.puco.ohio.gov/arcgis/rest/services/opsb/OPSB_Natural_Gas_Generation_Projects/MapServer/0/query?where=CTS_DISCaseNumber%3D%2726-1070-EL-BGN%27&outFields=*&f=html","label":"OPSB case-tracking map data, case 26-1070-EL-BGN (PORTS-Pike Energy Center II (Piketon))","publisher":"Ohio Power Siting Board (case-tracking map data)","kind":"filing","retrievedAt":"2026-10-28"},{"url":"https://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=26-0746-EL-BGN","label":"OPSB Case 26-0746-EL-BGN: Portsmouth Gas DevCo, LLC (docket)","publisher":"Public Utilities Commission of Ohio / Ohio Power Siting Board (DIS)","kind":"filing","retrievedAt":"2026-10-28"}]},{"id":"compute-avaio-digital-project-andromeda-oxford-township-oh","sourceRecordId":"avaio-digital-project-andromeda-oxford-township-oh","name":"Project Andromeda (Oxford Township)","operator":"AVAIO Digital","city":null,"county":"Erie","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.32861,"longitude":-82.68778,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/avaio-digital-project-andromeda-oxford-township-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.staytunedsandusky.com/p/data-center-partners-and-local-officials","label":"Stay Tuned Sandusky: 'Project Andromeda' by AVAIO Digital, 250 MW, 146 acres, ~1.2M sq ft in four buildings, $5.5B; town hall July 14, 2026","publisher":"Stay Tuned Sandusky","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://sanduskyregister.com/news/1176877/new-data-center-proposed-in-oxford-twp/","label":"Sandusky Register: 'New data center proposed in Oxford Twp.' (investment could total $5.5B)","publisher":"Sandusky Register","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://morethanjustparks.com/data-center-tracker/project-andromeda-avaio-digital-oxford-township-oh--0c3d04f9-babc-4f06-be74-51278884f2f0","label":"More Than Just Parks tracker: Project Andromeda (AVAIO Digital, Oxford Township, Erie County), proposed, 250 MW","publisher":"More Than Just Parks","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-zuharis-project-astralus-yellow-creek-columbiana-oh","sourceRecordId":"zuharis-project-astralus-yellow-creek-columbiana-oh","name":"Project Astralus (Yellow Creek Township)","operator":"Zuharis","city":null,"county":"Columbiana","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.61889,"longitude":-80.69611,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/zuharis-project-astralus-yellow-creek-columbiana-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.reviewonline.com/news/local-news/2026/05/public-information-meeting-held-for-data-center-in-yellow-creek-township/","label":"Review Online: Public information meeting held for data center in Yellow Creek Township (Zuharis, Project Astralus, ~510 acres, off-grid power plant)","publisher":"The Review (East Liverpool)","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-google-project-dazzler-franklin-furnace-oh","sourceRecordId":"google-project-dazzler-franklin-furnace-oh","name":"Project Dazzler","operator":"Google","city":"Franklin Furnace","county":"Scioto","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":38.68,"longitude":-82.72,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-project-dazzler-franklin-furnace-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-confirmed-as-company-behind-500000-sq-ft-data-center-in-scioto-county-ohio/","label":"Google confirmed as company behind 500,000 sq ft data center in Scioto County, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://sciotovalleyguardian.com/2026/03/06/scioto-county-data-center-moves-closer-to-construction-as-key-environmental-permit-clears-state-review/","label":"Scioto County data center moves closer to construction as key environmental permit clears state review","publisher":"Scioto Valley Guardian","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://sciotocountydailynews.com/commissioners-respond-to-open-meetings-lawsuit-over-data-center/","label":"Scioto County Daily News — \"Commissioners Respond to Open Meetings Lawsuit Over Data Center\"","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-meta-project-klondike-piqua-oh","sourceRecordId":"meta-project-klondike-piqua-oh","name":"Project Klondike","operator":"Meta","city":"Piqua","county":"Miami","address":"Farrington Road & N County Road 25A, Piqua I-75 Business and Industrial Park","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.103974,"longitude":-84.259053,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-project-klondike-piqua-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hntrbrk.com/meta-data-centers/","label":"Meta data centers investigation","publisher":"Hunterbrook","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/data-center-project-coming-to-piqua-ohio/","label":"Data center project coming to Piqua, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://stopohiodatacenters.org/miami-county","label":"Miami County: Project Klondike Meta Data Center","publisher":"stopohiodatacenters.org","kind":"subsidy","retrievedAt":"2026-08-27"}]},{"id":"compute-panattoni-project-shelby-canton-oh","sourceRecordId":"panattoni-project-shelby-canton-oh","name":"Project Shelby","operator":"Panattoni","city":"Canton","county":"Stark","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.799759,"longitude":-81.335551,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/panattoni-project-shelby-canton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://marketing.panattoni.com/project-shelby","label":"Project Shelby (City of Canton; ~30-month construction; completing engineering, environmental review and permitting)","publisher":"Panattoni Development Co. (project site)","kind":"other","retrievedAt":"2026-10-15"},{"url":"https://www.yahoo.com/news/us/articles/developers-host-open-house-proposed-155320743.html","label":"Developers to host open house for proposed data center on former Ford property in Canton (Panattoni 'Project Shelby', nearly 91-acre site south of Georgetown Rd NE; site plans submitted; Aug 13, 2026)","publisher":"The Canton Repository (via Yahoo News)","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.whbc.com/open-house-for-another-proposed-canton-data-center/","label":"Open House for Another Proposed Canton Data Center (Project Shelby, industrial land off 8th St NE between Marietta and Trump Aves; Aug 14, 2026)","publisher":"News-Talk 1480 WHBC","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.yahoo.com/news/us/articles/canton-spare-enough-water-4-095837393.html","label":"Can Canton spare enough water for 4 proposed data centers? (Panattoni Project Shelby: 320 MW, water-cooled, ~400,000 gal/day peak, proposed; Oct 9, 2026)","publisher":"The Canton Repository (via Yahoo News)","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-prologis-mila-trenton-oh","sourceRecordId":"prologis-mila-trenton-oh","name":"Prologis Project Mila","operator":"Prologis","city":"Trenton","county":"Butler","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.48,"longitude":-84.4638,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-mila-trenton-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/prologis-details-plans-for-data-center-campus-outside-cincinnati-ohio/","label":"Prologis details plans for data center campus outside Cincinnati, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.journal-news.com/local/what-to-know-about-trenton-s-proposed-data-center-tax-incentives/article_7b381512-adde-58f8-b35b-b43ca25051ef.html","label":"Journal-News — \"What to know about Trenton's proposed data center tax incentives\"","publisher":null,"kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.wcpo.com/news/local-news/butler-county/trenton/trenton-planning-commission-approves-data-center-site-plan-in-10-minute-meeting","label":"WCPO — \"Trenton Planning Commission approves data center site plan in 10-minute meeting\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://stopohiodatacenters.org/butler-county","label":"Stop Ohio Data Centers — Butler County / Project Mila tracker","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.wyso.org/2026-07-09/trenton-approves-15-year-tax-abatement-for-data-center","label":"WYSO — \"Trenton approves 15-year tax abatement for data center\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-province-group-perry-village-lake-oh","sourceRecordId":"province-group-perry-village-lake-oh","name":"Province Group Perry Village Data Center Campus","operator":"Province Group","city":"Perry","county":"Lake","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.76361,"longitude":-81.14306,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/province-group-perry-village-lake-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cleveland19.com/2026/04/14/perry-village-residents-demand-answers-proposed-data-center/","label":"Cleveland 19: Perry Village residents demand answers on proposed data center (Province Group, 230 acres under purchase agreement)","publisher":"Cleveland 19 News","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-prsm-preble-county-oh","sourceRecordId":"prsm-preble-county-oh","name":"PRSM Preble County Data Center Campus","operator":"PRSM Group","city":"Monroe Township","county":"Preble","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.8283325,"longitude":-84.6873978,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prsm-preble-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dayton247now.com/news/local/commissions-in-preble-county-reject-farmland-rezoning-for-data-center-development-plan","label":"Commissions in Preble County reject farmland rezoning for data center development plan","publisher":"Dayton 24/7 Now","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://baxtel.com/data-center/prsm-preble-county","label":"PRSM: Preble County data center — project record (withdrawn)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-qts-new-albany-1-franklin-county-oh","sourceRecordId":"qts-new-albany-1-franklin-county-oh","name":"QTS New Albany 1","operator":"QTS Data Centers","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.06378,"longitude":-82.75793,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-new-albany-1-franklin-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/qts-plans-four-building-data-center-campus-in-new-albany-ohio/","label":"QTS plans four-building data center campus in New Albany, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/data-center-company-qts-to-invest-1-5-billion-in-new-albany/","label":"Data center company QTS to invest $1.5 billion in New Albany","publisher":"NBC4 (WCMH)","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://q.com/data-centers/new-albany-1/","label":"QTS New Albany 1","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326","label":"Licking County parcel/GIS record (parcel 094-106404-00.011, 1235 Beech Rd SW — QTS NEW ALBANY I DC1 LLC; lead parcel of the QTS New Albany I campus: 094-106404-00.009/010/011/012 ≈ 56.7 ac). Corrects the record's prior Franklin County tag to Licking.","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"}]},{"id":"compute-qts-new-albany-2-franklin-county-oh","sourceRecordId":"qts-new-albany-2-franklin-county-oh","name":"QTS New Albany 2","operator":"QTS Data Centers","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.05491,"longitude":-82.75685,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-new-albany-2-franklin-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/qts-plans-four-building-data-center-campus-in-new-albany-ohio/","label":"QTS plans four-building data center campus in New Albany, Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://q.com/data-centers/new-albany-2/","label":"QTS New Albany 2","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-07-10"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326","label":"Licking County parcel/GIS record (parcel 094-107502-00.003 — QTS NEW ALBANY II DC1 LLC; lead parcel of the QTS New Albany II campus: 094-107502-00.003/004/005 ≈ 37.1 ac). Corrects the record's prior Franklin County tag to Licking.","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"}]},{"id":"compute-qts-new-albany-3-franklin-county-oh","sourceRecordId":"qts-new-albany-3-franklin-county-oh","name":"QTS New Albany III","operator":"QTS Data Centers","city":"New Albany","county":"Franklin","address":"5760-5780 Babbitt Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.06965,"longitude":-82.77165,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-new-albany-3-franklin-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=UPPER(OWNERNME1)+LIKE+'%25QTS%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Franklin County parcel/GIS record (parcel 222-005361 — QTS NEW ALBANY III LLC, use-class \"data center\", 78.01 ac)","publisher":"Franklin County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://newalbanybusiness.org/news/2023/12/qts-invests-4-4-billion-in-new-data-centers/","label":"QTS Invests $4.4 Billion in New Data Centers (Dec 2023)","publisher":"New Albany Company","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://columbusconstruction.org/new-datacenter-megaproject-planned-for-new-albany/","label":"New data center megaproject planned for New Albany","publisher":"Columbus/Central Ohio Building & Construction Trades Council","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 222-005361, 5760 - 5780 Babbitt Rd, QTS NEW ALBANY III LLC, class 'data center'","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-qts-new-albany-4-licking-county-oh","sourceRecordId":"qts-new-albany-4-licking-county-oh","name":"QTS New Albany IV","operator":"QTS Data Centers","city":"New Albany","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.11064,"longitude":-82.74301,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-new-albany-4-licking-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25QTS+NEW+ALBANY+IV%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","label":"Licking County parcel/GIS record (parcel 095-111570-01.000 — QTS NEW ALBANY IV LLC, 13335 Miller Rd, 161.26 ac)","publisher":"Licking County Auditor GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://newalbanybusiness.org/news/2023/12/qts-invests-4-4-billion-in-new-data-centers/","label":"QTS Invests $4.4 Billion in New Data Centers (Dec 2023)","publisher":"New Albany Company","kind":"press","retrievedAt":"2026-07-18"}]},{"id":"compute-qts-van-wert-oh","sourceRecordId":"qts-van-wert-oh","name":"QTS Van Wert Data Center Campus","operator":"QTS Data Centers","city":"Van Wert","county":"Van Wert","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.8696461,"longitude":-84.5829261,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-van-wert-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/","label":"City of Van Wert and QTS Announce Data Center Campus in Northwest Ohio","publisher":"QTS Data Centers","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-racksquared-columbus-oh","sourceRecordId":"racksquared-columbus-oh","name":"Racksquared Data Center (Columbus)","operator":"Racksquared Data Centers, LLC","city":"Columbus","county":"Franklin","address":"325 E Spring Street","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.966878,"longitude":-82.992615,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/racksquared-columbus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=OH&limit=200","label":"PeeringDB facility registry — Ohio (API query)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-saadia-holding-athens-dover-township-oh","sourceRecordId":"saadia-holding-athens-dover-township-oh","name":"Saadia Holding Athens–Dover Township Data Center","operator":"Saadia Holding LLC","city":"The Plains","county":"Athens","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.3700911,"longitude":-82.1323674,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/saadia-holding-athens-dover-township-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://athensindependent.com/possible-athens-data-center/","label":"(Updated) NY company exploring Athens County data center","publisher":"Athens County Independent","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-harner-sr-14-ravenna-portage-oh","sourceRecordId":"harner-sr-14-ravenna-portage-oh","name":"SR-14 Data Center Proposal (Ravenna)","operator":"Ray Harner (landowner-developer)","city":"Ravenna","county":"Portage","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.157557,"longitude":-81.242047,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/harner-sr-14-ravenna-portage-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://theportager.com/ravenna-city-council-rushes-to-block-potential-data-center-proposal","label":"Ravenna City Council rushes to block potential data center proposal","publisher":"The Portager","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://stopohiodatacenters.org/data-center-near-my-home-ohio","label":"Data Center Near My Home in Ohio? Find Out for Your County — Portage County entry","publisher":"Ohio Data Centers (stopohiodatacenters.org)","kind":"other","retrievedAt":"2026-09-09"}]},{"id":"compute-stack-nal01-new-albany-oh","sourceRecordId":"stack-nal01-new-albany-oh","name":"STACK Infrastructure NAL01 (New Albany)","operator":"STACK Infrastructure","city":"New Albany","county":"Franklin","address":"7300 Souder Rd","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.07,"longitude":-82.8,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-nal01-new-albany-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/new-albany/","label":"STACK Infrastructure New Albany page: facility NAL01, 40 acres, 60 MW of scalability, operational","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 222-004355, 7300 Souder Rd, SI NAL01A ABS LLC, class 'data center', 115,500 sq ft","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-stargate-lordstown-oh","sourceRecordId":"stargate-lordstown-oh","name":"Stargate Lordstown Campus","operator":"OpenAI / SoftBank / Oracle","city":"Lordstown","county":"Trumbull","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.1745,"longitude":-80.8534,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stargate-lordstown-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://openai.com/index/five-new-stargate-sites/","label":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — OpenAI","publisher":"OpenAI","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.wfmj.com/story/53109325/lordstown-part-of-mammoth-dollar500-billion-artificial-intelligence-data-center-project","label":"Lordstown part of $500B AI data center project — WFMJ","publisher":"WFMJ","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://businessjournaldaily.com/documents-shed-light-on-potential-expansion-at-foxconns-lordstown-plant/","label":"Documents Shed Light on Potential Expansion at Foxconn's Lordstown Plant","publisher":"Business Journal Daily","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.tribtoday.com/news/business/2026/01/positive-economic-news-bolsters-valley-in-2025/","label":"Positive economic news bolsters Valley in 2025","publisher":"Tribune Chronicle","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/machine-learning/article/55319132/scaling-stargate-openais-five-new-us-data-centers-push-toward-10-gw-ai-infrastructure","label":"Scaling Stargate: OpenAI's five new US data centers","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wfmj.com/archives/data-center-to-occupy-small-part-of-lordstown-ai-hub-feature-advanced-design/article_533f268a-ec1d-5378-9ccb-ceec7d6d343e.html","label":"Data center to occupy 'small part' of Lordstown AI hub; 'advanced' design","publisher":"WFMJ","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://signalohio.org/ohio-committed-at-least-2-3-billion-dollars-in-sales-tax-breaks-for-data-centers/","label":"Ohio committed at least $2.3B in data-center sales-tax breaks","publisher":"Signal Ohio","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://group.softbank/en/news/press/20250924","label":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","publisher":"SoftBank Group","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-lordstown","label":"OpenAI Stargate Lordstown | AI data centers","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-state-of-ohio-computer-center-columbus-oh","sourceRecordId":"state-of-ohio-computer-center-columbus-oh","name":"State of Ohio Computer Center (SOCC)","operator":"State of Ohio","city":"Columbus","county":"Franklin","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.0057597,"longitude":-83.0446845,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/state-of-ohio-computer-center-columbus-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.osc.edu/about/visitOSC","label":"Visit the Ohio Supercomputer Center — SOCC facility description","publisher":"Ohio Supercomputer Center","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-t5-cleveland-oh","sourceRecordId":"t5-cleveland-oh","name":"T5@Cleveland","operator":"T5 Data Centers","city":"Cleveland","county":"Cuyahoga","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.4430567,"longitude":-81.803445,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/t5-cleveland-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/9853","label":"T5 Data Centers facility directory","publisher":"T5 Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1292169104","label":"OpenStreetMap way/1292169104","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-tjx-new-albany-data-center-oh","sourceRecordId":"tjx-new-albany-data-center-oh","name":"TJX New Albany Data Center","operator":"TJX Companies Inc (owner of record)","city":"New Albany","county":"Franklin","address":"6595 New Albany Rd East","state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.103953,"longitude":-82.810601,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tjx-new-albany-data-center-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","label":"Franklin County Auditor GIS: parcel 222-004441, 6595 New Albany Rd East, TJX COMPANIES INC, class 'data center', 84,930 sq ft, 11.99 acres","publisher":"Franklin County Auditor","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-thor-equities-urbana-technology-hub-oh","sourceRecordId":"thor-equities-urbana-technology-hub-oh","name":"Urbana Technology Hub","operator":"Thor Equities","city":"Urbana","county":"Champaign","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.12,"longitude":-83.74722,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/thor-equities-urbana-technology-hub-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wyso.org/environment-news/2026-06-23/urbana-backed-down-from-rules-paving-way-for-big-data-centers-now-a-developer-is-suing","label":"WYSO: Urbana backed down from rules paving way for big data centers. Now a developer is suing (Thor Equities, 460,000 sq ft)","publisher":"WYSO","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-vantage-oh1-new-albany-licking-county-oh","sourceRecordId":"vantage-oh1-new-albany-licking-county-oh","name":"Vantage Data Centers OH1","operator":"Vantage Data Centers","city":"Johnstown","county":"Licking","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":40.100989,"longitude":-82.746359,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-oh1-new-albany-licking-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/","label":"Vantage Data Centers Breaks Ground on 192MW Campus, Enters Growing Ohio Data Center Market","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-new-albany-data-center-in-ohio/","label":"Vantage breaks ground on New Albany data center in Ohio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=PID%3D96538&outFields=PID,Parcel,OwnerName,SiteAddress&returnGeometry=true&outSR=4326&f=json","label":"Licking County parcel/GIS record (parcel 095-111756-00.009 (PID 96538))","publisher":"Licking County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.datacenterfrontier.com/site-selection/article/55091801/vantage-data-centers-augments-new-albany-ohio-data-center-boom","label":"Data Center Frontier — Vantage Data Centers Augments New Albany, Ohio Data Center Boom","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-vantage-oh2-millersport-fairfield-oh","sourceRecordId":"vantage-oh2-millersport-fairfield-oh","name":"Vantage Data Centers OH2 (Millersport Campus)","operator":"Vantage Data Centers","city":"Millersport","county":"Fairfield","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":39.902,"longitude":-82.5324,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-oh2-millersport-fairfield-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantagemillersportcampus.com/","label":"Vantage Millersport Campus official site: 352 acres, 696 MW IT capacity, 7 structures (up to 4 data centers), Lancaster-Newark Rd & Blacklick Rd, adjacent natural-gas power, $2.1B+","publisher":"Vantage Data Centers","kind":"other","retrievedAt":"2026-08-05"},{"url":"https://poweredbywho.com/projects/vantage-millersport-data-center-campus-oh2-ad8f96ad","label":"Powered By Who dossier: ~39.90N/-82.53W city-center pin (no exact address), 500 acres / 800 MW figures, 'under construction' as of 2026-06","publisher":"Powered By Who","kind":"other","retrievedAt":"2026-08-05"}]},{"id":"compute-bitdeer-whitetail-creek-trumbull-county-oh","sourceRecordId":"bitdeer-whitetail-creek-trumbull-county-oh","name":"Whitetail Creek Data Center","operator":"Bitdeer","city":"Niles / Weathersfield Township","county":"Trumbull","address":null,"state":"OH","stateName":"Ohio","jurisdictionType":"state","latitude":41.19,"longitude":-80.77,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bitdeer-whitetail-creek-trumbull-county-oh","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wkbn.com/news/local-news/niles-news/niles-announces-decision-on-proposed-data-center-annexation/","label":"Niles announces decision on proposed data center annexation","publisher":"WKBN","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://businessjournaldaily.com/bitdeer-eyes-energization-for-weathersfield-project-in-2029/","label":"Business Journal Daily — \"Bitdeer Eyes 'Energization' for Weathersfield Project in 2029\"","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.wkbn.com/news/local-news/niles-news/ai-company-makes-case-for-data-center-in-niles-but-some-arent-so-sure/","label":"WKBN — \"AI company Bitdeer makes case for data center in Niles, Ohio\"","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aligned-data-centers-amber-ok","sourceRecordId":"aligned-data-centers-amber-ok","name":"Aligned Data Centers Amber Site (Grady County)","operator":"Aligned Data Centers","city":"Amber","county":"Grady","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.1603415,"longitude":-97.8792104,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-data-centers-amber-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.news9.com/data-centers-in-oklahoma/grady-county-commissioners-special-meeting-data-center-oklahoma","label":"Grady County commissioners to hold special meeting on planned data center","publisher":"News 9 (KWTV)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.radiooklahomanews.com/post/grady-county-data-center-concerns-prompt-special-meeting","label":"Grady County Data Center Concerns Prompt Special Meeting","publisher":"Radio Oklahoma News","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.kswo.com/2026/09/02/grady-county-commissioners-hold-special-meeting-planned-data-center/","label":"Grady County Commissioners to hold special meeting on planned data center","publisher":"KSWO","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.news9.com/data-centers-in-oklahoma/grady-county-oklahoma-data-center","label":"What to know about the proposed Grady County, Oklahoma data center","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://hoodline.com/2026/09/grady-county-data-center-hits-water-wall-before-ground-even-breaks/","label":"Grady County data center hits water wall before ground even breaks","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-american-tower-edc-oklahoma-city-ok","sourceRecordId":"american-tower-edc-oklahoma-city-ok","name":"American Tower EDC Oklahoma (Oklahoma City)","operator":"American Tower","city":"Oklahoma City","county":"Oklahoma","address":"1309 NE 122nd St","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.5896,"longitude":-97.4934,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/american-tower-edc-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9 (KWTV)","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://dcmap.us/states/oklahoma/","label":"Oklahoma Data Center Map — American Tower EDC Oklahoma","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-beltline-oklahoma-city-frisco-road-ok","sourceRecordId":"beltline-oklahoma-city-frisco-road-ok","name":"Beltline Energy Oklahoma City Campus","operator":"Beltline Energy","city":"Oklahoma City","county":"Oklahoma","address":"3025 N Frisco Road","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.49,"longitude":-97.795,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beltline-oklahoma-city-frisco-road-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.okenergytoday.com/2026/01/data-center-wins-rezoning-approval-from-okc-planning-board/","label":"Data center wins rezoning approval from OKC planning board","publisher":"OK Energy Today","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://investigatemidwest.org/2026/07/14/oklahoma-data-centers-water-use-loophole/","label":"A loophole leaves Oklahoma data center water consumption largely untracked","publisher":"Investigate Midwest","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://okcfox.com/news/local/once-in-a-century-development-okc-city-council-votes-6-3-to-rezone-land-for-data-center","label":"'Once in a century development': OKC City Council votes 6-3 to rezone land for data center","publisher":"OKCFOX (KOKH)","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.news9.com/data-centers-in-oklahoma/oklahoma-city-council-approves-rezoning-data-center-project","label":"Oklahoma City Council approves rezoning for data center project with conditions","publisher":"News9","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-beltline-piedmont-kingfisher-county-ok","sourceRecordId":"beltline-piedmont-kingfisher-county-ok","name":"Beltline Energy Piedmont Site","operator":"Beltline Energy","city":"Piedmont","county":"Kingfisher","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.74394,"longitude":-97.81183,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beltline-piedmont-kingfisher-county-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://www.piedmont-ok.gov/323/Data-Center-Transparency-Portal","label":"Data Center Transparency Portal","publisher":"City of Piedmont, OK","kind":"permit","retrievedAt":"2026-07-11"},{"url":"https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review","label":"Commission urges council to deny Cloverleaf plan; Beltline Energy vote delayed for review","publisher":"OKCFOX","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://okcfox.com/news/local/piedmont-planning-commission-advances-beltline-data-center-plan","label":"Piedmont planning commission advances Beltline data center plan","publisher":"OKCFOX (KOKH)","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.news9.com/data-centers-in-oklahoma/piedmont-planning-commission-advances-proposed-data-center-rezoning","label":"Piedmont Planning Commission advances proposed data center rezoning","publisher":"News9","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-oklahoma-ai-ventures-black-bear-noble-county-ok","sourceRecordId":"oklahoma-ai-ventures-black-bear-noble-county-ok","name":"Black Bear AI Data Center Campus","operator":"Oklahoma AI Ventures LLC (Jericho Energy Ventures / Comstock Holding Companies JV)","city":"Perry","county":"Noble","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.2892,"longitude":-97.2836,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oklahoma-ai-ventures-black-bear-noble-county-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.jerichoenergyventures.com/aidatacenter","label":"AI Data Centers — Black Bear campus","publisher":"Jericho Energy Ventures","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://www.sec.gov/Archives/edgar/data/0001299969/000162828026042075/jerichojvpr-finalfor8xk.htm","label":"Comstock Holding Companies Form 8-K exhibit — Oklahoma AI Ventures JV with Jericho","publisher":"U.S. Securities and Exchange Commission","kind":"filing","retrievedAt":"2026-09-02"},{"url":"https://dcmap.us/states/oklahoma/","label":"Oklahoma Data Center Map — Black Bear AI Data Center Campus, Perry","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-blusky-ai-mulhall-ok","sourceRecordId":"blusky-ai-mulhall-ok","name":"BluSky AI Mulhall Modular Data Center","operator":"BluSky AI Inc.","city":"Mulhall","county":"Logan","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.0647221,"longitude":-97.405431,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blusky-ai-mulhall-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://markets.financialcontent.com/pennwell.pennenergy/article/nnwire-2025-11-5-investornewsbreaks-blusky-ai-inc-otcid-bsai-executes-loi-to-lease-five-acre-site-in-mulhall-oklahoma-for-modular-ai-data-center-expansion","label":"BluSky AI Inc. executes LOI to lease five-acre site in Mulhall, Oklahoma for modular AI data center expansion","publisher":"InvestorWire / FinancialContent","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://baxtel.com/data-center/blusky-ai-mulhall-oklahoma","label":"BluSky AI: Mulhall, Oklahoma","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://nominatim.openstreetmap.org/search?q=Mulhall,+Logan+County,+Oklahoma&format=json&limit=2","label":"OpenStreetMap Nominatim geocode for Mulhall, Logan County, Oklahoma","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-16"}]},{"id":"compute-boomtown-lawton-ok","sourceRecordId":"boomtown-lawton-ok","name":"Boomtown Lawton Data Center — cancelled","operator":"Boomtown","city":"Lawton","county":"Comanche","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":34.6086,"longitude":-98.3903,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/boomtown-lawton-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://nathanhammer.substack.com/p/a-2026-guide-to-the-oklahoma-data","label":"A 2026 Guide to the Oklahoma Data Center Boom (Boomtown, Lawton — canceled December 2025)","publisher":"Nathan Hammer","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://oklahomawatch.org/2025/12/09/state-delays-push-data-center-developers-to-private-land/","label":"State Delays Push Data Center Developers to Private Land (December 9, 2025)","publisher":"Oklahoma Watch","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-cerebras-oklahoma-city-ok","sourceRecordId":"cerebras-oklahoma-city-ok","name":"Cerebras Oklahoma City Data Center","operator":"Cerebras Systems","city":"Oklahoma City","county":"Oklahoma","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.4676,"longitude":-97.5164,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cerebras-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/55273769/cerebras-unveils-six-data-centers-to-meet-accelerating-demand-for-ai-inference-at-scale","label":"Cerebras Unveils Six Data Centers to Meet Accelerating Demand for AI Inference at Scale","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s","label":"Cerebras Announces Six New AI Datacenters Across North America and Europe","publisher":"Cerebras Systems","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.cerebras.ai/blog/okc","label":"Cerebras OKC Data Center — Official Blog","publisher":"Cerebras Systems","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/cerebras-opens-10mw-data-center-in-oklahoma-city/","label":"Cerebras Opens 10MW Data Center in Oklahoma City","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/cerebras-oklahoma-city","label":"Cerebras: Oklahoma City Data Center — Baxtel Profile","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-hp-cherokee-data-center-tulsa-ok","sourceRecordId":"hp-cherokee-data-center-tulsa-ok","name":"Cherokee Data Center (Tulsa)","operator":"Hewlett-Packard","city":"Tulsa","county":"Tulsa","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.2085,"longitude":-95.9137,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hp-cherokee-data-center-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? — Cherokee Data Center, Tulsa","publisher":"News On 6 (KOTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://baxtel.com/data-center/tulsa","label":"Tulsa Data Centers & Colocation — HP Cherokee Data Center (Tulsa)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-chickasaw-nation-winstar-data-center-thackerville-ok","sourceRecordId":"chickasaw-nation-winstar-data-center-thackerville-ok","name":"Chickasaw Nation WinStar Hardened Data Center","operator":"Chickasaw Nation Department of Commerce","city":"Thackerville","county":"Love","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":33.7955237,"longitude":-97.1438728,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/chickasaw-nation-winstar-data-center-thackerville-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://manhattanconstructiongroup.com/manhattan-construction-company/Projects/winstar-hardened-data-center/","label":"WinStar Hardened Data Center (project page)","publisher":"Manhattan Construction Company","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://nominatim.openstreetmap.org/search?q=Thackerville,+Love+County,+Oklahoma&format=json&limit=2","label":"OpenStreetMap Nominatim geocode for Thackerville, Love County, Oklahoma","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-16"}]},{"id":"compute-choctaw-nation-data-center-durant-ok","sourceRecordId":"choctaw-nation-data-center-durant-ok","name":"Choctaw Nation Data Center & Emergency Operations Center","operator":"Choctaw Nation of Oklahoma","city":"Durant","county":"Bryan","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":33.9740644,"longitude":-96.3991907,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/choctaw-nation-data-center-durant-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://fsb-ae.com/project/choctaw-nation-data-center/","label":"Choctaw Nation Data Center (project page)","publisher":"FSB Architecture & Engineering","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://nominatim.openstreetmap.org/search?q=Choctaw+Nation+Headquarters,+Durant,+Oklahoma&format=json&limit=3","label":"OpenStreetMap Nominatim record for Choctaw Nation of Oklahoma Headquarters, Durant","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-16"}]},{"id":"compute-cloudburst-oklahoma-city-campus-ok","sourceRecordId":"cloudburst-oklahoma-city-campus-ok","name":"CloudBurst Oklahoma City Campus","operator":"CloudBurst Data Centers","city":"Oklahoma City","county":"Oklahoma","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.4676,"longitude":-97.5164,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloudburst-oklahoma-city-campus-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudburstdc.com/oklahoma-city/","label":"CloudBurst Data Centers — Oklahoma City campus","publisher":"CloudBurst Data Centers","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma?","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://www.news9.com/cloudburst-data-center-campus-okc","label":"What to know about OKC CloudBurst data center campus","publisher":"News 9 (KWTV)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-cloverleaf-project-open-sky-piedmont-ok","sourceRecordId":"cloverleaf-project-open-sky-piedmont-ok","name":"Cloverleaf Project Open Sky","operator":"Cloverleaf Infrastructure","city":"Piedmont","county":"Canadian","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.7,"longitude":-97.8,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-project-open-sky-piedmont-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/","label":"Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-06"},{"url":"https://kfor.com/news/local/piedmont-planning-commission-encourages-city-council-to-deny-data-center-proposal/","label":"Piedmont planning commission encourages city council to deny data center proposal","publisher":"KFOR","kind":"press","retrievedAt":"2026-07-11"},{"url":"https://oklahomawatch.org/2026/06/26/a-transmission-line-built-to-fix-grid-congestion-has-become-oklahomas-hottest-data-center-address/","label":"A Transmission Line Built to Fix Grid Congestion Has Become Oklahoma's Hottest Data Center Address","publisher":"Oklahoma Watch","kind":"press","retrievedAt":"2026-07-11"},{"url":"https://morethanjustparks.com/data-center-tracker/cloverleaf-piedmont-campus-project-open-sky-ok--0430ed6d-6b23-4a03-adc5-c1b5b9b66391","label":"Cloverleaf Piedmont Campus (Project Open Sky) — Data Center Tracker","publisher":"More Than Just Parks Data Center Tracker","kind":"other","retrievedAt":"2026-08-06"},{"url":"https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review","label":"Commission urges council to deny Cloverleaf plan; Beltline Energy vote delayed for review","publisher":"KOKH FOX 25","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.radiooklahomanews.com/post/piedmont-data-center-proposal-heads-to-city-council-vote-tonight","label":"Piedmont Data Center Proposal Heads To City Council Vote Tonight","publisher":"Radio Oklahoma News","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.news9.com/data-centers-in-oklahoma/youve-dragged-your-feet-piedmont-delays-data-center-vote-for-fifth-time","label":"'You've dragged your feet': Piedmont delays data center vote for fifth time","publisher":"News 9","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-cogent-oklahoma-city-ok","sourceRecordId":"cogent-oklahoma-city-ok","name":"Cogent Oklahoma City Data Center","operator":"Cogent Communications","city":"Oklahoma City","county":"Oklahoma","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.4676,"longitude":-97.5164,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma? — Cogent Data Center","publisher":"News 9 (KWTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://dcmap.us/states/oklahoma/","label":"Oklahoma Data Center Map — Cogent Data Center, Oklahoma City","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-noec-core-data-center-vinita-ok","sourceRecordId":"noec-core-data-center-vinita-ok","name":"CORE Data Center (Vinita)","operator":"Northeast Oklahoma Electric Cooperative","city":"Vinita","county":"Craig","address":"27039 South 4440 Road","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.6408372,"longitude":-95.156363,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/noec-core-data-center-vinita-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (statewide inventory)","publisher":"News on 6 (KOTV)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.corecolocate.com/why-core-colocate/about-us/","label":"About Us — Core Data Center, Northeast Oklahoma Electric Cooperative","publisher":"CoreColocate (Northeast Oklahoma Electric Cooperative)","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.noec.coop/about-noec/contact-us/","label":"Contact Us — Northeast Oklahoma Electric Cooperative, Vinita headquarters address","publisher":"Northeast Oklahoma Electric Cooperative","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-core-scientific-muskogee-ok","sourceRecordId":"core-scientific-muskogee-ok","name":"Core Scientific Muskogee Campus","operator":"Core Scientific","city":"Muskogee","county":"Muskogee","address":"1525 West 43rd Street South","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.72,"longitude":-95.42,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/core-scientific-muskogee-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus","label":"Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus","publisher":"Core Scientific (investor release)","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","label":"Core Scientific and Port Muskogee Break Ground on 100 MW HPC Data Center (investor press release)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.businesswire.com/news/home/20260506005927/en/Core-Scientific-Plans-Expansion-to-1.5-Gigawatts-of-Gross-Power-at-Muskogee-Oklahoma-Campus","label":"Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus","publisher":"Business Wire","kind":"press","retrievedAt":"2026-08-06"},{"url":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/","label":"Core Scientific announces 440 MW expansion at Oklahoma site","publisher":"Blockspace","kind":"press","retrievedAt":"2026-08-06"},{"url":"https://corescientific.com/high-density-data-centers/muskogee-ok/","label":"Oklahoma Data Center | High-Density in Muskogee","publisher":"Core Scientific","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-data3-tulsa-ok","sourceRecordId":"data3-tulsa-ok","name":"DATA3 Tulsa Data Center","operator":"DATA3 Corporation","city":"Tulsa","county":"Tulsa","address":"2448 E 81st St, Suite 700","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.042795,"longitude":-95.9534996,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/data3-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/datacenters/data3-tulsa-data-center/","label":"Data3 - Tulsa Data Center","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://cloudandcolocation.com/state/oklahoma/","label":"Oklahoma Data Center Location Map","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=2448+E+81st+St%2C+Tulsa%2C+OK+74137&format=json&limit=2","label":"OpenStreetMap Nominatim geocode for 2448 E 81st St, Tulsa, OK 74137","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-jackson-technical-enguard-tulsa-ok","sourceRecordId":"jackson-technical-enguard-tulsa-ok","name":"ENGUARD Data Center (Jackson Technical)","operator":"Jackson Technical","city":"Tulsa","county":"Tulsa","address":"611 S Elgin Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1509,"longitude":-95.9856,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/jackson-technical-enguard-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? — Jackson Technical, 611 S Elgin Ave","publisher":"News On 6 (KOTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://dcmap.us/states/oklahoma/","label":"Oklahoma Data Center Map — ENGUARD Data Center, Jackson Technical, Tulsa","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-fluidstack-okmulgee-county-ok","sourceRecordId":"fluidstack-okmulgee-county-ok","name":"Fluidstack Okmulgee County Data Center","operator":"Fluidstack","city":"Okmulgee","county":"Okmulgee","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.6231,"longitude":-95.9605,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fluidstack-okmulgee-county-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.okmulgeefluidstack.io/","label":"Okmulgee Data Center — official project site","publisher":"Fluidstack","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://krmg.com/2026/07/21/okmulgee-residents-raise-concerns-during-fluidstack-data-center-open-house/","label":"Okmulgee residents raise concerns during Fluidstack data center open house","publisher":"KRMG 102.3","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://okenergytoday.com/2026/08/whats-happening-about-data-centers/","label":"What's happening about data centers (Okmulgee County commissioners approve Fluidstack site)","publisher":"Oklahoma Energy Today","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://www.kjrh.com/news/local-news/data-center-developer-seeks-to-change-impressions-at-sole-okmulgee-public-info-event","label":"Data center developer seeks to change impressions at sole Okmulgee public info event","publisher":"KJRH","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-fulltel-okc01-oklahoma-city-ok","sourceRecordId":"fulltel-okc01-oklahoma-city-ok","name":"FullTel Communications OKC01","operator":"FullTel Communications","city":"Oklahoma City","county":"Oklahoma","address":"201 Robert S Kerr Avenue","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.46994,"longitude":-97.516522,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fulltel-okc01-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/201-robert-s-kerr-avenue-oklahoma-city","label":"201 Robert S Kerr Avenue, Oklahoma City — data center building listing (FullTel Communications OKC01, Lumen Oklahoma City)","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=201+Robert+S+Kerr+Ave%2C+Oklahoma+City%2C+OK+73102&format=json&limit=2","label":"OpenStreetMap Nominatim geocode for 201 Robert S Kerr Ave, Oklahoma City, OK 73102","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-google-muskogee-county-ok","sourceRecordId":"google-muskogee-county-ok","name":"Google Muskogee County Data Center Campuses","operator":"Google","city":"Council Hill","county":"Muskogee","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.57,"longitude":-95.65,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-muskogee-county-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/technology/google-data-centers-muskogee-county-oklahoma","label":"Google to build two data centers in Muskogee County","publisher":"NewsOn6","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://okbusinessvoice.com/2025/11/20/google-unveils-plans-for-two-new-data-center-campuses-in-muskogee-county/","label":"Google unveils plans for two new data center campuses in Muskogee County","publisher":"Oklahoma Business Voice","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.readfrontier.org/stories/as-data-centers-boom-in-oklahoma-so-does-water-demand/","label":"As data centers boom in Oklahoma, so does water demand","publisher":"The Frontier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://muskogee.okcounties.org/media/view/springboard_data_data_center_project_plan_6-30-25_2969.pdf","label":"Muskogee County 'Springboard' Data Center Project Plan (June 2025)","publisher":"Board of County Commissioners of Muskogee County","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://ktul.com/news/local/google-announces-2-data-center-campuses-in-muskogee-county-summit-council-hill-electricity-grid-energy-investment-ai-cloud-workspace-search-maps-port-stephens-infrastructure-workforce-agriculture","label":"Google announces 2 data center campuses in Muskogee County","publisher":"KTUL","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.portmuskogee.com/google-announces-two-data-center-campuses-in-muskogee-county-oklahoma_news/","label":"Google Announces Two Data Center Campuses in Muskogee County, Oklahoma","publisher":"Port Muskogee","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-google-pryor-ok","sourceRecordId":"google-pryor-ok","name":"Google Pryor Data Center Campus (Mayes County Expansion)","operator":"Google","city":"Pryor","county":"Mayes","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.32,"longitude":-95.31,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-pryor-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.okcommerce.gov/google-planning-another-expansion-for-pryor-data-center/","label":"Google planning another expansion for Pryor data center","publisher":"Oklahoma Department of Commerce","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/","label":"Google to invest $9B in cloud and AI infrastructure in Oklahoma","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.readfrontier.org/stories/as-data-centers-boom-in-oklahoma-so-does-water-demand/","label":"As data centers boom in Oklahoma, so does water demand","publisher":"The Frontier","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.readfrontier.org/stories/oklahoma-lawmakers-tried-to-cut-a-costly-incentive-for-data-centers-but-gave-google-a-break/","label":"Oklahoma lawmakers tried to cut a costly data-center incentive, but gave Google a break","publisher":"The Frontier","kind":"filing","retrievedAt":"2026-07-06"},{"url":"https://www.pryorinfopub.com/news/google-announces-support-for-local-schools-and-nonprofits/article_ddd319a6-4823-11ef-bbfd-9b7b0264f6f1.html","label":"Google announces support for local schools and nonprofits","publisher":"Pryor Information Publication","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.lreus.com/over-700mwac-new-solar-projects-in-ok/","label":"LRE Announces Over 700 MWac of New Solar Projects in Oklahoma","publisher":"Leeward Renewable Energy","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-google-stillwater-ok","sourceRecordId":"google-stillwater-ok","name":"Google Stillwater Data Center Campus","operator":"Google","city":"Stillwater","county":"Payne","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.14,"longitude":-97.06,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-stillwater-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.okenergytoday.com/2025/11/construction-gets-go-ahead-for-stillwater-data-center/","label":"Construction gets go-ahead for Google Stillwater data center","publisher":"Oklahoma Energy Today","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/","label":"Google to invest $9B in cloud and AI infrastructure in Oklahoma","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thestillwegian.news/2025-storylines-big-tech-comes-to-town/","label":"The Google Deal: Stillwater's Biggest Story of 2025","publisher":"The Stillwegian","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://kfor.com/news/local/payne-county-commissioner-raises-water-concerns-over-planned-google-data-center-complex-in-stillwater/","label":"Payne County commissioner raises water concerns over planned Google data center","publisher":"KFOR","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.stwnewspress.com/news/update-stillwater-hoa-suing-google-over-claims-of-contamination-from-construction-site/article_350151c1-124a-405d-ad75-ca84c842556d.html","label":"Stillwater HOA suing Google over claims of contamination from construction site","publisher":"Stillwater News Press","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma? (News 9 project tracker) — Google Stillwater construction underway","publisher":"News 9 (KWTV Oklahoma City)","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.publicradiotulsa.org/local-regional/2026-08-06/some-data-centers-are-building-their-own-power-plants-in-oklahoma-most-want-to-plug-into-the-grid","label":"Some data centers are building their own power plants. In Oklahoma, most want to plug into the grid","publisher":"Public Radio Tulsa / StateImpact Oklahoma","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-host-digital-northeast-oklahoma-ok","sourceRecordId":"host-digital-northeast-oklahoma-ok","name":"Host Digital Northeast Oklahoma Data Center","operator":"Host Digital Infrastructure LLC","city":"Tulsa","county":null,"address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.154,"longitude":-95.9928,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/host-digital-northeast-oklahoma-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.globenewswire.com/news-release/2026/08/31/3353118/0/en/hcwc-announces-host-digital-secures-1-25-billion-15-year-ai-data-center-lease.html","label":"HCWC Announces Host Digital Secures $1.25 Billion, 15-Year AI Data Center Lease","publisher":"GlobeNewswire / Healthy Choice Wellness Corp.","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://usdatacenterprojects.com/oklahoma/host-digital-locks-usd-1-25-billion-15-year-ai-data-center-lease-in-northeast-oklahoma","label":"Host Digital Locks In 15-Year AI Data Center Lease","publisher":"US Data Center Projects","kind":"press","retrievedAt":"2026-09-02"}]},{"id":"compute-iren-woods-county-ok","sourceRecordId":"iren-woods-county-ok","name":"IREN Woods County Campus","operator":"IREN (Iris Energy)","city":"Alva","county":"Woods","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.8031,"longitude":-98.667,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iren-woods-county-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/iren-woods-county-oklahoma","label":"IREN Woods County Oklahoma","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://iren.com/data-centers/oklahoma","label":"IREN Oklahoma data center — 1,600 MW, 2,000 acres, 2028 substation energization","publisher":"IREN","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-isocentric-networks-tulsa-ok","sourceRecordId":"isocentric-networks-tulsa-ok","name":"Isocentric Networks Tulsa Data Center","operator":"Isocentric Networks","city":"Tulsa","county":"Tulsa","address":"100 W 5th St","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.154,"longitude":-95.9928,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/isocentric-networks-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (Isocentric Networks, 100 W 5th St, Tulsa)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-lambda-midamerica-industrial-park-chouteau-ok","sourceRecordId":"lambda-midamerica-industrial-park-chouteau-ok","name":"Lambda MidAmerica Industrial Park Data Center","operator":"Lambda","city":"Chouteau","county":"Mayes","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1859,"longitude":-95.343,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lambda-midamerica-industrial-park-chouteau-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lambda.ai/blog/new-lambda-data-center-in-oklahoma","label":"New Lambda data center in Oklahoma","publisher":"Lambda","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://okcfox.com/news/local/ai-cloud-company-plans-data-center-in-mayes-county","label":"AI cloud company plans data center in Mayes County","publisher":"KOKH FOX 25","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-lumen-oklahoma-city-1-ok","sourceRecordId":"lumen-oklahoma-city-1-ok","name":"Lumen Oklahoma City 1","operator":"Lumen Technologies","city":"Oklahoma City","county":"Oklahoma","address":"201 Robert S Kerr Avenue","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.46994,"longitude":-97.516522,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-oklahoma-city-1-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (statewide inventory)","publisher":"News on 6 (KOTV)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://inflect.com/building/201-robert-s-kerr-avenue-oklahoma-city","label":"201 Robert S Kerr Avenue, Oklahoma City — data center building listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=201+Robert+S+Kerr+Ave%2C+Oklahoma+City%2C+OK+73102&format=json&limit=2","label":"OpenStreetMap Nominatim geocode for 201 Robert S Kerr Ave, Oklahoma City, OK 73102","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-lumen-tulsa-1-ok","sourceRecordId":"lumen-tulsa-1-ok","name":"Lumen Tulsa 1","operator":"Lumen Technologies","city":"Tulsa","county":"Tulsa","address":"18 W Archer St","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1571337,"longitude":-95.993394,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-tulsa-1-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (statewide inventory)","publisher":"News on 6 (KOTV)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://inflect.com/building/18-west-archer-street-tulsa/lumen/datacenter/level-3-tulsa","label":"Lumen Tulsa — 18 West Archer Street, Tulsa, OK 74103","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=18+W+Archer+St%2C+Tulsa%2C+OK+74103&format=json&limit=3&addressdetails=1","label":"OpenStreetMap Nominatim geocode for 18 W Archer St, Tulsa, OK 74103","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-beltline-luther-horizon-technology-park-ok","sourceRecordId":"beltline-luther-horizon-technology-park-ok","name":"Luther Horizon Technology Park","operator":"Beltline Energy","city":"Luther","county":"Oklahoma","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.6612,"longitude":-97.1961,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beltline-luther-horizon-technology-park-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lutherhorizontechnologypark.com/","label":"Luther Horizon Technology Park — official project site","publisher":"Beltline Energy","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.publicradiotulsa.org/local-regional/2026-08-06/some-data-centers-are-building-their-own-power-plants-in-oklahoma-most-want-to-plug-into-the-grid","label":"Some data centers are building their own power plants. In Oklahoma, most want to plug into the grid","publisher":"StateImpact Oklahoma / Public Radio Tulsa","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-meta-anthem-tulsa-ok","sourceRecordId":"meta-anthem-tulsa-ok","name":"Meta Project Anthem — Tulsa","operator":"Meta","city":"Tulsa","county":"Tulsa","address":"Near East 11th Street & 193rd East Avenue (Fair Oaks industrial park, East Tulsa)","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.14,"longitude":-95.88,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-anthem-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/","label":"Breaking Ground on a New AI-Optimized Data Center in Tulsa, Oklahoma","publisher":"Meta (about.fb.com)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://datacenters.atmeta.com/2026/04/hello-tulsa/","label":"Hello, Tulsa! — Meta Data Centers","publisher":"Meta (atmeta.com)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.okcommerce.gov/meta-breaks-ground-on-data-center-in-tulsa/","label":"Meta Breaks Ground on New $1 Billion Data Center in Tulsa","publisher":"Oklahoma Department of Commerce","kind":"press","retrievedAt":"2026-08-06"},{"url":"https://tulsaflyer.org/2026/04/22/news/post/meta-east-tulsa-data-center/","label":"Meta's east Tulsa data center earns praise and protests","publisher":"Tulsa Flyer","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/340-acre-data-center-campus-planned-in-tulsa-oklahoma/","label":"340-acre data center campus planned in Tulsa, Oklahoma","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/tulsa-meta-data-center-project-announcement","label":"Gov. Stitt announces Meta behind Tulsa data center known as 'Project Anthem'","publisher":"NewsOn6","kind":"press","retrievedAt":"2026-07-07"},{"url":"http://web.archive.org/web/20260423021504/https://www.fox23.com/news/meta-confirmed-as-company-behind-project-anthem-amid-resident-concerns/article_33f131fe-fc26-466a-b6c8-774dd2b2a415.html","label":"Meta confirmed as company behind Project Anthem","publisher":"FOX23 News","kind":"press","retrievedAt":"2026-08-06"}]},{"id":"compute-midcon-recovery-solutions-oklahoma-city-ok","sourceRecordId":"midcon-recovery-solutions-oklahoma-city-ok","name":"MIDCON Recovery Solutions Data Center","operator":"MIDCON Recovery Solutions","city":"Oklahoma City","county":"Oklahoma","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.618,"longitude":-97.567,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/midcon-recovery-solutions-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma? — MIDCON Recovery Solutions","publisher":"News 9 (KWTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? — MIDCON, Quail Springs","publisher":"News On 6 (KOTV)","kind":"press","retrievedAt":"2026-09-02"}]},{"id":"compute-ocosa-321-south-boston-tulsa-ok","sourceRecordId":"ocosa-321-south-boston-tulsa-ok","name":"OCOSA Communications Tulsa Data Center (321 S Boston)","operator":"OCOSA Communications","city":"Tulsa","county":"Tulsa","address":"321 S Boston Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1535,"longitude":-95.9905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ocosa-321-south-boston-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/tulsa","label":"Tulsa Data Centers & Colocation — OCOSA 321 S Boston","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? — OCOSA Data Center, Tulsa","publisher":"News On 6 (KOTV)","kind":"press","retrievedAt":"2026-09-02"}]},{"id":"compute-onenet-osu-tulsa-ok","sourceRecordId":"onenet-osu-tulsa-ok","name":"OneNet OSU-Tulsa Data Center","operator":"OneNet (Oklahoma State Regents for Higher Education)","city":"Tulsa","county":"Tulsa","address":"700 N. Greenwood Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.163393,"longitude":-95.987612,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/onenet-osu-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/1668","label":"OneNet OSU Tulsa (facility record)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://baxtel.com/data-center/onenet-osc","label":"OneNet OSC data center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-buckley-bros-pawhuska-ok","sourceRecordId":"buckley-bros-pawhuska-ok","name":"Pawhuska AI Data Center","operator":"Buckley Bros Holdings LLC","city":"Pawhuska","county":"Osage","address":"1901 E. Boundary","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.6698,"longitude":-96.3364,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/buckley-bros-pawhuska-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (Pawhuska AI Data Center, Buckley Bros Holdings, 1901 E. Boundary, 8-10 MW)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://baxtel.com/news/10mw-data-center-proposed-for-ex-cannabis-siite-outside-tulsa-oklahoma","label":"10MW data center proposed for ex-cannabis site outside Tulsa, Oklahoma","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-paycom-headquarters-oklahoma-city-ok","sourceRecordId":"paycom-headquarters-oklahoma-city-ok","name":"Paycom Headquarters Data Centers (Oklahoma City)","operator":"Paycom Software, Inc.","city":"Oklahoma City","county":"Oklahoma","address":"7501 W. Memorial Road","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.6117012,"longitude":-97.6485485,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/paycom-headquarters-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1590955/000095017024015863/payc-20231231.htm","label":"Paycom Software, Inc. Form 10-K for fiscal year 2023","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-10-16"},{"url":"https://nominatim.openstreetmap.org/search?q=7501+W+Memorial+Rd,+Oklahoma+City,+OK&format=json&limit=2","label":"OpenStreetMap Nominatim record for Paycom, 7501 W Memorial Road, Oklahoma City","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-16"}]},{"id":"compute-philcade-data-center-tulsa-ok","sourceRecordId":"philcade-data-center-tulsa-ok","name":"Philcade Data Center","operator":"Kanbar Properties","city":"Tulsa","county":"Tulsa","address":"501 S Boston Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1516,"longitude":-95.9903,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/philcade-data-center-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? — Philcade Data Center, 501 S Boston Ave","publisher":"News On 6 (KOTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-potentia-oklahoma-campus-02-inola-ok","sourceRecordId":"potentia-oklahoma-campus-02-inola-ok","name":"Potentia Oklahoma Campus 02 (Inola)","operator":"Potentia, Inc.","city":"Inola","county":"Rogers","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1487,"longitude":-95.5097,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/potentia-oklahoma-campus-02-inola-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.joecrivelli.com/p/the-data-center-coming-to-inola-oklahoma","label":"The Data Center Coming to Inola, Oklahoma: What We Know","publisher":"Joe Crivelli","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-centers/potentia-inc","label":"Potentia Inc. Data Centers and Colocation — Campus 02 (Oklahoma)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://servercountry.org/data/states/oklahoma/","label":"Oklahoma Data Center Projects tracker — Potentia Oklahoma Campus 02, Inola","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-project-astro-broken-arrow-ok","sourceRecordId":"project-astro-broken-arrow-ok","name":"Project Astro (Broken Arrow) — withdrawn","operator":"Undisclosed developer","city":"Broken Arrow","county":"Wagoner","address":"8521 S 209th E Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.0751796,"longitude":-95.7439392,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-astro-broken-arrow-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/project-astro-broken-arrow","label":"Project Astro (Broken Arrow)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://servercountry.org/data/states/oklahoma/","label":"Oklahoma Data Center Projects (Broken Arrow East Data Center Prospect, canceled)","publisher":"ServerCountry","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://nominatim.openstreetmap.org/search?q=8521+S+209th+E+Ave,+Broken+Arrow,+Oklahoma&format=json&limit=2","label":"OpenStreetMap Nominatim record for South 209th East Avenue, Broken Arrow","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-16"}]},{"id":"compute-beale-project-atlas-coweta-ok","sourceRecordId":"beale-project-atlas-coweta-ok","name":"Project Atlas (Coweta) — withdrawn","operator":"Beale Infrastructure","city":"Coweta","county":"Wagoner","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.9526,"longitude":-95.6483,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beale-project-atlas-coweta-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers","label":"Oklahoma Is Walling Off Data Centers — project-by-project timeline","publisher":"Infra Thesis","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (lists Project Atlas, Coweta, as canceled)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-beale-project-clydesdale-tulsa-county-ok","sourceRecordId":"beale-project-clydesdale-tulsa-county-ok","name":"Project Clydesdale","operator":"Beale Infrastructure","city":"Owasso","county":"Tulsa","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.28,"longitude":-95.83,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/beale-project-clydesdale-tulsa-county-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/project-clydesdale-1-billion-data-center-in-tulsa-breaks-ground/","label":"Project Clydesdale: $1 billion data center in Tulsa breaks ground","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-iren-project-emerald-kiowa-ok","sourceRecordId":"iren-project-emerald-kiowa-ok","name":"Project Emerald (Kiowa)","operator":"IREN","city":"Kiowa","county":"Pittsburg","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":34.7206516,"longitude":-95.8991586,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iren-project-emerald-kiowa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kjrh.com/news/local-news/project-emerald-ai-data-center-plan-in-pittsburg-county-moving-forward","label":"'Project Emerald': AI data center plan in Pittsburg County moving forward","publisher":"KJRH","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.mcalesternews.com/news/proposed-data-center-concerns-residents/article_41fbeecd-9293-49d4-8156-1d3aaa3f686b.html","label":"Proposed data center concerns residents","publisher":"McAlester News-Capital","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-beale-project-mustang-claremore-ok","sourceRecordId":"beale-project-mustang-claremore-ok","name":"Project Mustang","operator":"Beale Infrastructure","city":"Claremore","county":"Rogers","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.31,"longitude":-95.62,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beale-project-mustang-claremore-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/beale-project-mustang","label":"Beale Project Mustang","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://constructionreviewonline.com/beale-infrastructure-in-talks-to-build-project-mustang-data-center-campus-outside-tulsa-oklahoma/","label":"Beale Infrastructure in talks to build Project Mustang data center campus outside Tulsa, Oklahoma","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/claremore-project-mustang-data-center-approved","label":"Claremore Project Mustang data center approved","publisher":"News On 6","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-google-spring-sand-springs-ok","sourceRecordId":"google-spring-sand-springs-ok","name":"Project Spring (Sand Springs)","operator":"Google","city":"Sand Springs","county":"Osage","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.256,"longitude":-96.11,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-spring-sand-springs-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tulsaflyer.org/2026/01/15/government/post/google-connected-sand-springs-data-center-project/","label":"Google connected to Sand Springs data center project","publisher":"Tulsa Flyer","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/sand-springs-oklahoma-to-consider-project-spring-data-center-proposal/","label":"Sand Springs, Oklahoma, to consider Project Spring data center proposal","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/google-gets-greenlight-for-data-center-in-tulsa-oklahoma/","label":"Google gets greenlight for data center in Tulsa, Oklahoma","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.fox23.com/news/sand-springs-city-council-approves-rezoning-for-proposed-google-data-center/article_ae464644-a5bf-4d2a-ba4c-fedcf7b113f8.html","label":"Sand Springs city council approves rezoning for proposed Google data center","publisher":"Fox23","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.publicradiotulsa.org/local-regional/2026-01-29/sand-springs-advances-proposed-google-data-center-rezoning","label":"Sand Springs advances proposed Google data center rezoning","publisher":"Public Radio Tulsa","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.projectspringok.com/","label":"Project Spring official developer website","publisher":"White Rose Partners","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://osagenews.org/proposed-sand-springs-data-center-raises-water-and-sovereignty-concerns/","label":"Proposed Sand Springs Data Center raises water and sovereignty concerns","publisher":"Osage News","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.kgou.org/indigenous-news/2026-06-25/as-data-centers-eye-oklahoma-tribes-weigh-the-costs","label":"As data centers eye Oklahoma, tribes weigh the costs","publisher":"KGOU","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-plainsmen-project-thunderbird-enid-ok","sourceRecordId":"plainsmen-project-thunderbird-enid-ok","name":"Project Thunderbird (Enid)","operator":"Plainsmen Holdings, LLC","city":"Enid","county":"Garfield","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.3967623,"longitude":-97.8791341,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/plainsmen-project-thunderbird-enid-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.enidnews.com/news/local_news/enid-natives-announce-local-data-center-power-generation-project/article_0465bc43-e183-4d3a-b602-9afd55ff300e.html","label":"UPDATED: Enid natives announce local data center, power generation project","publisher":"Enid News & Eagle","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://okenergytoday.com/2026/09/massive-data-center-campus-unveiled-for-enid/","label":"Massive data center campus unveiled for Enid","publisher":"Oklahoma Energy Today","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-rack59-oklahoma-city-ok","sourceRecordId":"rack59-oklahoma-city-ok","name":"RACK59 Data Center","operator":"RACK59","city":"Oklahoma City","county":"Oklahoma","address":"7725 W Reno Ave, Suite 304","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.4676,"longitude":-97.5164,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rack59-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://rack59.com/","label":"RACK59 Data Center — operator site","publisher":"RACK59","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (RACK59, 7725 W Reno Ave, ~30,000 sq ft)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-smarttec-site-01-mead-ok","sourceRecordId":"smarttec-site-01-mead-ok","name":"SmartTec Site 01 (Mead)","operator":"SmartTec by Z1Power","city":"Mead","county":"Bryan","address":"8460 US Highway 70","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":34.0005295,"longitude":-96.5110921,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/smarttec-site-01-mead-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://smarttec.dev/site","label":"Mead, Oklahoma Data Center Site — 39.39 acres, Bryan County","publisher":"SmartTec by Z1Power","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://smarttec.dev/power","label":"Power and cooling — SmartTec Site 01 (grid plan, shared service rating, closed-loop cooling concept)","publisher":"SmartTec by Z1Power","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-tierpoint-oklahoma-city-ok","sourceRecordId":"tierpoint-oklahoma-city-ok","name":"TierPoint Oklahoma City (OKC / OKC2)","operator":"TierPoint","city":"Oklahoma City","county":"Oklahoma","address":"4121 Perimeter Center Place","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.4676,"longitude":-97.5164,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/","label":"TierPoint Oklahoma data centers (OKC 4121 Perimeter Center Place; OKC2 4114 Perimeter Center Place)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (TierPoint Oklahoma City 1 & 2)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-tierpoint-tulsa-archer-ok","sourceRecordId":"tierpoint-tulsa-archer-ok","name":"TierPoint Tulsa - Archer","operator":"TierPoint","city":"Tulsa","county":"Tulsa","address":"322 East Archer Street North","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1585898,"longitude":-95.9886293,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-tulsa-archer-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/tulsa-archer/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/159959672","label":"OpenStreetMap way/159959672","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-tierpoint-tulsa-state-farm-ok","sourceRecordId":"tierpoint-tulsa-state-farm-ok","name":"TierPoint Tulsa - State Farm","operator":"TierPoint","city":"Tulsa","county":"Tulsa","address":"12151 E. State Farm Boulevard","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.154,"longitude":-95.9928,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-tulsa-state-farm-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/","label":"TierPoint Oklahoma data centers (Tulsa - State Farm, 12151 E. State Farm Blvd)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (TierPoint Tulsa - State Farm)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-tulsa-technology-exchange-tulsa-ok","sourceRecordId":"tulsa-technology-exchange-tulsa-ok","name":"Tulsa Technology Exchange","operator":"Facility Gateway Corporation","city":"Tulsa","county":"Tulsa","address":"509 S Boston Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1512,"longitude":-95.9903,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tulsa-technology-exchange-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? — Tulsa Technology Exchange, 509 S Boston Ave","publisher":"News On 6 (KOTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma?","publisher":"News 9","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-tulsaconnect-downtown-dc5-tulsa-ok","sourceRecordId":"tulsaconnect-downtown-dc5-tulsa-ok","name":"TulsaConnect Downtown (DC-5)","operator":"TulsaConnect","city":"Tulsa","county":"Tulsa","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.154,"longitude":-95.9928,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tulsaconnect-downtown-dc5-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tulsaconnect.com/data-centers-overview.php","label":"TulsaConnect data centers overview (DC-5 Downtown Tulsa)","publisher":"TulsaConnect","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (TulsaConnect Downtown DC-5)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-tulsaconnect-east-dc3-tulsa-ok","sourceRecordId":"tulsaconnect-east-dc3-tulsa-ok","name":"TulsaConnect East (DC-3)","operator":"TulsaConnect","city":"Tulsa","county":"Tulsa","address":"4500 S 129th E Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.154,"longitude":-95.9928,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tulsaconnect-east-dc3-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tulsaconnect.com/data-centers-overview.php","label":"TulsaConnect data centers overview (DC-3 East Tulsa, DC-5 Downtown)","publisher":"TulsaConnect","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? (TulsaConnect East DC-3, 4500 S 129th E Ave, underground facility)","publisher":"News On 6","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-tulsaconnect-dc1-tulsa-ok","sourceRecordId":"tulsaconnect-dc1-tulsa-ok","name":"TulsaConnect Tulsa Data Center (DC-1)","operator":"TulsaConnect","city":"Tulsa","county":"Tulsa","address":"321 S Boston Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1535,"longitude":-95.9905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tulsaconnect-dc1-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/state/oklahoma/","label":"Oklahoma Data Center Location Map — TulsaConnect Tulsa Data Center (DC1), 321 S. Boston Ave.","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://baxtel.com/data-center/tulsa","label":"Tulsa Data Centers & Colocation — TulsaConnect DC1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-tulsaconnect-dc2-tulsa-ok","sourceRecordId":"tulsaconnect-dc2-tulsa-ok","name":"TulsaConnect Tulsa Data Center (DC-2)","operator":"TulsaConnect","city":"Tulsa","county":"Tulsa","address":"110 W 7th St","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":36.1523,"longitude":-95.9932,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tulsaconnect-dc2-tulsa-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudandcolocation.com/state/oklahoma/","label":"Oklahoma Data Center Location Map — TulsaConnect Tulsa Data Center (DC2), 110 W. 7th St.","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://baxtel.com/data-center/tulsa","label":"Tulsa Data Centers & Colocation — TulsaConnect DC2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-valorc3-oklahoma-city-ok","sourceRecordId":"valorc3-oklahoma-city-ok","name":"ValorC3 Oklahoma City Data Center","operator":"ValorC3 Data Centers","city":"Oklahoma City","county":"Oklahoma","address":null,"state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.4676,"longitude":-97.5164,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/valorc3-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma? — ValorC3 Oklahoma City","publisher":"News 9 (KWTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://dcmap.us/states/oklahoma/","label":"Oklahoma Data Center Map — ValorC3 Oklahoma City Data Center","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-windstream-wholesale-oklahoma-city-ok","sourceRecordId":"windstream-wholesale-oklahoma-city-ok","name":"Windstream Wholesale Oklahoma City Data Center","operator":"Windstream","city":"Oklahoma City","county":"Oklahoma","address":"825 N Broadway Ave","state":"OK","stateName":"Oklahoma","jurisdictionType":"state","latitude":35.4791,"longitude":-97.5142,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/windstream-wholesale-oklahoma-city-ok","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","label":"What data centers are being built in Oklahoma? — Windstream Wholesale, 825 N Broadway","publisher":"News On 6 (KOTV)","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","label":"Where are data centers being built across Oklahoma? — Windstream Wholesale","publisher":"News 9 (KWTV)","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-adobe-or1-hillsboro-or","sourceRecordId":"adobe-or1-hillsboro-or","name":"Adobe Hillsboro Data Center (OR1)","operator":"Adobe","city":"Hillsboro","county":"Washington","address":"4455 NE Dawson Creek Dr","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5494337,"longitude":-122.9334563,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/adobe-or1-hillsboro-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html","label":"Adobe's strategic environmental considerations for our data centers","publisher":"Adobe","kind":"other","retrievedAt":"2026-10-12"},{"url":"https://baxtel.com/data-center/adobe-hillsboro","label":"Adobe Hillsboro","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-aligned-pdx-01-or","sourceRecordId":"aligned-pdx-01-or","name":"Aligned PDX-01","operator":"Aligned Data Centers","city":"Hillsboro","county":"Washington","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5540594,"longitude":-122.9492507,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-pdx-01-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/hillsboro-data-centers/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://www.openstreetmap.org/way/1114969101","label":"OpenStreetMap way/1114969101","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.canarymedia.com/articles/data-centers/oregon-utility-tries-out-a-faster-cheaper-way-to-power-data-centers","label":"Canary Media — Oregon utility tries out a faster, cheaper way to power data centers","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterdynamics.com/en/news/aligned-tops-out-pdx-1-data-center-in-hillsboro-oregon/","label":"DCD — Aligned tops out PDX-1 data center in Hillsboro, Oregon","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aws-boardman-morrow-county-or","sourceRecordId":"aws-boardman-morrow-county-or","name":"Amazon Boardman Exascale Data Center Campus","operator":"Amazon Web Services","city":"Boardman","county":"Morrow","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.84,"longitude":-119.702,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-boardman-morrow-county-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-purchases-1300-acres-in-morrow-county-oregon/","label":"Amazon Purchases 1,300 Acres in Morrow County, Oregon","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://lincolnchronicle.org/oregon-communities-envision-9100-acres-for-new-data-centers-quadrupling-the-industrys-footprint/","label":"Oregon Communities Envision 9,100 Acres for New Data Centers","publisher":"Lincoln Chronicle / The Oregonian","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.aboutamazon.com/news/sustainability/amazon-data-center-water-usage","label":"How Amazon data centers use water for cooling","publisher":"Amazon","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.morrowcountyor.gov/sites/default/files/fileattachments/planning_commission/page/16917/exhibit_08_-_economic_impact_analysis.pdf","label":"Johnson Economics — Economic Impact Analysis of Prospective Exascale Data Center Development in Morrow County (Jan 2025)","publisher":"Morrow County Planning Commission","kind":"filing","retrievedAt":"2026-07-06"},{"url":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","label":"Tri-Cities Business News","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-apple-prineville-or","sourceRecordId":"apple-prineville-or","name":"Apple Prineville Data Center Campus","operator":"Apple","city":"Prineville","county":"Crook","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":44.30349,"longitude":-120.84639,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/apple-prineville-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","label":"Business Oregon Commission agenda item, SIP determination for Amazon (Morrow County) — 'Update on Data Centers in Oregon' section lists ten data centers receiving 15-year long-term rural enterprise zone abatements, including 'Two by Apple and three by Facebook, in Prineville, Crook County'","publisher":"Business Oregon (Oregon Business Development Department)","kind":"subsidy","retrievedAt":"2026-08-14"},{"url":"https://www.oregonlegislature.gov/committees/slb/WorkgroupDocuments/Business%20Oregon%20(project%20tables)%20-%2010-16-19%20meeting.pdf","label":"Currently Tax-exempt Energy Projects and Data Centers in Crook, Gilliam, Morrow, Sherman, Umatilla and Wasco counties — row 'Apple Data Centers | Crook | LTREZ | 2 facilities | $17,605,121 | $350,000 | 85 jobs'","publisher":"Oregon Legislature / Business Oregon","kind":"subsidy","retrievedAt":"2026-08-14"},{"url":"https://www.morrowcountyor.gov/sites/default/files/fileattachments/planning_commission/page/16917/exhibit_08_-_economic_impact_analysis.pdf","label":"Economic Impact Analysis of Prospective Exascale Data Center Development in Morrow County (Johnson Economics, Jan 2025), Exhibit 08 — 'The Prineville area is home to a small number of large campuses, specifically Apple and Meta (Facebook) campuses of roughly 150 and 360 acres, respectively.'","publisher":"Morrow County Planning Commission / Johnson Economics","kind":"permit","retrievedAt":"2026-08-14"},{"url":"https://columbiacommunityconnection.com/sherman-gilliam-county-1/gilliam-county-puts-a-little-juice-in-apple","label":"Gilliam County puts a little juice in Apple","publisher":"Columbia Community Connection","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-aws-arlington-gilliam-or","sourceRecordId":"aws-arlington-gilliam-or","name":"AWS Arlington Data Center Campus","operator":"Amazon Web Services","city":"Arlington","county":"Gilliam","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.7168,"longitude":-120.20088,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-arlington-gilliam-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/","label":"Amazon plans major data center expansion in tiny Eastern Oregon town — 376 acres bought for $10 million, plus 30 more acres from the Port of Arlington for $3 million; served by PacifiCorp; tax terms to be negotiated under the Strategic Investment Program because Gilliam County does not qualify for the enterprise zone program","publisher":"The Bulletin (Bend, OR)","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.govtech.com/products/arlington-ore-amazon-plan-large-data-center-in-tiny-city","label":"Arlington, Ore., Amazon Plan Large Data Center in Tiny City — 400 acres total (376 acres for $10M plus 30 acres from Port of Arlington for $3M), PacifiCorp service, SIP negotiations not yet begun","publisher":"Government Technology","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.timesjournal1886.com/story/2026/07/16/news/arlington-pushes-ahead-with-municipal-water-system/2056.html","label":"Arlington pushes ahead with municipal water system — The Times-Journal (2026-07-16, updated 2026-07-29)","publisher":"The Times-Journal (Condon, OR)","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://bendbulletin.com/?p=417891","label":"Amazon plans major data center expansion in tiny Eastern Oregon town","publisher":"Bend Bulletin / The Oregonian","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-aws-boardman-bombing-range-road-or","sourceRecordId":"aws-boardman-bombing-range-road-or","name":"AWS Boardman — Bombing Range Road Campus (PDX-178)","operator":"Amazon Web Services","city":"Boardman","county":"Morrow","address":"Bombing Range Road","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.8193,"longitude":-119.6342,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-boardman-bombing-range-road-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/aws-expanding-presence-in-oregon-with-four-more-data-centers-in-morrow-county","label":"AWS expanding presence in Oregon with four more data centers in Morrow County — Baxtel News (2022-05-05)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://baxtel.com/data-center/amazon-bombing-range-campus","label":"Amazon: Bombing Range (PDX-178) Data Center — Baxtel (operational; built 2024; 127 acres; four buildings)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/1280344157","label":"OSM way 1280344157 — Amazon Web Services data center, Bombing Range Road, Boardman (owner Vadata Inc)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/1386017492","label":"OSM way 1386017492 — Amazon Web Services data center, Bombing Range Road, Boardman","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","label":"Oregon's rural power utility has become a big polluter — The Oregonian via Governing (2024-02-20)","publisher":"Governing / The Oregonian","kind":"press","retrievedAt":"2026-09-17"}]},{"id":"compute-aws-boardman-lewis-clark-west-or","sourceRecordId":"aws-boardman-lewis-clark-west-or","name":"AWS Boardman — Lewis and Clark Drive West Campus (PDX1)","operator":"Amazon Web Services","city":"Boardman","county":"Morrow","address":"73575 Lewis and Clark Drive","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.8523,"longitude":-119.6302,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-boardman-lewis-clark-west-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/way/460070147","label":"OSM way 460070147 — Amazon Web Services data center 'PDX1', 73575 Lewis and Clark Drive, Boardman (owner Vadata Inc)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/460070145","label":"OSM way 460070145 — Amazon Web Services data center 'PDX50/53', 73577 Lewis and Clark Drive, Boardman","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/697415323","label":"OSM way 697415323 — Amazon Web Services data center 'PDX56/59', 73579 Lewis and Clark Drive, Boardman","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://fortune.com/2023/05/11/amazon-1-billion-tax-breaks-oregon-building-5-new-data-centers/","label":"Amazon to get $1 billion in tax breaks in Oregon for 5 new data centers — Fortune/AP (2023-05-11): 'four giant data centers in Morrow County'; 'active member of eastern Oregon communities since 2011'","publisher":"Fortune / Associated Press","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://www.opb.org/article/2023/05/19/amazon-data-center-oregon-morrow-county/","label":"Morrow County OKs $1 billion deal in tax breaks with Amazon — OPB (2023-05-19)","publisher":"Oregon Public Broadcasting","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","label":"The economic impact of AWS's $15.6 billion investment in Oregon — Amazon (Boardman, Hermiston, Umatilla)","publisher":"Amazon","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","label":"Oregon's rural power utility has become a big polluter — The Oregonian via Governing (2024-02-20): Umatilla Electric Cooperative serves Amazon's data centers","publisher":"Governing / The Oregonian","kind":"press","retrievedAt":"2026-09-17"}]},{"id":"compute-aws-boardman-rippee-road-or","sourceRecordId":"aws-boardman-rippee-road-or","name":"AWS Boardman — Rippee Road Campus (PDX4)","operator":"Amazon Web Services","city":"Boardman","county":"Morrow","address":"79539 Rippee Road","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.8408,"longitude":-119.654,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-boardman-rippee-road-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/way/460070144","label":"OSM way 460070144 — Amazon Web Services data center 'PDX4', 79539 Rippee Road, Boardman (owner Vadata Inc)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/592171280","label":"OSM way 592171280 — Amazon Web Services data center 'PDX52', 79536 Rippee Road, Boardman","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://fortune.com/2023/05/11/amazon-1-billion-tax-breaks-oregon-building-5-new-data-centers/","label":"Amazon to get $1 billion in tax breaks in Oregon for 5 new data centers — Fortune/AP (2023-05-11): 'four giant data centers in Morrow County'","publisher":"Fortune / Associated Press","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://www.opb.org/article/2023/05/19/amazon-data-center-oregon-morrow-county/","label":"Morrow County OKs $1 billion deal in tax breaks with Amazon — OPB (2023-05-19): four existing, six new","publisher":"Oregon Public Broadcasting","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","label":"Oregon's rural power utility has become a big polluter — The Oregonian via Governing (2024-02-20)","publisher":"Governing / The Oregonian","kind":"press","retrievedAt":"2026-09-17"}]},{"id":"compute-aws-hermiston-or","sourceRecordId":"aws-hermiston-or","name":"AWS Hermiston Data Center Campuses","operator":"Amazon Web Services","city":"Hermiston","county":"Umatilla","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.84041,"longitude":-119.28946,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-hermiston-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.opb.org/article/2026/07/22/data-center-eastern-oregon-air-quality-umatilla-basin/","label":"Why data centers pose an outsized threat to Eastern Oregon's air quality — 'In Hermiston, Amazon has hired hundreds of employees and contractors to staff its two hyperscale data center campuses'; 'Hermiston has given the company 15-year tax breaks for each campus'","publisher":"Oregon Public Broadcasting","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","label":"Hermiston clears the way for data center industry — two data centers under construction in Hermiston; city council voted Sept. 9, 2025 to annex 800 acres zoned for hyperscale data center use","publisher":"Oregon Public Broadcasting","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.co.umatilla.or.us/fileadmin/user_upload/Community_Development/Planning/Ordinances/2025/Ordinance_2025-11.pdf","label":"Umatilla County Ordinance 2025-11 (Oct. 15, 2025) — co-adopts the Hermiston urban growth boundary expansion of approximately 810 acres and inserts a new section 157.058 'Hyperscale Data Center (HDC) Overlay' after the Heavy Industrial Zone; legal descriptions total roughly 824 acres across Sections 21, 25, 26, 27 and 28, Township 4 North, Range 28 East","publisher":"Umatilla County Board of Commissioners","kind":"permit","retrievedAt":"2026-08-14"},{"url":"https://www.tricitiesbusinessnews.com/articles/hermiston-ugb-aws","label":"Hermiston adds 810 acres to support future data centers — AWS operates multiple campuses in Hermiston, Umatilla and Boardman; 2024 Economic Opportunities Analysis cited a lack of property for hyperscale data center development","publisher":"Tri-Cities Area Journal of Business","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://bendbulletin.com/2023/09/15/small-eastern-oregon-city-could-be-next-hotspot-for-big-data-centers/","label":"Small eastern Oregon city could be next hotspot for big data centers — enumerates Amazon's Umatilla County footprint as of Sept 2023: two existing data centers in Umatilla and two more under construction there plus two with tax-break agreements; one operating data center in unincorporated Umatilla County near Hermiston, one under construction within Hermiston city limits, and two further Hermiston projects with negotiated tax deals","publisher":"The Bulletin (Bend, OR)","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-aws-pdx154-boardman-airport-or","sourceRecordId":"aws-pdx154-boardman-airport-or","name":"AWS PDX 154 (Boardman Airport Campus)","operator":"Amazon Web Services","city":"Boardman","county":"Morrow","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.81556,"longitude":-119.81621,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-pdx154-boardman-airport-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","label":"Amazon plans another data center southwest of Tri-Cities — Morrow County Planning Commission approved Amazon's land use application, called PDX 154, at its March 31, 2026 meeting; campus just east of Boardman Airport totalling 816,000 sq ft across four data center buildings of 190,000-218,000 sq ft each, plus a 7,260 sq ft industrial water building, an 8-acre stormwater evaporation pond, two 2-acre wastewater evaporation ponds and a 1.4-acre septic drain field","publisher":"Tri-Cities Area Journal of Business","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-aws-umatilla-city-or","sourceRecordId":"aws-umatilla-city-or","name":"AWS Umatilla Data Center Campus","operator":"Amazon Web Services","city":"Umatilla","county":"Umatilla","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.91735,"longitude":-119.34252,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-umatilla-city-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.opb.org/article/2026/07/22/data-center-eastern-oregon-air-quality-umatilla-basin/","label":"Why data centers pose an outsized threat to Eastern Oregon's air quality — of data centers in the city of Umatilla: 'It has four in city limits, and three others in the works.' 'All but one belong to Amazon.' Umatilla's budget has risen seven-fold since Amazon started building there around 2018","publisher":"Oregon Public Broadcasting","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.datacenterfrontier.com/energy/article/33011494/sabey-data-centers-plans-100-mw-multi-tenant-campus-in-gathering-eastern-oregon","label":"Sabey Data Centers Plans 100 MW Multi-Tenant Campus in Eastern Oregon — the Sabey property in Umatilla 'lies due west of sites for two even larger data centers Amazon plans to build' in the city; Umatilla Electric Cooperative serves AWS operations in Umatilla and Morrow counties","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","label":"Business Oregon Commission agenda item — 'Amazon has an active SIP in Umatilla city/County, as approved in 2017'; Amazon holds 12 of 13 additionally certified long-term rural enterprise zone facilities, 'Seven of the 12 are in Umatilla County'","publisher":"Business Oregon (Oregon Business Development Department)","kind":"subsidy","retrievedAt":"2026-08-14"},{"url":"https://bendbulletin.com/2023/09/15/small-eastern-oregon-city-could-be-next-hotspot-for-big-data-centers/","label":"Small eastern Oregon city could be next hotspot for big data centers — enumerates Amazon's Umatilla County footprint as of Sept 2023: two existing data centers in Umatilla and two more under construction there plus two with tax-break agreements; one operating data center in unincorporated Umatilla County near Hermiston, one under construction within Hermiston city limits, and two further Hermiston projects with negotiated tax deals","publisher":"The Bulletin (Bend, OR)","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-copia-charlestown-data-center-hermiston-or","sourceRecordId":"copia-charlestown-data-center-hermiston-or","name":"Charlestown Data Center and Battery Energy Storage System","operator":"Copia Power","city":"Hermiston","county":"Umatilla","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.8404101,"longitude":-119.28946,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/copia-charlestown-data-center-hermiston-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.opb.org/article/2026/09/29/data-centers-proposed-federal-land-eastern-oregon/","label":"Data centers proposed on federal land in Eastern Oregon, Western states","publisher":"OPB / Oregon Capital Chronicle","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://news.theregistryps.com/copia-power-seeks-106-acres-of-blm-land-near-hermiston-for-oregons-first-federal-land-data-center/","label":"Copia Power Seeks 106 Acres of BLM Land Near Hermiston for Oregon's First Federal-Land Data Center","publisher":"The Registry Pacific Northwest","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-coresite-hillsboro-or","sourceRecordId":"coresite-hillsboro-or","name":"CoreSite Hillsboro Data Campus (HI1/HI2)","operator":"CoreSite","city":"Hillsboro","county":"Washington","address":"5420 NE Sewell Avenue","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5594015,"longitude":-122.9522867,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-hillsboro-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hillsboroherald.com/coresite-proposes-massive-multi-story-hillsboro-data-campus-opposite-county-homes-and-over-wetlands-a-showdown-is-brewing/","label":"CoreSite Proposes Massive Multi-Story Hillsboro Data Campus Opposite County Homes And Over Wetlands (case file DR-012-26)","publisher":"The Hillsboro Herald","kind":"press","retrievedAt":"2026-09-05"}]},{"id":"compute-crane-pdx01-forest-grove-or","sourceRecordId":"crane-pdx01-forest-grove-or","name":"Crane PDX01","operator":"Crane Data Centers","city":"Forest Grove","county":"Washington","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5207,"longitude":-123.1087,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/crane-pdx01-forest-grove-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/planning-commission-greenlights-crane-dcs-forest-grove-data-center-in-northwest-oregon-again/","label":"Planning commission greenlights Crane DC's Forest Grove data center in northwest Oregon, again","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/oregons-forest-grove-data-center-gets-city-council-approval-again-again/","label":"Oregon's Forest Grove data center gets City Council approval, again","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://forestgrovenewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","label":"Construction boots up on first data center in Forest Grove (air cooling; municipal utility)","publisher":"Forest Grove News-Times","kind":"press","retrievedAt":"2026-07-08"}]},{"id":"compute-crane-pdx02-forest-grove-or","sourceRecordId":"crane-pdx02-forest-grove-or","name":"Crane PDX02","operator":"Crane Data Centers","city":"Forest Grove","county":"Washington","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.51904,"longitude":-123.11106,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crane-pdx02-forest-grove-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","label":"Crane Data Centers — Oregon (Portland Metro campus, Forest Grove): 'PDX02: ~48 MW and ~150,000 sf'; campus combined capacity 100+ MW; 'Q3 2026 ready for service'. PDX01 Phase 1 and Phase 2 are each listed separately at 24 MW / 36,000 sf white space","publisher":"Crane Data Centers","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-data-center-west-eugene-or","sourceRecordId":"data-center-west-eugene-or","name":"Data Center West Eugene","operator":"Data Center West, Inc.","city":"Eugene","county":"Lane","address":"800 Willamette Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":44.05071,"longitude":-123.093116,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/data-center-west-eugene-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?org_id=19441","label":"PeeringDB facility records: Data Center West, Inc.","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-data-center-west-medford-or","sourceRecordId":"data-center-west-medford-or","name":"Data Center West Medford","operator":"Data Center West, Inc.","city":"Medford","county":"Jackson","address":"739 Welch Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":42.332451,"longitude":-122.880416,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/data-center-west-medford-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?org_id=19441","label":"PeeringDB facility records: Data Center West, Inc.","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-digital-fortress-ptl-portland-or","sourceRecordId":"digital-fortress-ptl-portland-or","name":"Digital Fortress PTL (Downtown Portland 1)","operator":"Digital Fortress","city":"Portland","county":"Multnomah","address":"511 SW 10th Avenue","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.52115,"longitude":-122.68189,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-fortress-ptl-portland-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://digital-fortress.com/portland-interconnected-data-centers/","label":"Portland Interconnected Data Centers — Digital Fortress (PTL, PTL2, PTL3 addresses)","publisher":"Digital Fortress","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://digital-fortress.com/digital-fortress-acquires-three-datacenter-facilities-in-portland-oregon/","label":"Digital Fortress Acquires Three Datacenter Facilities in Portland, Oregon (press release, 2021-01-19)","publisher":"Digital Fortress","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://baxtel.com/data-center/digital-fortress-portland","label":"Digital Fortress: Portland Data Center — Baxtel (511 SW 10th Ave; 10,700 sq ft; 2.1 MW)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-17"}]},{"id":"compute-digital-fortress-ptl2-beaverton-or","sourceRecordId":"digital-fortress-ptl2-beaverton-or","name":"Digital Fortress PTL2 (Beaverton)","operator":"Digital Fortress","city":"Beaverton","county":"Washington","address":"9705 SW Sunshine Court","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.47633,"longitude":-122.77615,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-fortress-ptl2-beaverton-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://digital-fortress.com/portland-interconnected-data-centers/","label":"Portland Interconnected Data Centers — Digital Fortress (PTL2: 9705 SW Sunshine Ct)","publisher":"Digital Fortress","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://digital-fortress.com/digital-fortress-acquires-three-datacenter-facilities-in-portland-oregon/","label":"Digital Fortress Acquires Three Datacenter Facilities in Portland, Oregon (press release, 2021-01-19)","publisher":"Digital Fortress","kind":"press","retrievedAt":"2026-09-17"}]},{"id":"compute-digital-fortress-ptl3-beaverton-or","sourceRecordId":"digital-fortress-ptl3-beaverton-or","name":"Digital Fortress PTL3 (Beaverton)","operator":"Digital Fortress","city":"Beaverton","county":"Washington","address":"9610 SW Sunshine Court","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.47556,"longitude":-122.77617,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-fortress-ptl3-beaverton-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://digital-fortress.com/portland-interconnected-data-centers/","label":"Portland Interconnected Data Centers — Digital Fortress (PTL3: 9610 SW Sunshine Ct)","publisher":"Digital Fortress","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://digital-fortress.com/digital-fortress-acquires-three-datacenter-facilities-in-portland-oregon/","label":"Digital Fortress Acquires Three Datacenter Facilities in Portland, Oregon (press release, 2021-01-19)","publisher":"Digital Fortress","kind":"press","retrievedAt":"2026-09-17"}]},{"id":"compute-digital-realty-cornelius-pass-cornell-hillsboro-or","sourceRecordId":"digital-realty-cornelius-pass-cornell-hillsboro-or","name":"Digital Realty 'Corny' Data Center (Cornelius Pass Rd & NE Cornell Rd, Hillsboro)","operator":"Digital Realty","city":"Hillsboro","county":"Washington","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.53957,"longitude":-122.90018,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-cornelius-pass-cornell-hillsboro-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hillsboronewstimes.com/2026/08/08/data-center-proposals-filed-days-hours-before-hillsboro-moratorium-approved/","label":"Data center proposals filed days, hours before Hillsboro moratorium approved — Hillsboro News-Times (2026-08-08)","publisher":"Hillsboro News-Times","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://hillsboroherald.com/next-wave-7-hillsboro-data-center-projects-march-ahead-as-humans-fight-it-out/","label":"Next Wave: 7 Hillsboro data center projects march ahead — The Hillsboro Herald (2026-08-13)","publisher":"The Hillsboro Herald","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://hillsboroherald.com/hillsboros-latest-data-center-now-in-permitting-is-across-from-liberty-high-and-near-rock-creek-homes/","label":"Hillsboro's latest data center now in permitting — The Hillsboro Herald (2026-08-11)","publisher":"The Hillsboro Herald","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://hillsboroherald.com/the-real-story-data-centers-are-encroaching-on-hillsboros-schools-and-we-are-out-of-time/","label":"The Real Story: data centers are encroaching on Hillsboro's schools — The Hillsboro Herald","publisher":"The Hillsboro Herald","kind":"press","retrievedAt":"2026-09-17"}]},{"id":"compute-digital-realty-pdx10-or","sourceRecordId":"digital-realty-pdx10-or","name":"Digital Realty PDX10","operator":"Digital Realty","city":"Hillsboro","county":"Washington","address":"3825 NW Aloclek Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5476034,"longitude":-122.891975,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-pdx10-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/portland/pdx10","label":"Digital Realty PDX10 data center page (address, 48,000 ft², LEED Gold)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-digital-realty-pdx11-or","sourceRecordId":"digital-realty-pdx11-or","name":"Digital Realty PDX11","operator":"Digital Realty","city":"Hillsboro","county":"Washington","address":"6676 Northeast 62nd Avenue","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5679542,"longitude":-122.9167725,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-pdx11-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.usgbc.org/projects/digital-realty-hillsboro-or-1pdx-11","label":"USGBC project record + operator Portland directory page — PDX11, 6675 NE 62nd Ave, Hillsboro, LEED-Silver","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/734323663","label":"OpenStreetMap way/734323663","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-pdx12-or","sourceRecordId":"digital-realty-pdx12-or","name":"Digital Realty PDX12","operator":"Digital Realty","city":"Hillsboro","county":"Washington","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.56952,"longitude":-122.91865,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-pdx12-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/portland/pdx12","label":"Digital Realty PDX12 Data Center — 5870 NE Schaaf Street, Hillsboro, OR 97124; 546,000 ft² (50,750 m²); active colocation facility","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-digital-realty-wagon-hillsboro-or","sourceRecordId":"digital-realty-wagon-hillsboro-or","name":"Digital Realty Wagon Data Center (6240 NE Wagon Drive, Hillsboro)","operator":"Digital Realty","city":"Hillsboro","county":"Washington","address":"6240 NE Wagon Drive","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5592668,"longitude":-122.900845,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-wagon-hillsboro-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://katu.com/news/local/new-data-center-in-hillsboro-could-be-200-feet-away-from-high-school-portland-oregon-tech-controversy-environment-politics-local-community","label":"KATU: New data center in Hillsboro could be 200 feet away from high school","publisher":"KATU","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://baxtel.com/data-center/digital-realty-hillsboro-wagon","label":"Baxtel: Digital Realty Hillsboro Wagon","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-edgeconnex-por01-por02-hillsboro-campus-or","sourceRecordId":"edgeconnex-por01-por02-hillsboro-campus-or","name":"EdgeConneX POR01/POR02 (Hillsboro campus)","operator":"EdgeConneX","city":"Hillsboro","county":"Washington","address":"6501 Northeast Bennett Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5564226,"longitude":-122.9122077,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-por01-por02-hillsboro-campus-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/portland-or/","label":"EdgeConneX official locations page - Portland","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1019812125","label":"OpenStreetMap way/1019812125","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-portland-hillsboro-1-pdx01-or","sourceRecordId":"flexential-portland-hillsboro-1-pdx01-or","name":"Flexential Portland - Hillsboro 1 (PDX01)","operator":"Flexential","city":"Hillsboro","county":"Washington","address":"3935 NE Aloclek Drive","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5498253,"longitude":-122.8908454,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-1-pdx01-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/or/portland/hillsboro1-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/328703598","label":"OpenStreetMap way/328703598","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-portland-hillsboro-2-or","sourceRecordId":"flexential-portland-hillsboro-2-or","name":"Flexential Portland - Hillsboro 2","operator":"Flexential","city":"Hillsboro","county":"Washington","address":"5737 Northeast Huffman Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.558302,"longitude":-122.9171647,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-2-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/or/portland/hillsboro2-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/471691760","label":"OpenStreetMap way/471691760","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-portland-hillsboro-3-or","sourceRecordId":"flexential-portland-hillsboro-3-or","name":"Flexential Portland - Hillsboro 3","operator":"Flexential","city":"Hillsboro","county":"Washington","address":"5419 Northeast Starr Boulevard","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5594805,"longitude":-122.9382011,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-3-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/or/portland/hillsboro3-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/918873142","label":"OpenStreetMap way/918873142","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-portland-hillsboro-4-pdx04-or","sourceRecordId":"flexential-portland-hillsboro-4-pdx04-or","name":"Flexential Portland - Hillsboro 4 (PDX04)","operator":"Flexential","city":"Hillsboro","county":"Washington","address":"4915 Northeast Starr Boulevard","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5553133,"longitude":-122.9401317,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-4-pdx04-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/or/portland/hillsboro4-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/860433344","label":"OpenStreetMap way/860433344","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.flexential.com/resources/press-release/flexential-acquires-prime-property-hillsboro-plans-new-data-center","label":"Flexential Hillsboro press release (via search) — flexential.com resources/press-release","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-flexential-portland-hillsboro-5-or","sourceRecordId":"flexential-portland-hillsboro-5-or","name":"Flexential Portland - Hillsboro 5","operator":"Flexential","city":"Hillsboro","county":"Washington","address":"4975 NE Starr Boulevard","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5564617,"longitude":-122.9394058,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-5-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/flexential-secures-strategic-real-estate-ownership-in-hillsboro-oregon-with-acquisition-of-two-data-center-properties-302783801.html","label":"Flexential Secures Strategic Real Estate Ownership in Hillsboro, Oregon, with Acquisition of Two Data Center Properties","publisher":"Flexential via PR Newswire","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://www.prnewswire.com/news-releases/flexential-acquires-prime-property-in-hillsboro-plans-new-data-center-as-next-phase-of-expansion-302546009.html","label":"Flexential Acquires Prime Property in Hillsboro, Plans New Data Center as Next Phase of Expansion","publisher":"Flexential via PR Newswire","kind":"press","retrievedAt":"2026-09-05"}]},{"id":"compute-flexential-portland-hillsboro-6-or","sourceRecordId":"flexential-portland-hillsboro-6-or","name":"Flexential Portland - Hillsboro 6","operator":"Flexential","city":"Hillsboro","county":"Washington","address":"3935 NE Aloclek Place","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5472442,"longitude":-122.8910057,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-6-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/flexential-acquires-prime-property-in-hillsboro-plans-new-data-center-as-next-phase-of-expansion-302546009.html","label":"Flexential Acquires Prime Property in Hillsboro, Plans New Data Center as Next Phase of Expansion","publisher":"Flexential via PR Newswire","kind":"press","retrievedAt":"2026-09-05"}]},{"id":"compute-fort-rock-data-center-bend-or","sourceRecordId":"fort-rock-data-center-bend-or","name":"Fort Rock Data Center","operator":"Fort Rock Data Center","city":"Bend","county":"Deschutes","address":"207 SW Columbia St","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":44.0474593,"longitude":-121.3285495,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fort-rock-data-center-bend-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fortrockdc.com/about/","label":"About Fort Rock Data Center","publisher":"Fort Rock Data Center","kind":"other","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=207+SW+Columbia+St,+Bend,+OR&format=json","label":"OpenStreetMap: Fort Rock DC, 207 SW Columbia Street, Bend","publisher":"OpenStreetMap Nominatim","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-google-the-dalles-or","sourceRecordId":"google-the-dalles-or","name":"Google The Dalles Data Center Campus","operator":"Google","city":"The Dalles","county":"Wasco","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5975,"longitude":-121.1776,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-the-dalles-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://en.wikipedia.org/wiki/The_Dalles,_Oregon#Google_data_centers","label":"The Dalles, Oregon — Google data centers (Wikipedia)","publisher":"Wikipedia","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterdynamics.com/en/news/we-now-know-how-much-water-googles-oregon-data-centers-use-after-city-drops-lawsuit-against-journalists/","label":"We now know how much water Google's Oregon data centers use — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thedalles.org/business/google_data_centers/ezandsipagreements.php","label":"Enterprise Zone & Strategic Investment Program Agreements with Google — City of The Dalles","publisher":"City of The Dalles, OR","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://mailtribune.com/news/happening-now/google-touts-1-8-billion-investment-in-the-dalles-data-center","label":"Google touts $1.8 billion investment in The Dalles data center — Mail Tribune","publisher":"Mail Tribune","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.publicpower.org/periodical/article/northern-wasco-pud-supply-power-google-data-centers","label":"Northern Wasco PUD to Supply Power to Google Data Centers — American Public Power Association","publisher":"American Public Power Association","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.technostatecraft.com/p/how-google-is-reshaping-a-small-oregon","label":"How Google is Reshaping a Small Oregon Town — Technostatecraft","publisher":"Technostatecraft","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.opb.org/article/2026/01/15/as-googles-water-demands-grow-the-dalles-aims-to-pull-more-from-mount-hood-forest/","label":"As Google's water demands grow, The Dalles aims to pull more from Mount Hood forest","publisher":"Oregon Public Broadcasting","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.latitudemedia.com/news/data-center-water-use-black-box-google-trying-to-change/","label":"Data center water use can be a 'black box.' Google aims to change that","publisher":"Latitude Media","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://waterwatch.org/googles-water-use-is-soaring-in-the-dalles-records-show-with-two-more-data-centers-to-come-2/","label":"Google's water use is soaring in The Dalles, records show","publisher":"WaterWatch of Oregon","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://datacenters.google/locations/oregon/","label":"The Dalles, Oregon — Google Data Center Location (Google's own site page)","publisher":"Google","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://www.datacenterknowledge.com/hyperscalers/google-confirms-600-million-expansion-in-the-dalles","label":"Google Confirms $600 Million Expansion in The Dalles — Data Center Knowledge (2013-09-26)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://nbc16.com/news/local/google-touts-18-billion-investment-in-oregon-data-center","label":"Google touts $1.8 billion investment in Oregon data center","publisher":"NBC16 / The Oregonian","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://constructionreviewonline.com/avangrid-to-repower-leaning-juniper-iib-wind-project-to-extend-life-and-supply-100-mw-to-google-data-centers-in-the-dalles/","label":"Avangrid to repower Leaning Juniper IIB wind project to supply 100 MW to Google data centers in The Dalles","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://gorgeradio.com/avangrid-sings-agreement-with-google-to-power-data-centers/","label":"Avangrid Signs Agreement With Google To Power Data Centers","publisher":"Gorge Radio","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-google-the-dalles-port-river-road-or","sourceRecordId":"google-the-dalles-port-river-road-or","name":"Google The Dalles Data Center — 3500 River Road (Port of The Dalles)","operator":"Google","city":"The Dalles","county":"Wasco","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.62539,"longitude":-121.20239,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-the-dalles-port-river-road-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/","label":"Google taps Whiting-Turner to build $600M Oregon data center — 'Design LLC, a wholly-owned subsidiary of tech giant Google, selected Baltimore-based Whiting-Turner Contracting Co. to build a $600 million data center in Wasco County, Oregon'; 290,000 square feet; contractor cleared to start construction per The Dalles Community Development Department filings dated Jan. 30, 2024","publisher":"Construction Dive","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://columbiacommunityconnection.com/the-dalles/google-making-moves-to-break-ground-on-first-new-data-center-in-the-dalles","label":"Google makes move to break ground on new data center in The Dalles — site is 3500 River Road at the Port of The Dalles, a former aluminum smelter site; 290,000 sq ft; up to $600 million; described as 'the fourth such data center for Google in The Dalles'","publisher":"Columbia Community Connection","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.opb.org/article/2026/01/15/as-googles-water-demands-grow-the-dalles-aims-to-pull-more-from-mount-hood-forest/","label":"As Google's water demands grow, The Dalles aims to pull more from Mount Hood forest — 'By 2024, a third of The Dalles' water went to Google's three local data center sites'; Google 'just built a data center building in 2025, and plans to complete another one this year'; Google employs about 200 people in The Dalles","publisher":"Oregon Public Broadcasting","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-h5-data-centers-portland-or","sourceRecordId":"h5-data-centers-portland-or","name":"H5 Data Centers Portland","operator":"H5 Data Centers","city":"Portland","county":"Multnomah","address":"1233 NW 12th Avenue, Suite 201","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5318147,"longitude":-122.6839805,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-portland-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/portland-data-center.html","label":"H5 Data Centers Portland data center (42,000 SF, 1233 NW 12th Avenue)","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-hines-walker-road-hillsboro-or","sourceRecordId":"hines-walker-road-hillsboro-or","name":"Hines Walker Road Data Center Site (10500 NE Walker Road, Hillsboro)","operator":"Hines","city":"Hillsboro","county":"Washington","address":"10500 NE Walker Road","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.52707,"longitude":-122.87139,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/hines-walker-road-hillsboro-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://hillsboroherald.com/next-wave-7-hillsboro-data-center-projects-march-ahead-as-humans-fight-it-out/","label":"Next Wave: 7 Hillsboro data center projects march ahead — The Hillsboro Herald (2026-08-13)","publisher":"The Hillsboro Herald","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://hillsboroherald.com/the-real-story-data-centers-are-encroaching-on-hillsboros-schools-and-we-are-out-of-time/","label":"The Real Story: data centers are encroaching on Hillsboro's schools — The Hillsboro Herald","publisher":"The Hillsboro Herald","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://www.sec.gov/Archives/edgar/data/1585101/000158510122000026/wellsfargocenterpressrelea.htm","label":"Hines Global Income Trust acquires Wells Fargo Center, Hillsboro (SEC exhibit)","publisher":"U.S. SEC EDGAR / Hines Global Income Trust","kind":"filing","retrievedAt":"2026-09-17"}]},{"id":"compute-lumen-portland-1-northrup-portland-or","sourceRecordId":"lumen-portland-1-northrup-portland-or","name":"Lumen Portland 1 (1335 NW Northrup St)","operator":"Lumen Technologies","city":"Portland","county":"Multnomah","address":"1335 NW Northrup St","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.531671,"longitude":-122.68496,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-portland-1-northrup-portland-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13512","label":"PeeringDB facility record: Lumen Portland","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-meta-prineville-or","sourceRecordId":"meta-prineville-or","name":"Meta Prineville Data Center Campus","operator":"Meta","city":"Prineville","county":"Crook","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":44.3042,"longitude":-120.8515,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-prineville-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://en.wikipedia.org/wiki/Meta_Platforms#Data_centers","label":"Meta Platforms data centers — Wikipedia","publisher":"Wikipedia","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://sustainability.fb.com/report/2023-sustainability-report/","label":"Meta 2023 Sustainability Report","publisher":"Meta","kind":"filing","retrievedAt":"2026-07-05"},{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","label":"Meta's Prineville Data Center (fact sheet)","publisher":"Meta","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://bendbulletin.com/2024/05/09/prineville-doubles-down-on-water-conservation-with-tech-giant-backed-project/","label":"Prineville doubles down on water conservation with tech giant-backed project — The Bulletin","publisher":"The Bulletin (Bend, OR)","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.bendsource.com/news/localnews/prineville-wants-more-out-of-its-next-data-center-deal/","label":"Prineville Wants More Out of Its Next Data Center Deal — The Source Weekly","publisher":"The Source Weekly (Bend, OR)","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/cloud/article/11430439/facebook-unveils-major-data-center-campus-expansion-in-prineville","label":"Facebook Unveils Major Data Center Campus Expansion in Prineville — Data Center Frontier","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-ntt-hillsboro-hi1-data-center-or","sourceRecordId":"ntt-hillsboro-hi1-data-center-or","name":"NTT Hillsboro HI1 Data Center","operator":"NTT Global Data Centers","city":"Hillsboro","county":"Washington","address":"4050 Northeast Evergreen Road","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5496803,"longitude":-122.9373872,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-hillsboro-hi1-data-center-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","label":"NTT (RagingWire) facility directory","publisher":"NTT (RagingWire)","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/52059176","label":"OpenStreetMap way/52059176","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-verrus-oakline-mill-creek-salem-or","sourceRecordId":"verrus-oakline-mill-creek-salem-or","name":"Oakline at Mill Creek","operator":"Verrus","city":"Salem","county":"Marion","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":44.88315,"longitude":-122.96941,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/verrus-oakline-mill-creek-salem-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://apps.oregon.gov/oregon-newsroom/OR/GOV/Posts/Post/governor-kotek-directs-state-to-withdraw-land-for-proposed-salem-data-center-site","label":"Governor Kotek Directs State to Withdraw Land for Proposed Salem Data Center Site (July 30, 2026) — directs the Department of Administrative Services to terminate the state's contract for the sale of approximately 32 acres at the Mill Creek Corporate Center in southeast Salem","publisher":"Office of the Governor, State of Oregon","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://katu.com/news/local/massive-51b-data-center-proposed-for-salem-draws-praise-and-pushback-oregon-environment-local-money-water-energy-local-portland-hillsboro-companies-business-jobs","label":"Massive $5.1B data center proposed for Salem draws praise and pushback — developer Verrus; project 'Oakline at Mill Creek'; $5.1 billion; 75 acres at Mill Creek Corporate Center near Turner Road SE and Deer Park Drive SE; 75 permanent jobs; ~$9M/yr to Salem's general fund and ~$1.5M to the Community Livability Levy; power and water figures not yet disclosed by the company","publisher":"KATU","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-oracle-hillsboro-or","sourceRecordId":"oracle-hillsboro-or","name":"Oracle Hillsboro Data Center","operator":"Oracle","city":"Hillsboro","county":"Washington","address":"3295 NE 83rd Avenue","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5437211,"longitude":-122.8944315,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oracle-hillsboro-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dcpulse.com/project/oracle-3295-ne-83rd-ave-hillsboro-oregon-data-center","label":"Oracle Hillsboro Data Center — 3295 NE 83rd Ave, ~91,000 sq ft, ~7.0 MW total electrical utility capacity","publisher":"DC Pulse","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://baxtel.com/data-center/oracle-hillsboro-1","label":"Oracle: Hillsboro 1 Data Center — 91,000 sq ft, fully operational, built 2001","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-percheron-data-center-or","sourceRecordId":"percheron-data-center-or","name":"Percheron Data Center","operator":"Rowan Green Data (DBA Rowan Digital Infrastructure)","city":"Boardman area (Tower Road)","county":"Morrow","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.7113177,"longitude":-119.8262349,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/percheron-data-center-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/rowan-percheron","label":"Baxtel facility profile: Rowan Percheron Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1501824326","label":"OpenStreetMap way/1501824326","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://rowan.digital/portfolio/percheron/","label":"Rowan Digital Infrastructure — Percheron: 300 MW, 275 acres","publisher":"Rowan Digital Infrastructure","kind":"other","retrievedAt":"2026-08-08"}]},{"id":"compute-pittock-block-portland-or","sourceRecordId":"pittock-block-portland-or","name":"Pittock Block (PTOR1)","operator":"1547 Critical Systems Realty","city":"Portland","county":"Multnomah","address":"921 SW Washington Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5215436,"longitude":-122.680704,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pittock-block-portland-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://1547realty.com/data-centers/portland/","label":"1547 Critical Systems Realty — Portland (Pittock Block / PTOR1): 302,262 sq ft, 8 MW","publisher":"1547 Critical Systems Realty","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-qts-hillsboro-1-or","sourceRecordId":"qts-hillsboro-1-or","name":"QTS Hillsboro 1","operator":"QTS Data Centers","city":"Hillsboro","county":"Washington","address":"4951 Northeast Huffman Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5588149,"longitude":-122.9277661,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-hillsboro-1-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/hillsboro-1/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/729192992","label":"OpenStreetMap way/729192992","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-qts-hillsboro-2-or","sourceRecordId":"qts-hillsboro-2-or","name":"QTS Hillsboro 2","operator":"QTS Data Centers","city":"Hillsboro","county":"Washington","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.55888,"longitude":-122.92961,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-hillsboro-2-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://q.com/data-centers/hillsboro-2/","label":"QTS Data Centers — Hillsboro 2: '51 acre campus', '180 MW+', four buildings at DC1 4755 NE Huffman St, DC2 4425 NE Huffman St, DC3 4327 NE Huffman St, DC5 4113 NE Huffman St, Hillsboro, Oregon","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-qts-hillsboro-3-or","sourceRecordId":"qts-hillsboro-3-or","name":"QTS Hillsboro 3","operator":"QTS Data Centers","city":"Hillsboro","county":"Washington","address":"Northeast Pubols Street","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5719248,"longitude":-122.918438,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-hillsboro-3-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/hillsboro-3/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1465196735","label":"OpenStreetMap way/1465196735","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://hillsboroherald.com/next-wave-7-hillsboro-data-center-projects-march-ahead-as-humans-fight-it-out/","label":"Next Wave: 7 Hillsboro data center projects march ahead — The Hillsboro Herald (2026-08-13): QTS North HIL3 approved, ground not yet broken","publisher":"The Hillsboro Herald","kind":"press","retrievedAt":"2026-09-17"},{"url":"https://cleanview.co/data-centers/oregon","label":"Data Centers in Oregon — Cleanview project list (QTS Hillsboro 3 DC1/DC2: planned, TBD)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-17"}]},{"id":"compute-roundhouse-cascade-locks-or","sourceRecordId":"roundhouse-cascade-locks-or","name":"Roundhouse Cascade Locks Data Center","operator":"Roundhouse Digital Infrastructure","city":"Cascade Locks","county":"Hood River","address":"1400 Columbia Gorge Way","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.6678863,"longitude":-121.8963113,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/roundhouse-cascade-locks-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/roundhouse-cascade-locks-or","label":"Roundhouse: Cascade Locks, OR Data Center — cancelled before construction","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-rowan-meriwether-forest-grove-or","sourceRecordId":"rowan-meriwether-forest-grove-or","name":"Rowan Meriwether Data Center Campus (Project Meriwether)","operator":"Rowan Digital Infrastructure","city":"Forest Grove","county":"Washington","address":"2506 Oak St","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5259537,"longitude":-123.0879889,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/rowan-meriwether-forest-grove-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/rowan-meriwether-or","label":"Rowan: Meriwether, OR","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-12"}]},{"id":"compute-sabey-umatilla-or","sourceRecordId":"sabey-umatilla-or","name":"SDC Umatilla Campus","operator":"Sabey Data Centers","city":"Umatilla","county":"Umatilla","address":"Wanapa Road","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.919,"longitude":-119.339,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-umatilla-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/sabey-data-centers-purchases-60-acres-in-umatilla-oregon-for-100mw-facility/","label":"Sabey Data Centers Purchases 60 Acres in Umatilla, Oregon for 100MW+ Facility","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.businesswire.com/news/home/20230914142077/en/Sabey-Data-Centers-to-Build-New-Data-Center-Campus-in-Umatilla-Oregon","label":"Sabey Data Centers to Build New Data Center Campus in Umatilla, Oregon","publisher":"Business Wire","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://hermistonherald.com/2023/11/07/sabey-data-centers-comes-to-umatilla/","label":"Sabey Data Centers comes to Umatilla","publisher":"Hermiston Herald","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.commercialsearch.com/news/sabey-data-centers-picks-oregon-for-950m-project/","label":"Sabey Data Centers picks Oregon","publisher":"Commercial Search","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://hermistonherald.com/2026/07/15/714000-square-foot-data-center-construction-under-way-in-umatilla/","label":"714,000-square-foot data center construction under way in Umatilla","publisher":"Hermiston Herald","kind":"press","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://eastoregonian.com/2026/07/15/714000-square-foot-data-center-construction-under-way-in-umatilla/","label":"714,000-square-foot data center construction under way in Umatilla","publisher":"East Oregonian","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://sabeydatacenters.com/locations/sdc-umatilla","label":"SDC Umatilla","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://news.constructconnect.com/sabey-data-centers-breaks-ground-on-714540-square-foot-umatilla-campus","label":"Sabey Data Centers breaks ground on 714,540-square-foot Umatilla campus","publisher":"ConstructConnect","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-stack-hillsboro-or","sourceRecordId":"stack-hillsboro-or","name":"STACK Hillsboro Campus","operator":"STACK Infrastructure","city":"Hillsboro","county":"Washington","address":null,"state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5229,"longitude":-122.9898,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-hillsboro-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cleanview.co/data-centers/oregon","label":"Oregon data centers","publisher":"Cleanview","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.wweek.com/news/courts/2026/06/23/opponents-sue-to-block-17-proposed-data-centers-in-hillsboro/","label":"Willamette Week","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-stack-por01-or","sourceRecordId":"stack-por01-or","name":"STACK POR01","operator":"STACK Infrastructure","city":"Hillsboro","county":"Washington","address":"3145 Northeast Brookwood Parkway","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5493273,"longitude":-122.9278183,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-por01-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/portland/por01/","label":"STACK Infrastructure facility directory","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://www.openstreetmap.org/way/471691757","label":"OpenStreetMap way/471691757","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-por02-or","sourceRecordId":"stack-por02-or","name":"STACK POR02","operator":"STACK Infrastructure","city":"Hillsboro","county":"Washington","address":"8135 Northeast Evergreen Parkway","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5473758,"longitude":-122.8973869,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-por02-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/portland/por02/","label":"STACK Infrastructure facility directory","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://www.openstreetmap.org/way/328702378","label":"OpenStreetMap way/328702378","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-por03-or","sourceRecordId":"stack-por03-or","name":"STACK POR03","operator":"STACK Infrastructure","city":"Hillsboro","county":"Washington","address":"4735 Northeast Starr Boulevard","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":45.5541322,"longitude":-122.9379069,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-por03-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/portland/por03/","label":"STACK Infrastructure facility directory","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.openstreetmap.org/way/899634245","label":"OpenStreetMap way/899634245","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-us-signal-or01-bend-or","sourceRecordId":"us-signal-or01-bend-or","name":"US Signal OR01 Bend","operator":"US Signal","city":"Bend","county":"Deschutes","address":"20845 Sockeye Place","state":"OR","stateName":"Oregon","jurisdictionType":"state","latitude":44.086105,"longitude":-121.2830411,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-or01-bend-or","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/or01-bend/","label":"US Signal OR01 Bend Data Center (20845 Sockeye Place, Bend, OR 97701)","publisher":"US Signal","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-365-data-centers-philadelphia-university-city-pa","sourceRecordId":"365-data-centers-philadelphia-university-city-pa","name":"365 Data Centers Philadelphia (University City)","operator":"365 Data Centers","city":"Philadelphia","county":"Philadelphia","address":"3701 Market Street","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":39.956476,"longitude":-75.196035,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/365-data-centers-philadelphia-university-city-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.365datacenters.com/data-centers/philadelphia/","label":"365 Data Centers: Philadelphia","publisher":"365 Data Centers","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-four-three-glenbrook-salem-township-luzerne-pa","sourceRecordId":"four-three-glenbrook-salem-township-luzerne-pa","name":"4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)","operator":"4-3 Glenbrook Group","city":"Salem Township","county":"Luzerne","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.1078249,"longitude":-76.1791155,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/four-three-glenbrook-salem-township-luzerne-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.timesleader.com/news/1745226/1-2-billion-land-deal-for-second-data-center-project-in-salem-township-announced-by-4-3-group","label":"$1.2 billion land deal for second data center project in Salem Township announced by 4-3 Group","publisher":"Times Leader","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","label":"Developers tout impacts of 3 data center campuses; Zoning meeting set for Wednesday on 4-3 Glenbrook Group project","publisher":"Times Leader","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-aliquippa-data-center-beaver-county-pa","sourceRecordId":"aliquippa-data-center-beaver-county-pa","name":"Aliquippa Data Center (former J&L Steel site)","operator":"Five 9s Digital","city":"Aliquippa","county":"Beaver","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.6023,"longitude":-80.2456,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/aliquippa-data-center-beaver-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://poweredbywho.com/projects/aliquippa-5f9f2231","label":"Aliquippa Data Center, Pennsylvania — project record","publisher":"PoweredByWho","kind":"other","retrievedAt":"2026-08-31"},{"url":"https://cleanview.co/data-centers/pennsylvania","label":"Data Centers in Pennsylvania — Project List & Locations (Five 9s Digital Aliquippa, 496 MW)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-31"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/pennsylvania-s-70-billion-race-for-america-s-data-centers","label":"Pennsylvania's $70 Billion Race for America's Data Centers","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-31"}]},{"id":"compute-alpha-compute-alpha-energy-01-tioga-county-pa","sourceRecordId":"alpha-compute-alpha-energy-01-tioga-county-pa","name":"Alpha Energy 01 Data Center Campus (Tioga County)","operator":"Alpha Compute Corp.","city":null,"county":"Tioga","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.7741691,"longitude":-77.254256,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/alpha-compute-alpha-energy-01-tioga-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://finviz.com/news/390946/alpha-compute-secures-47-million-in-seller-financing-for-planned-200mw-pennsylvania-ai-data-center-campus","label":"Alpha Compute Secures $47 Million in Seller Financing for Planned 200MW Pennsylvania AI Data Center Campus","publisher":"Alpha Compute Corp. (press release via Finviz)","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-aws-falls-township-pa","sourceRecordId":"aws-falls-township-pa","name":"Amazon Web Services Innovation Campus, Falls Township","operator":"Amazon Web Services","city":"Falls Township","county":"Bucks","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.1545,"longitude":-74.7882,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-falls-township-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fallstwp.com/resources/news/article/?id=10070","label":"Amazon to Open Data Center at NorthPoint Development in Falls","publisher":"Falls Township","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://buckscountybeacon.com/2025/08/not-everyone-is-sold-on-the-benefits-of-amazons-data-center-coming-to-falls-township/","label":"Not Everyone Is Sold on the Benefits of Amazon's Data Center Coming to Falls Township","publisher":"Bucks County Beacon","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa","sourceRecordId":"archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa","name":"Archbald I Campus 1 Data Center (Eynon Jermyn Road)","operator":"Archbald I LLC","city":"Archbald","county":"Lackawanna","address":"Eynon Jermyn Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.5095,"longitude":-75.5661,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","label":"Developer applies for 22 more data center buildings in Archbald","publisher":"The Times-Tribune (via Yahoo News)","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://baxtel.com/data-center/archbald-i-llc-campus-2","label":"Archbald I LLC: Campus 2 (project listing, covers both campuses)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-25"}]},{"id":"compute-archbald-i-campus-2-washington-avenue-lackawanna-pa","sourceRecordId":"archbald-i-campus-2-washington-avenue-lackawanna-pa","name":"Archbald I Campus 2 Data Center (Eynon Jermyn Road at Washington Avenue)","operator":"Archbald I LLC","city":"Archbald","county":"Lackawanna","address":"Eynon Jermyn Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.5149,"longitude":-75.5554,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/archbald-i-campus-2-washington-avenue-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","label":"Developer applies for 22 more data center buildings in Archbald","publisher":"The Times-Tribune (via Yahoo News)","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://baxtel.com/data-center/archbald-i-llc-campus-2","label":"Archbald I LLC: Campus 2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-25"}]},{"id":"compute-ardent-pittsburgh-mckees-rocks-pa","sourceRecordId":"ardent-pittsburgh-mckees-rocks-pa","name":"Ardent Data Centers Pittsburgh (McKees Rocks)","operator":"Ardent Data Centers (Northern Data Group)","city":"McKees Rocks","county":"Allegheny","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.4646,"longitude":-80.081,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ardent-pittsburgh-mckees-rocks-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.co.uk/news-releases/ardent-data-centers-a-northern-data-group-company-completes-acquisition-of-pennsylvania-data-center-302040653.html","label":"Ardent Data Centers, a Northern Data Group company, completes acquisition of Pennsylvania data center","publisher":"Northern Data Group via PR Newswire","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.cleanview.co/data-centers/pennsylvania","label":"Data Centers in Pennsylvania — Project List & Locations (HPC data center, Northern Data, Allegheny, 20 MW)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-17"}]},{"id":"compute-aws-cumulus-salem-township-pa","sourceRecordId":"aws-cumulus-salem-township-pa","name":"AWS Cumulus Data Center Campus, Salem Township","operator":"Amazon Web Services","city":"Salem Township","county":"Luzerne","address":"1125 Electron Avenue","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.0949,"longitude":-76.1452,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-cumulus-salem-township-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-acquires-talens-nuclear-data-center-campus-in-pennsylvania/","label":"AWS Acquires Talen's Nuclear Data Center Campus in Pennsylvania","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon","label":"Talen Energy Expands Nuclear Energy Relationship with Amazon","publisher":"Talen Energy Investor Relations","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.tmia.com/sites/tmia.com/files/media/Amazon%20Testimony,%20(8_1_24)-2.pdf","label":"SRBC Consumptive Use Application No. 2024-056 (Amazon Cumulus) — public comment reproducing Amazon's application","publisher":"Susquehanna River Basin Commission / Three Mile Island Alert","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://technical.ly/civics/amazon-data-centers-tax-break/","label":"Amazon approved for tax break to build Pennsylvania data centers","publisher":"Technical.ly","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://blackchronicle.com/mid-atlantic/pennsylvania/big-money-enforced-silence-play-roles-in-pennsylvanias-data-center-push/","label":"Big money, enforced silence play roles in Pennsylvania's data-center push","publisher":"The Center Square (via Black Chronicle)","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://measuredai.substack.com/p/amazon-susquehanna-data-center-campus","label":"Amazon's Susquehanna Data Center Campus: A 1.92 GW Nuclear Bet in Pennsylvania","publisher":"Measured AI","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","label":"Developers tout impacts of 3 data center campuses; Zoning meeting set for Wednesday on 4-3 Glenbrook Group project","publisher":"Times Leader","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-aws-kline-township-schuylkill-pa","sourceRecordId":"aws-kline-township-schuylkill-pa","name":"AWS Kline Township Data Center Campus","operator":"Amazon Web Services","city":"Kline Township","county":"Schuylkill","address":"Lofty Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.8699957,"longitude":-76.0215859,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-kline-township-schuylkill-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/","label":"Kline supervisors grant extension for consideration of Amazon data center plans","publisher":"The Shenandoah Sentinel","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://coalregioncanary.com/2026/06/21/amazon-web-services-reps-discuss-planned-data-center-project-schuylkill-county-kline-township/","label":"Amazon Rep: Schuylkill County Data Centers Only Need Cooling Water 4% of the Year","publisher":"Coal Region Canary","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-switch-big-beaver-pa","sourceRecordId":"switch-big-beaver-pa","name":"Big Beaver Campus","operator":"Switch","city":"Big Beaver","county":"Beaver","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.75,"longitude":-80.33,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/switch-big-beaver-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/","label":"Switch announces new data center campus in Beaver County, Pennsylvania","publisher":"Switch","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/switch-announces-plans-for-data-center-campus-outside-pittsburgh-pennsylvania/","label":"Switch announces plans for data center campus outside Pittsburgh, Pennsylvania","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://beavercountyradio.com/news/big-turnout-and-big-voices-at-big-beaver-data-center-meeting/","label":"Big turnout and big voices at Big Beaver data center meeting — Beaver County Radio","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-blakely-borough-data-center-lackawanna-pa","sourceRecordId":"blakely-borough-data-center-lackawanna-pa","name":"Blakely Borough Data Center (withdrawn)","operator":"Undisclosed developer (Blakely rezoning applicant)","city":"Blakely","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.4809,"longitude":-75.5946,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blakely-borough-data-center-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds","label":"Blakely Borough data center plans scrapped amid community pushback, Borough responds","publisher":"Fox56 / WOLF","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-breaker-street-data-center-jessup-lackawanna-pa","sourceRecordId":"breaker-street-data-center-jessup-lackawanna-pa","name":"Breaker Street Data Center Campus","operator":"Breaker Street Associates LLC (Catalyst Commercial Development)","city":"Jessup","county":"Lackawanna","address":"Breaker Street","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.4712,"longitude":-75.5588,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/breaker-street-data-center-jessup-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/articles/jessup-denies-breaker-street-data-010400301.html","label":"Jessup denies Breaker Street data centers","publisher":"The Times-Tribune (via Yahoo News)","kind":"press","retrievedAt":"2026-08-31"},{"url":"https://cleanview.co/data-centers/pennsylvania","label":"Data Centers in Pennsylvania — Project List & Locations (Breaker Street, 600 MW)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa","sourceRecordId":"pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa","name":"Caughbaugh Road Data Center (Pennsylvania Glacial Till site)","operator":"Pennsylvania Glacial Till LLC","city":null,"county":"Monroe","address":"Caughbaugh Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.1345,"longitude":-75.6185,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay","label":"Tobyhanna Township approves second data center zoning overlay","publisher":"Fox56 / WOLF","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://fox56.com/news/local/tobyhanna-twp-public-hearing-draws-crowd-as-residents-challenge-zoning-ordinance","label":"Tobyhanna Twp. public hearing draws crowd as residents challenge zoning ordinance","publisher":"Fox56 / WOLF","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-air-products-cetronia-road-upper-macungie-pa","sourceRecordId":"air-products-cetronia-road-upper-macungie-pa","name":"Cetronia Road Data Center (former Air Products site)","operator":"Air Products","city":"Trexlertown","county":"Lehigh","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.5510536,"longitude":-75.5965424,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/air-products-cetronia-road-upper-macungie-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/26-million-sq-ft-data-center-campus-proposed-in-pennsylvania/","label":"2.6 million sq ft data center campus proposed in Pennsylvania","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.lehighvalleynews.com/business/giant-data-center-proposal-in-upper-macungie-township-is-in-the-works","label":"Giant data center proposal in Upper Macungie Township is in the works","publisher":"LehighValleyNews.com","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.wfmz.com/news/area/lehighvalley/lehigh-county/western-lehigh-county/upper-macungie-zoners-reject-appeal-for-massive-data-center-campus-on-former-air-products-site/article_c531b72e-e928-4562-bcbf-3dbc7e9ce3e8.html","label":"Upper Macungie zoners weigh massive data center campus on former Air Products site","publisher":"WFMZ","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.lehighvalleypublicmedia.org/news/all/air-products-abandons-plan-for-data-center-at-former-upper-macungie-headquarters/","label":"Air Products abandons plan for data center at former Upper Macungie headquarters","publisher":"Lehigh Valley Public Media","kind":"press","retrievedAt":"2026-08-17"}]},{"id":"compute-coreweave-lancaster-pa","sourceRecordId":"coreweave-lancaster-pa","name":"CoreWeave Lancaster Data Center","operator":"CoreWeave","city":"Lancaster","county":"Lancaster","address":"216 Greenfield Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.0379,"longitude":-76.3055,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coreweave-lancaster-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx","label":"CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania — CoreWeave","publisher":"CoreWeave","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/","label":"CoreWeave plans $6bn data center in Lancaster, Pennsylvania — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.witf.org/2025/09/27/data-centers-water-allotment-to-be-80-less-than-former-printing-plants-in-lancaster-city/","label":"Data centers' water allotment to be 80% less than former printing plants — WITF","publisher":"WITF Public Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cityoflancasterpa.gov/wp-content/uploads/2025/11/Community-Benefits-Agreement-Summary-1-1.pdf","label":"Community Benefits Agreement Summary — City of Lancaster, PA","publisher":"City of Lancaster, PA","kind":"filing","retrievedAt":"2026-07-06"},{"url":"https://www.govtech.com/products/lancaster-pa-zoning-may-limit-input-on-6b-data-center","label":"Lancaster, Pa., Zoning May Limit Input on $6B Data Center — Government Technology","publisher":"Government Technology","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://lancasteronline.com/news/local/ai-cloud-computing-firm-announces-plans-for-6b-data-center-in-lancaster-county/article_269bec19-6d27-41f0-8486-01149492ecf0.html","label":"AI cloud computing firm announces plans for $6B data center in Lancaster County","publisher":"LancasterOnline","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.credaily.com/briefs/coreweave-funding-powers-4b-ai-data-center-in-pennsylvania/","label":"CoreWeave Funding Powers $4B AI Data Center In Pennsylvania","publisher":"CRE Daily","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://rebusinessonline.com/coreweave-to-invest-6b-for-ai-based-data-center-in-lancaster-pennsylvania/","label":"CoreWeave to Invest $6B for AI-Based Data Center in Lancaster, Pennsylvania","publisher":"REBusinessOnline","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-pgob-coventry-mall-data-center-north-coventry-chester-pa","sourceRecordId":"pgob-coventry-mall-data-center-north-coventry-chester-pa","name":"Coventry Mall Data Center (Shoppes at Coventry) (withdrawn)","operator":"PGOB Coventry Holdings LLC / PennMark Management Company Inc.","city":"North Coventry Township","county":"Chester","address":"351 W. Schuylkill Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.233412,"longitude":-75.662312,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pgob-coventry-mall-data-center-north-coventry-chester-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mychesco.com/a/communities/coventry-mall-data-center-plan-withdrawn-amid-zoning-dispute/","label":"Coventry Mall Data Center Plan Withdrawn Amid Zoning Dispute","publisher":"MyChesCo","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-databank-pit1-pittsburgh-pa","sourceRecordId":"databank-pit1-pittsburgh-pa","name":"DataBank PIT1 (Downtown Pittsburgh)","operator":"DataBank","city":"Pittsburgh","county":"Allegheny","address":"100 S Commons","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.4479,"longitude":-80.0086,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/databank-pit1-pittsburgh-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/pittsburgh/","label":"DataBank Pittsburgh Data Centers — PIT1","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-17"}]},{"id":"compute-databank-pit2-summit-park-pittsburgh-pa","sourceRecordId":"databank-pit2-summit-park-pittsburgh-pa","name":"DataBank PIT2 (Summit Park)","operator":"DataBank","city":"Pittsburgh","county":"Allegheny","address":"35 Summit Park Drive","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.4433,"longitude":-80.1697,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/databank-pit2-summit-park-pittsburgh-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/pittsburgh/","label":"DataBank Pittsburgh Data Centers — PIT2 Summit Park","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-17"}]},{"id":"compute-dickson-city-development-bell-mountain-lackawanna-pa","sourceRecordId":"dickson-city-development-bell-mountain-lackawanna-pa","name":"Dickson City Data Center (Bell Mountain)","operator":"Dickson City Development LLC","city":"Dickson City","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.4714693,"longitude":-75.607688,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dickson-city-development-bell-mountain-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvia.org/news/local/2026-05-21/dickson-city-zoning-board-upholds-ordinance-governing-data-centers-in-the-borough","label":"Dickson City Zoning Board upholds ordinance governing data centers in the borough","publisher":"WVIA","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-dta-alliance-blue-shamrock-lower-towamensing-carbon-pa","sourceRecordId":"dta-alliance-blue-shamrock-lower-towamensing-carbon-pa","name":"DTA Alliance Data Center Campus (Blue Shamrock Golf Course / Alliance Sand Quarry)","operator":"DTA Alliance LLC / Murphy's Meadow LLC","city":"Lower Towamensing Township","county":"Carbon","address":"415 Golf Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.80481,"longitude":-75.631467,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dta-alliance-blue-shamrock-lower-towamensing-carbon-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tnonline.com/?p=286092","label":"Times News: data center proposed at Blue Shamrock Golf Course and DTA Alliance quarry","publisher":"Times News","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://hoodline.com/2026/10/carbon-county-data-center-proposal-tests-local-zoning-and-infrastructure-planning/","label":"Bowmanstown, PA Data Center Plan Sparks Zoning Fight","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-expedient-pit1-green-tree-pittsburgh-south-pa","sourceRecordId":"expedient-pit1-green-tree-pittsburgh-south-pa","name":"Expedient PIT1 (Green Tree / Pittsburgh South)","operator":"Expedient","city":"Pittsburgh","county":"Allegheny","address":"810 Parish Street","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.427371,"longitude":-80.0425212,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-pit1-green-tree-pittsburgh-south-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.expedient.com/data-centers/pittsburgh/","label":"Expedient official Pittsburgh data center page","publisher":"Expedient","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/537807168","label":"OpenStreetMap way/537807168","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-five-up-realty-eynon-jermyn-road-archbald-pa","sourceRecordId":"five-up-realty-eynon-jermyn-road-archbald-pa","name":"Eynon Jermyn Road Data Center Campus (former auto salvage yard)","operator":"Five Up Realty LLC","city":"Archbald","county":"Lackawanna","address":"Eynon Jermyn Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.509,"longitude":-75.535,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/five-up-realty-eynon-jermyn-road-archbald-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/developer-seeks-convert-archbald-junkyard-000700860.html","label":"Developer seeks to convert Archbald junkyard to data centers","publisher":"The Times-Tribune (via Yahoo News)","kind":"press","retrievedAt":"2026-08-31"}]},{"id":"compute-elysian-partners-fairview-crossroads-fairview-township-york-pa","sourceRecordId":"elysian-partners-fairview-crossroads-fairview-township-york-pa","name":"Fairview Crossroads Data Center","operator":"Elysian Partners","city":"Fairview Township","county":"York","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.1692628,"longitude":-76.8516507,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/elysian-partners-fairview-crossroads-fairview-township-york-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://poweredbywho.com/projects/1efe16d9-b280-4143-b0d2-d3977c162ad8","label":"Fairview Crossroads Data Center (Elysian Partners) - Fairview Township, PA","publisher":"PoweredByWho","kind":"other","retrievedAt":"2026-09-12"}]},{"id":"compute-flexential-allentown-data-center-abe01-pa","sourceRecordId":"flexential-allentown-data-center-abe01-pa","name":"Flexential Allentown Data Center (ABE01)","operator":"Flexential","city":"Allentown","county":"Lehigh","address":"744 Roble Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.6356953,"longitude":-75.4575733,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-allentown-data-center-abe01-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/pa/allentown/data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/296374269","label":"OpenStreetMap way/296374269","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-philadelphia-collegeville-phl01-pa","sourceRecordId":"flexential-philadelphia-collegeville-phl01-pa","name":"Flexential Philadelphia - Collegeville (PHL01)","operator":"Flexential","city":"Collegeville","county":"Montgomery","address":"101 Troutman Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.1522366,"longitude":-75.4776181,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-philadelphia-collegeville-phl01-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/pa/philadelphia/collegeville-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1178609569","label":"OpenStreetMap way/1178609569","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenters.com/flexential-philadelphia-collegeville","label":"Flexential PHL01 listing — datacenters.com","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-miles-brothers-glassworks-data-campus-clarion-pa","sourceRecordId":"miles-brothers-glassworks-data-campus-clarion-pa","name":"Glassworks Data Campus (former Owens-Illinois glass plant)","operator":"Miles Brothers, LLC","city":"Clarion","county":"Clarion","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.210335,"longitude":-79.37146,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/miles-brothers-glassworks-data-campus-clarion-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.exploreclarion.com/local/2026/01/30/is-a-massive-data-center-coming-to-clarion-inside-the-conceptual-plans-for-the-100-acre-glassworks-data-campus-861095/","label":"Is a massive data center coming to Clarion? Inside the conceptual plans for the 100-acre Glassworks Data Campus","publisher":"exploreClarion","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-gouldsboro-project-gold-clifton-covington-lackawanna-pa","sourceRecordId":"gouldsboro-project-gold-clifton-covington-lackawanna-pa","name":"Gouldsboro Data Center Campus (Project Gold)","operator":"1778 Rich Pike LLC","city":"Clifton Township","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.195,"longitude":-75.595,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/gouldsboro-project-gold-clifton-covington-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation","label":"Clifton Twp. Supervisors settle with data center developer, residents promise litigation","publisher":"WVIA","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.cleanview.co/data-centers/pennsylvania","label":"Data Centers in Pennsylvania — Project List & Locations (Gouldsboro Data Center, 1778 Rich Pike LLC, Lackawanna, 1,500 MW planned)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-17"}]},{"id":"compute-pa-data-center-partners-granville-township-mifflin-pa","sourceRecordId":"pa-data-center-partners-granville-township-mifflin-pa","name":"Granville Township Data Center Campus (Loop Road)","operator":"PA Data Center Partners","city":"Lewistown","county":"Mifflin","address":"Loop Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.5656,"longitude":-77.6176,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pa-data-center-partners-granville-township-mifflin-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/us/articles/plans-filed-mifflin-county-data-011151924.html","label":"Plans filed for Mifflin County data center days before planned moratorium vote","publisher":"ABC27 (via Yahoo News)","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-homer-city-energy-campus-pa","sourceRecordId":"homer-city-energy-campus-pa","name":"Homer City Energy Campus","operator":"Homer City Redevelopment","city":"Homer City","county":"Indiana","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.5383,"longitude":-79.1542,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/homer-city-energy-campus-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.alleghenyfront.org/homer-city-pennsylvania-gas-plant-data-center-ai/","label":"In Western Pennsylvania, a former coal town gets a gas-fired data center — The Allegheny Front","publisher":"The Allegheny Front","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.axios.com/local/pittsburgh/2026/03/31/homer-city-power-plant-grid-data-centers-pennsylvania","label":"Homer City power plant to boost grid as data-center demand rises — Axios Pittsburgh","publisher":"Axios","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.gevernova.com/news/press-releases/homer-city-redevelopment-kiewit-announce-country-largest-natural-gas-powered-data-center-support-ai-hpc-demand","label":"Homer City Redevelopment and Kiewit announce country's largest natural-gas-powered data-center campus — GE Vernova","publisher":"GE Vernova","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment","label":"Homer City Generation Site Redevelopment — Pennsylvania DEP","publisher":"Pennsylvania DEP","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://www.utilitydive.com/news/homer-city-gas-fired-power-station-data-center-firstenergy/744332/","label":"Largest US gas-fired power plant planned for data centers in Pennsylvania — Utility Dive","publisher":"Utility Dive","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.spotlightpa.org/news/2026/07/pennsylvania-data-centers-emissions-gas-plants-climate-environment/","label":"New power plants for data centers would worsen pollution — Spotlight PA","publisher":"Spotlight PA","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.businesswire.com/news/home/20250402452555/en/Homer-City-Redevelopment-and-Kiewit-Announce-Countrys-Largest-Natural-Gas-Powered-Data-Center-Campus-to-Support-AI-and-HPC-Demand","label":"Homer City Redevelopment and Kiewit Announce Country's Largest Natural Gas-Powered Data Center Campus","publisher":"Business Wire","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/","label":"Homer City and Kiewit unveil plans for 4.5GW natural gas powered AI data center in Pennsylvania","publisher":"DataCenterDynamics","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.homercityredevelopment.com/project-overview","label":"Project Overview - Homer City Redevelopment","publisher":"Homer City Redevelopment","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-iron-city-no-2-data-center-beccaria-township-clearfield-pa","sourceRecordId":"iron-city-no-2-data-center-beccaria-township-clearfield-pa","name":"Iron City No. 2 Data Center Project","operator":"Undisclosed applicant (Iron City No. 2 Data Center Project)","city":"Beccaria Township","county":"Clearfield","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.775104,"longitude":-78.489923,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-city-no-2-data-center-beccaria-township-clearfield-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://paenvironmentdaily.blogspot.com/2026/07/dep-invites-comments-on-air-quality.html","label":"DEP Invites Comments On Air Quality Permit For 15 Natural Gas Generators For Iron City No. 2 Data Center In Beccaria Twp., Clearfield County","publisher":"PA Environment Digest","kind":"permit","retrievedAt":"2026-10-15"}]},{"id":"compute-iron-city-wells-karthaus-township-clearfield-pa","sourceRecordId":"iron-city-wells-karthaus-township-clearfield-pa","name":"Iron City Wells A.I. Data Center","operator":"Iron City Wells, LLC","city":"Karthaus Township","county":"Clearfield","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.1420054,"longitude":-78.1040324,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-city-wells-karthaus-township-clearfield-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://paenvironmentdaily.blogspot.com/2026/01/dep-issues-air-quality-permit-for-15.html","label":"DEP Issues Air Quality Permit For 15 Natural Gas Generators To Power Iron City Wells, LLC Data Center In Karthaus Twp., Clearfield County","publisher":"PA Environment Digest","kind":"permit","retrievedAt":"2026-09-12"}]},{"id":"compute-iron-mountain-wpa-1-boyers-butler-county-pa","sourceRecordId":"iron-mountain-wpa-1-boyers-butler-county-pa","name":"Iron Mountain WPA-1 (Boyers underground data center)","operator":"Iron Mountain","city":"Boyers","county":"Butler","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.0956,"longitude":-79.9128,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-wpa-1-boyers-butler-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenter.ironmountain.com/western-pennsylvania-data-center","label":"Iron Mountain — Western Pennsylvania Data Center (WPA-1)","publisher":"Iron Mountain","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://cleanview.co/data-centers/pennsylvania","label":"Data Centers in Pennsylvania — Project List & Locations (Iron Mountain WPA-1, Butler County)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-31"}]},{"id":"compute-jg-petrucci-1024-n-bradford-street-allentown-pa","sourceRecordId":"jg-petrucci-1024-n-bradford-street-allentown-pa","name":"J.G. Petrucci Allentown Data Center (1024 N. Bradford St.)","operator":"J.G. Petrucci Co.","city":"Allentown","county":"Lehigh","address":"1024 N. Bradford Street","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.6022552,"longitude":-75.4716115,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/jg-petrucci-1024-n-bradford-street-allentown-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/100mw-data-center-proposed-in-allentown-pennsylvania","label":"100MW Data Center Proposed In Allentown, Pennsylvania","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-klondike-wyalusing-data-center-bradford-pa","sourceRecordId":"klondike-wyalusing-data-center-bradford-pa","name":"Klondike Wyalusing Data Center","operator":"KDI Wyalusing Power LLC (Klondike Digital Infrastructure / New Fortress Energy)","city":"Wyalusing","county":"Bradford","address":"US Route 6","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.6966,"longitude":-76.244,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/klondike-wyalusing-data-center-bradford-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.northcentralpa.com/business/bradford-county-adopts-data-center-rules-wyalusing-hyperscale-projects-air-permit-issued/article_b09783c0-fc03-416b-b0a7-c6881f9616fd.html","label":"Bradford County adopts data center rules, Wyalusing hyperscale project's air permit issued","publisher":"NorthcentralPA.com","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-mcd7-limerick-township-montgomery-county-pa","sourceRecordId":"mcd7-limerick-township-montgomery-county-pa","name":"Limerick Township Data Center Campus (MCD 7)","operator":"MCD 7 LLC","city":"Limerick Township","county":"Montgomery","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.2447,"longitude":-75.573,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mcd7-limerick-township-montgomery-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.suburbanrealtorsalliance.com/news/2026/01/16/montgomery-county/limerick-gets-first-look-at-1.4m-square-foot-data-center-proposal/","label":"Limerick gets first look at 1.4M-square-foot data center proposal","publisher":"Suburban Realtors Alliance","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://6abc.com/post/limerick-board-supervisors-vote-send-letter-opposing-land-swap-proposed-data-center/18440961/","label":"Limerick Board of Supervisors vote to send a letter opposing a land swap for proposed data center","publisher":"6abc Philadelphia (WPVI)","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-lower-mount-bethel-tech-center-northampton-pa","sourceRecordId":"lower-mount-bethel-tech-center-northampton-pa","name":"Lower Mount Bethel Tech Center","operator":"Peron Development / J.G. Petrucci Co.","city":"Lower Mount Bethel Township","county":"Northampton","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.8015773,"longitude":-75.1572603,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lower-mount-bethel-tech-center-northampton-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wfmz.com/news/area/lehighvalley/northampton-county/slate-belt/we-will-fight-until-the-end-lower-mt-bethel-residents-pack-data-center-town-hall/article_d2b0dca6-fae7-4c83-bc29-bfbe42761882.html","label":"'We will fight until the end': Lower Mt. Bethel residents pack data center town hall","publisher":"WFMZ-TV 69 News","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-lumen-norristown-pa","sourceRecordId":"lumen-norristown-pa","name":"Lumen Norristown","operator":"Lumen Technologies","city":"Norristown","county":"Montgomery","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.127067,"longitude":-75.4086586,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-norristown-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-norristown","label":"Baxtel facility profile — Lumen Norristown","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/366049843","label":"OpenStreetMap way/366049843","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-prospect-rd-misty-hollow-forward-township-butler-pa","sourceRecordId":"prospect-rd-misty-hollow-forward-township-butler-pa","name":"Misty Hollow Energy and Data Campus","operator":"Prospect RD LLC","city":"Prospect","county":"Butler","address":"614 Prospect Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.8079,"longitude":-80.0558,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prospect-rd-misty-hollow-forward-township-butler-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.butlereagle.com/20260918/massive-data-center-proposed-in-forward-township/","label":"Massive data center proposed in Forward Township","publisher":"Butler Eagle","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-mlp-ventures-plymouth-township-conshohocken-pa","sourceRecordId":"mlp-ventures-plymouth-township-conshohocken-pa","name":"MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)","operator":"MLP Ventures","city":"Conshohocken","county":"Montgomery","address":"900 Conshohocken Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.086,"longitude":-75.312,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mlp-ventures-plymouth-township-conshohocken-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572","label":"Battle begins over proposed data center in Plymouth Township","publisher":"Metro Philadelphia","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.chestnuthilllocal.com/stories/developer-proposes-another-hyperscale-data-center-in-montco,40801","label":"Developer proposes another hyperscale data center in MontCo","publisher":"The Chestnut Hill Local","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://northpennnow.com/news/2025/oct/07/proposed-data-center-in-plymouth-township-faces-roadblocks/","label":"Proposed data center in Plymouth Township faces roadblocks","publisher":"North Penn Now","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://www.suburbanrealtorsalliance.com/news/2026/05/08/montgomery-county/conshohocken-area-data-center-plans-resubmitted-in-plymouth-township/","label":"Conshohocken area data center plans resubmitted in Plymouth Township","publisher":"Suburban Realtors Alliance","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://www.nbcphiladelphia.com/news/local/proposed-data-center-faces-renewed-opposition-in-plymouth-township/4444474/","label":"Plymouth Township data center fight continues","publisher":"NBC10 Philadelphia","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-mudiita-ransom-township-lackawanna-pa","sourceRecordId":"mudiita-ransom-township-lackawanna-pa","name":"Mudiita Ransom Township Data Center Campus","operator":"Mudiita Land Venture LLC","city":"Ransom Township","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.4483,"longitude":-75.7375,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mudiita-ransom-township-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/ransom-township-could-host-930-acre-data-centre-campus","label":"Ransom Township Could Host 930-Acre Data Centre Campus","publisher":"Baxtel","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus","label":"Future of Ransom Twp. property uncertain as Carbon County developer says 'no plans' for data center campus","publisher":"WVIA","kind":"press","retrievedAt":"2026-08-17"}]},{"id":"compute-muncy-data-center-lycoming-county-pa","sourceRecordId":"muncy-data-center-lycoming-county-pa","name":"Muncy Data Center","operator":"Danko Holdings II","city":"Muncy","county":"Lycoming","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.23,"longitude":-76.804,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/muncy-data-center-lycoming-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sungazette.com/news/top-news/2026/06/site-plan-offers-details-on-data-center-proposal/","label":"Site plan offers details on Muncy data center proposal","publisher":"Williamsport Sun-Gazette","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.sungazette.com/uncategorized/2026/06/data-center-proposed-in-muncy-township/","label":"Data center proposed in Muncy Township","publisher":"Williamsport Sun-Gazette","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.northcentralpa.com/business/neighbors-100-against-proposed-muncy-data-center/article_bec0e4a8-6ab8-4933-b96b-eacb2d0023ab.html","label":"Neighbors '100% against' proposed Muncy data center","publisher":"NorthcentralPa.com","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.sungazette.com/news/top-news/2026/07/legal-notice-claims-deemed-approval-for-muncy-township-data-center/","label":"Legal notice claims deemed approval for Muncy Township data center","publisher":"Williamsport Sun-Gazette","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://postindustrial.com/stories/data-center-developers-want-to-build-in-three-pa-communities-each-has-its-own-experience/","label":"Data center developers want to build in three PA communities. Each has its own experience.","publisher":"Postindustrial","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-netrality-401-north-broad-philadelphia-pa","sourceRecordId":"netrality-401-north-broad-philadelphia-pa","name":"Netrality 401 North Broad","operator":"Netrality Data Centers","city":"Philadelphia","county":"Philadelphia","address":"401 North Broad Street","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":39.9601,"longitude":-75.1619,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/netrality-401-north-broad-philadelphia-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://netrality.com/data-center/401-north-broad-philadelphia/","label":"Philadelphia Pennsylvania Data Center, 401 North Broad St","publisher":"Netrality Data Centers","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-popca-newton-township-data-center-lackawanna-pa","sourceRecordId":"popca-newton-township-data-center-lackawanna-pa","name":"Newton Township Data Center Campus (Newton Road)","operator":"Popca LLC","city":"Newton Township","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.4539024,"longitude":-75.7539478,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/popca-newton-township-data-center-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvia.org/news/local/2026-04-10/proposed-newton-data-center-campus-is-10th-planned-for-lackawanna-county","label":"Proposed Newton data center campus is 10th planned for Lackawanna County","publisher":"WVIA","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-panther-creek-hpc-ai-campus-nesquehoning-pa","sourceRecordId":"panther-creek-hpc-ai-campus-nesquehoning-pa","name":"Panther Creek HPC/AI Data Center Campus","operator":"Bitfarms Ltd.","city":"Nesquehoning","county":"Carbon","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.8564,"longitude":-75.8283,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/panther-creek-hpc-ai-campus-nesquehoning-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investor.bitfarms.com/news-releases/news-release-details/bitfarms-announces-partnership-t5-data-centers-advance-hpcai","label":"Bitfarms Announces Partnership with T5 Data Centers to Advance HPC/AI Development at Panther Creek Campus","publisher":"Bitfarms Ltd.","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://paenvironmentdaily.blogspot.com/2025/08/bitfarms-announces-partnership-to.html","label":"Bitfarms Announces Partnership To Develop A.I. Data Center At Panther Creek Waste Coal-Fired Power Plant In Carbon County","publisher":"PA Environment Digest","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://investor.bitfarms.com/news-releases/news-release-details/bitfarms-converts-macquarie-debt-facility-300m-project-financing","label":"Bitfarms Converts Macquarie Debt Facility to $300M Project Financing and Draws Additional $50M to Accelerate HPC/AI Development at Panther Creek Campus","publisher":"Bitfarms Ltd.","kind":"filing","retrievedAt":"2026-08-31"},{"url":"https://finance.yahoo.com/news/local-officials-greenlight-bitfarms-panther-142555915.html","label":"Local officials greenlight Bitfarms Panther Creek AI data center","publisher":"Times News Online (via Yahoo Finance)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.wfmz.com/news/area/poconos-coal/carbon-county/public-meeting-to-be-held-thursday-on-data-center-proposal-in-carbon-county/article_246d8c60-4536-4460-a05c-b4f8b7fe86d8.html","label":"Public meeting to be held Thursday on data center proposal in Carbon County","publisher":"WFMZ-TV 69 News","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.tnonline.com/20260422/nesquehoning-data-center-plans-need-work/","label":"Nesquehoning data center plans need work","publisher":"Times News Online","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-powerhouse-pax-carlisle-pa","sourceRecordId":"powerhouse-pax-carlisle-pa","name":"PAX — Pennsylvania Digital I","operator":"PowerHouse Data Centers","city":"Carlisle","county":"Cumberland","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.2015,"longitude":-77.1889,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-pax-carlisle-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.globenewswire.com/news-release/2025/07/15/3115977/0/en/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania.html","label":"Pennsylvania Data Center Partners and PowerHouse Data Centers launch JV to build 1.35 GW hyperscale campus in Carlisle","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.powerhousedata.com/news/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania","label":"PA Data Center Partners and PowerHouse launch 1.35 GW Carlisle JV","publisher":"PowerHouse Data Centers","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.commondreams.org/news/data-center-pennsylvania-town","label":"Data center's $14.1M deal to consume 40% of a PA town's excess water","publisher":"Common Dreams","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.govtech.com/artificial-intelligence/cumberland-county-pa-data-centers-take-new-step-forward","label":"Cumberland County, PA data centers take new step forward","publisher":"Government Technology","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://protectcumberlandcountypa.org/middlesex/","label":"Middlesex Township data center overlay","publisher":"Protect Cumberland County PA","kind":"other","retrievedAt":"2026-07-08"},{"url":"https://www.globenewswire.com/news-release/2025/07/15/3115977/0/en/Pennsylvania-Data-Center-Partners-and-PowerHouse-Data-Centers-Launch-Joint-Venture-to-Build-Next-Gen-1-35-GW-Hyperscale-Data-Center-Campus-in-Carlisle-Pennsylvania.html","label":"PA Data Center Partners and PowerHouse launch JV for 1.35 GW hyperscale campus in Carlisle","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://constructionreviewonline.com/450-mw-substation-approved-for-15b-pennsylvania-digital-i-pax-ai-data-center-in-carlisle/","label":"450 MW substation approved for $15B Pennsylvania Digital I (PAX) AI data center in Carlisle","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-08-02"}]},{"id":"compute-pennhurst-data-center-east-vincent-chester-county-pa","sourceRecordId":"pennhurst-data-center-east-vincent-chester-county-pa","name":"Pennhurst Data Center Campus","operator":"Penn Hurst Holdings","city":"Spring City","county":"Chester","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.193717,"longitude":-75.560162,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pennhurst-data-center-east-vincent-chester-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://philadelphia.today/2026/03/pennhurst-data-center-plan/","label":"Pennhurst Data Center Developers Add 600,000 Square Feet, Gas Plant in Last-Minute Revision","publisher":"PHILADELPHIA.Today","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://vista.today/2026/05/east-vincent-pennhurst-data-center-rejected/","label":"East Vincent Says No to Pennhurst Data Center, But the Fight May Not Be Over","publisher":"VISTA.Today","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://philadelphia.today/2026/07/pennhurst-data-center-appeal-east-vincent/","label":"Penn Hurst Holdings Takes Data Center Fight to Chester County Court","publisher":"PHILADELPHIA.Today","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-pnk-great-stream-commons-gregg-township-union-pa","sourceRecordId":"pnk-great-stream-commons-gregg-township-union-pa","name":"PNK Great Stream Commons Data Center Campus (Allenwood)","operator":"PNK Group","city":"Allenwood","county":"Union","address":"Enterprise Boulevard","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.1161,"longitude":-76.9011,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pnk-great-stream-commons-gregg-township-union-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wkok.com/gregg-township-to-decide-data-center-proposal/","label":"Gregg Township To Decide Data Center Proposal","publisher":"WKOK","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-stonebridge-powder-mills-lawrence-county-pa","sourceRecordId":"stonebridge-powder-mills-lawrence-county-pa","name":"Powder Mills Data Center Campus","operator":"Stonebridge Associates","city":null,"county":"Lawrence","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.9915328,"longitude":-80.4272333,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stonebridge-powder-mills-lawrence-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-campus-proposed-at-former-dynamite-factory-site-in-lawrence-county-pennsylvania/","label":"Data center campus proposed at former dynamite factory site in Lawrence County, Pennsylvania","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.ncnewsonline.com/news/local_news/stonebridge-presents-data-center-plans-details/article_5dd3c006-0eb3-466f-92fb-c5241f737d3e.html","label":"Stonebridge presents data center plans, details","publisher":"New Castle News (ncnewsonline.com)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://gis.leoc.net:6443/arcgis/rest/services/LAWRENCEGIS/TaxParcelCAMA/MapServer/1/query?where=CONTROLNUM%3D%2726132000%27&outFields=*&f=json","label":"Lawrence County parcel/GIS record (parcel 26132000)","publisher":"Lawrence County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-prime-data-centers-starpointe-hanover-township-washington-pa","sourceRecordId":"prime-data-centers-starpointe-hanover-township-washington-pa","name":"Prime Data Centers Starpointe Campus","operator":"Prime Data Centers LLC","city":"Hanover Township","county":"Washington","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.421072,"longitude":-80.4645098,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prime-data-centers-starpointe-hanover-township-washington-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.heraldstandard.com/news/local_news/2026/sep/02/developer-details-expansive-starpointe-data-center-proposal/","label":"Developer details expansive Starpointe data center proposal","publisher":"Herald-Standard","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-cde-acquisitions-project-atlas-south-whitehall-lehigh-pa","sourceRecordId":"cde-acquisitions-project-atlas-south-whitehall-lehigh-pa","name":"Project Atlas Data Center Campus (South Whitehall Township)","operator":"CDE Acquisitions, LLC","city":"South Whitehall Township","county":"Lehigh","address":"2747 North Cedar Crest Boulevard","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.6400848,"longitude":-75.5443246,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cde-acquisitions-project-atlas-south-whitehall-lehigh-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wfmz.com/news/area/lehighvalley/lehigh-county/allentown-area/plans-change-for-proposed-south-whitehall-data-center-here-s-what-s-on-the-table/article_5016b739-5f4e-497a-adfc-9c9811b8f980.html","label":"Plans change for proposed South Whitehall data center; here's what's on the table now","publisher":"WFMZ-TV 69 News","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/","label":"Residents push for public hearing as South Whitehall takes new look at hyperscale data center","publisher":"Lehigh Valley Public Media","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-project-gravity-archbald-lackawanna-county-pa","sourceRecordId":"project-gravity-archbald-lackawanna-county-pa","name":"Project Gravity","operator":"Archbald 25 Developer LLC","city":"Archbald","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.5,"longitude":-75.55,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-gravity-archbald-lackawanna-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting","label":"No tenant yet: Archbald data center developer answers questions about project applications","publisher":"WVIA","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-16-million-sq-ft-data-center-campus-in-northeast-pennsylvania/","label":"Plans filed for 1.6 million sq ft data center campus in northeast Pennsylvania","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.desmog.com/2026/03/11/data-centers-are-poised-to-engulf-a-pennsylvania-town/","label":"DeSmog — \"Data centers are poised to engulf a Pennsylvania town\"","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-project-hazelnut-hazle-township-pa","sourceRecordId":"project-hazelnut-hazle-township-pa","name":"Project Hazelnut","operator":"NorthPoint Development (NP Hazleton Holdings 1 LLC)","city":"Hazle Township","county":"Luzerne","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.985,"longitude":-75.955,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-hazelnut-hazle-township-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/northpoint-proposes-15-building-1280-acre-data-center-campus-in-pennsylvania/","label":"Northpoint proposes 15-building, 1,280-acre data center campus in Pennsylvania","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.foodandwaterwatch.org/2026/06/09/hazle-township-pa-pauses-data-center-development-for-six-months/","label":"Hazle Township, PA Pauses Data Center Development for Six Months","publisher":"Food & Water Watch","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.psdispatch.com/news/103461/hazle-township-data-center-developer-announces-community-development-package","label":"Hazle Township data center developer announces community development package","publisher":"The Sunday Dispatch","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://poweredbywho.com/projects/project-hazelnut-hazle-twp-denied-on-appeal-525adf43","label":"Project Hazelnut (Hazle Twp - Denied, On Appeal)","publisher":"PoweredByWho","kind":"other","retrievedAt":"2026-07-09"},{"url":"https://projecthazelnut.com/","label":"Project Hazelnut - official project site","publisher":"NorthPoint Development","kind":"other","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.wvia.org/news/local/2026-02-18/residents-raise-questions-as-developer-describes-hazle-twp-data-center-plans-at-dep-hearing","label":"Residents raise questions as developer describes Hazle Twp. data center plans at DEP hearing","publisher":"WVIA","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-iep-hummingbird-data-center-campus-greene-county-pa","sourceRecordId":"iep-hummingbird-data-center-campus-greene-county-pa","name":"Project Hummingbird Data Center Campus (former Robena Mine)","operator":"International Electric Power","city":"Greensboro","county":"Greene","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":39.79,"longitude":-79.92,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iep-hummingbird-data-center-campus-greene-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.observer-reporter.com/news/local-news/2026/sep/25/monongahela-township-residents-seek-more-chances-for-input-on-data-center-project/","label":"Monongahela Township residents seek more chances for input on data center project","publisher":"Observer-Reporter","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-prologis-allen-township-northampton-pa","sourceRecordId":"prologis-allen-township-northampton-pa","name":"Prologis Allen Township Data Center (2500 Liberty Drive)","operator":"Prologis","city":"Allen Township","county":"Northampton","address":"2500 Liberty Drive","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.7017264,"longitude":-75.4801064,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prologis-allen-township-northampton-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.lehighvalleypublicmedia.org/northampton-county/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center","label":"Allen Township warehouse could become Lehigh Valley's first hyperscale data center","publisher":"Lehigh Valley Public Media","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-qts-salem-township-luzerne-pa","sourceRecordId":"qts-salem-township-luzerne-pa","name":"QTS Salem Township Data Center Campus (Salem 2)","operator":"QTS Data Centers","city":"Salem Township","county":"Luzerne","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.1078249,"longitude":-76.1791155,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-salem-township-luzerne-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","label":"Developers tout impacts of 3 data center campuses; Zoning meeting set for Wednesday on 4-3 Glenbrook Group project","publisher":"Times Leader","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-quantm-group-2401-w-emaus-avenue-allentown-pa","sourceRecordId":"quantm-group-2401-w-emaus-avenue-allentown-pa","name":"Quantm Group Allentown Data Center (2401 W. Emaus Ave.)","operator":"Quantm Group LLC","city":"Allentown","county":"Lehigh","address":"2401 W. Emaus Ave.","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.566986,"longitude":-75.473678,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/quantm-group-2401-w-emaus-avenue-allentown-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wfmz.com/news/area/lehighvalley/lehigh-county/allentown-area/allentown-planners-examine-developer-s-changes-to-emaus-avenue-data-center-proposal/article_82e86912-d655-48ab-a45f-4fbb511adc49.html","label":"Allentown planners examine developer's changes to Emaus Avenue data center proposal","publisher":"WFMZ-TV 69 News","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-renaissance-park-upper-merion-king-of-prussia-pa","sourceRecordId":"renaissance-park-upper-merion-king-of-prussia-pa","name":"Renaissance Park and Innovation Data Center Campus","operator":"MLP Ventures","city":"King of Prussia","county":"Montgomery","address":"411 Swedeland Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.092,"longitude":-75.347,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/renaissance-park-upper-merion-king-of-prussia-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://6abc.com/post/proposed-king-prussia-data-center-campus-faces-renewed-scrutiny-review-continues/19560357/","label":"Proposed King of Prussia data center campus faces renewed scrutiny as review continues","publisher":"6abc Philadelphia","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.desmog.com/2026/08/07/how-pennsylvania-governors-office-helped-push-for-huge-data-centers-in-the-philadelphia-suburbs/","label":"How Pennsylvania Governor's Office Helped Push for Huge Data Centers in the Philadelphia Suburbs","publisher":"DeSmog","kind":"press","retrievedAt":"2026-08-17"}]},{"id":"compute-scranton-materials-ransom-township-data-center-lackawanna-pa","sourceRecordId":"scranton-materials-ransom-township-data-center-lackawanna-pa","name":"Scranton Materials Data Center Campus (819 Newton Road quarry)","operator":"Scranton Materials LLC","city":"Ransom Township","county":"Lackawanna","address":"819 Newton Road","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.440033,"longitude":-75.704129,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/scranton-materials-ransom-township-data-center-lackawanna-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus","label":"Future of Ransom Twp. property uncertain as developer says 'no plans' for data center campus","publisher":"WVIA","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.wvia.org/news/local/2026-04-10/proposed-newton-data-center-campus-is-10th-planned-for-lackawanna-county","label":"Proposed Newton data center campus is 10th planned for Lackawanna County","publisher":"WVIA","kind":"press","retrievedAt":"2026-10-15"}]},{"id":"compute-keel-scrubgrass-ai-campus-venango-pa","sourceRecordId":"keel-scrubgrass-ai-campus-venango-pa","name":"Scrubgrass AI/HPC Data Center Campus","operator":"Keel Infrastructure Corp. (formerly Bitfarms)","city":"Scrubgrass Township","county":"Venango","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.2306,"longitude":-79.8517,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/keel-scrubgrass-ai-campus-venango-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/","label":"Scrubgrass could become area's largest AI data center campus","publisher":"exploreClarion","kind":"press","retrievedAt":"2026-10-15"},{"url":"https://www.keelinfra.com/campuses/scrubgrass","label":"Scrubgrass Campus","publisher":"Keel Infrastructure","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-sentinel-east-whiteland-chester-county-pa","sourceRecordId":"sentinel-east-whiteland-chester-county-pa","name":"Sentinel East Whiteland Data Center","operator":"Sentinel Data Centers","city":"East Whiteland Township","county":"Chester","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.041,"longitude":-75.545,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sentinel-east-whiteland-chester-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cleanview.co/news/data-centers/sentinel-data-centers-announces-300-mw-sentinel-east-whiteland-data-center-in-pa-20260417","label":"Sentinel Data Centers announces 300 MW Sentinel East Whiteland Data Center in PA","publisher":"CleanView","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html","label":"Judge denies challenges to East Whiteland data center expansion","publisher":"Philadelphia Inquirer","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-project-20260730.html","label":"East Whiteland officials allow work to resume on data center planned for Superfund site","publisher":"The Philadelphia Inquirer","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.suburbanrealtorsalliance.com/news/2026/07/31/chester-county/data-center-construction-starts-then-stops-at-superfund-site-in-east-whiteland/","label":"Data center construction starts - then stops - at Superfund site in East Whiteland","publisher":"Suburban Realtors Alliance","kind":"press","retrievedAt":"2026-08-17"}]},{"id":"compute-aligned-shippingport-pa","sourceRecordId":"aligned-shippingport-pa","name":"Shippingport Industrial Park","operator":"Aligned Data Centers","city":"Shippingport","county":"Beaver","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.63,"longitude":-80.44,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-shippingport-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/shippingport-industrial-park/","label":"Shippingport Industrial Park data center campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://bcbizpa.com/data-centers-beaver-county-cant-seem-to-get-enough-of-them/","label":"Data Centers? Beaver County Can't Seem to Get Enough of Them","publisher":"Beaver County Business","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.cbsnews.com/pittsburgh/news/ai-infrastructure-beaver-valley/","label":"Beaver Valley could become center of AI infrastructure for region","publisher":"CBS Pittsburgh","kind":"press","retrievedAt":"2026-08-19"},{"url":"http://www.tmia.com/content/beaver-valley-becomes-data-center-target","label":"Beaver Valley becomes data center target (Post-Gazette reprint, byline Anya Litvak and Chloe Jad, Feb 8 2026)","publisher":"Pittsburgh Post-Gazette (via Three Mile Island Alert reprint)","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://community.triblive.com/news/3990268","label":"Shippingport data centers will be financial, health burdens on Beaver County residents","publisher":"TribLive (community op-ed by Elan Justice Pavlinich, Environmental Health Project)","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.globenewswire.com/news-release/2026/09/10/3359602/0/en/aligned-data-centers-and-shippingport-community-mark-revitalization-of-legacy-energy-site-with-groundbreaking-of-2-gw-project-phoenix-campus.html","label":"Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW \"Project Phoenix\" Campus","publisher":"Aligned Data Centers (GlobeNewswire)","kind":"press","retrievedAt":"2026-09-25"},{"url":"https://marcellusdrilling.com/2026/09/aligned-breaks-ground-on-10b-2-gw-data-center-in-beaver-county/","label":"Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver County","publisher":"Marcellus Drilling News","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-slate-belt-holdings-upper-mount-bethel-northampton-pa","sourceRecordId":"slate-belt-holdings-upper-mount-bethel-northampton-pa","name":"Slate Belt Holdings Data Center Campus (Upper Mount Bethel)","operator":"Slate Belt Holdings LLC (Talen Energy / River Pointe Logistics joint venture)","city":"Upper Mount Bethel Township","county":"Northampton","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.9,"longitude":-75.13,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/slate-belt-holdings-upper-mount-bethel-northampton-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/","label":"Talen looks to develop 23-building data center campus in Pennsylvania","publisher":"BIC Magazine","kind":"press","retrievedAt":"2026-08-31"}]},{"id":"compute-depg-smithfield-gateway-data-center-monroe-pa","sourceRecordId":"depg-smithfield-gateway-data-center-monroe-pa","name":"Smithfield Gateway Data Center","operator":"DEPG Mosier Associates LP / DEPG of Shawnee II LP","city":"East Stroudsburg","county":"Monroe","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.0206,"longitude":-75.1778,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/depg-smithfield-gateway-data-center-monroe-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://smithfieldtownship.com/odp/gatewaydc/","label":"Smithfield Gateway Data Center – Conditional Use (township application page)","publisher":"Smithfield Township, Monroe County","kind":"permit","retrievedAt":"2026-09-25"}]},{"id":"compute-inch-eastern-land-south-annville-lebanon-pa","sourceRecordId":"inch-eastern-land-south-annville-lebanon-pa","name":"South Annville Township Data Center Campus (withdrawn)","operator":"Inch & Co. / Eastern Land & Resources Co. (1235 Martina Drive Owner)","city":"South Annville Township","county":"Lebanon","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.290713,"longitude":-76.5192514,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/inch-eastern-land-south-annville-lebanon-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lebtown.com/2026/05/13/south-annville-twp-data-center-project-scrapped-after-grass-roots-opposition/","label":"South Annville Twp. data center project scrapped after grass-roots opposition","publisher":"LebTown","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-allegheny-dc-springdale-cheswick-pa","sourceRecordId":"allegheny-dc-springdale-cheswick-pa","name":"Springdale Data Center (former Cheswick Generating Station)","operator":"Allegheny DC Property Co., LLC","city":"Springdale","county":"Allegheny","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.5425,"longitude":-79.7844,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/allegheny-dc-springdale-cheswick-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wesanews.org/environment-energy/2025-09-29/allegheny-county-springdale-cheswick-data-center-concern","label":"Coal plant to data center: Allegheny County community voices concern","publisher":"90.5 WESA","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.alleghenyfront.org/allegheny-county-springdale-cheswick-power-plant-community-concern/","label":"From coal plant to data center: An Allegheny County community voices concern","publisher":"The Allegheny Front","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.blackridgeresearch.com/news-releases/pennsylvania-data-center-plans-face-delays-as-officials-review-former-power-station-project-us","label":"Pennsylvania data center plans face delays as officials review former power station project","publisher":"BlackRidge Research","kind":"other","retrievedAt":"2026-08-17"},{"url":"https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/","label":"Springdale data center gets green light","publisher":"The Allegheny Front","kind":"press","retrievedAt":"2026-09-12"}]},{"id":"compute-suncap-stowe-township-allegheny-county-pa","sourceRecordId":"suncap-stowe-township-allegheny-county-pa","name":"Stowe Township Data Center (former railcar plant)","operator":"SunCap Industries","city":"Stowe Township","county":"Allegheny","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.469,"longitude":-80.064,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/suncap-stowe-township-allegheny-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wpxi.com/news/local/stowe-township-community-expresses-concerns-over-data-center-proposal/F3UN7MXY3RD2DMMTPZDZR6VVXM/","label":"Stowe Township community expresses concerns over data center proposal","publisher":"WPXI","kind":"press","retrievedAt":"2026-08-17"}]},{"id":"compute-talen-montour-data-center-campus-montour-county-pa","sourceRecordId":"talen-montour-data-center-campus-montour-county-pa","name":"Talen Energy Montour Data Center Campus","operator":"Talen Energy","city":"Washingtonville","county":"Montour","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.05,"longitude":-76.67,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/talen-montour-data-center-campus-montour-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.northcentralpa.com/business/talen-energy-officials-address-community-concerns-about-rezoning/article_18cf27f5-6015-4978-a910-593e02b43c79.html","label":"Talen Energy officials address community concerns about rezoning","publisher":"NorthcentralPA.com","kind":"press","retrievedAt":"2026-08-31"},{"url":"http://paenvironmentdaily.blogspot.com/2026/08/dep-invites-comments-on-air-permit-for.html","label":"DEP Invites Comments On Air Permit For Montour CT Natural Gas Power Plant Expansion In Montour County To Feed Data Centers","publisher":"PA Environment Digest","kind":"permit","retrievedAt":"2026-08-31"}]},{"id":"compute-tecfusions-keystone-connect-upper-burrell-pa","sourceRecordId":"tecfusions-keystone-connect-upper-burrell-pa","name":"TECfusions Keystone Connect","operator":"TECfusions","city":"Upper Burrell Township","county":"Westmoreland","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.5817,"longitude":-79.705,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tecfusions-keystone-connect-upper-burrell-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/tecfusions-unveils-massive-1400-acre-data-center-project-in-pennsylvania-revitalizing-former-industrial-plant-302350041.html","label":"TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant","publisher":"TECfusions via PR Newswire","kind":"press","retrievedAt":"2026-08-17"},{"url":"https://www.cleanview.co/data-centers/pennsylvania","label":"Data Centers in Pennsylvania — Project List & Locations (TECfusions Keystone Connect, Westmoreland, 3,000 MW planned)","publisher":"Cleanview","kind":"other","retrievedAt":"2026-08-17"},{"url":"https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/","label":"Upper Burrell residents decry transparency as data center progresses despite moratorium and a lawsuit","publisher":"PublicSource","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-tierpoint-allentown-tekpark-breinigsville-pa","sourceRecordId":"tierpoint-allentown-tekpark-breinigsville-pa","name":"TierPoint Allentown TekPark","operator":"TierPoint","city":"Breinigsville","county":"Lehigh","address":"9999 Hamilton Boulevard","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.5384,"longitude":-75.6288,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-allentown-tekpark-breinigsville-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/tekpark-campus/","label":"TekPark Data Center Campus — TierPoint","publisher":"TierPoint","kind":"other","retrievedAt":"2026-08-17"}]},{"id":"compute-tierpoint-philadelphia-phi-league-island-pa","sourceRecordId":"tierpoint-philadelphia-phi-league-island-pa","name":"TierPoint Philadelphia Data Center (PHI)","operator":"TierPoint","city":"Philadelphia","county":"Philadelphia","address":"4775 League Island Boulevard","state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":39.892327,"longitude":-75.166546,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-philadelphia-phi-league-island-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/philadelphia/","label":"TierPoint Philadelphia Data Center (PHI)","publisher":"TierPoint","kind":"other","retrievedAt":"2026-10-15"}]},{"id":"compute-tierpoint-valley-forge-pa","sourceRecordId":"tierpoint-valley-forge-pa","name":"TierPoint Valley Forge","operator":"TierPoint","city":"Norristown","county":"Montgomery","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.1218812,"longitude":-75.4208776,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-valley-forge-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/valley-forge/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1109881281","label":"OpenStreetMap way/1109881281","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-triboro-industrial-park-jessup-olyphant-lackawanna-county-pa","sourceRecordId":"triboro-industrial-park-jessup-olyphant-lackawanna-county-pa","name":"Triboro Industrial Park / Triboro Commerce Park","operator":"Ercor Triboro LLC (Sansone Group)","city":"Jessup / Olyphant","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.45,"longitude":-75.58,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/triboro-industrial-park-jessup-olyphant-lackawanna-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","label":"PPL Electric Utilities confirms data centers spurred transmission project in Lackawanna County","publisher":"WVIA","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://thetimes-tribune.com/2026/04/29/firm-linked-to-denaples-challenges-olyphant-over-data-center-zoning/","label":"The Times-Tribune — \"Firm linked to DeNaples challenges Olyphant over data center zoning\" (corroborated by lackawannacounty.com settlement coverage)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-tron-usa-ai-campus-titus-station-cumru-berks-pa","sourceRecordId":"tron-usa-ai-campus-titus-station-cumru-berks-pa","name":"TRON USA AI Campus (former Titus Station)","operator":"Titus Development Company / Go Energy Group","city":"Reading","county":"Berks","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.2839,"longitude":-75.9372,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tron-usa-ai-campus-titus-station-cumru-berks-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/","label":"Titus Station redevelopment project in Berks County planned as AI infrastructure campus","publisher":"Berks Weekly","kind":"press","retrievedAt":"2026-09-25"}]},{"id":"compute-wildcat-ridge-archbald-lackawanna-county-pa","sourceRecordId":"wildcat-ridge-archbald-lackawanna-county-pa","name":"Wildcat Ridge AI Data Center Campus","operator":"Cornell Realty Management","city":"Archbald","county":"Lackawanna","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":41.51,"longitude":-75.54,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wildcat-ridge-archbald-lackawanna-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.desmog.com/2026/03/11/data-centers-are-poised-to-engulf-a-pennsylvania-town/","label":"Data centers are poised to engulf a Pennsylvania town","publisher":"DeSmog","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.datacenterdynamics.com/en/news/21bn-data-center-campus-proposed-in-archbald-pennsylvania/","label":"$2.1bn data center campus proposed in Archbald, Pennsylvania","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ecp-york-2-energy-center-data-center-peach-bottom-york-pa","sourceRecordId":"ecp-york-2-energy-center-data-center-peach-bottom-york-pa","name":"York 2 Energy Center Data Center","operator":"Energy Capital Partners","city":"Peach Bottom Township","county":"York","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":39.75,"longitude":-76.35,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ecp-york-2-energy-center-data-center-peach-bottom-york-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-31","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/","label":"$5B data center coming to York County energy site","publisher":"Central Penn Business Journal","kind":"press","retrievedAt":"2026-08-31"},{"url":"https://www.yahoo.com/news/articles/heres-where-data-centers-proposed-120559817.html","label":"Here's where data centers have been proposed or discussed in York County — and their status","publisher":"York Daily Record (via Yahoo News)","kind":"press","retrievedAt":"2026-08-31"}]},{"id":"compute-cnx-zediker-station-south-strabane-washington-county-pa","sourceRecordId":"cnx-zediker-station-south-strabane-washington-county-pa","name":"Zediker Station Data Center Site","operator":"CNX Resources","city":"South Strabane Township","county":"Washington","address":null,"state":"PA","stateName":"Pennsylvania","jurisdictionType":"state","latitude":40.156,"longitude":-80.19,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cnx-zediker-station-south-strabane-washington-county-pa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington","label":"JLL announces major data center development site in Washington County, Pennsylvania","publisher":"JLL","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-edgeuno-sju1-san-juan-pr","sourceRecordId":"edgeuno-sju1-san-juan-pr","name":"EdgeUno SJU1","operator":"EdgeUno, Inc.","city":"San Juan","county":null,"address":"17 Calle Prudencio Rivera Martinez","state":"PR","stateName":"Puerto Rico","jurisdictionType":"territory","latitude":18.43004,"longitude":-66.05873,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeuno-sju1-san-juan-pr","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/7158","label":"EdgeUno Datacenter San Juan Puerto Rico (SJU1) — PeeringDB","publisher":null,"kind":"other","retrievedAt":"2026-09-13"},{"url":"https://edgeuno.com/locations/","label":"EdgeUno — Locations (SJU1)","publisher":"EdgeUno, Inc.","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-hub787-carolina-pr","sourceRecordId":"hub787-carolina-pr","name":"HUB787","operator":"HUB Advanced Networks","city":"Carolina","county":null,"address":"8030 Isla Verde Ave","state":"PR","stateName":"Puerto Rico","jurisdictionType":"territory","latitude":18.442021,"longitude":-66.021669,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hub787-carolina-pr","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.investpr.org/wp-content/uploads/2022/09/InvestPR_Landing-Pads_Hub-787_EN.pdf","label":"A landing pad primed for tech innovation — Hub787","publisher":"Invest Puerto Rico","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/fac/6107","label":"HUB787 Data Center — PeeringDB","publisher":null,"kind":"other","retrievedAt":"2026-09-13"},{"url":"https://hub.pr/services/hub-787.html","label":"HUB 787 — services page","publisher":"HUB Advanced Networks","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-brightstar-lottery-west-greenwich-ri","sourceRecordId":"brightstar-lottery-west-greenwich-ri","name":"Brightstar Lottery Enterprise Data Center (West Greenwich)","operator":"Brightstar Lottery PLC","city":"West Greenwich","county":"Kent","address":"47 Technology Way","state":"RI","stateName":"Rhode Island","jurisdictionType":"state","latitude":41.6584424,"longitude":-71.5703238,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/brightstar-lottery-west-greenwich-ri","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1619762/000162828026011083/igt-20251231.htm","label":"Brightstar Lottery PLC Form 20-F FY2025, Item 4.D Property, Plants and Equipment","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-10-26"},{"url":"https://www.sec.gov/Archives/edgar/data/1619762/000161976225000007/igt-20241231.htm","label":"International Game Technology PLC Form 20-F FY2024","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-10-26"},{"url":"https://nominatim.openstreetmap.org/search?q=47+Technology+Way,+West+Greenwich,+RI&format=json","label":"OpenStreetMap Nominatim geocode of 47 Technology Way, West Greenwich, RI","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-26"}]},{"id":"compute-hanton-city-smithfield-ri","sourceRecordId":"hanton-city-smithfield-ri","name":"Hanton City Business Park (data center anchor)","operator":"Hanton City Investments LLC","city":"Smithfield","county":"Providence","address":"George Washington Highway","state":"RI","stateName":"Rhode Island","jurisdictionType":"state","latitude":41.867,"longitude":-71.527,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hanton-city-smithfield-ri","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.oceanstatemedia.org/technology/proposed-data-center-still-looms-over-smithfield-even-after-town-council-enacts-ban","label":"Proposed data center still looms over Smithfield, even after town council enacts ban","publisher":"Ocean State Media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.valleybreeze.com/news/smithfield-puts-the-brakes-on-potential-data-center/article_cd279d3e-1bda-4e2e-b3ac-a716d776ab2f.html","label":"Smithfield puts the brakes on potential data center","publisher":"Valley Breeze","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://upriseri.com/article/smithfield-corporate-complex-appeal-pushed-to-january-2027/","label":"Smithfield Corporate Complex Appeal Pushed to January 2027","publisher":"Uprise RI","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.valleybreeze.com/news/smithfield-to-defend-decision-to-ban-data-center/article_835489a3-e09c-49ca-9bb0-bd860de9c280.html","label":"Smithfield to defend decision to ban data center (Oct 1, 2026)","publisher":"The Valley Breeze","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-lumen-providence-375-promenade-ri","sourceRecordId":"lumen-providence-375-promenade-ri","name":"Lumen Providence (375 Promenade St)","operator":"Lumen Technologies","city":"Providence","county":"Providence","address":"375 Promenade Street","state":"RI","stateName":"Rhode Island","jurisdictionType":"state","latitude":41.8295841,"longitude":-71.4251937,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-providence-375-promenade-ri","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/375-promenade-street-providence/lumen/datacenter/providence","label":"Inflect: Lumen Providence, 375 Promenade Street","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://baxtel.com/data-center/providence","label":"Baxtel: Providence data center market (Lumen Providence listed as operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://nominatim.openstreetmap.org/search?q=375+Promenade+Street,+Providence,+RI&format=json","label":"OpenStreetMap Nominatim geocode of 375 Promenade Street, Providence","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-26"}]},{"id":"compute-provdotnet-1155-westminster-providence-ri","sourceRecordId":"provdotnet-1155-westminster-providence-ri","name":"Prov.net 1155 Westminster St","operator":"Provdotnet LLC","city":"Providence","county":"Providence","address":"1155 Westminster Street","state":"RI","stateName":"Rhode Island","jurisdictionType":"state","latitude":41.8170824,"longitude":-71.4276628,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/provdotnet-1155-westminster-providence-ri","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/datacenters/usa/rhode-island/providence","label":"Inflect: Providence data centers (Prov.net PVD1, 1155 Westminster Street)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://baxtel.com/data-center/rhode-island","label":"Baxtel: Rhode Island data centers (Prov.net 1155 Westminster, operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://www.kadoa.com/datacenter/state/rhode-island","label":"Kadoa US Datacenter Tracker: Rhode Island (Provdotnet LLC, 1155 Westminster St)","publisher":"Kadoa","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://nominatim.openstreetmap.org/search?q=1155+Westminster+Street,+Providence,+RI&format=json","label":"OpenStreetMap Nominatim geocode of 1155 Westminster Street, Providence","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-26"}]},{"id":"compute-zayo-providence-ri1-235-promenade-ri","sourceRecordId":"zayo-providence-ri1-235-promenade-ri","name":"Providence RI1 (former Crown Castle Fiber / Lightower), The Foundry, 235 Promenade St","operator":"Zayo (formerly Crown Castle Fiber)","city":"Providence","county":"Providence","address":"235 Promenade Street","state":"RI","stateName":"Rhode Island","jurisdictionType":"state","latitude":41.8287005,"longitude":-71.4195134,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/zayo-providence-ri1-235-promenade-ri","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/235-promenade-street-providence/crown-castle/datacenter/lightower-fiber-networks-235-promenade","label":"Inflect: Crown Castle Fiber RI1, 235 Promenade Street","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://baxtel.com/data-center/providence","label":"Baxtel: Providence data center market (Crown Castle Providence RI1 listed as operational)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://www.sec.gov/Archives/edgar/data/0001051470/000105147026000052/cci-20260501.htm","label":"Crown Castle Inc. Form 8-K (May 1, 2026): completion of the fiber solutions business sale to the Zayo purchaser","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-10-26"},{"url":"https://nominatim.openstreetmap.org/search?q=235+Promenade+Street,+Providence,+RI&format=json","label":"OpenStreetMap Nominatim geocode of 235 Promenade Street (The Foundry), Providence","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-26"}]},{"id":"compute-zayo-providence-300-carpenter-ri","sourceRecordId":"zayo-providence-300-carpenter-ri","name":"Providence RI2 (former Crown Castle Fiber / Lightower), 300 Carpenter St","operator":"Zayo (formerly Crown Castle Fiber)","city":"Providence","county":"Providence","address":"300 Carpenter Street","state":"RI","stateName":"Rhode Island","jurisdictionType":"state","latitude":41.817914,"longitude":-71.428845,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/zayo-providence-300-carpenter-ri","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/300-carpenter-street-providence/crown-castle/datacenter/lightower-fiber-networks-providence-300-carpenter","label":"Inflect: Crown Castle Fiber RI2, 300 Carpenter Street","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://baxtel.com/data-center/crown-castle-providence-300-carpenter","label":"Baxtel: Crown Castle Providence 300 Carpenter","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-26"},{"url":"https://www.sec.gov/Archives/edgar/data/0001051470/000105147026000052/cci-20260501.htm","label":"Crown Castle Inc. Form 8-K (May 1, 2026): completion of the fiber solutions business sale to the Zayo purchaser","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-10-26"},{"url":"https://nominatim.openstreetmap.org/search?q=300+Carpenter+Street,+Providence,+RI&format=json","label":"OpenStreetMap Nominatim geocode of 300 Carpenter Street, Providence","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-26"}]},{"id":"compute-cielo-gaffney-cherokee-county-sc","sourceRecordId":"cielo-gaffney-cherokee-county-sc","name":"Cielo Digital Infrastructure Gaffney Campus","operator":"Cielo Digital Infrastructure, LLC","city":"Gaffney","county":"Cherokee","address":"Ford Road","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":35.0666365,"longitude":-81.5576062,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cielo-gaffney-cherokee-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development","label":"Cielo Digital Infrastructure selects Cherokee County for first South Carolina development project","publisher":"Office of the Governor of South Carolina","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://nominatim.openstreetmap.org/search?q=Ford+Road%2C+Gaffney%2C+Cherokee+County%2C+South+Carolina&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for Ford Road, Gaffney, Cherokee County, SC","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-26"},{"url":"https://scbiz.com/cielo-2b-data-center-cherokee-county/","label":"Digital infrastructure company to invest $2.1B in Cherokee County data center","publisher":null,"kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.sccommerce.com/news/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development-project","label":"Cielo Digital Infrastructure selects Cherokee County for first South Carolina development project","publisher":"South Carolina Department of Commerce","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.wistv.com/2025/06/24/companys-first-sc-data-center-be-built-cherokee-county/","label":"Company's first SC data center to be built in Cherokee County","publisher":"WIS","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://www.dcbyte.com/facility/gaffney/","label":"Gaffney facility profile (Cielo Digital Infrastructure)","publisher":"DC Byte","kind":"other","retrievedAt":"2026-10-27"}]},{"id":"compute-oppidan-clop-aiken-graniteville-sc","sourceRecordId":"oppidan-clop-aiken-graniteville-sc","name":"Clop Aiken Data Center (Sage Mill, Graniteville)","operator":"Oppidan Investment Company (Clop Aiken SC LLC)","city":"Graniteville","county":"Aiken","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.5637483,"longitude":-81.8078887,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oppidan-clop-aiken-graniteville-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wgac.com/2025/06/10/aiken-county-gives-green-light-to-32m-data-center-project-in-graniteville/","label":"Aiken County approves $32 million data center project in Graniteville","publisher":"WGAC","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://dcmap.us/states/south-carolina/","label":"dcmap.us — South Carolina data center map (Oppidan Sage Mill Industrial Park, Graniteville, under construction)","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-aib-clt-01-spartanburg-county-sc","sourceRecordId":"aib-clt-01-spartanburg-county-sc","name":"CLT-01 Campus (One Blockchain Spartanburg)","operator":"AIB Data Centers Inc. (One Blockchain LLC)","city":"Moore","county":"Spartanburg","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.8548673,"longitude":-82.0126849,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aib-clt-01-spartanburg-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/2070542/000121390026089151/ea0301093-10q_aibdata.htm","label":"AIB Data Centers Inc. Form 10-Q for the quarter ended 2026-06-30","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-10-10"},{"url":"https://baxtel.com/data-center/blockchain-spartanburg-sc","label":"Baxtel — BlockchAIn: Spartanburg, SC data center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://dcmap.us/states/south-carolina/","label":"dcmap.us — South Carolina data center map (One BlockchAIn Spartanburg, Moore, operational)","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-cogent-fairfax-allendale-county-sc","sourceRecordId":"cogent-fairfax-allendale-county-sc","name":"Cogent Fairfax Data Center","operator":"Cogent Communications","city":"Fairfax","county":"Allendale","address":"831 North Hampton Avenue","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":32.963731,"longitude":-81.236142,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-fairfax-allendale-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/fac/16624","label":"PeeringDB facility record: Cogent Fairfax","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-27"},{"url":"https://sclawyersweekly.com/news/2026/10/05/data-centers-near-the-south-carolina-lowcountry-what-to-know/","label":"Data centers near the South Carolina Lowcountry - What to know","publisher":"South Carolina Lawyers Weekly","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-dartpoints-charleston-ladson-sc","sourceRecordId":"dartpoints-charleston-ladson-sc","name":"DartPoints Charleston Data Center (CHS01)","operator":"DartPoints","city":"Ladson","county":"Charleston","address":"8480 Palmetto Commerce Parkway","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":32.9648939,"longitude":-80.1012147,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-charleston-ladson-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/locations/chs01-charleston-sc/","label":"DartPoints — Charleston, SC (CHS01) data center","publisher":"DartPoints","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.openstreetmap.org/way/648154126","label":"OpenStreetMap way 648154126 — DartPoints Charleston (telecom=data_center)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-dartpoints-columbia-sc","sourceRecordId":"dartpoints-columbia-sc","name":"DartPoints Columbia Data Center (CAE01)","operator":"DartPoints","city":"Columbia","county":"Richland","address":"1000 Catawba Street","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.9873119,"longitude":-81.0308106,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-columbia-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/locations/cae01-columbia-sc/","label":"DartPoints — Columbia, SC (CAE01) data center","publisher":"DartPoints","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.openstreetmap.org/node/12120745596","label":"OpenStreetMap node 12120745596 — DartPoints Columbia (telecom=data_center)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-dartpoints-greenville-sc","sourceRecordId":"dartpoints-greenville-sc","name":"DartPoints Greenville Data Center","operator":"DartPoints","city":"Greenville","county":"Greenville","address":"78 Global Drive","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.8075277,"longitude":-82.3434922,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-greenville-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations","label":"DartPoints expands Greenville County operations","publisher":"South Carolina Department of Commerce","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://nominatim.openstreetmap.org/search?q=78+Global+Drive%2C+Greenville%2C+SC&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for 78 Global Drive, Greenville, SC","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-26"},{"url":"https://greenvilleeconomicdevelopment.com/dartpoints-expands-greenville-county-operations/","label":"DartPoints Expands Greenville County Operations","publisher":"Greenville Area Development Corporation","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-dartpoints-spartanburg-sc","sourceRecordId":"dartpoints-spartanburg-sc","name":"DartPoints Spartanburg Data Center (SPA01)","operator":"DartPoints","city":"Spartanburg","county":"Spartanburg","address":"5700 North Blackstock Road","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.9965845,"longitude":-82.034841,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dartpoints-spartanburg-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dartpoints.com/locations/spa01-spartanburg-sc/","label":"DartPoints — Spartanburg, SC (SPA01) data center","publisher":"DartPoints","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.openstreetmap.org/way/680114725","label":"OpenStreetMap way 680114725 — DartPoints Spartanburg (telecom=data_center)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-dc-blox-camp-hall-berkeley-county-sc","sourceRecordId":"dc-blox-camp-hall-berkeley-county-sc","name":"DC BLOX Camp Hall Data Center Campus","operator":"DC BLOX","city":null,"county":"Berkeley","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.1595951,"longitude":-79.9070461,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-camp-hall-berkeley-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/","label":"DC BLOX Purchases Land and Secures Power in Berkeley County, South Carolina","publisher":"DC BLOX","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://scbiz.com/tech-company-to-build-200k-square-foot-data-center-in-berkeley-county/","label":"Tech company to build 200K-square-foot data center in Berkeley County","publisher":"SC Biz News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.lightwaveonline.com/data-center/article/14299551/dc-blox-sets-berkeley-county-south-carolina-as-its-next-data-center-site","label":"DC BLOX sets Berkeley County, South Carolina, as its next data center site","publisher":"Lightwave","kind":"press","retrievedAt":"2026-10-10"}]},{"id":"compute-dc-blox-greenville-sc","sourceRecordId":"dc-blox-greenville-sc","name":"DC BLOX Greenville Data Center","operator":"DC BLOX","city":"Greenville","county":"Greenville","address":"33 Global Drive","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.80455191966,"longitude":-82.342676840132,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-greenville-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/data-centers/greenville/","label":"DC BLOX Greenville Data Center","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-dc-blox-myrtle-beach-cls-sc","sourceRecordId":"dc-blox-myrtle-beach-cls-sc","name":"DC BLOX Myrtle Beach Cable Landing Station","operator":"DC BLOX","city":"Myrtle Beach","county":"Horry","address":"1401 Howard Avenue","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.6746096,"longitude":-78.9440697,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-myrtle-beach-cls-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/dc-blox-opens-myrtle-beach-cable-landing-station/","label":"DC BLOX Opens Myrtle Beach Cable Landing Station","publisher":"DC BLOX","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://nominatim.openstreetmap.org/search?q=Myrtle+Beach+International+Technology+and+Aerospace+Park%2C+Myrtle+Beach%2C+South+Carolina&format=json&limit=3","label":"OpenStreetMap Nominatim record for DC BLOX Myrtle Beach Cable Landing Station, 1401 Howard Avenue","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-26"},{"url":"https://www.dcblox.com/data-centers/myrtle-beach/","label":"DC BLOX Myrtle Beach Cable Landing Station (MYR1)","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.dcblox.com/dc-blox-to-expand-myrtle-beach-cable-landing-station/","label":"DC BLOX Set to Expand Myrtle Beach Cable Landing Station","publisher":"DC BLOX","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://governor.sc.gov/node/1266","label":"DC BLOX growing S.C. footprint with new data center in Horry County","publisher":"Office of the Governor of South Carolina","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-dc-blox-north-augusta-sc","sourceRecordId":"dc-blox-north-augusta-sc","name":"DC BLOX North Augusta Hyper Edge Data Center","operator":"DC BLOX","city":"North Augusta","county":"Aiken","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.4838645,"longitude":-81.9141182,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-north-augusta-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/","label":"DC BLOX to develop four Southeastern hyperscale edge node data centers","publisher":"DC BLOX","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://servercountry.org/data/projects/dc-blox-north-augusta-hyper-edge-facility-sc/","label":"Server Country — DC BLOX North Augusta Hyper Edge Facility project record","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-google-moncks-corner-sc","sourceRecordId":"google-moncks-corner-sc","name":"Google Berkeley County Data Center (Moncks Corner)","operator":"Google","city":"Moncks Corner","county":"Berkeley","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.072101,"longitude":-80.039105,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-moncks-corner-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.google/locations/berkeley-county-south-carolina/","label":"Google Berkeley County, South Carolina — official location page: 'one of our first data centers in the United States', operational since 2007","publisher":"Google","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.datacenterdynamics.com/en/news/google-signs-225mw-solar-energy-deal-with-sol-systems-for-north-south-carolina/","label":"Google signs 225MW solar energy deal with Sol Systems for North & South Carolina","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.postandcourier.com/business/2-new-solar-farms-are-being-built-in-orangeburg-county-1-will-fuel-google-data/article_5a858278-0c69-11ea-90d7-c75e0b9a8a91.html","label":"2 new solar farms are being built in Orangeburg County; 1 will fuel Google data center","publisher":null,"kind":"press","retrievedAt":"2026-09-21"},{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","label":"S.C. Governor Henry McMaster — Google grows South Carolina footprint with new Dorchester County operations, expansion in Berkeley County","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-google-ridgeville-sc","sourceRecordId":"google-ridgeville-sc","name":"Google Ridgeville Data Center (Project Dawson)","operator":"Google","city":"Ridgeville","county":"Dorchester","address":"Research Center Drive","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.096,"longitude":-80.3239,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-ridgeville-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-confirms-it-is-behind-project-dawson-data-center-campus-in-south-carolina/","label":"Google confirms it is behind Project Dawson data center campus in South Carolina","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","label":"Google grows South Carolina footprint with new Dorchester County operations – SC Governor press release","publisher":"SC Governor's Office","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://baxtel.com/data-center/google-ridgeville-sc","label":"Google: Ridgeville, SC Data Center (Project Dawson) — site record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.live5news.com/2024/10/15/dorchester-co-community-weigh-google-data-center-expansion-permits/","label":"Dorchester Co. community weighing in on Google data center expansion, permits","publisher":"Live 5 News (WCSC)","kind":"press","retrievedAt":"2026-10-21"},{"url":"https://crda.org/newsroom/google-expands-investment-in-dorchester-county/","label":"Google Expands Investment in Dorchester County (Charleston Regional Development Alliance, 2025-10-13)","publisher":"Charleston Regional Development Alliance","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://web.archive.org/web/20260729100110/https://www.dorchestercountysc.gov/business/data-center-fact-sheet","label":"Dorchester County, SC — Data Center Fact Sheet (archived copy captured 2026-07-29)","publisher":"Dorchester County, SC","kind":"other","retrievedAt":"2026-10-27"}]},{"id":"compute-google-winding-woods-st-george-sc","sourceRecordId":"google-winding-woods-st-george-sc","name":"Google Winding Woods Campus","operator":"Google","city":"St. George","county":"Dorchester","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.1843,"longitude":-80.5793,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-winding-woods-st-george-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-south-carolina-data-centers/","label":"Google to invest $9bn in South Carolina data centers","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/google-winding-woods","label":"Baxtel — Google: Winding Woods Data Center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-07-25"},{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","label":"Google grows South Carolina footprint with new Dorchester County operations – SC Governor press release","publisher":"SC Governor's Office","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://web.archive.org/web/20260608143212/https://www.dorchesterforbusiness.com/news/google_breaks_ground/","label":"Google breaks ground in Dorchester County (Dorchester County Economic Development, 2024-09-26; archived copy)","publisher":"Dorchester County Economic Development","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://crda.org/newsroom/google-expands-investment-in-dorchester-county/","label":"Google Expands Investment in Dorchester County (Charleston Regional Development Alliance, 2025-10-13)","publisher":"Charleston Regional Development Alliance","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://web.archive.org/web/20260729100110/https://www.dorchestercountysc.gov/business/data-center-fact-sheet","label":"Dorchester County, SC — Data Center Fact Sheet (archived copy captured 2026-07-29)","publisher":"Dorchester County, SC","kind":"other","retrievedAt":"2026-10-27"}]},{"id":"compute-lighthouse-data-centers-spartanburg-sc","sourceRecordId":"lighthouse-data-centers-spartanburg-sc","name":"LightHouse Data Centers Spartanburg (300 Jones Road)","operator":"LightHouse Data Centers (The Lightstone Group)","city":"Spartanburg","county":"Spartanburg","address":"300 Jones Road","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":35.0151258,"longitude":-81.8838447,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lighthouse-data-centers-spartanburg-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1844971/000162828025056519/pressreleasescsaleclosing.htm","label":"Greenidge Generation 8-K Ex-99.1 — closing of the South Carolina property sale to an affiliate of The Lightstone Group and LightHouse Data Centers","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-09-22"},{"url":"https://theenergymag.com/news/2025-12-03/greenidge-south-caroline-sale-bitcoin","label":"Greenidge sells South Carolina land and power rights","publisher":"The Energy Mag","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://baxtel.com/data-center/lighthouse-spartanburg-sc","label":"Baxtel — LightHouse: Spartanburg, SC data center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://www.foxcarolina.com/2026/08/26/spartanburg-county-zoning-board-upholds-denial-data-center-jones-road/","label":"Spartanburg County zoning board upholds denial of data center on Jones Road","publisher":"FOX Carolina","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/amp/","label":"LightHouse Data Centers proposal denied","publisher":"WSPA 7News","kind":"press","retrievedAt":"2026-10-10"}]},{"id":"compute-meta-aiken-county-sc","sourceRecordId":"meta-aiken-county-sc","name":"Meta Aiken Data Center","operator":"Meta","city":"Graniteville","county":"Aiken","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.5629,"longitude":-81.8287,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-aiken-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/meta-plans-800m-data-center-campus-in-aiken-county-south-carolina/","label":"Meta plans $800m data center campus in Aiken County, South Carolina","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.postandcourier.com/aikenstandard/business/meta-aiken-county-data-center-mcmaster/article_aaf0aa0c-64a8-11ef-a8f7-d389d536dea5.html","label":"Facebook owner Meta selects Aiken County for first South Carolina data center","publisher":"Post and Courier / Aiken Standard","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wfxg.com/news/aiken-data-center-nearing-completion/article_4facd65f-d825-463d-91b5-1ed60eca94f9.html","label":"Aiken data center nearing completion","publisher":"WFXG (Augusta/Aiken local news)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center","label":"Meta selects Aiken County for first South Carolina data center","publisher":"Office of the Governor of South Carolina","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.energytech.com/renewables/news/55311348/metas-first-data-center-in-south-carolina-connecting-to-100-mw-silicon-ranch-solar-project","label":"Meta's First Data Center in South Carolina Spurs New 100-MW Silicon Ranch Solar Project","publisher":"EnergyTech","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://www.postandcourier.com/aikenstandard/news/local/aiken-county-council-approves-incentives-for-huge-economic-development-project/article_093bf234-dead-11ed-ba09-87505aeaac4a.html","label":"Aiken County Council approves incentives for huge economic development project (April 19, 2023)","publisher":"Aiken Standard (Post and Courier)","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.postandcourier.com/aikenstandard/opinion/columns/meta-facebook-aiken-williams-economic-development/article_1c8a7a4a-6ba6-11ef-85c9-3336ccef84e6.html","label":"Column: A lot of patience, a little luck helped bring Meta to Aiken County (September 7, 2024)","publisher":"Aiken Standard (Post and Courier)","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-northmark-valara-spartanburg-sc","sourceRecordId":"northmark-valara-spartanburg-sc","name":"NorthMark Strategies Spartanburg High-Performance Computing Center","operator":"Valara Holdings (NorthMark Strategies)","city":"Spartanburg","county":"Spartanburg","address":"4000 South Pine Street","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.923066,"longitude":-81.851905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/northmark-valara-spartanburg-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spectrumlocalnews.com/sc/south-carolina/news/2026/04/23/south-carolina-news-data-center-power-generation-scdes","label":"Spartanburg data center requests additional equipment for larger power capacity","publisher":"Spectrum News 1 South Carolina","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://nominatim.openstreetmap.org/search?q=4000+South+Pine+Street%2C+Spartanburg%2C+SC&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for 4000 South Pine Street, Spartanburg, SC","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-26"},{"url":"https://www.postandcourier.com/spartanburg/news/spartanburg-data-center-northmark-water-power/article_07cc2de8-9eb6-4711-ad7f-90ef8230b158.html","label":"Energy and water use, projected jobs and revenue: Spartanburg's NorthMark data center by the numbers","publisher":null,"kind":"other","retrievedAt":"2026-09-10"},{"url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf","label":"Air - Construction Permit (Modification), Submission HQJ-32R0-VR9VC — Valara Holdings High Performance Compute Center","publisher":"SC Department of Environmental Services","kind":"permit","retrievedAt":"2026-09-13"},{"url":"https://www.carolinaecology.com/p/what-the-drafts-let-us-see","label":"What the Drafts Let Us See (Valara development agreement drafts)","publisher":"Carolina Ecology (Sam Harrelson)","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://des.sc.gov/sites/des/files/2026-06/Valara%20Fact%20Sheet.pdf","label":"Fact Sheet: Valara Holdings High Performance Compute Center Air Quality Construction Permits","publisher":"SC Department of Environmental Services","kind":"permit","retrievedAt":"2026-10-27"},{"url":"https://cleanenergy.org/press-archive/residents-sue-over-data-center-permits-seek-utility-regulator-scrutiny-of-natura/","label":"Residents sue over data center permits, seek utility regulator scrutiny of natural gas plant","publisher":"Southern Alliance for Clean Energy","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-pollard-mccormick-county-data-center-sc","sourceRecordId":"pollard-mccormick-county-data-center-sc","name":"Pollard Data Center Site (McCormick County)","operator":"Undisclosed end user (site facilitated by Pollard Lumber Company)","city":"McCormick","county":"McCormick County","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.8992855,"longitude":-82.2674735,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pollard-mccormick-county-data-center-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wrdw.com/2026/08/12/hundreds-gather-debate-proposed-mccormick-county-data-center/","label":"Hundreds gather to debate proposed McCormick County data center","publisher":"WRDW/WAGT","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://www.wrdw.com/2026/09/11/mccormick-county-council-approves-data-center-rezoning-while-tempers-flare/","label":"McCormick County council approves data center rezoning while tempers flare","publisher":"WRDW/WAGT","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://www.wrdw.com/2026/09/16/mccormick-county-chairman-discusses-approved-data-center-site/","label":"McCormick County chairman discusses approved data center site","publisher":"WRDW/WAGT","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://nominatim.openstreetmap.org/search?format=json&limit=3&countrycodes=us&q=Whitetown%20Road%2C%20McCormick%2C%20SC","label":"OSM Nominatim: Whitetown Road, McCormick County","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-10"}]},{"id":"compute-clarendon-county-ram-bay-data-center-manning-sc","sourceRecordId":"clarendon-county-ram-bay-data-center-manning-sc","name":"Potential Data Center, Ram Bay Industrial Park (Clarendon County)","operator":"Undisclosed data center company","city":"Manning","county":"Clarendon County","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.6382891,"longitude":-80.2708259,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/clarendon-county-ram-bay-data-center-manning-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://media-002-us.cdn.govstack.com/clarendoncountygov-us/media/xqjbymc5/public-notice-data-center-project-august-19-2026.pdf","label":"Public Notice: Potential Data Center - Addressing Concerns, Answering Questions (as of Aug. 19, 2026)","publisher":"Clarendon County","kind":"filing","retrievedAt":"2026-10-27"},{"url":"https://www.wistv.com/2026/08/19/clarendon-county-administration-responds-pushback-proposed-data-center/","label":"Clarendon County administration responds to pushback on proposed data center","publisher":"WIS","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://nominatim.openstreetmap.org/search?format=json&limit=5&countrycodes=us&q=Ram%20Bay%2C%20Clarendon%20County%2C%20SC","label":"OSM Nominatim: Ram Bay Road, Clarendon County","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-10"},{"url":"https://www.wistv.com/2026/08/25/clarendon-county-rushes-close-zoning-loophole-first-data-center-heads-industrial-park/","label":"Clarendon County rushes to close zoning loophole as first data center heads to industrial park","publisher":"WIS","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-volt-edge-project-alpaca-union-county-sc","sourceRecordId":"volt-edge-project-alpaca-union-county-sc","name":"Project Alpaca (Midway Green Industrial Park)","operator":"Volt Edge Energy","city":"Union","county":"Union","address":"265 Midway Drive","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.708932747649,"longitude":-81.662386821414,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/volt-edge-project-alpaca-union-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.foxcarolina.com/2026/05/05/union-county-data-center-tax-breaks-tabled-by-county-council/","label":"Union County tables tax breaks for $400M data center | Project Alpaca","publisher":"Fox Carolina","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://uniondevelopmentboard.com/union-midway-industrial-park/","label":"Midway Green Industrial Park","publisher":"Union County Development Board","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://servercountry.org/policy/south-carolina/","label":"Server Country — South Carolina data center policy and project table (Project Alpaca, 49 MW, $410M)","publisher":"Server Country","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://datacentersexposed.com/states/south-carolina","label":"Data Centers Exposed — South Carolina tracked projects (Project Alpaca, Volt Edge Energy, Union County, 49 MW)","publisher":"Data Centers Exposed","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-project-altair-newberry-county-sc","sourceRecordId":"project-altair-newberry-county-sc","name":"Project Altair (Mid-Carolina Commerce Park II)","operator":"Undisclosed developer (Project Altair)","city":"Prosperity","county":"Newberry","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.2098669,"longitude":-81.5338576,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-altair-newberry-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers","label":"Newberry County Government's Statement on Data Centers (Project Altair / Ordinance 03-01-2026)","publisher":"Newberry County, South Carolina","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.wistv.com/2026/06/03/moratorium-data-centers-put-effect-after-newberry-county-residents-raise-concerns/","label":"Moratorium on data centers put in effect after Newberry County residents raise concerns","publisher":"WIS News 10","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://nominatim.openstreetmap.org/search?q=Prosperity%2C+Newberry+County%2C+South+Carolina&format=json&limit=2","label":"OpenStreetMap Nominatim geocode for Prosperity, Newberry County, SC","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-26"}]},{"id":"compute-project-boulder-colleton-county-sc","sourceRecordId":"project-boulder-colleton-county-sc","name":"Project Boulder","operator":"Eagle Rock Partners","city":null,"county":"Colleton","address":"Cooks Hill Road","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":32.7,"longitude":-80.62,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-boulder-colleton-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/","label":"Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians","publisher":"SC Daily Gazette","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.yahoo.com/news/articles/gigawatt-data-center-proposal-draws-212106926.html","label":"News From The States (Yahoo mirror) — Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.yahoo.com/news/articles/pay-run-colleton-county-data-130030844.html","label":"Who will pay to run the Colleton County data center?","publisher":null,"kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.scelp.org/news/colleton-data-center","label":"Proposed Data Center Campus in Colleton County","publisher":null,"kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.postandcourier.com/rising-waters/ace-basin-data-center-lawsuit-settled/article_07f960a7-ad73-4449-9f7e-03001bc05373.html","label":"Settlement protects sensitive ACE Basin from data center development in Colleton County (October 7, 2026)","publisher":"The Post and Courier","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-stream-data-centers-project-liberty-marion-county-sc","sourceRecordId":"stream-data-centers-project-liberty-marion-county-sc","name":"Project Liberty (Stream Data Centers, Marion County Industrial Park)","operator":"Stream Data Centers (site entity: Eagle Myra, LLC)","city":"Marion","county":"Marion","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.1782,"longitude":-79.4006,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stream-data-centers-project-liberty-marion-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.postandcourier.com/pee-dee/news/marion-county-stream-data-center/article_fce64b6c-7e65-4d99-ba9a-4d1dc70d28e5.html","label":"Rural SC residents didn't know about an $800M data center before approval. Now they have questions.","publisher":"The Post and Courier","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.postandcourier.com/pee-dee/news/sc-pee-dee-data-centers/article_1afcd3af-40d1-4e00-8465-b0e3fb912862.html","label":"Developer pulls plug on $2.4B data center deal in rural SC","publisher":"The Post and Courier","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/","label":"Stream Data Centers pulls out of controversial Marion County project","publisher":"WMBF News","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-tigerdc-project-spero-spartanburg-county-sc","sourceRecordId":"tigerdc-project-spero-spartanburg-county-sc","name":"Project Spero (TigerDC), Tyger River Industrial Park","operator":"TigerDC","city":null,"county":"Spartanburg","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.9109275,"longitude":-82.092603,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tigerdc-project-spero-spartanburg-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/","label":"Company withdraws AI data center from Spartanburg County consideration","publisher":"FOX Carolina","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://nominatim.openstreetmap.org/search?q=Tyger+River+Industrial+Park%2C+Spartanburg+County%2C+South+Carolina&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for Tyger River Industrial Park area, Spartanburg County, SC","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-26"}]},{"id":"compute-qts-york-county-sc","sourceRecordId":"qts-york-county-sc","name":"QTS York County Data Center Campus","operator":"QTS Data Centers","city":null,"county":"York","address":"Hands Mill Highway","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":35.0046528,"longitude":-81.1001847,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-york-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sccommerce.com/news/qts-data-centers-establishing-first-south-carolina-operations-york-county","label":"QTS Data Centers establishing first South Carolina operations in York County","publisher":"South Carolina Department of Commerce","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.yorkcountysc.gov/1313/Data-Centers","label":"Data Centers — York County, SC (county information page on the QTS campus)","publisher":"York County, South Carolina","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=Hands+Mill+Highway%2C+York+County%2C+South+Carolina&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for Hands Mill Highway, York County, SC","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-08-26"},{"url":"http://q.com/data-centers/york/","label":"QTS York County Data Center Campus","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://www.gilbaneco.com/about/whats-new/news/gilbane-marks-steel-topping-out-milestone-for-data-center-campus-in-upstate-south-carolina/","label":"Gilbane marks steel topping-out milestone for data center campus in Upstate South Carolina","publisher":"Gilbane Building Company","kind":"press","retrievedAt":"2026-09-22"}]},{"id":"compute-overwatch-resilience-gsp-greer-sc","sourceRecordId":"overwatch-resilience-gsp-greer-sc","name":"Resilience GSP","operator":"Overwatch Capital","city":"Greer","county":"Greenville","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.9413008,"longitude":-82.2967764,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/overwatch-resilience-gsp-greer-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/resilience-gsp","label":"Baxtel — Resilience GSP data center, Greer SC (Overwatch Capital)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://dcmap.us/states/south-carolina/","label":"dcmap.us — South Carolina data center map (Resilience GSP, Overwatch Capital, Greer)","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-eagle-rock-rhodes-technology-park-colleton-county-sc","sourceRecordId":"eagle-rock-rhodes-technology-park-colleton-county-sc","name":"Rhodes Technology Park","operator":"Eagle Rock Partners","city":null,"county":"Colleton County","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.0509477,"longitude":-80.7911503,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eagle-rock-rhodes-technology-park-colleton-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/","label":"New proposed Colleton County data center campus draws residents' questions","publisher":"Live 5 News (WCSC)","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://abcnews4.com/news/local/colleton-county-residents-raise-concerns-over-proposed-data-center-power-plant-projects","label":"Colleton County residents raise concerns over proposed data center, power plant projects","publisher":"ABC News 4 (WCIV)","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://nominatim.openstreetmap.org/search?format=json&limit=3&countrycodes=us&q=Mount%20Carmel%20Road%2C%20Colleton%20County%2C%20SC","label":"OSM Nominatim: Mount Carmel Road, Colleton County (segment west of I-95, ZIP 29493)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-10"},{"url":"https://www.postandcourier.com/rising-waters/ace-basin-data-center-lawsuit-settled/article_07f960a7-ad73-4449-9f7e-03001bc05373.html","label":"Settlement protects sensitive ACE Basin from data center development in Colleton County (October 7, 2026)","publisher":"The Post and Courier","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://abcnews4.com/newsletter-daily/colleton-county-settles-lawsuit-creating-exclusion-zone-for-data-centers-in-ace-basin-agreement-settlement-colleton-county-government-selc-community-environment-preservation-charleston-south-carolina-lowcountry","label":"Colleton County settles lawsuit, creating exclusion zone for data centers in ACE Basin (October 5, 2026)","publisher":"ABC News 4 (WCIV)","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-ross-stores-rock-hill-sc","sourceRecordId":"ross-stores-rock-hill-sc","name":"Ross Stores Rock Hill Data Center","operator":"Ross Stores","city":"Rock Hill","county":"York","address":"1231 Galleria Blvd","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.9367002,"longitude":-80.969455,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ross-stores-rock-hill-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/ross-stores-rock-hill","label":"Ross Stores Rock Hill Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-27"},{"url":"https://nominatim.openstreetmap.org/search?format=json&q=1231+Galleria+Boulevard,+Rock+Hill,+SC","label":"OpenStreetMap Nominatim geocode for 1231 Galleria Blvd, Rock Hill, SC","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-27"}]},{"id":"compute-srs-ai-data-center-savannah-river-site-sc","sourceRecordId":"srs-ai-data-center-savannah-river-site-sc","name":"Savannah River Site AI Data Center (Amentum)","operator":"Amentum","city":null,"county":"Barnwell","address":null,"state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":33.2122041,"longitude":-81.6223727,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/srs-ai-data-center-savannah-river-site-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site","label":"NNSA Selects Amentum for AI Data Center and Energy Project at Savannah River Site","publisher":"U.S. Department of Energy / NNSA","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://www.nucnet.org/news/amentum-chosen-for-negotiations-on-lease-for-savannah-river-ai-data-centre-7-3-2026","label":"Amentum chosen for negotiations on lease for Savannah River AI data centre","publisher":"NucNet","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/coordinates?x=-81.6223727&y=33.2122041&benchmark=Public_AR_Current&vintage=Current_Current&layers=Counties&format=json","label":"US Census Bureau geocoder: county containing the Savannah River Site pin (Barnwell County, SC)","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://www.energy.gov/nnsa/articles/nnsa-seeks-proposals-ai-data-centers-energy-projects-savannah-river-site-0","label":"NNSA Seeks Proposals for AI Data Centers, Energy Projects at Savannah River Site","publisher":"U.S. Department of Energy / NNSA","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://en.wikipedia.org/wiki/Savannah_River_Site","label":"Savannah River Site — Wikipedia (site spans Aiken, Allendale and Barnwell counties)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-terra-nexus-camden-kershaw-county-sc","sourceRecordId":"terra-nexus-camden-kershaw-county-sc","name":"Terra Nexus Ventures Camden Data Center (771 Park Road)","operator":"Terra Nexus Ventures","city":"Camden","county":"Kershaw","address":"771 Park Road","state":"SC","stateName":"South Carolina","jurisdictionType":"state","latitude":34.3084326,"longitude":-80.5392422,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/terra-nexus-camden-kershaw-county-sc","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wistv.com/2025/09/24/questions-concerns-raised-about-planned-kershaw-county-data-center/","label":"Questions, concerns raised about planned Kershaw County data center","publisher":"WIS News 10","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://baxtel.com/data-center/terra-nexus-camden-sc","label":"Baxtel — Terra Nexus: Camden, SC (withdrawn)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://cleanview.co/public/data-centers/south-carolina/2175/terra-nexus-ventures-data-center","label":"Cleanview — Terra Nexus Ventures Data Center, Kershaw County SC","publisher":"Cleanview","kind":"other","retrievedAt":"2026-09-22"}]},{"id":"compute-applied-digital-deuel-county-sd","sourceRecordId":"applied-digital-deuel-county-sd","name":"Applied Digital Deuel County AI Campus","operator":"Applied Digital Corporation","city":"Toronto","county":"Deuel","address":null,"state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":44.567,"longitude":-96.62,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/applied-digital-deuel-county-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-proposes-multi-billion-dollar-data-center-in-south-dakota/","label":"Applied Digital proposes multi-billion-dollar data center in South Dakota","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-says-data-center-near-toronto-south-dakota-unlikely-to-go-forward/","label":"Applied Digital says data center near Toronto, South Dakota, unlikely to go forward","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.mykxlg.com/news/local/potential-14-billion-data-center-could-transform-deuel-countys-economy/article_2a031739-b2ae-4932-95f5-57e4f280b7c7.html","label":"mykxlg.com — \"Potential $14 Billion Data Center Could Transform Deuel County's Economy\"","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.deuelcountysd.com/_files/ugd/1bce45_74002fe687464440ae3316875fd5059c.pdf","label":"Deuel County Commission minutes, December 16, 2025","publisher":"Deuel County","kind":"filing","retrievedAt":"2026-10-30"}]},{"id":"compute-leola-data-center-mcpherson-county-sd","sourceRecordId":"leola-data-center-mcpherson-county-sd","name":"Leola Data Center","operator":"Leola Data Center, LLC","city":"Leola","county":"McPherson","address":"11641 358th Avenue","state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":45.704374067105,"longitude":-99.035447087942,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/leola-data-center-mcpherson-county-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://puc.sd.gov/commission/dockets/electric/2024/EL24-027/CondUsePermit.pdf","label":"Leola Data Center -- McPherson County Conditional Use Permit Application & Supplemental Information","publisher":"McPherson County, SD (via South Dakota PUC docket EL24-027)","kind":"permit","retrievedAt":"2026-09-13"},{"url":"https://aberdeeninsider.com/mcpherson-county-postpones-approval-of-leola-data-center-conditional-use-permit/","label":"McPherson County Postpones Approval Of Leola Data Center Conditional Use Permit","publisher":"Aberdeen Insider","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://aberdeeninsider.com/mcpherson-county-approves-moratorium-on-data-centers-enacts-1-mile-setback/","label":"McPherson County Approves Moratorium On Data Centers, Enacts 1 Mile Setback","publisher":"Aberdeen Insider","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.sdpb.org/politics/2026-09-09/leola-data-center-electricity-to-be-served-by-mdu-next-faces-county-permitting","label":"Leola data center electricity to be served by MDU, next faces county permitting","publisher":"SDPB","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://www.thedakotascout.com/p/mcpherson-county-officials-want-legal-assurances-on-data-center-pledges","label":"McPherson County officials want legal assurances on data center pledges","publisher":"The Dakota Scout","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://mcpherson.sdcounty.gov/august-11th-notice-of-hearing/","label":"August 11th Notice of Hearing (Conditional Use Permit 26-CUP-04, posted July 22, 2026)","publisher":"McPherson County, SD","kind":"permit","retrievedAt":"2026-10-30"},{"url":"https://leoladatacenter.com/","label":"Leola Data Center - Community Fact Sheet","publisher":"Leola Data Center, LLC","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-midco-sioux-falls-sd","sourceRecordId":"midco-sioux-falls-sd","name":"Midco Sioux Falls Data Center","operator":"Midco (Midcontinent Communications)","city":"Sioux Falls","county":null,"address":"5401 S Solberg Ave","state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":43.4968,"longitude":-96.7845,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/midco-sioux-falls-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://business.midco.com/services/data-centers/sioux-falls-data-center/","label":"Sioux Falls Data Center","publisher":"Midco Business","kind":"other","retrievedAt":"2026-10-10"},{"url":"https://web.archive.org/web/20250209083058/https://www.datacentermap.com/usa/south-dakota/sioux-falls/solberg/","label":"Midco Sioux Falls Data Center | 5401 S Solberg Ave (archived)","publisher":"Data Center Map (via Internet Archive)","kind":"other","retrievedAt":"2026-10-10"}]},{"id":"compute-midco-yankton-sd","sourceRecordId":"midco-yankton-sd","name":"Midco Yankton Data Center","operator":"Midco (Midcontinent Communications)","city":"Yankton","county":"Yankton","address":"2106 W City Limits Rd","state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":42.8908,"longitude":-97.417,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/midco-yankton-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20250217163307/https://www.datacentermap.com/usa/south-dakota/sioux-falls/midco-yankton/","label":"Midco Yankton Data Center (archived)","publisher":"Data Center Map (via Internet Archive)","kind":"other","retrievedAt":"2026-10-10"}]},{"id":"compute-sequitor-edge-rapid-city-sd","sourceRecordId":"sequitor-edge-rapid-city-sd","name":"Sequitor Edge Rapid City","operator":"Sequitor Edge","city":"Rapid City","county":"Pennington","address":"S Highway 79, Black Hills Industrial Center","state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":44.0222987,"longitude":-103.1914102,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sequitor-edge-rapid-city-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/sequitor-edge-rapid-city-south-dakota","label":"Sequitor Edge: Rapid City, South Dakota Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.kotatv.com/2026/07/02/south-dakota-drought-strains-power-grid-rapid-city-data-center-moves-forward/","label":"South Dakota drought strains power grid as Rapid City data center moves forward","publisher":"KOTA TV","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://rapidcitypost.com/?p=76434","label":"Data Center Promises Low Impact on Rapid City","publisher":"The Rapid City Post","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/","label":"Sequitor Edge Data Center Coming to Rapid City (Rapid City Journal, February 11, 2026, reposted on the operator's site)","publisher":"Rapid City Journal / Sequitor Edge","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.kotatv.com/2026/07/30/rapid-city-residents-raise-data-center-oversight-concerns-city-meeting/","label":"Rapid City residents raise data center oversight concerns at city meeting (July 30, 2026)","publisher":"KOTA TV","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-gemini-data-center-sioux-falls-sd","sourceRecordId":"gemini-data-center-sioux-falls-sd","name":"Sioux Falls Technology Park (Gemini Data Center)","operator":"Gemini Data Center SD LLC","city":"Sioux Falls","county":"Minnehaha","address":null,"state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":43.583,"longitude":-96.685,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/gemini-data-center-sioux-falls-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/","label":"Hyperscale data center seeking city approvals to build northeast of Sioux Falls","publisher":"SiouxFalls.Business","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/","label":"Sioux Falls data center developers detail next steps","publisher":"SiouxFalls.Business","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thedakotascout.com/p/planned-hyperscale-data-center-moving","label":"Planned hyperscale data center moving into South Dakota's largest city","publisher":"The Dakota Scout","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-tierpoint-sioux-falls-east-sd","sourceRecordId":"tierpoint-sioux-falls-east-sd","name":"TierPoint Sioux Falls - East (SFE)","operator":"TierPoint","city":"Sioux Falls","county":"Minnehaha","address":"700 East 54th Street North","state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":43.5947,"longitude":-96.7193,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-sioux-falls-east-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/south-dakota/sioux-falls-east/","label":"Sioux Falls - East Data Center","publisher":"TierPoint","kind":"other","retrievedAt":"2026-10-10"}]},{"id":"compute-tierpoint-sioux-falls-west-sd","sourceRecordId":"tierpoint-sioux-falls-west-sd","name":"TierPoint Sioux Falls - West","operator":"TierPoint","city":"Sioux Falls","county":"Minnehaha","address":"5300 North La Mesa Drive","state":"SD","stateName":"South Dakota","jurisdictionType":"state","latitude":43.6069708,"longitude":-96.8091949,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-sioux-falls-west-sd","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/south-dakota/sioux-falls-west/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/239032142","label":"OpenStreetMap way/239032142","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-5c-mem01-memphis-tn","sourceRecordId":"5c-mem01-memphis-tn","name":"5C MEM01 Memphis (former Fred's headquarters)","operator":"5C Data Centers","city":"Memphis","county":"Shelby","address":"4300 Getwell Road","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.0301213,"longitude":-89.936928,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/5c-mem01-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20250720112541/https://www.datacenterdynamics.com/en/news/5c-plots-data-center-at-former-freds-site-in-memphis-tennessee/","label":"5C plots data center at former Fred's site in Memphis, Tennessee","publisher":"DataCenterDynamics (archived)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://wearememphis.com/news/152-million-data-center-coming-to-former-freds-headquarters-advancing-memphis-tech-future/","label":"$152 Million Data Center Coming to Former Fred's Headquarters — investment, jobs and site details from the EDGE filing","publisher":"We Are Memphis (Greater Memphis Chamber)","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.fox13memphis.com/news/data-center-company-purchases-freds-headquarters-building-for-25-million-records-show/article_4cae4b04-ee6a-41a6-9ac3-279134616909.html","label":"Data center company purchases Fred's headquarters building for $25 million, records show — address from property records","publisher":"FOX13 Memphis","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://5c.ai/datacenters","label":"Next-Gen AI Data Centers | 5C — facilities table: Memphis, TN 20 MW (2026), 64 MW (2027), 35 MW (2029+), power source 'GRID BTM', status 'FULLY COMMITTED'","publisher":"5C","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://dailymemphian.com/article/66232","label":"The AM/DM podcast: Is Memphis at a turning point?","publisher":"Daily Memphian","kind":"press","retrievedAt":"2026-10-10"}]},{"id":"compute-bitdeer-knoxville-tn","sourceRecordId":"bitdeer-knoxville-tn","name":"Bitdeer Knoxville AI Datacenter (5101 S. National Drive)","operator":"Bitdeer","city":"Knoxville","county":"Knox","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.941272,"longitude":-83.836066,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bitdeer-knoxville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1899123/000121390026049770/ea0282628-20f_bitdeer.htm","label":"Bitdeer Technologies Group FY2025 Form 20-F, filed 2026-04-30","publisher":"SEC EDGAR (Bitdeer Technologies Group, CIK 0001899123)","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-bny-mellon-tennessee-processing-center-nashville-tn","sourceRecordId":"bny-mellon-tennessee-processing-center-nashville-tn","name":"BNY Mellon Tennessee Processing Center (Nashville)","operator":"BNY Mellon","city":"Nashville","county":"Davidson","address":"436 Woodfolk Avenue","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.2156443,"longitude":-86.7840012,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bny-mellon-tennessee-processing-center-nashville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/bny-mellons-continued-global-growth-prompts-expansion-of-tennessee-facilities-123740554.html","label":"BNY Mellon's Continued Global Growth Prompts Expansion of Tennessee Facilities","publisher":"PR Newswire / BNY Mellon","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.openstreetmap.org/way/776316726","label":"OpenStreetMap way 776316726 — 'Tennessee Processing Center LLC', telecom=data_center","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-centersquare-gallatin-tn","sourceRecordId":"centersquare-gallatin-tn","name":"Centersquare Gallatin (NAS) Campus","operator":"Centersquare","city":"Gallatin","county":"Sumner","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.40406,"longitude":-86.39812,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-gallatin-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/cloud/article/11427377/evoque-to-partner-with-archer-datacenters-on-200m-nashville-campus","label":"Evoque to Partner With Archer Datacenters on $200M Nashville Campus","publisher":"Data Center Frontier","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://baxtel.com/data-center/centersquare-gallatin-nas","label":"Centersquare: Gallatin (NAS) Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.newschannel5.com/news/how-big-are-middle-tennessees-data-centers-a-look-at-facilities-already-operating","label":"How big are Middle Tennessee's data centers? A look at facilities already operating","publisher":"NewsChannel 5 Nashville","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-cielo-clarksville-tn","sourceRecordId":"cielo-clarksville-tn","name":"Cielo Montgomery County AI Campus","operator":"Cielo Digital Infrastructure","city":"Clarksville","county":"Montgomery","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.53,"longitude":-87.36,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cielo-clarksville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cleanview.co/data-centers/tennessee/2037/cielo-clarksville-data-center","label":"Cielo Clarksville Data Center","publisher":"Cleanview","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://cieloinfra.com/","label":"Cielo Digital Infrastructure","publisher":"Cielo Digital Infrastructure","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cogent-nashville-woodycrest-tn","sourceRecordId":"cogent-nashville-woodycrest-tn","name":"Cogent Data Center - Nashville (338 Woodycrest Ave)","operator":"Cogent Communications","city":"Nashville","county":"Davidson","address":"338 Woodycrest Avenue","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.132143,"longitude":-86.752262,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-nashville-woodycrest-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","label":"How many data centers are there in Nashville? Here's a map of where they're located","publisher":"WSMV","kind":"press","retrievedAt":"2026-10-10"}]},{"id":"compute-aphorio-carter-collierville-tn","sourceRecordId":"aphorio-carter-collierville-tn","name":"Collierville Enterprise Data Center (FedEx World Technology Center Campus)","operator":"Aphorio Carter","city":"Collierville","county":"Shelby","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.04204,"longitude":-89.66453,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aphorio-carter-collierville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/aphorio-carter-acquires-data-center-in-collierville-tn-301983903.html","label":"Aphorio Carter Acquires Data Center in Collierville, TN","publisher":"Aphorio Carter (via PR Newswire)","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://baxtel.com/data-center/memphis","label":"Memphis Data Centers & Colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-xai-colossus-memphis-tn","sourceRecordId":"xai-colossus-memphis-tn","name":"Colossus","operator":"xAI","city":"Memphis","county":"Shelby","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.0565,"longitude":-90.0148,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/xai-colossus-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://en.wikipedia.org/wiki/Colossus_(supercomputer)","label":"Colossus (supercomputer) — Wikipedia","publisher":"Wikipedia","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.reuters.com/technology/artificial-intelligence/musk-says-xai-has-built-worlds-most-powerful-ai-training-cluster-2024-09-24/","label":"Musk says xAI has built world's most powerful AI training cluster — Reuters","publisher":"Reuters","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterdynamics.com/en/news/xai-doubles-number-of-onsite-gas-turbines-at-memphis-data-center-in-violation-of-permit-limits/","label":"xAI doubles number of on-site gas turbines at Memphis data center in violation of permit limits — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.governing.com/resilience/wastewater-will-cool-this-memphis-data-center","label":"Wastewater Will Cool This Memphis Data Center — Governing","publisher":"Governing","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cnbc.com/2025/07/16/musks-xai-permits-challenged-by-naacp-environmental-groups-memphis.html","label":"Musk's xAI permits challenged by NAACP, environmental groups in Memphis — CNBC","publisher":"CNBC","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://dailymemphian.com/article/51159/heres-what-xai-will-pay-in-property-taxes","label":"Here's what xAI will pay in property taxes","publisher":"Daily Memphian","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-xai-colossus-2-memphis-tn","sourceRecordId":"xai-colossus-2-memphis-tn","name":"Colossus 2 (Whitehaven)","operator":"xAI","city":"Memphis","county":"Shelby","address":"5400 Tulane Road","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":34.997983,"longitude":-90.0348672,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/xai-colossus-2-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20250517234219/https://www.datacenterdynamics.com/en/news/elon-musks-xai-buys-one-million-sq-ft-site-for-second-memphis-data-center/","label":"Elon Musk's xAI buys 1 million sq ft site for second Memphis data center","publisher":"DataCenterDynamics (archived)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://en.wikipedia.org/wiki/Colossus_(data_center)","label":"Colossus (data center)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://epoch.ai/data/ai-data-centers/directory/colossus-2","label":"Colossus 2 | AI data centers","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-connect-data-centers-oppidan-memphis-tn","sourceRecordId":"connect-data-centers-oppidan-memphis-tn","name":"Connect Data Centers Memphis (3900 S. Mendenhall Road)","operator":"Connect Data Centers (Oppidan Investment Company)","city":"Memphis","county":"Shelby","address":"3900 S. Mendenhall Road","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.034212,"longitude":-89.884694,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/connect-data-centers-oppidan-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/oppidan-submits-paperwork-for-a-99-000-sq-ft-data-center-in-memphis-tennessee","label":"Oppidan Submits Paperwork For a 99,000 sq ft Data Center in Memphis, Tennessee (May 5, 2023)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/connect-data-centers-memphis-tn","label":"Connect Data Centers: Memphis, TN Data Center (facility listing)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-data-suites-murfreesboro-tn","sourceRecordId":"data-suites-murfreesboro-tn","name":"Data Suites Murfreesboro","operator":"Data Suites","city":"Murfreesboro","county":"Rutherford","address":"1020 W. College Street","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.85555,"longitude":-86.4048269,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/data-suites-murfreesboro-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://mydatasuites.com/","label":"Nashville / Murfreesboro Data Center | AI Colocation | Data Suites","publisher":"Data Suites","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://mydatasuites.com/about/","label":"About Data Suites -- A Locally Owned, Eco-Friendly Data Center in Murfreesboro, TN","publisher":"Data Suites","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://mydatasuites.com/powered-shell-data-center-nashville/","label":"Powered Shell Data Center for Lease Near Nashville TN | Data Suites","publisher":"Data Suites","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-databank-mem1-memphis-tn","sourceRecordId":"databank-mem1-memphis-tn","name":"DataBank MEM1 (Memphis)","operator":"DataBank","city":"Memphis","county":"Shelby","address":"7620 Appling Center Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.20249,"longitude":-89.8097,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-mem1-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/data-centers/memphis/7620-appling-center-drive/","label":"7620 Appling Center Drive - Memphis Data Center","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/memphis","label":"Memphis Data Centers & Colocation","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-14"}]},{"id":"compute-dcblox-chattanooga-e16th-tn","sourceRecordId":"dcblox-chattanooga-e16th-tn","name":"DC BLOX Chattanooga (807 E 16th Street)","operator":"DC BLOX","city":"Chattanooga","county":"Hamilton","address":"807 E 16th Street","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.0314592,"longitude":-85.2975821,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dcblox-chattanooga-e16th-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","label":"Where are data centers in Chattanooga region? Facilities vary widely.","publisher":"Chattanooga Times Free Press (archived)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.peeringdb.com/api/fac?id=7217","label":"PeeringDB facility 7217 — DC BLOX CHA1, 807 E 16th St, Chattanooga, TN 37408","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.dcblox.com/data-centers/chattanooga/","label":"Chattanooga Data Center — DC BLOX: 807 East 16th Street; up to 1 MW critical load expandable to 3.5 MW; 8,000 sq ft expandable to 16,000; 280-ton air-cooled chiller plant and 240-ton dry cooler plant","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-dcblox-nashville-grassmere-tn","sourceRecordId":"dcblox-nashville-grassmere-tn","name":"DC BLOX Nashville (Grassmere Park)","operator":"DC BLOX","city":"Nashville","county":"Davidson","address":"648 Grassmere Park Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.0865,"longitude":-86.74893,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dcblox-nashville-grassmere-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://williamsonsource.com/dc-blox-sues-metro-over-blocked-data-center-project-near-nashville-zoo/","label":"DC BLOX Sues Metro Over Blocked Data Center Project Near Nashville Zoo","publisher":"Williamson Source","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.wsmv.com/2026/07/22/metro-council-passes-first-data-center-regulations-nashville-heres-what-changes/","label":"Metro Council passes first data-center regulations in Nashville. Here's what changes","publisher":"WSMV News 4 Nashville","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.yahoo.com/news/us/articles/guide-data-centers-tennessee-could-081728521.html","label":"Your guide to data centers in Tennessee and how they could affect you","publisher":"The Tennessean (via Yahoo News)","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.dcblox.com/nashville-data-center/","label":"Nashville Data Center Project (DC BLOX project page): 69,200 sq ft single-story building, 10 MW, closed-loop water cooling, NES power, $380M+ capital investment","publisher":"DC BLOX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://nashvegas.com/nashville-zoo-data-center-proposal-gets-even-bigger/","label":"Nashville Zoo Data Center Proposal Gets Even Bigger (Nashvegas.com): second building >200,000 sq ft / 40 MW; 24 acres at 648 Grassmere Park","publisher":"Nashvegas.com","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://wpln.org/post/why-nashville-will-struggle-to-block-the-dc-blox-data-center-near-zoo/","label":"Why Nashville will struggle to block the DC BLOX data center near zoo (WPLN News, July 9, 2026): 'more than $700 million', 24 acres, ~$23M land purchase, building permit filed","publisher":"WPLN News","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://fox17.com/news/local/dc-blox-closes-on-property-proposed-data-center-near-nashville-zoo-grassmere-park-ai-data-center-artificial-intelligence-23-million-georgia-based-marketstreet-mayor-freddie-oconnell-eminent-domain-push-metro-council-davidson-county-tennessee","label":"DC BLOX closes on $23M property for proposed data center near Nashville Zoo, records show (FOX 17, July 21, 2026): 648 and 650 Grassmere Park Drive","publisher":"FOX 17 Nashville","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-edgeconnex-mem01-memphis-tn","sourceRecordId":"edgeconnex-mem01-memphis-tn","name":"EdgeConneX Memphis (EDCMEM01)","operator":"EdgeConneX","city":"Memphis","county":"Shelby","address":"4005 S Mendenhall Road","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.038995,"longitude":-89.88623,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-mem01-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?id=1930","label":"PeeringDB facility 1930 — EdgeConneX Memphis (EDCMEM01), 4005 S Mendenhall Rd, Memphis","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.edgeconnex.com/locations/americas/memphis-tn/","label":"EdgeConneX Memphis (MEM01) facility specifications","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-edgeconnex-nas01-nashville-tn","sourceRecordId":"edgeconnex-nas01-nashville-tn","name":"EdgeConneX NAS01 Nashville","operator":"EdgeConneX","city":"Nashville","county":"Davidson","address":"1841 Air Lane Drive, Building 3","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.1449104,"longitude":-86.703549,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-nas01-nashville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20260802162755/https://www.edgeconnex.com/locations/americas/nashville-tn/","label":"NAS01 Nashville Data Center","publisher":"EdgeConneX (archived)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/edgeconnex-nashville","label":"EdgeConneX Nashville","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://www.peeringdb.com/api/fac?id=1924","label":"PeeringDB facility 1924 — EdgeConneX Nashville (EDCNAS01), 1841 Air Lane Dr Building 3, Nashville, TN 37210","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-expedient-memphis-tn","sourceRecordId":"expedient-memphis-tn","name":"Expedient Memphis (MEM1)","operator":"Expedient","city":"Memphis","county":"Shelby","address":"3180 Players Lane","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.062965,"longitude":-89.786143,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?id=8473","label":"PeeringDB facility 8473 — Expedient Memphis, 3180 Players Lane, Memphis","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://expedient.com/data-centers/memphis/","label":"Expedient Memphis data center (MEM1) specifications — 1.5 MW critical load, 35,000 sq ft","publisher":"Expedient","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-fisk-quantum-leap-nashville-tn","sourceRecordId":"fisk-quantum-leap-nashville-tn","name":"Fisk University Quantum Leap Innovation & Technology Center","operator":"Fisk University","city":"Nashville","county":"Davidson","address":"Herman Street at 17th Avenue North","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.1667902,"longitude":-86.7973014,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fisk-quantum-leap-nashville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20260819034031/https://www.datacenterdynamics.com/en/news/fisk-university-looks-to-build-data-center-in-nashville-tennessee/","label":"Fisk University looks to build data center in Nashville, Tennessee","publisher":"DataCenterDynamics (archived)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.wsmv.com/2026/06/08/what-know-about-data-center-planned-nashville-hbcu-fisk-universitys-campus/","label":"What to know about the data center planned for Nashville HBCU Fisk University's campus","publisher":"WSMV 4 Nashville","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.insidehighered.com/news/tech-innovation/artificial-intelligence/2026/08/07/will-data-center-bring-risk-or-reward-fisk","label":"Will a Data Center Bring Risk or Reward to Fisk? (Inside Higher Ed, Aug 7, 2026)","publisher":"Inside Higher Ed","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-lawrenceburg-flatwoods-road-data-center-tn","sourceRecordId":"lawrenceburg-flatwoods-road-data-center-tn","name":"Flatwoods Road Data Center (Lawrenceburg)","operator":"Undisclosed","city":"Lawrenceburg","county":"Lawrence","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.2423023,"longitude":-87.3347389,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lawrenceburg-flatwoods-road-data-center-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lawrenceburgnow.com/04212026data.html","label":"Lawrenceburg data center — rezoning, size and community response (April 21, 2026)","publisher":"Lawrenceburg Now","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.newschannel5.com/news/despite-strong-opposition-plans-for-a-data-center-moves-forward-in-lawrenceburg","label":"Despite strong opposition, plans for a data center move forward in Lawrenceburg (NewsChannel 5): 4.9 MW network/edge facility; site plan passed planning commission unanimously; water figures from Lawrenceburg Utilities System","publisher":"NewsChannel 5 (WTVF)","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://www.newschannel5.com/news/one-lawrence-co-city-to-vote-on-data-center-another-tries-to-ban-facilities-altogether","label":"One Lawrence Co. city to vote on data center, another tries to ban facilities altogether (NewsChannel 5): planning commission to vote on permits for the 'Scalepoint TN data processing center' on Flatwoods Road","publisher":"NewsChannel 5 (WTVF)","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-flexential-nashville-brentwood-nas01-04-tn","sourceRecordId":"flexential-nashville-brentwood-nas01-04-tn","name":"Flexential Nashville - Brentwood (NAS01/04)","operator":"Flexential","city":"Brentwood","county":"Williamson","address":"7100 Commerce Way","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.9727294,"longitude":-86.8084949,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-nashville-brentwood-nas01-04-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/tn/nashville/brentwood-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/node/12112295055","label":"OpenStreetMap node/12112295055","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-nashville-cool-springs-tn","sourceRecordId":"flexential-nashville-cool-springs-tn","name":"Flexential Nashville - Cool Springs","operator":"Flexential","city":"Franklin","county":"Williamson","address":"425 Duke Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.951045,"longitude":-86.833406,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-nashville-cool-springs-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/tn/nashville/cool-springs-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1210515186","label":"OpenStreetMap way/1210515186","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-flexential-nashville-franklin-tn","sourceRecordId":"flexential-nashville-franklin-tn","name":"Flexential Nashville - Franklin","operator":"Flexential","city":"Franklin","county":"Williamson","address":"4600 Carothers Parkway","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.9204203,"longitude":-86.8155401,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-nashville-franklin-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/tn/nashville/franklin-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/942604537","label":"OpenStreetMap way/942604537","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-google-montgomery-county-tn","sourceRecordId":"google-montgomery-county-tn","name":"Google Montgomery County Data Center","operator":"Google","city":"Clarksville","county":"Montgomery","address":"1000 Boolean Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.5288,"longitude":-87.3636,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-montgomery-county-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tnecd.com/news/governor-haslam-commissioner-boyd-announce-google-to-locate-new-data-center-in-clarksville/","label":"Governor Haslam Announces Google to Locate New Data Center in Clarksville","publisher":"Tennessee Department of Economic & Community Development","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://clarksvillenow.com/local/google-officially-opens-clarksville-montgomery-county-data-center/","label":"Google officially opens Clarksville-Montgomery County data center","publisher":"ClarksvilleNow","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://datacenters.google/locations/montgomery-county-tennessee/","label":"Google Data Centers: Montgomery County, Tennessee (official)","publisher":"Google","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.openstreetmap.org/way/708931343","label":"OpenStreetMap way 708931343 — 'Google Montgomery Data Center', operator=Google LLC, addr 1000 Boolean Drive, Clarksville","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-21"},{"url":"https://tcog.info/google-secrecy-agreement-with-the-montgomery-county-industrial-development-board-should-be-undone/","label":"Google's secrecy agreement with the Montgomery County IDB should be undone (Tennessee Coalition for Open Government, Sept 30, 2018) — Dec 22, 2015 PILOT agreement terms","publisher":"Tennessee Coalition for Open Government","kind":"subsidy","retrievedAt":"2026-09-21"}]},{"id":"compute-h5-nashville-147-fourth-avenue-tn","sourceRecordId":"h5-nashville-147-fourth-avenue-tn","name":"H5 Data Centers Nashville (147 Fourth Avenue)","operator":"H5 Data Centers","city":"Nashville","county":"Davidson","address":"147 Fourth Avenue North, 8th Floor","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.162626,"longitude":-86.778674,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-nashville-147-fourth-avenue-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?id=561","label":"PeeringDB facility 561 — H5 Data Centers Nashville, 147 Fourth Avenue, 8th floor (record updated 2026-03-02)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://h5datacenters.com/nashville-colocation.html","label":"H5 Data Centers — Nashville colocation (147 Fourth Avenue N., 8th Floor; 19,700 sq ft)","publisher":"H5 Data Centers","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-hca-it-services-data-center-nashville-tn","sourceRecordId":"hca-it-services-data-center-nashville-tn","name":"HCA Information Technology & Services Data Center (Antioch)","operator":"HCA Healthcare","city":"Nashville","county":"Davidson","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.0326354,"longitude":-86.637789,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hca-it-services-data-center-nashville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nashville.gov/departments/mayor/economic-opportunity/growth-incentives/growth-projects/hca-data-center","label":"HCA (Data Center) PILOT Incentive — Metro Nashville growth-incentive record, Parcel ID 17400003200, 5900 Crossings Boulevard","publisher":"Metropolitan Government of Nashville and Davidson County","kind":"subsidy","retrievedAt":"2026-09-14"},{"url":"https://www.openstreetmap.org/way/819981891","label":"OpenStreetMap way 819981891 — 'HCA Information Technology & Services Data Center'","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-hixson-data-center-mcminnville-tn","sourceRecordId":"hixson-data-center-mcminnville-tn","name":"Hixson Data Center (McMinnville)","operator":"Hixson Data Center","city":"McMinnville","county":"Warren","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.6834,"longitude":-85.76998,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hixson-data-center-mcminnville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/25mw-ai-data-center-planned-for-mcminnville","label":"25MW AI Data Center Planned for McMinnville","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.wsmv.com/2026/06/01/amid-plans-new-high-density-ai-data-center-campus-middle-tennessee-city-locals-push-moratorium-such-facilities/","label":"Amid plans for new 'high-density' AI data center campus in a Middle Tennessee city, locals push for moratorium on such facilities","publisher":"WSMV News 4 Nashville","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://hixsondc.com/","label":"Hixson Data Center - Secure Data Room (project specifications)","publisher":"Hixson Data Center","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://web.archive.org/web/20260812114305/https://tennesseelookout.com/2026/06/15/local-tennessee-officials-are-putting-data-center-plans-on-ice-to-consider-regulations/","label":"Local Tennessee officials are putting data center plans on ice to consider regulations (Tennessee Lookout, June 15, 2026; archived copy)","publisher":"Tennessee Lookout","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-jailhouse-studios-chattanooga-tn","sourceRecordId":"jailhouse-studios-chattanooga-tn","name":"Jailhouse Studios (former Hamilton County Jail)","operator":"Urban Story Ventures","city":"Chattanooga","county":"Hamilton","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.04572,"longitude":-85.30949,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/jailhouse-studios-chattanooga-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://urbanstoryventures.com/citys-new-jailhouse-studios-the-worlds-first-quantum-ready-sovereign-data-processing-and-ai-center-with-an-integrated-creator-campus/","label":"City's New Jailhouse Studios: The World's First Quantum-Ready Sovereign Data, Processing, and AI Center with an Integrated Creator Campus","publisher":"Urban Story Ventures","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://newschannel9.com/news/local/residents-rally-against-proposed-ai-data-center-inside-old-hamilton-county-jail","label":"Residents rally against proposed AI data center inside old Hamilton County Jail","publisher":"NewsChannel 9 (WTVC Chattanooga)","kind":"press","retrievedAt":"2026-08-14"}]},{"id":"compute-lcub-data-center-lenoir-city-tn","sourceRecordId":"lcub-data-center-lenoir-city-tn","name":"LCUB Data Center (Lenoir City Utilities Board)","operator":"Lenoir City Utilities Board","city":"Lenoir City","county":"Loudon","address":"7698 Creekwood Park Blvd","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.840815,"longitude":-84.265703,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lcub-data-center-lenoir-city-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/17123","label":"PeeringDB facility 17123: LCUB Data Center, 7698 Creekwood Park Blvd, Lenoir City (record created 2026-04-27; owner; diverse serving substations)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.lcub.com/data-center/","label":"LCUB Data Center — Lenoir City Utilities Board (colocation marketing page)","publisher":"Lenoir City Utilities Board","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.news-herald.net/news/new-lcub-facility-ready/article_a2a7f8ea-b104-535b-bdbd-efcd490c147b.html","label":"New LCUB facility ready (Loudon County News-Herald, Jan 10, 2018) — LCUB's new facility off Creekwood Park Boulevard","publisher":"News-Herald (Lenoir City)","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-litewire-mcminnville-tn","sourceRecordId":"litewire-mcminnville-tn","name":"Litewire McMinnville (former A.O. Smith Building)","operator":"Litewire","city":"McMinnville","county":"Warren","address":"204 Red Rd.","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.69221,"longitude":-85.7619,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/litewire-mcminnville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tnecd.com/news/litewire-llc-to-open-new-facility-in-warren-county/","label":"Litewire, LLC to Open New Facility in Warren County","publisher":"Tennessee Department of Economic and Community Development","kind":"subsidy","retrievedAt":"2026-09-09"},{"url":"https://www.newschannel5.com/news/how-big-are-middle-tennessees-data-centers-a-look-at-facilities-already-operating","label":"How big are Middle Tennessee's data centers? A look at facilities already operating","publisher":"NewsChannel 5 Nashville","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.tn.gov/ecd/news/2015/7/15/litewire-llc-to-open-new-facility-in-warren-county.html","label":"Litewire, LLC to Open New Facility in Warren County (TN Dept. of Economic & Community Development, July 15, 2015): Tier IV data center at 204 Red Rd., McMinnville; 285,000 sq ft; 66 jobs","publisher":"Tennessee Department of Economic and Community Development","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-lumen-memphis-crowfarn-drive-tn","sourceRecordId":"lumen-memphis-crowfarn-drive-tn","name":"Lumen Memphis (3993 Crowfarn Drive) — Level(3)","operator":"Lumen Technologies","city":"Memphis","county":"Shelby","address":"3993 Crowfarn Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.02884,"longitude":-89.930739,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-memphis-crowfarn-drive-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/1294","label":"PeeringDB facility 1294: Level(3) Memphis, 3993 Crowfarn Drive, Memphis TN 38118-7326 (org: Lumen Technologies Inc; record created 2012-09-06)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-lumen-nashville-9th-ave-n-tn","sourceRecordId":"lumen-nashville-9th-ave-n-tn","name":"Lumen Nashville (2208 9th Avenue North) — Level(3)","operator":"Lumen Technologies","city":"Nashville","county":"Davidson","address":"2208 9th Avenue North","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.189148,"longitude":-86.804111,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-nashville-9th-ave-n-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","label":"How many data centers are there in Nashville? Here's a map of where they're located","publisher":"WSMV","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://www.peeringdb.com/api/fac/1983","label":"PeeringDB facility 1983 — Level(3) Nashville (9th Ave)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-10"}]},{"id":"compute-lumen-nashville-sidco-drive-tn","sourceRecordId":"lumen-nashville-sidco-drive-tn","name":"Lumen Nashville (Sidco Drive) — Level(3)","operator":"Lumen Technologies","city":"Nashville","county":"Davidson","address":"2992 Sidco Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.102726,"longitude":-86.755786,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-nashville-sidco-drive-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?id=311","label":"PeeringDB facility 311 — Level(3) Nashville (Sidco Drive), Lumen Technologies Inc, 2992 Sidco Drive","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-lumen-nashville-perimeter-place-tn","sourceRecordId":"lumen-nashville-perimeter-place-tn","name":"Lumen Nashville 2 (2530 Perimeter Place Drive)","operator":"Lumen Technologies","city":"Nashville","county":"Davidson","address":"2530 Perimeter Place Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.147409,"longitude":-86.681369,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-nashville-perimeter-place-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","label":"How many data centers are there in Nashville? Here's a map of where they're located","publisher":"WSMV","kind":"press","retrievedAt":"2026-10-10"}]},{"id":"compute-mca-technology-solutions-chattanooga-tn","sourceRecordId":"mca-technology-solutions-chattanooga-tn","name":"MCA Technology Solutions Data Center (6048 Century Oaks Drive)","operator":"MCA Technology Solutions (Mike Collins & Associates)","city":"Chattanooga","county":"Hamilton","address":"6048 Century Oaks Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.0759,"longitude":-85.184553,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mca-technology-solutions-chattanooga-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","label":"Where are data centers in Chattanooga region? Facilities vary widely. (Chattanooga Times Free Press, Aug 23, 2026; archived copy)","publisher":"Chattanooga Times Free Press","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-meta-gallatin-tn","sourceRecordId":"meta-gallatin-tn","name":"Meta Gallatin Data Center Campus","operator":"Meta","city":"Gallatin","county":"Sumner","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.3884,"longitude":-86.4369,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-gallatin-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/meta-brings-data-centers-in-tents-to-gallatin-tennessee/","label":"Meta brings data centers in tents to Gallatin, Tennessee","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.weku.org/amsn/2025-11-25/tennessee-has-60-data-centers-nashville-probably-has-more-than-you-think","label":"Tennessee has 60 data centers; Nashville probably has more than you think","publisher":"WEKU / NPR","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://ttc.tml1.org/2024/11/15/meta-data-center-begins-operations-gallatin","label":"Meta data center begins operations in Gallatin","publisher":"Tennessee Municipal League","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.pascalforgallatin.com/post/why-is-gallatin-giving-woolhawk-a-tax-break-when-they-are-considering-raising-our-property-taxes","label":"Why is Gallatin giving Woolhawk a tax break?","publisher":"Pascal for Gallatin","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://w.media/meta-expands-gallatin-data-center-with-nearly-1b-total-investment/","label":"Meta expands Gallatin data center — cooling & water approach","publisher":"w.media","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/","label":"Meta Data Centers blog — Gallatin, we are online!","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://wpln.org/post/gallatin-offers-a-glimpse-at-hyperscale-data-center-experiences/","label":"Gallatin offers a glimpse at hyperscale data center experiences","publisher":"WPLN News (Nashville Public Radio)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://datacenters.atmeta.com/asset/gallatin-data-center-info-sheet/","label":"Meta Gallatin Data Center info sheet (PDF): $1.5B+ investment, 100+ operational jobs, TVA energy planning, water stewardship, 100% clean and renewable energy matching","publisher":"Meta","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-xai-minihard-memphis-tn","sourceRecordId":"xai-minihard-memphis-tn","name":"Minihard","operator":"xAI","city":"Memphis","county":"Shelby","address":"5414 Tulane Road","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":34.9994934,"longitude":-90.0429461,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/xai-minihard-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://en.wikipedia.org/wiki/Colossus_(data_center)","label":"Colossus (data center) - Wikipedia","publisher":null,"kind":"other","retrievedAt":"2026-09-13"},{"url":"https://baxtel.com/data-center/xai-colossus-2-bldg1","label":"xAI: Colossus 2 Bldg1 Data Center - Baxtel","publisher":null,"kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-neural-nexus-memphis-tn","sourceRecordId":"neural-nexus-memphis-tn","name":"Neural Nexus Innovation District","operator":"Legacy Power Capital","city":"Memphis","county":"Shelby","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.1428067,"longitude":-90.0500147,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/neural-nexus-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://memphischamber.com/blog/press-release/legacy-power-capital-announces-neural-nexus-innovation-district-in-downtown-memphis/","label":"Legacy Power Capital Announces \"Neural Nexus\" Innovation District in Downtown Memphis - Greater Memphis Chamber","publisher":"Greater Memphis Chamber","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://downtownmemphis.com/post/downtown-memphis-to-get-94-billion-neural-nexus-mixed-use-development","label":"Downtown Memphis to Get $9.4 Billion \"Neural Nexus\" Mixed-Use Development","publisher":"Downtown Memphis Commission","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-ornl-oak-ridge-leadership-computing-facility-tn","sourceRecordId":"ornl-oak-ridge-leadership-computing-facility-tn","name":"Oak Ridge Leadership Computing Facility (Frontier supercomputer)","operator":"Oak Ridge National Laboratory (UT-Battelle for the U.S. Department of Energy)","city":"Oak Ridge","county":"Roane","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.92951,"longitude":-84.31057,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ornl-oak-ridge-leadership-computing-facility-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.olcf.ornl.gov/frontier/","label":"Frontier — Oak Ridge Leadership Computing Facility (delivered 2021, early operations 2022; HPE Cray EX, AMD EPYC/Instinct; 1.6 EF peak)","publisher":"Oak Ridge Leadership Computing Facility / ORNL","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/node/10648552506","label":"OpenStreetMap node 10648552506: 'Frontier (supercomputer)', operator Oak Ridge National Laboratory, telecom=data_center","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-21"},{"url":"https://www.olcf.ornl.gov/2026/01/12/call-for-proposals-open-to-develop-discovery-supercomputers-first-science-applications/","label":"Call for Proposals Open to Develop Discovery Supercomputer's First Science Applications (OLCF, Jan 12, 2026) — Discovery arriving in 2028 at ORNL","publisher":"Oak Ridge Leadership Computing Facility / ORNL","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-doe-oak-ridge-reservation-ai-data-centers-tn","sourceRecordId":"doe-oak-ridge-reservation-ai-data-centers-tn","name":"Oak Ridge Reservation AI Data Center Sites (DOE land lease)","operator":"U.S. Department of Energy","city":"Oak Ridge","county":"Roane","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.9352633,"longitude":-84.3923554,"coordinatePrecision":"representative_multi_site","recordUnit":"representative multi-site record","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/doe-oak-ridge-reservation-ai-data-centers-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge","label":"U.S. Energy Department Seeks Proposals for AI Data Centers, Energy Projects at Oak Ridge","publisher":"U.S. Department of Energy, Office of Environmental Management","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://fedscoop.com/energy-rfp-oak-ridge-ai-data-centers/","label":"Energy seeks proposals for AI data centers at Oak Ridge","publisher":"FedScoop","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-peace-communications-cha1-chattanooga-tn","sourceRecordId":"peace-communications-cha1-chattanooga-tn","name":"Peace Communications CHA1 (Chattanooga)","operator":"Peace Communications","city":"Chattanooga","county":"Hamilton","address":"1100 E 11th Street","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.03746,"longitude":-85.293181,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/peace-communications-cha1-chattanooga-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?id=14177","label":"PeeringDB facility 14177 — Peace Communications CHA1, 1100 E 11th Street, Chattanooga","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-peace-communications-knx1-knoxville-tn","sourceRecordId":"peace-communications-knx1-knoxville-tn","name":"Peace Communications KNX1 (Knoxville)","operator":"Peace Communications","city":"Knoxville","county":"Knox","address":"500 W. Summit Hill Drive","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.965586,"longitude":-83.921438,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/peace-communications-knx1-knoxville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?id=234","label":"PeeringDB facility 234 — Peace Communications KNX1 (formerly Nexus Group / Digital Crossing), 500 W. Summit Hill, Knoxville","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-peace-communications-nsh2-nashville-tn","sourceRecordId":"peace-communications-nsh2-nashville-tn","name":"Peace Communications NSH2 (Nashville, 1661 Murfreesboro Pike)","operator":"Peace Communications (formerly Nexus Group)","city":"Nashville","county":"Davidson","address":"1661 Murfreesboro Pike","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.104717,"longitude":-86.669783,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/peace-communications-nsh2-nashville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/5483","label":"PeeringDB facility 5483: Peace Communications NSH2, 1661 Murfreesboro Pike, Nashville TN 37217 (org: Peace Communications, formerly Nexus Group; record created 2018-06-20)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-sdcl-project-midspan-bradley-county-tn","sourceRecordId":"sdcl-project-midspan-bradley-county-tn","name":"Project MidSpan Data Center (Hiwassee River Industrial Park, behind Walker Valley High School)","operator":"SDCL Tennessee Propco LLC","city":null,"county":"Bradley","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.2762,"longitude":-84.785,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sdcl-project-midspan-bradley-county-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://newschannel9.com/news/local/lawsuit-company-behind-project-midspan-sues-bradley-county-over-data-center-rules-sdcl-tennessee-propco-project-midspan-walker-valley-high-school-data-center-bradley-county-lawsuit-zoning","label":"Lawsuit: Company behind Project MidSpan sues Bradley County over data center rules","publisher":"NewsChannel 9 (WTVC)","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://newschannel9.com/news/local/new-bradley-county-data-center-proposal-would-sit-behind-walker-valley-high-school-project-midspan-walker-valley-high-school-gary-davis-data-center-lawsuit-bradley-county-zoning","label":"New Bradley County data center proposal would sit behind Walker Valley High School","publisher":"NewsChannel 9 (WTVC)","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://nominatim.openstreetmap.org/search?q=Walker+Valley+High+School&countrycodes=us&format=json","label":"OSM Nominatim geocode of Walker Valley High School (site is directly behind the school)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-27"}]},{"id":"compute-project-river-data-center-bradley-county-tn","sourceRecordId":"project-river-data-center-bradley-county-tn","name":"Project River Data Center","operator":"Wright Brothers Construction","city":"Cleveland","county":"Bradley","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.3314339,"longitude":-84.8686025,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-river-data-center-bradley-county-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://projectriver.energy/","label":"Project River — An Industrial Energy Campus That Supplies Itself","publisher":"Wright Brothers Construction","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.chattanoogan.com/2026/8/26/522510/Proponents-Of-Bradley-County-Project.aspx","label":"Proponents Of Bradley County Project With Large-Scale Data Center Cite Tax Benefits","publisher":"Chattanoogan.com","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://newschannel9.com/news/local/bradley-county-family-proposes-113b-data-center-project-west-of-cleveland-project-river-wright-brothers-lower-river-road-forestry-jobs-utility-bills-opposition-environmental-concerns-noise-concerns-data-center-issues-midterms-political-liability-growth","label":"$11.3B data center pitch in Bradley County comes amid growing local skepticism","publisher":"NewsChannel 9 / WTVC","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-radiusdc-nashville-i-tn","sourceRecordId":"radiusdc-nashville-i-tn","name":"RadiusDC Nashville I","operator":"RadiusDC","city":"Nashville","county":"Davidson","address":"2902 Brick Church Pike","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.27987,"longitude":-86.7837,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/radiusdc-nashville-i-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.radius-dc.com/newsroom-and-events/radiusdc-breaks-ground-on-largest-data-center-in-nashville","label":"RadiusDC Breaks Ground on Largest Data Center in Nashville","publisher":"RadiusDC","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.yahoo.com/news/us/articles/guide-data-centers-tennessee-could-081728521.html","label":"Your guide to data centers in Tennessee and how they could affect you","publisher":"The Tennessean (via Yahoo News)","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.prnewswire.com/news-releases/radiusdc-expands-its-footprint-with-a-new-data-center-colocation-facility-in-nashville-tn-302393935.html","label":"RadiusDC Expands its Footprint with a New Data Center Colocation Facility in Nashville, TN (March 6, 2025)","publisher":"PR Newswire / RadiusDC","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://newswire.telecomramblings.com/2025/09/radiusdc-breaks-ground-on-largest-data-center-in-nashville/","label":"RadiusDC Breaks Ground on Largest Data Center in Nashville (press release via Telecom Ramblings, Sept 4, 2025): 12 MW critical power, 102,500 sq ft, ~12 acres, closed-loop cooling","publisher":"RadiusDC / Telecom Ramblings","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://nespowernews.com/radiusdc-celebrates-its-new-data-center-with-groundbreaking/","label":"RadiusDC Celebrates its New Data Center with Groundbreaking (Nashville Electric Service News, Sept 17, 2025)","publisher":"Nashville Electric Service","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","label":"How many data centers are there in Nashville? Here's a map of where they're located","publisher":"WSMV","kind":"press","retrievedAt":"2026-10-10"},{"url":"https://www.wkrn.com/news/local-news/nashville/radiusdc-nashville-data-center-will-use-about-700-gallons-of-water-a-day/amp/","label":"RadiusDC Nashville data center will use about 700 gallons of water a day","publisher":"WKRN","kind":"press","retrievedAt":"2026-10-27"},{"url":"https://www.newschannel5.com/news/state/tennessee/north-nashville/a-data-center-debate-is-growing-in-north-nashville-as-one-facility-nears-completion-on-brick-church-pike","label":"A data center debate is growing in North Nashville as one facility nears completion on Brick Church Pike","publisher":"NewsChannel 5 (WTVF)","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-tennessee-south-data-center-smyrna-tn","sourceRecordId":"tennessee-south-data-center-smyrna-tn","name":"Tennessee South Data Center (State of Tennessee)","operator":"State of Tennessee — Strategic Technology Solutions","city":"Smyrna","county":"Rutherford","address":null,"state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.9934295,"longitude":-86.4958261,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tennessee-south-data-center-smyrna-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.abecelectric.com/tennessee-south-data-center","label":"Tennessee South Data Center — Smyrna, TN (electrical scope: two 3,000 A services, 2N UPS, two 2,000 kW generators)","publisher":"ABEC Electric Company, LLC","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://iceagents.com/index.php/project/tn-south-data-centers-smyrna-tn/","label":"TN South Data Center, Smyrna TN — commissioning project record (State of Tennessee executive-branch computing)","publisher":"International Commissioning Engineers","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://www.openstreetmap.org/way/930226814","label":"OpenStreetMap way 930226814 — 'Tennessee South Data Center', operator=State of Tennessee, telecom=data_center","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-tenhats-fort-summit-knoxville-tn","sourceRecordId":"tenhats-fort-summit-knoxville-tn","name":"The Fort (TenHats Knoxville Data Center)","operator":"TenHats (formerly SH Data Technologies)","city":"Knoxville","county":"Knox","address":"550 Fort Summit Way","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.9704933,"longitude":-83.9184704,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tenhats-fort-summit-knoxville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.teknovation.biz/sh-data-technologies-rebrands-as-tenhats/","label":"SH Data Technologies rebrands as TenHats","publisher":"Teknovation.biz","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.tenhats.com/","label":"TenHats","publisher":"TenHats","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-stem-practice-sycamore-view-memphis-tn","sourceRecordId":"stem-practice-sycamore-view-memphis-tn","name":"The STEM Practice Sycamore View AI Data Center","operator":"Golden Acquisitions / The STEM Practice","city":"Memphis","county":"Shelby","address":"1341 Sycamore View Road","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.161633,"longitude":-89.85969,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stem-practice-sycamore-view-memphis-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.actionnews5.com/2026/01/14/another-ai-data-center-coming-memphis-sources-say/","label":"Another AI data center coming to Memphis, sources say","publisher":"Action News 5 (WMC)","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://web.archive.org/web/20260116165108/https://www.datacenterdynamics.com/en/news/data-center-acquired-in-memphis-set-to-serve-oracle-cloud-partner/","label":"Data center acquired in Memphis, set to serve Oracle cloud partner (DCD, Jan 15, 2026; archived copy): 1341 Sycamore View Road, 1.5-acre parcel, 38,500 sq ft, up to 9 MW at full build-out","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-tierpoint-nashville-tn","sourceRecordId":"tierpoint-nashville-tn","name":"TierPoint Nashville","operator":"TierPoint","city":"Franklin","county":"Williamson","address":"311 Eddy Lane","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":35.9245097,"longitude":-86.8556872,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-nashville-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/tennessee/nashville/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-09-09"},{"url":"https://www.openstreetmap.org/way/819981908","label":"OpenStreetMap way/819981908","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.peeringdb.com/api/fac?id=4374","label":"PeeringDB facility 4374 — TierPoint Nashville, 311 Eddy Lane, Franklin, TN 37064","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-09-14"}]},{"id":"compute-zayo-nashville-10th-ave-s-tn","sourceRecordId":"zayo-nashville-10th-ave-s-tn","name":"Zayo Nashville (209 10th Ave. S)","operator":"Zayo Group","city":"Nashville","county":"Davidson","address":"209 10th Avenue South","state":"TN","stateName":"Tennessee","jurisdictionType":"state","latitude":36.155165,"longitude":-86.782559,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/zayo-nashville-10th-ave-s-tn","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/2936","label":"PeeringDB facility 2936 — Zayo Nashville - 209 10th Ave. S","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-10"}]},{"id":"compute-aligned-project-caprock-hale-county-tx","sourceRecordId":"aligned-project-caprock-hale-county-tx","name":"Aligned Data Centers Project Caprock","operator":"Aligned Data Centers","city":"Abernathy","county":"Hale","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.84,"longitude":-101.84,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-project-caprock-hale-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/","label":"Aligned breaks ground on Project Caprock 540 MW campus in Hale County","publisher":"Aligned Data Centers","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.globenewswire.com/news-release/2026/04/09/3271435/0/en/Aligned-Data-Centers-Breaks-Ground-on-Project-Caprock-a-Sustainable-540-MW-Next-Generation-Data-Center-Campus-in-Northwest-Texas.html","label":"Aligned Data Centers breaks ground on Project Caprock 540 MW campus in Northwest Texas","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-aligned-dfw-01-tx","sourceRecordId":"aligned-dfw-01-tx","name":"Aligned DFW-01","operator":"Aligned Data Centers","city":"Plano","county":"Collin","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.0093142,"longitude":-96.6765617,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-dfw-01-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/dallas-data-centers/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.openstreetmap.org/way/483286527","label":"OpenStreetMap way/483286527","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://baxtel.com/data-center/aligned-plano","label":"baxtel — Aligned Plano Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-16"}]},{"id":"compute-aligned-dfw-03-tx","sourceRecordId":"aligned-dfw-03-tx","name":"Aligned DFW-03","operator":"Aligned Data Centers","city":"Mansfield","county":"Tarrant","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.5498227,"longitude":-97.0748553,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-dfw-03-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/dallas-data-centers/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.openstreetmap.org/way/1443620406","label":"OpenStreetMap way/1443620406","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/","label":"Aligned — DFW-03 Mansfield press release","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-amazon-floydada-floyd-county-tx","sourceRecordId":"amazon-floydada-floyd-county-tx","name":"Amazon Data Services Floydada Data Center","operator":"Amazon Data Services, Inc.","city":"Floydada","county":"Floyd","address":"1752 County Road 241","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.983972,"longitude":-101.3344603,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-floydada-floyd-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026025594","label":"TDLR TABS2026025594 - Confidential Data Center, 1752 County Road 241, Floydada","publisher":"Texas Department of Licensing and Regulation","kind":"permit","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Floydada,+Floyd+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Floydada, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-amazon-pecos-county-data-center-tx","sourceRecordId":"amazon-pecos-county-data-center-tx","name":"Amazon Pecos County Data Center Campus","operator":"Amazon Data Services, Inc.","city":null,"county":"Pecos","address":"6000 TX-18","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.8981,"longitude":-102.8779,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-pecos-county-data-center-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://usdatacenterprojects.com/texas/amazon-files-plans-for-new-data-center-buildings-in-texas-across-three-sites","label":"Amazon Files Plans for New Data Center Buildings in Texas","publisher":"US Data Center Projects","kind":"permit","retrievedAt":"2026-08-25"},{"url":"https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs","label":"Amazon's planned data center campus in Pecos County, Texas: Read Amazon's statement","publisher":"About Amazon","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://constructionreviewonline.com/amazon-backs-7-65-gw-gas-plant-in-texas-to-power-new-ai-data-center-campus/","label":"Amazon Backs 7.65-GW Gas Plant in Texas to Power New AI Data Center Campus","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-amp-z-lufkin-southland-mill-angelina-county-tx","sourceRecordId":"amp-z-lufkin-southland-mill-angelina-county-tx","name":"Amp Z East Texas Data Center Campus (former Southland Paper Mill)","operator":"Amp Z (Amp Z Champion Data Center Holdings LLC)","city":null,"county":"Angelina","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.3386242,"longitude":-94.7288558,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/amp-z-lufkin-southland-mill-angelina-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lufkindailynews.com/news/local/ai-data-center-planned-on-1-000-acres-at-former-southland-paper-mill-site/article_ff9e97bf-361d-5649-835b-68a75818bd94.html","label":"AI data center planned on 1,000+ acres at former Southland Paper Mill site","publisher":"Lufkin Daily News","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Lufkin,+Angelina+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Lufkin, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-edgeconnex-cedar-creek-tx","sourceRecordId":"edgeconnex-cedar-creek-tx","name":"AUS02 / Cedar Creek Campus","operator":"EdgeConneX","city":"Cedar Creek","county":"Bastrop","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.139438,"longitude":-97.565051,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-cedar-creek-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://communityimpact.com/austin/bastrop-cedar-creek/government/2026/03/31/edgeconnex-plans-second-data-center-campus-in-bastrop-county/","label":"EdgeConneX plans second data center campus in Bastrop County","publisher":"Community Impact","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://bastropcc.com/blog/edgeconnex-data-center-update-may-2026/","label":"EdgeConneX data center update, May 2026","publisher":"Bastrop County Chamber","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025023484","label":"Texas Department of Licensing and Regulation (TDLR) TABS project registration #TABS2025023484 — \"ECX AUSTIN DFW33220N\", owner DFW33220N LLC (EdgeConneX), address 8001 Wolf Ln Bldg 2 / 6752 FM 535, Cedar Creek, TX 78612","publisher":null,"kind":"other","retrievedAt":"2026-07-18"}]},{"id":"compute-aws-project-eagle-boling-wharton-county-tx","sourceRecordId":"aws-project-eagle-boling-wharton-county-tx","name":"AWS Project Eagle (Wharton County)","operator":"Amazon Data Services, Inc.","city":"Boling","county":"Wharton","address":"Eaglewood Road","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.3167,"longitude":-96.0553,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-project-eagle-boling-wharton-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://usdatacenterprojects.com/texas/aws-files-1-2-billion-permit-for-four-building-data-center-campus-in-wharton-county-texas","label":"AWS Files $1.2 Billion Permit for Data Center in Texas","publisher":"US Data Center Projects","kind":"permit","retrievedAt":"2026-08-25"}]},{"id":"compute-aws-project-spectrum-somervell-county-tx","sourceRecordId":"aws-project-spectrum-somervell-county-tx","name":"AWS Project Spectrum (Somervell/Hood County)","operator":"Amazon Data Services, Inc.","city":null,"county":"Somervell","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.2373,"longitude":-97.7561,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-project-spectrum-somervell-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://constructionreviewonline.com/amazon-to-collocate-5-billion-project-spectrum-data-center-campus-in-texas-with-nuclear-power-plant/","label":"Amazon to Collocate $5 Billion Project Spectrum Data Center Campus in Texas with Nuclear Power Plant","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://baxtel.com/data-center/amazon-project-spectrum","label":"Amazon: Comanche Peak Data Center (Baxtel) — history: Hood County plan of about 1,265 acres; Amazon said in September 2026 it would not build in Hood County","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://interchange.puc.texas.gov/search/filings/?ControlNumber=59399","label":"Public Utility Commission of Texas docket 59399 filing list — Joint application of Comanche Peak Power Company LLC and Amazon Data Services, Inc. for approval of a net metering arrangement","publisher":"Public Utility Commission of Texas","kind":"permit","retrievedAt":"2026-10-28"}]},{"id":"compute-big-digital-energy-10netzero-hood-county-tx","sourceRecordId":"big-digital-energy-10netzero-hood-county-tx","name":"Big Digital Energy–10NetZero Hood County AI Data Center Campus","operator":"Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)","city":null,"county":"Hood","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.44194,"longitude":-97.76472,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/big-digital-energy-10netzero-hood-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.globenewswire.com/news-release/2026/07/20/3329715/0/en/Big-Digital-Energy-and-10NetZero-Complete-Acquisition-of-Hood-County-Texas-Site.html","label":"Big Digital Energy and 10NetZero Complete Acquisition of Hood County, Texas Site","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-09-08"},{"url":"https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm","label":"Big Digital Energy SEC exhibit re: Hood County / DFW-area site LOI","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-09-08"}]},{"id":"compute-blockchain-digital-infrastructure-collin-county-tx","sourceRecordId":"blockchain-digital-infrastructure-collin-county-tx","name":"BlockchAIn Collin County AI GPU Hosting Site","operator":"BlockchAIn Digital Infrastructure, Inc.","city":null,"county":"Collin","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.1972,"longitude":-96.6398,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blockchain-digital-infrastructure-collin-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/blockchain-collin-county-tx","label":"BlockchAIn: Collin County, TX Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-25"}]},{"id":"compute-blockchain-digital-infrastructure-reeves-county-tx","sourceRecordId":"blockchain-digital-infrastructure-reeves-county-tx","name":"BlockchAIn Reeves County AI GPU Hosting Site","operator":"BlockchAIn Digital Infrastructure, Inc.","city":null,"county":"Reeves","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.4229,"longitude":-103.4933,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blockchain-digital-infrastructure-reeves-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/blockchain-reeves-county-tx","label":"BlockchAIn: Reeves County, TX Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-25"}]},{"id":"compute-blueprint-georgetown-tx","sourceRecordId":"blueprint-georgetown-tx","name":"Blueprint Data Centers Georgetown","operator":"Blueprint Data Centers","city":"Georgetown","county":"Williamson","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.6370152,"longitude":-97.6775634,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blueprint-georgetown-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://convergedigest.com/blueprint-data-centers-plans-85mw-austin-expansion-energized-by-2026/","label":"Blueprint Data Centers plans 85MW Austin expansion, energized by 2026","publisher":"Converge Digest","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Georgetown,+Williamson+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Georgetown, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"},{"url":"https://www.blueprint-dc.com/","label":"Blueprint Data Centers: Taylor DC and Georgetown DC project listings","publisher":"Blueprint Data Centers","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-blueprint-taylor-tx","sourceRecordId":"blueprint-taylor-tx","name":"Blueprint Data Centers Taylor","operator":"Blueprint Data Centers","city":"Taylor","county":"Williamson","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.5728854,"longitude":-97.4141053,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blueprint-taylor-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://convergedigest.com/blueprint-data-centers-plans-85mw-austin-expansion-energized-by-2026/","label":"Blueprint Data Centers plans 85MW Austin expansion, energized by 2026","publisher":"Converge Digest","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Taylor,+Williamson+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Taylor, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-cipher-barber-lake-colorado-city-tx","sourceRecordId":"cipher-barber-lake-colorado-city-tx","name":"Cipher Barber Lake Campus","operator":"Cipher Digital","city":"Colorado City","county":"Mitchell","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.3954,"longitude":-100.8687,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-barber-lake-colorado-city-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/","label":"Cipher Mining acquires more than 500 acres across two sites in Texas for crypto and HPC use","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.quiverquant.com/news/Cipher+Mining+Inc.+Announces+$1.4+Billion+Offering+of+Senior+Secured+Notes+for+Barber+Lake+Facility+Construction","label":"Cipher Mining Inc. — Proposed $1.4B Senior Secured Notes Offering press release (SEC 8-K exhibit, via Quiver Quantitative reproduction)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-cipher-black-pearl-wink-tx","sourceRecordId":"cipher-black-pearl-wink-tx","name":"Cipher Black Pearl Campus","operator":"Cipher Digital","city":"Wink","county":"Winkler","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.751,"longitude":-103.1607,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-black-pearl-wink-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/cipher-digital-black-pearl","label":"Cipher Digital Black Pearl","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.prnewswire.com/news-releases/engie-teams-up-with-cipher-mining-to-power-texas-data-center-302454171.html","label":"ENGIE teams up with Cipher Mining to power Texas data center (up to 300 MW wind PPA)","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://finance.yahoo.com/news/cipher-mining-pursues-2-billion-161628888.html","label":"Cipher Mining pursues $2 billion debt offering for Amazon data center","publisher":"Yahoo Finance","kind":"filing","retrievedAt":"2026-07-08"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.globenewswire.com/news-release/2025/11/03/3179121/0/en/Cipher-Mining-Provides-Third-Quarter-2025-Business-Update.html","label":"Cipher Mining Provides Third Quarter 2025 Business Update (GlobeNewswire, Nov 3, 2025)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-cipher-colchis-tom-green-tx","sourceRecordId":"cipher-colchis-tom-green-tx","name":"Cipher Colchis Campus","operator":"Cipher Digital","city":"San Angelo","county":"Tom Green","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.5290977,"longitude":-100.3212098,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-colchis-tom-green-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","label":"Cipher Digital Inc. FY2025 Form 10-K — Item 1 Site Pipeline, Colchis Site (1-GW West Texas, 620 acres, AEP Direct Connect, energize 2028)","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://investors.ciphermining.com/news-releases/news-release-details/cipher-mining-provides-third-quarter-2025-business-update","label":"Cipher Mining Provides Third Quarter 2025 Business Update — formation of JV to develop 1-GW Colchis site in West Texas","publisher":"Cipher Mining Inc.","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate","label":"San Angelo May End Up With a Data Center It Can't Regulate — Cipher Digital Colchis in Tom Green County, near AEP Red Creek substation","publisher":"San Angelo LIVE","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.globenewswire.com/news-release/2025/11/03/3179121/0/en/Cipher-Mining-Provides-Third-Quarter-2025-Business-Update.html","label":"Cipher Mining Provides Third Quarter 2025 Business Update (GlobeNewswire, Nov 3, 2025)","publisher":null,"kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-cipher-mclennan-county-tx","sourceRecordId":"cipher-mclennan-county-tx","name":"Cipher McLennan HPC Data Center","operator":"Cipher Digital","city":"Waco","county":"McLennan","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.474088,"longitude":-96.96261,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-mclennan-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","label":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — McLennan Site, central Texas, targeted capacity up to 500 MW, energize 2028; option exercised Feb 2026","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","label":"Waco Bridge — 'Second Waco-area data center proposal troubles residents' (citing McLennan County clerk records)","publisher":null,"kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.globenewswire.com/news-release/2024/10/15/2963299/0/en/Cipher-Mining-Announces-the-Signing-of-Option-Agreements-to-Acquire-1-5-GW-of-Data-Center-Sites-in-West-and-North-Texas.html","label":"Cipher Mining — Announces Signing of Option Agreements to Acquire 1.5 GW of Data Center Sites in West and North Texas (GlobeNewswire, Oct 15, 2024)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-cipher-mikeska-mcculloch-county-tx","sourceRecordId":"cipher-mikeska-mcculloch-county-tx","name":"Cipher Mikeska HPC Data Center","operator":"Cipher Digital","city":"Brady","county":"McCulloch","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.1317,"longitude":-99.3349,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-mikeska-mcculloch-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","label":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — Mikeska Site, West Texas, targeted capacity up to 500 MW, energize 2028; option to purchase exercised Feb 2026","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/data-center/cipher-mining-mikeska","label":"Baxtel — Cipher Mikeska data center (500 MW, outside Brady, Texas)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-17"}]},{"id":"compute-cipher-milsing-huntsville-walker-tx","sourceRecordId":"cipher-milsing-huntsville-walker-tx","name":"Cipher Milsing HPC Data Center","operator":"Cipher Digital","city":"Huntsville","county":"Walker","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.7235,"longitude":-95.5508,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-milsing-huntsville-walker-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","label":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — Milsing Site, East Texas, targeted capacity up to 500 MW, energize 2028-2029; option exercised Dec 2025","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/data-center/cipher-mining-milsing","label":"Baxtel — Cipher Milsing data center (~187 acres, Huntsville, Texas, outside Houston)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-17"}]},{"id":"compute-cipher-reveille-cotulla-la-salle-tx","sourceRecordId":"cipher-reveille-cotulla-la-salle-tx","name":"Cipher Reveille HPC Data Center","operator":"Cipher Digital","city":"Cotulla","county":"La Salle","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":28.4359,"longitude":-99.2351,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-reveille-cotulla-la-salle-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","label":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — Reveille Site, located in Cotulla, Texas, ERCOT interconnection up to 70 MW, energize 2027","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/data-center/cipher-digital-reveille-tx","label":"Baxtel — Cipher Reveille, Cotulla, Texas data center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-17"}]},{"id":"compute-cipher-stingray-andrews-county-tx","sourceRecordId":"cipher-stingray-andrews-county-tx","name":"Cipher Stingray HPC Data Center","operator":"Cipher Digital","city":"Andrews","county":"Andrews","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.3187,"longitude":-102.5457,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cipher-stingray-andrews-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","label":"Cipher Digital (Cipher Mining) FY2025 Form 10-K (filed 2026-02-24) — Stingray Site, West Texas, conditional ERCOT interconnection up to 100 MW, energize H1 2026","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/","label":"DCD — Cipher acquires Stingray, 250 acres in Andrews County (west of Andrews), 100 MW front-of-the-meter, energize Q2 2026","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.globenewswire.com/news-release/2024/11/26/2987553/0/en/Cipher-Mining-Announces-Acquisition-of-New-Site-in-West-Texas-Adding-100-MW-of-Capacity-to-its-Growing-Portfolio-of-Power-and-Data-Center-Development-Opportunities.html","label":"Cipher Mining — Announces Acquisition of New Site in West Texas (GlobeNewswire, Nov 26, 2024)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-cleanspark-austin-county-tx","sourceRecordId":"cleanspark-austin-county-tx","name":"CleanSpark Austin County AI Data Center Campus","operator":"CleanSpark, Inc.","city":null,"county":"Austin","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.9508,"longitude":-96.2661,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cleanspark-austin-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/827876/000119312525254934/clsk-20251029.htm","label":"CleanSpark, Inc. Form 8-K, filed 2025-10-29 (Item 8.01)","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://www.sec.gov/Archives/edgar/data/827876/000119312525254934/clsk-ex99_1.htm","label":"CleanSpark Exhibit 99.1 press release: AI Data Center in Greater Houston","publisher":"CleanSpark, Inc.","kind":"filing","retrievedAt":"2026-08-02"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-enters-texas-market-with-land-and-large-scale-power-acquisition-to-rapidly-deploy-an-ai-data-center-in-greater-houston-302598051.html","label":"CleanSpark Enters Texas Market with Land and Large-Scale Power Acquisition to Rapidly Deploy an AI Data Center in Greater Houston","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-08-25"}]},{"id":"compute-cleanspark-brazoria-county-tx","sourceRecordId":"cleanspark-brazoria-county-tx","name":"CleanSpark Brazoria County (Second Texas) Campus","operator":"CleanSpark, Inc.","city":null,"county":"Brazoria","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.1694,"longitude":-95.431,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cleanspark-brazoria-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html","label":"CleanSpark Expands Texas Footprint with Major Power Acquisition Near Houston","publisher":"PR Newswire (CleanSpark, Inc.)","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://investors.cleanspark.com/news/news-details/2026/CleanSpark-Expands-Texas-Footprint-with-Major-Power-Acquisition-Near-Houston-to-Support-Scaled-AI-and-HPC-Development/default.aspx","label":"CleanSpark Expands Texas Footprint (issuer IR copy)","publisher":"CleanSpark, Inc.","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://investors.cleanspark.com/news/news-details/2026/CleanSpark-Releases-February-2026-Operational-Update/default.aspx","label":"CleanSpark Releases February 2026 Operational Update","publisher":"CleanSpark, Inc.","kind":"press","retrievedAt":"2026-08-02"},{"url":"https://katten.com/katten-advises-cleanspark-on-acquisition-and-commencement-of-development-for-additional-ai-data-center-in-texas","label":"Katten advises CleanSpark on acquisition and commencement of development for additional AI data center in Texas","publisher":"Katten","kind":"other","retrievedAt":"2026-10-30"}]},{"id":"compute-cloudburst-san-marcos-tx","sourceRecordId":"cloudburst-san-marcos-tx","name":"CloudBurst San Marcos GigaCenter","operator":"CloudBurst Data Centers","city":"San Marcos","county":"Hays","address":"2955 Francis Harris Lane","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.88,"longitude":-97.94,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloudburst-san-marcos-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/cloudburst-breaks-ground-on-gigawatt-scale-data-center-campus-in-texas/","label":"CloudBurst breaks ground on gigawatt-scale data center campus in Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas","label":"CloudBurst and Evolve break ground on 1.2 GW flagship AI campus in Central Texas","publisher":"eVOLVE Inc.","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://therealdeal.com/texas/2026/05/01/cloudburst-secures-tax-breaks-for-central-texas-data-center/","label":"Cloudburst secures incentives for $14B central-Texas data center","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://communityimpact.com/san-antonio/government/guadalupe-county-commissioners-vote-down-500m-tax-cut-for-proposed-data-center-in-new-braunfels/","label":"Guadalupe County commissioners vote down $500M tax cut for proposed data center","publisher":"Community Impact","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://web.archive.org/web/20260819033742/https://www.datacenterdynamics.com/en/news/706-acre-data-center-approved-for-development-outside-san-antonio-texas/","label":"706-acre data center approved for development outside San Antonio, Texas (Internet Archive snapshot of DCD)","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://w.media/cloudburst-breaks-ground-on-1-2-gw-ai-data-center-in-texas/","label":"CloudBurst breaks ground on 1.2 GW AI data center in Texas","publisher":"W.Media","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-comanche-circle-sailfish-hood-county-tx","sourceRecordId":"comanche-circle-sailfish-hood-county-tx","name":"Comanche Circle","operator":"Sailfish Digital Ventures (SDV)","city":"Tolar","county":"Hood","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.35,"longitude":-97.83,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/comanche-circle-sailfish-hood-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/sailfish-plans-multi-gigawatt-data-center-park-outside-dfw-texas/","label":"Sailfish plans multi-gigawatt data center park outside DFW, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/","label":"Hood County rejects data center development pause","publisher":"Texas Tribune","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.keranews.org/energy-environment/2026-06-25/comanche-circle-paluxy-river-valley-data-center-hill-county-dinosaur-valley-state-park","label":"KERA News: NRG withdraws permit for proposed Tolar gas plant amid community opposition (confirms June 18 2026 withdrawal, campus power plan now undefined)","publisher":null,"kind":"press","retrievedAt":"2026-08-16"}]},{"id":"compute-core-scientific-austin-tx","sourceRecordId":"core-scientific-austin-tx","name":"Core Scientific Austin Data Center (Austin 1)","operator":"Core Scientific","city":"Austin","county":"Travis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.214,"longitude":-97.622,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/core-scientific-austin-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.businesswire.com/news/home/20240603752657/en/Core-Scientific-to-Provide-Approximately-200-MW-of-Infrastructure-to-Host-CoreWeave%E2%80%99s-High-Performance-Computing-Services-Capturing-Significant-AI-Compute-Opportunity","label":"Core Scientific to Provide Approximately 200 MW of Infrastructure to Host CoreWeave's High-Performance Computing Services","publisher":"BusinessWire","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://corescientific.com/high-density-data-centers/austin-tx/","label":"Data Center Austin TX | High-Density Infrastructure","publisher":"Core Scientific (operator site)","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://www.datacentermap.com/usa/texas/austin/core-scientific-austin/","label":"Core Scientific Austin Data Center | 3301 Hibbetts Rd","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-core-scientific-denton-tx","sourceRecordId":"core-scientific-denton-tx","name":"Core Scientific Denton Data Center (Denton 1)","operator":"Core Scientific","city":"Denton","county":"Denton","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.1932,"longitude":-97.1276,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/core-scientific-denton-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site","label":"Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site","publisher":"Core Scientific IR (BusinessWire-syndicated)","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://baxtel.com/data-center/core-scientific-denton-tx","label":"Core Scientific: Denton, TX Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://corescientific.com/high-density-data-centers/denton-texas/","label":"Denton, TX Data Center | High-Density at Scale","publisher":"Core Scientific (operator site)","kind":"other","retrievedAt":"2026-08-16"}]},{"id":"compute-core-scientific-pecos-tx","sourceRecordId":"core-scientific-pecos-tx","name":"Core Scientific Pecos AI Campus","operator":"Core Scientific","city":"Pecos","county":"Reeves","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.44,"longitude":-103.58,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/core-scientific-pecos-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/134/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-pecos-texas-campus","label":"Core Scientific plans expansion to 1.5 gigawatts of gross power at Pecos, Texas campus","publisher":"Core Scientific Inc.","kind":"filing","retrievedAt":"2026-07-08"},{"url":"https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results","label":"Core Scientific announces Q4 FY2025 results","publisher":"Core Scientific","kind":"filing","retrievedAt":"2026-07-08"}]},{"id":"compute-sb-energy-cosmos-technology-campus-austin-tx","sourceRecordId":"sb-energy-cosmos-technology-campus-austin-tx","name":"Cosmos Technology Campus (former 3M campus)","operator":"SB Energy","city":"Austin","county":"Travis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.395976,"longitude":-97.844709,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sb-energy-cosmos-technology-campus-austin-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/2133037/000162828026062846/sbenergy-sx1a2.htm","label":"SB Energy Form S-1/A (Amendment No. 2): Cosmos Technology Campus, Travis County, TX, ~50 MW critical IT, under construction, ready for service 2027","publisher":"U.S. SEC (EDGAR)","kind":"filing","retrievedAt":"2026-10-26"},{"url":"https://data.austintexas.gov/resource/3syk-w9eu.json?permit_number=2026-057410%20BP","label":"City of Austin construction permit 2026-057410 BP, 6801 River Place Blvd: UPS-MV-DH1-2 installation (Turner Construction), issued 2026-06-08; one of 18 data-hall UPS permits issued 2026-05-27 to 2026-06-08","publisher":"City of Austin Open Data","kind":"permit","retrievedAt":"2026-10-26"},{"url":"https://www.fourpointsnews.com/2026/09/03/sec-filings-show-that-sb-energy-is-constructing-a-data-center-at-former-3m-site-in-four-points/","label":"SEC filings show that SB Energy is constructing a data center at former 3M site in Four Points","publisher":"Four Points News","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.fourpointsnews.com/2026/08/09/construction-ongoing-until-spring-for-the-new-tenant-of-the-former-3m-site/","label":"Construction ongoing until spring for the new tenant of the former 3M site","publisher":"Four Points News","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.kxan.com/news/austins-former-3m-campus-set-for-data-center-following-1b-transformation/amp/","label":"KXAN: former 3M campus in Four Points, SB Energy Project Cosmos (headline per URL slug)","publisher":"KXAN","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://communityimpact.com/lake-travis-westlake/development/four-points-area-residents-discuss-future-of-former-3m-campus/","label":"Community Impact: Four Points area residents discuss future of former 3M campus (headline per URL slug)","publisher":"Community Impact","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.fourpointsnews.com/2026/04/30/former-3m-site-will-continue-to-be-rd-site-not-a-data-center/","label":"Former 3M site will continue to be R&D site, not a data center","publisher":"Four Points News","kind":"press","retrievedAt":"2026-10-26"}]},{"id":"compute-crow-holdings-cleanarc-stemmons-dallas-tx","sourceRecordId":"crow-holdings-cleanarc-stemmons-dallas-tx","name":"Crow Holdings Stemmons Corridor Data Center Campus","operator":"Crow Holdings (developed and leased by CleanArc Data Centers)","city":"Dallas","county":"Dallas","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.7762719,"longitude":-96.7968559,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crow-holdings-cleanarc-stemmons-dallas-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.crowholdings.com/insights/crow-holdings-announces-245mw-flagship-data-center-campus-in-central-dallas/","label":"Crow Holdings Announces 245MW Flagship Data Center Campus in Central Dallas","publisher":"Crow Holdings","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-crusoe-nolan-county-tx","sourceRecordId":"crusoe-nolan-county-tx","name":"Crusoe Nolan County Data Center","operator":"Crusoe Energy Systems","city":"Sweetwater","county":"Nolan","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.4709519,"longitude":-100.405938,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crusoe-nolan-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved","label":"'It will change our rural town': Tax abatement for $7 billion Texas data center approved","publisher":"KTXS (Sinclair)","kind":"subsidy","retrievedAt":"2026-10-14"}]},{"id":"compute-crusoe-blue-energy-victoria-tx","sourceRecordId":"crusoe-blue-energy-victoria-tx","name":"Crusoe Victoria AI Factory","operator":"Crusoe","city":"Victoria","county":"Victoria","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":28.8053,"longitude":-97.0036,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/crusoe-blue-energy-victoria-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center","label":"Blue Energy and Crusoe partner to develop nuclear-powered AI data center","publisher":"Crusoe","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.crossroadstoday.com/news/local-news/data-centers-spark-debate-in-victoria-county-commissioners-court/article_41cfcf09-e3db-421c-80ea-e99b83ec699d.html","label":"Crossroads Today — Data centers spark debate in Victoria County Commissioners Court","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-cyrusone-bosque-county-thad-hill-tx","sourceRecordId":"cyrusone-bosque-county-thad-hill-tx","name":"CyrusOne Bosque County Campus (Thad Hill Energy Center)","operator":"CyrusOne","city":null,"county":"Bosque","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.9243,"longitude":-97.6564,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-bosque-county-thad-hill-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","label":"Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas","publisher":"CyrusOne","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.calpine.com/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas/","label":"Calpine and CyrusOne Announce Phase 2 of Powered Land Agreement at Thad Hill Energy Center (190 MW + 210 MW = 400 MW)","publisher":"Calpine","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://web.archive.org/web/20251109203538/https://www.businesswire.com/news/home/20250730057911/en/Energy-Capital-Partners-and-KKR-Announce-Development-of-Hyperscale-Data-Center-Campus-in-Texas","label":"Energy Capital Partners and KKR Announce Development of Hyperscale Data Center Campus in Texas — 'Construction of the project is underway'","publisher":"Business Wire / Energy Capital Partners (via Internet Archive)","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-cyrusone-dfw3-dfw5-allen-tx","sourceRecordId":"cyrusone-dfw3-dfw5-allen-tx","name":"CyrusOne DFW3-DFW5 (Allen)","operator":"CyrusOne","city":"Allen","county":"Collin","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.1385206,"longitude":-96.6599516,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-dfw3-dfw5-allen-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/allen-texas","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/590213771","label":"OpenStreetMap way/590213771","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.datacenterknowledge.com/operations-and-management/future-allen-campus-would-be-cyrusone-s-largest-texas-data-center","label":"CyrusOne AI/HPC — Allen campus marketed for AI training, HPC, multi-cloud","publisher":"datacenterknowledge.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.businesswire.com/news/home/20220420005203/en/CyrusOne-Purchases-Solar-and-Wind-Energy-in-North-Texas-from-Gexa-Energy-as-Part-of-Transition-to-100-Sustainable-Power","label":"Business Wire: CyrusOne Purchases Solar and Wind Energy in North Texas from Gexa Energy (Apr 2022) — names Allen, Carrollton, Lewisville","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-signs-40mw-wind-and-solar-ppa-with-gexa-energy-in-texas/","label":"DataCenterDynamics: CyrusOne signs 40MW wind and solar PPA with Gexa Energy in Texas","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-cyrusone-freestone-energy-center-fairfield-tx","sourceRecordId":"cyrusone-freestone-energy-center-fairfield-tx","name":"CyrusOne Freestone Energy Center Campus","operator":"CyrusOne","city":"Fairfield","county":"Freestone","address":"1366 FM488","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.7285,"longitude":-96.1611,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-freestone-energy-center-fairfield-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","label":"Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas","publisher":"CyrusOne","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.constellationenergy.com/news/2026/02/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas.html","label":"Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas","publisher":"Constellation Energy","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-cyrusone-jack-county-tx","sourceRecordId":"cyrusone-jack-county-tx","name":"CyrusOne Jack County Data Center","operator":"CyrusOne (C1 Jack 1 LLC)","city":null,"county":"Jack","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.2187858,"longitude":-98.1580978,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-jack-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/jack-county-tx","label":"CyrusOne: Jack County Data Center","publisher":"CyrusOne","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Jacksboro,+Jack+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Jacksboro, Jack County, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-sat1-san-antonio-tx","sourceRecordId":"cyrusone-sat1-san-antonio-tx","name":"CyrusOne SAT1 (San Antonio)","operator":"CyrusOne","city":"San Antonio","county":"Bexar","address":"9999 Westover Hills Boulevard","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.4666098,"longitude":-98.6880869,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-sat1-san-antonio-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/cyrusone-sat1-san-antonio","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/509611432","label":"OpenStreetMap way/509611432","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-cyrusone-sat14a-medina-county-tx","sourceRecordId":"cyrusone-sat14a-medina-county-tx","name":"CyrusOne SAT14A (Medina County)","operator":"CyrusOne","city":"Castroville","county":"Medina","address":"3397 U.S. 90 West","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.3565001,"longitude":-98.8788844,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-sat14a-medina-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://devinenews.com/county-approves-80-tax-break-for-new-data-center-project/","label":"County approves 80% tax break for new data center project","publisher":"Devine News","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://hoodline.com/2026/07/castroville-braces-as-500-million-data-giant-rolls-in-on-u-s-90/","label":"Castroville braces as $500 million data giant rolls in on U.S. 90","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Castroville,+Medina+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Castroville, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-sat2-sat4-san-antonio-tx","sourceRecordId":"cyrusone-sat2-sat4-san-antonio-tx","name":"CyrusOne SAT2-SAT4 (San Antonio)","operator":"CyrusOne","city":"San Antonio","county":"Bexar","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.4708878,"longitude":-98.6730474,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-sat2-sat4-san-antonio-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/509611438","label":"OpenStreetMap way/509611438","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.datacentermap.com/usa/texas/san-antonio/cyrusone-san-antonio/","label":"CyrusOne AI/HPC — HPC spec: over 1,000 watts/sqft in designated areas","publisher":"datacentermap.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","label":"CyrusOne breaks ground on fifth San Antonio campus (CPS Energy attendance)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-data-city-energy-abundance-laredo-tx","sourceRecordId":"data-city-energy-abundance-laredo-tx","name":"Data City, Texas","operator":"Energy Abundance Development Corporation","city":"Laredo","county":"Webb","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":27.5306,"longitude":-99.4803,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/data-city-energy-abundance-laredo-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","label":"Energy Abundance announces Data City, Texas (press release, Mar 21 2025)","publisher":"PR Newswire / Energy Abundance Development Corporation","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.datacenterdynamics.com/en/news/5gw-data-center-with-behind-the-meter-hydrogen-power-planned-for-laredo-texas/","label":"Up to 5GW data center with behind-the-meter hydrogen power promised for Laredo, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://baxtel.com/data-center/data-city-texas","label":"Data City Texas — project listing","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-14"}]},{"id":"compute-digital-realty-aus11-tx","sourceRecordId":"digital-realty-aus11-tx","name":"Digital Realty AUS11","operator":"Digital Realty","city":"Austin","county":"Travis","address":"7500 Metro Center Drive","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.212156,"longitude":-97.6957555,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-aus11-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/austin/aus11","label":"Digital Realty facility directory","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/379204279","label":"OpenStreetMap way/379204279","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-edged-dallas-irving-tx","sourceRecordId":"edged-dallas-irving-tx","name":"Edged Dallas (Irving)","operator":"Edged Energy","city":"Irving","county":"Dallas","address":"505 North Wildwood Drive","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8211516,"longitude":-96.9169508,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edged-dallas-irving-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edged.us/news/edged-dallas-irving","label":"Edged Continues North American Expansion with New, Ultra-Efficient, AI Ready Data Center in Irving, Texas","publisher":"Edged Energy","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://datacenter.news/story/edged-gains-approval-for-second-waterless-ai-data-centre","label":"Edged gains approval for second waterless AI data centre","publisher":"DataCenterNews US","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-edged-martindale-campus-caldwell-county-tx","sourceRecordId":"edged-martindale-campus-caldwell-county-tx","name":"Edged Energy Martindale Campus","operator":"Edged Energy","city":"Martindale","county":"Caldwell","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.8534,"longitude":-97.82453,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edged-martindale-campus-caldwell-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/campus/edged-energy-martindale-campus","label":"Edged Energy: Martindale Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-element-critical-austin-one-tx","sourceRecordId":"element-critical-austin-one-tx","name":"Element Critical Austin One","operator":"Element Critical","city":"Austin","county":"Travis","address":"8025 North Interstate Highway 35 Service Road","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.3428035,"longitude":-97.6961735,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/element-critical-austin-one-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://elementcritical.com/data-centers/austin-data-center/","label":"Element Critical facility directory","publisher":"Element Critical","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/384396017","label":"OpenStreetMap way/384396017","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-energy-vault-snyder-scurry-county-tx","sourceRecordId":"energy-vault-snyder-scurry-county-tx","name":"Energy Vault Snyder AI Campus","operator":"Energy Vault, Inc.","city":"Snyder","county":"Scurry","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.7138,"longitude":-100.9112,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/energy-vault-snyder-scurry-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas","label":"Energy Vault breaks ground on AI Data Center Campus in Snyder, Texas","publisher":"US Data Center Projects","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-eneus-energy-rgv-data-center-harlingen-tx","sourceRecordId":"eneus-energy-rgv-data-center-harlingen-tx","name":"Eneus Energy RGV Data Center (Harlingen)","operator":"Eneus Energy (RGV Property Group)","city":"Harlingen","county":"Cameron","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":26.1907543,"longitude":-97.6960599,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eneus-energy-rgv-data-center-harlingen-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/eneus-energy-harlingen-rgv-campus","label":"Eneus Energy: Harlingen RGV Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Harlingen,+Cameron+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Harlingen, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-equinix-dallas-da11-tx","sourceRecordId":"equinix-dallas-da11-tx","name":"Equinix Dallas DA11","operator":"Equinix","city":"Dallas","county":"Dallas","address":"1990 N Stemmons Freeway","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8017196,"longitude":-96.8243167,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-dallas-da11-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/equinix-dallas-da11","label":"Equinix Dallas DA11 Data Center — site record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-equinix-dallas-da12-tx","sourceRecordId":"equinix-dallas-da12-tx","name":"Equinix Dallas DA12 (West Dallas)","operator":"Equinix","city":"Dallas","county":"Dallas","address":"1550 W Mockingbird Lane","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8209286,"longitude":-96.8586608,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-dallas-da12-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/equinix-dallas-da12","label":"Equinix: Dallas DA12 Data Center — site record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-flexential-dallas-downtown-dallas-tx","sourceRecordId":"flexential-dallas-downtown-dallas-tx","name":"Flexential Dallas - Downtown Dallas","operator":"Flexential","city":"Dallas","county":"Dallas","address":"1950 North Stemmons Freeway","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8004101,"longitude":-96.8193707,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-dallas-downtown-dallas-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/tx/dallas/downtown-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/node/12112238944","label":"OpenStreetMap node/12112238944","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-dallas-plano-tx","sourceRecordId":"flexential-dallas-plano-tx","name":"Flexential Dallas - Plano","operator":"Flexential","city":"Plano","county":"Collin","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.007033,"longitude":-96.6663507,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-dallas-plano-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/tx/dallas/plano-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/650412346","label":"OpenStreetMap way/650412346","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.datacenterdynamics.com/en/news/flexential-to-host-coreweave-hardware-in-plano-data-center-texas/","label":"Flexential AI/HPC — CoreWeave 13MW liquid-cooled high-density GPU deployment, up to 80kW/r","publisher":"datacenterdynamics.com","kind":"press","retrievedAt":"2026-07-23"},{"url":"https://www.datacentermap.com/usa/texas/dallas/flexential-plano/specs/","label":"Flexential Dallas-Plano specs — datacentermap.com","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterfrontier.com/design/article/33015029/dcf-tours-flexential-dallas-plano-data-center-18-mw-colocation-facility","label":"DCF Tours: Flexential Dallas-Plano Data Center, 18 MW Colocation Facility","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-flexential-dallas-richardson-tx","sourceRecordId":"flexential-dallas-richardson-tx","name":"Flexential Dallas - Richardson","operator":"Flexential","city":"Richardson","county":"Dallas","address":"3010 Waterview Parkway","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.9948122,"longitude":-96.7524974,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-dallas-richardson-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/tx/dallas/richardson-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/548184239","label":"OpenStreetMap way/548184239","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-flexential-kaufman-county-talty-tx","sourceRecordId":"flexential-kaufman-county-talty-tx","name":"Flexential Kaufman County Campus (Talty)","operator":"Flexential","city":"Talty","county":"Kaufman","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.689,"longitude":-96.3378,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-kaufman-county-talty-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/flexential-to-build-new-dallas-area-data-center-campus-on-110-acres-in-kaufman-county-302836104.html","label":"Flexential to Build New Dallas-Area Data Center Campus on 110 Acres in Kaufman County","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-fluidstack-abernathy-tx","sourceRecordId":"fluidstack-abernathy-tx","name":"Fluidstack Abernathy AI Campus","operator":"Fluidstack","city":"Abernathy","county":"Hale","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.84,"longitude":-101.84,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fluidstack-abernathy-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/terawulf-and-fluidstack-to-develop-texas-data-center-in-google-backed-deal/","label":"TeraWulf and Fluidstack to develop Texas data center in Google-backed deal","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://investors.terawulf.com/news-events/press-releases/detail/142/","label":"TeraWulf announces Anthropic lease at Justified Data Campus and sale of majority interest in Abernathy JV to Fluidstack","publisher":"TeraWulf Inc.","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-fort-spunky-pacifico-energy-hood-county-tx","sourceRecordId":"fort-spunky-pacifico-energy-hood-county-tx","name":"Fort Spunky","operator":"Pacifico Energy","city":null,"county":"Hood","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.42,"longitude":-97.78,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fort-spunky-pacifico-energy-hood-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/","label":"Texas data centers: Hood County, local control, rural water and power","publisher":"Texas Tribune","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.kbtx.com/2026/06/02/eight-data-centers-threaten-transform-this-small-texas-county-local-officials-say-they-have-no-power-stop-them/","label":"KBTX: Eight data centers threaten to transform this small Texas county (Fort Spunky name, 862 acres, 100MW grid request, water-permit lawsuit)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-galaxy-helios-dickens-county-tx","sourceRecordId":"galaxy-helios-dickens-county-tx","name":"Galaxy Helios Data Center Campus","operator":"Galaxy Digital","city":"Afton","county":"Dickens","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.72,"longitude":-100.84,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/galaxy-helios-dickens-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/galaxy-secures-approval-for-more-than-800mw-at-helios-campus-in-texas/","label":"Galaxy secures 1.6 GW ERCOT approval at Helios campus in Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://convergedigest.com/coreweave-locks-in-800-mw-at-galaxys-helios-campus-in-texas/","label":"CoreWeave locks in 800 MW at Galaxy Helios campus in Texas","publisher":"Converge Digest","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thetexasspur.com/news/205m-tax-abatement-paves-way-galaxy-growth-dickens-county","label":"$20.5M tax abatement paves way for Galaxy growth in Dickens County","publisher":"The Texas Spur","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.thetexasspur.com/news/galaxy-inks-major-deal-dickens-helios-host-services-coreweave","label":"Galaxy inks major deal; Helios to host services for CoreWeave","publisher":"The Texas Spur","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://claycorp.com/project/galaxy-digital-helios-renovation","label":"Galaxy Digital Helios Renovation — 133MW liquid-cooled build","publisher":"Clayco","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","label":"Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.argoblockchain.com/news-room/2022-december-helios-sale-to-galaxy","label":"Sale of Helios to Galaxy Digital Holdings","publisher":"Argo Blockchain","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://cryptobriefing.com/galaxy-digital-coreweave-200mw-helios-lease/","label":"Galaxy Digital Delivers First 200MW Phase to CoreWeave Under 15-Year Lease","publisher":"CryptoBriefing","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/galaxy-digital-closes-14bn-debt-facility-for-helios-data-center-campus-in-texas/","label":"Galaxy Digital Closes $1.4bn Debt Facility for Helios Data Center Campus in Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.theblock.co/post/407396/galaxy-delivers-133-mw-of-critical-it-load-to-coreweave-as-helios-bitcoin-mine-turns-ai-hub","label":"Galaxy Delivers 133 MW of Critical IT Load to CoreWeave as Helios Bitcoin Mine Turns AI Hub","publisher":"The Block","kind":"press","retrievedAt":"2026-07-10"}]},{"id":"compute-google-armstrong-county-tx","sourceRecordId":"google-armstrong-county-tx","name":"Goodnight Campus","operator":"Google / Crusoe","city":"Claude","county":"Armstrong","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":34.973,"longitude":-101.367,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-armstrong-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-commits-40bn-to-expand-cloud-and-ai-infrastructure-in-texas-through-2027/","label":"Google commits $40bn to expand cloud and AI infrastructure in Texas through 2027","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://e360.yale.edu/digest/google-natural-gas-data-center","label":"Google to Use Natural Gas to Power Massive Data Center in Texas","publisher":"Yale Environment 360","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.distilled.earth/p/google-is-weighing-natural-gas-without","label":"Google Is Considering Natural Gas Without Carbon Capture in Its AI Data Center Strategy","publisher":"Distilled","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","label":"How a Crusoe-Google campus became Texas' co-location test case","publisher":"Latitude Media","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.powermag.com/google-launches-1-gw-plus-co-located-data-center-and-generation-complex-in-texas-panhandle/","label":"Google Launches 1-GW-Plus Co-Located Data Center and Generation Complex in Texas Panhandle","publisher":"Power Magazine","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.newschannel10.com/2025/10/18/armstrong-county-ai-data-center-project-scaled-back-original-plan/","label":"Armstrong County AI data center project scaled back from original plan","publisher":"NewsChannel 10 (Amarillo)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Tax%20Abatement%20Agreement%202%20Phase%201.pdf","label":"Tax Abatement Agreement between Armstrong County, Texas and GN DC1, LLC (Phase 1)","publisher":"Armstrong County, Texas","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight","label":"Crusoe Plans $1B Texas AI Data Center Expansion, Pursues Nuclear Power","publisher":"The Energy Mag","kind":"press","retrievedAt":"2026-07-31"}]},{"id":"compute-google-haskell-county-tx","sourceRecordId":"google-haskell-county-tx","name":"Google Haskell County Data Center Campus","operator":"Google","city":"Haskell","county":"Haskell","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.1576,"longitude":-99.7337,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-haskell-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.texastribune.org/2025/11/14/texas-google-data-centers-ai/","label":"Google data centers totaling $40 billion coming to Texas","publisher":"Texas Tribune","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://gov.texas.gov/news/post/governor-abbott-google-announce-40-billion-investment-in-texas","label":"Governor Abbott, Google Announce $40 Billion Investment In Texas","publisher":"Office of the Texas Governor","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://datacenters.google/haskell-county/","label":"Google's investment in Haskell and West Central Texas","publisher":"Google","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.intersect.com/portfolio/quantum","label":"Quantum Clean Energy Project - Haskell County TX","publisher":"Intersect Power","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://ktxs.com/news/local/its-jarring-googles-40-billion-data-center-investment-to-transform-texas-town","label":"Google's $40 billion data center investment to transform Texas town","publisher":"KTXS ABC Abilene","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.newschannel6now.com/2025/11/26/data-centers-bring-major-investment-growth-potential-haskell-county/","label":"Data centers bring major investment, growth potential to Haskell County","publisher":"KAUZ News Channel 6","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-google-meitner-pampa-tx","sourceRecordId":"google-meitner-pampa-tx","name":"Google Meitner Energy Center","operator":"Google","city":"Pampa","county":"Gray","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":35.5365,"longitude":-100.9609,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-meitner-pampa-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.intersect.com/news/google-and-intersect-deepen-texas-roots-with-new-data-center-and-energy-investments-in-gray-and-roberts-counties","label":"Google and Intersect deepen Texas roots with new data center and energy investments in Gray and Roberts Counties","publisher":"Intersect Power","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.powermag.com/google-launches-1-gw-plus-co-located-data-center-and-generation-complex-in-texas-panhandle/","label":"Google launches 1 GW+ co-located data center and generation complex in Texas Panhandle","publisher":"POWER Magazine","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/","label":"Pampa's $3 billion AI data center signals new era of growth in Gray County","publisher":"NewsChannel 10","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://abc7amarillo.com/news/local/intersect-powers-1-billion-project-ignites-ogallala-aquifer-protection-talks-meinter-intersect-power-project-pampa-chris-porter-mitchell-locke-highway-152-panhandle-groundwater-conservation-district-terry-hall-levi-berry-gray-county-roberts-county-texas","label":"Intersect Power's project ignites Ogallala Aquifer protection talks in Gray County","publisher":"ABC 7 Amarillo","kind":"press","retrievedAt":"2026-07-08"}]},{"id":"compute-google-midlothian-ellis-county-tx","sourceRecordId":"google-midlothian-ellis-county-tx","name":"Google Midlothian Campus","operator":"Google","city":"Midlothian","county":"Ellis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.44363,"longitude":-97.06345,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-midlothian-ellis-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dallasinnovates.com/google-expands-further-into-texas-with-a-new-600m-midlothian-data-center/","label":"Google Boosts its Texas Investments With a New $600M Midlothian Data Center","publisher":"Dallas Innovates","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/campus/google-midlothian-campus","label":"Google: Midlothian Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-google-red-oak-tx","sourceRecordId":"google-red-oak-tx","name":"Google Red Oak Campus","operator":"Google","city":"Red Oak","county":"Ellis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.5163,"longitude":-96.8011,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-red-oak-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-announces-plans-for-red-oak-data-center-campus-in-texas/","label":"Google announces plans for Red Oak data center campus in Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://datacenters.google/locations/texas/","label":"Texas - Google Data Center Location","publisher":"Google","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.elliscountypress.com/news/google-plans-invest-more-600-million-new-data-center","label":"Google plans to invest more than $600 million in a new data center","publisher":"Ellis County Press","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.elliscountypress.com/news/google-announces-plans-invest-nearly-40-billion-ellis-county-data-centers","label":"Google announces plans to invest nearly $40 billion in Ellis County Data Centers","publisher":"Ellis County Press","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/google-red-oak-tx","label":"Google Red Oak TX Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/","label":"New Red Oak Data Center Project Meets Community Pushback","publisher":"Dallas Observer","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-google-wilbarger-vernon-tx","sourceRecordId":"google-wilbarger-vernon-tx","name":"Google Wilbarger County Campus","operator":"Google","city":"Vernon","county":"Wilbarger","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":34.1551,"longitude":-99.294,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-wilbarger-vernon-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/","label":"A new data center in Wilbarger County, Texas","publisher":"Google","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-hut8-beacon-point-robstown-tx","sourceRecordId":"hut8-beacon-point-robstown-tx","name":"Hut 8 Beacon Point AI Campus","operator":"Hut 8","city":"Robstown","county":"Nueces","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":27.7897,"longitude":-97.6689,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hut8-beacon-point-robstown-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html","label":"Hut 8 commercializes first phase of 1 GW Beacon Point AI data center campus with 15-year, 352 MW IT lease","publisher":"Hut 8 Corp.","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.prnewswire.com/news-releases/hut-8-announces-pricing-of-4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data-center-project-302792238.html","label":"Hut 8 prices $4.25 billion of senior secured notes for Beacon Point data center project","publisher":"PR Newswire / Hut 8 Corp.","kind":"filing","retrievedAt":"2026-07-08"},{"url":"https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county","label":"Beacon Point: massive AI data center planned for Nueces County","publisher":"KRIS-TV (Corpus Christi)","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://finance.yahoo.com/sectors/technology/articles/ai-data-center-bring-17b-211739130.html","label":"AI data center to bring $17B investment to Nueces County","publisher":"Yahoo Finance / Axios","kind":"press","retrievedAt":"2026-07-08"}]},{"id":"compute-hyperdatagrid-lufkin-angelina-county-tx","sourceRecordId":"hyperdatagrid-lufkin-angelina-county-tx","name":"HyperDataGrid Lufkin Data Center (Former Timber Mill Site)","operator":"HyperDataGrid","city":"Lufkin","county":"Angelina","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.3383,"longitude":-94.7292,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hyperdatagrid-lufkin-angelina-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://usdatacenterprojects.com/texas/hyperdatagrid-plans-data-center-on-former-timber-mill-site-near-lufkin-texas","label":"HyperDataGrid plans data center on former timber mill site near Lufkin, Texas","publisher":"US Data Center Projects","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-infrakey-lacy-lakeview-data-district-mclennan-county-tx","sourceRecordId":"infrakey-lacy-lakeview-data-district-mclennan-county-tx","name":"Infrakey Lacy Lakeview Data District","operator":"Infrakey","city":"Elm Mott","county":"McLennan","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.6715215,"longitude":-97.1000553,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/infrakey-lacy-lakeview-data-district-mclennan-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.texastribune.org/2026/05/14/waco-data-center-lacy-lakeview-infrakey-texas/","label":"Waco officials say they've been kept in the dark about Lacy Lakeview data center (Texas Tribune / Waco Bridge, May 14, 2026)","publisher":"The Texas Tribune","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Elm+Mott,+McLennan+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Elm Mott, McLennan County, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-iren-horizon-childress-tx","sourceRecordId":"iren-horizon-childress-tx","name":"IREN Horizon — Childress, TX","operator":"IREN (Iris Energy)","city":"Childress","county":"Childress","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":34.4276,"longitude":-100.2046,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iren-horizon-childress-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/iren-plans-75mw-liquid-cooled-ai-data-center-in-texas/","label":"IREN plans 75MW liquid-cooled AI data center in Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://iren.com/data-centers/childress","label":"Childress Data Center — 750MW AI-Optimised Facility","publisher":"IREN (official)","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.globenewswire.com/news-release/2025/11/03/3178993/0/en/IREN-Secures-9-7bn-AI-Cloud-Contract-with-Microsoft.html","label":"IREN Secures $9.7bn AI Cloud Contract with Microsoft","publisher":"GlobeNewsWire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/iren-horizon-1","label":"IREN: Horizon 1 Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.newschannel10.com/2026/05/18/iren-continues-developing-data-center-campus-childress/","label":"IREN continues developing data center campus in Childress","publisher":"NewsChannel 10 (Amarillo)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-signs-97bn-cloud-capacity-deal-with-iren/","label":"Microsoft signs $9.7bn cloud capacity deal with IREN","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://northwiseproject.com/iren-stock-childress/","label":"Northwise Project — IREN Stock Childress: Inside the 750MW Texas AI Factory","publisher":null,"kind":"subsidy","retrievedAt":"2026-07-25"}]},{"id":"compute-iren-sweetwater-tx","sourceRecordId":"iren-sweetwater-tx","name":"IREN Sweetwater Campus","operator":"IREN (Iris Energy)","city":"Sweetwater","county":"Nolan","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.4707,"longitude":-100.4059,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iren-sweetwater-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-announces-successful-energization-sweetwater-1","label":"IREN Announces Successful Energization of Sweetwater 1","publisher":"IREN investor relations","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.globenewswire.com/news-release/2026/05/01/3286213/0/en/iren-announces-successful-energization-of-sweetwater-1.html","label":"IREN Announces Successful Energization of Sweetwater 1 (May 1, 2026)","publisher":"GlobeNewswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-business-update","label":"IREN Business Update Jan 21, 2025 — first 1,400 MW Sweetwater announcement","publisher":"IREN investor relations","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://irisenergy.gcs-web.com/static-files/899b6969-7d10-4722-a259-f0ed5576bef3","label":"IREN Secures 2.75GW for Data Centers in West Texas — Sweetwater 2 600 MW announcement (Mar 17, 2025)","publisher":"IREN investor relations","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-secures-97bn-ai-cloud-contract-microsoft","label":"IREN Secures $9.7bn AI Cloud Contract with Microsoft (Nov 3, 2025)","publisher":"IREN investor relations","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas/","label":"Iren energizes first phase of 2GW Sweetwater data center campus in Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.stocktitan.net/news/IREN/iren-secures-2-75gw-for-data-centers-in-west-texas-with-new-600mw-s2dozeguu2xw.html","label":"IREN Expands Data Center Power to 2.75GW with New Texas Agreement (Sweetwater 2)","publisher":"StockTitan","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.globaldatacenterhub.com/p/nvidia-anchors-iren-with-34b-contract","label":"NVIDIA Anchors IREN With $3.4B Contract And $2.1B Equity Warrant (May 2026)","publisher":"Global Data Center Hub","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.sweetwaterreporter.com/county-approves-tax-increment-reinvestment-zone-to-enable-development-of-hyperscale-data-center-solar-power/article_1905ef84-a73c-4e87-8f02-e62e4aa72a74.html","label":"Nolan County approves Tax Increment Reinvestment Zone No. 1 for hyperscale data center development (June 2025)","publisher":"Sweetwater Reporter","kind":"subsidy","retrievedAt":"2026-07-07"},{"url":"https://www.texastribune.org/2025/10/02/rural-texas-data-centers-water/","label":"Rural Texas casting skeptical eye on data center openings — water concerns (Oct 2025)","publisher":"Texas Tribune","kind":"other","retrievedAt":"2026-07-07"}]},{"id":"compute-iron-mountain-taylor-williamson-county-tx","sourceRecordId":"iron-mountain-taylor-williamson-county-tx","name":"Iron Mountain Williamson County Data Center Campus","operator":"Iron Mountain","city":null,"county":"Williamson","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.5728854,"longitude":-97.4141053,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-taylor-williamson-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://newsletter.communityimpact.com/p/new-post-b3e4","label":"Iron Mountain data center plan presented to Hutto City Council (Community Impact, Mar 19, 2026)","publisher":"Community Impact","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Taylor,+Williamson+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Taylor, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-lambda-aligned-plano-tx","sourceRecordId":"lambda-aligned-plano-tx","name":"Lambda Plano AI Data Center (Aligned DFW-04)","operator":"Lambda","city":"Plano","county":"Collin","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.0198,"longitude":-96.6989,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/lambda-aligned-plano-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.devx.com/daily-news/lambda-cloud-to-occupy-aligned-data-center/","label":"Lambda Cloud to occupy Aligned data center in Plano","publisher":"DevX","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-lumen-austin-1-tx","sourceRecordId":"lumen-austin-1-tx","name":"Lumen Austin 1","operator":"Lumen Technologies","city":"Austin","county":"Travis","address":"4207 Smith School Road","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.1965,"longitude":-97.7124025,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-austin-1-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/texas/austin/level3-austin1/","label":"Lumen facility directory","publisher":"Lumen","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/383888101","label":"OpenStreetMap way/383888101","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-lumen-austin-3-tx","sourceRecordId":"lumen-austin-3-tx","name":"Lumen Austin 3","operator":"Lumen Technologies","city":"Austin","county":"Travis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.261396,"longitude":-97.7235975,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-austin-3-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-austin-3-500-chicon","label":"Baxtel facility profile — Lumen Austin 3","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/379195054","label":"OpenStreetMap way/379195054","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-lumen-dallas-1-tx","sourceRecordId":"lumen-dallas-1-tx","name":"Lumen Dallas 1","operator":"Lumen Technologies","city":"Dallas","county":"Dallas","address":"3180 Irving Boulevard","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8069549,"longitude":-96.8685888,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-dallas-1-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-dallas-1","label":"Baxtel facility profile — Lumen Dallas 1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/465032201","label":"OpenStreetMap way/465032201","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-lumen-dallas-6-tx","sourceRecordId":"lumen-dallas-6-tx","name":"Lumen Dallas 6","operator":"Lumen Technologies","city":"Dallas","county":"Dallas","address":"1150 Regal Row","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.827998,"longitude":-96.8843787,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-dallas-6-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-dallas-6","label":"Baxtel facility profile — Lumen Dallas 6","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/465032484","label":"OpenStreetMap way/465032484","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-lumen-san-antonio-2-tx","sourceRecordId":"lumen-san-antonio-2-tx","name":"Lumen San Antonio 2","operator":"Lumen Technologies","city":"San Antonio","county":"Bexar","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.4382791,"longitude":-98.5065217,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-san-antonio-2-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-san-antonio-2","label":"Baxtel facility profile — Lumen San Antonio 2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/319857331","label":"OpenStreetMap way/319857331","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-meta-el-paso-tx","sourceRecordId":"meta-el-paso-tx","name":"Meta El Paso AI Data Center Campus","operator":"Meta","city":"El Paso","county":"El Paso","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.81,"longitude":-106.55,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-el-paso-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/","label":"Meta breaks ground on El Paso AI-optimized data center","publisher":"Meta","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","label":"Meta boosts El Paso investment from $1.5B to $10B","publisher":"CNBC","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.texastribune.org/2026/01/26/texas-el-paso-meta-data-center-natural-gas-power-plant/","label":"Plan to run El Paso data center on natural gas sparks concern","publisher":"Texas Tribune","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","label":"Big things are happening, El Paso!","publisher":"Meta Data Centers","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-meta-fort-worth-tx","sourceRecordId":"meta-fort-worth-tx","name":"Meta Fort Worth Data Center","operator":"Meta","city":"Fort Worth","county":"Tarrant","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.9844048,"longitude":-97.2617581,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/meta-fort-worth-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/facebook-fort-worth","label":"Facebook Fort Worth Data Center — 4500 Like Way, opened 2017, ~200 acres, fully operational","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://datacenters.atmeta.com/asset/fort-worth-data-center-info-sheet/","label":"Fort Worth Data Center info sheet","publisher":"Meta Data Centers","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://fortune.com/2015/07/07/facebook-data-center-texas/","label":"Fortune - Facebook is building a huge wind-powered data center in Texas","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.power-technology.com/projects/shannon-wind-farm-texas/","label":"Power Technology - Shannon Wind Farm, Clay County, Texas","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterknowledge.com/archives/2015/07/07/reports-1b-facebook-data-center-project-underway-in-texas","label":"Data Center Knowledge — Reports: $1B Facebook Data Center Project Underway in Texas (2015)","publisher":null,"kind":"subsidy","retrievedAt":"2026-07-25"}]},{"id":"compute-meta-temple-tx","sourceRecordId":"meta-temple-tx","name":"Meta Temple Data Center","operator":"Meta","city":"Temple","county":"Bell","address":"3101 Industrial Blvd","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.1399225,"longitude":-97.3812992,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-temple-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kwtx.com/2026/07/22/meta-goes-live-temple-with-12-billion-ai-data-center/","label":"Meta goes live in Temple with $1.2 billion AI data center","publisher":"KWTX","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://jedunn.com/projects/meta-temple-data-center/","label":"Meta Temple Data Center — project page (general contractor)","publisher":"JE Dunn Construction","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-microsoft-irving-tx","sourceRecordId":"microsoft-irving-tx","name":"Microsoft Irving Data Centers","operator":"Microsoft","city":"Irving","county":"Dallas","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8295183,"longitude":-96.9442177,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-irving-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/microsoft-irving-tx","label":"Microsoft: Irving, TX Data Center — site record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-26"},{"url":"https://www.connectcre.com/stories/microsoft-qts-awarded-incentives-to-build-in-irving/","label":"Microsoft, QTS Awarded Incentives to Build in Irving","publisher":"Connect CRE","kind":"subsidy","retrievedAt":"2026-08-26"}]},{"id":"compute-microsoft-pecos-tx","sourceRecordId":"microsoft-pecos-tx","name":"Microsoft Pecos Data Center Campus","operator":"Microsoft","city":"Pecos","county":"Reeves","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.42,"longitude":-103.49,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-pecos-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/","label":"Microsoft announces Pecos data center campus","publisher":"Microsoft","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-plans-2gw-data-center-campus-in-pecos-texas/","label":"Microsoft plans 2 GW data center campus in Pecos, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-microsoft-san-antonio-expansion-tx","sourceRecordId":"microsoft-san-antonio-expansion-tx","name":"Microsoft San Antonio SAT89/SAT90 Data Centers","operator":"Microsoft","city":"Castroville","county":"Medina","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.35,"longitude":-98.88,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-san-antonio-expansion-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-data-center-campus-outside-san-antonio/","label":"Microsoft files for data center campus outside San Antonio","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenters.com/news/microsoft-s-1-5-billion-data-center-expansion-in-san-antonio","label":"Microsoft $1.5 billion data center expansion in San Antonio","publisher":"Datacenters.com","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.texasmonthly.com/news-politics/data-center-water-shortage-medina-county/","label":"How One Texas County Struck a Deal With Its Data Centers","publisher":"Texas Monthly","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","label":"Data centers replacing Medina County farmland, straining resources","publisher":"San Antonio Report","kind":"press","retrievedAt":"2026-07-07"}]},{"id":"compute-nexus-hubbard-campus-hill-county-tx","sourceRecordId":"nexus-hubbard-campus-hill-county-tx","name":"Nexus Hubbard Data Center & Power Campus","operator":"Nexus Data Centers","city":"Hubbard","county":"Hill","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.824001,"longitude":-96.776243,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nexus-hubbard-campus-hill-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/600mw-natural-gas-powered-data-center-campus-proposed-in-hubbard-texas/","label":"600MW natural gas-powered data center campus proposed in Hubbard, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://nexus-datacenter.com/","label":"Nexus Data Centers — Hubbard Data Center & Power Project, Hill County TX","publisher":"Nexus Data Centers","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.datacentermap.com/usa/texas/dallas/nexus-hubbard-campus/","label":"Nexus Hubbard Campus (612 MW) listing","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-14"},{"url":"https://news.datacenterview.com/p/december-4-2025-nexus-proposes-612mw-campus","label":"Nexus proposes 612MW campus (Dec 2025 TCEQ filing)","publisher":"Data Center View","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.tceq.texas.gov/permitting/air/newsourcereview/combustion/ng-egu-sp","label":"TCEQ Air NSR — Nexus applied air permits 183046, PSDTX1700, GHGPSDTX269 (per Dec 2025 filing)","publisher":"Texas Commission on Environmental Quality","kind":"permit","retrievedAt":"2026-07-14"},{"url":"https://lakelander.com/2026/03/06/citizens-voice-concerns-about-nexus-data-center-negotiations/","label":"Lake Lander — Citizens voice concerns about Nexus data center negotiations","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://constructionreviewonline.com/nexus-data-center-project-in-hubbard-texas-reaches-fid-as-construction-advances/","label":"Nexus Data Center Project in Hubbard, Texas Reaches FID as Construction Advances","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-08-25"}]},{"id":"compute-ntt-global-data-centers-dallas-tx1-tx","sourceRecordId":"ntt-global-data-centers-dallas-tx1-tx","name":"NTT Global Data Centers Dallas TX1","operator":"NTT Global Data Centers","city":"Garland","county":"Dallas","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.9810371,"longitude":-96.6563775,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-global-data-centers-dallas-tx1-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ragingwire.com/wholesale/wholesale-data-center-dallas-texas-tx1","label":"NTT Global Data Centers Americas facility directory","publisher":"NTT Global Data Centers Americas","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/671637259","label":"OpenStreetMap way/671637259","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-nightpeak-old-ocean-data-center-brazoria-county-tx","sourceRecordId":"nightpeak-old-ocean-data-center-brazoria-county-tx","name":"Old Ocean Data Center","operator":"Nightpeak Energy","city":"Old Ocean","county":"Brazoria","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.0799726,"longitude":-95.749673,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nightpeak-old-ocean-data-center-brazoria-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bisnow.com/news/houston/data-center-development/houston-area-county-rejects-tax-abatement-for-35b-data-center-development-133616","label":"Houston-Area County Rejects Tax Break For $3.5B Data Center Project","publisher":"Bisnow","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Old+Ocean,+Brazoria+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Old Ocean, Brazoria County, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-pacifico-glass-mountains-brewster-county-tx","sourceRecordId":"pacifico-glass-mountains-brewster-county-tx","name":"Pacifico Energy Glass Mountains Ranch Campus","operator":"Pacifico Energy","city":null,"county":"Brewster","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.3602181,"longitude":-103.6628596,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pacifico-glass-mountains-brewster-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tpr.org/news/2026-09-18/developer-behind-amazons-pecos-county-data-center-approaches-brewster-county-officials","label":"Developer behind Amazon's Pecos County data center approaches Brewster County officials","publisher":"Texas Public Radio","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Alpine,+Brewster+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Alpine, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-poolside-project-horizon-pecos-county-tx","sourceRecordId":"poolside-project-horizon-pecos-county-tx","name":"Poolside Project Horizon AI Campus","operator":"Poolside AI","city":null,"county":"Pecos","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.8938,"longitude":-102.8796,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/poolside-project-horizon-pecos-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://poolside.ai/blog/announcing-project-horizon","label":"Poolside — Announcing Project Horizon: a 2 GW AI campus in Texas","publisher":"Poolside","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.datacenterdynamics.com/en/news/ai-startup-poolside-teams-up-with-coreweave-on-2gw-data-center-in-texas/","label":"AI startup Poolside teams up with CoreWeave on 2GW data center in Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers","label":"How CoreWeave and Poolside Are Teaming Up in West Texas","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-08"},{"url":"https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas","label":"Plans Unveiled for 2 GW AI Campus in West Texas","publisher":"American Public Power Association","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.forbes.com/sites/davidblackmon/2026/06/02/west-texas-data-center-project-addresses-activist-concerns-head-on/","label":"West Texas Data Center Project Addresses Activist Concerns Head-On","publisher":"Forbes","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://press.airstreet.com/p/poolside-launches-project-horizon-ai-compute","label":"Compute, power, intelligence: Poolside goes full-stack with Project Horizon","publisher":"Poolside AI","kind":"press","retrievedAt":"2026-09-08"},{"url":"https://www.elpasoinc.com/townnews/hydrography/giant-data-center-coming-to-west-texas-ranch/article_4290e637-b820-4b20-acb9-035ca14319a5.html","label":"Giant data center coming to West Texas ranch (WSJ, via El Paso Inc., Oct 2025)","publisher":"El Paso Inc. / The Wall Street Journal","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/news/poolside-pursues-new-partners-for-texas-data-center-following-coreweave-deal-breakdown","label":"Poolside Pursues New Partners for Texas Data Center Following CoreWeave Deal Breakdown","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-22"}]},{"id":"compute-powerhouse-uhland-caldwell-county-tx","sourceRecordId":"powerhouse-uhland-caldwell-county-tx","name":"PowerHouse Caldwell County Data Center","operator":"PowerHouse Data Centers","city":"Uhland","county":"Caldwell","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.87,"longitude":-97.85,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-uhland-caldwell-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-looking-to-build-500-acre-data-center-near-austin-texas/","label":"PowerHouse looking to build 500-acre data center near Austin, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437","label":"PowerHouse plans Austin suburb data center, moves to skirt city control","publisher":"Bisnow","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://baxtel.com/news/500-acre-texas-data-center-project-eyed-by-powerhouse","label":"500-Acre Texas Data Center Project Eyed by PowerHouse (Baxtel)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://centexdatacenters.org/projects/tract-caldwell-county","label":"Tract Data Center Technology Park — Central Texas Data Center Tracker (Bluebonnet/LCRA/gas pipeline detail)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-powerhouse-circle-t-westlake-tx","sourceRecordId":"powerhouse-circle-t-westlake-tx","name":"PowerHouse Circle T Data Center Campus","operator":"PowerHouse Data Centers","city":"Westlake","county":null,"address":"13580 Denton Highway","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.9972,"longitude":-97.2083,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-circle-t-westlake-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://westlaketx.portal.civicclerk.com/event/194/files/agenda/5473","label":"Westlake Planning & Zoning Commission agenda — Circle T Data Center","publisher":"Town of Westlake, TX","kind":"permit","retrievedAt":"2026-09-08"},{"url":"https://usdatacenterprojects.com/texas/powerhouse-files-plans-for-300-mw-circle-t-data-center-campus-in-westlake-texas","label":"PowerHouse files plans for 300 MW Circle T Data Center Campus in Westlake, Texas","publisher":"US Data Center Projects","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-powerhouse-provident-grand-prairie-tx","sourceRecordId":"powerhouse-provident-grand-prairie-tx","name":"PowerHouse Grand Prairie Campus","operator":"PowerHouse Data Centers","city":"Grand Prairie","county":"Ellis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.62,"longitude":-97.02,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-provident-grand-prairie-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-and-provident-to-develop-18gw-campus-in-dfw-texas/","label":"PowerHouse and Provident to develop 1.8GW campus in DFW, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.bisnow.com/national/news/data-center/provident-powerhouse-partner-on-768-acre-texas-data-center-campus-127465","label":"Provident, PowerHouse partner on 768-acre Texas data center campus","publisher":"Bisnow","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/","label":"DOE-funded UTA project tackles cooling costs amid AI data center demand","publisher":"Dallas Innovates","kind":"press","retrievedAt":"2026-07-08"}]},{"id":"compute-prime-austin-campus-lockhart-caldwell-county-tx","sourceRecordId":"prime-austin-campus-lockhart-caldwell-county-tx","name":"Prime Data Centers Austin Campus (AUS01, formerly Project Snow)","operator":"Prime Data Centers","city":"Lockhart","county":"Caldwell","address":"1395 Bob White Road","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.8832105,"longitude":-97.6736292,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prime-austin-campus-lockhart-caldwell-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/prime-austin-campus","label":"Prime: Austin Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Lockhart,+Caldwell+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Lockhart, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-prime-dfw01-01-tx","sourceRecordId":"prime-dfw01-01-tx","name":"Prime DFW01-01","operator":"Prime Data Centers","city":"Dallas","county":"Dallas","address":"1515 Round Table Drive","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8379581,"longitude":-96.8784007,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prime-dfw01-01-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://primedatacenters.com/locations/dallas/","label":"Prime Data Centers facility directory","publisher":"Prime Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/465032380","label":"OpenStreetMap way/465032380","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://primedatacenters.com/wp-content/uploads/2025/10/PDC_Dallas_TechSheet_DFW01_01.pdf","label":"Prime Data Centers AI/HPC — Prime's own DFW01-01 Dallas tech sheet lists this specific building's ","publisher":"primedatacenters.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://datacenterhawk.com/marketplace/providers/prime-data-centers/1515-round-table-drive/dfw01-01","label":"datacenterHawk — Prime Data Centers DFW01-01 listing","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://primedatacenters.com/sustainability/","label":"Prime Data Centers — Sustainability page (company-wide REC/matching commitment, not site-specific)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-rcm-hill-project-aquila-hill-county-tx","sourceRecordId":"rcm-hill-project-aquila-hill-county-tx","name":"Project Aquila","operator":"RCM Hill, LLC","city":null,"county":"Hill","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.03,"longitude":-97.13,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rcm-hill-project-aquila-hill-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kwtx.com/2026/05/28/illegal-under-texas-law-data-center-developer-files-lawsuit-against-hill-county-moratorium/","label":"Data center developer files lawsuit against Hill County moratorium","publisher":"KWTX","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/","label":"KWTX: Hill County Commissioners Court rescinds moratorium on data center in the wake of lawsuit","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-fermi-matador-amarillo-tx","sourceRecordId":"fermi-matador-amarillo-tx","name":"Project Matador","operator":"Fermi America","city":"Amarillo","county":"Carson","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":35.396,"longitude":-101.543,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fermi-matador-amarillo-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/fermi-america-acquires-600mw-of-gas-turbines-for-11gw-ai-mega-campus-in-amarillo-texas/","label":"Fermi America acquires 600MW of gas turbines for 11GW AI mega campus in Amarillo, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","label":"Fermi America Makes Initial Draw on $200M Equipment Facility to Accelerate 2.3GW Delivery","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.prnewswire.com/news-releases/fermi-america-and-the-state-of-texas-announce-preliminary-approval-for-first-6-gw-of-one-of-the-worlds-largest-clean-natural-gas-facilities-on-project-matadors-11-gw-private-hypergrid-campus-302603582.html","label":"Fermi America and State of Texas Announce TCEQ Preliminary Approval for First 6GW Natural Gas Facilities","publisher":"PR Newswire","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://www.nrc.gov/reactors/new-reactors/large-lwr/col/fermi-energy-intel-campus","label":"Fermi America Project Matador AP1000 Units 1-4 Combined License Application","publisher":"U.S. Nuclear Regulatory Commission","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://www.ans.org/news/2025-09-10/article-7357/fermi-america-looks-to-go-public-as-nrc-accepts-cola-for-ap1000s/","label":"Fermi America looks to go public as NRC accepts COLA for AP1000s","publisher":"ANS Nuclear Newswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.sierraclub.org/texas/blog/2025/12/project-matador-trump-ai-data-center-texas","label":"Project Matador: Massive AI Data Center in Texas Panhandle Promises Pollution","publisher":"Sierra Club Texas","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://fortune.com/2025/10/10/rick-perry-ai-power-startup-fermi-ipo-zero-revenue/","label":"Rick Perry's AI power startup Fermi already has a $16 billion market cap—and zero revenue","publisher":"Fortune","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://fortune.com/2026/04/20/financially-struggling-ai-power-startup-fermi-loses-ceo-reset/","label":"Financially struggling, AI power startup Fermi loses its CEO and CFO for '2.0' reset","publisher":"Fortune","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.sec.gov/Archives/edgar/data/2071778/000121390025094424/ea0252333-11.htm","label":"Fermi Inc. IPO prospectus (Form 424B4) — beneficial ownership table","publisher":"U.S. Securities and Exchange Commission","kind":"filing","retrievedAt":"2026-08-26"},{"url":"https://www.sec.gov/Archives/edgar/data/2071778/000121390026070601/ea0295478-defa14a_fermi.htm","label":"Fermi Inc. proxy solicitation materials (DEFA14A), June 2026","publisher":"U.S. Securities and Exchange Commission","kind":"filing","retrievedAt":"2026-08-26"}]},{"id":"compute-galaxy-digital-mcgregor-tx","sourceRecordId":"galaxy-digital-mcgregor-tx","name":"Project Merlin (Helios II)","operator":"Galaxy Digital","city":"McGregor","county":"McLennan","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.44,"longitude":-97.4,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/galaxy-digital-mcgregor-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas","label":"Galaxy Digital AI data center announced in McGregor, Texas","publisher":"The Energy Mag","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/galaxy-digital-eyes-second-texas-data-center-site-buys-land-outside-waco/","label":"Galaxy Digital eyes second Texas data center site, buys land outside Waco","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.kxxv.com/news/local-news/in-your-neighborhood/mcgregor-residents-submit-petition-to-recall-mayor-over-data-center-water-concerns","label":"KXXV — McGregor residents submit petition to recall mayor over data center water concerns","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-bilateral-energy-project-patriot-granbury-tx","sourceRecordId":"bilateral-energy-project-patriot-granbury-tx","name":"Project Patriot (Knox Ranch)","operator":"Bilateral Energy LLC","city":"Granbury","county":"Hood","address":"2801 W US Hwy 377","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.4426759,"longitude":-97.7870525,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bilateral-energy-project-patriot-granbury-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/bilateral-energy-project-patriot","label":"Bilateral Energy: Project Patriot","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Granbury,+Hood+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Granbury, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-related-digital-project-star-encinal-la-salle-tx","sourceRecordId":"related-digital-project-star-encinal-la-salle-tx","name":"Project Star Data Center Campus","operator":"Related Digital","city":"Encinal","county":"La Salle","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":28.0406329,"longitude":-99.3552096,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/related-digital-project-star-encinal-la-salle-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://newsroom.nexteraenergy.com/2026-09-30-The-United-States-Department-of-Commerce-and-the-Government-of-the-Republic-of-Korea-Announce-Strategic-Investment-in-Project-Star,-a-22-3-billion-Energy-Infrastructure-Campus-in-Encinal,-Texas,-being-jointly-developed-by-Related-Companies-and?l=12","label":"Project Star, a $22.3 billion energy infrastructure campus in Encinal, Texas (joint press release, Sept. 30, 2026)","publisher":"NextEra Energy Newsroom (PR Newswire)","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.related-digital.com/news/us-dept-of-commerce-and-republic-of-korea-announce-project-star","label":"U.S. Dept. of Commerce and Republic of Korea announce Project Star","publisher":"Related Digital","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://www.frio-nuecescurrent.com/2026/10/07/i-want-a-seat-at-the-table/","label":"\"I want a seat at the table\" (La Salle County Judge on Project Star)","publisher":"Frio-Nueces Current","kind":"press","retrievedAt":"2026-10-26"},{"url":"https://nominatim.openstreetmap.org/search?q=Encinal,+La+Salle+County,+Texas&format=jsonv2&limit=1","label":"OpenStreetMap Nominatim geocode, Encinal village centroid","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-26"}]},{"id":"compute-prometheus-hyperscale-kaufman-county-tx","sourceRecordId":"prometheus-hyperscale-kaufman-county-tx","name":"Prometheus Hyperscale Kaufman County Campus","operator":"Prometheus Hyperscale","city":null,"county":"Kaufman","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.65,"longitude":-96.36,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-kaufman-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.greenvillechronicle.com/s/4925/Prometheus-Hyperscale-Plans-200MW-AI-Data-Center-Campus-in-Kaufman-County.php","label":"Prometheus Hyperscale Plans 200MW AI Data Center Campus in Kaufman County","publisher":"Greenville Chronicle","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-qts-fort-worth-ftw1-tx","sourceRecordId":"qts-fort-worth-ftw1-tx","name":"QTS Fort Worth 1 (FTW1)","operator":"QTS Data Centers","city":"Fort Worth","county":"Tarrant","address":"14100 Park Vista Boulevard","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.981432,"longitude":-97.262693,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-fort-worth-ftw1-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/fort-worth/","label":"QTS Fort Worth Data Center Campus","publisher":"QTS Data Centers","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=14100+Park+Vista+Boulevard,+Fort+Worth,+TX&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: 14100 Park Vista Blvd, Fort Worth","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-qts-irving-1-tx","sourceRecordId":"qts-irving-1-tx","name":"QTS Irving 1","operator":"QTS Data Centers","city":"Irving","county":"Dallas","address":"6431 Longhorn Drive","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8972479,"longitude":-96.9826475,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-irving-1-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/irving/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/526806006","label":"OpenStreetMap way/526806006","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-qts-lancium-hall-county-tx","sourceRecordId":"qts-lancium-hall-county-tx","name":"QTS–Lancium Hall County Data Center Campus","operator":"QTS Data Centers / Lancium","city":"Turkey","county":"Hall","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":34.394,"longitude":-100.8954,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-lancium-hall-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/","label":"QTS and Lancium Announce Data Center Campus in Hall County, Texas","publisher":"QTS Data Centers","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-qumulusai-denton-tx","sourceRecordId":"qumulusai-denton-tx","name":"QumulusAI Denton Modular Data Center","operator":"QumulusAI, Inc.","city":"Denton","county":"Denton","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.2148,"longitude":-97.1331,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qumulusai-denton-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/qumulusai-denton-tx","label":"QumulusAI: Denton, TX Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-compass-red-oak-tx","sourceRecordId":"compass-red-oak-tx","name":"Red Oak Campus","operator":"Compass Datacenters","city":"Red Oak","county":"Ellis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.537981,"longitude":-96.804371,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/compass-red-oak-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/","label":"Compass Datacenters looks to expand Red Oak campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/","label":"DeSoto Tribune — Red Oak data center sparks controversy as expansion moves forward","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-databank-red-oak-tx","sourceRecordId":"databank-red-oak-tx","name":"Red Oak Campus","operator":"DataBank","city":"Red Oak","county":"Ellis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.5135,"longitude":-96.7282,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-red-oak-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/","label":"DataBank — $2 billion construction loan for the Dallas-area data center campus","publisher":"DataBank","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.bisnow.com/dallas-ft-worth/news/data-center-development/databank-secures-2b-construction-loan-for-red-oak-data-centers-134226","label":"Bisnow — DataBank Secures $2B Construction Loan For Red Oak Data Centers","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.databank.com/data-centers/dallas/red-oak-campus/","label":"DataBank — Red Oak Campus (operator site)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://dallasinnovates.com/databank-announces-new-480mw-north-texas-data-center-campus-featuring-eight-two-story-data-centers/","label":"Dallas Innovates — DataBank Announces New 480MW North Texas Data Center Campus Featuring Eight Two-Story Data Centers","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/","label":"DataBank Secures $2.0B of Construction Financing for First Three Data Centers on New South Dallas Campus","publisher":"DataBank","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-rellis-data-research-center-bryan-brazos-county-tx","sourceRecordId":"rellis-data-research-center-bryan-brazos-county-tx","name":"RELLIS Data and Research Center","operator":"ThisWay Global, Inc.","city":"Bryan","county":"Brazos","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.6013,"longitude":-96.3589,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/rellis-data-research-center-bryan-brazos-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kbtx.com/2026/08/18/brazos-county-commissioners-approve-new-owner-rellis-data-center-heres-what-it-means-your-wallet/","label":"Brazos County commissioners approve new owner for RELLIS data center","publisher":"KBTX","kind":"press","retrievedAt":"2026-08-25"}]},{"id":"compute-rowan-temple-tx","sourceRecordId":"rowan-temple-tx","name":"Rowan Project Temple","operator":"Rowan Digital Infrastructure","city":"Temple","county":"Bell","address":"Bob White Road","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.0982,"longitude":-97.3428,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/rowan-temple-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://rowan.digital/news/rowan-powers-texas-growth-as-construction-begins-on-300-mw-temple-data-center/","label":"Rowan powers Texas growth as construction begins on 300 MW Temple data center","publisher":"Rowan Digital Infrastructure","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.templetx.gov/community/faq__data_center_development_.php","label":"City of Temple - Data Center Development FAQ (closed-loop cooling, 4,000 gpd cap)","publisher":"City of Temple","kind":"other","retrievedAt":"2026-07-08"},{"url":"https://kdhnews.com/news/region/third-rowan-data-center-minimum-700-million-investment-temple-withholds-utility-records/","label":"Third Rowan data center; minimum $700 million investment; Temple withholds utility records","publisher":"Killeen Daily Herald","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.kxxv.com/news/local-news/temple-residents-raise-concerns-over-proposed-rowan-data-center-expansion","label":"Temple residents raise concerns over proposed Rowan data center expansion","publisher":"KXXV","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://rowan.digital/portfolio/temple/","label":"Temple — 300 MW Hyperscale Data Center Campus (operator portfolio page)","publisher":"Rowan Digital Infrastructure","kind":"press","retrievedAt":"2026-09-08"},{"url":"https://www.kwtx.com/2026/08/12/rowan-digital-infrastructure-seeks-approval-6th-final-data-center-temple/","label":"Rowan Digital Infrastructure seeks approval for 6th and final data center in Temple","publisher":"KWTX","kind":"press","retrievedAt":"2026-09-08"},{"url":"https://rowan.com/news/rowan-powers-texas-growth-as-construction-begins-on-300-mw-temple-data-center/","label":"Rowan Powers Texas Growth as Construction Begins on 300 MW Temple Data Center","publisher":"Rowan Digital Infrastructure","kind":"press","retrievedAt":"2026-10-14"},{"url":"http://rowan.com/portfolio/temple/","label":"Rowan portfolio: Temple, Texas (300 MW, minimum $700M investment, 700 acres)","publisher":"Rowan Digital Infrastructure","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.kwtx.com/2025/10/07/new-700-million-data-center-temple-will-be-near-robinson-family-farm/","label":"New $700 million data center in Temple will be near Robinson Family Farm","publisher":"KWTX","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-sabey-sdc-austin-round-rock-tx","sourceRecordId":"sabey-sdc-austin-round-rock-tx","name":"Sabey SDC Austin (Round Rock)","operator":"Sabey Data Centers","city":"Round Rock","county":"Williamson","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.5085915,"longitude":-97.6788056,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-sdc-austin-round-rock-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sabeydatacenters.com/news/sabey-data-centers-completes-construction-at-austin-texas-data-center-site","label":"Sabey Data Centers Completes Construction at Austin, Texas Data Center Site","publisher":"Sabey Data Centers","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/texas-data-centers/","label":"Every Data Center in Texas: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Round+Rock,+Williamson+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Round Rock, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-mara-site-mat-1177-matagorda-tx","sourceRecordId":"mara-site-mat-1177-matagorda-tx","name":"Site MAT 1177","operator":"MARA Holdings","city":null,"county":"Matagorda","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":28.95,"longitude":-95.97,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/mara-site-mat-1177-matagorda-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stocktitan.net/news/MARA/mara-signs-agreement-with-hif-to-acquire-strategic-powered-land-site-nqvuby8e4d46.html","label":"MARA signs agreement with HIF to acquire strategic powered land site","publisher":"StockTitan","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/","label":"Marathon Digital Holdings $600M Texas AI-bitcoin campus","publisher":"Crypto Briefing","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-skybox-houston-one-tx","sourceRecordId":"skybox-houston-one-tx","name":"Skybox Houston One","operator":"Skybox Datacenters","city":"Katy","county":"Harris","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.802893,"longitude":-95.7553386,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/skybox-houston-one-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.skyboxdatacenters.com/locations/skybox-houston","label":"Skybox Datacenters official facility page","publisher":"Skybox Datacenters","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/714776107","label":"OpenStreetMap way/714776107","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.grcooling.com/customer-successes/shells-skybox-houston-one-data-center/","label":"GRC — Shell's Skybox Houston One Data Center (immersion cooling case study)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://baxtel.com/data-center/skybox-houston-one","label":"Baxtel — Skybox Houston One Data Center (substation/power infrastructure specs)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-skybox-prologis-hutto-powercampus-tx","sourceRecordId":"skybox-prologis-hutto-powercampus-tx","name":"Skybox PowerCampus Austin (Hutto)","operator":"Skybox Datacenters (with Prologis)","city":"Hutto","county":"Williamson","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.5427638,"longitude":-97.5468898,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/skybox-prologis-hutto-powercampus-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/33004603/skybox-prologis-plan-massive-600-megawatt-data-center-campus-in-austin","label":"Skybox, Prologis Plan Massive 600-Megawatt Data Center Campus in Austin","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://insidethedatacenter.com/articles/texas-data-centers/","label":"Every Data Center in Texas: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Hutto,+Williamson+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Hutto, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-soluna-project-annie-paris-tx","sourceRecordId":"soluna-project-annie-paris-tx","name":"Soluna Project Annie","operator":"Soluna Holdings","city":"Paris","county":"Lamar","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.6609,"longitude":-95.5555,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/soluna-project-annie-paris-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.solunacomputing.com/?post_type=news&p=15253","label":"Soluna to Launch First Solar-Powered Data Center With 75 MW Project","publisher":"Soluna Computing","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://baxtel.com/data-center/soluna-project-annie","label":"Soluna: Project Annie Details","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://corvusunited.com/project/tyson-nick-solar/","label":"Tyson Nick Solar project profile","publisher":"Corvus United","kind":"other","retrievedAt":"2026-08-03"}]},{"id":"compute-soluna-project-ellen-rio-hondo-tx","sourceRecordId":"soluna-project-ellen-rio-hondo-tx","name":"Soluna Project Ellen","operator":"Soluna Holdings","city":"Rio Hondo","county":"Cameron","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":26.2373,"longitude":-97.5814,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/soluna-project-ellen-rio-hondo-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.solunacomputing.com/news/project-ellen-term-sheet/","label":"Soluna to Expand Renewable-Powered AI & Bitcoin Computing With New 100MW Site","publisher":"Soluna Computing","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://baxtel.com/data-center/soluna-project-ellen","label":"Soluna: Project Ellen Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://www.gridinfo.com/plant/palmas-wind-llc/61773","label":"Palmas Wind, LLC plant record","publisher":"GridInfo","kind":"other","retrievedAt":"2026-08-03"}]},{"id":"compute-soluna-project-fei-childress-tx","sourceRecordId":"soluna-project-fei-childress-tx","name":"Soluna Project Fei","operator":"Soluna Holdings","city":"Childress","county":"Childress","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":34.4262,"longitude":-100.2013,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/soluna-project-fei-childress-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.solunacomputing.com/news/1gw/","label":"Soluna Surpasses One Gigawatt of Clean Computing Projects with Launch of Two New Sites","publisher":"Soluna Computing","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://baxtel.com/data-center/soluna-project-fei","label":"Soluna Project Fei Data Center Details","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-03"}]},{"id":"compute-soluna-project-grace-silverton-tx","sourceRecordId":"soluna-project-grace-silverton-tx","name":"Soluna Project Grace","operator":"Soluna Holdings","city":"Silverton","county":"Briscoe","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":34.4692,"longitude":-101.3082,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/soluna-project-grace-silverton-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.solunacomputing.com/news/siemens-partnership/","label":"Soluna and Siemens Collaborate to Solve GPU Power Swings in Behind-the-Meter AI","publisher":"Soluna Computing","kind":"press","retrievedAt":"2026-08-03"},{"url":"https://baxtel.com/data-center/soluna-project-grace","label":"Soluna: Project Grace Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-03"},{"url":"https://www.solunacomputing.com/projects/","label":"Data Centers — Soluna Computing (project tracker)","publisher":"Soluna Computing","kind":"press","retrievedAt":"2026-08-03"}]},{"id":"compute-soluna-project-kati-willacy-tx","sourceRecordId":"soluna-project-kati-willacy-tx","name":"Soluna Project Kati","operator":"Soluna Holdings","city":"Raymondville","county":"Willacy","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":26.4804,"longitude":-97.7836,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/soluna-project-kati-willacy-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.businesswire.com/news/home/20250911683738/en/Soluna-Breaks-Ground-on-its-Largest-Site-to-Date-Project-Kati","label":"Soluna Breaks Ground on its Largest Site to Date, Project Kati","publisher":"Soluna Holdings","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.solunacomputing.com/?p=16169","label":"Soluna Presents Q2 2026 Highlights & Business Update","publisher":"Soluna Holdings","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-soluna-project-kati-2-willacy-county-tx","sourceRecordId":"soluna-project-kati-2-willacy-county-tx","name":"Soluna Project Kati 2","operator":"Soluna Holdings (JV with Metrobloks)","city":null,"county":"Willacy","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":26.4814565,"longitude":-97.783051,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/soluna-project-kati-2-willacy-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.solunacomputing.com/?p=16169","label":"Soluna Presents Q2 2026 Highlights & Business Update","publisher":"Soluna Holdings","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://nominatim.openstreetmap.org/search?q=Raymondville,+Willacy+County,+Texas&format=json&limit=1","label":"OpenStreetMap Nominatim geocode: Raymondville, Willacy County, TX","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-14"}]},{"id":"compute-stack-dfw01-plano-tx","sourceRecordId":"stack-dfw01-plano-tx","name":"STACK DFW01 (Plano)","operator":"STACK Infrastructure","city":"Plano","county":"Collin","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.0136764,"longitude":-96.6925096,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-dfw01-plano-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","label":"Dallas/Ft. Worth Hyperscale Data Center Campus — operator location page","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-stack-dfw02-lancaster-tx","sourceRecordId":"stack-dfw02-lancaster-tx","name":"STACK DFW02 (Lancaster)","operator":"STACK Infrastructure","city":"Lancaster","county":"Dallas","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.5920798,"longitude":-96.7561083,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-dfw02-lancaster-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","label":"Dallas/Ft. Worth Hyperscale Data Center Campus — operator location page","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-stargate-abilene-tx","sourceRecordId":"stargate-abilene-tx","name":"Stargate Abilene","operator":"OpenAI / Oracle / Crusoe","city":"Abilene","county":"Taylor","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.5001,"longitude":-99.784,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stargate-abilene-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://openai.com/index/announcing-the-stargate-project/","label":"Announcing the Stargate Project — OpenAI","publisher":"OpenAI","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://en.wikipedia.org/wiki/Stargate_LLC","label":"Stargate LLC — Wikipedia","publisher":"Wikipedia","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","label":"OpenAI Stargate: where the US sites stand — Epoch AI","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://measuredai.substack.com/p/stargate-site-by-site-status","label":"Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch","publisher":"Measured AI","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","label":"Stargate data center poised to complete construction this year in Abilene","publisher":"Texas Standard","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://epochai.substack.com/p/openai-stargate-where-the-us-sites","label":"OpenAI Stargate: where the US sites stand","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://ktxs.com/news/local/taylor-county-residents-raise-concerns-on-lancium-tax-breaks-at-commissioners-meeting","label":"Taylor County residents raise concerns on tax breaks at commissioners meeting","publisher":"KTXS News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene","label":"OpenAI Stargate Abilene | AI Data Centers","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://www.prnewswire.com/news-releases/taylor-county-and-city-of-abilene-announce-historic-partnership-with-lancium-for-development-of-a-2-4-billion-data-center-campus-301449354.html","label":"Taylor County and City of Abilene Announce Historic Partnership With Lancium","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterdynamics.com/en/news/crusoe-begins-construction-on-second-phase-of-abilene-texas-data-center-campus-will-add-six-buildings/","label":"Crusoe Begins Construction on Second Phase of Abilene, Texas Data Center Campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.datacenterfrontier.com/hyperscale/article/55276169/crusoe-adds-45-gw-natural-gas-to-fuel-ai-expands-abilene-data-center-to-12-gw","label":"Crusoe Adds 4.5 GW of Natural Gas to Fuel AI, Expands Abilene Data Center to 1.2 GW","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment","label":"Lancium, Crusoe Executives Brief Abilene Leaders on Major Northside Investment","publisher":"KTXS (Sinclair)","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://bitcoinmagazine.com/business/city-of-abilene-taylor-county-to-build-billion-data-center-host-bitcoin-mining","label":"City of Abilene, Taylor County to Build Billion-Dollar Data Center to Host Bitcoin Mining","publisher":"Bitcoin Magazine","kind":"press","retrievedAt":"2026-07-10"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","label":"Crusoe expands AI data center campus in Abilene to 1.2 gigawatts","publisher":"Crusoe","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","label":"Crusoe announces new 900 MW AI factory campus in Abilene, Texas to support Microsoft AI infrastructure","publisher":"Crusoe","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://stockanalysis.com/stocks/orcl/transcripts/592465-q4-2026/","label":"Oracle Q4 fiscal 2026 earnings call, third-party transcript (June 10, 2026)","publisher":"StockAnalysis","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://stockanalysis.com/stocks/orcl/transcripts/689425-q1-2027/","label":"Oracle Q1 fiscal 2027 earnings call, third-party transcript (September 10, 2026)","publisher":"StockAnalysis","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://taylor-cad.org/wp-content/uploads/2026/08/TaylorCAD_2026_Certified_Adjusted_Appraisal_Roll_17Aug26.zip","label":"Taylor CAD 2026 Certified Adjusted Appraisal Roll (as of August 17, 2026)","publisher":"Taylor Central Appraisal District","kind":"filing","retrievedAt":"2026-10-16"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live","label":"Crusoe announces flagship Abilene data center is live","publisher":"Crusoe","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.oracle.com/data-centers/abilene/","label":"Abilene, Texas data center","publisher":"Oracle","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://epoch.ai/data/data_centers/data_centers.csv","label":"Frontier data centers dataset (CSV): OpenAI Stargate Abilene","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-16"},{"url":"https://www.businessinsider.com/oracle-seeks-bigger-tax-break-texas-property-value-protest-2025-7","label":"Oracle Seeks Bigger Tax Breaks in Texas With Property Value Protest","publisher":"Business Insider","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture","label":"Crusoe, Blue Owl Capital, and Primary Digital Infrastructure enter second phase of $15 billion joint venture to fund AI data center in Abilene, Texas","publisher":"Crusoe","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://www.itiger.com/news/2537792946","label":"Newmark Facilitates $7.1 Billion Financing for Texas AI Data Center","publisher":"MT Newswires","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-stargate-milam-county-tx","sourceRecordId":"stargate-milam-county-tx","name":"Stargate Milam County Campus","operator":"OpenAI / SoftBank (SB Energy)","city":null,"county":"Milam","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.852,"longitude":-96.972,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stargate-milam-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","label":"OpenAI Stargate: where the US sites stand — Epoch AI","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-07-05"},{"url":"https://openai.com/index/five-new-stargate-sites/","label":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — OpenAI","publisher":"OpenAI","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/","label":"SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase/","label":"OpenAI Stargate's Milam 'Freebird' data center to span 548,950 sq ft in first phase ($470M) — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://therealdeal.com/texas/austin/2025/06/10/softbank-groups-sb-energy-plans-3-billion-texas-data-center/","label":"SoftBank's SB Energy plans $3 billion Texas data center — The Real Deal","publisher":"The Real Deal","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-milam","label":"OpenAI Stargate Milam | AI data centers","publisher":"Epoch AI","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-stream-data-centers-dfwa-dfw-vii-tx","sourceRecordId":"stream-data-centers-dfwa-dfw-vii-tx","name":"Stream Data Centers DFWA (DFW VII)","operator":"Stream Data Centers","city":"Garland","county":"Dallas","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.9836243,"longitude":-96.6542632,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stream-data-centers-dfwa-dfw-vii-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.streamdatacenters.com/locations/dallas-data-centers/","label":"Stream Data Centers - Dallas locations page","publisher":"Stream Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1300765126","label":"OpenStreetMap way/1300765126","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-switch-the-rock-round-rock-tx","sourceRecordId":"switch-the-rock-round-rock-tx","name":"Switch: The Rock (Round Rock)","operator":"Switch","city":"Round Rock","county":"Williamson","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.4880189,"longitude":-97.6725256,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/switch-the-rock-round-rock-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/switch-granted-planning-permission-for-data-center-in-round-rock-texas/","label":"Switch facility directory","publisher":"Switch","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1493169641","label":"OpenStreetMap way/1493169641","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/","label":"Switch AI/HPC — The Rock: exascale data center campus for hyperscale/high-density","publisher":"switch.com","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://communityimpact.com/austin/round-rock/texas-legislature/2026/04/01/ercot-developers-detail-plans-to-manage-data-center-growth-amid-legislative-scrutiny/","label":"Community Impact: ERCOT/Oncor grid capacity for Round Rock data centers","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.switch.com/sustainable-data-center-designs/","label":"Switch sustainable data center design page (confirms 179MW renewable claim is Nevada-only, silent on TX)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-core-scientific-quinlan-tx","sourceRecordId":"core-scientific-quinlan-tx","name":"Telios Quinlan Campus","operator":"Core Scientific","city":"Quinlan","county":"Hunt","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.911,"longitude":-96.138,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/core-scientific-quinlan-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000162828026031396/core-20260331.htm","label":"Core Scientific 10-Q Q1 2026 (Telios Quinlan One acquisition)","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.heraldbanner.com/news/local_news/commissioners-approve-data-center-resolution-at-monday-meeting/article_13a6debf-507d-4960-9dc1-49b62029d98f.html","label":"Herald Banner — Commissioners approve data center resolution at Monday meeting","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-tesla-cortex-2-giga-texas-austin-tx","sourceRecordId":"tesla-cortex-2-giga-texas-austin-tx","name":"Tesla Cortex 2.0 AI Training Cluster (Giga Texas)","operator":"Tesla","city":"Austin","county":"Travis","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":30.2223,"longitude":-97.6171,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tesla-cortex-2-giga-texas-austin-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://interestingengineering.com/innovation/tesla-supercomputer-cortex-2-texas","label":"Cortex 2.0: Tesla's new supercomputer at Giga Texas","publisher":"Interesting Engineering","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.notateslaapp.com/news/2215/a-look-at-teslas-new-ai-training-center-at-giga-texas-video","label":"A Look at Tesla's New AI Training Center at Giga Texas","publisher":"Not a Tesla App","kind":"press","retrievedAt":"2026-07-14"},{"url":"https://www.teslaoracle.com/2025/06/27/tesla-fsd-cortex-ai-supercluster-is-running-at-full-capacity-confirms-elon-musk/","label":"Tesla FSD Cortex AI supercluster running at full capacity, confirms Musk","publisher":"Tesla Oracle","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://en.wikipedia.org/wiki/Gigafactory_Texas","label":"Gigafactory Texas — location (unincorporated Travis County, Austin)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-07-14"},{"url":"https://www.notateslaapp.com/news/3520/tesla-adds-megapacks-for-its-next-generation-supercomputer-cortex-2","label":"Tesla Adds Megapacks for Its Next-Generation Supercomputer (Cortex 2)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://teslanorth.com/2023/11/03/teslas-giga-texas-to-have-worlds-largest-rooftop-solar-installation/","label":"Tesla's Giga Texas to Have World's Largest Rooftop Solar Installation (30MW)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-tcdc-ector-county-tx","sourceRecordId":"tcdc-ector-county-tx","name":"Texas Critical Data Centers (TCDC)","operator":"Sharon AI + New Era Energy & Digital (joint venture)","city":null,"county":"Ector","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.87,"longitude":-102.54,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tcdc-ector-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/tcdc-signs-loi-to-acquire-an-additional-203-acres-for-offgrid-data-center-campus-in-ector-county-texas/","label":"TCDC signs LOI to acquire an additional 203 acres for off-grid data center campus in Ector County, Texas","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://sharonai.com/press-releases/sharon-ai-completes-phase-one-engineering-for-flagship-ai-data-center-campus-joint-venture-in-texas/","label":"Sharon AI: Sharon AI Completes Phase One Engineering for Flagship AI Data Center Campus JV in Texas (Thunderhead Energy Solutions 250MW behind-the-meter agreement, SB6/grid interconnection plan)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.businesswire.com/news/home/20251223632678/en/New-Era-Energy-Digital-Secures-Full-Ownership-of-Texas-Critical-Data-Centers-Through-Binding-Agreement-Completes-203-Acre-Land-Acquisition-Expanding-TCDC-Campus-in-Ector-County-Texas","label":"Businesswire: New Era Energy & Digital Secures Full Ownership of Texas Critical Data Centers, Completes 203-Acre Land Acquisition Expanding TCDC Campus in Ector County","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-tierpoint-dallas-tx","sourceRecordId":"tierpoint-dallas-tx","name":"TierPoint Dallas","operator":"TierPoint","city":"Dallas","county":"Dallas","address":"3004 Irving Boulevard","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.8079818,"longitude":-96.8573889,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-dallas-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/465042594","label":"OpenStreetMap way/465042594","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-tierpoint-dallas-allen-tx","sourceRecordId":"tierpoint-dallas-allen-tx","name":"TierPoint Dallas-Allen","operator":"TierPoint","city":"Allen","county":"Collin","address":"840 Allen Commerce Parkway","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":33.1379102,"longitude":-96.657329,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-dallas-allen-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas-allen/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/483307714","label":"OpenStreetMap way/483307714","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-tract-caldwell-valley-uhland-tx","sourceRecordId":"tract-caldwell-valley-uhland-tx","name":"Tract Caldwell Valley Technology Park","operator":"Tract","city":"Uhland","county":"Caldwell","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.9499,"longitude":-97.7889,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-caldwell-valley-uhland-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tract.com/news/tract-closes-acquisition-of-1515-acres-in-caldwell-county-texas-for-multi-gigawatt-data-center-technology-park/","label":"Tract closes acquisition of 1,515 acres in Caldwell County, Texas for multi-gigawatt data center technology park","publisher":"Tract","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/","label":"Muskin | Elam Group — 1,500-acre data center campus, 800 jobs confirmed for small town in Caldwell County","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-vantage-frontier-shackelford-county-tx","sourceRecordId":"vantage-frontier-shackelford-county-tx","name":"Vantage Frontier Campus","operator":"Vantage Data Centers","city":null,"county":"Shackelford","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":32.7272,"longitude":-99.2987,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-frontier-shackelford-county-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","label":"Vantage Data Centers Unveils Plans for Frontier, a $25B Mega-campus in Texas — Vantage","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","label":"Vantage breaks ground on Texas gigawatt data center campus for OpenAI — Data Center Dynamics","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.constructionowners.com/news/oracle-and-openai-to-power-new-texas-data-center-off-the-grid","label":"Oracle and OpenAI Texas data center to run on 700MW natural gas microgrid","publisher":"Construction Owners","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx","label":"Vantage Shackelford County, TX campus","publisher":"Vantage Data Centers","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.thealbanynews.net/news/data-center-plans-move-forward-shackelford-county","label":"Data center plans move forward in Shackelford County","publisher":"The Albany News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://group.softbank/en/news/press/20250924","label":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","publisher":"SoftBank Group","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas/","label":"Vantage Data Centers breaks ground on data center campus in Texas","publisher":"W.Media","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-frontier","label":"Stargate Frontier","publisher":"Cleanview","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-vantage-san-antonio-tx11-tx","sourceRecordId":"vantage-san-antonio-tx11-tx","name":"Vantage San Antonio TX11","operator":"Vantage Data Centers","city":"San Antonio","county":"Bexar","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.4161404,"longitude":-98.7892449,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-san-antonio-tx11-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/vantage-san-antonio-tx11","label":"Baxtel facility profile — Vantage San Antonio TX11","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1344369112","label":"OpenStreetMap way/1344369112","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-vantage-san-antonio-tx22-tx","sourceRecordId":"vantage-san-antonio-tx22-tx","name":"Vantage San Antonio TX22","operator":"Vantage Data Centers","city":"San Antonio","county":"Bexar","address":"5207 Rogers Road","state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":29.4790852,"longitude":-98.6977011,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-san-antonio-tx22-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/vantage-tx22-san-antonio","label":"Vantage facility directory","publisher":"Vantage","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1502710557","label":"OpenStreetMap way/1502710557","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-beacon-westline-dove-creek-san-angelo-tx","sourceRecordId":"beacon-westline-dove-creek-san-angelo-tx","name":"Westline Site / Dove Creek Technology Campus","operator":"Beacon Data Centers (via Westline TX Holdings)","city":"San Angelo (Tankersley area, unincorporated)","county":"Tom Green","address":null,"state":"TX","stateName":"Texas","jurisdictionType":"state","latitude":31.335,"longitude":-100.478,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/beacon-westline-dove-creek-san-angelo-tx","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","label":"TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings)","publisher":"Texas Commission on Environmental Quality (reported via The Concho Observer)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium","label":"Tom Green County Commissioners Reject Data Center Moratorium","publisher":"SanAngeloLIVE","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.conchovalleyhomepage.com/news/local-news/concho-valley-data-centers/developer-sheds-light-on-dove-creek-data-center-as-commissioners-mull-options/","label":"Developer sheds light on Dove Creek data center as commissioners mull options","publisher":"ConchoValleyHomepage.com","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-aligned-west-jordan-ut","sourceRecordId":"aligned-west-jordan-ut","name":"Aligned Salt Lake City Campus (SLC-01/02/03)","operator":"Aligned Data Centers","city":"West Jordan","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.5861,"longitude":-111.96973,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-west-jordan-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/salt-lake-city-data-centers/","label":"Aligned Data Centers — Salt Lake City data centers","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://www.datacenterfrontier.com/cloud/article/11428310/aligned-continues-its-expansion-with-second-salt-lake-city-data-center","label":"Aligned Continues its Expansion With Second Salt Lake City Data Center","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.deseret.com/2018/11/27/20659830/jordan-school-board-votes-to-support-tax-incentives-for-paypal-data-center-in-west-jordan/","label":"Jordan School Board votes to support tax incentives for PayPal data center in West Jordan","publisher":"Deseret News","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://kutv.com/news/local/pay-pal-commits-to-west-jordan-will-get-68-million-in-tax-rebates","label":"PayPal commits to West Jordan, will get $6.8 million in tax rebates","publisher":"KUTV","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.ksl.com/article/46451408/west-jordan-paypal-data-center-is-just-1-step-away-from-being-approved","label":"West Jordan PayPal data center is just 1 step away from being approved","publisher":"KSL.com","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-aligned-west-valley-city-ut","sourceRecordId":"aligned-west-valley-city-ut","name":"Aligned SLC-04","operator":"Aligned Data Centers","city":"West Valley City","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.71498,"longitude":-112.05576,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-west-valley-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/salt-lake-city-data-centers/","label":"Aligned Data Centers — Salt Lake City data centers (SLC-04, 6368 W Beagley Rd)","publisher":"Aligned Data Centers","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.wvc-ut.gov/ArchiveCenter/ViewFile/Item/3376","label":"West Valley City Fund 22 (Redevelopment Agency) adopted budget, FY2023-24 — project-area tax-increment ledger","publisher":"West Valley City","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.utahbusiness.com/aligned-completes-phase-i-of-build-to-scale-salt-lake-metro-data-center/","label":"Aligned completes Phase I of build-to-scale Salt Lake metro data center","publisher":"Utah Business","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.deseret.com/environment/2026/10/10/how-rural-utah-became-the-frontline-of-americas-ai-data-center-backlash/","label":"How rural Utah became the frontline of America's AI data center backlash","publisher":"Deseret News","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-pronghorn-antelope-cedar-city-ut","sourceRecordId":"pronghorn-antelope-cedar-city-ut","name":"Antelope Data Center (Project Antelope)","operator":"Pronghorn Development LLC","city":"Cedar City","county":"Iron","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":37.6775,"longitude":-113.0619,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pronghorn-antelope-cedar-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stgeorgeutah.com/news/planning-commission-approves-conditional-use-permit-for-proposed-iron-county-data-center/article_0a818ae9-8496-4e3e-87e0-53a09ee256c5.html","label":"Planning Commission approves conditional use permit for proposed Iron County data center","publisher":"St. George News","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://ironcountyut.gov/planning/data-center-projects","label":"Proposed Data Center Information — Iron County","publisher":"Iron County, Utah","kind":"permit","retrievedAt":"2026-08-25"},{"url":"https://www.ksl.com/article/51463149/planning-commission-considers-ai-data-center-near-cedar-city","label":"Planning commission considers AI data center near Cedar City","publisher":"KSL.com","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://secure.utah.gov/pmn-admin/files/1431597.pdf","label":"Iron County Planning Commission minutes, 4 June 2026 — Antelope data campus conditional use permit","publisher":"Iron County","kind":"subsidy","retrievedAt":"2026-09-04"}]},{"id":"compute-blusky-ai-delta-millard-county-ut","sourceRecordId":"blusky-ai-delta-millard-county-ut","name":"BluSky AI Delta Data Center","operator":"BluSky AI Inc.","city":"Delta","county":"Millard","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.3502,"longitude":-112.5766,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blusky-ai-delta-millard-county-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223","label":"BluSky AI Inc. Signs Letter of Intent to Acquire 25 Acres with up to 50 MW of Capacity in Strategic Expansion","publisher":"GlobeNewswire (via Manila Times)","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.utahbusiness.com/industry/2025/11/05/data-center-creekstone-energy-joule-capital-partners-millard-county-fillmore/","label":"Millard County commissioner on data-center incentives — Creekstone Energy / BluSky AI Delta Gigasite named","publisher":"Utah Business","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://delta.utah.gov/bc","label":"Boards and Commissions — Delta City (no Community Reinvestment Agency or Redevelopment Agency listed)","publisher":"Delta City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-blusky-ai-milford-ut","sourceRecordId":"blusky-ai-milford-ut","name":"BluSky AI Milford Campus","operator":"BluSky AI Inc.","city":"Milford","county":"Beaver","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":38.3936,"longitude":-113.0111,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blusky-ai-milford-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.manilatimes.net/2025/07/08/tmt-newswire/globenewswire/blusky-ai-inc-secures-first-site-with-93mw-to-launch-flagship-data-center-in-central-utah/2145520","label":"BluSky AI Inc. Secures First Site with 9.3MW to Launch Flagship Data Center in Central, Utah","publisher":"GlobeNewswire (via Manila Times)","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.sec.gov/Archives/edgar/data/1416090/000109690625001096/imii-20250626.htm","label":"BluSky AI Inc. Form 8-K (filed July 7, 2025) — Milford, Beaver County power and ground-lease terms","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-09-05"},{"url":"https://www.sec.gov/Archives/edgar/data/1416090/000109690625001096/bsai_ex10z2.htm","label":"Ground Lease with Option to Purchase — BluSky AI Inc. and Wild Mustang Ventures, LLC (June 30, 2025), Exhibit 10.2 to Form 8-K","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-09-05"},{"url":"https://www.milfordcityutah.com/government/boards-commissions","label":"Boards & Commissions — Milford City (no Redevelopment Agency or Community Reinvestment Agency listed)","publisher":"Milford City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-blusky-ai-nephi-ut","sourceRecordId":"blusky-ai-nephi-ut","name":"BluSky AI Nephi SkyMod Site","operator":"BluSky AI Inc.","city":"Nephi","county":"Juab","address":"1358 N 200 W, Nephi, UT","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.71023,"longitude":-111.83632,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/blusky-ai-nephi-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://natlawreview.com/press-releases/blusky-ai-inc-signs-letter-intent-lease-strategic-site-nephi-utah-modular-ai","label":"BluSky AI Inc. Signs Letter of Intent to Lease Strategic Site in Nephi, Utah for Modular AI Infrastructure Expansion","publisher":"National Law Review (company press release, September 2025)","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.nephi.utah.gov/690/CRA-Fund","label":"Nephi City — Community Reinvestment Agency fund","publisher":"Nephi City","kind":"subsidy","retrievedAt":"2026-09-04"},{"url":"https://sec.gov/Archives/edgar/data/1416090/000149315225014760/ex99-1.htm","label":"BluSky AI Inc. Form 8-K Exhibit 99.1 — Letter of Intent for Nephi, UT Site","publisher":"SEC EDGAR","kind":"filing","retrievedAt":"2026-10-13"},{"url":"https://markets.financialcontent.com/clarkebroadcasting.mymotherlode/article/nnwire-2025-9-23-techmediabreaks-blusky-ai-inc-otcid-bsai-signs-loi-to-lease-nephi-utah-site-for-modular-data-center-expansion","label":"BluSky AI Inc. signs LOI to lease Nephi, Utah site for modular data center expansion","publisher":"TechMediaWire via FinancialContent","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-cirrus-data-services-midvale-ut","sourceRecordId":"cirrus-data-services-midvale-ut","name":"CirrusDS View 78 Data Center","operator":"Cirrus Data Services","city":"Midvale","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.6111,"longitude":-111.8994,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cirrus-data-services-midvale-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://cirrusds.com/midvale-ut-campus","label":"Midvale, UT Data Center Campus","publisher":"Cirrus Data Services","kind":"other","retrievedAt":"2026-08-25"},{"url":"https://www.prweb.com/releases/cirrus-data-services-entering-data-center-market-in-salt-lake-city-855163208.html","label":"Cirrus Data Services Entering Data Center Market in Salt Lake City","publisher":"PRWeb","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.midvale.utah.gov/government/departments/redevelopment_agency/index.php","label":"Redevelopment Agency — Midvale City (three project areas: Bingham Junction, Jordan Bluffs, Main Street)","publisher":"Midvale City","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.midvale.utah.gov/government/departments/recorder_s_office/midvale_city_resolutions.php","label":"Midvale City Resolutions index","publisher":"Midvale City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-creekstone-delta-ut","sourceRecordId":"creekstone-delta-ut","name":"Creekstone Energy Delta Gigasite","operator":"Creekstone Energy","city":"Delta","county":"Millard","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.3527,"longitude":-112.5777,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/creekstone-delta-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/zeo-energy-to-supply-280mw-of-power-for-creekstone-energys-up-to-10gw-data-center-campus-in-millard-county-utah/","label":"Zeo Energy to supply 280MW for Creekstone's 10GW Delta Gigasite","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/","label":"Creekstone Energy Commits $17B to Millard County — Utah Governor's Office","publisher":"Utah Governor's Office of Economic Development","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://www.businesswire.com/news/home/20260310800142/en/Creekstone-Energy-Secures-Largest-Solar-Lease-in-Utahs-History-and-Receives-Millard-County-Zoning-Approval-for-Over-1-GW-of-Solar-Development","label":"Creekstone Energy Secures 13,000-Acre SITLA Solar Lease (Largest in Utah History)","publisher":"BusinessWire","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.solarpowerworldonline.com/2026/03/1-gw-solar-project-planned-for-utah-hyperscale-data-center/","label":"1-GW solar project planned for Utah hyperscale data center","publisher":"Solar Power World","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.sltrib.com/news/2026/09/09/delta-gigasite-worlds-largest-data/","label":"Delta Gigasite could be world's largest data center","publisher":"The Salt Lake Tribune","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://lehifreepress.com/2026/02/11/utahs-massive-data-centers-seek-to-build-new-power-sources/","label":"Utah's massive data centers seek to build new power sources","publisher":"Lehi Free Press","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-cyrusone-dugway-proving-ground-tooele-county-ut","sourceRecordId":"cyrusone-dugway-proving-ground-tooele-county-ut","name":"CyrusOne Dugway Proving Ground Data Center","operator":"CyrusOne","city":null,"county":"Tooele","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.2,"longitude":-112.93,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-dugway-proving-ground-tooele-county-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.army.mil/article/291360/army_reaches_conditional_agreement_with_private_industry_for_hyperscaled_data_centers","label":"Army reaches conditional agreement with private industry for hyperscaled data centers","publisher":"Army.mil","kind":"filing","retrievedAt":"2026-07-09"},{"url":"https://www.datacenterdynamics.com/en/news/us-army-taps-carlyle-and-cyrusone-to-develop-data-centers-on-army-owned-land/","label":"US Army taps Carlyle and CyrusOne to develop data centers on Army-owned land","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://en.wikipedia.org/wiki/Dugway_Proving_Ground","label":"Dugway Proving Ground — ownership and jurisdiction (U.S. Army-owned federal land, unincorporated Tooele County)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-databank-granite-point-bluffdale-ut","sourceRecordId":"databank-granite-point-bluffdale-ut","name":"DataBank Granite Point Campus (SLC2-SLC6)","operator":"DataBank","city":"Bluffdale","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.48568,"longitude":-111.90016,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-granite-point-bluffdale-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/resources/blogs/get-to-know-databanks-salt-lake-city-data-centers/","label":"Get to Know DataBank's Salt Lake City Data Centers","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.prnewswire.com/news-releases/databank-announces-opening-of-sixth-salt-lake-city-area-data-center-301632343.html","label":"DataBank Announces Opening of Sixth Salt Lake City Area Data Center","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.utah.gov/pmn/sitemap/notice/1039853.html","label":"Public notice — Gateway Redevelopment Area boundary amendment (Bluffdale RDA)","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.bluffdale.gov/DocumentCenter/View/3522/Jordan-Crossing-CRA-Draft-Plan-PDF","label":"Jordan Crossing Community Reinvestment Project Area — Draft Plan","publisher":"Bluffdale City","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.databank.com/resources/blogs/tax-incentives-add-to-attractiveness-of-databanks-salt-lake-data-centers/","label":"Tax Incentives Add to Attractiveness of DataBank's Salt Lake Data Centers","publisher":"DataBank","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-databank-slc1-salt-lake-city-ut","sourceRecordId":"databank-slc1-salt-lake-city-ut","name":"DataBank SLC1 (Salt Lake City Carrier Hotel)","operator":"DataBank","city":"Salt Lake City","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.76852,"longitude":-111.88585,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/databank-slc1-salt-lake-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.databank.com/resources/blogs/get-to-know-databanks-salt-lake-city-data-centers/","label":"Get to Know DataBank's Salt Lake City Data Centers","publisher":"DataBank","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://cra.slc.gov/projects/central-business-district/","label":"Central Business District Project Area — Redevelopment Agency of Salt Lake City","publisher":"Redevelopment Agency of Salt Lake City","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://cra.slc.gov/wp-content/uploads/2021/12/SLCRDA_FY2021_FINAL.pdf","label":"Redevelopment Agency of Salt Lake City — FY2021 Annual/Audit Report","publisher":"Redevelopment Agency of Salt Lake City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-dcpc-mona-juab-county-ut","sourceRecordId":"dcpc-mona-juab-county-ut","name":"DCPC Data Center Campus (north of Mona)","operator":"DCPC","city":null,"county":"Juab","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.8895,"longitude":-111.862,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dcpc-mona-juab-county-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/","label":"Public Hearing Notice: Conditional Use Permit made by DCPC","publisher":"Juab County","kind":"permit","retrievedAt":"2026-10-13"},{"url":"https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf","label":"Juab County Planning Commission Minutes, Nov 19, 2025","publisher":"Juab County","kind":"permit","retrievedAt":"2026-10-13"}]},{"id":"compute-summit-group-holdings-dog-valley-juab-county-ut","sourceRecordId":"summit-group-holdings-dog-valley-juab-county-ut","name":"Dog Valley Data Center (McWilliams/Sperry rezone)","operator":"Summit Group Holdings","city":null,"county":"Juab","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.609,"longitude":-112.0136,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/summit-group-holdings-dog-valley-juab-county-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf","label":"Juab County Planning Commission Minutes, Nov 19, 2025","publisher":"Juab County","kind":"permit","retrievedAt":"2026-10-13"},{"url":"https://www.deseret.com/environment/2026/09/08/mona-citizens-revolt-against-local-data-centers/","label":"Mona citizens revolt against local data centers","publisher":"Deseret News","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-ebay-topaz-south-jordan-ut","sourceRecordId":"ebay-topaz-south-jordan-ut","name":"eBay Topaz Data Center","operator":"eBay","city":"South Jordan","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.55849,"longitude":-111.93671,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ebay-topaz-south-jordan-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/hyperscalers/ebay-utah-data-center-earns-leed-gold","label":"eBay Utah Data Center Earns LEED Gold","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/","label":"To power Utah's data center boom, companies are turning to fossil fuels","publisher":"Grist","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/sojordanut-meet-5c77a92d3b554728bf67b91e7e009dac/ITEM-Attachment-001-f0e4eafd922043329648698ba0077660.pdf","label":"South Jordan City FY 2024-25 Tentative Budget — Redevelopment Agency section (all 11 RDA/CDA/EDA project areas)","publisher":"South Jordan City","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/sojordanut-meet-974b3762cc76457ba50aa12674d4a602/ITEM-Attachment-001-e60a92d2ce134faabd49b6a5ff53e5cd.pdf","label":"South Jordan RDA — Southwest Quadrant Urban Center Community Reinvestment Project Area Plan and staff report (adopted April 5, 2022)","publisher":"South Jordan City Redevelopment Agency","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-edgeconnex-west-valley-city-ut","sourceRecordId":"edgeconnex-west-valley-city-ut","name":"EdgeConneX SLC01","operator":"EdgeConneX","city":"West Valley City","county":"Salt Lake","address":"2302 South President's Dr., Suite A/B","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.69679,"longitude":-111.9867,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-west-valley-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.wvc-ut.gov/ArchiveCenter/ViewFile/Item/3376","label":"West Valley City Fund 22 (Redevelopment Agency) adopted budget, FY2023-24 — project-area tax-increment ledger","publisher":"West Valley City","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://edgeconnex.com/wp-content/uploads/2024/09/Salt-Lake-City-Data-Sheet.pdf","label":"EdgeConneX Salt Lake City SLC01 Data Sheet","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-edged-bluffdale-ut","sourceRecordId":"edged-bluffdale-ut","name":"Edged Salt Lake City Data Center (Project Inabi)","operator":"Edged Energy","city":"Bluffdale","county":"Salt Lake","address":"600 W 14600 S","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.488,"longitude":-111.905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edged-bluffdale-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.utah.gov/pmn/sitemap/notice/876505.html","label":"Bluffdale City Planning Commission agenda, Dec 6, 2023 (Project Inabi Edged Data Center site plan)","publisher":"Utah Public Notice Website","kind":"permit","retrievedAt":"2026-10-13"},{"url":"https://baxtel.com/data-center/edged-energy-bluffdale-ut","label":"Edged Energy: Bluffdale, UT","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-fibernet-orem-ut","sourceRecordId":"fibernet-orem-ut","name":"Fibernet Orem Data Center","operator":"Fibernet","city":"Orem","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.27619,"longitude":-111.67595,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fibernet-orem-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fiber.net/colocation/utah-colocation/","label":"Fibernet — Utah Data Center & Colocation (1145 South 800 East, Orem, UT 84097)","publisher":"Fibernet","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.utah.gov/pmn/files/498543.pdf","label":"Redevelopment Agency of the City of Orem — meeting minutes, May 14, 2019 (only Project 90-08 remained active)","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.utah.gov/pmn/files/1444291.pdf","label":"Orem City RDA FY2026-27 budget public-hearing notice (University Place CDA)","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-fiberstate-draper-ut","sourceRecordId":"fiberstate-draper-ut","name":"FiberState SLC1","operator":"FiberState","city":"Draper","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.52478,"longitude":-111.8628,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/fiberstate-draper-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.draperutah.gov/media/5baoyq5c/adopted-budget-cra-fy26-final.pdf","label":"Draper City Community Reinvestment Agency FY2025-26 adopted budget — six active project-area divisions itemized","publisher":"Draper City","kind":"subsidy","retrievedAt":"2026-09-08"},{"url":"https://www.draperutah.gov/media/sfkbgezm/acfr-fy22-draper-city.pdf","label":"Draper City FY2022 Annual Comprehensive Financial Report, Note 13 (RDA Commitments and Tax Abatements) — three abatement agreements citywide, none a data centre; most recent ACFR located","publisher":"Draper City","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-flexential-cottonwood-heights-ut","sourceRecordId":"flexential-cottonwood-heights-ut","name":"Flexential Cottonwood","operator":"Flexential","city":"Cottonwood Heights","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.61347,"longitude":-111.82565,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-cottonwood-heights-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.utah.gov/pmn/files/1088841.pdf","label":"Cottonwood Heights CDRA — Canyon Centre CDA Analysis (LRB Public Finance Advisors, 20 Feb 2024); Canyon Centre is the agency's only established project area and lies at a different location from this site","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-flexential-salt-lake-city-downtown-ut","sourceRecordId":"flexential-salt-lake-city-downtown-ut","name":"Flexential Salt Lake City - Downtown","operator":"Flexential","city":"Salt Lake City","county":"Salt Lake","address":"572 South Delong Street","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.7563065,"longitude":-111.9548375,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-downtown-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ut/salt-lake-city/downtown-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/729696933","label":"OpenStreetMap way/729696933","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://cra.slc.gov/project-areas/","label":"Project Areas — Redevelopment Agency of Salt Lake City (8 current RDA/CRA project areas)","publisher":"Redevelopment Agency of Salt Lake City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-flexential-salt-lake-city-fair-park-ut","sourceRecordId":"flexential-salt-lake-city-fair-park-ut","name":"Flexential Salt Lake City - Fair Park","operator":"Flexential","city":"Salt Lake City","county":"Salt Lake","address":"118 South 1000 West","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.7667963,"longitude":-111.9202947,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-fair-park-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ut/salt-lake-city/fair-park-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1121188409","label":"OpenStreetMap way/1121188409","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://rda.slc.gov/projects/north-temple-project-area/","label":"North Temple Project Area — Redevelopment Agency of Salt Lake City","publisher":"Redevelopment Agency of Salt Lake City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-flexential-salt-lake-city-lindon-ut","sourceRecordId":"flexential-salt-lake-city-lindon-ut","name":"Flexential Salt Lake City - Lindon","operator":"Flexential","city":"Lindon","county":"Utah","address":"333 South 520 West","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.332648,"longitude":-111.7278754,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-lindon-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ut/salt-lake-city/lindon-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/node/12112382397","label":"OpenStreetMap node/12112382397","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.utah.gov/pmn/files/1403855.pdf","label":"Lindon City FY2024-25 Annual Comprehensive Financial Report — Note 11 (project-area tax increment, \"700 N CDA\") and Note 12 (GASB 77 tax-abatement disclosure, one agreement citywide)","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-flexential-salt-lake-city-millcreek-ut","sourceRecordId":"flexential-salt-lake-city-millcreek-ut","name":"Flexential Salt Lake City - Millcreek","operator":"Flexential","city":"Salt Lake City","county":"Salt Lake","address":"3949 South 200 East","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.685569,"longitude":-111.8850505,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-millcreek-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ut/salt-lake-city/millcreek-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1056658555","label":"OpenStreetMap way/1056658555","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.millcreekut.gov/208/Community-Reinvestment-Agency","label":"Community Reinvestment Agency — Millcreek City (six project areas)","publisher":"Millcreek City","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://ut-millcreek.civicplus.com/DocumentCenter/View/4320/Project-Area-Plan--West-Millcreek-CRA","label":"West Millcreek Community Reinvestment Area — Project Area Plan","publisher":"Millcreek City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-flexential-salt-lake-city-south-valley-slc09-ut","sourceRecordId":"flexential-salt-lake-city-south-valley-slc09-ut","name":"Flexential Salt Lake City - South Valley (SLC09)","operator":"Flexential","city":"West Jordan","county":"Salt Lake","address":"3949 South Campus View Drive","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.6203519,"longitude":-111.986047,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-south-valley-slc09-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/ut/salt-lake-city/south-valley-data-center","label":"Flexential facility directory","publisher":"Flexential","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/355926681","label":"OpenStreetMap way/355926681","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.westjordan.utah.gov/economic-development/redevelopment/","label":"West Jordan Redevelopment Agency — project areas","publisher":"West Jordan City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-google-eagle-mountain-ut","sourceRecordId":"google-eagle-mountain-ut","name":"Google Eagle Mountain Site","operator":"Google","city":"Eagle Mountain","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.30935,"longitude":-112.01198,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-eagle-mountain-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ksl.com/article/50255468/google-buys-land-for-potential-data-center-in-eagle-mountain-promises-to-spend-12-billion","label":"Google buys land for potential data center in Eagle Mountain, promises to spend $1.2 billion","publisher":"KSL.com","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/","label":"To power Utah's data center boom, companies are turning to fossil fuels","publisher":"Grist","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.thecooldown.com/green-business/eagle-mountain-property-tax-hike-referendum/","label":"Eagle Mountain property tax hike triggers referendum — incentive recipients named (Meta, QTS)","publisher":"The Cool Down","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-joule-millard-county-ut","sourceRecordId":"joule-millard-county-ut","name":"Joule Energy and Data Center Campus","operator":"Joule Capital Partners","city":"Holden","county":"Millard","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.1072,"longitude":-112.165,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/joule-millard-county-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.abc4.com/news/central-utah/groundbreaking-millard-county-data-center/","label":"Groundbreaking held for Joule data center campus in Millard County","publisher":"ABC4 Utah","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/","label":"Why this coming data center in Millard County is so unique","publisher":"Deseret News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.utahbusiness.com/industry/2025/11/05/data-center-creekstone-energy-joule-capital-partners-millard-county-fillmore/","label":"Utah Business — Millard County commissioners on data-center incentives","publisher":"Utah Business","kind":"subsidy","retrievedAt":"2026-09-04"}]},{"id":"compute-lumen-ogden-ut","sourceRecordId":"lumen-ogden-ut","name":"Lumen Ogden 1","operator":"Lumen","city":"Ogden","county":"Weber","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":41.223,"longitude":-111.97384,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-ogden-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.ogdencity.gov/1216/RDA-Projects","label":"Ogden City RDA — the nine active project areas with their terms; none references 526 W 17th Street or Lumen","publisher":"Ogden City","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-lumen-salt-lake-city-ut","sourceRecordId":"lumen-salt-lake-city-ut","name":"Lumen Salt Lake City Sites (Salt Lake 1, 2 and 4)","operator":"Lumen","city":"Salt Lake City","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.75962,"longitude":-111.8868,"coordinatePrecision":"representative_multi_site","recordUnit":"representative multi-site record","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-salt-lake-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://baxtel.com/data-center/lumen-salt-lake-1","label":"Lumen Salt Lake 1 — 572 South Delong, Salt Lake City; one of three distinct facilities aggregated by this record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-08"},{"url":"https://baxtel.com/data-center/lumen-salt-lake-2","label":"Lumen Salt Lake 2 — 5035 Harold Gatty Drive, Salt Lake City; one of three distinct facilities aggregated by this record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-08"},{"url":"https://cra.slc.gov/project-areas/","label":"Redevelopment Agency of Salt Lake City — the eight active project areas; none names Lumen or its predecessor entities","publisher":"Redevelopment Agency of Salt Lake City","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-meta-eagle-mountain-ut","sourceRecordId":"meta-eagle-mountain-ut","name":"Meta Eagle Mountain Data Center Campus","operator":"Meta","city":"Eagle Mountain","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.3138,"longitude":-111.9697,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-eagle-mountain-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/meta-eagle-mountain-utah-campus","label":"Meta Eagle Mountain Utah Campus — Baxtel","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-05"},{"url":"https://greatsaltlakenews.org/latest-news/salt-lake-tribune/can-utah-become-a-data-center-hub-without-draining-its-water-supply","label":"Can Utah become a data center hub without draining its water supply? — Great Salt Lake Collaborative / Salt Lake Tribune","publisher":"Salt Lake Tribune","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","label":"Meta Eagle Mountain Data Center fact sheet","publisher":"Meta","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://grist.org/technology/utah-data-center-water-supply-meta-novva/","label":"Can you build data centers in a desert without draining the water supply? — Grist","publisher":"Grist","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.deseret.com/utah/2022/9/30/23380151/facebook-meta-announces-expansion-eagle-mountain-data-center-tax-breaks/","label":"Meta announces mega expansion to Eagle Mountain data center project — Deseret News","publisher":"Deseret News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","label":"Utah's largest solar plant set to power Eagle Mountain data center — Daily Herald","publisher":"Daily Herald (Utah)","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-setsquare-nebo-north-mona-juab-county-ut","sourceRecordId":"setsquare-nebo-north-mona-juab-county-ut","name":"Nebo North Data Center Campus (Project Nebo)","operator":"SetSquare Capital Group (Nebo North LLC)","city":"Mona","county":"Juab","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.8605,"longitude":-111.909,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/setsquare-nebo-north-mona-juab-county-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sltrib.com/news/2026/09/14/utahns-left-in-dark-10b-data/","label":"A Utah county OK'd a data center campus the size of 20 Costcos. Neighbors say they were left 'in the dark.'","publisher":"The Salt Lake Tribune","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/","label":"Notice of Public Hearing: Nebo North LLC Conditional Use Permit","publisher":"Juab County","kind":"permit","retrievedAt":"2026-10-13"},{"url":"https://www.deseret.com/environment/2026/09/08/mona-citizens-revolt-against-local-data-centers/","label":"Mona citizens revolt against local data centers","publisher":"Deseret News","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.abc4.com/news/central-utah/mona-residents-against-data-center/amp/","label":"Mona residents against data center","publisher":"ABC4","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-newfold-digital-provo-ut","sourceRecordId":"newfold-digital-provo-ut","name":"Newfold Digital Utah County Data Center","operator":"Newfold Digital","city":"Provo","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.23373,"longitude":-111.65871,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/newfold-digital-provo-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.provo.gov/869/Redevelopment-Areas","label":"Redevelopment Areas — Provo City (3 RDA project areas, 5 CDA project areas)","publisher":"Provo City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-nine-mile-data-myton-duchesne-county-ut","sourceRecordId":"nine-mile-data-myton-duchesne-county-ut","name":"Nine Mile Data Center (Uinta Basin Data Center Project)","operator":"Nine Mile Data, LLC","city":"Myton","county":"Duchesne","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.193,"longitude":-110.0568,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/nine-mile-data-myton-duchesne-county-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://uintahbasindatacenter.com/infrastructure.html","label":"Infrastructure — Uintah Basin Data Center Project Information","publisher":"Uintah Basin Data Center Project","kind":"other","retrievedAt":"2026-08-25"},{"url":"https://www.basinnow.com/public-hearing-scheduled-on-nine-mile-data-llc-conditional-use-permit/","label":"Public Hearing Scheduled On Nine Mile Data LLC Conditional Use Permit","publisher":"Basin Now","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf","label":"Duchesne County findings report — Nine Mile Data, LLC conditional use permit","publisher":"Duchesne County","kind":"permit","retrievedAt":"2026-09-21"}]},{"id":"compute-novva-west-jordan-ut","sourceRecordId":"novva-west-jordan-ut","name":"Novva West Jordan Campus","operator":"Novva Data Centers","city":"West Jordan","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.57389,"longitude":-112.04576,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/novva-west-jordan-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.novva.com/data-center-facilities/utah/","label":"Novva Data Centers — Utah Data Center, 100-Acre SLC Colocation Campus","publisher":"Novva Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.utahmoneywatch.com/utah-based-novva-data-centers-and-its-investment-partner-cim-group-land-2-billion-loan-to-complete-a-175mw-state-of-the-art-ai-data-center-in-west-jordan-utah/","label":"Novva and CIM Group land $2 billion loan to complete a 175MW AI data center in West Jordan, Utah","publisher":"Utah Money Watch","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.westjordan.utah.gov/economic-development/redevelopment/","label":"West Jordan Redevelopment Agency — active project areas and boundaries","publisher":"City of West Jordan","kind":"subsidy","retrievedAt":"2026-09-04"},{"url":"https://lehifreepress.com/2026/02/11/utahs-massive-data-centers-seek-to-build-new-power-sources/","label":"Utah's massive data centers seek to build new power sources","publisher":"Lehi Free Press","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-nsa-utah-data-center-bluffdale-ut","sourceRecordId":"nsa-utah-data-center-bluffdale-ut","name":"NSA Utah Data Center (Bumblehive)","operator":"National Security Agency","city":"Bluffdale","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.429,"longitude":-111.9327,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nsa-utah-data-center-bluffdale-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://clui.org/ludb/site/nsa-utah-data-center","label":"NSA Utah Data Center, Utah","publisher":"Center for Land Use Interpretation","kind":"other","retrievedAt":"2026-10-13"},{"url":"https://www.datacenterknowledge.com/energy-power-supply/nsa-data-center-plagued-by-electrical-problems","label":"NSA Data Center Plagued by Electrical Problems","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-oracle-salt-lake-city-ut","sourceRecordId":"oracle-salt-lake-city-ut","name":"Oracle Salt Lake City","operator":"Oracle","city":"Salt Lake City","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.736391,"longitude":-112.005741,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oracle-salt-lake-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.datacentermap.com/usa/utah/salt-lake-city/oracle-salt-lake-city/","label":"Oracle Salt Lake City — data centre directory listing (1499-1521 S 4800 W, Salt Lake City, UT 84104). Address read from the search index only: the page was bot-walled on direct fetch and its content is not independently verified.","publisher":"DataCenterMap","kind":"other","retrievedAt":"2026-09-08"},{"url":"https://cra.slc.gov/project-areas/","label":"Redevelopment Agency of Salt Lake City — the eight active project areas, all downtown-core or North Temple/9-Line corridors; none covers 4800 West","publisher":"Redevelopment Agency of Salt Lake City","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-oracle-west-jordan-ut","sourceRecordId":"oracle-west-jordan-ut","name":"Oracle West Jordan Data Center (Project Sequoia)","operator":"Oracle","city":"West Jordan","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.60613,"longitude":-111.93952,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oracle-west-jordan-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.computerworld.com/article/1554289/work-resumes-on-oracle-s-massive-utah-data-center.html","label":"Work resumes on Oracle's massive Utah data center","publisher":"Computerworld","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://clui.org/ludb/site/oracle-south-jordan-data-center","label":"Oracle South Jordan Data Center — Land Use Database entry","publisher":"The Center for Land Use Interpretation","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/","label":"To power Utah's data center boom, companies are turning to fossil fuels","publisher":"Grist","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.deseret.com/2008/5/19/20253264/oracle-to-build-data-center-in-west-jordan/","label":"Oracle to build data center in West Jordan — GOED tax rebate and Economic Development Area reported","publisher":"Deseret News","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.datacenterknowledge.com/operations-and-management/oracle-confirms-285m-utah-data-center","label":"Oracle confirms $285M Utah data center — up to $15 million in state tax incentives","publisher":"Data Center Knowledge","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-valar-atomics-project-beehive-price-ut","sourceRecordId":"valar-atomics-project-beehive-price-ut","name":"Project Beehive","operator":"Valar Atomics","city":"Price","county":"Carbon","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.5994,"longitude":-110.8107,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/valar-atomics-project-beehive-price-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.eastidahonews.com/2026/10/nuclear-powered-ai-data-center-proposed-on-state-and-federal-land-in-central-eastern-utah/","label":"Nuclear-powered AI data center proposed on state and federal land in central eastern Utah (KSL)","publisher":"East Idaho News / KSL","kind":"press","retrievedAt":"2026-10-13"},{"url":"https://www.resilience.org/stories/2026-10-06/9000-acre-nuclear-powered-data-center-proposed-on-public-lands-in-utah/","label":"9,000-acre nuclear-powered data center proposed on public lands in Utah","publisher":"Resilience.org (More Than Just Parks)","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-qts-eagle-mountain-ut","sourceRecordId":"qts-eagle-mountain-ut","name":"QTS Eagle Mountain Data Center Campus","operator":"QTS Data Centers","city":"Eagle Mountain","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.3155,"longitude":-111.9847,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-eagle-mountain-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://eaglemountain.gov/qts-begins-construction-on-new-datacenter-campus-in-eagle-mountain/","label":"QTS begins construction on new datacenter campus in Eagle Mountain — Eagle Mountain City","publisher":"Eagle Mountain City","kind":"permit","retrievedAt":"2026-07-05"},{"url":"https://utahnewsdispatch.com/2026/04/17/eagle-mountain-193-acre-data-center-campus-is-set-to-be-done-this-year-with-big-water-promises/","label":"Eagle Mountain 193-acre data center campus set to be done this year — Utah News Dispatch","publisher":"Utah News Dispatch","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://q.com/data-centers/eagle-mountain/","label":"QTS Eagle Mountain — official data center page","publisher":"QTS Data Centers","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.utah.gov/pmn/files/1158232.pdf","label":"Eagle Mountain RDA — Sweetwater #3 CRA / QTS participation agreement (Aug 2024 packet)","publisher":"Eagle Mountain City / Utah Public Notice","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://kutv.com/news/utah-water/questions-grow-over-water-use-at-massive-qts-data-center-in-eagle-mountain","label":"Questions grow over water use at massive QTS Data Center in Eagle Mountain — KUTV","publisher":"KUTV (CBS Utah)","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/","label":"To power Utah's data center boom, companies are turning to fossil fuels — Grist","publisher":"Grist","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.utahbusiness.com/press-releases/2026/04/20/layton-construction-qts-data-centers-campus-eagle-mountain/","label":"Layton Construction, QTS Data Centers Break Ground on Eagle Mountain Campus","publisher":"Utah Business","kind":"press","retrievedAt":"2026-08-08"},{"url":"https://lehifreepress.com/2026/02/11/utahs-massive-data-centers-seek-to-build-new-power-sources/","label":"Utah's massive data centers seek to build new power sources","publisher":"Lehi Free Press","kind":"press","retrievedAt":"2026-10-13"}]},{"id":"compute-qts-eagle-mountain-ii-fairfield-ut","sourceRecordId":"qts-eagle-mountain-ii-fairfield-ut","name":"QTS Eagle Mountain II","operator":"QTS Data Centers","city":"Fairfield","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.26217,"longitude":-112.093,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-eagle-mountain-ii-fairfield-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.utah.gov/pmn/files/1003911.pdf","label":"Eagle Mountain RDA Board packet — Sweetwater Industrial Park CRA #3 Amended Project Area Plan & Participation Agreement terms (August 1, 2023)","publisher":"Eagle Mountain Redevelopment Agency via Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://www.utah.gov/pmn/files/1158232.pdf","label":"Eagle Mountain RDA Board packet — Sweetwater #3 CRA Participation Agreement Second Amendment (QTS Eagle Mountain I, LLC), August 20, 2024","publisher":"Eagle Mountain Redevelopment Agency via Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-brightnight-red-butte-newcastle-ut","sourceRecordId":"brightnight-red-butte-newcastle-ut","name":"Red Butte Energy and Data Center Campus","operator":"BrightNight","city":"Newcastle","county":"Iron","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":37.6949,"longitude":-113.943,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/brightnight-red-butte-newcastle-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://brightnightpower.com/red-butte/","label":"Red Butte Energy and Data Center Campus","publisher":"BrightNight","kind":"other","retrievedAt":"2026-08-25"},{"url":"https://ironcountyut.gov/planning/data-center-projects","label":"Proposed Data Center Information — Iron County","publisher":"Iron County, Utah","kind":"permit","retrievedAt":"2026-08-25"},{"url":"https://www.stgeorgeutah.com/news/ai-campus-proposed-in-iron-county-could-bring-500-jobs-on-site-power-generation-public/article_bcfedf59-aa3f-4ff8-92c0-438f38266f72.html","label":"AI campus proposed in Iron County could bring 500 jobs, on-site power generation","publisher":"St. George News","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-regence-salt-lake-city-ut","sourceRecordId":"regence-salt-lake-city-ut","name":"Regence BlueCross BlueShield Salt Lake City Data Center","operator":"Regence BlueCross BlueShield","city":"Cottonwood Heights","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.633117,"longitude":-111.809456,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/regence-salt-lake-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2890+E+Cottonwood+Pkwy%2C+UT+84121&benchmark=Public_AR_Current&vintage=Current_Current&layers=Incorporated+Places&format=json","label":"US Census Geocoder — 2890 E Cottonwood Pkwy resolves to Incorporated Place \"Cottonwood Heights\" (GEOID 4916270), Salt Lake County, despite a USPS mailing label reading \"Salt Lake City\". This is Regence's Utah office address; its use as the data-center site is inferred, not independently confirmed.","publisher":"US Census Bureau","kind":"other","retrievedAt":"2026-09-08"},{"url":"https://www.utah.gov/pmn/files/1088841.pdf","label":"Cottonwood Heights CDRA — Canyon Centre CDA Analysis (LRB Public Finance Advisors, 20 Feb 2024); Canyon Centre is the agency's only project area and does not cover this address","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-senawave-salt-lake-city-ut","sourceRecordId":"senawave-salt-lake-city-ut","name":"Senawave Salt Lake City","operator":"Senawave","city":"West Valley City","county":"Salt Lake","address":"3047 W Parkway Blvd","state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.71216,"longitude":-111.964329,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/senawave-salt-lake-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://inflect.com/building/3047-parkway-boulevard-west-valley-city/senawave/datacenter/salt-lake-city","label":"Senawave Salt Lake City — building listing (3047 Parkway Boulevard, West Valley City, UT 84119); used to establish the street address, which the US Census Geocoder places inside the West Valley City incorporated boundary (GEOID 4983470)","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-08"},{"url":"https://www.wvc-ut.gov/ArchiveCenter/ViewFile/Item/3376","label":"West Valley City Fund 22 (Redevelopment Agency) adopted budget — project-area tax-increment ledger; Decker Lake shows $0 increment from FY2020-21 onward","publisher":"West Valley City","kind":"subsidy","retrievedAt":"2026-09-08"},{"url":"https://www.peeringdb.com/fac/8572","label":"Senawave facility record","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-stratos-box-elder-ut","sourceRecordId":"stratos-box-elder-ut","name":"Stratos AI Data Center Campus","operator":"O'Leary Digital","city":"Lucin","county":"Box Elder","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":41.5,"longitude":-113.5,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stratos-box-elder-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet","label":"Stratos Project Fact Sheet — Box Elder County","publisher":"Box Elder County, UT","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://utahnewsdispatch.com/2026/05/19/renderings-show-massive-data-center-box-elder-utah-permits-could-take-years/","label":"Renderings show Stratos data center but permits could take years","publisher":"Utah News Dispatch","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.kuer.org/business-economy/2026-06-04/kevin-oleary-shrinks-project-stratos-box-elder-data-center-20000-acres","label":"Kevin O’Leary says he’ll shrink the Box Elder data center by 20,000 acres","publisher":"KUER","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-summit-ridge-santaquin-ut","sourceRecordId":"summit-ridge-santaquin-ut","name":"Summit Ridge Data Center","operator":"Data Center Power Company","city":"Santaquin","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":39.97551,"longitude":-111.78521,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/summit-ridge-santaquin-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ksl.com/article/51442989/some-santaquin-residents-raise-concerns-over-approval-of-future-data-center","label":"Some Santaquin residents raise concerns over approval of future data center","publisher":"KSL.com","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.santaquin.gov/DocumentCenter/View/5806/2023-05-01_notice_of_intent_to_transfer_property_-_cdra_santaquin_final","label":"Notice of Intent to Provide Assistance Pursuant to Section 17C-1-207 (West Fields Community Reinvestment Project Area), May 1, 2023","publisher":"Santaquin City Community Development and Renewal Agency","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-syringa-networks-west-valley-city-ut","sourceRecordId":"syringa-networks-west-valley-city-ut","name":"Syringa Networks West Valley","operator":"Syringa Networks","city":"West Valley City","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.69679,"longitude":-111.9867,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/syringa-networks-west-valley-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.wvc-ut.gov/ArchiveCenter/ViewFile/Item/3376","label":"West Valley City Fund 22 (Redevelopment Agency) adopted budget, FY2023-24 — project-area tax-increment ledger","publisher":"West Valley City","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-zenith-tooele-valley-burmester-ut","sourceRecordId":"zenith-tooele-valley-burmester-ut","name":"Tooele Valley Data Center Campus","operator":"Zenith Development","city":"Burmester","county":"Tooele","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.748,"longitude":-112.674,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/zenith-tooele-valley-burmester-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.yahoo.com/news/us/articles/500mw-utah-data-center-wants-150431818.html","label":"A 500MW Utah Data Center Wants to Dump 250,000 Gallons of Waste Water Into the Great Salt Lake Daily","publisher":"Yahoo News","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.standard.net/news/local/2026/jul/28/concern-about-data-center-impacts-on-great-salt-lake-grows-now-for-tooele-projects-wastewater/","label":"Concern about data center impacts on Great Salt Lake grows, now for Tooele project's wastewater","publisher":"Standard-Examiner","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://www.sltrib.com/news/environment/2026/07/28/yet-another-data-center-planned/","label":"Utahns speak out as yet another data center is planned near the Great Salt Lake","publisher":"The Salt Lake Tribune","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://inlandportauthority.utah.gov/wp-content/uploads/Petition-for-TV-PID.pdf","label":"Petition Requesting the Creation of TV Public Infrastructure District (26 March 2024) — petitioner/owner Zenith Bolinder, LLC (a Delaware LLC), contact sponsor Charles Akerlow, representing 100% of surface property owners within the proposed district","publisher":"Utah Inland Port Authority","kind":"filing","retrievedAt":"2026-09-08"},{"url":"https://www.ksl.com/article/51145917/80m-bond-offering-100-acres-under-contract-tooele-countys-inland-port-project-underway","label":"$80M bond offering, 100 acres under contract: Tooele County's Inland Port project underway — states Zenith Bolinder LLC is \"a partnership with longtime Utah developer Zenith Development\" and names Chuck Akerlow as Zenith Development's managing director","publisher":"KSL","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-tpc-payson-ut","sourceRecordId":"tpc-payson-ut","name":"TPC Payson Data Center Campus","operator":"Twin Palms Capital (TPC Data Centers)","city":"Payson","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.0444,"longitude":-111.7321,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tpc-payson-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/tpc-payson-ut","label":"Carrier-Neutral Data Center, Payson, UT (TPC)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-tract-eagle-mountain-ut","sourceRecordId":"tract-eagle-mountain-ut","name":"Tract Eagle Mountain Data Center Park","operator":"Tract","city":"Eagle Mountain","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.30935,"longitude":-112.01198,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-eagle-mountain-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://eaglemountain.gov/wp-content/uploads/2024/10/Eagle-Mountain-Press-Release_1.17.2024-1.pdf","label":"Tract announces acquisition of 668 acres in Eagle Mountain, UT, promising further investment for data center campuses","publisher":"Eagle Mountain City (hosting Tract press release, January 2024)","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.ksl.com/article/50855355/colorado-based-company-acquires-land-for-another-data-center-in-eagle-mountain","label":"Colorado-based company acquires land for another data center in Eagle Mountain","publisher":"KSL.com","kind":"press","retrievedAt":"2026-08-14"},{"url":"https://www.utah.gov/pmn/files/1158232.pdf","label":"Eagle Mountain RDA Board Meeting packet — Triple Tail Project Area Plan, Exhibit C Parcel List (August 20, 2024)","publisher":"Eagle Mountain Redevelopment Agency via Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"},{"url":"https://pscdocs.utah.gov/electric/24docs/2403543/336619PtnIntrvnTract11-20-2024.pdf","label":"Petition to Intervene of Tract Capital Management, LP, UTLCO Eagle Mtn., LLC, and UTLCO Eagle Mtn. Two, LLC (Utah PSC Docket No. 24-035-43)","publisher":"Utah Public Service Commission","kind":"filing","retrievedAt":"2026-09-05"},{"url":"https://www.utah.gov/pmn/files/1237341.pdf","label":"Notice of Interlocal Agreements — Eagle Mountain Redevelopment Agency, Utah County, Alpine School District, Eagle Mountain City, Central Utah Water Conservancy District, and Unified Fire Service Area (Triple Tail Project Area)","publisher":"Eagle Mountain Redevelopment Agency via Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-unisys-salt-lake-city-ut","sourceRecordId":"unisys-salt-lake-city-ut","name":"Unisys Salt Lake City","operator":"Unisys","city":"Salt Lake City","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.75962,"longitude":-111.8868,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/unisys-salt-lake-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://cra.slc.gov/project-areas/","label":"Redevelopment Agency of Salt Lake City — the eight active project areas; none names Unisys","publisher":"Redevelopment Agency of Salt Lake City","kind":"subsidy","retrievedAt":"2026-09-08"}]},{"id":"compute-university-of-utah-downtown-data-center-salt-lake-city-ut","sourceRecordId":"university-of-utah-downtown-data-center-salt-lake-city-ut","name":"University of Utah Downtown Data Center","operator":"University of Utah (UIT)","city":"Salt Lake City","county":"Salt Lake","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.7466,"longitude":-111.8945,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/university-of-utah-downtown-data-center-salt-lake-city-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://it.utah.edu/node4/posts/2018/october/downtown-data-center.php","label":"Downtown Data Center","publisher":"University of Utah Information Technology","kind":"other","retrievedAt":"2026-10-13"}]},{"id":"compute-valorc3-st-george-ut","sourceRecordId":"valorc3-st-george-ut","name":"ValorC3 Saint George Data Center","operator":"ValorC3","city":"St. George","county":"Washington","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":37.10988,"longitude":-113.58321,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/valorc3-st-george-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.utah.gov/pmn/files/1286199.pdf","label":"St. George Redevelopment Agency FY2025-26 budget agenda packet — itemizes all six currently active project areas by fund number and name","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-08"},{"url":"https://www.datacenterknowledge.com/business/new-data-center-project-in-utah","label":"New data center project in Utah — the facility was built by Kay Traveller of Tonaquint Development on land within the privately developed Tonaquint Business Park","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-volition-spanish-fork-ut","sourceRecordId":"volition-spanish-fork-ut","name":"Volition Spanish Fork Data Center","operator":"Volition Industries","city":"Spanish Fork","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.115,"longitude":-111.6461,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/volition-spanish-fork-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.heraldextra.com/news/2026/aug/20/data-center-discussion-spanish-fork-city-council-delays-vote-for-amendments-that-could-pave-way-for-data-center/","label":"Data center discussion: Spanish Fork City Council delays vote for amendments that could pave way for data center","publisher":"Daily Herald","kind":"press","retrievedAt":"2026-08-25"},{"url":"https://servercountry.org/data/projects/volition-industries-spanish-fork-data-center-ut/","label":"Volition Industries - Spanish Fork Data Center","publisher":"Server Country","kind":"other","retrievedAt":"2026-08-25"},{"url":"https://www.ksl.com/article/51611520/residents-voice-concerns-over-proposed-data-center-regulations-in-spanish-fork","label":"Residents voice concerns over proposed data center regulations in Spanish Fork","publisher":"KSL.com","kind":"press","retrievedAt":"2026-09-08"},{"url":"https://www.fox13now.com/news/local-news/central-utah/data-center-company-ponders-moving-on-after-spanish-fork-leaders-delay-title-15-vote","label":"Data Center company ponders moving on after Spanish Fork leaders delay Title 15 vote","publisher":"FOX 13 News Utah","kind":"press","retrievedAt":"2026-09-08"}]},{"id":"compute-voonami-orem-ut","sourceRecordId":"voonami-orem-ut","name":"Voonami Orem Data Center","operator":"Voonami","city":"Orem","county":"Utah","address":null,"state":"UT","stateName":"Utah","jurisdictionType":"state","latitude":40.29816,"longitude":-111.69443,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/voonami-orem-ut","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","kind":"other","retrievedAt":"2026-08-14"},{"url":"https://www.utah.gov/pmn/files/498543.pdf","label":"Redevelopment Agency of the City of Orem — meeting minutes, May 14, 2019 (only Project 90-08 remained active)","publisher":"Utah Public Notice Website","kind":"subsidy","retrievedAt":"2026-09-05"}]},{"id":"compute-penzance-1500-gateway-fredericksburg-va","sourceRecordId":"penzance-1500-gateway-fredericksburg-va","name":"1500 Gateway Data Center (denied)","operator":"1500 Gateway LLC (Penzance)","city":"Fredericksburg","county":null,"address":"1500 Gateway Boulevard","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.301,"longitude":-77.509,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/penzance-1500-gateway-fredericksburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.potomaclocal.com/2026/08/26/no-byte-tonight-fred-council-unplugs-23m-i-95-data-center-7-0-after-midnight-hearing/","label":"No Byte Tonight: Fred Council Unplugs $23M I-95 Data Center 7–0 After Midnight Hearing","publisher":"Potomac Local News","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-anchorstone-58-east-data-campus-ringgold-va","sourceRecordId":"anchorstone-58-east-data-campus-ringgold-va","name":"58 East Data Campus (Route 58 East Data Center Campus)","operator":"Anchorstone Advisors LLC","city":"Ringgold","county":"Pittsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.6048,"longitude":-79.2905,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/anchorstone-58-east-data-campus-ringgold-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cardinalnews.org/2024/07/17/pittsylvania-county-approves-its-first-data-center-project/","label":"Pittsylvania County Board of Supervisors rezoning approval (7/16/2024) + Board of Zoning Appeals Special Use Permit approval","publisher":"Cardinal News (reporting county board action)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/virginias-pittsylvania-supervisors-approve-rezoning-of-945-acres-for-data-center/","label":"Pittsylvania supervisors approve rezoning of 945 acres for data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/","label":"Permit approved for Ringgold data center campus","publisher":"Showcase Magazine","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/950-acre-data-center-campus-proposed-in-pittsylvania-county-virginia/","label":"950-acre data center campus proposed in Pittsylvania County","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-falmouth-tech-accokeek-center-stafford-va","sourceRecordId":"falmouth-tech-accokeek-center-stafford-va","name":"Accokeek Center","operator":"Falmouth Tech LLC","city":null,"county":"Stafford County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.4064243,"longitude":-77.4216174,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/falmouth-tech-accokeek-center-stafford-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.potomaclocal.com/?p=252787","label":"Stafford Planning Commission recommends Accokeek Center data campus, 4-3","publisher":"Potomac Local","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.fox5dc.com/news/planning-commission-supports-massive-data-center-proposal-stafford-county","label":"Planning commission supports massive data center proposal for Stafford County","publisher":"FOX 5 DC","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-adp-ladysmith-data-hub-caroline-va","sourceRecordId":"adp-ladysmith-data-hub-caroline-va","name":"ADP Ladysmith Data Hub","operator":"ADP Ladysmith Data Hub, LLC","city":"Ruther Glen","county":"Caroline","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.00386898862997,"longitude":-77.5030262165529,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/adp-ladysmith-data-hub-caroline-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","label":"Caroline County Special Exceptions and Rezonings case listing, Case RZ-02-2025 / SPEX-06-2025","publisher":"Caroline County, VA Department of Planning and Community Development","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.fredericksburgfreepress.com/2024/08/28/community-meeting-thursday-in-ladysmith-to-discuss-data-center-project/","label":"Community meeting Thursday in Ladysmith to discuss data center project","publisher":"Fredericksburg Free Press","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-aligned-iad-01-va","sourceRecordId":"aligned-iad-01-va","name":"Aligned IAD-01","operator":"Aligned Data Centers","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0136079,"longitude":-77.4705563,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-iad-01-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/northern-virginia-data-centers/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.openstreetmap.org/way/793622740","label":"OpenStreetMap way/793622740","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenters.com/aligned-energy-iad01-ashburn","label":"datacenters.com — Aligned Energy IAD01 Ashburn","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-aligned-iad-03-va","sourceRecordId":"aligned-iad-03-va","name":"Aligned IAD-03","operator":"Aligned Data Centers","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9886354,"longitude":-77.4407776,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aligned-iad-03-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aligneddc.com/location/iad-03-data-center/","label":"Aligned facility directory","publisher":"Aligned","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1276518684","label":"OpenStreetMap way/1276518684","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://aligneddc.com/northern-virginia-data-centers/","label":"Aligned AI/HPC — Sterling IAD-03 supports high/variable-density AI/HPC","publisher":"aligneddc.com","kind":"other","retrievedAt":"2026-09-01"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenters.com/aligned-energy-iad01-ashburn","label":"datacenters.com — Aligned Energy IAD01/IAD02 Ashburn","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-amazon-devlin-tech-park-va","sourceRecordId":"amazon-devlin-tech-park-va","name":"Amazon Devlin Technology Park","operator":"Amazon Web Services","city":"Bristow","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.724,"longitude":-77.558,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-devlin-tech-park-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","label":"Amazon buys 189 acres in Prince William tech park for $700M","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/amazon-pays-700m-for-planned-data-center-site-in-virginias-prince-william-county-report/","label":"Amazon pays $700M for planned data center site in Virginia's Prince William County","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-amazon-stevensburg-culpeper-va","sourceRecordId":"amazon-stevensburg-culpeper-va","name":"Amazon Stevensburg Data Center Campus","operator":"Amazon Web Services","city":"Stevensburg","county":"Culpeper County","address":"20420 Germanna Highway","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.443348,"longitude":-77.8784268,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-stevensburg-culpeper-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/amazon-granted-approval-for-rezoning-of-243-acres-in-culpeper-county-virginia","label":"Amazon Granted Approval For Rezoning of 243 Acres in Culpeper County, Virginia","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/amazon-stevensburg","label":"Amazon: Stevensburg Bldg-A Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-digital-realty-aurora-ai-factory-manassas-va","sourceRecordId":"digital-realty-aurora-ai-factory-manassas-va","name":"Aurora AI Factory","operator":"Digital Realty","city":"Manassas","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7509,"longitude":-77.4753,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-aurora-ai-factory-manassas-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260215011608/https://www.datacenterdynamics.com/en/news/nvidia-to-deploy-emerald-ais-orchestration-software-at-96mw-aurora-data-center-in-manassas-virginia/","label":"Nvidia to deploy Emerald AI's orchestration software at 96MW Aurora data center in Manassas, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-avaio-appomattox-va","sourceRecordId":"avaio-appomattox-va","name":"AVAIO Appomattox Data Center Campus","operator":"AVAIO Digital Partners","city":"Appomattox","county":"Appomattox","address":"1098 Oakville Rd","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.43,"longitude":-78.8,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/avaio-appomattox-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://virginiabusiness.com/developer-plans-3b-data-center-in-appomattox-county/","label":"Developer plans $3B data center in Appomattox County","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/","label":"Appomattox County answers questions for future data center","publisher":"WDBJ7","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://baxtel.com/data-center/avaio-appomattox-va","label":"Avaio: Appomattox, VA Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-27"}]},{"id":"compute-aws-mattermeade-caroline-va","sourceRecordId":"aws-mattermeade-caroline-va","name":"AWS Mattermeade Tech Campus","operator":"Amazon Web Services","city":"Bowling Green","county":"Caroline","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.044,"longitude":-77.3527,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-mattermeade-caroline-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-requests-permit-for-11-building-data-center-campus-in-caroline-county-virginia/","label":"Amazon requests permit for 11-building data center campus in Caroline County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterfrontier.com/cloud/article/33006046/amazon-plans-major-data-center-expansion-in-virginias-spotsylvania-county","label":"Data Center Frontier — AWS Spotsylvania/Caroline campuses incl. Orrock (1,078 ac spanning both counties)","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.spotsylvania.va.us/799/Rezoning-Cases","label":"Spotsylvania County rezoning cases index (Orrock Rd Spotsylvania portion, A-2->I-2, supports Caroline campus)","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://virginiabusiness.com/amazon-eyes-caroline-spotsylvania-for-11-building-data-center-campus/","label":"Virginia Business — Amazon eyes Caroline, Spotsylvania for 11-building data center campus (2025-02-20)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://fredericksburg.com/news/local/spotsylvania-continues-preparations-for-data-center-development/article_963eeb90-113f-11ee-b22b-6f25cabfb657.html","label":"Spotsylvania continues preparations for data center development (Orrock Tech Campus: about 158 acres in Spotsylvania, about 920.50 in Caroline)","publisher":"The Free Lance-Star","kind":"press","retrievedAt":"2026-10-27"}]},{"id":"compute-bermuda-hundred-data-center-chesterfield-va","sourceRecordId":"bermuda-hundred-data-center-chesterfield-va","name":"Bermuda Hundred Data Center (Old Bermuda Hundred Road)","operator":"Undisclosed (landowner: Washington Single Family Fund3)","city":"Chester","county":"Chesterfield","address":"1931 Old Bermuda Hundred Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.33798175,"longitude":-77.39493747,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bermuda-hundred-data-center-chesterfield-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wtvr.com/news/local-news/chesterfield-county/proposed-data-center-appeal-denied-june-3-2026","label":"Chesterfield Zoning Appeals Board denies appeal over proposed data center campus near I-95","publisher":"WTVR CBS6","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://richmondbizsense.com/2026/06/04/zoning-appeals-board-rejects-challenge-to-permit-requirement-for-data-center-project-in-chester/","label":"Zoning appeals board rejects challenge to permit requirement for data center project in Chester","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.wric.com/news/local-news/chesterfield-county/new-chesterfield-data-center-on-pause-as-county-faces-lawsuits/","label":"New Chesterfield data center on pause as county faces lawsuits","publisher":"WRIC ABC 8News","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.12onyourside.com/2026/06/03/chesterfield-board-upholds-denial-bermuda-district-data-center/","label":"Chesterfield board upholds denial of Bermuda District data center","publisher":"12 On Your Side / Gray Media","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://opengisdata.chesterfield.gov/","label":"Chesterfield County official Address Points GIS layer — 1931 Old Bermuda Hundred Rd, parcel GPIN 8046474181","publisher":null,"kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-stack-berry-hill-va","sourceRecordId":"stack-berry-hill-va","name":"Berry Hill / Southern Virginia Megasite","operator":"STACK Infrastructure","city":"Berry Hill","county":"Pittsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.68,"longitude":-79.35,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stack-berry-hill-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/stack-commits-735bn-investment-into-data-center-campus-in-berry-hill-virginia/","label":"STACK commits $73.5bn investment into data center campus in Berry Hill, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://cardinalnews.org/2026/06/30/stack-infrastructure-says-its-moving-forward-with-ai-data-center-in-pittsylvania/","label":"STACK Infrastructure says it's moving forward with AI data center in Pittsylvania","publisher":"Cardinal News","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://cardinalnews.org/2026/03/10/73-billion-project-at-pittsylvania-megasite-would-be-largest-in-southside-history/","label":"Cardinal News","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://wset.com/news/local/pittsylvania-county-advances-100b-data-center-campus-proposal-despite-resident-concerns-berry-hill-july-2026","label":"Pittsylvania supervisors back $100B Berry Hill Data Center project","publisher":"WSET (ABC13)","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://wset.com/news/local/local-leaders-approve-100b-ai-data-campus-in-pittsylvania-county-amid-citizen-concerns-megasite-berry-hill-may-2026","label":"Local leaders approve $100B AI data campus in Pittsylvania County amid citizen concerns","publisher":"WSET (ABC13)","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/","label":"$100B data center project proposed at Berry Hill megasite advances","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://constructionreviewonline.com/berry-hill-100b-data-center-performance-agreement-unanimously-approved-by-officials/","label":"Berry Hill $100B data center performance agreement unanimously approved by officials","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://constructionreviewonline.com/southside-virginia-advances-historic-100b-berry-hill-data-center-campus-despite-resident-pushback/","label":"Southside Virginia advances historic $100B Berry Hill data center campus despite resident pushback","publisher":"Construction Review Online","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://cardinalnews.org/2026/05/19/a-data-center-project-in-pittsylvania-was-approved-monday-with-higher-investment-and-jobs-than-previously-announced/","label":"A data center project in Pittsylvania was approved Monday with higher investment and jobs than previously announced","publisher":"Cardinal News","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-aws-birchwood-data-campus-king-george-va","sourceRecordId":"aws-birchwood-data-campus-king-george-va","name":"Birchwood Data Campus","operator":"Amazon Web Services","city":"King George","county":"King George","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.25934134516552,"longitude":-77.32191549954541,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-birchwood-data-campus-king-george-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/virginias-king-george-county-approves-land-rezoning-for-aws-data-campus/","label":"Virginia's King George County approves rezoning for AWS data campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-amazon-blackwell-road-warrenton-va","sourceRecordId":"amazon-blackwell-road-warrenton-va","name":"Blackwell Road Data Center (Warrenton)","operator":"Amazon Data Services","city":"Warrenton","county":"Fauquier","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.72948224074257,"longitude":-77.78753470617198,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-blackwell-road-warrenton-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-03","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fauquiernow.com/news/warrenton-town-staff-approves-site-plan-for-220-000-square-foot-amazon-data-center-project/article_13b53e3e-fe67-11ee-81ce-b361084ba5ae.html","label":"Warrenton town staff approves site plan for Amazon data center (SUP-22-3)","publisher":"Fauquier Now","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","label":"Amazon Blackwell Frequently Asked Questions (Town of Warrenton / PEC town hall handout)","publisher":"Piedmont Environmental Council / Town of Warrenton","kind":"permit","retrievedAt":"2026-09-03"},{"url":"https://agol.gis.fauquiercounty.gov:6443/arcgis/rest/services/CAMA/Fauquier_Operational_Layers_VisionCAMA/MapServer/32","label":"Fauquier County CAMA/Tax Parcels GIS layer — parcel 6984-69-2419-000, owner Amazon Data Services Inc, site address 719 Blackwell Rd","publisher":null,"kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-amazon-bridgefield-tech-center-ashburn-loudoun-va","sourceRecordId":"amazon-bridgefield-tech-center-ashburn-loudoun-va","name":"Bridgefield Tech Center","operator":"Amazon Web Services","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.029784,"longitude":-77.4744148,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-bridgefield-tech-center-ashburn-loudoun-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-looks-to-build-800000-sq-ft-data-center-campus-at-gwu-site-in-ashburn-virginia/","label":"AWS looks to build 800,000 sq ft data center campus at GWU site in Ashburn, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://virginiabusiness.com/amazon-data-centers-gwu-ashburn/","label":"Amazon data center campus plan for Ashburn hits Loudoun opposition","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://wtop.com/loudoun-county/2026/08/concrete-jungle-as-amazon-details-plans-for-new-ashburn-data-centers-some-residents-are-fed-up/","label":"'Concrete jungle': As Amazon details plans for new Ashburn data centers, some residents are fed up","publisher":"WTOP News","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-bull-church-data-center-caroline-va","sourceRecordId":"bull-church-data-center-caroline-va","name":"Bull Church Data Center","operator":"NRD Retail, LLC","city":"Ruther Glen","county":"Caroline","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.00820612043225,"longitude":-77.49262214339025,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/bull-church-data-center-caroline-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","label":"Caroline County rezoning case RZ-04-2024, Bull Church Data Center","publisher":"Caroline County, VA Department of Planning and Community Development","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.fredericksburgfreepress.com/2024/05/12/zombie-data-center-project-still-has-life-in-caroline-county/","label":"'Zombie' data center project still has life in Caroline County","publisher":"Fredericksburg Free Press","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-mesh-capital-cabin-field-road-data-center-campbell-va","sourceRecordId":"mesh-capital-cabin-field-road-data-center-campbell-va","name":"Cabin Field Road Data Center","operator":"Mesh Capital LLC","city":null,"county":"Campbell","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.3407675,"longitude":-78.9909489,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mesh-capital-cabin-field-road-data-center-campbell-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wdbj7.com/2025/11/03/data-center-could-still-be-coming-campbell-county-despite-denial-vote-supervisors/","label":"Data center could still be coming to Campbell County despite denial vote from supervisors","publisher":"WDBJ7","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://wset.com/news/local/campbell-county-faces-data-center-proposals-as-residents-call-for-stricter-regulations-route-460-concord-cabin-field-road-mesh-capital-llc-supervisor-matthew-kline-november-2025","label":"Campbell County faces data center proposals as residents call for stricter regulations","publisher":"WSET","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-aws-carters-store-tech-campus-spotsylvania-va","sourceRecordId":"aws-carters-store-tech-campus-spotsylvania-va","name":"Carter's Store Tech Campus","operator":"Amazon Web Services","city":"Spotsylvania","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.1911,"longitude":-77.4687,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-carters-store-tech-campus-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/cloud/article/33006046/amazon-plans-major-data-center-expansion-in-virginias-spotsylvania-county","label":"Data Center Frontier — Amazon plans major data center expansion in Spotsylvania County (Carter's Store: 313 ac, 2.6M sq ft, Phase 1 construction from July 2027)","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/data-center/amazon-carter-s-store-tech-campus","label":"Baxtel — Amazon Carter's Store Tech Campus (313 ac, 2.6M sq ft, 8432 Flippo Drive, rezoning approved Oct 2023)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","label":"The Fredericksburg Advance — Digital Insights: status of data centers in Spotsylvania (Carter's Store among AWS campuses with buildings going up)","publisher":"The Fredericksburg Advance","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.fredericksburgfreepress.com/2023/10/13/watch-rezoning-for-data-centers-approved-in-spotsylvania/","label":"Fredericksburg Free Press — \"WATCH: Rezoning for data centers approved in Spotsylvania\" (Oct 13, 2023)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-penzance-chantilly-premier-fairfax-va","sourceRecordId":"penzance-chantilly-premier-fairfax-va","name":"Chantilly Premier","operator":"Penzance","city":"Chantilly","county":"Fairfax","address":"4151 Auto Park Circle","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.8943,"longitude":-77.4311,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/penzance-chantilly-premier-fairfax-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ffxnow.com/2025/10/10/developer-breaks-ground-on-100m-data-center-building-in-chantilly/","label":"Developer breaks ground on $100M data center building in Chantilly","publisher":"FFXnow","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-powerhouse-chirisa-chester-va","sourceRecordId":"powerhouse-chirisa-chester-va","name":"Chirisa Technology Park — Richmond (Chester)","operator":"PowerHouse Data Centers","city":"Chester","county":"Chesterfield","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.3554,"longitude":-77.4416,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-chirisa-chester-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/blue-owl-chirisa-technology-parks-and-powerhouse-data-centers-announce-first-phase-of-5-billion-joint-venture-development-partnership-302233967.html","label":"Blue Owl, Chirisa Technology Parks and PowerHouse Data Centers announce first phase of $5 billion JV development partnership","publisher":"PowerHouse Data Centers","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.prnewswire.com/news-releases/chirisa-technology-parks-and-powerhouse-data-centers-to-launch-next-generation-hyperscale-campus-in-chesterfield-county-302259869.html","label":"Chirisa Technology Parks and PowerHouse launch hyperscale campus in Chesterfield County","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers","label":"Richmond, Va.-area counties split on data centers","publisher":"Government Technology","kind":"press","retrievedAt":"2026-07-08"}]},{"id":"compute-cleanarc-ruther-glen-va","sourceRecordId":"cleanarc-ruther-glen-va","name":"CleanArc VA1","operator":"CleanArc Data Centers","city":"Ruther Glen","county":"Caroline","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.9374,"longitude":-77.4837,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cleanarc-ruther-glen-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/cleanarc-gets-green-light-for-600mw-data-center-campus-in-caroline-county-virginia/","label":"CleanArc gets green light for data center campus in Caroline County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.vedp.org/press-release/2025-11/cleanarc-caroline","label":"CleanArc Data Centers invests $3 billion in Caroline County","publisher":"Virginia Economic Development Partnership","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.prnewswire.com/news-releases/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-302621903.html","label":"CleanArc Data Centers breaks ground on 900MW flagship campus in Virginia","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/37147/639189502405330000","label":"VA DEQ air permit 74341-1 — Clean Arc Data Centers VA-1 Campus (issued 2026-07-02)","publisher":"Virginia Department of Environmental Quality","kind":"permit","retrievedAt":"2026-07-29"},{"url":"https://publicevidence.org/records/clean-arc-data-centers-va-1-campus-air-permit-74341-1","label":"Submission provenance (not controlling source) — Public Evidence record for permit 74341-1","publisher":"Public Evidence Project","kind":"other","retrievedAt":"2026-07-30"}]},{"id":"compute-cloudhq-clp-campus-culpeper-va","sourceRecordId":"cloudhq-clp-campus-culpeper-va","name":"CloudHQ CLP Campus (Culpeper)","operator":"CloudHQ","city":"Culpeper","county":"Culpeper County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.4620783,"longitude":-77.9776797,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloudhq-clp-campus-culpeper-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudhq.com/campus/clp-campus/","label":"CLP Campus — Culpeper, Virginia","publisher":"CloudHQ","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/campus/cloudhq-culpeper-clp-campus","label":"CloudHQ: Culpeper CLP Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-cloudhq-lc1-va","sourceRecordId":"cloudhq-lc1-va","name":"CloudHQ LC1","operator":"CloudHQ","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0102471,"longitude":-77.4626713,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloudhq-lc1-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/virginia/ashburn/cloudhq-lc1/","label":"CloudHQ facility directory","publisher":"CloudHQ","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/794147654","label":"OpenStreetMap way/794147654","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cloudhq-lc3-va","sourceRecordId":"cloudhq-lc3-va","name":"CloudHQ LC3","operator":"CloudHQ","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0112123,"longitude":-77.4604251,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloudhq-lc3-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudhq.com/campus/lc-campus/","label":"CloudHQ facility directory","publisher":"CloudHQ","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1443187163","label":"OpenStreetMap way/1443187163","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cloudhq-manassas-mcc-va","sourceRecordId":"cloudhq-manassas-mcc-va","name":"CloudHQ Manassas MCC Campus","operator":"CloudHQ","city":"Manassas","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7196,"longitude":-77.4982,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cloudhq-manassas-mcc-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cloudhq.com/campus/mcc-campus/","label":"CloudHQ MCC Campus — Manassas, Virginia","publisher":"CloudHQ","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/cloud/article/11430643/cloudhq-unveils-massive-new-manassas-data-center","label":"CloudHQ Unveils Massive New Manassas Data Center — Data Center Frontier","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://pwcgov.granicus.com/DocumentViewer.php?file=pwcgov_c58bb783a384db5f364a5c3162dce923.pdf&view=1","label":"Prince William County Planning Commission — MCC-7 proffer amendment (REZ2024-00025)","publisher":"Prince William County, VA","kind":"permit","retrievedAt":"2026-07-06"},{"url":"https://wjla.com/news/local/prince-william-county-digital-gateway-datacenter-appeal-lawsuit-rezoning-rural-farmland-manassas-battlefield-community-opposition-judges-construction-halted-developer-qts-compass-blackstone-supreme-virginia-economy-environment-landuse","label":"Legal battle over Prince William Digital Gateway data-center campus — WJLA","publisher":"WJLA ABC7","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-cologix-ash1-va","sourceRecordId":"cologix-ash1-va","name":"Cologix ASH1","operator":"Cologix","city":"Ashburn","county":"Loudoun","address":"21745 Beaumeade Circle","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0179257,"longitude":-77.4595164,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cologix-ash1-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cologix.com/data-centers/ashburn/ash1/","label":"Cologix facility directory","publisher":"Cologix","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1188715510","label":"OpenStreetMap way/1188715510","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/25974/638889504246870000","label":"Virginia DEQ air permit 74235-2 (issued 2025-07-23)","publisher":"Virginia DEQ","kind":"permit","retrievedAt":"2026-07-30"}]},{"id":"compute-compass-datacenters-loudoun-county-i-true-north-va","sourceRecordId":"compass-datacenters-loudoun-county-i-true-north-va","name":"Compass Datacenters Loudoun County I (\"True North\")","operator":"Compass Datacenters","city":"Leesburg","county":"Loudoun","address":"20632 Sycolin Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0436134,"longitude":-77.5372623,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/compass-datacenters-loudoun-county-i-true-north-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenterhawk.com/marketplace/providers/compass-datacenters/20632-sycolin-road/loudoun-county-i","label":"datacenterHawk — Compass Datacenters Loudoun County I (commissioned, 750,000 SF)","publisher":"Compass Datacenters","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1387391200","label":"OpenStreetMap way/1387391200","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-convergent-technology-park-remington-fauquier-va","sourceRecordId":"convergent-technology-park-remington-fauquier-va","name":"Convergent Technology Park","operator":"Convergent VA LLC","city":"Remington","county":"Fauquier","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.55073067963831,"longitude":-77.8046447409979,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/convergent-technology-park-remington-fauquier-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fauquiernow.com/news/data-center-database-where-projects-stand-across-fauquier-county/article_18be50e8-49f6-11ef-95cf-3b45407fea55.html","label":"Fauquier County planning staff project database (maintained record of application status)","publisher":"FauquierNow (sourced from Fauquier Co. planning staff)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.pecva.org/wp-content/uploads/convergent-tech-park-acceptance-letter-fauquier-aug-20-2024.pdf","label":"Fauquier County Department of Community Development application acceptance letter, Aug 20 2024","publisher":"Fauquier County DCD","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/new-plans-shared-for-convergent-technology-park-in-fauquier-county-virginia/","label":"New plans shared for Convergent Technology Park in Fauquier County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.pecva.org/region/fauquier/update-on-data-center-development-and-transmission-lines-in-fauquier/","label":"Piedmont Environmental Council (PEC), \"Update on Data Center Development and Transmission Lines in Fauquier\"","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.insidenova.com/news/business/convergent-data-center-application-in-fauquier-pulled-in-favor-of-residential-development/article_00158de0-b82e-4051-b2e1-f3c5f1ab6055.html","label":"Convergent data center application in Fauquier pulled in favor of residential development","publisher":"InsideNoVa","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.fauquier.com/localnews/convergent-drops-remington-area-data-center-project-to-build-homes/article_6b2cc59c-ea41-4a74-b860-f87fb24c8cf3.html","label":"Convergent drops Remington-area data center project to build homes","publisher":"Fauquier Times","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/convergent-technology-park","label":"Convergent Technology Park Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-coresite-va1-reston-va-va","sourceRecordId":"coresite-va1-reston-va-va","name":"CoreSite VA1 - Reston, VA","operator":"CoreSite","city":"Reston","county":"Fairfax","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9506059,"longitude":-77.3645496,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-va1-reston-va-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/va1-reston-va","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/79298926","label":"OpenStreetMap way/79298926","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.coresite.com/data-center/va3-reston-va","label":"CoreSite AI/HPC — CoreSite offers liquid cooling capabilities at VA1 (Northern Virginia)","publisher":"coresite.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-coresite-va3-reston-va-va","sourceRecordId":"coresite-va3-reston-va-va","name":"CoreSite VA3 - Reston, VA","operator":"CoreSite","city":"Reston","county":"Fairfax","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9483343,"longitude":-77.3724298,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/coresite-va3-reston-va-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.coresite.com/data-center/va3-reston-va","label":"CoreSite facility directory","publisher":"CoreSite","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/79818498","label":"OpenStreetMap way/79818498","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.businesswire.com/news/home/20211129005079/en/CoreSites-VA3-Data-Center-Powered-by-100-Renewable-Energy","label":"CoreSite's VA3 Data Center Powered by 100% Renewable Energy (Business Wire, 2021)","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-aws-cosner-technology-campus-massaponax-va","sourceRecordId":"aws-cosner-technology-campus-massaponax-va","name":"Cosner Technology Campus","operator":"Amazon Web Services","city":"Massaponax","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.204738259414135,"longitude":-77.47623258858057,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-cosner-technology-campus-massaponax-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/","label":"Amazon files for four data center campuses in Spotsylvania and Caroline Counties","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterfrontier.com/cloud/article/33006046/amazon-plans-major-data-center-expansion-in-virginias-spotsylvania-county","label":"Data Center Frontier — Amazon Plans Major Data Center Expansion in Virginia's Spotsylvania County","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.fredericksburgfreepress.com/2023/10/13/watch-rezoning-for-data-centers-approved-in-spotsylvania/","label":"Fredericksburg Free Press — \"WATCH: Rezoning for data centers approved in Spotsylvania\" (Oct 13, 2023)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/36613/639168592121270000","label":"VA DEQ air permit 74288-2 — Amazon Data Services IAD450 Cosner Tech Campus (issued 2026-06-01)","publisher":"Virginia Department of Environmental Quality","kind":"permit","retrievedAt":"2026-07-29"},{"url":"https://publicevidence.org/records/amazon-data-services-inc-iad450-cosner-tech-campus-air-permit-74288-2","label":"Submission provenance (not controlling source) — Public Evidence record for permit 74288-2","publisher":"Public Evidence Project","kind":"other","retrievedAt":"2026-07-30"},{"url":"http://www.fredericksburgfreepress.com/2026/06/04/deq-issued-air-pollution-violations-on-spotsylvania-data-center-campus-in-2025/","label":"DEQ issued air pollution violations on Spotsylvania data center campus in 2025","publisher":"Fredericksburg Free Press","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-jk-land-cross-mill-center-leesburg-va","sourceRecordId":"jk-land-cross-mill-center-leesburg-va","name":"Cross Mill Center","operator":"JK Land Holdings","city":"Leesburg","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0781,"longitude":-77.5575,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/jk-land-cross-mill-center-leesburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.loudounnow.com/news/supervisors-narrowly-approve-data-center-near-leesburg/article_3e355c29-4dbc-42df-bdb9-37d86f3013ad.html","label":"Supervisors Narrowly Approve Data Center Near Leesburg","publisher":"Loudoun Now","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","label":"Data Centers in Loudoun: A Primer","publisher":"The Piedmont Environmental Council","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-rck-crossroads-technology-campus-spotsylvania-va","sourceRecordId":"rck-crossroads-technology-campus-spotsylvania-va","name":"Crossroads Technology Campus","operator":"RCK Digital Crossroads LLC","city":null,"county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.2445,"longitude":-77.4334,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/rck-crossroads-technology-campus-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spotsylvania.va.us/3206/SUP26-0003-Crossroads-Technology-Campus","label":"Spotsylvania County official case page — SUP26-0003 Crossroads Technology Campus","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/40291/SUP-Application","label":"SUP26-0003 Special Use Permit Application (applicant RCK Digital Crossroads LLC, a Delaware LLC)","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"}]},{"id":"compute-culpeper-brandy-station-va","sourceRecordId":"culpeper-brandy-station-va","name":"Culpeper Acquisitions Brandy Station Campus (denied)","operator":"Culpeper Acquisitions LLC","city":"Brandy Station","county":"Culpeper","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.5095,"longitude":-77.8863,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/culpeper-brandy-station-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterwatch.org/report","label":"Data Center Watch — Blocked and Delayed Projects Report","publisher":"Data Center Watch","kind":"other","retrievedAt":"2026-07-05"},{"url":"https://fortune.com/2026/05/18/communities-are-blocking-billions-in-data-centers-big-tech-has-wagered-1-trillion-otherwise/","label":"Communities are blocking billions in data centers — Fortune","publisher":"Fortune","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.pecva.org/region/culpeper/new-data-center-proposals-in-brandy-station-and-near-the-town-of-culpeper/","label":"PEC — New data center proposals in Brandy Station and near the Town of Culpeper (incl. BoardDocs public submittal)","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.datacenterdynamics.com/en/news/county-planners-recommend-denial-of-brandy-station-data-center-campus-in-culpeper-county/","label":"DCD — County planners recommend denial of Brandy Station data center campus in Culpeper County","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-peterson-culpeper-technology-campus-va","sourceRecordId":"peterson-culpeper-technology-campus-va","name":"Culpeper Technology Campus","operator":"Peterson Companies","city":"Culpeper","county":"Culpeper County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.4615949,"longitude":-77.9824214,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/peterson-culpeper-technology-campus-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.petersoncos.com/blog/peterson-companies-announces-2-million-sq-ft-data-center-campus-in-virginias-culpeper-county/","label":"Peterson Companies announces 2 million sq ft data center campus in Virginia's Culpeper County","publisher":"Peterson Companies","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.virginiabusiness.com/article/culpeper-tech-zone-attracts-data-centers/","label":"Culpeper tech zone attracts data centers","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/peterson-culpeper-technology-campus","label":"Peterson: Culpeper Technology Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-cyrusone-nva1-nva2-nva3-sterling-va","sourceRecordId":"cyrusone-nva1-nva2-nva3-sterling-va","name":"CyrusOne NVA1, NVA2 & NVA3 (Sterling)","operator":"CyrusOne","city":"Sterling","county":"Loudoun","address":"21111 Ridgetop Circle","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0259023,"longitude":-77.4144697,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nva1-nva2-nva3-sterling-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva1-nva3","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/435324552","label":"OpenStreetMap way/435324552","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cyrusone-nva5-sterling-va","sourceRecordId":"cyrusone-nva5-sterling-va","name":"CyrusOne NVA5 (Sterling)","operator":"CyrusOne","city":"Sterling","county":"Loudoun","address":"21350 Pacific Boulevard","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.024356,"longitude":-77.4341,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nva5-sterling-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/435817145","label":"OpenStreetMap way/435817145","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cyrusone-nva7-sterling-va","sourceRecordId":"cyrusone-nva7-sterling-va","name":"CyrusOne NVA7 (Sterling)","operator":"CyrusOne","city":"Sterling","county":"Loudoun","address":"21350 Pacific Boulevard","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0263152,"longitude":-77.4340194,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nva7-sterling-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/983627455","label":"OpenStreetMap way/983627455","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cyrusone-nva8-sterling-va","sourceRecordId":"cyrusone-nva8-sterling-va","name":"CyrusOne NVA8 (Sterling)","operator":"CyrusOne","city":"Sterling","county":"Loudoun","address":"45905 Maries Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0211789,"longitude":-77.4132443,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-nva8-sterling-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-virginia-nva8","label":"CyrusOne facility directory","publisher":"CyrusOne","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/701930919","label":"OpenStreetMap way/701930919","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-cyrusone-vint-hill-fauquier-va","sourceRecordId":"cyrusone-vint-hill-fauquier-va","name":"CyrusOne Vint Hill Campus","operator":"CyrusOne","city":"Vint Hill","county":"Fauquier","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.752287510948115,"longitude":-77.67347422456572,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-vint-hill-fauquier-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fauquiernow.com/news/data-center-database-where-projects-stand-across-fauquier-county/article_18be50e8-49f6-11ef-95cf-3b45407fea55.html","label":"Fauquier County data-center project database","publisher":"Fauquier Now","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","label":"Effort to curb data centers in Vint Hill faces pushback","publisher":"Prince William Times / Fauquier Times","kind":"press","retrievedAt":"2026-08-19"}]},{"id":"compute-oasis-dahlgren-west-king-george-va","sourceRecordId":"oasis-dahlgren-west-king-george-va","name":"Dahlgren West Data Center Campus","operator":"Oasis Digital Properties","city":"Dahlgren","county":"King George County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.3385746,"longitude":-77.0782376,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/oasis-dahlgren-west-king-george-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://northernvirginiamag.com/news/2025/08/21/nova-based-data-center-company-building-new-campus-near-fredericksburg/","label":"NoVA-based data center company building new campus near Fredericksburg","publisher":"Northern Virginia Magazine","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.bisnow.com/news/national/data-center/second-massive-data-center-campus-planned-in-king-george-county-virginia-123780","label":"Developer Proposes 9M SF Data Center Campus In Virginia","publisher":"Bisnow","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-databank-culpeper-iad5-iad6-va","sourceRecordId":"databank-culpeper-iad5-iad6-va","name":"DataBank Culpeper Campus (IAD5 / IAD6)","operator":"DataBank","city":"Culpeper","county":"Culpeper County","address":"14601 Germanna Highway","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.4492071,"longitude":-77.9821013,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/databank-culpeper-iad5-iad6-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://chooseculpeper.com/culpeper-tech-zone/databank-chooses-culpeper-county/","label":"DataBank chooses Culpeper County","publisher":"Culpeper County Economic Development","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://baxtel.com/data-center/databank-iad5","label":"DataBank: IAD5","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://www.virginiabusiness.com/article/culpeper-tech-zone-attracts-data-centers/","label":"Culpeper tech zone attracts data centers","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-dc-blox-henrico-county-va","sourceRecordId":"dc-blox-henrico-county-va","name":"DC Blox Henrico County Campus (withdrawn)","operator":"DC BLOX","city":null,"county":"Henrico","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.5532,"longitude":-77.4543,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dc-blox-henrico-county-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://heatmap.news/politics/data-center-cancellations-2025","label":"Scoop: Local Pushback, Canceled Data Centers Surged in 2025 — Heatmap News","publisher":"Heatmap News","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.datacenterwatch.org/report","label":"Data Center Watch — Blocked and Delayed Projects Report","publisher":"Data Center Watch","kind":"other","retrievedAt":"2026-07-05"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-8100-boone-boulevard-former-dupont-fabros-va3-va","sourceRecordId":"digital-realty-8100-boone-boulevard-former-dupont-fabros-va3-va","name":"Digital Realty 8100 Boone Boulevard (former DuPont Fabros VA3)","operator":"Digital Realty","city":"Vienna","county":"Fairfax","address":"8100 Boone Boulevard","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9137236,"longitude":-77.2258825,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-8100-boone-boulevard-former-dupont-fabros-va3-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/8100-boone-digital-realty","label":"Baxtel facility profile (small legacy DLR site, not on current DLR NoVA directory page)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/7985753364","label":"OpenStreetMap node/7985753364","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-acc10-va","sourceRecordId":"digital-realty-acc10-va","name":"Digital Realty ACC10","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"21744 Sir Timothy Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0126563,"longitude":-77.4656035,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-acc10-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/21744-sir-timothy-drive-acc10","label":"Baxtel facility page — ACC10, 21744 Sir Timothy Drive, former DuPont Fabros expansion completed 2018","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/701923204","label":"OpenStreetMap way/701923204","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-acc3-va","sourceRecordId":"digital-realty-acc3-va","name":"Digital Realty ACC3","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"44520 Hastings Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.01988,"longitude":-77.4598033,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-acc3-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/44520-hastings-acc3-digital-realty","label":"Baxtel facility profile (not on current digitalrealty.com NoVA directory table, corroborated by DCD/Data Center Frontier","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.openstreetmap.org/way/298242335","label":"OpenStreetMap way/298242335","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-acc9-va","sourceRecordId":"digital-realty-acc9-va","name":"Digital Realty ACC9","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"21745 Sir Timothy Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0154331,"longitude":-77.4673732,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-acc9-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/21745-sir-timothy-acc9-digital-realty","label":"Baxtel facility page — ACC9, 21745 Sir Timothy Drive, part of former DuPont Fabros Ashburn campus (acquired by Digital R","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/649365764","label":"OpenStreetMap way/649365764","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-iad38-va","sourceRecordId":"digital-realty-iad38-va","name":"Digital Realty IAD38","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"44100 Digital Loudoun Plaza","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0010841,"longitude":-77.4772014,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-iad38-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia","label":"Digital Realty official Northern Virginia directory — IAD38, 44100 Digital Loudoun Plaza (Bldg J)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/597970813","label":"OpenStreetMap way/597970813","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-iad41-building-p-va","sourceRecordId":"digital-realty-iad41-building-p-va","name":"Digital Realty IAD41 (Building P)","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"44751 Round Table Plaza","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0088059,"longitude":-77.4582358,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-iad41-building-p-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://marketplace.upstack.com/data-centers/digital-realty-ashburn-iad41","label":"UPSTACK marketplace facility page — IAD41, 44751 Round Table Plaza (Building P), Ashburn VA","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/793087858","label":"OpenStreetMap way/793087858","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-iad42-building-r-va","sourceRecordId":"digital-realty-iad42-building-r-va","name":"Digital Realty IAD42 (Building R)","operator":"Digital Realty","city":"Sterling","county":"Loudoun","address":"22125 Broderick Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0056891,"longitude":-77.4494637,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-iad42-building-r-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://marketplace.upstack.com/data-centers/digital-realty-ashburn-iad42","label":"UPSTACK marketplace facility page — IAD42, 22124 Broderick Drive (Building R)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1025002889","label":"OpenStreetMap way/1025002889","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-iad43-building-s-va","sourceRecordId":"digital-realty-iad43-building-s-va","name":"Digital Realty IAD43 (Building S)","operator":"Digital Realty","city":"Sterling","county":"Loudoun","address":"44820 Prentice Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0018258,"longitude":-77.4527034,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-iad43-building-s-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/digital-realty-iad43","label":"Baxtel facility page — IAD43 (Building S)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1344901569","label":"OpenStreetMap way/1344901569","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-iad44-va","sourceRecordId":"digital-realty-iad44-va","name":"Digital Realty IAD44","operator":"Digital Realty","city":"Sterling","county":"Loudoun","address":"43704 Efficiency Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9608537,"longitude":-77.4913983,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-iad44-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1317733642","label":"OpenStreetMap way/1317733642","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-digital-realty-iad55-va","sourceRecordId":"digital-realty-iad55-va","name":"Digital Realty IAD55","operator":"Digital Realty","city":"Sterling","county":"Loudoun","address":"22515 Fitness Court","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9921932,"longitude":-77.4339218,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-iad55-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/digital-realty-iad43","label":"Baxtel/marketplace listings confirming IAD55 as an active Digital Realty Ashburn/Sterling-area building code","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1276518687","label":"OpenStreetMap way/1276518687","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-iad73-va","sourceRecordId":"digital-realty-iad73-va","name":"Digital Realty IAD73","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"44540 Round Table Plaza","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0066187,"longitude":-77.4664074,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-iad73-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/44540-round-table-plaza-ashburn/digital-realty/datacenter/iad73","label":"Inflect marketplace facility page — IAD73, 44540 Round Table Plaza, Ashburn VA","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/701923202","label":"OpenStreetMap way/701923202","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-northern-virginia-acc4-va","sourceRecordId":"digital-realty-northern-virginia-acc4-va","name":"Digital Realty Northern Virginia ACC4","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"44480 Hastings Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0178592,"longitude":-77.4624708,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-northern-virginia-acc4-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc4","label":"Digital Realty official Northern Virginia facilities page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/298126010","label":"OpenStreetMap way/298126010","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-northern-virginia-acc5-va","sourceRecordId":"digital-realty-northern-virginia-acc5-va","name":"Digital Realty Northern Virginia ACC5","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"44521 Hastings Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0201584,"longitude":-77.4631033,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-northern-virginia-acc5-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc5","label":"Digital Realty official Northern Virginia facilities page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/300162674","label":"OpenStreetMap way/300162674","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-northern-virginia-iad14-va","sourceRecordId":"digital-realty-northern-virginia-iad14-va","name":"Digital Realty Northern Virginia IAD14","operator":"Digital Realty","city":"Ashburn","county":"Loudoun","address":"43791 Devin Shafron Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0033364,"longitude":-77.4870935,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-northern-virginia-iad14-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad14","label":"Digital Realty official Northern Virginia facilities page (verified via WebFetch)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/300969614","label":"OpenStreetMap way/300969614","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-digital-realty-va3-va","sourceRecordId":"digital-realty-va3-va","name":"Digital Realty VA3","operator":"Digital Realty","city":"Reston","county":"Fairfax","address":"1780 Business Center Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9484941,"longitude":-77.3273071,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-va3-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/va3","label":"Digital Realty official facility page","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/79158387","label":"OpenStreetMap way/79158387","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/26115/638639803959100000","label":"Virginia DEQ air permit 73162-3 (issued 2010-03-05)","publisher":"Virginia DEQ","kind":"permit","retrievedAt":"2026-07-30"}]},{"id":"compute-digital-realty-va4-va","sourceRecordId":"digital-realty-va4-va","name":"Digital Realty VA4","operator":"Digital Realty","city":"Bristow","county":"Prince William","address":"8217 Linton Hall Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7780614,"longitude":-77.594905,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-va4-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenterhawk.com/marketplace/providers/digital-realty/8217-linton-hall-road/va4","label":"datacenterHawk facility profile (not on current DLR NoVA directory page, corroborated by UPSTACK/datacentermap)","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/46831933","label":"OpenStreetMap way/46831933","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/26117/638639805143900000","label":"Virginia DEQ air permit 73180-4 (issued 2008-08-07)","publisher":"Virginia DEQ","kind":"permit","retrievedAt":"2026-07-30"}]},{"id":"compute-dulles-cloud-south-gainesville-prince-william-va","sourceRecordId":"dulles-cloud-south-gainesville-prince-william-va","name":"Dulles Cloud South (Dulles South Innovation Center)","operator":"Undisclosed","city":"Gainesville","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.83,"longitude":-77.61,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dulles-cloud-south-gainesville-prince-william-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/","label":"Prince William Board Rejects Dulles South Data Center Proposal in Gainesville","publisher":"Potomac Local","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-edgecore-culpeper-tech-zone-va","sourceRecordId":"edgecore-culpeper-tech-zone-va","name":"EdgeCore Culpeper Data Center Campus","operator":"EdgeCore Digital Infrastructure","city":"Culpeper","county":"Culpeper","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.4735,"longitude":-77.96,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgecore-culpeper-tech-zone-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia","label":"EdgeCore Digital Infrastructure Announces New Hyperscale Data Center Market in Culpeper, Virginia","publisher":"EdgeCore Digital Infrastructure","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-edgecore-shannon-hill-louisa-va","sourceRecordId":"edgecore-shannon-hill-louisa-va","name":"EdgeCore Shannon Hill Data Center Campus","operator":"EdgeCore Digital Infrastructure","city":null,"county":"Louisa","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.836,"longitude":-77.988,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/edgecore-shannon-hill-louisa-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/edgecore-to-develop-11gw-data-center-in-louisa-county-virginia/","label":"EdgeCore to develop 1.1GW data center in Louisa County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-26"},{"url":"https://virginiabusiness.com/17b-louisa-county-data-center-edgecore/","label":"EdgeCore to invest $17B in Louisa County data center campus","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.louisacounty.gov/CivicAlerts.aspx?AID=470","label":"Louisa County Sale of Shannon Hill Regional Business Park","publisher":"Louisa County, VA (government)","kind":"filing","retrievedAt":"2026-07-26"},{"url":"https://edgecore.com/resources/press-releases/new-louisa-county-virginia-data-center-campus","label":"EdgeCore announces plans to invest $17B+ in Louisa County, VA (1.1+ GW campus)","publisher":"EdgeCore Digital Infrastructure","kind":"press","retrievedAt":"2026-07-26"},{"url":"https://baxtel.com/data-center/edgecore-shannon-hill-campus","label":"EdgeCore: Shannon Hill Campus Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-26"},{"url":"https://edgecore.com/new-louisa-county-virginia-data-center-campus/","label":"EdgeCore Digital Infrastructure Announces Plans to Invest $17B+ in Louisa County, VA through the Development of 1.1+ Gigawatt Data Center Campus","publisher":"EdgeCore Digital Infrastructure","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-equinix-ashburn-va","sourceRecordId":"equinix-ashburn-va","name":"Equinix Ashburn Campus (DC1–DC15)","operator":"Equinix","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0437,"longitude":-77.4875,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-ashburn-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://en.wikipedia.org/wiki/Ashburn,_Virginia#Data_centers","label":"Ashburn, Virginia — Data centers (Wikipedia)","publisher":"Wikipedia","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://sustainability.equinix.com/wp-content/uploads/2022/04/GU_IBX-Sustainability-Quick-Reference_EN-LTR-1.pdf","label":"Equinix IBX Sustainability Quick Reference Guide","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.loudounwater.org/commercial-customers/reclaimed-water-program","label":"Loudoun Water — Reclaimed Water Program","publisher":"Loudoun Water","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.vedp.org/incentive/data-center-retail-sales-use-tax-exemption","label":"Data Center Retail Sales & Use Tax Exemption — Virginia EDP","publisher":"Virginia Economic Development Partnership","kind":"subsidy","retrievedAt":"2026-07-06"},{"url":"https://www.hklaw.com/en/insights/publications/2025/04/loudoun-county-virginia-eliminates-by-right-data-center-development","label":"Loudoun County, Virginia Eliminates By-Right Data Center Development — Holland & Knight","publisher":"Holland & Knight","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers","label":"Washington D.C. (Ashburn) Data Centers","publisher":"Equinix","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-equinix-culpeper-cu1-cu4-va","sourceRecordId":"equinix-culpeper-cu1-cu4-va","name":"Equinix Culpeper Campus (CU1–CU4)","operator":"Equinix","city":"Culpeper","county":"Culpeper County","address":"18155 Technology Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.4551359,"longitude":-77.9780171,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-culpeper-cu1-cu4-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/equinix-culpeper-campus","label":"Equinix Culpeper Campus","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-equinix-dc2-va","sourceRecordId":"equinix-dc2-va","name":"Equinix DC2","operator":"Equinix","city":"Ashburn","county":"Loudoun","address":"21715 Filigree Court","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0163894,"longitude":-77.4590691,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-dc2-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc2","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/234722029","label":"OpenStreetMap way/234722029","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-equinix-dc3-va","sourceRecordId":"equinix-dc3-va","name":"Equinix DC3","operator":"Equinix","city":"Ashburn","county":"Loudoun","address":"44470 Chilum Place","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0220154,"longitude":-77.460235,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-dc3-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc3","label":"Equinix facility directory","publisher":"Equinix","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/298242260","label":"OpenStreetMap way/298242260","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-emerald-lakes-etheridge-lakes-data-center-chesapeake-va","sourceRecordId":"emerald-lakes-etheridge-lakes-data-center-chesapeake-va","name":"Etheridge Lakes Data Center (Great Bridge)","operator":"Emerald Lakes Estates (Doug Fuller)","city":"Chesapeake","county":"Chesapeake (independent city)","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.68061281906499,"longitude":-76.18817902157426,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/emerald-lakes-etheridge-lakes-data-center-chesapeake-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityofchesapeake.net/DocumentCenter/View/23727/PLN-REZ-2025-002---Etheridge-Lakes-Data-Centerpdf","label":"City of Chesapeake Department of Planning, Rezoning Case PLN-REZ-2025-002 (Etheridge Lakes Data Center)","publisher":"City of Chesapeake Department of Planning","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://virginiabusiness.com/chesapeake-city-council-rejects-massive-data-center/","label":"Chesapeake City Council rejects massive data center","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/chesapeake-city-council-rejects-land-rezoning-proposal-for-virginia-data-center/","label":"Chesapeake City Council rejects land rezoning proposal for Virginia data center","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.13newsnow.com/article/news/local/mycity/chesapeake/chesapeake-planning-commission-denies-rezoning-application-for-proposed-data-center/291-c2a7a600-49d6-4da3-a042-7f4599c72475","label":"City Planning Commission rejects Chesapeake data center","publisher":"13News Now","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.wavy.com/wp-content/uploads/sites/3/2025/05/PLN-REZ-2025-002-Etheridge-Lakes-Data-Center_1.pdf","label":"PLN-REZ-2025-002 Etheridge Lakes Data Center rezoning application (mirror)","publisher":"WAVY-TV","kind":"filing","retrievedAt":"2026-08-26"}]},{"id":"compute-flexential-richmond-ric01-02-va","sourceRecordId":"flexential-richmond-ric01-02-va","name":"Flexential Richmond (RIC01/02)","operator":"Flexential","city":"Richmond","county":"Henrico","address":"8851 Park Central Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.6468902,"longitude":-77.4386952,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/flexential-richmond-ric01-02-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.flexential.com/data-centers/va/richmond/data-center","label":"Flexential official facility page (corroborated by DataCenterJournal RIC01/02 listing)","publisher":"Flexential","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/257581364","label":"OpenStreetMap way/257581364","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-corscale-gainesville-crossing-va","sourceRecordId":"corscale-gainesville-crossing-va","name":"Gainesville Crossing Digital Campus (GCDC)","operator":"Corscale Data Centers (Patrinely / USAA Real Estate)","city":"Gainesville","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.78,"longitude":-77.62,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/corscale-gainesville-crossing-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/new-hyperscale-developer-corscale-is-behind-300mw-gainesville-crossing-campus-in-prince-william-county/","label":"New hyperscale developer Corscale is behind 300MW Gainesville Crossing campus in Prince William County","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-08"},{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","label":"Digital Gateway data center project dies after final developer withdraws appeal","publisher":"WTOP","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://affiniuscapital.com/projects/gcdc/","label":"Gainesville Crossing Digital Campus (GCDC)","publisher":"Affinius Capital","kind":"other","retrievedAt":"2026-07-08"},{"url":"https://protectpwc.org/gainesville-crossing-data-center-complex/","label":"Gainesville Crossing data center complex","publisher":"Coalition to Protect Prince William County","kind":"other","retrievedAt":"2026-07-08"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/35467/639105417615730000","label":"Virginia DEQ air permit 74241-3 (issued 2025-11-21)","publisher":"Virginia DEQ","kind":"permit","retrievedAt":"2026-07-30"}]},{"id":"compute-gigaland-data-centers-remington-fauquier-va","sourceRecordId":"gigaland-data-centers-remington-fauquier-va","name":"Gigaland Data Centers","operator":"Gigaland LLC","city":"Remington","county":"Fauquier","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.56070838764574,"longitude":-77.78314256153212,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/gigaland-data-centers-remington-fauquier-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fauquiernow.com/news/data-center-database-where-projects-stand-across-fauquier-county/article_18be50e8-49f6-11ef-95cf-3b45407fea55.html","label":"Fauquier County planning staff project database (maintained record of application status)","publisher":"FauquierNow (sourced from Fauquier Co. planning staff)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.fauquiernow.com/news/gigaland-developers-withdraw-remington-data-center-application-new-filing-anticipated/article_ea7c2fd1-97a0-416f-9a1b-4e68e72cc496.html","label":"Gigaland developers pull Remington data center application; new filing anticipated","publisher":"FauquierNow","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.fauquiernow.com/news/fauquier-planning-commission-recommends-denial-of-gigaland-data-center-project-in-remington/article_0aa8068e-1c6e-437e-917b-6f32d2a6f836.html","label":"Fauquier Planning Commission recommends denial of Gigaland data center project in Remington","publisher":"FauquierNow","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.pecva.org/region/fauquier/gigaland-new-packaging-same-harmful-impacts/","label":"Gigaland: New Packaging, Same Harmful Impacts (with July 20, 2026 update)","publisher":"Piedmont Environmental Council","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-google-arcola-loudoun-va","sourceRecordId":"google-arcola-loudoun-va","name":"Google Arcola Data Center (Loudoun County)","operator":"Google","city":"Sterling","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9432462,"longitude":-77.5253232,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/google-arcola-loudoun-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/google-dulles-arcola-center","label":"Google Dulles / Arcola Center — 42575 Arcola Blvd, Sterling VA, fully operational, built 2020","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-19"},{"url":"https://www.datacenterfrontier.com/cloud/article/11430462/google-buys-two-data-center-sites-in-northern-virginia","label":"Google buys two data center sites in Northern Virginia — 91-acre Arcola Center parcel, $58M (Nov 2017)","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://virginiabusiness.com/aes-to-provide-carbon-free-power-for-googles-nova-data-centers/","label":"AES to provide carbon-free power for Google's Loudoun data centers","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-google-botetourt-greenfield-va","sourceRecordId":"google-botetourt-greenfield-va","name":"Google Botetourt Center at Greenfield Data Center Campus","operator":"Google","city":"Daleville","county":"Botetourt","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.42,"longitude":-79.89,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-botetourt-greenfield-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.botetourtva.gov/1021/Google-Data-Center","label":"Google Data Center — Botetourt County, VA (county project page)","publisher":"Botetourt County, Virginia","kind":"permit","retrievedAt":"2026-08-27"},{"url":"https://www.wsls.com/news/local/2026/07/24/google-data-center-cooling-update/","label":"Google announces air-cooling for first Botetourt data center building, raising questions over new water use numbers","publisher":"WSLS 10","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://wset.com/news/local/google-announced-plans-to-develop-data-center-campus-in-botetourt-county-virginia-march-2026","label":"Google announced plans to develop data center campus in Botetourt County","publisher":"WSET","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-google-loch-midlothian-va","sourceRecordId":"google-loch-midlothian-va","name":"Google Project Loch","operator":"Google","city":"Midlothian","county":"Chesterfield","address":"750 Watkins Centre Parkway","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.454,"longitude":-77.71,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-loch-midlothian-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/google-files-for-data-center-campus-outside-richmond-virginia/","label":"Google files for data center campus outside Richmond, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://richmondbizsense.com/2025/08/28/chesterfield-scores-a-google-trifecta-tech-giant-reveals-ties-to-3-massive-sites-across-the-county/","label":"Chesterfield scores a Google trifecta: ties to 3 sites across the county","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.chesterfield.gov/m/newsflash/Home/Detail/6383","label":"In Google, Chesterfield landed the Rolls-Royce of data center operators","publisher":"Chesterfield County, VA","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.grpva.com/news/chesterfield-county-approves-two-data-center-developments/","label":"Chesterfield County approves two data center developments","publisher":"Greater Richmond Partnership","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://richmondbizsense.com/2025/05/29/chesterfield-eda-secures-zoning-approval-for-two-data-center-projects/","label":"Chesterfield EDA secures zoning approval for two data center projects","publisher":"Richmond BizSense","kind":"permit","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","label":"Google's $9B bet on a trio of Chesterfield data center campuses","publisher":"VPM","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://chesterfieldreport.com/data-centers.html","label":"Data Center Tracker | The Chesterfield Report","publisher":"The Chesterfield Report","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-jk-land-greenlin-park-leesburg-va","sourceRecordId":"jk-land-greenlin-park-leesburg-va","name":"Greenlin Park","operator":"JK Land Holdings","city":"Leesburg","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.064,"longitude":-77.524,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/jk-land-greenlin-park-leesburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html","label":"300 MW Data Center Approved South of Leesburg","publisher":"Loudoun Now","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","label":"Data Centers in Loudoun: A Primer","publisher":"The Piedmont Environmental Council","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-tract-hanover-technology-park-va","sourceRecordId":"tract-hanover-technology-park-va","name":"Hanover Technology Park","operator":"Tract","city":null,"county":"Hanover","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.81,"longitude":-77.47,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-hanover-technology-park-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tract.com/project/hanover/","label":"Hanover — Tract (operator project page)","publisher":"Tract","kind":"press","retrievedAt":"2026-08-27"},{"url":"http://web.archive.org/web/20260724010609/https://richmondbizsense.com/2026/06/26/one-data-center-project-pulled-and-another-delayed-in-hanover-as-supervisors-reinstitute-equipment-tax/","label":"One data center project pulled and another delayed in Hanover, as supervisors reinstitute equipment tax (archived)","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-hunters-ridge-south-data-center-campus-spotsylvania-va","sourceRecordId":"hunters-ridge-south-data-center-campus-spotsylvania-va","name":"Hunters Ridge South Data Center Campus","operator":"American Real Estate Partners (AREP)","city":"Spotsylvania","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.213,"longitude":-77.482,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hunters-ridge-south-data-center-campus-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fredericksburgfreepress.com/2025/08/27/spotsylvania-board-of-supervisors-approve-potential-2-2-million-square-foot-data-center-campus/","label":"Fredericksburg Free Press — Spotsylvania Board of Supervisors approve potential 2.2M sq ft data center campus (Hunters Ridge South, 5-2 vote, Aug 27 2025)","publisher":"Fredericksburg Free Press","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.fredericksburgfreepress.com/2025/08/11/spotsylvania-planning-commission-recommends-approval-of-2-2-million-square-foot-data-center-campus/","label":"Fredericksburg Free Press — Spotsylvania Planning Commission recommends approval of 2.2M sq ft data center campus (Aug 11 2025)","publisher":"Fredericksburg Free Press","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://fredericksburg.com/news/local/article_db51f74a-c54f-4ee9-92c1-60273b3bf2f7.html","label":"The Free Lance-Star — Spotsylvania approves Hunter's Ridge data center project","publisher":"The Free Lance-Star (fredericksburg.com)","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-hhhunt-hunting-hawk-technology-park-hanover-va","sourceRecordId":"hhhunt-hunting-hawk-technology-park-hanover-va","name":"Hunting Hawk Technology Park","operator":"HHHunt","city":"Glen Allen","county":"Hanover","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.657,"longitude":-77.626,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/hhhunt-hunting-hawk-technology-park-hanover-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.vpm.org/news/2026-01-20/hanover-hunting-hawk-data-center-hhhunt-wyndham-ashland-road-clark","label":"Hanover Planning Commission nixes Hunting Hawk Technology Park proposal","publisher":"VPM News","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/","label":"Developer withdraws Hanover data center campus proposal","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-09-09"},{"url":"http://web.archive.org/web/20260203121049/https://www.datacenterdynamics.com/en/news/900mw-data-center-campus-plan-withdrawn-in-hanover-county-virginia/","label":"900MW data center campus plan withdrawn in Hanover County, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-westdulles-iron-horse-hanover-va","sourceRecordId":"westdulles-iron-horse-hanover-va","name":"Iron Horse Data Center Campus","operator":"WestDulles Properties","city":null,"county":"Hanover","address":"10171 E. Patrick Henry Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.762,"longitude":-77.44,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/westdulles-iron-horse-hanover-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260724010609/https://richmondbizsense.com/2026/06/26/one-data-center-project-pulled-and-another-delayed-in-hanover-as-supervisors-reinstitute-equipment-tax/","label":"One data center project pulled and another delayed in Hanover, as supervisors reinstitute equipment tax (archived)","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/","label":"Iron Horse data center proposal deferred in Hanover County","publisher":"WWBT NBC12","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://richmondbizsense.com/2026/05/14/latest-iron-horse-data-center-proposal-teed-up-for-hanover-planning-commission-review/","label":"Latest Iron Horse data center proposal teed up for Hanover Planning Commission review","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.12onyourside.com/2026/08/21/iron-horse-data-center-proposal-gets-planning-commissions-backing-despite-public-opposition/","label":"Iron Horse data center proposal gets planning commission's backing despite public opposition","publisher":"WWBT 12 On Your Side","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-iron-mountain-va-2-va","sourceRecordId":"iron-mountain-va-2-va","name":"Iron Mountain VA-2","operator":"Iron Mountain","city":"Manassas","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7772373,"longitude":-77.5459965,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-va-2-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://resources.ironmountain.com/solution-guides/d/data-centers-northern-virginia-va-2","label":"Iron Mountain facility directory","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/996723585","label":"OpenStreetMap way/996723585","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-iron-mountain-va-3-va","sourceRecordId":"iron-mountain-va-3-va","name":"Iron Mountain VA-3","operator":"Iron Mountain","city":"Manassas","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7755471,"longitude":-77.5451498,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-va-3-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/virginia-data-center","label":"Iron Mountain facility directory","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1283698132","label":"OpenStreetMap way/1283698132","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-iron-mountain-va-4-va","sourceRecordId":"iron-mountain-va-4-va","name":"Iron Mountain VA-4","operator":"Iron Mountain","city":"Manassas","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7744146,"longitude":-77.54223,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-va-4-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ironmountain.com/data-centers/locations/virginia-data-center","label":"Iron Mountain facility directory","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1287260556","label":"OpenStreetMap way/1287260556","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-iron-mountain-va-6-va","sourceRecordId":"iron-mountain-va-6-va","name":"Iron Mountain VA-6","operator":"Iron Mountain","city":"Manassas","county":"Prince William","address":"11891 Sudley Manor Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7681429,"longitude":-77.5386481,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-va-6-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/virginia/manassas/iron-mountain-va-6/","label":"Iron Mountain facility directory","publisher":"Iron Mountain","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1304357577","label":"OpenStreetMap way/1304357577","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-iron-mountain-white-oak-henrico-va","sourceRecordId":"iron-mountain-white-oak-henrico-va","name":"Iron Mountain White Oak Technology Park Campus","operator":"Iron Mountain","city":"Henrico","county":"Henrico","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.556,"longitude":-77.427,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iron-mountain-white-oak-henrico-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/iron-mountain-acquires-66-acres-outside-richmond-for-200mw-data-center-campus/","label":"Iron Mountain acquires 66 acres outside Richmond for 200MW data center campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.henricocitizen.com/iron-mountain-to-build-data-center-in-henricos-white-oak-technology-park/","label":"Iron Mountain to build data center in Henrico's White Oak Technology Park","publisher":"Henrico Citizen","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/36251/639149773966430000","label":"VA DEQ air permit 53266-1 — Iron Mountain Information Management, LLC (issued 2026-05-07)","publisher":"Virginia Department of Environmental Quality","kind":"permit","retrievedAt":"2026-07-29"},{"url":"https://publicevidence.org/records/iron-mountain-information-management-llc-air-permit-53266-1","label":"Submission provenance (not controlling source) — Public Evidence record for permit 53266-1","publisher":"Public Evidence Project","kind":"other","retrievedAt":"2026-07-30"}]},{"id":"compute-green-energy-ventures-king-george-technology-center-va","sourceRecordId":"green-energy-ventures-king-george-technology-center-va","name":"King George Technology Center","operator":"Green Energy Ventures","city":"King George","county":"King George","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.250254083928,"longitude":-77.29011580291154,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/green-energy-ventures-king-george-technology-center-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fxbgadvance.com/p/green-energy-ventures-presents-its","label":"Green Energy Ventures presents King George Technology Center","publisher":"Fredericksburg Advance","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.kinggeorgecountyva.gov/DocumentCenter/View/24172/92625-Proffers-Revised-after-Supervisor-Meeting-Clean---GEV","label":"King George County official Parcels GIS layer — Tax Map 21 Parcels 49 & 73, Tax Map 22 Parcels 46A & 49A, per the county's own voluntary proffer statement","publisher":null,"kind":"other","retrievedAt":"2026-07-18"},{"url":"https://kinggeorgetechnologycenter.com/wp-content/uploads/2026/01/12.12.25-Clean-Proffers-GEV.pdf","label":"King George Technology Center Voluntary Proffer Statement (Dec 12, 2025)","publisher":"Green Energy Ventures / J2 Engineers","kind":"filing","retrievedAt":"2026-08-26"}]},{"id":"compute-aws-lake-anna-technology-campus-louisa-va","sourceRecordId":"aws-lake-anna-technology-campus-louisa-va","name":"Lake Anna Technology Campus (LATC)","operator":"Amazon Web Services","city":"Louisa","county":"Louisa","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.04763641638,"longitude":-77.81682351474,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-lake-anna-technology-campus-louisa-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tammypurcell.substack.com/p/aws-preparing-to-start-work-at-lake","label":"Louisa County land-disturbance permit + VA DEQ stormwater permit (reported via county-sourced local coverage)","publisher":"Tammy Purcell / Engage Louisa (citing Louisa County permitting records)","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.datacenterdynamics.com/en/news/amazon-files-for-17-million-sq-ft-data-center-campus-in-louisa-county-virginia/","label":"AWS files for 1.7M sq ft data center campus in Louisa County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.louisacounty.gov/3258/Data-Centers","label":"Louisa County Data Centers information page","publisher":"Louisa County, VA","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://infocville.com/2023/09/02/amazon-to-invest-11-billion-in-louisa-county/","label":"infoCville — Amazon to invest $11 billion in Louisa County","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-lumen-ashburn-va","sourceRecordId":"lumen-ashburn-va","name":"Lumen Ashburn","operator":"Lumen Technologies","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.022182,"longitude":-77.4576094,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-ashburn-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-ashburn","label":"Baxtel facility profile — Lumen Ashburn","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/300162689","label":"OpenStreetMap way/300162689","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-lumen-mclean-1-va","sourceRecordId":"lumen-mclean-1-va","name":"Lumen McLean 1","operator":"Lumen Technologies","city":"McLean","county":"Fairfax","address":"1755 Old Meadow Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9208538,"longitude":-77.2115713,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-mclean-1-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/lumen-mclean-1","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/9669639033","label":"OpenStreetMap node/9669639033","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-lavue-massaponax-tech-campus-spotsylvania-va","sourceRecordId":"lavue-massaponax-tech-campus-spotsylvania-va","name":"Massaponax Tech Campus","operator":"Lavue Lane Owner LLC","city":"Massaponax","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.1869,"longitude":-77.5505,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lavue-massaponax-tech-campus-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus","label":"Spotsylvania County official case page — R25-0004 Massaponax Tech Campus","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35530/4th-Submission-Proffer-Statement","label":"R25-0004 4th-Submission Voluntary Proffer Statement (applicant Lavue Lane Owner LLC; 12 parcels; 588.56 ac)","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"}]},{"id":"compute-menlo-digital-jamestown-drive-petersburg-va","sourceRecordId":"menlo-digital-jamestown-drive-petersburg-va","name":"Menlo Digital Richmond Virginia Data Center (Jamestown Drive)","operator":"Menlo Digital","city":"Petersburg","county":null,"address":"2255 Jamestown Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.199,"longitude":-77.363,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/menlo-digital-jamestown-drive-petersburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/","label":"Documents reveal details on several data center projects in Petersburg's pipeline (archived)","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges","label":"Navigating Virginia's Data Center Boom: Policy Shifts, Local Projects, and Future Challenges","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-meta-henrico-white-oak-sandston-va","sourceRecordId":"meta-henrico-white-oak-sandston-va","name":"Meta Henrico Data Center (White Oak Technology Park)","operator":"Meta Platforms","city":"Sandston","county":"Henrico County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.4820177,"longitude":-77.2337105,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-henrico-white-oak-sandston-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dpr.com/projects/meta-henrico-data-center","label":"DPR Construction — Meta Henrico Data Center project page","publisher":"DPR Construction","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://richmondbizsense.com/2022/11/28/facebook-parent-meta-adding-to-henrico-footprint-with-code-named-project-tropical-data-center-development/","label":"Facebook parent Meta adding to Henrico footprint with code-named 'Project Tropical' data center","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-microsoft-boydton-bn-campus-mecklenburg-va","sourceRecordId":"microsoft-boydton-bn-campus-mecklenburg-va","name":"Microsoft Boydton Campus (BN / Azure East US)","operator":"Microsoft","city":"Boydton","county":"Mecklenburg","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.65969,"longitude":-78.36487,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-boydton-bn-campus-mecklenburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://local.microsoft.com/wp-content/uploads/2021/11/Boydton-datacenter-fact-sheet.pdf","label":"Microsoft Boydton datacenter fact sheet","publisher":"Microsoft (local.microsoft.com)","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.datacenters.com/microsoft-azure-east-us-virginia","label":"Microsoft Azure East US-Virginia, 101 Herbert Drive, Boydton VA","publisher":"datacenters.com","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/data-center/microsoft-boydton-va","label":"Microsoft Boydton VA Data Center — 175-acre site, 10 buildings, built 2013, $2B+ invested since 2010","publisher":"baxtel","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-another-virginia-campus-in-mecklenburg-county/","label":"Microsoft files for another Virginia campus in Mecklenburg County (named corroboration only, DCD 403-blocks fetch)","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.yourgv.com/business/local_business/microsoft-s-2b-investment-in-southern-virginia-fulfills-early-vision/article_862bfb68-1cb2-4701-aad5-0be0ef8ccbe7.html","label":"yourgv.com — Microsoft's $2B investment in Southern Virginia fulfills early vision","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.vedp.org/press-release/2010-08/mecklenburg-county-microsoft-locate-major-data-center","label":"VEDP press release — Governor McDonnell Announces Microsoft to Locate Major Data Center in Mecklenburg County","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.vedp.org/case-study/microsoft-corporations-expanding-virginia-footprint","label":"VEDP case study — Microsoft Corporation's Expanding Virginia Footprint","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-microsoft-bristow-mnz03-va","sourceRecordId":"microsoft-bristow-mnz03-va","name":"Microsoft Bristow Data Center Campus (MNZ03)","operator":"Microsoft","city":"Bristow","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.728,"longitude":-77.56,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-bristow-mnz03-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/virginia/bristow/microsoft-8008-devlin-rd/","label":"Microsoft 8008 Devlin Rd Data Center — Datacentermap.com","publisher":"Datacentermap.com","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://baxtel.com/data-center/microsoft-mnz03","label":"Microsoft MNZ03 Data Center — Baxtel","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/07/25/sustainable-by-design-transforming-datacenter-water-efficiency/","label":"Sustainable by design: Transforming datacenter water efficiency — Microsoft","publisher":"Microsoft","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.insidenova.com/headlines/prince-william-supervisors-deny-bristow-campus-data-center-following-protest/article_62d95463-34e8-4a68-a82a-713d38dda8af.html","label":"Prince William supervisors deny Bristow Campus data center following protest — InsideNova","publisher":"InsideNova","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-microsoft-panhandle-road-mecklenburg-va","sourceRecordId":"microsoft-panhandle-road-mecklenburg-va","name":"Microsoft Panhandle Road Campus (AVC17 expansion)","operator":"Microsoft","city":"Boydton","county":"Mecklenburg","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.6674,"longitude":-78.3897,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-panhandle-road-mecklenburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260819033426/https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-data-center-campus-in-mecklenburg-county-virginia/","label":"Microsoft files to expand data center campus in Mecklenburg County, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-microsoft-skipwith-road-campus-mecklenburg-va","sourceRecordId":"microsoft-skipwith-road-campus-mecklenburg-va","name":"Microsoft Skipwith Road Campus (LYH03)","operator":"Microsoft","city":"Boydton","county":"Mecklenburg","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.6798,"longitude":-78.4194,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-skipwith-road-campus-mecklenburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nao.usace.army.mil/Media/Public-Notices/Article/3357496/nao-2022-02394-vmrc-22-v2715-microsoft-data-center-mecklenburg-county-virginia/","label":"USACE Norfolk District Public Notice NAO-2022-02394 / VMRC# 22-V2715, Microsoft Data Center, Mecklenburg County, Virginia","publisher":"U.S. Army Corps of Engineers, Norfolk District","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-six-building-data-center-campus-in-virginias-mecklenburg-county/","label":"Microsoft files for six-building data center campus in Virginia's Mecklenburg County","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/news/microsoft-submits-plans-for-a-six-building-data-center-facility-in-mecklenburg-county-virginia","label":"Microsoft Submits Plans For a Six-Building Data Center Facility in Mecklenburg County, Virginia","publisher":"Baxtel","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-microsoft-tunstall-road-hillcrest-mecklenburg-va","sourceRecordId":"microsoft-tunstall-road-hillcrest-mecklenburg-va","name":"Microsoft Tunstall Road Campus (Hillcrest / AVC09)","operator":"Microsoft","city":"South Hill","county":"Mecklenburg","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.74254,"longitude":-78.10265,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-tunstall-road-hillcrest-mecklenburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-25","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nao.usace.army.mil/Media/Public-Notices/Article/3090248/nao-2013-01922-hillcrest-data-center-mecklenburg-county/","label":"NAO-2013-01922, Hillcrest Data Center, Mecklenburg County","publisher":"USACE Norfolk District","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-permit-to-build-data-center-campus-in-mecklenburg-county-virginia/","label":"Microsoft files for permit to build data center campus in Mecklenburg County (named corroboration only, DCD 403-blocks fetch)","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://services.arcgis.com/O8ZpeBC0xLM5nL34/arcgis/rest/services/MeckParcels_TammyTest20221101/FeatureServer/0/query?where=OBJECTID%3D33037&outFields=*&f=json","label":"Mecklenburg County parcel/GIS record (parcel OBJECTID 33037 / ParcelNumber 002)","publisher":"Mecklenburg County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.datacentermap.com/usa/virginia/richmond/microsoft-hillcrest-avc01/","label":"datacentermap.com — Microsoft Hillcrest Data Center (AVC09)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-minnieville-mid-county-industrial-park-prince-william-va","sourceRecordId":"minnieville-mid-county-industrial-park-prince-william-va","name":"Mid-County Industrial Park Data Center Campus","operator":"Minnieville Capital Acquisitions","city":null,"county":"Prince William County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.6320976,"longitude":-77.4218513,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/minnieville-mid-county-industrial-park-prince-william-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.insidenova.com/headlines/prince-william-supervisors-approve-contentious-mid-county-industrial-park-data-center-project/article_041857e0-98ca-5344-9397-67329e70a394.html","label":"Prince William supervisors approve contentious Mid-County Industrial Park data center project","publisher":"InsideNoVa","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-middletown-data-center-frederick-va","sourceRecordId":"middletown-data-center-frederick-va","name":"Middletown Data Center","operator":"Middletown Data Center LLC","city":"Middletown","county":"Frederick County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0202984,"longitude":-78.2907443,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/middletown-data-center-frederick-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.middletowndatacenter.com/technical-specs","label":"Middletown Data Center — Technical Specifications","publisher":"Middletown Data Center","kind":"other","retrievedAt":"2026-10-14"},{"url":"https://www.nvdaily.com/nvdaily/data-centers-stripped-as-allowable-use-in-frederick-county/article_79da8f36-a547-5430-bf96-e07bcc68a7ef.html","label":"Data centers stripped as allowable use in Frederick County","publisher":"Northern Virginia Daily","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.mslaw.com/news/board-of-zoning-appeals-oks-variance-for-additional-generator-at-existing-data-center","label":"Board of Zoning Appeals OKs variance for additional generator at existing data center","publisher":"Miles & Stockbridge (via The Winchester Star)","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-dp-facilities-mineral-gap-wise-va","sourceRecordId":"dp-facilities-mineral-gap-wise-va","name":"Mineral Gap Data Center","operator":"DP Facilities","city":"Wise","county":"Wise","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.987,"longitude":-82.53,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/dp-facilities-mineral-gap-wise-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.dpfacilities.com/in-the-news/65-million-minderal-gap-data-center-to-be-built/","label":"$65 Million 'Mineral Gap' Data Center to be Built in Wise County","publisher":"DP Facilities","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.dpfacilities.com/news-releases/virginias-first-designed-and-constructed-tier-iii-data-center-expanding-into-d-c-metro-area/","label":"Virginia's First Designed and Constructed Tier III Data Center Expanding Into D.C. Metro Area","publisher":"DP Facilities","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://elevatewisecounty.com/top-industries/data-centers/","label":"Data Centers — Wise County Economic Development","publisher":"Wise County Economic Development","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-tract-mountain-road-technology-park-hanover-va","sourceRecordId":"tract-mountain-road-technology-park-hanover-va","name":"Mountain Road Technology Park","operator":"Tract","city":null,"county":"Hanover","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.693493,"longitude":-77.53629,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-mountain-road-technology-park-hanover-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://richmondbizsense.com/2025/10/30/data-center-developer-tract-proposes-mountain-road-tech-park-in-western-hanover-county/","label":"Data center developer Tract proposes Mountain Road Tech Park in western Hanover County","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.datacenterdynamics.com/en/news/tracts-430-acre-data-center-rejected-by-local-officials-in-hanover-county-virginia/","label":"Tract's 430-acre data center rejected by local officials in Hanover County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-13"},{"url":"https://richmondbizsense.com/2026/05/28/hanover-supervisors-reject-data-center-project-on-mountain-road/","label":"Hanover supervisors reject data center project on Mountain Road","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-07-13"},{"url":"https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble","label":"Hanover supervisors nix Mountain Road data center project","publisher":"VPM News","kind":"press","retrievedAt":"2026-07-13"},{"url":"https://services2.arcgis.com/sKZWgJlU6SekCzQV/arcgis/rest/services/Hanover_Parcels/FeatureServer/0/query?where=GPIN%3D%277767-17-2423%27&outFields=*&f=json","label":"Hanover County parcel/GIS record (parcel GPIN 7767-17-2423)","publisher":"Hanover County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://virginiabusiness.com/hanover-supervisors-reject-430-acre-data-center-campus/","label":"Virginia Business: Hanover supervisors reject 430-acre data center campus","publisher":null,"kind":"other","retrievedAt":"2026-07-24"},{"url":"https://www.vpm.org/news/2026-04-17/hanover-planning-commission-mountain-rd-data-center-covington-strong","label":"VPM: Hanover planning commission recommends approving Mountain Rd data center","publisher":null,"kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.wtvr.com/news/local-news/hanover-county/tract-data-center-vote-may-28-2026","label":"WTVR (CBS 6) — Hanover rejects Mountain Road data center after marathon meeting / vote coverage","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-aws-north-creek-technology-campus-louisa-va","sourceRecordId":"aws-north-creek-technology-campus-louisa-va","name":"North Creek Technology Campus (NCTC)","operator":"Amazon Web Services","city":"Louisa","county":"Louisa","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.999666431819,"longitude":-77.967415971191,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/aws-north-creek-technology-campus-louisa-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://tammypurcell.substack.com/p/aws-preparing-to-start-work-at-lake","label":"Louisa County Planning Commission buffer/landscaping plan discussion (Nov. 9, 2024) + county-sourced reporting","publisher":"Tammy Purcell / Engage Louisa (citing Louisa County Planning Commission proceedings)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/amazon-files-for-38-million-sq-ft-data-center-campus-in-louisa-county-virginia/","label":"Amazon files for 3.8 million sq ft data center campus in Louisa County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.louisacounty.gov/3258/Data-Centers","label":"Louisa County Data Centers information page","publisher":"Louisa County, VA","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.nao.usace.army.mil/Media/Public-Notices/Article/3952905/nao-2024-01939-amazon-data-services-louisa-virginia/","label":"US Army Corps of Engineers, Norfolk District — Public Notice NAO-2024-01939 (Amazon Data Services, Louisa, Virginia)","publisher":null,"kind":"press","retrievedAt":"2026-07-25"}]},{"id":"compute-ntt-ashburn-va1-data-center-va","sourceRecordId":"ntt-ashburn-va1-data-center-va","name":"NTT Ashburn VA1 Data Center","operator":"NTT Global Data Centers","city":"Ashburn","county":"Loudoun","address":"44664 Guilford Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0227436,"longitude":-77.4548911,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-ashburn-va1-data-center-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","label":"NTT facility directory","publisher":"NTT","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/300163083","label":"OpenStreetMap way/300163083","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ntt-ashburn-va2-data-center-va","sourceRecordId":"ntt-ashburn-va2-data-center-va","name":"NTT Ashburn VA2 Data Center","operator":"NTT Global Data Centers","city":"Ashburn","county":"Loudoun","address":"44610 Guilford Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0250127,"longitude":-77.4576402,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-ashburn-va2-data-center-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-2-data-center","label":"NTT facility directory","publisher":"NTT","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/610977485","label":"OpenStreetMap way/610977485","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/25821/638628728843130000","label":"Virginia DEQ air permit 74094-1 (issued 2016-01-13)","publisher":"Virginia DEQ","kind":"permit","retrievedAt":"2026-07-30"}]},{"id":"compute-ntt-ashburn-va5-data-center-va","sourceRecordId":"ntt-ashburn-va5-data-center-va","name":"NTT Ashburn VA5 Data Center","operator":"NTT Global Data Centers","city":"Ashburn","county":"Loudoun","address":"21583 Megawatt Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0183033,"longitude":-77.472611,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-ashburn-va5-data-center-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-5-data-center","label":"NTT facility directory","publisher":"NTT","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/793888429","label":"OpenStreetMap way/793888429","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ntt-ashburn-va7-data-center-va","sourceRecordId":"ntt-ashburn-va7-data-center-va","name":"NTT Ashburn VA7 Data Center","operator":"NTT Global Data Centers","city":"Ashburn","county":"Loudoun","address":"44371 Gigabit Plaza","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0160142,"longitude":-77.471954,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-ashburn-va7-data-center-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va7-data-center","label":"NTT facility directory","publisher":"NTT","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/node/13154826378","label":"OpenStreetMap node/13154826378","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-ntt-ashburn-va8-data-center-va","sourceRecordId":"ntt-ashburn-va8-data-center-va","name":"NTT Ashburn VA8 Data Center","operator":"NTT Global Data Centers","city":"Ashburn","county":"Loudoun","address":"44710 Gigabit Plaza","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0201893,"longitude":-77.475509,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-ashburn-va8-data-center-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-data-centers","label":"NTT Global Data Centers Americas facility directory","publisher":"NTT Global Data Centers Americas","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1188691868","label":"OpenStreetMap way/1188691868","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-nuvu-county-drive-petersburg-va","sourceRecordId":"nuvu-county-drive-petersburg-va","name":"NuVu County Drive Data Center Campus","operator":"NuVu Real Estate","city":"Petersburg","county":null,"address":"2588 County Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.193,"longitude":-77.376,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nuvu-county-drive-petersburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/","label":"Documents reveal details on several data center projects in Petersburg's pipeline (archived)","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.wtvr.com/news/local-news/tri-cities/data-center-projects-july-21-2026","label":"Multiple data centers planned for Petersburg; documents shed light on new details","publisher":"WTVR CBS 6","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-ls-power-old-ridge-road-hanover-va","sourceRecordId":"ls-power-old-ridge-road-hanover-va","name":"Old Ridge Road Data Center Campus","operator":"LS Power","city":"Doswell","county":"Hanover","address":"10165 Old Ridge Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.859,"longitude":-77.4536,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ls-power-old-ridge-road-hanover-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260724010609/https://richmondbizsense.com/2026/06/26/one-data-center-project-pulled-and-another-delayed-in-hanover-as-supervisors-reinstitute-equipment-tax/","label":"One data center project pulled and another delayed in Hanover, as supervisors reinstitute equipment tax","publisher":"Richmond BizSense (via Internet Archive)","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-eagle-rock-pairmont-data-center-campus-spotsylvania-va","sourceRecordId":"eagle-rock-pairmont-data-center-campus-spotsylvania-va","name":"Pairmont Data Center Campus","operator":"Eagle Rock Partners","city":null,"county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.1791903850787,"longitude":-77.44283210846356,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/eagle-rock-pairmont-data-center-campus-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus","label":"Spotsylvania County official case page — R25-0014 Pairmont Data Center Campus","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35472/3rd-Submission-Proffer-Statement","label":"R25-0014 3rd-Submission Voluntary Proffer Statement (applicant Eagle Rock Partners LLC; parcels 51-A-29/30; 99.35 ac)","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-amazon-potomac-church-fredericksburg-va","sourceRecordId":"amazon-potomac-church-fredericksburg-va","name":"Potomac Church Technology Center","operator":"Amazon Data Services","city":"Fredericksburg","county":"Stafford","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.411322338680904,"longitude":-77.4042471172777,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/amazon-potomac-church-fredericksburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.staffordcountyva.gov","label":"Stafford County zoning/substation case — Potomac Church","publisher":"Stafford County VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.potomaclocal.com/2026/06/18/stafford-supervisors-defer-amazon-data-center-proffer-amendment-amid-road-damage-generator-emissions-and-water-sharing-concerns/","label":"Stafford supervisors defer Amazon data center proffer amendment","publisher":"Potomac Local","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-potomac-creek-campus-stafford-va","sourceRecordId":"potomac-creek-campus-stafford-va","name":"Potomac Creek Campus Data Center","operator":"Undisclosed","city":null,"county":"Stafford County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.3800153,"longitude":-77.4044535,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/potomac-creek-campus-stafford-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.potomaclocal.com/2026/06/01/stafford-panel-rejects-data-center-over-cemetery/","label":"Stafford panel rejects data center over cemetery","publisher":"Potomac Local","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://wjla.com/news/local/stafford-county-pauses-data-center-construction-amid-concerns-about-slave-gravesite-virginia-dominion-energy-property-value-tax-rates","label":"Stafford County pauses data center construction amid concerns about slave gravesite","publisher":"WJLA 7News","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-powerhouse-95-spotsylvania-va","sourceRecordId":"powerhouse-95-spotsylvania-va","name":"PowerHouse 95","operator":"PowerHouse Data Centers","city":"Spotsylvania","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.17,"longitude":-77.66,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-95-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia","label":"PowerHouse breaks ground on 800MW data center campus in Spotsylvania County, Virginia","publisher":"PowerHouse Data Centers (press release)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.powerhousedata.com/news/powerhouse-data-centers-announces-purchase-of-145-acres-in-spotsylvania-va-for-powerhouse-95-campus","label":"PowerHouse Data Centers announces purchase of 145 acres in Spotsylvania, VA for PowerHouse 95 campus","publisher":"PowerHouse Data Centers (press release)","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/","label":"PowerHouse breaks ground on 800MW data center campus in Spotsylvania County, Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.prnewswire.com/news-releases/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia-302041246.html","label":"PowerHouse Data Centers Closes on Site of 800 MW Data Center Campus in Spotsylvania, Virginia","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/powerhouse-95","label":"PowerHouse 95 Data Center — Baxtel profile","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.americanrepartners.com/properties/powerhouse-95","label":"PowerHouse 95 — AREP property page","publisher":"American Real Estate Partners","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.dominionenergy.com/tributary","label":"Tributary 230 kV Transmission Project — Dominion Energy Spotsylvania data center infrastructure","publisher":"Dominion Energy","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.fredericksburgfreepress.com/2025/12/10/spotsylvania-board-of-supervisors-approves-data-center-design-standards-but-they-may-be-short-lived/","label":"Spotsylvania Board of Supervisors approves data center design standards","publisher":"Fredericksburg Free Press","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-powerhouse-abx-1-va","sourceRecordId":"powerhouse-abx-1-va","name":"PowerHouse ABX-1","operator":"PowerHouse Data Centers","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0195992,"longitude":-77.4504568,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-abx-1-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-abx-1","label":"PowerHouse Data Centers official facility page (delivered Oct 2023; sold Q4 2024)","publisher":"PowerHouse Data Centers","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1188715508","label":"OpenStreetMap way/1188715508","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-powerhouse-ctp-02-va","sourceRecordId":"powerhouse-ctp-02-va","name":"PowerHouse CTP-02","operator":"PowerHouse Data Centers","city":"Chester","county":"Chesterfield","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.360586,"longitude":-77.3256869,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/powerhouse-ctp-02-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230","label":"Bisnow: CoreWeave data center at CTP's Richmond-area (Meadowville) campus lands $600M loan","publisher":"PowerHouse Data Centers (JV with Chirisa Technology Parks and Blue Owl Real Estate)","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/1449347339","label":"OpenStreetMap way/1449347339","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-province-group-powhatan-technology-park-va","sourceRecordId":"province-group-powhatan-technology-park-va","name":"Powhatan Technology Park","operator":"Province Group (Newport Equities / LC West LLC)","city":null,"county":"Powhatan County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.5154292,"longitude":-77.73203,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/province-group-powhatan-technology-park-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://virginiabusiness.com/powhatan-green-lights-2-7b-data-center-campus/","label":"Powhatan green-lights $2.7B data center campus","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://irei.com/news/virginias-powhatan-county-greenlights-180-acre-data-center-development","label":"Virginia's Powhatan County greenlights 180-acre data center development","publisher":"IREI","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://richmondbizsense.com/2024/05/07/data-center-project-proposed-for-120-acre-site-in-powhatan-county/","label":"Data center project proposed for 120-acre site in Powhatan County","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-prince-william-digital-gateway-va","sourceRecordId":"prince-william-digital-gateway-va","name":"Prince William Digital Gateway","operator":"QTS / Compass Datacenters","city":"Gainesville","county":"Prince William","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.8,"longitude":-77.68,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prince-william-digital-gateway-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","label":"Digital Gateway data center project dies after final developer withdraws appeal","publisher":"WTOP News","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/officials-in-virginias-prince-william-county-drop-support-for-qtscompass-digital-gateway-data-center-project/","label":"Officials in Prince William County drop support for QTS/Compass Digital Gateway data center project","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterfrontier.com/site-selection/article/21437363/prince-william-digital-gateway","label":"Data Center Frontier — PW Digital Gateway Advances as Prince William Supervisors Back Massive Project","publisher":null,"kind":"press","retrievedAt":"2026-07-24"},{"url":"https://www.insidenova.com/news/prince_william/updated-developer-to-end-appeal-in-digital-gateway-data-center-case-putting-the-massive-project/article_d17048b9-8d0a-47ad-aeec-1cbd02f73f47.html","label":"InsideNoVa — Digital Gateway data center developer to end appeal","publisher":null,"kind":"press","retrievedAt":"2026-07-24"}]},{"id":"compute-crusoe-project-flash-franklin-va","sourceRecordId":"crusoe-project-flash-franklin-va","name":"Project Flash (Summit View Business Park)","operator":"Crusoe","city":"Rocky Mount","county":"Franklin","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.9979,"longitude":-79.8922,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/crusoe-project-flash-franklin-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260819034221/https://www.datacenterdynamics.com/en/news/crusoe-linked-to-potential-data-center-project-in-franklin-county-virginia/","label":"Crusoe linked to potential data center project in Franklin County, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.smithmountaineagle.com/news/project-flash-initiative-shut-down-by-franklin-county-board-of-supervisors/article_27ab1925-77b5-428e-9a12-13ca0d2c3918.html","label":"\"Project Flash\" initiative shut down by Franklin County Board of Supervisors","publisher":"Smith Mountain Eagle","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-project-lightning-wildwood-commerce-park-carroll-va","sourceRecordId":"project-lightning-wildwood-commerce-park-carroll-va","name":"Project Lightning (Wildwood Commerce Park)","operator":"Undisclosed (Blue Ridge Crossroads Economic Development Authority site)","city":"Hillsville","county":"Carroll County","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.7631399,"longitude":-80.8440807,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/project-lightning-wildwood-commerce-park-carroll-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wdbj7.com/2026/09/30/grayson-county-confirms-11-billion-data-center-planned-wildwood-commerce-park/","label":"Grayson County confirms $11 billion data center planned for Wildwood Commerce Park","publisher":"WDBJ7","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.wdbj7.com/2026/10/07/data-center-project-divides-three-southwest-virginia-localities/","label":"Data center project divides three Southwest Virginia localities","publisher":"WDBJ7","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-google-project-peanut-chester-va","sourceRecordId":"google-project-peanut-chester-va","name":"Project Peanut","operator":"Google","city":"Chester","county":"Chesterfield","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.34629075,"longitude":-77.29960686,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-project-peanut-chester-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","label":"Google data centers: Chesterfield's Peanut, Skye, Loch","publisher":"VPM","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.wric.com/news/local-news/chesterfield-county/google-site-plan-project-peanut-data-center-chesterfield/","label":"Google site plan: Project Peanut data center Chesterfield","publisher":"WRIC","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://richmondbizsense.com/2025/08/28/chesterfield-scores-a-google-trifecta-tech-giant-reveals-ties-to-3-massive-sites-across-the-county/","label":"Richmond BizSense — Chesterfield scores a Google trifecta: tech giant reveals ties to 3 massive sites across the county","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://chesterfieldreport.com/story/chesterfield-residents-seek-clarity-on-data-center-expansion-plans.html","label":"Chesterfield Report — Chesterfield Residents Seek Clarity on Data Center Expansion Plans","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-peterson-project-sisson-stafford-va","sourceRecordId":"peterson-project-sisson-stafford-va","name":"Project Sisson","operator":"Peterson Companies","city":null,"county":"Stafford","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.287,"longitude":-77.39,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/peterson-project-sisson-stafford-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/peterson-project-sisson","label":"Peterson: Project Sisson Data Center","publisher":"Baxtel","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-google-project-skye-midlothian-va","sourceRecordId":"google-project-skye-midlothian-va","name":"Project Skye","operator":"Google","city":"Midlothian","county":"Chesterfield","address":"4201 Moseley Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.44741159,"longitude":-77.77600992,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-project-skye-midlothian-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/details-revealed-for-googles-project-skye-data-center-campus-in-chesterfield-county-virginia/","label":"Details revealed for Google's Project Skye data center campus","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://usdatacenterprojects.com/virginia/google-files-plans-for-887-acre-project-skye-data-center-campus-in-chesterfield-county-virginia","label":"Google files plans for 887-acre Project Skye data center campus","publisher":"US Data Center Projects","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://richmondbizsense.com/2025/08/28/chesterfield-scores-a-google-trifecta-tech-giant-reveals-ties-to-3-massive-sites-across-the-county/","label":"Richmond BizSense — Chesterfield scores a Google trifecta","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://chesterfieldreport.com/story/chesterfield-residents-seek-clarity-on-data-center-expansion-plans.html","label":"Chesterfield Report — Chesterfield Residents Seek Clarity on Data Center Expansion Plans","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","label":"Google's $9B bet on a trio of Chesterfield data center campuses","publisher":"VPM","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-takanock-project-tallmadge-strasburg-va","sourceRecordId":"takanock-project-tallmadge-strasburg-va","name":"Project Tallmadge","operator":"Takanock, LLC","city":"Strasburg","county":"Shenandoah","address":"Borden Mowery Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9893,"longitude":-78.3589,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/takanock-project-tallmadge-strasburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260819034219/https://www.datacenterdynamics.com/en/news/87-acre-project-tallmadge-to-be-built-in-strasburg-virginia/","label":"87-acre 'Project Tallmadge' to be built in Strasburg, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html","label":"Strasburg data center proposal prompts questions on water use, hydrogen, oversight","publisher":"The Northern Virginia Daily","kind":"press","retrievedAt":"2026-10-14"}]},{"id":"compute-qts-ashburn-1-va","sourceRecordId":"qts-ashburn-1-va","name":"QTS Ashburn 1","operator":"QTS Data Centers","city":"Sterling","county":"Loudoun","address":"22271 Broderick Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9995277,"longitude":-77.4501109,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-ashburn-1-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/ashburn-1/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/701923200","label":"OpenStreetMap way/701923200","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-qts-ashburn-2-ashburn-lockridge-va","sourceRecordId":"qts-ashburn-2-ashburn-lockridge-va","name":"QTS Ashburn 2 (Ashburn-Lockridge)","operator":"QTS Data Centers","city":"Sterling","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.9959297,"longitude":-77.4562445,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-ashburn-2-ashburn-lockridge-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/ashburn-2/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1064211366","label":"OpenStreetMap way/1064211366","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-qts-richmond-1-dc1-ric1-white-oak-technology-park-va","sourceRecordId":"qts-richmond-1-dc1-ric1-white-oak-technology-park-va","name":"QTS Richmond 1 DC1 (RIC1, White Oak Technology Park)","operator":"QTS Data Centers","city":"Sandston","county":"Henrico","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.4892338,"longitude":-77.2474761,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/qts-richmond-1-dc1-ric1-white-oak-technology-park-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://q.com/data-centers/richmond-1/","label":"QTS facility directory","publisher":"QTS","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/13685576464","label":"OpenStreetMap node/13685576464","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-qts-white-oak-technology-park-ii-henrico-va","sourceRecordId":"qts-white-oak-technology-park-ii-henrico-va","name":"QTS White Oak Technology Park II (RIC5)","operator":"QTS Data Centers","city":"Sandston","county":"Henrico","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.49,"longitude":-77.27,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-white-oak-technology-park-ii-henrico-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/henrico-county-approves-622-acre-rezoning-request-for-data-centers-in-virginia/","label":"Henrico County approves 622-acre rezoning request for data centers in Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-13"},{"url":"https://www.henricocitizen.com/articles/conceptual-plan-shows-13-data-centers-on-622-acre-sandston-site/","label":"Conceptual plan shows 13 data centers on 622-acre Sandston site","publisher":"The Henrico Citizen","kind":"press","retrievedAt":"2026-07-13"},{"url":"https://virginiabusiness.com/qts-finishes-purchase-of-rezoned-henrico-tech-park-land/","label":"QTS finishes $137M purchase of rezoned Henrico tech park land","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-08-27"},{"url":"https://richmondbizsense.com/2026/05/18/data-center-giant-qts-preparing-1100-acre-expansion-that-would-add-17-buildings-to-its-henrico-hub/","label":"QTS progressing on 1,100-acre expansion adding 17 buildings to its Henrico hub","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.newsbreak.com/henrico-citizen-560689/3450103309308-henrico-supervisors-approve-rezoning-for-potential-data-center-complex-in-sandston-which-also-could-include-ai-users","label":"Henrico Citizen — Henrico supervisors approve rezoning for potential data center complex in Sandston (May 20, 2024; via NewsBreak syndication)","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-quantum-park-data-center-ashburn-loudoun-va","sourceRecordId":"quantum-park-data-center-ashburn-loudoun-va","name":"Quantum Park Data Center Expansion","operator":"Quantum Park LLC","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.011,"longitude":-77.464,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/quantum-park-data-center-ashburn-loudoun-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.loudountimes.com/news/politics_and_government/levels_of_government/county/planning-commission-sends-quantum-park-data-center-project-to-supervisors/article_2529879e-8cdc-4a1f-a376-28d748b851bd.html","label":"Planning Commission sends Quantum Park data center project to supervisors","publisher":"Loudoun Times-Mirror","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","label":"Data Centers in Loudoun: A Primer — Upcoming Decisions","publisher":"The Piedmont Environmental Council","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-red-ace-data-center-culpeper-va","sourceRecordId":"red-ace-data-center-culpeper-va","name":"Red Ace Data Center","operator":"Red Ace Capital Management","city":"Culpeper","county":"Culpeper","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.474,"longitude":-77.997,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/red-ace-data-center-culpeper-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-campus-in-virginias-culpeper-county-gets-approval/","label":"Data center campus in Virginia's Culpeper County gets approval","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-pointone-remington-technology-park-fauquier-va","sourceRecordId":"pointone-remington-technology-park-fauquier-va","name":"Remington Technology Park","operator":"PointOne Holdings Inc.","city":"Remington","county":"Fauquier","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.53,"longitude":-77.8,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pointone-remington-technology-park-fauquier-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fauquiernow.com/news/data-center-database-where-projects-stand-across-fauquier-county/article_18be50e8-49f6-11ef-95cf-3b45407fea55.html","label":"Fauquier County planning staff project database (maintained record of application status)","publisher":"FauquierNow (sourced from Fauquier Co. planning staff)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.fauquiernow.com/news/business/fauquier-board-of-supervisors-approves-private-power-plant-for-remington-technology-park-data-center/article_5991291e-ba38-4d44-9aef-acdabd1d3608.html","label":"Fauquier Board of Supervisors approves private power plant for Remington Technology Park data center","publisher":"FauquierNow","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html","label":"Most Remington data center projects still pending (notes Remington Technology Park as the sole approved/under-construction exception)","publisher":"Fauquier.com (Fauquier Times)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard","label":"PointOne Receives Approval for Remington Technology Park Fuel Cell Equipment Yard (July 9, 2026)","publisher":"PointOne Data Centers","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://www.pecva.org/region/fauquier/remington-tech-park-developer-plans-a-permanent-gas-fuel-cell-power-plant/","label":"Remington Tech Park Developer Plans a Permanent Gas Fuel Cell Power Plant (updated July 10, 2026)","publisher":"Piedmont Environmental Council","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-sabey-intergate-ashburn-building-a-va","sourceRecordId":"sabey-intergate-ashburn-building-a-va","name":"Sabey Intergate.Ashburn (Building A)","operator":"Sabey Data Centers","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0144996,"longitude":-77.4799874,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-ashburn-building-a-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.businesswire.com/news/home/20250624907578/en/Sabey-Data-Centers-Breaks-Ground-on-Final-Phase-of-Ashburn-Campus-Expansion","label":"Sabey Data Centers facility directory","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/793888427","label":"OpenStreetMap way/793888427","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://sabeydatacenters.com/locations/ashburn-data-center","label":"Sabey Data Centers AI/HPC — Sabey's own Ashburn page markets Building A as air/liquid/hybrid-coole","publisher":"sabeydatacenters.com","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-samx-data-centers-remington-fauquier-va","sourceRecordId":"samx-data-centers-remington-fauquier-va","name":"SAMX Data Centers","operator":"SAMX Data LLC","city":"Remington","county":"Fauquier","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.53,"longitude":-77.8,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/samx-data-centers-remington-fauquier-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fauquiernow.com/news/data-center-database-where-projects-stand-across-fauquier-county/article_18be50e8-49f6-11ef-95cf-3b45407fea55.html","label":"Fauquier County planning staff project database (maintained record of application status)","publisher":"FauquierNow (sourced from Fauquier Co. planning staff)","kind":"press","retrievedAt":"2026-07-17"}]},{"id":"compute-solis-arx-progress-park-wythe-va","sourceRecordId":"solis-arx-progress-park-wythe-va","name":"Solis Arx Progress Park Data Center Campus","operator":"Solis Arx","city":"Max Meadows","county":"Wythe","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.958,"longitude":-80.899,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/solis-arx-progress-park-wythe-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cardinalnews.org/2025/12/05/data-center-campus-announced-for-wythe-county/","label":"Data center campus announced for Wythe County","publisher":"Cardinal News","kind":"press","retrievedAt":"2026-07-26"},{"url":"https://www.wytheco.org/418/Solis-Arx","label":"Solis Arx Digital Infrastructure Project at Progress Park","publisher":"Wythe County, VA (government)","kind":"filing","retrievedAt":"2026-07-26"},{"url":"https://www.wytheco.org/CivicAlerts.aspx?AID=36","label":"Wythe County and Solis Arx Announce New Digital Infrastructure Investment in Progress Park","publisher":"Wythe County, VA (government)","kind":"filing","retrievedAt":"2026-07-26"},{"url":"https://www.wsls.com/news/local/2025/12/06/ai-computing-center-headed-to-wythe-county/","label":"AI computing center headed to Wythe County","publisher":"WSLS 10","kind":"press","retrievedAt":"2026-07-26"},{"url":"https://swvasun.com/county-explains-solis-arx-data-center-plans-as-residents-voice-concerns-p14890-10.htm","label":"County explains Solis Arx data center plans as residents voice concerns","publisher":"Southwest Virginia Sun","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-active-infrastructure-spring-valley-tech-park-loudoun-va","sourceRecordId":"active-infrastructure-spring-valley-tech-park-loudoun-va","name":"Spring Valley Technology Park","operator":"Active Infrastructure","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.008,"longitude":-77.523,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/active-infrastructure-spring-valley-tech-park-loudoun-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.loudounnow.com/news/active-infrastructure-eyes-3m-square-feet-of-data-centers-along-evergreen-mills/article_6cfbeb62-2e1f-491a-8fe0-8b23736a9c38.html","label":"Active Infrastructure Eyes 3M Square Feet of Data Centers Along Evergreen Mills","publisher":"Loudoun Now","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://loudounwildlife.org/2026/01/spring-valley-technology-park/","label":"Spring Valley Technology Park (LEGI-2024-0074)","publisher":"Loudoun Wildlife Conservancy","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","label":"Data Centers in Loudoun: A Primer","publisher":"The Piedmont Environmental Council","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-stack-nova-loudoun-va","sourceRecordId":"stack-nova-loudoun-va","name":"STACK NVA Loudoun 144MW Hyperscale Campus","operator":"STACK Infrastructure","city":"Ashburn","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.04,"longitude":-77.49,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stack-nova-loudoun-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/","label":"STACK Infrastructure Expands Loudoun County Footprint with 144MW Hyperscale Campus","publisher":"STACK Infrastructure","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-nva01a-va","sourceRecordId":"stack-nva01a-va","name":"STACK NVA01A","operator":"STACK Infrastructure","city":"Sterling","county":"Loudoun","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.0046933,"longitude":-77.4417399,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-nva01a-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.stackinfra.com/locations/americas/northern-virginia/nva01/","label":"STACK Infrastructure facility directory","publisher":"STACK Infrastructure","kind":"other","retrievedAt":"2026-08-16"},{"url":"https://www.openstreetmap.org/way/59294476","label":"OpenStreetMap way/59294476","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-stafford-technology-campus-va","sourceRecordId":"stack-stafford-technology-campus-va","name":"Stafford Technology Campus","operator":"STACK Infrastructure","city":"Falmouth","county":"Stafford","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.365,"longitude":-77.485,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/stack-stafford-technology-campus-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.staffordcountyva.gov","label":"Stafford County Zoning Reclassification case — data center","publisher":"Stafford County VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/stack-plans-1gw-campus-in-stafford-county-virginia/","label":"STACK plans 1GW campus in Stafford County","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.globenewswire.com/news-release/2025/01/16/3010737/0/en/STACK-Infrastructure-Announces-Landmark-1-GW-Stafford-Technology-Campus-in-Northern-Virginia.html","label":"STACK Infrastructure press release (GlobeNewswire), Jan 16 2025","publisher":null,"kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.fxbgadvance.com/p/stafford-supervisors-approve-stafford","label":"The FXBG Advance — \"Stafford Supervisors Approve Stafford Technology Center\"","publisher":null,"kind":"press","retrievedAt":"2026-07-26"}]},{"id":"compute-aws-summit-crossing-tech-campus-spotsylvania-va","sourceRecordId":"aws-summit-crossing-tech-campus-spotsylvania-va","name":"Summit Crossing Tech Campus","operator":"Amazon Web Services","city":"Massaponax","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.18847901989237,"longitude":-77.44053482811216,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-summit-crossing-tech-campus-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterfrontier.com/cloud/article/33006046/amazon-plans-major-data-center-expansion-in-virginias-spotsylvania-county","label":"Data Center Frontier — Amazon plans major data center expansion in Spotsylvania County (Summit Crossing: 231 ac, 2.1M sq ft)","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","label":"The Fredericksburg Advance — Digital Insights: status of data centers in Spotsylvania (all four AWS campuses under construction, buildings going up)","publisher":"The Fredericksburg Advance","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://baxtel.com/data-center/amazon-summit-crossing-tech-campus","label":"Baxtel — Amazon Summit Crossing Tech Campus (231 ac, Phase 1 max 900k sq ft, rezoning approved Oct 2023)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-tac-data-centers-wythe-county-va","sourceRecordId":"tac-data-centers-wythe-county-va","name":"TAC Data Centers Wythe County Campus","operator":"TAC Data Centers (The Ardent Companies)","city":null,"county":"Wythe","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.93,"longitude":-80.86,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tac-data-centers-wythe-county-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia","label":"TAC Data Centers Plans Gigawatt Scale Campus in Wythe County, Virginia","publisher":"US Data Center Projects","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-thornberry-data-center-campus-caroline-va","sourceRecordId":"thornberry-data-center-campus-caroline-va","name":"Thornberry Data Center Campus","operator":"Thornberry, LLC","city":"Ruther Glen","county":"Caroline","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.885,"longitude":-77.52,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/thornberry-data-center-campus-caroline-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","label":"Caroline County Special Exceptions and Rezonings case listing, Case RZ-03-2025","publisher":"Caroline County, VA Department of Planning and Community Development","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://cleanview.co/public/data-centers/virginia/2189/thornberry-data-center-campus","label":"Thornberry Data Center Campus — Caroline, Virginia","publisher":"CleanView","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-thornburg-business-park-data-center-spotsylvania-va","sourceRecordId":"thornburg-business-park-data-center-spotsylvania-va","name":"Thornburg Business Park","operator":"LID, LLC (with IWG Thornburg, LLC and JR Bluestar Thornburg, LLC)","city":"Thornburg","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.127876,"longitude":-77.52959,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/thornburg-business-park-data-center-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321","label":"Spotsylvania County — Thornburg Business Park rezoning Impact Statement (R25-0013; applicant LID LLC; 9 parcels; ~200.35 ac; ~2M sq ft data center)","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026","label":"Spotsylvania County Planning Dept Public Hearing Cases Status Report (March 2026) — R25-0013 Thornburg Business Park, LID LLC, Under Review","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://gis.spotsylvania.va.us/arcgis/rest/services/GeoHub/Tax_Parcels/MapServer/29/query?objectIds=57736,57735,57734,57536,57535,57550,61107,61108,61109&outFields=OBJECTID,MAP_Pin,GPIN&f=json","label":"Spotsylvania County parcel/GIS record (parcel GPIN 7673-00-3106 (tax map 76-A-5) — largest of 9 assembled parcels: 63-12-E (7673-31-5064), 63-12-D (7673-32-4013), 63-12-C (7673-32-2049), 63-A-33 (7673-21-8296), 63-A-32 (7673-22-5133), 63-A-37 (7673-20-3589), 76-A-5 (7673-00-3106), 76-A-5A (7672-09-2510), 76-A-6 (7672-08-7646))","publisher":"Spotsylvania County GIS / Assessor","kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-thornburg-industrial-park-data-center-spotsylvania-va","sourceRecordId":"thornburg-industrial-park-data-center-spotsylvania-va","name":"Thornburg Industrial Park Data Center Campus","operator":"South Roxbury Mill LLC / Grindstone VA LLC","city":"Thornburg","county":"Spotsylvania","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.135,"longitude":-77.5208,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/thornburg-industrial-park-data-center-spotsylvania-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525","label":"Spotsylvania County — Thornburg Industrial Park 2 Voluntary Proffer Statement (R25-0011; South Roxbury Mill LLC & Grindstone VA LLC; parcel 63-5-C1, 49.68 ac; industrial data center campus)","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/40486/BOS-Memo-Planning-Dept-Monthly-and-Project-Summary-Reports-March-2026","label":"Spotsylvania County Planning Dept Public Hearing Cases Status Report (March 2026) — R25-0011 Thornburg Industrial 2, 49 ac + proffer amendment to 124 ac, Under Review","publisher":"Spotsylvania County, VA","kind":"permit","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-tract-branders-bridge-chesterfield-va","sourceRecordId":"tract-branders-bridge-chesterfield-va","name":"Tract Branders Bridge Road Data Center Park (withdrawn)","operator":"Tract","city":null,"county":"Chesterfield County","address":"16100 Branders Bridge Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.2936256,"longitude":-77.4542454,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tract-branders-bridge-chesterfield-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://richmondbizsense.com/2025/07/02/after-thumbs-down-from-commission-developer-withdraws-plans-to-refile-700-acre-chesterfield-data-center-proposal/","label":"After thumbs down from commission, developer withdraws, plans to refile 700-acre Chesterfield data center proposal","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-10-14"},{"url":"https://www.baxtel.com/data-center/tract-colonial-heights-va","label":"Tract: Colonial Heights, VA","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-14"}]},{"id":"compute-tract-tuckahoe-technology-park-goochland-county-va","sourceRecordId":"tract-tuckahoe-technology-park-goochland-county-va","name":"Tuckahoe Technology Park","operator":"Tract","city":null,"county":"Goochland","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.68,"longitude":-77.68,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tract-tuckahoe-technology-park-goochland-county-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://virginiabusiness.com/tract-planning-872-acre-data-center-campus-in-goochland/","label":"Tract planning 872-acre data center campus in Goochland","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.wtvr.com/news/local-news/data-center-goochland-june-11-2026","label":"Tract submits application for Tuckahoe Technology Park in Goochland","publisher":"WTVR","kind":"press","retrievedAt":"2026-07-09"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.goochlandva.us/1480/Tuckahoe-Technology-Park","label":"Goochland County: Tuckahoe Technology Park official project page","publisher":null,"kind":"other","retrievedAt":"2026-07-24"}]},{"id":"compute-warrenton-group-halifax-road-petersburg-va","sourceRecordId":"warrenton-group-halifax-road-petersburg-va","name":"TWG Data Halifax Road Campus (former Collier Yard)","operator":"Warrenton Group (TWG Data)","city":"Petersburg","county":null,"address":"2233 Halifax Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.177,"longitude":-77.418,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/warrenton-group-halifax-road-petersburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/","label":"Documents reveal details on several data center projects in Petersburg's pipeline (archived)","publisher":"Richmond BizSense","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-vantage-ashburn-ii-va2-va","sourceRecordId":"vantage-ashburn-ii-va2-va","name":"Vantage Ashburn II (VA2)","operator":"Vantage Data Centers","city":"Sterling","county":"Loudoun","address":"22435 Glenn Drive","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.997949,"longitude":-77.4302306,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-ashburn-ii-va2-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/","label":"Vantage facility directory","publisher":"Vantage","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/1344901575","label":"OpenStreetMap way/1344901575","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-vantage-stafford-va4-va","sourceRecordId":"vantage-stafford-va4-va","name":"Vantage Data Centers VA4 Stafford Campus","operator":"Vantage Data Centers","city":null,"county":"Stafford","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.44,"longitude":-77.44,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-stafford-va4-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/","label":"Vantage Data Centers Invests $2B in Fredericksburg Virginia Region","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://virginiabusiness.com/vantage-data-centers-2b-stafford-campus/","label":"Vantage Data Centers to invest $2B on Stafford campus","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-07-06"}]},{"id":"compute-vint-hill-corners-fauquier-va","sourceRecordId":"vint-hill-corners-fauquier-va","name":"Vint Hill Corners","operator":"Vint Hill Corners LLC","city":"Vint Hill","county":"Fauquier","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.746,"longitude":-77.664,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vint-hill-corners-fauquier-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.fauquiernow.com/news/data-center-database-where-projects-stand-across-fauquier-county/article_18be50e8-49f6-11ef-95cf-3b45407fea55.html","label":"Fauquier County planning staff project database (maintained record of application status)","publisher":"FauquierNow (sourced from Fauquier Co. planning staff)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.rappnews.com/news/landuse/data-center-database-where-projects-stand-across-fauquier-county/article_3b3bea48-3789-5388-ac49-4390c56e9e92.html","label":"Data center database: Where projects stand across Fauquier County (lists Vint Hill Corners as a distinct project from CyrusOne)","publisher":"Rappahannock News","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.fauquier.com/news/fauquier-supervisors-exempt-3rd-data-center-from-new-vint-hill-zoning-rules/article_d2c516d4-0fd1-11ef-af98-138f4b7b5664.html","label":"Fauquier supervisors exempt 3rd data center from new Vint Hill zoning rules","publisher":"Fauquier Times (Piedmont Journalism Foundation)","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","label":"Effort to curb data centers in Vint Hill faces pushback","publisher":"Prince William Times / Fauquier Times","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://baxtel.com/data-center/vint-hill-corners","label":"Vint Hill Corners data center proposal, 4295 Aiken Dr","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-virginia-technology-park-clear-brook-frederick-va","sourceRecordId":"virginia-technology-park-clear-brook-frederick-va","name":"Virginia Technology Park","operator":"Equus Capital Partners","city":"Clear Brook","county":"Frederick","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.2564912,"longitude":-78.096111,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/virginia-technology-park-clear-brook-frederick-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nvdaily.com/nvdaily/frederick-county-planners-vote-down-clear-brook-data-center-campus/article_8e6c14d9-ce6f-51fd-9c04-e46953e6b6e5.html","label":"Frederick County planners vote down Clear Brook data center campus","publisher":"Northern Virginia Daily","kind":"press","retrievedAt":"2026-08-26"},{"url":"https://www.winchesterstar.com/winchester_star/new-technology-park-proposal-begins-review-process-in-frederick-county/article_b90887cd-5145-5494-8eb0-ade0edc35288.html","label":"New technology park proposal begins review process in Frederick County","publisher":"Winchester Star","kind":"press","retrievedAt":"2026-08-26"}]},{"id":"compute-wagner-properties-wagner-road-petersburg-va","sourceRecordId":"wagner-properties-wagner-road-petersburg-va","name":"Wagner Road Data Center Campus","operator":"Wagner Properties","city":"Petersburg","county":"Petersburg","address":"1161 Wagner Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":37.2279,"longitude":-77.4019,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wagner-properties-wagner-road-petersburg-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/","label":"Documents reveal details on several data center projects in Petersburg's pipeline","publisher":"Richmond BizSense (via Internet Archive)","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-sharpless-wellington-road-bristow-va","sourceRecordId":"sharpless-wellington-road-bristow-va","name":"Wellington Road Data Center Campus (Sharpless)","operator":"Sharpless Enterprises LLC","city":"Bristow","county":"Prince William","address":"6201 Wellington Road","state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.746,"longitude":-77.523,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sharpless-wellington-road-bristow-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-09","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html","label":"Army Corps of Engineers greenlights Bristow data center complex","publisher":"InsideNoVa","kind":"permit","retrievedAt":"2026-09-09"}]},{"id":"compute-winchester-gateway-data-center-frederick-va","sourceRecordId":"winchester-gateway-data-center-frederick-va","name":"Winchester Gateway","operator":"Winchester Gateway LLC","city":"Winchester","county":"Frederick","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":39.1442224,"longitude":-78.1980384,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/winchester-gateway-data-center-frederick-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nvdaily.com/nvdaily/panel-recommends-denial-of-winchester-gateway-data-center-proposal/article_228ead16-7a9b-5e08-bf16-54cd65670acc.html","label":"Panel recommends denial of Winchester Gateway data center proposal","publisher":"Northern Virginia Daily","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://www.datacenter.fyi/public-record/winchester-gateway-llc-cef8563d","label":"Winchester Gateway LLC — public record","publisher":"datacenter.fyi","kind":"other","retrievedAt":"2026-08-26"}]},{"id":"compute-wise-innovation-hub-wise-va","sourceRecordId":"wise-innovation-hub-wise-va","name":"Wise Innovation Hub (OASIS)","operator":"Wise Innovation Hub Venture LLC","city":null,"county":"Wise","address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":36.99,"longitude":-82.53,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wise-innovation-hub-wise-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cardinalnews.org/2026/02/25/data-center-complex-with-gas-power-plant-planned-for-wise-county/","label":"Data center complex with gas power plant planned for Wise County","publisher":"Cardinal News","kind":"press","retrievedAt":"2026-08-16"},{"url":"https://virginiabusiness.com/wise-data-center-developers-explore-hydrogen-power/","label":"Data center developers seek on-site energy in Wise","publisher":"Virginia Business","kind":"press","retrievedAt":"2026-07-13"},{"url":"https://elevatewisecounty.com/top-industries/data-centers/","label":"Data Centers — Wise County Economic Development","publisher":"Wise County Economic Development","kind":"other","retrievedAt":"2026-07-13"},{"url":"https://www.prnewswire.com/news-releases/red-post-energy-and-wise-innovation-hub-venture-oasis-execute-letter-of-intent-to-advance-power-infrastructure-for-major-data-center-development-in-southwest-virginia-302645511.html","label":"Red Post Energy and Wise Innovation Hub Venture (OASIS) Execute Letter of Intent to Advance Power Infrastructure for Major Data Center Development in Southwest Virginia","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-09-09"},{"url":"https://appvoices.org/2026/03/13/wise-county-maverick-project/","label":"Wise County considers new gas infrastructure for data center project","publisher":"Appalachian Voices","kind":"press","retrievedAt":"2026-09-09"}]},{"id":"compute-yondr-cerberus-manassas-va","sourceRecordId":"yondr-cerberus-manassas-va","name":"Yondr Manassas Data Center Campus","operator":"Yondr Group / Cerberus Capital Management","city":"Manassas","county":null,"address":null,"state":"VA","stateName":"Virginia","jurisdictionType":"state","latitude":38.7509,"longitude":-77.4753,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/yondr-cerberus-manassas-va","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-27","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/","label":"Cerberus and Yondr Acquire 40 Acres in Northern Virginia to Build 72MW Data Center","publisher":"Cerberus Capital Management","kind":"press","retrievedAt":"2026-08-27"}]},{"id":"compute-epicio-st-croix-vi","sourceRecordId":"epicio-st-croix-vi","name":"Epic.io St. Croix Data Center","operator":"Epic.io","city":"St. Croix","county":null,"address":"Estate Northside","state":"VI","stateName":"U.S. Virgin Islands","jurisdictionType":"territory","latitude":17.7581924,"longitude":-64.8874524,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/epicio-st-croix-vi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.epic.io/st-croix/","label":"Epic.io | St. Croix Data Center","publisher":"Epic.io","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.datacenterknowledge.com/archives/2014/08/28/centrilogic-acquires-us-virgin-islands-data-center","label":"CentriLogic Acquires US Virgin Islands Data Center Provider Adveniat","publisher":null,"kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-consolidated-fidium-burlington-266-main-st-vt","sourceRecordId":"consolidated-fidium-burlington-266-main-st-vt","name":"Consolidated Communications (Fidium) – 266 Main St. (BURLVTMA)","operator":"Consolidated Communications, Inc. (Fidium)","city":"Burlington","county":"Chittenden","address":"266 Main St.","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.476496,"longitude":-73.208582,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/consolidated-fidium-burlington-266-main-st-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/4105","label":"PeeringDB facility record 4105: Consolidated - 266 Main St. (CLLI BURLVTMA)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://www.peeringdb.com/api/fac/14600","label":"PeeringDB facility record 14600 (Lightboard Vermont) notes listing 'Fidium (f.k.a. Consolidated Communications), 266 Main St., Burlington, VT' as an extended facility","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-firstlight-burlington-cherry-st-vt","sourceRecordId":"firstlight-burlington-cherry-st-vt","name":"FirstLight Burlington Data Center (110 Cherry St, former Sovernet)","operator":"FirstLight Fiber","city":"Burlington","county":"Chittenden","address":"110 Cherry St.","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.479557,"longitude":-73.213218,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-burlington-cherry-st-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac?state=VT","label":"PeeringDB facility records for Vermont (SoVerNet Burlington, 110 Cherry St.)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://inflect.com/datacenters/usa/vermont/burlington","label":"Inflect: Burlington, VT data centers (Firstlight Fiber Burlington, 110 Cherry Street)","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.telecompetitor.com/firstlight-sovernet-deal-completed-augmenting-northeast-fiber-network/","label":"FirstLight-Sovernet deal completed (Mar 14, 2017)","publisher":"Telecompetitor","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://www.peeringdb.com/api/fac/2225","label":"PeeringDB facility record 2225: SoVerNet Burlington","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-firstlight-williston-vt","sourceRecordId":"firstlight-williston-vt","name":"FirstLight Data Center (Williston, VT)","operator":"FirstLight Fiber","city":"Williston","county":"Chittenden","address":"45 Krupp Drive","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.4502206,"longitude":-73.1275724,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/firstlight-williston-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/firstlight-burlington","label":"FirstLight Burlington Data Center (address resolves to Williston, VT -- see notes)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://web.vtchamber.com/FirstLight-3456","label":"Vermont Chamber of Commerce member directory: FirstLight","publisher":"Vermont Chamber of Commerce","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://vtdigger.org/2014/03/24/williston-fiber-optic-data-center-doubles-capacity/","label":"Williston fiber optic data center doubles capacity (Mar 24, 2014)","publisher":"VTDigger","kind":"press","retrievedAt":"2026-10-11"}]},{"id":"compute-lightboard-vermont-south-burlington-vt","sourceRecordId":"lightboard-vermont-south-burlington-vt","name":"Lightboard ★ Vermont (530 Community Drive carrier hotel)","operator":"Lightboard","city":"South Burlington","county":"Chittenden","address":"530 Community Drive","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.448637,"longitude":-73.146839,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lightboard-vermont-south-burlington-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://as.peeringdb.com/fac/14600","label":"PeeringDB: Lightboard ★ Vermont","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.peeringdb.com/api/fac?state=VT","label":"PeeringDB facility records for Vermont","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-29"},{"url":"https://www.kadoa.com/datacenter/state/vermont","label":"Kadoa US Datacenter Tracker: Vermont","publisher":"Kadoa","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.peeringdb.com/api/fac/14600","label":"PeeringDB facility record 14600: Lightboard ★ Vermont (530 Community Drive Carrier Hotel)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-power-shift-stowe-vt","sourceRecordId":"power-shift-stowe-vt","name":"Power Shift Stowe Server Co-location (571 South Main Street)","operator":"Power Shift","city":"Stowe","county":"Lamoille County","address":"571 South Main Street","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.459088647285,"longitude":-72.693229676105,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/power-shift-stowe-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.pshift.com/business","label":"Power Shift – Business Services (shared and co-located server hosting; 571 South Main Street, Stowe, VT 05672)","publisher":"Power Shift","kind":"other","retrievedAt":"2026-10-29"},{"url":"https://pshift.com/who-we-are","label":"About Power Shift (company history; Stowe-area internet services since 1995)","publisher":"Power Shift","kind":"other","retrievedAt":"2026-10-29"},{"url":"https://morethanjustparks.com/data-center-tracker/power-shift-stowevt-data-center-vt--c84d8caf-7a0f-4c4c-a458-1c6cc47de14c","label":"Power Shift StoweVT Data Center – Data Center Tracker listing (Operating, Lamoille County)","publisher":"More Than Just Parks","kind":"other","retrievedAt":"2026-10-29"}]},{"id":"compute-powertransitions-vermont-yankee-vernon-vt","sourceRecordId":"powertransitions-vermont-yankee-vernon-vt","name":"PowerTransitions Vermont Yankee Site Redevelopment (data center option)","operator":"PowerTransitions","city":"Vernon","county":"Windham","address":null,"state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":42.77889,"longitude":-72.51306,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/powertransitions-vermont-yankee-vernon-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.ctpublic.org/2026-06-15/energy-development-company-lease-vermont-yankee-property","label":"Energy development company inks lease deal for Vermont Yankee property (Jun 15, 2026)","publisher":"Connecticut Public","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://vtdigger.org/2026/06/17/vernon-community-and-the-state-grapple-with-potential-redevelopment-of-vermont-yankee-site/","label":"Vernon community and the state grapple with potential redevelopment of Vermont Yankee site (Jun 17, 2026)","publisher":"VTDigger","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://vtdigger.org/2026/08/06/vernon-wants-input-on-the-future-of-the-vermont-yankee-site/","label":"Vernon wants input on the future of the Vermont Yankee site (Aug 6, 2026)","publisher":"VTDigger","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://www.wcax.com/2026/06/18/talks-underway-decide-fate-vermont-yankee-plant-property/","label":"Talks underway on future of Vermont Yankee property (Jun 18, 2026)","publisher":"WCAX","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://en.wikipedia.org/wiki/Vermont_Yankee_Nuclear_Power_Plant","label":"Vermont Yankee Nuclear Power Plant (site coordinates)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.vermontpublic.org/local-news/2026-09-25/energy-development-company-makes-pitch-vermont-yankee-property-vernon","label":"Energy development company makes pitch for Vermont Yankee property in Vernon","publisher":"Vermont Public","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://vtdigger.org/2026/09/30/texas-company-presents-ideas-for-future-vermont-yankee-property-use/","label":"Texas company presents ideas for future Vermont Yankee property use","publisher":"VTDigger (from The Commons)","kind":"press","retrievedAt":"2026-10-29"},{"url":"https://www.vermontpublic.org/local-news/2026-06-15/energy-development-company-lease-vermont-yankee-property","label":"Energy development company inks lease deal for Vermont Yankee property","publisher":"Vermont Public","kind":"press","retrievedAt":"2026-10-29"}]},{"id":"compute-st-albans-data-center-vt","sourceRecordId":"st-albans-data-center-vt","name":"Proposed St. Albans, VT Data Center (Unbuilt)","operator":"Unnamed developer","city":"St. Albans","county":"Franklin","address":null,"state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.8107911,"longitude":-73.0833607,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/st-albans-data-center-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vtdigger.org/2026/02/24/vermont-plugs-into-the-data-center-conversation/","label":"Vermont plugs into the data center conversation","publisher":"VTDigger","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.compassvermont.com/p/vermonts-data-center-bill-is-dead","label":"Vermont's Data Center Bill Is Dead. Developers Weren't Lining Up to Build One Here Anyway","publisher":"Compass Vermont","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-tech-vault-south-burlington-vt","sourceRecordId":"tech-vault-south-burlington-vt","name":"Tech Vault Data Center","operator":"Tech Vault, Inc.","city":"South Burlington","county":"Chittenden","address":"21 Gregory Drive, Suite 165","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.4541938,"longitude":-73.1417505,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/tech-vault-south-burlington-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.techvault.net/vermont-data-center-facility/","label":"Vermont Data Center Facility - Tech Vault","publisher":"Tech Vault, Inc.","kind":"other","retrievedAt":"2026-10-29"},{"url":"https://web.vermont.org/Communications/Tech-Vault,-Inc-4522","label":"Tech Vault, Inc. - Lake Champlain Chamber","publisher":"Lake Champlain Chamber","kind":"other","retrievedAt":"2026-09-12"},{"url":"https://vermontbiz.com/news/2013/april/12/state-awards-tech-vault-long-term-data-center-agreement","label":"State awards Tech Vault long-term data center agreement","publisher":"Vermont Business Magazine","kind":"press","retrievedAt":"2026-09-12"},{"url":"https://www.datacenterknowledge.com/business/tech-vault-small-company-in-spotlight-at-gartner","label":"Tech Vault: Small Company in Spotlight at Gartner (Dec 5, 2011)","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://www.peeringdb.com/api/fac?state=VT","label":"PeeringDB facility records for Vermont (Tech Vault South Burlington)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://inflect.com/building/21-gregory-drive-south-burlington/tech-vault-inc/datacenter/tech-vault-south-burlington","label":"Inflect: Tech Vault South Burlington, 21 Gregory Drive","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.hpac.com/archive/data-center-energy-management-system-reduces-costs-associated-hvac","label":"Data-Center Energy-Management System Reduces Costs Associated With HVAC (Tech Vault, South Burlington)","publisher":"HPAC Engineering","kind":"press","retrievedAt":"2026-10-29"}]},{"id":"compute-velco-rutland-pinnacle-ridge-vt","sourceRecordId":"velco-rutland-pinnacle-ridge-vt","name":"VELCO Rutland (366 Pinnacle Ridge Rd)","operator":"Vermont Electric Power Company, Inc. (VELCO)","city":"Rutland","county":"Rutland","address":"366 Pinnacle Ridge Rd","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":43.660147,"longitude":-72.992651,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/velco-rutland-pinnacle-ridge-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.peeringdb.com/api/fac/13614","label":"PeeringDB facility record 13614: VELCO Rutland","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://dchub.cloud/facility/16465","label":"DC Hub facility listing: VELCO Rutland","publisher":"DC Hub","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-uvm-vacc-south-burlington-vt","sourceRecordId":"uvm-vacc-south-burlington-vt","name":"Vermont Advanced Computing Center (VACC), University of Vermont","operator":"University of Vermont","city":"South Burlington","county":"Chittenden","address":"530 Community Drive","state":"VT","stateName":"Vermont","jurisdictionType":"state","latitude":44.448637,"longitude":-73.146839,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/uvm-vacc-south-burlington-vt","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.uvm.edu/cems/news/icecore-advances-new-era-discovery-uvm","label":"IceCore advances a new era of discovery at UVM (Dec 10, 2025)","publisher":"University of Vermont CEMS","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.uvm.edu/vacc/cluster-specs","label":"VACC cluster specifications","publisher":"University of Vermont","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.uvm.edu/vacc/artificial-intelligence-workloads","label":"VACC: Artificial intelligence workloads (cooling and power)","publisher":"University of Vermont","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://www.uvm.edu/vacc/mission-and-history","label":"VACC mission and history","publisher":"University of Vermont","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://as.peeringdb.com/fac/14600","label":"PeeringDB: Lightboard Vermont, 530 Community Drive (lists VACC as a connected facility)","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://www.peeringdb.com/api/fac/14600","label":"PeeringDB facility record 14600 (Lightboard Vermont) listing 'Vermont Advanced Computing Center (UVM VACC), 530 Community Dr., S. Burlington, VT'","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://www.peeringdb.com/api/fac?state=VT","label":"PeeringDB – Lightboard ★ Vermont record listing 'Vermont Advanced Computing Center (UVM VACC), 530 Community Dr., S. Burlington, VT.'","publisher":"PeeringDB","kind":"other","retrievedAt":"2026-10-29"}]},{"id":"compute-actapio-east-wenatchee-wa","sourceRecordId":"actapio-east-wenatchee-wa","name":"Actapio East Wenatchee Data Center","operator":"Actapio, Inc.","city":"East Wenatchee","county":"Douglas","address":"207 North United Sakura Drive","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4072423,"longitude":-120.213935,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/actapio-east-wenatchee-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","label":"Data centers - air quality permits index (East Wenatchee: Actapio, Approval Order No. 18AQ-C226)","publisher":"Washington State Department of Ecology","kind":"permit","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/813688320","label":"OSM way 813688320 - 'Actapio', telecom=data_center, operator=Actapio, website actap.io","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/813688319","label":"OSM way 813688319 - data-center building at 207 North United Sakura Drive, East Wenatchee 98802","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"}]},{"id":"compute-atlas-agro-richland-data-center-campus-wa","sourceRecordId":"atlas-agro-richland-data-center-campus-wa","name":"Atlas Agro Richland Data Center Campus","operator":"Atlas Agro North America","city":"Richland","county":"Benton","address":"2100 Horn Rapids Road","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":46.36,"longitude":-119.325,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/atlas-agro-richland-data-center-campus-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center","label":"Richland OKs option agreement for Atlas Agro data center","publisher":"Tri-Cities Area Journal of Business","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.columbiariverkeeper.org/wp-content/uploads/2026/02/2026.02.26-Data-Center-Closer-Look-Report.pdf","label":"A Closer Look: Columbia River Data Centers (February 2026) — Benton County, Washington","publisher":"Columbia Riverkeeper","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://www.yahoo.com/news/articles/know-4-major-data-center-120000272.html","label":"What to know about 4 major data center proposals for Tri-Cities area","publisher":"Tri-City Herald (via Yahoo News)","kind":"press","retrievedAt":"2026-09-05"}]},{"id":"compute-aws-wallula-gap-walla-walla-wa","sourceRecordId":"aws-wallula-gap-walla-walla-wa","name":"AWS Wallula Gap Campus","operator":"Amazon Web Services","city":"Wallula","county":"Walla Walla","address":"Sundance Road, Wallula Gap Business Park","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":46.0726,"longitude":-118.9135,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aws-wallula-gap-walla-walla-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/aws-likely-behind-48bn-data-center-in-walla-walla-washington/","label":"AWS likely behind $4.8bn data center in Walla Walla, Washington","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.tricitiesbusinessnews.com/articles/amazon-wallula-gap","label":"Port of Walla Walla names Amazon Data Services as Wallula Gap buyer","publisher":"Tri-Cities Area Journal of Business","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.tricitiesbusinessnews.com/articles/wallula-data-center","label":"Tri-Cities Area Journal of Business — 'Transformative' $5 billion data center campus planned for Wallula","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.nbcrightnow.com/news/amazon-to-hold-burbank-open-house-on-walla-walla-county-data-center-plan/article_7704eb3b-1182-4823-808e-52f20c90d0cf.html","label":"Amazon to hold Burbank open house on Walla Walla County data center plan","publisher":"NBC Right Now","kind":"press","retrievedAt":"2026-08-22"},{"url":"https://elkhornmediagroup.com/amazons-proposed-data-center-application-deemed-complete-by-walla-walla-county/","label":"Amazon's proposed data center application deemed complete by Walla Walla County","publisher":"Elkhorn Media Group","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://www.wwcowa.gov/government/community_development/amazon_data_center.php","label":"Walla Walla County Community Development — Amazon data center project page","publisher":"Walla Walla County, Washington","kind":"permit","retrievedAt":"2026-09-14"},{"url":"https://www.union-bulletin.com/news/local/governments/what-we-know-so-far-about-amazons-proposed-data-center-in-walla-walla-county/article_ed98d2b1-5111-4dca-8ce2-62c9340755f1.html","label":"What we know so far about Amazon's proposed data center in Walla Walla County","publisher":"Walla Walla Union-Bulletin","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-bitdeer-wenatchee-pangborn-wa","sourceRecordId":"bitdeer-wenatchee-pangborn-wa","name":"Bitdeer Wenatchee (Pangborn) Data Center","operator":"Bitdeer","city":"East Wenatchee","county":"Douglas","address":"624 Urban Industrial Way","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.413902,"longitude":-120.209264,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/bitdeer-wenatchee-pangborn-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.sec.gov/Archives/edgar/data/1899123/000121390026049770/ea0282628-20f_bitdeer.htm","label":"Bitdeer Technologies Group FY2025 Form 20-F (filed 2026-04-30) — Item 4.D Property: Pangborn, Washington datacenter, 13 MW, operational May 2018, being converted to AI cloud (GB300 cluster; permits submitted; crypto dismantling began March 2026; target Q4 2026)","publisher":"U.S. Securities and Exchange Commission (EDGAR)","kind":"filing","retrievedAt":"2026-07-17"},{"url":"https://www.datacentermap.com/usa/washington/wenatchee/bitdeer-wenatchee-washington/","label":"Data Center Map — Bitdeer Wenatchee, Washington (13 MW)","publisher":"Data Center Map","kind":"other","retrievedAt":"2026-07-17"},{"url":"https://www.datacenterdynamics.com/en/news/bitdeer-taps-contractor-to-begin-conversion-of-norwegian-crypto-mine-to-hpc/","label":"DCD — Bitdeer crypto-to-AI conversion program (Washington among the sites being converted, GB300, Q4 2026)","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.sec.gov/Archives/edgar/data/1899123/000121390026086938/ea030131301ex99-1.htm","label":"Bitdeer Q2 2026 results press release (Form 6-K Ex. 99.1)","publisher":"Bitdeer Technologies Group / SEC EDGAR","kind":"filing","retrievedAt":"2026-10-30"},{"url":"https://www.wenatcheeworld.com/news/local/cryptocurrency-company-applying-for-ai-facility-near-pangborn/article_d1dd7b72-fe90-42fe-9eaa-8a035b82635e.html","label":"Cryptocurrency company applying for AI facility near Pangborn","publisher":"Wenatchee World","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-blue-fern-cle-elum-data-center-wa","sourceRecordId":"blue-fern-cle-elum-data-center-wa","name":"Blue Fern Cle Elum Data Center","operator":"Blue Fern Development","city":"Cle Elum","county":"Kittitas","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.18,"longitude":-120.97,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/blue-fern-cle-elum-data-center-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spokesman.com/stories/2026/aug/05/cle-elum-passed-a-data-center-ban-one-might-be-bui/","label":"Cle Elum passed a data center ban. One might be built there anyway","publisher":"The Spokesman-Review","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://hoodline.com/2026/08/cle-elum-outlaws-data-centers-but-this-200m-project-could-slip-through/","label":"Hoodline: Cle Elum outlaws data centers, but this $200M project could slip through (Aug 2026)","publisher":"Hoodline","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://komonews.com/news/local/cle-elum-adopts-emergency-moratorium-as-200m-ai-data-center-plan-stirs-concerns-computing-facilities-electricity-demand-water-supplies-community-increasing-rates","label":"Cle Elum adopts emergency moratorium as $200M AI data center plan stirs concerns","publisher":"KOMO News","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-centeris-south-hill-puyallup-wa","sourceRecordId":"centeris-south-hill-puyallup-wa","name":"Centeris South Hill Campus (SH1/SH2)","operator":"Centeris (The Benaroya Company)","city":"Puyallup","county":"Pierce","address":"1023 39th Avenue SE","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.136,"longitude":-122.272,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centeris-south-hill-puyallup-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenterfrontier.com/centeris-signs-7-megawatt-lease-in-seattle-data-center/","label":"Centeris Signs 7 Megawatt Lease in Seattle Data Center","publisher":"Data Center Frontier","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://cloudandcolocation.com/colocation-provider/centeris/","label":"Centeris Data Center Locations (SH1 and SH2, Puyallup, WA)","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://mrsc.org/stay-informed/mrsc-insight/august-2026/data-centers","label":"What the Data Center Boom Means for Washington Local Governments","publisher":"Municipal Research and Services Center (MRSC)","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-centersquare-lynnwood-se1-wa","sourceRecordId":"centersquare-lynnwood-se1-wa","name":"Centersquare Lynnwood SE1","operator":"Centersquare","city":"Lynnwood","county":"Snohomish","address":"17300 Highway 99","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.841809,"longitude":-122.3016653,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/centersquare-lynnwood-se1-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/way/396296733","label":"OSM way 396296733 - 'Centersquare Lynnwood SE1', telecom=data_center, operator=Centersquare, ref=SE1, CLLI LYWDWAJG, 17300 Highway 99 Lynnwood 98037","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"}]},{"id":"compute-cogent-seattle-federal-way-wa","sourceRecordId":"cogent-seattle-federal-way-wa","name":"Cogent Seattle Data Center (Federal Way)","operator":"Cogent Communications","city":"Federal Way","county":"King","address":"32275 32nd Avenue South","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.3117738,"longitude":-122.2948339,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-seattle-federal-way-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/building/32275-32nd-avenue-south-federal-way/cogent/datacenter/cogent-seattle","label":"Inflect: Cogent Federal Way, 32275 32nd Avenue South","publisher":"Inflect","kind":"other","retrievedAt":"2026-10-12"},{"url":"https://dcmap.us/states/washington/","label":"dcmap.us Washington data center map (Cogent Data Center - Seattle, Federal Way, operational, 5.3 MW)","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=32275+32nd+Avenue+South,+Federal+Way,+WA&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for 32275 32nd Ave S, Federal Way","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-csquare-sea2-tukwila-wa","sourceRecordId":"csquare-sea2-tukwila-wa","name":"Csquare (Centersquare) Seattle SEA2 – Tukwila","operator":"Centersquare (Csquare)","city":"Tukwila","county":"King","address":"6101 South 180th Street","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4409177,"longitude":-122.2564593,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/csquare-sea2-tukwila-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/centersquare-seattle-sea2","label":"Centersquare: Seattle SEA2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://nominatim.openstreetmap.org/search?q=6101+South+180th+Street,+Tukwila,+WA&format=json&limit=3","label":"OpenStreetMap Nominatim geocode: 6101 S 180th St, Tukwila","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-30"}]},{"id":"compute-cyrusone-pnw1-quincy-wa","sourceRecordId":"cyrusone-pnw1-quincy-wa","name":"CyrusOne PNW1","operator":"CyrusOne","city":"Quincy","county":"Grant","address":"1025 D Street NW","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.2334,"longitude":-119.8528,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyrusone-pnw1-quincy-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyrusone.com/data-centers/north-america/quincy-washington","label":"Quincy, WA: PNW1","publisher":"CyrusOne","kind":"press","retrievedAt":"2026-08-22"}]},{"id":"compute-dallesport-server-farm-webster-orchards-wa","sourceRecordId":"dallesport-server-farm-webster-orchards-wa","name":"Dallesport Server Farm (Webster Orchards / Williams Ranch site)","operator":"Webster Orchards (landowner; developer not selected)","city":"Dallesport","county":"Klickitat","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":45.6173426,"longitude":-121.179515,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dallesport-server-farm-webster-orchards-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.goldendalesentinel.com/news/data-center-proposed-for-a-dallesport-site/article_64ef39a5-3f41-4d4d-be45-289ea6d4b17f.html","label":"Goldendale Sentinel: Data center proposed for a Dallesport site (May 27, 2026)","publisher":"The Goldendale Sentinel","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.columbiagorgenews.com/news/another-data-center/article_e81e8737-9db6-49c5-bd3e-594e8976cdd4.html","label":"Columbia Gorge News: Dallesport Server Farm on Scott Webster orchard zoned industrial park (Aug 26, 2026)","publisher":"Columbia Gorge News","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=Dallesport,+Washington&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for Dallesport, WA (approximate point)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-12"},{"url":"https://www.columbiagorgenews.com/free_news/rural-klickitat-county-faces-surge-in-data-center-proposals/article_91218fee-16bc-4e95-8cde-85b7a8d712ed.html","label":"Rural Klickitat County faces surge in data center proposals","publisher":"Columbia Gorge News / Washington State Standard","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-data-center-3625-first-ave-s-sodo-seattle-wa","sourceRecordId":"data-center-3625-first-ave-s-sodo-seattle-wa","name":"Data Center at 3625 First Avenue South (SoDo)","operator":"Undisclosed developer","city":"Seattle","county":"King","address":"3625 1st Avenue South","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.5698552,"longitude":-122.3361429,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/data-center-3625-first-ave-s-sodo-seattle-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.kuow.org/stories/seattle-banned-new-data-centers-why-companies-want-them-here-anyway","label":"Seattle banned new data centers. Why companies want them here anyway","publisher":"KUOW","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://nominatim.openstreetmap.org/search?q=3625+1st+Avenue+South,+Seattle,+WA&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: 3625 1st Ave S, Seattle","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-30"}]},{"id":"compute-digital-fortress-lynnwood-wa","sourceRecordId":"digital-fortress-lynnwood-wa","name":"Digital Fortress Lynnwood (SEA1)","operator":"Digital Fortress","city":"Lynnwood","county":"Snohomish","address":"4200 194th Street SW","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.8224039,"longitude":-122.2896138,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-fortress-lynnwood-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/way/589360530","label":"OSM way 589360530 - 'Digital Fortress Lynnwood', telecom=data_center, website digital-fortress.com/lynnwood-data-center/","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://baxtel.com/data-center/digital-fortress-lynnwood","label":"Digital Fortress Lynnwood - 4200 194th Street SW, Lynnwood WA; 15,941 sq ft data floor; opened 2006","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-digital-realty-301-virginia-st-seattle-wa","sourceRecordId":"digital-realty-301-virginia-st-seattle-wa","name":"Digital Realty 301 Virginia Street Data Center (proposed)","operator":"Digital Realty","city":"Seattle","county":"King","address":"301 Virginia Street","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.6123517,"longitude":-122.3404263,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-301-virginia-st-seattle-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/news/digital-realty-plans-new-data-center-in-seattle-washington","label":"Digital Realty Plans New Data Center in Seattle, Washington","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.kuow.org/stories/seattle-banned-new-data-centers-why-companies-want-them-here-anyway","label":"Seattle banned new data centers. Why companies want them here anyway","publisher":"KUOW","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://nominatim.openstreetmap.org/search?q=301+Virginia+Street,+Seattle,+WA&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: 301 Virginia Street, Seattle","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-30"}]},{"id":"compute-digital-realty-sea1-intergate-seattle-east-bldg-4-wa","sourceRecordId":"digital-realty-sea1-intergate-seattle-east-bldg-4-wa","name":"Digital Realty SEA1 (Intergate Seattle-East, Bldg 4)","operator":"Digital Realty","city":"Tukwila","county":"King","address":"3433 South 120th Place","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4934032,"longitude":-122.2888803,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/digital-realty-sea1-intergate-seattle-east-bldg-4-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.digitalrealty.com/data-centers/americas/seattle","label":"Digital Realty Seattle metro directory page + datacenterHawk facility profile","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/293211687","label":"OpenStreetMap way/293211687","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-energizer-data-center-hoctor-road-klickitat-wa","sourceRecordId":"energizer-data-center-hoctor-road-klickitat-wa","name":"Energizer Data Center (BPA L0493 / L0497)","operator":"Savion (Shell Energy subsidiary), per BPA application documents","city":null,"county":"Klickitat","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":45.7770659,"longitude":-120.8128216,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/energizer-data-center-hoctor-road-klickitat-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html","label":"Goldendale Sentinel: More data centers possible for county (Sep 2, 2026)","publisher":"The Goldendale Sentinel","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","label":"Spokesman-Review: Shell Energy/Savion named on Energizer applications (Oct 7, 2026)","publisher":"The Spokesman-Review / Washington State Standard","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=Hoctor+Road,+Klickitat+County,+Washington&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for Hoctor Road, Klickitat County (approximate)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-energizer-ii-data-center-goodnoe-hills-klickitat-wa","sourceRecordId":"energizer-ii-data-center-goodnoe-hills-klickitat-wa","name":"Energizer II Data Center (BPA L0702)","operator":"Savion (Shell Energy subsidiary), per BPA application documents","city":null,"county":"Klickitat","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":45.7754842,"longitude":-120.8009807,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/energizer-ii-data-center-goodnoe-hills-klickitat-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html","label":"Goldendale Sentinel: More data centers possible for county (Sep 2, 2026)","publisher":"The Goldendale Sentinel","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","label":"Spokesman-Review: Energizer II described as AI data center in application documents (Oct 7, 2026)","publisher":"The Spokesman-Review / Washington State Standard","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=Goodnoe+Hills+Road,+Klickitat+County,+Washington&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for Goldendale Goodnoe Hills Road (approximate)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-equinix-se3-seattle-wa","sourceRecordId":"equinix-se3-seattle-wa","name":"Equinix Seattle SE3","operator":"Equinix","city":"Seattle","county":"King","address":"2020 5th Avenue","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.6144229,"longitude":-122.3397427,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-se3-seattle-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/way/359930465","label":"OSM way 359930465 - 'Equinix SE3 Data Center', building=data_center, operator=Equinix, ref=SE3, 2020 5th Avenue Seattle 98121","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://baxtel.com/data-center/equinix-seattle-se3","label":"Equinix Seattle SE3 - 2020 Fifth Ave, Seattle, WA; opened 2013; adjacent to SE2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-17"}]},{"id":"compute-equinix-se4-kent-wa","sourceRecordId":"equinix-se4-kent-wa","name":"Equinix Seattle SE4","operator":"Equinix","city":"Kent","county":"King","address":"6906 South 204th Street","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4215254,"longitude":-122.2473931,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/equinix-se4-kent-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://leg.wa.gov/jlarc/taxReports/2026/data/1/report.html","label":"2026 tax preference review: Data Centers in Urban Counties - names Equinix's SE4 facility in Kent (King County) as an exemption beneficiary","publisher":"Washington State Legislature, JLARC","kind":"subsidy","retrievedAt":"2026-09-17"},{"url":"https://baxtel.com/data-center/equinix-seattle-se4","label":"Equinix Seattle SE4 - 6906 S. 204th Street, Kent, WA; opened 2000; acquired from Verizon May 2017","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-17"}]},{"id":"compute-h5-data-centers-quincy-campus-wa","sourceRecordId":"h5-data-centers-quincy-campus-wa","name":"H5 Data Centers Quincy Campus","operator":"H5 Data Centers","city":"Quincy","county":"Grant","address":"1711 M St NE","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.2334,"longitude":-119.8528,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-quincy-campus-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/quincy-data-center.html","label":"Quincy Data Center - Washington Data Center","publisher":"H5 Data Centers","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://baxtel.com/data-center/h5-quincy","label":"H5 Quincy Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-22"}]},{"id":"compute-h5-data-centers-seattle-denny-way-wa","sourceRecordId":"h5-data-centers-seattle-denny-way-wa","name":"H5 Data Centers Seattle","operator":"H5 Data Centers","city":"Seattle","county":"King","address":"1000 Denny Way","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.6205,"longitude":-122.3379,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/h5-data-centers-seattle-denny-way-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://h5datacenters.com/seattle-data-center.html","label":"Seattle Data Center","publisher":"H5 Data Centers","kind":"press","retrievedAt":"2026-09-21"}]},{"id":"compute-komo-plaza-seattle-wa","sourceRecordId":"komo-plaza-seattle-wa","name":"KOMO Plaza (formerly Fisher Plaza)","operator":"GI Partners","city":"Seattle","county":"King","address":"140 4th Avenue North","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.6192326,"longitude":-122.3482873,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/komo-plaza-seattle-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/komo-plaza-was-fisher-plaza","label":"KOMO Plaza (was Fisher Plaza) - GI Partners, 140 4th Avenue North Seattle; 293,727 sq ft two-building carrier hotel; data center operators Evocative Seattle SEA1 and TierPoint Seattle DC1/DC2","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/417682780","label":"OSM way 417682780 - 'KOMO Plaza East' (old_name Fisher Plaza East), telecom=data_center, CLLI STTOWAJM, 140 4th Avenue North Seattle 98109","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/417682781","label":"OSM way 417682781 - 'KOMO Plaza West' (old_name Fisher Plaza West), telecom=data_center, 100 4th Avenue North Seattle 98109","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"}]},{"id":"compute-krambu-newport-wa","sourceRecordId":"krambu-newport-wa","name":"Krambu Eastern Washington (Newport)","operator":"Krambu","city":"Newport","county":"Pend Oreille","address":"240 N Union Ave","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":48.1834302,"longitude":-117.0423605,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/krambu-newport-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spokanejournal.com/articles/2019-having-survived-crypto-winter-krambu-thrives","label":"Spokane Journal of Business: Having survived crypto winter, Krambu thrives (Feb 13, 2020)","publisher":"Spokane Journal of Business","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://dcmap.us/states/washington/","label":"dcmap.us Washington data center map (Krambu Eastern Washington, Newport, operational, ~10 MW est.)","publisher":"dcmap.us","kind":"other","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=240+N+Union+Ave,+Newport,+WA&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for 240 N Union Ave, Newport, WA","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-12"}]},{"id":"compute-lakeside-industries-dallesport-data-center-wa","sourceRecordId":"lakeside-industries-dallesport-data-center-wa","name":"Lakeside Industries Dallesport Data Center (proposed)","operator":"Lakeside Industries","city":"Dallesport","county":"Klickitat","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":45.6173426,"longitude":-121.179515,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lakeside-industries-dallesport-data-center-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.columbiagorgenews.com/news/another-data-center/article_e81e8737-9db6-49c5-bd3e-594e8976cdd4.html","label":"Columbia Gorge News: KPUD confirms second Dallesport data center proposal on Lakeside Industries parcel (Aug 26, 2026)","publisher":"Columbia Gorge News","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","label":"Spokesman-Review: Rural Klickitat County faces surge in data center proposals (Oct 7, 2026)","publisher":"The Spokesman-Review / Washington State Standard","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://nominatim.openstreetmap.org/search?q=Dallesport,+Washington&format=json&limit=3","label":"OpenStreetMap Nominatim geocode for Dallesport, WA (approximate point; no parcel coordinates published)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-12"},{"url":"https://www.columbiagorgenews.com/free_news/rural-klickitat-county-faces-surge-in-data-center-proposals/article_91218fee-16bc-4e95-8cde-85b7a8d712ed.html","label":"Rural Klickitat County faces surge in data center proposals","publisher":"Columbia Gorge News / Washington State Standard","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-lumen-spokane-wa","sourceRecordId":"lumen-spokane-wa","name":"Lumen Spokane","operator":"Lumen Technologies","city":"Spokane","county":"Spokane","address":"501 West 2nd Avenue","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.6542257,"longitude":-117.4200007,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-spokane-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/providers/lumen/data-center-locations","label":"Lumen Technologies facility directory","publisher":"Lumen Technologies","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/444683815","label":"OpenStreetMap way/444683815","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-lunavi-bellingham-wa","sourceRecordId":"lunavi-bellingham-wa","name":"Lunavi Bellingham Data Center","operator":"Lunavi","city":"Bellingham","county":"Whatcom","address":"851 Coho Way, Suite 206","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":48.7591358,"longitude":-122.5035003,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lunavi-bellingham-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://lunavi.com/data-centers/bellingham","label":"Bellingham Data Center","publisher":"Lunavi","kind":"other","retrievedAt":"2026-10-30"},{"url":"https://nominatim.openstreetmap.org/search?q=851+Coho+Way,+Bellingham,+WA&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: 851 Coho Way, Bellingham","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-30"}]},{"id":"compute-microsoft-columbia-quincy-wa","sourceRecordId":"microsoft-columbia-quincy-wa","name":"Microsoft Columbia Data Center (Quincy)","operator":"Microsoft","city":"Quincy","county":"Grant","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.2333,"longitude":-119.8667,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-columbia-quincy-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://en.wikipedia.org/wiki/Columbia_Data_Center","label":"Columbia Data Center (Microsoft, Quincy, Washington)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://www.spokesman.com/stories/2026/jul/26/where-agriculture-meets-technology-inside-the-smal/","label":"Where agriculture meets technology: Inside the small Washington town that became a data center hub","publisher":"The Spokesman-Review","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://www.columbiariverkeeper.org/wp-content/uploads/2026/02/2026.02.26-Data-Center-Closer-Look-Report.pdf","label":"A Closer Look: Columbia River Data Centers (February 2026) — Grant County, Washington","publisher":"Columbia Riverkeeper","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-microsoft-east-wenatchee-wa","sourceRecordId":"microsoft-east-wenatchee-wa","name":"Microsoft East Wenatchee Data Center","operator":"Microsoft","city":"East Wenatchee","county":"Douglas","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.407837,"longitude":-120.207723,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-east-wenatchee-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-24","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wenatcheeworld.com/business/new-douglas-county-microsoft-data-center-launches-with-party-tour/article_95ce41dc-7267-11ed-ab98-af7c94439b63.html","label":"New Douglas County Microsoft data center launches — Urban Industrial Way, 340.22 acres, $409M first-building permit, grand opening Dec 2022","publisher":"Wenatchee World","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/","label":"Douglas County PUD, Microsoft Enter Power Delivery Agreement — up to 180 MW (Schedule 4), 180MW substation","publisher":"KPQ","kind":"press","retrievedAt":"2026-07-19"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-microsoft-malaga-wa","sourceRecordId":"microsoft-malaga-wa","name":"Microsoft Malaga Campus","operator":"Microsoft","city":"Malaga","county":"Chelan","address":"Malaga Alcoa Highway","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.23,"longitude":-120.2,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-malaga-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-plans-three-data-centers-in-malaga-washington/","label":"Microsoft Plans Three Data Centers in Malaga, Washington","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://local.microsoft.com/blog/malaga-datacenter-project-overview/","label":"Malaga Datacenter Project Overview","publisher":"Microsoft Local","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://cleanview.co/data-centers/washington/819/microsoft-malaga-campus","label":"Microsoft Malaga Campus — 288 MW capacity profile","publisher":"Cleanview","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.chelanpud.org/about-us/news/2025/06/17/pud-commissioners-approve-power-contract-for-microsoft-data-center","label":"PUD commissioners approve power contract for Microsoft data center","publisher":"Chelan County PUD","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://local.microsoft.com/communities/americas/quincy/","label":"Quincy Community — Microsoft Local","publisher":"Microsoft","kind":"other","retrievedAt":"2026-08-08"},{"url":"https://www.wenatcheeworld.com/business/chelan-county-pud-commissioners-ok-energy-contract-with-microsoft-for-malaga-data-center-buildings/article_75835428-510f-4b96-b302-f1e681b64b2b.html","label":"Chelan County PUD commissioners OK energy contract with Microsoft for Malaga data center buildings","publisher":"The Wenatchee World","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.columbiariverkeeper.org/wp-content/uploads/2026/02/2026.02.26-Data-Center-Closer-Look-Report.pdf","label":"A Closer Look: Columbia River Data Centers (February 2026) — Chelan County: 24 MW existing / 288 MW planned","publisher":"Columbia Riverkeeper","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://www.cascadepbs.org/the-newsfeed-2/2026/08/washington-state-grapples-with-the-ai-data-center-boom/","label":"Washington state grapples with the AI data center boom","publisher":"Cascade PBS","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.govtech.com/computing/washington-utility-district-oks-4m-investment-in-microsoft-substation","label":"Washington Utility District OKs $4M Investment in Microsoft Substation","publisher":"Government Technology","kind":"press","retrievedAt":"2026-09-05"}]},{"id":"compute-microsoft-mwh-quincy-wa","sourceRecordId":"microsoft-mwh-quincy-wa","name":"Microsoft MWH Data Center","operator":"Microsoft Corporation","city":"Quincy","county":"Grant","address":"1515 Port Industrial Parkway","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.237888,"longitude":-119.8875891,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-mwh-quincy-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ecology.wa.gov/Asset-Collections/Doc-Assets/Air-quality/Data-Centers/Microsoft-MWH-formerly-Oxford-data-center/20220937MicrosoftMWH22AQE035","label":"Approval Order No. 22AQ-E035, Microsoft Corporation MWH Data Center (Notice of Construction, renewable diesel)","publisher":"Washington State Department of Ecology","kind":"permit","retrievedAt":"2026-09-21"},{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","label":"Data centers - air quality permits index (Quincy: Microsoft MWH, formerly Oxford)","publisher":"Washington State Department of Ecology","kind":"permit","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/700001774","label":"OSM way 700001774 - 'Microsoft MWH Data Center', landuse=industrial, industrial=data_centre, operator=Microsoft","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"}]},{"id":"compute-ntt-data-quincy-data-center-wa","sourceRecordId":"ntt-data-quincy-data-center-wa","name":"NTT Data Quincy Data Center","operator":"NTT DATA","city":"Quincy","county":"Grant","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.2435798,"longitude":-119.8657481,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ntt-data-quincy-data-center-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-08","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/ntt-data-quincy","label":"Baxtel facility profile — NTT Data Quincy Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/337127824","label":"OpenStreetMap way/337127824","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-pnnl-ai-data-center-richland-wa","sourceRecordId":"pnnl-ai-data-center-richland-wa","name":"PNNL AI Data Center","operator":"Battelle Memorial Institute (Pacific Northwest National Laboratory)","city":"Richland","county":"Benton","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":46.348,"longitude":-119.279,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pnnl-ai-data-center-richland-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spokesman.com/stories/2026/apr/26/ai-data-center-with-a-different-mission-being-cons/","label":"AI data center with a different mission being considered in Tri-Cities","publisher":"The Spokesman-Review","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.tricitiesbusinessnews.com/articles/pnnl-data-centers","label":"DOE eyes PNNL to 'power the AI revolution'","publisher":"Tri-Cities Area Journal of Business","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://www.yahoo.com/news/articles/know-4-major-data-center-120000272.html","label":"What to know about 4 major data center proposals for Tri-Cities area","publisher":"Tri-City Herald (via Yahoo News)","kind":"press","retrievedAt":"2026-09-05"}]},{"id":"compute-apricus-rock-point-data-center-west-plains-wa","sourceRecordId":"apricus-rock-point-data-center-west-plains-wa","name":"Rock Point Data Center Project","operator":"Apricus Energy Partners","city":"West Plains","county":"Spokane","address":"11703 W. Medical Lake Highway","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.621,"longitude":-117.73,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/apricus-rock-point-data-center-west-plains-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-12","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.spokesman.com/stories/2026/aug/02/company-proposing-massive-west-plains-data-center-/","label":"Company proposing massive West Plains data center","publisher":"The Spokesman-Review","kind":"press","retrievedAt":"2026-10-12"},{"url":"https://www.spokesman.com/stories/2026/jun/09/avista-confirms-negotiations-with-company-seeking-/","label":"Avista confirms negotiations with company seeking to build large data center","publisher":"The Spokesman-Review","kind":"press","retrievedAt":"2026-08-22"}]},{"id":"compute-sabey-intergate-columbia-building-a-wa","sourceRecordId":"sabey-intergate-columbia-building-a-wa","name":"Sabey Intergate.Columbia Building A","operator":"Sabey Data Centers","city":"East Wenatchee","county":"Douglas","address":"4405 A Grant Road","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4086205,"longitude":-120.1893981,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-columbia-building-a-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/sabey-intergate-columbia","label":"Baxtel facility profile — Sabey Intergate.Columbia Building A","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/460167187","label":"OpenStreetMap way/460167187","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-sabey-intergate-columbia-building-b-wa","sourceRecordId":"sabey-intergate-columbia-building-b-wa","name":"Sabey Intergate.Columbia Building B","operator":"Sabey Data Centers","city":"East Wenatchee","county":"Douglas","address":"4405 B Grant Road","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.407164,"longitude":-120.1875239,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-columbia-building-b-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","label":"SDC Columbia, 4405 Grant Rd, East Wenatchee - 70 MW campus, three buildings operational and a fourth under construction, Douglas County PUD hydro, evaporative and economizer cooling, 1.2 average annualized PUE","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://ecology.wa.gov/Asset-Collections/Doc-Assets/Air-quality/Data-Centers/Blackrock-and-Sabey/Tier2-TSD-Blackrock-Sabey-CL100510","label":"Technical Support Document for Second Tier Review of Blackrock and Sabey Data Centers, East Wenatchee (Oct 5, 2010) - Intergate Columbia, 4405 Grant Road, Douglas County","publisher":"Washington State Department of Ecology","kind":"permit","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/460167186","label":"OSM way 460167186 - 'Intergate Columbia B', telecom=data_center, operator=Sabey Data Centers, 4405 B Grant Road East Wenatchee 98802","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"}]},{"id":"compute-sabey-intergate-columbia-building-d-wa","sourceRecordId":"sabey-intergate-columbia-building-d-wa","name":"Sabey Intergate.Columbia Building D","operator":"Sabey Data Centers","city":"East Wenatchee","county":"Douglas","address":"4405 Grant Road","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4075849,"longitude":-120.1915785,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-columbia-building-d-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","label":"SDC Columbia, 4405 Grant Rd, East Wenatchee - 'Three buildings currently operational; a fourth under construction'","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-09-17"},{"url":"https://www.openstreetmap.org/way/1071774674","label":"OSM way 1071774674 - 'Intergate Columbia D', building=industrial, telecom=data_center, operator=Sabey Data Centers","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://baxtel.com/news/sabey-data-centers-to-add-14mw-in-washington","label":"Baxtel: Sabey Data Centers to add 14MW in Washington (Aug 22, 2018)","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-12"}]},{"id":"compute-sabey-intergate-east-building-1-wa","sourceRecordId":"sabey-intergate-east-building-1-wa","name":"Sabey Intergate.East Building 1","operator":"Sabey Data Centers","city":"Tukwila","county":"King","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4948597,"longitude":-122.2881943,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-east-building-1-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/washington/seattle/sabey-intergate-east/","label":"Sabey Data Centers facility directory","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/205724885","label":"OpenStreetMap way/205724885","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-sabey-intergate-east-building-3-wa","sourceRecordId":"sabey-intergate-east-building-3-wa","name":"Sabey Intergate.East Building 3","operator":"Sabey Data Centers","city":"Tukwila","county":"King","address":"3333 South 120th Place","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4934798,"longitude":-122.2904647,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-east-building-3-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/way/293211686","label":"OSM way 293211686 - 'Intergate Seattle East Building 3', building=data_center, telecom=data_center, operator=Sabey Data Centers, 3333 South 120th Place Tukwila 98168","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://sabeydatacenters.com/locations/seattle-data-center","label":"SDC Seattle, Tukwila - 54 MW capacity, single or multi-tenant buildings, evaporative and economizer cooling","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-09-17"}]},{"id":"compute-sabey-intergate-east-building-5-sdc-east-5-wa","sourceRecordId":"sabey-intergate-east-building-5-sdc-east-5-wa","name":"Sabey Intergate.East Building 5 (SDC East 5)","operator":"Sabey Data Centers","city":"Tukwila","county":"King","address":"3355 South 120th Place","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.491986,"longitude":-122.2896655,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-east-building-5-sdc-east-5-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenters.com/sabey-sdc-east-5","label":"Sabey Data Centers facility directory","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/293211683","label":"OpenStreetMap way/293211683","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-sabey-intergate-quincy-campus-wa","sourceRecordId":"sabey-intergate-quincy-campus-wa","name":"Sabey Intergate.Quincy Campus","operator":"Sabey Data Centers","city":"Quincy","county":"Grant","address":"2200 M Street NE","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.247,"longitude":-119.83,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-quincy-campus-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/sabey-intergate-quincy-building-b","label":"Sabey: Intergate.Quincy (Building B) — 2200 M Street NE, Quincy, Washington","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://www.cascadepbs.org/the-newsfeed-2/2026/08/washington-state-grapples-with-the-ai-data-center-boom/","label":"Washington state grapples with the AI data center boom","publisher":"Cascade PBS","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://sabeydatacenters.com/locations","label":"Sabey Data Centers — Locations (SDC Quincy, SDC Columbia, SDC Seattle)","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-sabey-intergate-west-building-a-wa","sourceRecordId":"sabey-intergate-west-building-a-wa","name":"Sabey Intergate.West Building A","operator":"Sabey Data Centers","city":"Tukwila","county":"King","address":"12301 Tukwila International Boulevard","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4921833,"longitude":-122.2933176,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-west-building-a-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/washington/seattle/sabey-intergate-west/","label":"Sabey Data Centers facility directory","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/337126742","label":"OpenStreetMap way/337126742","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-sabey-intergate-west-building-b-wa","sourceRecordId":"sabey-intergate-west-building-b-wa","name":"Sabey Intergate.West Building B","operator":"Sabey Data Centers","city":"Tukwila","county":"King","address":"12201 Tukwila International Boulevard","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.4930744,"longitude":-122.2936837,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-west-building-b-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.openstreetmap.org/way/337126741","label":"OSM way 337126741 - 'Intergate Seattle West Building B', telecom=data_center, operator=Sabey Data Centers, 12201 Tukwila International Boulevard Tukwila 98168","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-17"},{"url":"https://sabeydatacenters.com/locations/seattle-data-center","label":"SDC Seattle, Tukwila - Sabey's Seattle-area campus","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-09-17"}]},{"id":"compute-sabey-intergate-west-building-c-wa","sourceRecordId":"sabey-intergate-west-building-c-wa","name":"Sabey Intergate.West Building C","operator":"Sabey Data Centers","city":"Tukwila","county":"King","address":"12101 Tukwila International Boulevard","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.494123,"longitude":-122.2943972,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/sabey-intergate-west-building-c-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacentermap.com/usa/washington/seattle/sabey-intergate-west/","label":"Sabey Data Centers facility directory","publisher":"Sabey Data Centers","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/337126739","label":"OpenStreetMap way/337126739","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stack-infrastructure-goldendale-data-center-wa","sourceRecordId":"stack-infrastructure-goldendale-data-center-wa","name":"STACK Infrastructure Goldendale Data Center","operator":"STACK Infrastructure","city":"Goldendale","county":"Klickitat","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":45.8213,"longitude":-120.8217,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stack-infrastructure-goldendale-data-center-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site","label":"Yakamas protest clean energy project on sacred site to power data center","publisher":"Tri-Cities Area Journal of Business (via Oregon Capital Chronicle)","kind":"press","retrievedAt":"2026-08-22"},{"url":"https://morethanjustparks.com/data-center-tracker/klickitat-county-wa-data-center-wa--61a57f2b-6d60-4d2e-a38e-ee726e2a16e3","label":"Klickitat County, WA Data Center (STACK Infrastructure)","publisher":"More Than Just Parks Data Center Tracker","kind":"other","retrievedAt":"2026-08-22"},{"url":"https://www.columbiagorgenews.com/news/hyperscale-data-center-developer-confirmed/article_0a22bbde-0a31-4d72-9bd3-6cf5a5c50e65.html","label":"Hyperscale data center developer confirmed","publisher":"Columbia Gorge News","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.columbiagorgenews.com/free_news/rural-klickitat-county-faces-surge-in-data-center-proposals/article_91218fee-16bc-4e95-8cde-85b7a8d712ed.html","label":"Rural Klickitat County faces surge in data center proposals","publisher":"Columbia Gorge News / Washington State Standard","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-colossus-starbucks-center-sodo-seattle-wa","sourceRecordId":"colossus-starbucks-center-sodo-seattle-wa","name":"Starbucks Center Data Center (2401 Utah Ave S, SoDo)","operator":"Colossus Data Center Advisors","city":"Seattle","county":"King","address":"2401 Utah Avenue South","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.5807667,"longitude":-122.3359179,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/colossus-starbucks-center-sodo-seattle-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.connectcre.com/stories/small-data-center-proposed-at-sodo-starbucks-hq-building/","label":"Small data center proposed at SODO Starbucks HQ building","publisher":"Connect CRE","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://nominatim.openstreetmap.org/search?q=2401+Utah+Avenue+South,+Seattle,+WA&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: Starbucks Center, 2401 Utah Ave S","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-30"}]},{"id":"compute-tierpoint-spokane-wa","sourceRecordId":"tierpoint-spokane-wa","name":"TierPoint Spokane","operator":"TierPoint","city":"Liberty Lake","county":"Spokane","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.6719149,"longitude":-117.0959323,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-spokane-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/washington/spokane/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/335468616","label":"OpenStreetMap way/335468616","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-serverfarm-titan-moses-lake-wa","sourceRecordId":"serverfarm-titan-moses-lake-wa","name":"TiTAN (Serverfarm Moses Lake)","operator":"Serverfarm LLC","city":"Moses Lake","county":"Grant","address":"4949 Randolph Rd NE","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.1554,"longitude":-119.25,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/serverfarm-titan-moses-lake-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.serverfarmllc.com/moses-lake-data-center/","label":"TiTAN | Moses Lake, Washington Data Center","publisher":"Serverfarm","kind":"press","retrievedAt":"2026-08-22"}]},{"id":"compute-trammell-crow-lewis-clark-ranch-west-richland-wa","sourceRecordId":"trammell-crow-lewis-clark-ranch-west-richland-wa","name":"Trammell Crow Lewis & Clark Ranch Data Center","operator":"Trammell Crow Company","city":"West Richland","county":"Benton","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":46.3046,"longitude":-119.3667,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/trammell-crow-lewis-clark-ranch-west-richland-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tricitiesbusinessnews.com/articles/west-richland-data-center","label":"Company eyes West Richland for future data center","publisher":"Tri-Cities Area Journal of Business","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-vantage-quincy-wa11-wa","sourceRecordId":"vantage-quincy-wa11-wa","name":"Vantage Quincy WA11","operator":"Vantage Data Centers","city":"Quincy","county":"Grant","address":"2101 M Street NE","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.2501646,"longitude":-119.8144903,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-quincy-wa11-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/data-center-locations/north-america/quincy-washington/","label":"Vantage facility directory","publisher":"Vantage","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.openstreetmap.org/way/337127817","label":"OpenStreetMap way/337127817","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/","label":"Vantage Data Centers Completes Development of 89MW, $1 Billion Quincy, Washington Campus","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-09-05"}]},{"id":"compute-vantage-wa12-wa","sourceRecordId":"vantage-wa12-wa","name":"Vantage WA12","operator":"Vantage Data Centers","city":"Quincy","county":"Grant","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.2539697,"longitude":-119.8136985,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-wa12-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenterhawk.com/marketplace/providers/vantage-data-centers/2101-m-street-ne/wa12","label":"datacenterHawk facility listing — Vantage WA12, 2101 M Street NE, Quincy WA","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/694602725","label":"OpenStreetMap way/694602725","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://vantage-dc.com/data-center-locations/north-america/quincy-washington/","label":"Vantage facility directory: Quincy, Washington campus","publisher":"Vantage Data Centers","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/","label":"Vantage Data Centers Completes Development of 89MW, $1 Billion Quincy, Washington Campus","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-vantage-wa13-quincy-wa","sourceRecordId":"vantage-wa13-quincy-wa","name":"Vantage WA13","operator":"Vantage Data Centers","city":"Quincy","county":"Grant","address":"2101 M Street NE","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.247,"longitude":-119.83,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-wa13-quincy-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-05","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/","label":"Vantage Data Centers Completes Development of 89MW, $1 Billion Quincy, Washington Campus","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-09-05"},{"url":"https://vantage-dc.com/data-center-locations/north-america/quincy-washington/","label":"Quincy, Washington Data Center Campus","publisher":"Vantage Data Centers","kind":"other","retrievedAt":"2026-09-05"},{"url":"https://baxtel.com/data-center/quincy","label":"Quincy, WA data center facility directory (Vantage WA11/WA12/WA13)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-05"}]},{"id":"compute-vines-rest-data-center-alderdale-klickitat-wa","sourceRecordId":"vines-rest-data-center-alderdale-klickitat-wa","name":"Vines Rest Data Center (BPA L0704)","operator":"Savion (Shell Energy subsidiary), per BPA application documents","city":"Alderdale (vicinity)","county":"Klickitat","address":null,"state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":45.8349586,"longitude":-119.9208683,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"rumored","sourceUrl":"https://www.compute-atlas.com/facilities/vines-rest-data-center-alderdale-klickitat-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html","label":"More data centers possible for county","publisher":"Goldendale Sentinel","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://www.columbiagorgenews.com/free_news/rural-klickitat-county-faces-surge-in-data-center-proposals/article_91218fee-16bc-4e95-8cde-85b7a8d712ed.html","label":"Rural Klickitat County faces surge in data center proposals","publisher":"Columbia Gorge News / Washington State Standard","kind":"press","retrievedAt":"2026-10-30"},{"url":"https://nominatim.openstreetmap.org/search?q=Alderdale,+Klickitat+County,+Washington&format=json&limit=2","label":"OpenStreetMap Nominatim geocode: Alderdale, WA (representative point)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-30"}]},{"id":"compute-washington-state-data-center-olympia-wa","sourceRecordId":"washington-state-data-center-olympia-wa","name":"Washington State Data Center (1500 Jefferson Building)","operator":"Washington Technology Solutions","city":"Olympia","county":"Thurston","address":"1500 Jefferson Street SE","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.0345059,"longitude":-122.8945401,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/washington-state-data-center-olympia-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","label":"Data centers - air quality permits index (Olympia: Washington Department of Information Services, second-tier health impact assessment, 9/16/2010)","publisher":"Washington State Department of Ecology","kind":"permit","retrievedAt":"2026-09-17"},{"url":"https://capitol.wa.gov/discover/buildings/1500-jefferson-building","label":"1500 Jefferson Building - completed 2011, 245,000 sq ft, six-storey L-shaped office with a three-storey wing wrapping a data center; houses Enterprise Services, Washington Technology Solutions and DCYF","publisher":"Washington State Capitol Campus","kind":"other","retrievedAt":"2026-09-17"}]},{"id":"compute-westin-building-digital-realty-seattle-sea10-wa","sourceRecordId":"westin-building-digital-realty-seattle-sea10-wa","name":"Westin Building (Digital Realty Seattle SEA10)","operator":"Digital Realty","city":"Seattle","county":"King","address":"2001 6th Avenue","state":"WA","stateName":"Washington","jurisdictionType":"state","latitude":47.6143555,"longitude":-122.3388637,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/westin-building-digital-realty-seattle-sea10-wa","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/digital-realty-acquire-majority-stake-westin-building-exchange-seattle/","label":"Data Center Dynamics: Digital Realty acquired majority/controlling stake and assumed operational oversight of the Westin","publisher":"Digital Realty","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/223928497","label":"OpenStreetMap way/223928497","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-viridian-apecs-janesville-wi","sourceRecordId":"viridian-apecs-janesville-wi","name":"APECS Data Center Campus (Former GM Assembly Plant)","operator":"Viridian Acquisitions LLC","city":"Janesville","county":"Rock","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.66331,"longitude":-89.02056,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/viridian-apecs-janesville-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wpr.org/news/janesville-data-center-abandoned-gm-site","label":"Janesville moves forward with data center plans for abandoned GM site","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-08-18"},{"url":"https://baxtel.com/data-center/apecs-data-center-campus","label":"APECS Data Center Campus — project record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-08-18"},{"url":"https://608scanner.com/the-rock-county-data-center-fight-janesvilles-three-proposals-and-the-vote-that-could-decide-them/","label":"The Rock County data center fight: Janesville's three proposals","publisher":"608 Scanner","kind":"press","retrievedAt":"2026-08-18"}]},{"id":"compute-ark-data-centers-green-bay-harrison-campus-wi","sourceRecordId":"ark-data-centers-green-bay-harrison-campus-wi","name":"Ark Data Centers Green Bay (Harrison Campus)","operator":"Involta (rebranded Ark Data Centers, May 2024)","city":"Harrison","county":"Calumet","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.2044349,"longitude":-88.3449304,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ark-data-centers-green-bay-harrison-campus-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-26","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.arkdna.com/data-centers/wisconsin/","label":"Involta (rebranded Ark Data Centers, May 2024) facility directory","publisher":"Involta (rebranded Ark Data Centers, May 2024)","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/766768556","label":"OpenStreetMap way/766768556","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-aventus-715-marshfield-wi","sourceRecordId":"aventus-715-marshfield-wi","name":"Aventus 715 Data Center","operator":"Aventus Data Centers","city":"Marshfield","county":"Wood","address":"901 Commerce Dr.","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.632178,"longitude":-90.1734887,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aventus-715-marshfield-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aventusdatacenters.com/aventus-715/","label":"Aventus 715 — operator facility page (901 Commerce Dr., Marshfield, WI 54449; 20,000 sq ft)","publisher":"Aventus Data Centers","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"Aventus 715, Marshfield\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=901+Commerce+Drive%2C+Marshfield%2C+WI+54449&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of Commerce Drive, Mill Creek Business Park, Marshfield, Wood County (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-aventus-lakes-milwaukee-wi","sourceRecordId":"aventus-lakes-milwaukee-wi","name":"Aventus Lakes Data Center","operator":"Aventus Data Centers","city":"Milwaukee","county":"Milwaukee","address":"7901 W. Clinton Ave.","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.1513247,"longitude":-88.009665,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/aventus-lakes-milwaukee-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://aventusdatacenters.com/aventus-lakes/","label":"Aventus Lakes — operator facility page (address, 26,432 sq ft, vaults, power)","publisher":"Aventus Data Centers","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"Aventus Lakes, Milwaukee\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=7901+W+Clinton+Ave%2C+Milwaukee%2C+WI+53223&format=json&limit=1&addressdetails=1","label":"OpenStreetMap/Nominatim geocode of 7901 West Clinton Avenue, Granville, Milwaukee (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-cassville-grant-county-wi","sourceRecordId":"cassville-grant-county-wi","name":"Cassville Data Center Campus (Undisclosed Developer)","operator":"Undisclosed (major tech company, NDA not signed)","city":"Cassville","county":"Grant","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.716,"longitude":-91.007,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cassville-grant-county-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wisconsinwatch.org/2026/02/wisconsin-data-center-billion-dollar-grant-county-cassville-utility-energy/","label":"Another $1 billion Wisconsin data center eyed in Grant County town of Cassville","publisher":"Wisconsin Watch","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://pbswisconsin.org/news-item/another-billion-dollar-wisconsin-data-center-is-eyed-for-cassville-in-grant-county/","label":"Another billion-dollar Wisconsin data center is eyed for Cassville in Grant County","publisher":"PBS Wisconsin","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://wisconsinwatch.org/2026/04/wisconsin-data-center-rural-town-cassville-rejects-plan-driftless-area-zoning/","label":"In rural Wisconsin, a town rejects a plan to build a massive data center","publisher":"Wisconsin Watch","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://wisconsinwatch.org/2026/06/a-2-billion-proposal-then-silence-how-a-driftless-area-data-center-deal-fell-apart/","label":"A $2 billion proposal, then silence: How a Driftless Area data center deal fell apart","publisher":"Wisconsin Watch","kind":"press","retrievedAt":"2026-08-04"}]},{"id":"compute-cloverleaf-carlton-kewaunee-county-wi","sourceRecordId":"cloverleaf-carlton-kewaunee-county-wi","name":"Cloverleaf Carlton Data Center Site (Kewaunee County)","operator":"Cloverleaf Infrastructure","city":"Carlton","county":"Kewaunee","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.35,"longitude":-87.58,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-carlton-kewaunee-county-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wisconsinwatch.org/2026/01/wisconsin-data-center-kewaunee-county-town-carlton-cloverleaf-nuclear-power/","label":"Kewaunee County town staves off interest from data center developers","publisher":"Wisconsin Watch","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-cloverleaf-greenleaf-town-of-wrightstown-wi","sourceRecordId":"cloverleaf-greenleaf-town-of-wrightstown-wi","name":"Cloverleaf Greenleaf Data Center Site Inquiry (Village of Greenleaf / Town of Wrightstown)","operator":"Cloverleaf Infrastructure (via Bear Creek DevCo LLC)","city":"Greenleaf","county":"Brown","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.31333,"longitude":-88.09611,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-greenleaf-town-of-wrightstown-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wpr.org/news/developer-abandons-data-center-rural-brown-county","label":"Developer abandons data center in rural Brown County","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://en.wikipedia.org/wiki/Greenleaf,_Wisconsin","label":"Greenleaf, Wisconsin (village coordinates)","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-10-16"}]},{"id":"compute-cloverleaf-wrightstown-village-wi","sourceRecordId":"cloverleaf-wrightstown-village-wi","name":"Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)","operator":"Cloverleaf Infrastructure","city":"Wrightstown","county":"Brown","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.3269,"longitude":-88.1631,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cloverleaf-wrightstown-village-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spectrumnews1.com/wi/milwaukee/news/2026/06/01/data-center-wrightstown-meeting","label":"Wrightstown hosts public meeting as data centers target village land","publisher":"Spectrum News 1 Wisconsin","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://wisconsinwatch.org/2026/08/wisconsin-ai-data-center-land-big-tech-wrightstown-voters-opposition-opinion/","label":"Wisconsin voters push back on AI data center development","publisher":"Wisconsin Watch","kind":"press","retrievedAt":"2026-09-01"}]},{"id":"compute-cyberlynk-franklin-mke1-wi","sourceRecordId":"cyberlynk-franklin-mke1-wi","name":"CyberLynk Franklin Data Center (MKE1)","operator":"CyberLynk Network, Inc.","city":"Franklin","county":"Milwaukee","address":"10125 S. 52nd Street","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.8618895,"longitude":-87.982841,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cyberlynk-franklin-mke1-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cyberlynk.net/facilities/milwaukee-datacenter/","label":"Milwaukee, WI (MKE1) Data Center — operator facility page (address, SOC 2, carriers)","publisher":"CyberLynk Network","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"CyberLynk Network Inc., Franklin\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=10125+S+52nd+Street%2C+Franklin%2C+WI+53132&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode returning the named \"CyberLynk\" feature at 10125 South 52nd Street, Franklin Business Park (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-data-holdings-eau-claire-wi","sourceRecordId":"data-holdings-eau-claire-wi","name":"Data Holdings Eau Claire Data Center","operator":"Data Holdings LLC","city":"Eau Claire","county":"Eau Claire","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.811349,"longitude":-91.4984941,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/data-holdings-eau-claire-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dataholdings.com/eau-claire-data-center","label":"Eau Claire Data Center | SOC2 Compliant — operator facility page (4,000 SF raised floor, 1 MW, 2N cooling and standby power)","publisher":"Data Holdings","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Eau+Claire%2C+Eau+Claire+County%2C+Wisconsin&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of Eau Claire, Eau Claire County, WI (city-level coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-data-holdings-milwaukee-wi","sourceRecordId":"data-holdings-milwaukee-wi","name":"Data Holdings Milwaukee Data Center","operator":"Data Holdings LLC","city":"Milwaukee","county":"Milwaukee","address":"3135 W. Highland Blvd","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.0437366,"longitude":-87.9540068,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/data-holdings-milwaukee-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dataholdings.com/milwaukee-data-center","label":"Milwaukee Data Center — facility specifications","publisher":"Data Holdings","kind":"other","retrievedAt":"2026-08-18"},{"url":"https://cloudandcolocation.com/datacenters/data-holdings-milwaukee-data-center/","label":"Data Holdings Milwaukee Data Center — facility profile","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-dpo-wisconsin-rapids-hpc-wi","sourceRecordId":"dpo-wisconsin-rapids-hpc-wi","name":"DPO Wisconsin Rapids AI Computing Facility","operator":"Digital Power Optimization","city":"Wisconsin Rapids","county":"Wood","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.3917589,"longitude":-89.8228767,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dpo-wisconsin-rapids-hpc-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html","label":"DPO Launches $200 Million AI Data Center Development in Partnership with Billerud","publisher":"PR Newswire / Digital Power Optimization","kind":"press","retrievedAt":"2026-08-18"},{"url":"https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/","label":"Data center developer plans $200 million project in Wisconsin Rapids (up to 20 MW, ~10 acres, power from Consolidated Water Power Company, 50-year land lease)","publisher":"BizTimes Milwaukee","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-edgeconnex-mad01-madison-wi","sourceRecordId":"edgeconnex-mad01-madison-wi","name":"EdgeConneX Madison (MAD01)","operator":"EdgeConneX","city":"Madison","county":"Dane","address":"4916 E Broadway","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.0481038,"longitude":-89.2982832,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/edgeconnex-mad01-madison-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-21","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.edgeconnex.com/locations/americas/madison-wi/","label":"EdgeConneX Madison, WI data center","publisher":"EdgeConneX","kind":"other","retrievedAt":"2026-09-21"},{"url":"https://www.datacenterhawk.com/colo/edgeconnex/4916-east-broadway/mad01","label":"EdgeConneX MAD01 — 4916 East Broadway, Madison","publisher":"datacenterHawk","kind":"other","retrievedAt":"2026-08-18"}]},{"id":"compute-epic-hosting-verona-wi","sourceRecordId":"epic-hosting-verona-wi","name":"Epic Hosting Verona Data Center","operator":"Epic Hosting, LLC (Epic Systems)","city":"Verona","county":"Dane","address":"Milky Way","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.98,"longitude":-89.562,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/epic-hosting-verona-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-01","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","label":"Wisconsin DOR — Exemption for Qualified Data Center (list of certified data centers)","publisher":"Wisconsin Department of Revenue","kind":"subsidy","retrievedAt":"2026-09-01"}]},{"id":"compute-expedient-mke1-milwaukee-franklin-wi","sourceRecordId":"expedient-mke1-milwaukee-franklin-wi","name":"Expedient MKE1 (Milwaukee/Franklin)","operator":"Expedient","city":"Franklin","county":"Milwaukee","address":"4777 West Ironwood Drive","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.8631424,"longitude":-87.9778759,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/expedient-mke1-milwaukee-franklin-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.expedient.com/data-centers/milwaukee/","label":"Expedient official Milwaukee data center page","publisher":"Expedient","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/way/664938835","label":"OpenStreetMap way/664938835","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-heartland-business-systems-little-chute-wi","sourceRecordId":"heartland-business-systems-little-chute-wi","name":"Heartland Business Systems Little Chute Data Center","operator":"Heartland Business Systems, LLC","city":"Little Chute","county":"Outagamie","address":"1700 Stephen Street","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.2965755,"longitude":-88.2938896,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/heartland-business-systems-little-chute-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hbs.net/contact-us","label":"HBS locations — Northeast Wisconsin headquarters, 1700 Stephen Street, Little Chute, WI 54140","publisher":"Heartland Business Systems","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"HBS Little Chute, Little Chute\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=1700+Stephen+Street%2C+Little+Chute%2C+WI+54140&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of 1700 Stephen Street, Little Chute Industrial Park, Outagamie County (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-iscorp-mequon-mqs5-wi","sourceRecordId":"iscorp-mequon-mqs5-wi","name":"ISCorp Mequon Data Center (MQS5)","operator":"ISCorp","city":"Mequon","county":"Ozaukee","address":"10325 N. Port Washington Road","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.205315,"longitude":-87.9243984,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/iscorp-mequon-mqs5-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.iscorp.com/iscorp-facilities/","label":"ISCorp Data Centers — MQS5, 10325 N. Port Washington Rd., Mequon, WI 53092 (Tier III+, SSAE18, 8,000 sq ft raised floor)","publisher":"ISCorp","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"ISCorp North MQN\" and \"ISCorp South MQN\", Mequon)","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=10325+N+Port+Washington+Road%2C+Mequon%2C+WI+53092&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of 10325 North Port Washington Road, Mequon, Ozaukee County (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-lumen-madison-1-wi","sourceRecordId":"lumen-madison-1-wi","name":"Lumen Madison 1","operator":"Lumen Technologies","city":"Madison","county":"Dane","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.0677161,"longitude":-89.3922794,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lumen-madison-1-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/lumen-madison-1","label":"Baxtel facility profile — Lumen Madison 1","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/13226718075","label":"OpenStreetMap node/13226718075","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"}]},{"id":"compute-menomonie-data-center-wi","sourceRecordId":"menomonie-data-center-wi","name":"Menomonie Data Center Campus","operator":"Undisclosed (Balloonist LLC)","city":"Menomonie","county":"Dunn","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.8769,"longitude":-91.9193,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/menomonie-data-center-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wtmj.com/news/2025/12/23/a-look-back-at-wisconsins-year-of-the-data-center/","label":"Wisconsin's Year of the Data Center","publisher":"WTMJ","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://volumeone.org/articles/2025/08/26/370164-tech-giant-is-considering-16-billion-data-center-dunn-county","label":"Tech Giant Considering $1.6B Data Center in Dunn County","publisher":"Volume One","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/data-center-in-red-cedar-wisconsin-could-be-16bn-investment/","label":"Data center in Red Cedar, Wisconsin, could be $1.6bn investment","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://menomonienewsnet.org/3707/city/proposed-data-center/","label":"Proposed Data Center - Menomonie News Net","publisher":"Menomonie News Net","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.wpr.org/news/menomonie-mayor-puts-data-center-proposal-on-hold","label":"Menomonie mayor puts $1.6B data center proposal on hold","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/data-center-development-in-menomonie-wisconsin-delayed/","label":"Data center development in Menomonie, Wisconsin, delayed","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://wcfw.fm/news/2026/01/06/menomonie-data-center-ordinance","label":"Menomonie City Council Approves Data Center Ordinance Change","publisher":"WCFW","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.menomonieminute.com/post/mayor-crowe-releases-statement-regarding-proposed-data-center-ordinance","label":"Mayor Crowe statement on proposed data center ordinance (June 2026)","publisher":"Menomonie Minute","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-meta-beaver-dam-wi","sourceRecordId":"meta-beaver-dam-wi","name":"Meta Beaver Dam Data Center Campus","operator":"Meta","city":"Beaver Dam","county":"Dodge","address":"County Road A","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.457,"longitude":-88.837,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-beaver-dam-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://datacenters.atmeta.com/2025/11/hello-beaver-dam/","label":"Hello, Beaver Dam! — Meta Data Centers blog","publisher":"Meta","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.constructiondive.com/news/meta-mortenson-beaver-dam-wisconsin-data-center/806211/","label":"Meta taps Mortenson for $1B Wisconsin data center","publisher":"Construction Dive","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://wedc.org/meta-state-and-local-officials-announce-1-billion-data-center-investment-in-beaver-dam-project/","label":"Meta $1B Beaver Dam announcement — Wisconsin Economic Development Corporation","publisher":"WEDC","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.wpr.org/news/wisconsin-regulators-approve-rates-for-metas-beaver-dam-data-center-with-sharp-criticism","label":"Wisconsin regulators approve rates for Meta's Beaver Dam data center, with sharp criticism","publisher":"Wisconsin Public Radio (WPR)","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.wpr.org/news/lawsuit-expected-energy-demand-meta-data-center-beaver-dam","label":"Lawsuit seeks release of expected energy demand from Meta data center in Beaver Dam","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://dailyreporter.com/2026/09/10/wi-judge-rules-on-data-center-energy-demand-secrets/","label":"WI judge rules on data center energy demand secrets","publisher":"The Daily Reporter","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/","label":"New details revealed for Meta's Beaver Dam data center (up to 220 MW, per newly unredacted Alliant Energy service contract)","publisher":"WisBusiness","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement","label":"Meta announces $1 billion Data Center Investment in Beaver Dam, Wisconsin Project (dry cooling, water restoration, renewable match, $200M energy infrastructure)","publisher":"Alliant Energy","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","label":"DOR Qualified Data Center Exemption — certified qualified data centers, incl. Degas LLC, Beaver Dam (County Road A), certified 2/18/2025","publisher":"Wisconsin Department of Revenue","kind":"subsidy","retrievedAt":"2026-09-13"},{"url":"https://www.wpr.org/news/bloomberg-meta-developer-beaver-dam-data-center","label":"Bloomberg: Meta is the developer behind planned Beaver Dam data center (agreements made with \"a company working through Degas LLC\"; state incentive deal reached February 2025)","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-microsoft-kenosha-wi","sourceRecordId":"microsoft-kenosha-wi","name":"Microsoft Kenosha Data Center Campus","operator":"Microsoft","city":"Kenosha","county":"Kenosha","address":"State Highway 142 west of Interstate 94","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.537,"longitude":-87.89,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-kenosha-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-acquires-240-acres-in-kenosha-wisconsin-for-data-center-development/","label":"Microsoft acquires 240 acres in Kenosha, Wisconsin, for data center development","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.areadevelopment.com/newsItems/2-1-2025/microsoft-kenosha-wisconsin.shtml","label":"Microsoft Plans Kenosha, Wisconsin, Data Center Operations","publisher":"Area Development","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.we-energies.com/company/area","label":"We Energies service area","publisher":"We Energies","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.wpr.org/news/we-energies-plans-new-gas-fired-power-plant-to-meet-growing-demand-in-southeast-wisconsin","label":"We Energies plans new gas plant for SE Wisconsin demand","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.areadevelopment.com/newsitems/2-1-2025/microsoft-kenosha-wisconsin.shtml","label":"Area Development — Microsoft Plans Kenosha, Wisconsin, Data Center Operations","publisher":null,"kind":"press","retrievedAt":"2026-07-25"},{"url":"https://www.wpr.org/news/plan-commission-approves-new-kenosha-data-center","label":"Plan commission approves new Kenosha data center (four 250,000 sq ft buildings, new substation, air cooling, city sewer and water, annexation from Town of Paris, unanimous approval Nov. 22, 2024)","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.wgtd.org/news/proposed-kenosha-data-center-remains-table","label":"Proposed Kenosha Data Center Remains on the Table (243-acre site west of I-94 along State Highway 142; city awaiting Microsoft site plans; construction could begin 2027)","publisher":"WGTD","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-microsoft-mount-pleasant-wi","sourceRecordId":"microsoft-mount-pleasant-wi","name":"Microsoft Mount Pleasant Data Center Campus","operator":"Microsoft","city":"Mount Pleasant","county":"Racine","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.7209,"longitude":-87.9023,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-mount-pleasant-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://news.microsoft.com/source/2024/05/08/microsoft-announces-3-3-billion-investment-in-wisconsin-to-spur-artificial-intelligence-innovation-and-economic-growth/","label":"Microsoft announces $3.3 billion investment in Wisconsin (Mount Pleasant campus)","publisher":"Microsoft","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://www.jsonline.com/story/money/business/2025/01/09/microsoft-data-center-racine-county/77568940007/","label":"Microsoft data center coming to Racine County, Wisconsin — Milwaukee Journal Sentinel","publisher":"Milwaukee Journal Sentinel","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/","label":"Made in Wisconsin: the world's most powerful AI datacenter","publisher":"Microsoft On the Issues","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.datacenterknowledge.com/data-center-construction/microsoft-s-wisconsin-ai-campus-moves-from-construction-to-operations","label":"Microsoft's Wisconsin AI Data Center Campus Now Fully Operational","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wpr.org/news/wisconsin-data-centers-revenue-tax-subsidy-microsoft","label":"Local leaders see data centers as revenue boon, but critics say subsidy programs undermine those efforts","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://rcedc.org/microsoft-in-racine-county/","label":"Microsoft in Racine County","publisher":"Racine County Economic Development Corp","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.wpr.org/news/microsoft-hired-375-people-for-mount-pleasant-data-center","label":"Microsoft says it hired around 375 people for its Mount Pleasant data center","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","label":"Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin","publisher":"Microsoft","kind":"press","retrievedAt":"2026-08-04"},{"url":"https://www.wpr.org/news/microsoft-finishes-construction-mount-pleasant-data-center","label":"Microsoft finishes construction of Mount Pleasant data center, plans for more","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-08-04"},{"url":"https://futurism.com/artificial-intelligence/microsoft-ai-data-center-lawsuit-neighbors","label":"Microsoft's $7.3 Billion AI Data Center Just Caught a Nasty Lawsuit From Furious Neighbors","publisher":"Futurism","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wpr.org/news/microsoft-data-centers-8-million-gallons-water-each-year","label":"Microsoft data centers will use up to 8.4M gallons of water each year, records show","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-10-30"}]},{"id":"compute-afs-milwaukee-midtown-center-computing-facility-wi","sourceRecordId":"afs-milwaukee-midtown-center-computing-facility-wi","name":"Midtown Center Computing Facility (Former Walmart, 5825 W. Hope Ave.)","operator":"AFS Milwaukee LLC","city":"Milwaukee","county":"Milwaukee","address":"5825 W. Hope Ave.","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.0928763,"longitude":-87.9850587,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/afs-milwaukee-midtown-center-computing-facility-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://biztimes.com/plan-commission-holds-redevelopment-proposal-for-former-midtown-center-walmart-store-following-tense-public-hearing/","label":"Plan Commission holds redevelopment proposal for former Midtown Center Walmart store following tense public hearing","publisher":"BizTimes Milwaukee","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://biztimes.com/data-computing-facility-removed-from-midtown-center-redevelopment-proposal/","label":"Data computing facility removed from Midtown Center redevelopment proposal","publisher":"BizTimes Milwaukee","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://nominatim.openstreetmap.org/search?q=5825+W+Hope+Ave,+Milwaukee,+WI&format=json","label":"OpenStreetMap/Nominatim geocode of 5825 West Hope Avenue, Midtown Center, Milwaukee 53216","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-10-16"}]},{"id":"compute-mapletree-riverwood-pewaukee-wi","sourceRecordId":"mapletree-riverwood-pewaukee-wi","name":"N15W24250 Riverwood Drive Data Centre (Pewaukee)","operator":"Mapletree Redwood Data Centre Trust","city":"Pewaukee","county":"Waukesha","address":"N15 W24250 Riverwood Drive","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.052836,"longitude":-88.2304946,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mapletree-riverwood-pewaukee-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://baxtel.com/data-center/mapletree-n15-w24250-riverwood","label":"Mapletree: N15 W24250 Riverwood Data Center — ownership history and status","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://baxtel.com/data-center/wisconsin","label":"Wisconsin Data Centers & Colocation (lists N15 W24250 Riverwood at 142,952 sq ft, ~40,000 sq ft gross)","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=N15W24250+Riverwood+Drive%2C+Pewaukee%2C+WI+53188&format=json&limit=1&addressdetails=1","label":"OpenStreetMap/Nominatim geocode of N15W24250 Riverwood Drive, Riverwood Corporate Center, City of Pewaukee (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-netsonic-green-bay-wi","sourceRecordId":"netsonic-green-bay-wi","name":"Netsonic Green Bay Data Center","operator":"Netsonic (Dynamic Ventures LLC)","city":"Green Bay","county":"Brown","address":"1263 Main St., Suite 223","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.5155,"longitude":-87.995,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/netsonic-green-bay-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.netsonic.net/datacenter.php","label":"Green Bay, WI Datacenter — Colocation, Backup and Disaster Recovery","publisher":"Netsonic","kind":"other","retrievedAt":"2026-09-21"}]},{"id":"compute-new-era-technology-appleton-wi","sourceRecordId":"new-era-technology-appleton-wi","name":"New Era Technology Appleton Data Center","operator":"New Era Technology","city":"Appleton","county":"Outagamie","address":"2201 E. Enterprise Avenue","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.2998488,"longitude":-88.370814,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/new-era-technology-appleton-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.godatacenters.com/data-centers/wisconsin/appleton/3069b211-42d8-4380-8f43-77c22a7c2397","label":"New Era Technology - Appleton, WI Data Center (2201 E Enterprise Avenue; Tier 3; built 2020)","publisher":"GoDataCenters","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"New Era Technology-Appleton, Appleton\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=2201+E+Enterprise+Avenue%2C+Appleton%2C+WI+54913&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of 2201 East Enterprise Avenue, Appleton, Outagamie County (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-oppidan-beaver-dam-edge-wi","sourceRecordId":"oppidan-beaver-dam-edge-wi","name":"Oppidan Beaver Dam Edge Data Center","operator":"Oppidan Investment Company","city":"Beaver Dam","county":"Dodge","address":"Highway 151 and Hemlock Road","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.4578,"longitude":-88.8373,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/oppidan-beaver-dam-edge-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-16","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/","label":"Beaver Dam Common Council Approves Second Data Center","publisher":"Daily Dodge","kind":"press","retrievedAt":"2026-09-01"},{"url":"https://www.wpr.org/economy/second-data-center-project-proposed-in-beaver-dam","label":"Second data center project proposed in Beaver Dam (90,000 sq ft, 13-acre site at Highway 151 and Hemlock Road, under 20 MW, 5,929 gallons/day estimated water use, 15 full-time jobs)","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-cambrin-project-cornmaze-town-of-beloit-wi","sourceRecordId":"cambrin-project-cornmaze-town-of-beloit-wi","name":"Project Cornmaze Data Center (Town of Beloit)","operator":"Panattoni","city":"Beloit","county":"Rock","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.5843885,"longitude":-89.0215921,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/cambrin-project-cornmaze-town-of-beloit-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wpr.org/news/town-of-beloit-pre-development-agreement-develop-data-center","label":"Town of Beloit has pre-development agreement with company looking to develop data center","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-08-18"},{"url":"https://608scanner.com/the-rock-county-data-center-fight-janesvilles-three-proposals-and-the-vote-that-could-decide-them/","label":"The Rock County data center fight — Cambrin/Beloit quarry site","publisher":"608 Scanner","kind":"press","retrievedAt":"2026-08-18"},{"url":"https://www.panattoni.com/cornmaze","label":"Cornmaze: Proposed Data Center Development, Town of Beloit and Town of Turtle","publisher":"Panattoni","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://www.wuwm.com/citizens-push-back-on-possible-data-center-in-town-of-beloit","label":"Citizens push back on possible data center in Town of Beloit","publisher":"WUWM","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-microsoft-project-nova-caledonia-wi","sourceRecordId":"microsoft-project-nova-caledonia-wi","name":"Project Nova Data Center Campus (Caledonia)","operator":"Microsoft","city":"Caledonia","county":"Racine","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.8210813,"longitude":-87.8501324,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-project-nova-caledonia-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wpr.org/news/caledonia-rezoning-microsoft-data-center-wisconsin","label":"Wisconsin village's plan commission approves rezoning for Microsoft data center","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.tmj4.com/news/racine-county/microsoft-pulls-plug-on-plans-for-244-acre-data-center-in-caledonia-after-community-pushback","label":"Microsoft pulls plug on plans for 244-acre data center in Caledonia after community pushback","publisher":"TMJ4 News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/microsoft-cancels-wisconsin-data-center-154306947.html","label":"Microsoft cancels Wisconsin data center (Project Nova) — three buildings and a 15-acre substation","publisher":"Tom's Hardware via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"Project Nova, Caledonia\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=Botting+Road%2C+Caledonia%2C+Racine+County%2C+Wisconsin&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of Botting Road, Caledonia, Racine County, WI (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-qts-dane-county-deforest-wi","sourceRecordId":"qts-dane-county-deforest-wi","name":"QTS Dane County Hyperscale Campus (DeForest)","operator":"QTS Data Centers","city":"DeForest","county":"Dane","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.2428,"longitude":-89.3401,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-dane-county-deforest-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://qtsdatacenters.com/news/qts-advances-plans-for-state-of-the-art-data-center-campus-and-announces-50-million-community-commitment-for-dane-county/","label":"QTS advances plans for Dane County campus - official press release","publisher":"QTS Data Centers","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://spectrumnews1.com/wi/milwaukee/news/2025/10/30/qts-data-centers-dane-county","label":"QTS plans multibillion-dollar data center campus in Dane County","publisher":"Spectrum News 1 Wisconsin","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://www.engagedeforest.com/QTS","label":"Village of DeForest - QTS project public engagement portal","publisher":"Village of DeForest","kind":"filing","retrievedAt":"2026-07-07"},{"url":"https://www.datacenterdynamics.com/en/news/qts-drops-plan-for-data-center-near-madison-wisconsin-amid-opposition-from-local-officials/","label":"QTS drops plan for data center near Madison, Wisconsin","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://dailyreporter.com/2026/01/29/deforest-cancels-qts-data-center/","label":"DeForest cancels $12 billion QTS data center plan","publisher":"The Daily Reporter","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://wtmj.com/news/2026/01/28/update-qts-withdraws-data-center-project-in-village-of-deforest/","label":"QTS withdraws data center project in Village of DeForest","publisher":"WTMJ","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://baxtel.com/data-center/qts-deforest-wisconsin","label":"QTS DeForest, Wisconsin - Baxtel facility record","publisher":"Baxtel","kind":"other","retrievedAt":"2026-07-07"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-stargate-port-washington-wi","sourceRecordId":"stargate-port-washington-wi","name":"Stargate Lighthouse Campus","operator":"Vantage Data Centers","city":"Port Washington","county":"Ozaukee","address":"Between I-43, Dixie Road, and the Ozaukee Interurban Trail, north of the city of Port Washington","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.3882,"longitude":-87.8753,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stargate-port-washington-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","label":"OpenAI, Oracle, and Vantage Data Centers Announce Stargate Site in Wisconsin — Vantage","publisher":"Vantage Data Centers","kind":"press","retrievedAt":"2026-08-04"},{"url":"https://www.datacenterknowledge.com/data-center-construction/vantage-breaks-ground-on-15b-stargate-campus-in-wisconsin","label":"Vantage Breaks Ground on $15B Stargate Campus in Wisconsin — Data Center Knowledge","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-07-05"},{"url":"https://www.constructiondive.com/news/stargate-openai-oracle-vantage-data-center-wisconsin/808437/","label":"$15B Stargate data center breaks ground in Wisconsin","publisher":"Construction Dive","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://wisconsinwatch.org/2026/04/port-washington-data-center-project-voters-referendum-tif-district-wisconsin/","label":"Did Port Washington voters stop a $458 million data center project?","publisher":"Wisconsin Watch","kind":"filing","retrievedAt":"2026-07-06"},{"url":"https://www.wpr.org/news/port-washington-referendum-concerns-data-center-project","label":"Port Washington voters pass referendum fueled by concerns about data center project","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://biztimes.com/groundbreaking-held-as-construction-begins-on-15b-port-washington-data-center/","label":"Groundbreaking held as construction begins on $15 billion Port Washington data center","publisher":"BizTimes Milwaukee","kind":"press","retrievedAt":"2026-08-04"},{"url":"https://www.wpr.org/news/data-center-port-washington-cloverleaf-infrastructure","label":"Large data center may be coming to Port Washington","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://dailyreporter.com/2026/06/24/oracle-sues-wisconsin-public-service-commission-data-center-rules/","label":"Tech giant sues Wisconsin regulator over data center restrictions","publisher":"The Daily Reporter","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.wpr.org/news/lawsuit-wisconsin-dnr-environmental-review-port-washington-data-centers","label":"Groups sue Wisconsin DNR over environmental review of Port Washington data centers","publisher":"Wisconsin Public Radio","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","label":"DOR Qualified Data Center Exemption — Oracle America Cloud Services LLC (formerly Green Chile Ventures, LLC), Port Washington, WI: \"Four data center buildings at 531, 533, 701, and 723 E. Lake Drive\", certified 10/31/2025","publisher":"Wisconsin Department of Revenue","kind":"subsidy","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=E+Lake+Drive%2C+Port+Washington%2C+Ozaukee+County%2C+Wisconsin&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of Lake Drive, Town of Port Washington, Ozaukee County, WI 53074 (postal code provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-stonebridge-pacific-columbia-county-wi","sourceRecordId":"stonebridge-pacific-columbia-county-wi","name":"Stonebridge Pacific AI Data Center (Columbia County)","operator":"Stonebridge","city":"Pacific","county":"Columbia","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.55,"longitude":-89.4,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"cancelled","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/stonebridge-pacific-columbia-county-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-04","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wisconsinwatch.org/2026/08/wisconsin-10-billion-data-center-proposal-columbia-county-town-pacific-developer/","label":"A $10 billion data center proposal vanished after a local official told the developer the process would have to unfold in public","publisher":"Wisconsin Watch","kind":"press","retrievedAt":"2026-08-04"},{"url":"https://urbanmilwaukee.com/2026/08/03/10-billion-data-center-proposal-in-central-wisconsin-dropped-to-avoid-public-process/","label":"$10 Billion Data Center Proposal in Central Wisconsin Dropped to Avoid Public Process","publisher":"Urban Milwaukee","kind":"press","retrievedAt":"2026-08-04"}]},{"id":"compute-supranet-madison-wi","sourceRecordId":"supranet-madison-wi","name":"SupraNet Madison Data Center","operator":"SupraNet Communications, Inc.","city":"Madison","county":"Dane","address":"8000 Excelsior Drive, Suite 204","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.075033,"longitude":-89.525037,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/supranet-madison-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.supranet.net/cloud-solutions/","label":"SupraNet Data Center, Cloud, Disaster Recovery — Madison (address, SOC 2 Type II, carriers, redundancy)","publisher":"SupraNet Communications","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"SupraNet Madison, Madison\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=8000+Excelsior+Drive%2C+Madison%2C+WI+53717&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of 8000 Excelsior Drive, Old Sauk Trails Park, Madison (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-tierpoint-milwaukee-wi","sourceRecordId":"tierpoint-milwaukee-wi","name":"TierPoint Milwaukee","operator":"TierPoint","city":"Milwaukee","county":"Milwaukee","address":null,"state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.0097937,"longitude":-87.9610932,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tierpoint-milwaukee-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-07-23","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.tierpoint.com/data-centers/wisconsin/milwaukee/","label":"TierPoint facility directory","publisher":"TierPoint","kind":"other","retrievedAt":"2026-07-22"},{"url":"https://www.openstreetmap.org/node/9721703993","label":"OpenStreetMap node/9721703993","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"}]},{"id":"compute-town-of-janesville-data-center-rock-county-wi","sourceRecordId":"town-of-janesville-data-center-rock-county-wi","name":"Town of Janesville Data Center Inquiry (Polzin/Fenric Roads)","operator":"Undisclosed (approached through a San Diego-based consulting firm)","city":"Janesville","county":"Rock","address":"North Polzin Road at West Fenric Road","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.7158171,"longitude":-89.1216592,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/town-of-janesville-data-center-rock-county-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://spectrumnews1.com/wi/milwaukee/news/2026/05/13/town-of-janesville--data-center--rock-county--paul-terpstra--petition","label":"Rock County sees third data center proposal request","publisher":"Spectrum News 1 Wisconsin","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://608scanner.com/the-rock-county-data-center-fight-janesvilles-three-proposals-and-the-vote-that-could-decide-them/","label":"The Rock County data center fight: Janesville's three proposals and the vote that could decide them","publisher":"608 Scanner","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.gazettextra.com/news/more-rock-county-townships-are-seeking-data-center-moratoriums/article_c7214f26-7749-4c17-9e60-73e66da327b7.html","label":"More Rock County townships are seeking data center moratoriums","publisher":"Janesville Gazette (GazetteXtra)","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=North+Polzin+Road%2C+Janesville%2C+Rock+County%2C+Wisconsin&format=json&limit=1","label":"OpenStreetMap/Nominatim geocode of North Polzin Road, Town of Janesville, Rock County, WI (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"},{"url":"https://www.panattoni.com/cornmaze/","label":"Cornmaze Proposed Data Center Development, Town of Beloit and Town of Turtle, Wisconsin","publisher":"Panattoni Development Company","kind":"other","retrievedAt":"2026-10-28"}]},{"id":"compute-us-signal-wi01-madison-wi","sourceRecordId":"us-signal-wi01-madison-wi","name":"US Signal WI01 Madison","operator":"US Signal","city":"Madison","county":"Dane","address":"222 W Washington Ave. Ste. 1","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.0732716,"longitude":-89.3870807,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-wi01-madison-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/wi01-madison/","label":"US Signal WI01 Madison — facility specifications","publisher":"US Signal","kind":"other","retrievedAt":"2026-08-18"}]},{"id":"compute-us-signal-wi02-fitchburg-wi","sourceRecordId":"us-signal-wi02-fitchburg-wi","name":"US Signal WI02 Madison (Fitchburg)","operator":"US Signal","city":"Fitchburg","county":"Dane","address":"5515 Nobel Drive","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":42.9947535,"longitude":-89.42339,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/us-signal-wi02-fitchburg-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-18","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://ussignal.com/data-centers/wi02-madison/","label":"US Signal WI02 Madison — facility specifications","publisher":"US Signal","kind":"other","retrievedAt":"2026-08-18"},{"url":"https://ussignal.com/data-centers","label":"US Signal data center locations (two Madison, WI facilities)","publisher":"US Signal","kind":"other","retrievedAt":"2026-08-18"}]},{"id":"compute-wells-interconnection-milwaukee-wi","sourceRecordId":"wells-interconnection-milwaukee-wi","name":"Wells Interconnection Data Center (Wells Building)","operator":"Wells Interconnection","city":"Milwaukee","county":"Milwaukee","address":"324 E. Wisconsin Ave.","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":43.0389885,"longitude":-87.9069379,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/wells-interconnection-milwaukee-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/324-east-wisconsin-avenue-milwaukee/wells-interconnection/datacenter/324-e-wisconsin","label":"Wells Interconnection 324 E Wisconsin — carrier-hotel facility listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://www.yahoo.com/news/articles/data-center-community-heres-map-131352571.html","label":"Is there a data center in your community? Here's a map of the data centers in Wisconsin (lists \"1547 Critical Systems Realty, Milwaukee\")","publisher":"Milwaukee Journal Sentinel via Yahoo News","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://nominatim.openstreetmap.org/search?q=324+E+Wisconsin+Ave%2C+Milwaukee%2C+WI+53202&format=json&limit=1&addressdetails=1","label":"OpenStreetMap/Nominatim geocode of the Wells Building, 324 East Wisconsin Avenue, Milwaukee (coordinate provenance)","publisher":"OpenStreetMap contributors","kind":"osm","retrievedAt":"2026-09-13"}]},{"id":"compute-pch-wi-holdings-wisconsin-rapids-wood-county-wi","sourceRecordId":"pch-wi-holdings-wisconsin-rapids-wood-county-wi","name":"Wisconsin Rapids Data Center","operator":"PCH WI Holdings LLC","city":"Wisconsin Rapids","county":"Wood","address":"950 Fourth Avenue North","state":"WI","stateName":"Wisconsin","jurisdictionType":"state","latitude":44.39,"longitude":-89.82,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/pch-wi-holdings-wisconsin-rapids-wood-county-wi","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wausaupilotandreview.com/2026/05/17/who-is-the-developer-of-the-proposed-wisconsin-rapids-data-center/","label":"Who is the developer of the proposed Wisconsin Rapids data center?","publisher":"Wausau Pilot & Review","kind":"press","retrievedAt":"2026-10-16"},{"url":"https://whsm.com/news/2026/10/15/wisconsin-rapids-data-center-faces-key-council-decision-october-20","label":"Wisconsin Rapids Data Center Faces Key Council Decision October 20","publisher":"WHSM","kind":"press","retrievedAt":"2026-10-16"}]},{"id":"compute-adams-fork-harless-datacenter-logan-county-wv","sourceRecordId":"adams-fork-harless-datacenter-logan-county-wv","name":"Adams Fork Energy Campus Data Center (Harless Industrial Park, Holden)","operator":"TransGas Development Systems","city":"Holden","county":"Logan","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":37.8134,"longitude":-81.9822,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/adams-fork-harless-datacenter-logan-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvhighlands.org/article/despite-public-pushback-west-virginia-approves-air-quality-permits-for-data-center-energy-campus-in-mingo-county/","label":"Despite public pushback, West Virginia approves air quality permits for data center energy campus in Mingo County","publisher":"West Virginia Highlands Conservancy","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/","label":"Adams Fork is a Giant Waste of Energy","publisher":"Ohio River Valley Institute","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-adams-fork-wharncliffe-datacenter-mingo-county-wv","sourceRecordId":"adams-fork-wharncliffe-datacenter-mingo-county-wv","name":"Adams Fork Energy Campus Data Center (Twisted Gun Golf Course, Wharncliffe)","operator":"TransGas Development Systems","city":"Wharncliffe","county":"Mingo","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":37.6412,"longitude":-81.9689,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/adams-fork-wharncliffe-datacenter-mingo-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvhighlands.org/article/despite-public-pushback-west-virginia-approves-air-quality-permits-for-data-center-energy-campus-in-mingo-county/","label":"Despite public pushback, West Virginia approves air quality permits for data center energy campus in Mingo County","publisher":"West Virginia Highlands Conservancy","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/","label":"Adams Fork is a Giant Waste of Energy","publisher":"Ohio River Valley Institute","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-alpha-technologies-huntington-wv","sourceRecordId":"alpha-technologies-huntington-wv","name":"Alpha Technologies Huntington Headquarters Data Center","operator":"Alpha Technologies","city":"Huntington","county":"Cabell","address":"1125 6th Avenue","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.419045646836,"longitude":-82.437058798916,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/alpha-technologies-huntington-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wchstv.com/news/local/alpha-technologies-announces-new-data-center-to-be-built-in-huntington","label":"Alpha Technologies to invest $10M for data center headquarters in Huntington","publisher":"WCHS","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://myalphainnovations.com/alpha-cloud/","label":"Alpha Innovations — ALPHA CLOUD data center locations: \"1125 6th Avenue, Huntington, WV 25701\"","publisher":"Alpha Technologies / Alpha Innovations","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://downtownhuntington.net/alpha-technologies-to-open-new-it-data-center-in-huntington/","label":"Alpha Technologies To Open New IT Data Center In Huntington — former Appalachian Power Company building at 1125 6th Avenue","publisher":"Downtown Huntington Partners","kind":"press","retrievedAt":"2026-09-15"}]},{"id":"compute-alpha-technologies-south-charleston-wv","sourceRecordId":"alpha-technologies-south-charleston-wv","name":"Alpha Technologies South Charleston DC01","operator":"Alpha Technologies","city":"South Charleston","county":"Kanawha","address":"2020 Union Carbide Drive, Building 6000","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.3530922,"longitude":-81.6962715,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/alpha-technologies-south-charleston-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://myalphainnovations.com/dc1/","label":"DC1 - High-Performance Data Center - Alpha Innovations","publisher":"Alpha Technologies","kind":"other","retrievedAt":"2026-09-13"},{"url":"https://cloudandcolocation.com/datacenters/alpha-technologies-south-charleston-dc01/","label":"Alpha Technologies - South Charleston DC01","publisher":"Cloud and Colocation","kind":"other","retrievedAt":"2026-09-13"}]},{"id":"compute-penzance-bedington-berkeley-county-wv","sourceRecordId":"penzance-bedington-berkeley-county-wv","name":"Bedington Campus","operator":"Penzance Management","city":null,"county":"Berkeley","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.554,"longitude":-77.882,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/penzance-bedington-berkeley-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact","label":"Governor Morrisey Announces $4 Billion Private Investment in WV's First High Impact Intelligence Center","publisher":"WV Office of the Governor","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://westvirginiawatch.com/2026/02/26/d-c-based-real-estate-firm-investing-4b-for-new-data-center-development-in-berkeley-county-wv/","label":"D.C.-based real estate firm investing $4B for new data center development in Berkeley County, WV","publisher":"West Virginia Watch","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.datacenterdynamics.com/en/news/penzance-targets-600mw-data-center-campus-in-west-virginia/","label":"Penzance targets 600MW data center campus in West Virginia","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://wvmetronews.com/2026/03/23/public-speaks-out-on-data-center-planned-for-falling-waters-area/","label":"WV MetroNews — Public speaks out on data center planned for Falling Waters area","publisher":null,"kind":"press","retrievedAt":"2026-07-26"},{"url":"https://westvirginia.gov/4-billion-data-center-campus-planned-for-berkeley-county-positioning-west-virginia-for-the-ai-and-cloud-economy/","label":"$4 Billion Data Center Campus Planned for Berkeley County — \"up to 600 megawatts of critical IT capacity\"","publisher":"West Virginia Division of Economic Development","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://observerwv.com/data-center-project-planned-in-bedington-area-of-berkeley-county/","label":"Data center project planned in Bedington area of Berkeley County","publisher":"The Observer (WV)","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-qts-kearneysville-berkeley-jefferson-wv","sourceRecordId":"qts-kearneysville-berkeley-jefferson-wv","name":"Berkeley/Jefferson County Data Center Campus (QTS Kearneysville)","operator":"QTS Data Centers","city":"Kearneysville","county":"Berkeley","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.3729,"longitude":-77.8636,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/qts-kearneysville-berkeley-jefferson-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://observerwv.com/plan-for-data-center-complex-near-kearneysville-approved/","label":"Plan For Data Center Complex Near Kearneysville Approved","publisher":"ObserverWV","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://baxtel.com/data-center/qts-kearneysville-campus","label":"QTS: Kearneysville Campus Data Center","publisher":"Baxtel","kind":"other","retrievedAt":"2026-09-10"}]},{"id":"compute-citynet-bridgeport-harrison-county-wv","sourceRecordId":"citynet-bridgeport-harrison-county-wv","name":"Citynet Bridgeport Data Center","operator":"Citynet, LLC","city":"Bridgeport","county":"Harrison","address":"100 Citynet Drive","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.2763943,"longitude":-80.2721692,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/citynet-bridgeport-harrison-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.citynet.net/network-services/data-center-colocation/","label":"Citynet — Data Centers & Colocation (facility locations)","publisher":"Citynet, LLC","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=100+Platinum+Drive%2C+Bridgeport%2C+WV&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for the Citynet Bridgeport site (street-level match)","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-citynet-charleston-kanawha-county-wv","sourceRecordId":"citynet-charleston-kanawha-county-wv","name":"Citynet Charleston Data Center","operator":"Citynet, LLC","city":"Charleston","county":"Kanawha","address":"226 Kanawha Boulevard East","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.3521647,"longitude":-81.6413397,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/citynet-charleston-kanawha-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.citynet.net/network-services/data-center-colocation/","label":"Citynet — Data Centers & Colocation (facility locations)","publisher":"Citynet, LLC","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=226+Kanawha+Boulevard+East%2C+Charleston%2C+WV&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for 226 Kanawha Boulevard East, Charleston, WV","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-continent-8-west-virginia-dc1-south-charleston-wv","sourceRecordId":"continent-8-west-virginia-dc1-south-charleston-wv","name":"Continent 8 West Virginia DC1","operator":"Continent 8 Technologies","city":"South Charleston","county":"Kanawha","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.368429,"longitude":-81.69957,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/continent-8-west-virginia-dc1-south-charleston-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/","label":"Continent 8 Technologies doubles down in West Virginia","publisher":"Continent 8 Technologies","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=South+Charleston%2C+Kanawha+County%2C+West+Virginia&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for South Charleston, Kanawha County, WV","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-continent-8-west-virginia-dc2-petersburg-grant-county-wv","sourceRecordId":"continent-8-west-virginia-dc2-petersburg-grant-county-wv","name":"Continent 8 West Virginia DC2","operator":"Continent 8 Technologies","city":"Petersburg","county":"Grant","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.9924886,"longitude":-79.123975,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/continent-8-west-virginia-dc2-petersburg-grant-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/","label":"Continent 8 Technologies doubles down in West Virginia","publisher":"Continent 8 Technologies","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=Petersburg%2C+Grant+County%2C+West+Virginia&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for Petersburg, Grant County, WV","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-dedispec-berkeley-springs-morgan-county-wv","sourceRecordId":"dedispec-berkeley-springs-morgan-county-wv","name":"Dedispec Berkeley Springs Data Center","operator":"Dedispec","city":"Berkeley Springs","county":"Morgan","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.6267975,"longitude":-78.2279514,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/dedispec-berkeley-springs-morgan-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://dedispec.com/wvdatacenter.php","label":"Dedispec: Berkeley Springs, West Virginia Data Center","publisher":"Dedispec","kind":"other","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=Berkeley+Springs%2C+Morgan+County%2C+West+Virginia&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for Berkeley Springs (Bath), Morgan County, WV","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-fbi-cjis-division-clarksburg-harrison-county-wv","sourceRecordId":"fbi-cjis-division-clarksburg-harrison-county-wv","name":"FBI Criminal Justice Information Services (CJIS) Division Data Center","operator":"Federal Bureau of Investigation","city":"Clarksburg","county":"Harrison","address":"1000 Custer Hollow Road","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.3257988,"longitude":-80.2680771,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fbi-cjis-division-clarksburg-harrison-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nextgov.com/digital-government/2013/07/fbi-data-center-program-connotes-things-come/67373/","label":"FBI data center efficiency program the way of the future? (CJIS data center in Clarksburg, W.Va.)","publisher":"Nextgov","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://news.lockheedmartin.com/2002-09-17-Lockheed-Martin-Wins-Contract-to-Refresh-FBI-West-Virginia-Center-Technology","label":"Lockheed Martin wins contract to refresh FBI West Virginia center technology (CJIS 'System of Systems')","publisher":"Lockheed Martin","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://www.som.com/?p=9976","label":"FBI Biometric Technology Center on the CJIS campus, Clarksburg","publisher":"SOM","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://nominatim.openstreetmap.org/search?q=1000+Custer+Hollow+Road+Clarksburg+WV&format=json","label":"OpenStreetMap Nominatim geocode — FBI Criminal Justice Information Services, 1000 Custer Hollow Road, Clarksburg, WV 26306","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-11"}]},{"id":"compute-google-putnam-county-campus-wv","sourceRecordId":"google-putnam-county-campus-wv","name":"Google Putnam County Data Center","operator":"Google","city":"Buffalo","county":"Putnam","address":"22272 Charleston Road","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.64411,"longitude":-81.956511,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/google-putnam-county-campus-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wvmetronews.com/2026/03/27/google-announces-plans-for-data-center-in-buffalo-w-va/","label":"Google announces plans for data center in Buffalo, W.Va.","publisher":"WV MetroNews","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://wsaz.com/2026/03/27/google-purchases-land-potential-data-center-putnam-county/","label":"Google purchases land for potential data center in Putnam County","publisher":"WSAZ","kind":"press","retrievedAt":"2026-07-17"},{"url":"https://www.herald-dispatch.com/news/putnam_news/possible-google-data-center-property-location-in-buffalo-identified/article_963132ef-0a9c-44bf-9fc6-7c9751278305.html","label":"Possible Google data center property location in Buffalo identified","publisher":"Herald-Dispatch","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://services.wvgis.wvu.edu/arcgis/rest/services/Geocode/WV_Composite/GeocodeServer","label":"West Virginia GIS Technical Center -- WV Composite Geocoder (state PointAddress match for 22272 Charleston Rd, Buffalo, WV 25033)","publisher":null,"kind":"other","retrievedAt":"2026-07-18"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://wvmetronews.com/2026/09/01/pack-releases-study-on-expected-data-center-tax-revenue/","label":"Pack releases study on expected data center tax revenue","publisher":"WV MetroNews","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://buffalowvdatacenter.com/","label":"Google — Buffalo, West Virginia data center project site","publisher":"Google","kind":"other","retrievedAt":"2026-09-15"},{"url":"https://wvpublic.org/story/economy/google-launches-data-center-website-for-putnam-county-campus/","label":"Google Launches Data Center Website For Putnam County Campus — plans to generate 100% of the electricity needed and treat 120% of the water needed","publisher":"West Virginia Public Broadcasting","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://wvpublic.org/story/energy-environment/google-to-source-solar-power-for-planned-putnam-data-center/","label":"Google To Source Solar Power For Planned Putnam Data Center","publisher":"West Virginia Public Broadcasting","kind":"press","retrievedAt":"2026-10-29"},{"url":"https://www.globenewswire.com/news-release/2026/09/02/3355060/0/en/mn8-energy-google-and-eos-energy-enterprises-bring-advanced-clean-energy-solutions-to-west-virginia.html","label":"MN8 Energy, Google, and Eos Energy Enterprises Bring Advanced Clean Energy Solutions to West Virginia","publisher":"GlobeNewswire (MN8 Energy / Eos Energy Enterprises)","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://wvtreasury.gov/Portals/wvtreasury/Content/Research/DataCenterAnalysis.pdf","label":"West Virginia Treasury Analysis: Tax Impact of Data Centers on Local Communities (Mark Muchow, September 2026)","publisher":"West Virginia State Treasurer","kind":"other","retrievedAt":"2026-10-27"},{"url":"https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs","label":"EEI Large Load Projects and Tariffs (October 2026)","publisher":"Edison Electric Institute","kind":"other","retrievedAt":"2026-10-28"},{"url":"https://moorefieldexaminer.com/?p=23426","label":"Morrisey announces Google data center","publisher":"Moorefield Examiner / The Inter-Mountain","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://wvpublic.org/newsroom/series/tracking-data-center-development/","label":"Tracking Data Center Development (series)","publisher":"West Virginia Public Broadcasting","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.bondbuyer.com/news/west-virginia-welcomes-more-than-80b-of-data-center-deals","label":"West Virginia welcomes more than $80B of data center deals","publisher":"The Bond Buyer","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-hog-lick-aggregates-white-hall-marion-wv","sourceRecordId":"hog-lick-aggregates-white-hall-marion-wv","name":"Hog Lick Aggregates Data Center / Microgrid Proposal","operator":"Hog Lick Aggregates","city":"White Hall","county":"Marion","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.4211977,"longitude":-80.1825815,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/hog-lick-aggregates-white-hall-marion-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-13","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wdtv.com/2026/05/05/local-company-proposes-data-center-marion-county/","label":"Local company proposes data center in Marion County","publisher":"WDTV","kind":"press","retrievedAt":"2026-09-13"}]},{"id":"compute-irs-enterprise-computing-center-kearneysville-wv","sourceRecordId":"irs-enterprise-computing-center-kearneysville-wv","name":"IRS Enterprise Computing Center (Martinsburg Computing Center)","operator":"Internal Revenue Service","city":"Kearneysville","county":"Berkeley","address":"250 Murall Drive","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.3985849,"longitude":-77.9163203,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/irs-enterprise-computing-center-kearneysville-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc","label":"IRS procurement technical exhibit — Martinsburg Computing Center: \"Main Building: 250 Murall Drive, Kearneysville, WV Occupied 1999 379,200 GSF\"","publisher":"Internal Revenue Service","kind":"filing","retrievedAt":"2026-09-15"},{"url":"https://www.energy.gov/nepa/articles/cx-032001-internal-revenue-service-martinsburg-enterprise-computing-center-espc","label":"CX-032001: Internal Revenue Service Martinsburg Enterprise Computing Center ESPC (DOE AFFECT grant, NEPA categorical exclusion)","publisher":"U.S. Department of Energy","kind":"filing","retrievedAt":"2026-09-15"},{"url":"https://www.sdxcentral.com/news/irs-purchases-nvidia-dgx-b200-superpod/","label":"IRS purchases Nvidia DGX B200 SuperPOD — 31 DGX B200 systems for the Martinsburg Enterprise Computing Center","publisher":"SDxCentral","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://theintercept.com/2025/02/14/irs-ai-nvidia-tax/","label":"The IRS Is Buying an AI Supercomputer From Nvidia","publisher":"The Intercept","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=250%20Murall%20Drive%2C%20Kearneysville%2C%20West%20Virginia&format=json&addressdetails=1&limit=3","label":"OpenStreetMap Nominatim geocode — Internal Revenue Service, 250 Murall Drive, Berkeley County, WV 25430","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-nscale-monarch-mason-county-wv","sourceRecordId":"nscale-monarch-mason-county-wv","name":"Monarch Compute Campus","operator":"Nscale","city":"Point Pleasant","county":"Mason","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.87,"longitude":-82.1,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/nscale-monarch-mason-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory","label":"Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW NVIDIA Vera Rubin at WV AI Factory Campus","publisher":"Nscale","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/","label":"Nscale acquires 8GW Monarch Compute Campus; Microsoft signs on for 1.35GW","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.wvgazettemail.com/news/a-lot-of-rumors-mason-county-residents-meet-discuss-plans-to-fight-data-center/article_b1873a93-dbff-4476-811c-df55357449a1.html","label":"Mason County residents meet to discuss plans to fight data center","publisher":"WV Gazette-Mail","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.wvgazettemail.com/news/energy_and_environment/morrisey-hails-state-certifications-for-two-mason-county-data-center-projects/article_96015183-04d8-4947-90b4-0b19f8bcfa48.html","label":"Morrisey hails state certifications for two Mason County data center projects","publisher":"WV Gazette-Mail","kind":"press","retrievedAt":"2026-10-29"},{"url":"https://www.wvgazettemail.com/business/construction-weeks-away-mason-county-data-center-operational-in-early-2027-builder/article_0edb4165-114e-4b92-ba1c-9acbdd240893.html","label":"Construction weeks away, Mason County data center operational in early 2027, builder says","publisher":"WV Gazette-Mail","kind":"press","retrievedAt":"2026-09-10"},{"url":"https://www.herald-dispatch.com/business/morrisey-hails-state-certifications-for-two-mason-county-data-center-projects/article_924875e0-77b4-45ab-9115-2ff4b193a6ae.html","label":"West Virginia certifies two data centers in Mason County — Monarch phase one \"approximately 2 gigawatts of power\", expansion \"to 8 gigawatts or more\"","publisher":"The Herald-Dispatch","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://wvpublic.org/story/energy-environment/second-certified-data-center-announced-for-mason-county/","label":"Second Certified Data Center Announced For Mason County — \"Nscale will use a closed-loop water system to minimize water use\"","publisher":"West Virginia Public Broadcasting","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-netl-computational-science-engineering-center-morgantown-wv","sourceRecordId":"netl-computational-science-engineering-center-morgantown-wv","name":"NETL Computational Science and Engineering Center","operator":"National Energy Technology Laboratory (U.S. Department of Energy)","city":"Morgantown","county":"Monongalia","address":"3610 Collins Ferry Road","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.669344,"longitude":-79.977168,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/netl-computational-science-engineering-center-morgantown-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://netl.doe.gov/node/14819","label":"NETL's Computational Science & Engineering Center Is Under Construction","publisher":"National Energy Technology Laboratory (U.S. DOE)","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=3610+Collins+Ferry+Road%2C+Morgantown%2C+WV&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for the NETL Morgantown campus address","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"}]},{"id":"compute-noaa-environmental-security-computing-center-fairmont-wv","sourceRecordId":"noaa-environmental-security-computing-center-fairmont-wv","name":"NOAA Environmental Security Computing Center (NESCC)","operator":"National Oceanic and Atmospheric Administration","city":"Fairmont","county":"Marion","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.484898,"longitude":-80.1426539,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/noaa-environmental-security-computing-center-fairmont-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wvpress.org/breaking-news/noaas-100m-rhea-supercomputer-coming-to-fairmont-boosting-west-virginia-tech-growth/","label":"NOAA's $100M Rhea supercomputer coming to Fairmont, boosting West Virginia tech growth","publisher":"West Virginia Press Association","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=Fairmont%2C+Marion+County%2C+West+Virginia&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for Fairmont, Marion County, WV","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"},{"url":"https://wvhtf.org/press-release-biden-harris-administration-invests-100-million-in-a-new-high-performance-computer-system-to-advance-noaa-research-and-development/","label":"Press release: $100 million for new NOAA high-performance computer system (Rhea) at NESCC Fairmont","publisher":"West Virginia High Technology Foundation (NOAA release)","kind":"press","retrievedAt":"2026-10-11"}]},{"id":"compute-starwood-tamarack-west-columbia-mason-wv","sourceRecordId":"starwood-tamarack-west-columbia-mason-wv","name":"Project Tamarack","operator":"Starwood Digital Ventures","city":"West Columbia","county":"Mason","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":38.9831343,"longitude":-82.0634753,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/starwood-tamarack-west-columbia-mason-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wdtv.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/","label":"Starwood Digital Ventures announces data center for Mason County","publisher":"WDTV","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.wsaz.com/2026/09/04/total-shocker-residents-react-second-data-center-coming-mason-county/","label":"'Total shocker': Residents react to second data center coming to Mason County","publisher":"WSAZ","kind":"press","retrievedAt":"2026-09-13"},{"url":"https://www.herald-dispatch.com/business/morrisey-hails-state-certifications-for-two-mason-county-data-center-projects/article_924875e0-77b4-45ab-9115-2ff4b193a6ae.html","label":"West Virginia certifies two data centers in Mason County — Project Tamarack \"roughly 2.16 gigawatts of power\", \"advanced cooling systems designed to limit water consumption\"","publisher":"The Herald-Dispatch","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://wvpublic.org/story/energy-environment/second-certified-data-center-announced-for-mason-county/","label":"Second Certified Data Center Announced For Mason County — Tamarack closed-loop cooling to minimize water use","publisher":"West Virginia Public Broadcasting","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://wvmetronews.com/2026/09/03/morrisey-announces-12-billion-data-center-project-in-mason-county/","label":"Morrisey announces $12 billion data center project in Mason County","publisher":"WV MetroNews","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://www.wsaz.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/","label":"Starwood Digital Ventures announces data center for Mason County","publisher":"WSAZ","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-fundamental-data-ridgeline-datacenter-tucker-county-wv","sourceRecordId":"fundamental-data-ridgeline-datacenter-tucker-county-wv","name":"Ridgeline Data Center","operator":"Fundamental Data LLC","city":null,"county":"Tucker","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.1517,"longitude":-79.4913,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/fundamental-data-ridgeline-datacenter-tucker-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-10","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvhighlands.org/tucker-county-data-center-ridgeline-facility/","label":"Tucker County Data Center \"Ridgeline Facility\"","publisher":"West Virginia Highlands Conservancy","kind":"other","retrievedAt":"2026-09-10"},{"url":"https://westvirginiawatch.com/2026/07/20/wv-advocates-want-to-know-who-owns-the-land-proposed-for-data-center-development-in-tucker-county/","label":"WV advocates want to know who owns the land proposed for data center development in Tucker County","publisher":"West Virginia Watch","kind":"press","retrievedAt":"2026-09-10"}]},{"id":"compute-shady-spring-data-center-campus-raleigh-county-wv","sourceRecordId":"shady-spring-data-center-campus-raleigh-county-wv","name":"Shady Spring Data Center Campus (Greenbrier Land Company rezoning)","operator":"Undisclosed end user (rezoning sought by Greenbrier Land Company)","city":"Shady Spring","county":"Raleigh","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":37.7020095,"longitude":-81.0855214,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/shady-spring-data-center-campus-raleigh-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wvva.com/2024/01/09/residents-say-they-are-filled-with-relief-after-raleigh-county-commission-officially-tables-shady-spring-rezoning/","label":"Residents say they are filled with relief after Raleigh County Commission officially tables Shady Spring rezoning","publisher":"WVVA","kind":"press","retrievedAt":"2026-09-22"},{"url":"https://nominatim.openstreetmap.org/search?q=Shady+Spring%2C+Raleigh+County%2C+West+Virginia&format=json&limit=1","label":"OpenStreetMap Nominatim geocode for Shady Spring, Raleigh County, WV","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-22"},{"url":"https://www.wvva.com/2023/12/22/shady-spring-residents-up-arms-over-proposed-rezoning-wooded-area-bordering-their-neighborhoods/","label":"Shady Spring residents up in arms over proposed rezoning of wooded area bordering their neighborhoods","publisher":"WVVA","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://woay.com/?p=113172","label":"Commissioners table decision on Shady Spring data center, future development not ruled out","publisher":"WOAY","kind":"press","retrievedAt":"2026-10-28"}]},{"id":"compute-silicon-foundation-warwood-wheeling-ohio-county-wv","sourceRecordId":"silicon-foundation-warwood-wheeling-ohio-county-wv","name":"Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry)","operator":"Silicon Foundation Energy","city":"Wheeling","county":"Ohio","address":"74 Warwood Avenue","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":40.1013314,"longitude":-80.7029667,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/silicon-foundation-warwood-wheeling-ohio-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-29","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://wvpublic.org/story/energy-environment/states-sixth-data-center-announced-near-wheeling/","label":"State's Sixth Data Center Announced Near Wheeling","publisher":"West Virginia Public Broadcasting","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://rivernews.org/2026/06/22/historic-centre-foundry-site-sold-plans-announced-for-data-center-and-energy-campus-in-wheeling/","label":"Historic Centre Foundry Site Sold, Plans Announced for Data Center and Energy Campus in Wheeling","publisher":"River News Network","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=74%20Warwood%20Avenue%2C%20Wheeling%2C%20West%20Virginia&format=json&addressdetails=1&limit=3","label":"OpenStreetMap Nominatim geocode — 74 Warwood Avenue, Wheeling, Ohio County, WV 26003","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"},{"url":"https://baxtel.com/news/100mw-data-center-proposed-for-wheeling-west-virginia","label":"100MW Data Center Proposed for Wheeling, West Virginia","publisher":"Baxtel","kind":"press","retrievedAt":"2026-10-28"},{"url":"https://www.weirtondailytimes.com/news/community/2026/07/warwood-residents-file-civil-suit-to-stop-data-center-development/","label":"Warwood residents file civil suit to stop data center development","publisher":"Weirton Daily Times","kind":"press","retrievedAt":"2026-10-29"}]},{"id":"compute-ryan-stuart-summit-point-jefferson-county-wv","sourceRecordId":"ryan-stuart-summit-point-jefferson-county-wv","name":"Summit Point Data Center Site (Ryan Stuart Development)","operator":"Ryan Stuart Development","city":"Summit Point","county":"Jefferson","address":null,"state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.2495466,"longitude":-77.9586082,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ryan-stuart-summit-point-jefferson-county-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-15","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://observerwv.news/posts/data-center-in-summit-point-politics-not-as-usual","label":"Data Center In Summit Point, Politics Not As Usual","publisher":"The Observer (WV)","kind":"press","retrievedAt":"2026-09-15"},{"url":"https://nominatim.openstreetmap.org/search?q=Summit%20Point%2C%20Jefferson%20County%2C%20West%20Virginia&format=json&addressdetails=1&limit=2","label":"OpenStreetMap Nominatim geocode — Summit Point, Jefferson County, WV 25446","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-15"}]},{"id":"compute-uscg-operations-systems-center-kearneysville-wv","sourceRecordId":"uscg-operations-systems-center-kearneysville-wv","name":"U.S. Coast Guard Operations Systems Center","operator":"U.S. Coast Guard","city":"Kearneysville","county":"Jefferson","address":"408 Coast Guard Drive","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.3953774,"longitude":-77.9139105,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/uscg-operations-systems-center-kearneysville-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.shepherdstownchronicle.com/news/local-news/2014/10/03/new-coast-guard-facility-opens-in-jefferson/","label":"New Coast Guard facility opens in Jefferson","publisher":"Shepherdstown Chronicle","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://www.capito.senate.gov/news/in-the-news/sen-capito-us-coast-guard-commandant-visit-panhandle","label":"Sen. Capito, U.S. Coast Guard commandant visit Panhandle (Operations Systems Center houses all USCG IT systems and servers)","publisher":"Office of U.S. Sen. Shelley Moore Capito","kind":"press","retrievedAt":"2026-10-11"},{"url":"https://nominatim.openstreetmap.org/search?q=Coast+Guard+Drive+Kearneysville+WV&format=json","label":"OpenStreetMap Nominatim geocode — US Coast Guard Operations Systems Center, 408 Coast Guard Drive, Jefferson County, WV 25430","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-11"}]},{"id":"compute-va-capital-region-readiness-center-martinsburg-wv","sourceRecordId":"va-capital-region-readiness-center-martinsburg-wv","name":"VA Capital Region Readiness Center (Martinsburg VAMC Data Center)","operator":"U.S. Department of Veterans Affairs","city":"Martinsburg","county":"Berkeley","address":"510 Butler Avenue","state":"WV","stateName":"West Virginia","jurisdictionType":"state","latitude":39.4160546,"longitude":-77.9110265,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/va-capital-region-readiness-center-martinsburg-wv","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-11","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.hitt.com/?p=15626","label":"Capital Region Readiness Center (CRRC), VAMC Martinsburg — 66,000-sf standalone Tier III data center","publisher":"HITT Contracting","kind":"other","retrievedAt":"2026-10-11"},{"url":"https://nominatim.openstreetmap.org/search?q=Veterans+Affairs+Medical+Center+Martinsburg&format=json","label":"OpenStreetMap Nominatim geocode — Martinsburg Veterans Affairs Medical Center, 510 Butler Avenue, Martinsburg, WV 25405","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-10-11"}]},{"id":"compute-cogent-cheyenne-114-w-10th-wy","sourceRecordId":"cogent-cheyenne-114-w-10th-wy","name":"Cogent Cheyenne Data Center","operator":"Cogent Communications","city":"Cheyenne","county":"Laramie","address":"114 W 10th Street","state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.1278101,"longitude":-104.8110116,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/cogent-cheyenne-114-w-10th-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-28","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cogentco.com/files/docs/wholesale_colocation/Cheyenne_Wholesale_2025.pdf","label":"Cogent Wholesale Colocation - 114 W 10th, Cheyenne, WY (operator datasheet)","publisher":"Cogent Communications","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-skybox-viawest-cox-ranch-cheyenne-wy","sourceRecordId":"skybox-viawest-cox-ranch-cheyenne-wy","name":"Cox Ranch Data Center","operator":"Skybox Datacenters / ViaWest Group","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.145,"longitude":-104.92,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/skybox-viawest-cox-ranch-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cowboystatedaily.com/2026/09/29/cheyenne-approves-another-annexation-for-data-center-during-contentious-meeting/","label":"Data Center Critics Angry As Cheyenne Council OKs Another Data Center Annexation","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.wyomingnews.com/news/local_news/cox-ranch-data-center-developers-outline-project-commitments-at-council-work-session/article_2436cc57-2c13-452d-a089-df88ea6915e3.html","label":"Cox Ranch data center developers outline project commitments at council work session","publisher":"Wyoming Tribune Eagle","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://cheyenneleads.org/wp-content/uploads/2026/08/LC-Data-Centers_8.4.2026.pdf","label":"Cheyenne LEADS Data Center Locations map (updated Aug 4, 2026): Planned S. ViaWest/SkyBox - Happy Jack","publisher":"Cheyenne LEADS","kind":"other","retrievedAt":"2026-10-17"}]},{"id":"compute-mwtn-data-center-of-the-rockies-casper-wy","sourceRecordId":"mwtn-data-center-of-the-rockies-casper-wy","name":"Data Center of the Rockies","operator":"Mountain West Technologies","city":"Casper","county":"Natrona","address":"851 Werner Court, Suite 100","state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":42.8602,"longitude":-106.3355,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/mwtn-data-center-of-the-rockies-casper-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.mwtn.net/data-centers","label":"Data Centers | Data Center of the Rockies (operator site)","publisher":"Mountain West Technologies","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=851+Werner+Court%2C+Casper%2C+WY&format=json&addressdetails=1&limit=3","label":"OpenStreetMap/Nominatim geocode returning \"Mountain West Technologies, 851, Werner Court, Casper, Natrona County, Wyoming, 82601\"","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-echostar-cheyenne-wy","sourceRecordId":"echostar-cheyenne-wy","name":"EchoStar Cheyenne Data Center and Satellite Uplink Facility","operator":"EchoStar","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.135,"longitude":-104.725,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/echostar-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-08-19","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterknowledge.com/business/echostar-picks-cheyenne-for-data-center","label":"EchoStar Picks Cheyenne for Data Center","publisher":"Data Center Knowledge","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","label":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-08-19"}]},{"id":"compute-etc-dc-opco-lysite-fremont-county-wy","sourceRecordId":"etc-dc-opco-lysite-fremont-county-wy","name":"ETC DC OpCo Lysite Data Center (\"1 MW DC Site\")","operator":"ETC DC OpCo LLC","city":"Lysite","county":"Fremont","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":43.285,"longitude":-107.636,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/etc-dc-opco-lysite-fremont-county-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cowboystatedaily.com/2026/08/19/plan-for-small-data-center-in-fremont-county-shines-light-on-permissive-zoning/","label":"Plan For Data Center Puts Spotlight On Lax Fremont County Zoning Laws","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://rivertonranger.com/news/details-emerge-on-lysite-data-center/article_c9aadf9d-dfc5-4675-a01e-ae14b0c944e5.html","label":"Details emerge on Lysite data center","publisher":"Riverton Ranger","kind":"press","retrievedAt":"2026-09-14"}]},{"id":"compute-lunavi-cheyenne-wy","sourceRecordId":"lunavi-cheyenne-wy","name":"Lunavi Cheyenne Data Center","operator":"Lunavi","city":"Cheyenne","county":"Laramie","address":"340 Progress Circle","state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.11,"longitude":-104.78,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/lunavi-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.lunavi.com/data-centers/cheyenne","label":"Lunavi Cheyenne Data Center","publisher":"Lunavi","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://www.1547realty.com/data-center/cheyenne-wy-chwy1/","label":"Cheyenne WY | CHWY1","publisher":"Fifteenfortyseven Critical Systems Realty","kind":"other","retrievedAt":"2026-08-19"},{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","label":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-08-19"},{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","label":"Wyoming Business Council Programs & Services (Data Center Sales Tax Exemption Eligibility Certification recipient list)","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-09-02"},{"url":"https://cdn.prod.website-files.com/678a60a2cfea0646ec3afd2c/69a707dc5d0a7f4963d52db8_Cheyenne%20Datacenter%201pager%20FINAL.pdf","label":"Lunavi's AI Launchpad: Cheyenne, Wyoming datacenter one-pager","publisher":"Lunavi","kind":"other","retrievedAt":"2026-10-17"}]},{"id":"compute-meta-cheyenne-wy","sourceRecordId":"meta-cheyenne-wy","name":"Meta Cheyenne Data Center","operator":"Meta","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.099,"longitude":-104.769,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/meta-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/meta-officially-announces-data-center-in-cheyenne-wyoming/","label":"Meta Officially Announces Data Center in Cheyenne, Wyoming","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-06"},{"url":"https://cheyenneleads.org/meta-announces-new-data-center-a-major-investment-in-cheyenne-wyoming/","label":"Meta Announces New Data Center, a Major Investment, in Cheyenne, Wyoming","publisher":"Cheyenne LEADS","kind":"other","retrievedAt":"2026-07-06"},{"url":"https://www.ewweb.com/news/project-watch/article/55124842/meta-facebook-announces-plans-for-800-million-data-center-in-cheyenne-wy","label":"Meta/Facebook Announces Plans for $800-Million Data Center in Cheyenne, WY","publisher":"Electrical Wholesaling","kind":"press","retrievedAt":"2026-08-07"},{"url":"https://cleanview.co/data-centers/wyoming/3137/meta-cheyenne---building-1","label":"Meta Cheyenne — Building 1 (109 MW)","publisher":"CleanView","kind":"other","retrievedAt":"2026-08-07"},{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","label":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-08-19"},{"url":"https://www.industrialinfo.com/iirenergy/industry-news/article/wyoming-meta-platforms-to-support-data-center-with-power-from-enbridge-solar-bess-facility--358073","label":"Wyoming: Meta Platforms to Support Data Center with Power from Enbridge Solar-BESS Facility","publisher":"Industrial Info Resources","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.enbridge.com/stories/2026/may/enbridge-meta-expand-partnership-cowboy-project-solar-plus-battery-storage","label":"Enbridge, Meta expand partnership with Cowboy Project solar-plus-battery storage","publisher":"Enbridge","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-microsoft-cheyenne-expansion-wy","sourceRecordId":"microsoft-cheyenne-expansion-wy","name":"Microsoft Cheyenne Mega-Campus Expansion","operator":"Microsoft","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.09,"longitude":-104.79,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/microsoft-cheyenne-expansion-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-22","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://news.microsoft.com/source/2026/04/14/microsoft-announces-intent-to-expand-datacenter-operations-in-cheyenne-accelerating-innovation-and-economic-growth/","label":"Microsoft Announces Intent to Expand Datacenter Operations in Cheyenne","publisher":"Microsoft","kind":"press","retrievedAt":"2026-09-21"},{"url":"https://cowboystatedaily.com/2026/04/14/microsoft-to-triple-its-cheyenne-data-center-footprint-with-3-200-acre-land-buy/","label":"Microsoft to Triple Its Cheyenne Data Center Footprint With 3,200-Acre Land Buy","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.wyomingnews.com/news/local_news/cheyenne-city-council-approves-microsofts-3-460-acre-annexation-after-hours-of-public-debate/article_ed2cfdf9-0e25-455f-a17d-3ceac92e91eb.html","label":"Cheyenne City Council approves Microsoft's 3,460-acre annexation after hours of public debate","publisher":"Wyoming Tribune Eagle","kind":"press","retrievedAt":"2026-07-22"},{"url":"https://county17.com/2026/07/14/cheyenne-passes-microsoft-data-center-land-annexation-after-more-than-5-hours-of-discussion/","label":"Cheyenne is 3,500 acres larger after approving controversial Microsoft annexation","publisher":"County 17","kind":"press","retrievedAt":"2026-07-22"},{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","label":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-08-19"}]},{"id":"compute-ncar-wyoming-supercomputing-center-cheyenne-wy","sourceRecordId":"ncar-wyoming-supercomputing-center-cheyenne-wy","name":"NCAR-Wyoming Supercomputing Center","operator":"University Corporation for Atmospheric Research (UCAR)","city":"Cheyenne","county":"Laramie","address":"Veta Drive","state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.1289,"longitude":-104.8974,"coordinatePrecision":"exact","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/ncar-wyoming-supercomputing-center-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cisl.ucar.edu/ncar-wyoming-supercomputing-center","label":"NCAR-Wyoming Supercomputing Center - Computational and Information Systems Lab","publisher":"NCAR/UCAR","kind":"other","retrievedAt":"2026-09-02"},{"url":"https://en.wikipedia.org/wiki/NCAR-Wyoming_Supercomputing_Center","label":"NCAR-Wyoming Supercomputing Center","publisher":"Wikipedia","kind":"other","retrievedAt":"2026-09-02"}]},{"id":"compute-trammell-crow-orchard-hills-cheyenne-wy","sourceRecordId":"trammell-crow-orchard-hills-cheyenne-wy","name":"Orchard Hills Data Center","operator":"Trammell Crow Company","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.098,"longitude":-104.815,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/trammell-crow-orchard-hills-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wyomingnews.com/news/local_news/planning-commission-recommends-denial-of-proposed-orchard-hills-data-center-rezoning/article_690699d2-5a9c-42ce-8b56-b72d59897486.html","label":"Planning commission recommends denial of proposed Orchard Hills data center rezoning","publisher":"Wyoming Tribune Eagle","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://cowboystatedaily.com/2026/09/29/cheyenne-approves-another-annexation-for-data-center-during-contentious-meeting/","label":"Cheyenne council coverage noting the 162-acre Orchard Hills item with final votes Oct 12","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-tallgrass-project-jade-cheyenne-wy","sourceRecordId":"tallgrass-project-jade-cheyenne-wy","name":"Project Tembo","operator":"Google","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.12,"longitude":-104.82,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/tallgrass-project-jade-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-30","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.datacenterdynamics.com/en/news/crusoe-gets-go-ahead-for-18gw-data-center-campus-and-power-plant-in-cheyenne-wyoming/","label":"Crusoe gets go-ahead for 1.8GW data center campus and power plant in Cheyenne, Wyoming","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://cowboystatedaily.com/2026/06/11/partner-pulling-out-doesnt-slow-huge-2-7gw-cheyenne-project-jade-data-center/","label":"Partner pulling out doesn't slow huge 2.7GW Cheyenne Project Jade data center","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-07-07"},{"url":"https://cowboystatedaily.com/2026/07/08/google-revealed-as-owner-of-wyomings-largest-data-center-now-project-tembo/","label":"Say Hello To Google, The Mystery Owner Behind Wyoming's Largest Data Center Project","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","label":"Wyoming Approves Data Center Campus That Includes 2.7 GW of New Natural Gas-Fired Generation","publisher":"POWER Magazine","kind":"press","retrievedAt":"2026-08-07"},{"url":"https://www.power-eng.com/gas/turbines/wyoming-data-center-power-projects-highlight-new-entrants-partnerships-in-power-generation-market/","label":"Wyoming data center power projects highlight new entrants, partnerships in power generation market","publisher":"Power Engineering","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://wyofile.com/laramie-county-approves-construction-of-what-could-become-the-largest-data-center-in-us/","label":"Laramie County approves construction of what could become the largest data center in US","publisher":"WyoFile","kind":"press","retrievedAt":"2026-09-02"},{"url":"https://finviz.com/news/399523/black-hills-corp-executes-definitive-agreements-to-serve-googles-planned-data-center-in-cheyenne-wyoming","label":"Black Hills Corp. executes definitive agreements to serve Google's planned data center in Cheyenne, Wyoming","publisher":"Black Hills Corp. (press release via Finviz)","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://cowboystatedaily.com/2026/10/08/mind-boggling-fremont-county-coming-to-grips-with-66b-data-center-project/","label":"'Mind-Boggling': With No Zoning, Fremont County In The Dark On $66B Data Center Plan (cites Project Tembo at $17B)","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-prometheus-hyperscale-evanston-wy","sourceRecordId":"prometheus-hyperscale-evanston-wy","name":"Prometheus Hyperscale Atlas Industrial Park Data Center Campus","operator":"Prometheus Hyperscale","city":"Evanston","county":"Uinta","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.27,"longitude":-110.81,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-evanston-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.prnewswire.com/news-releases/prometheus-hyperscale-secures-unanimous-conditional-use-permit-approval-from-uinta-county-commissioners-302803665.html","label":"Prometheus Hyperscale Secures Unanimous Conditional Use Permit Approval from Uinta County Commissioners","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-07-22"},{"url":"https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-secures-planning-approval-for-gigawatt-data-center-campus-in-wyoming/","label":"Prometheus Hyperscale secures planning approval for gigawatt data center campus in Wyoming","publisher":"Data Center Dynamics","kind":"press","retrievedAt":"2026-08-07"},{"url":"https://wyofile.com/uinta-county-data-center-moves-forward/","label":"Uinta County data center moves forward","publisher":"WyoFile","kind":"press","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.kpcw.org/state-regional/2026-06-19/1-25gw-data-center-approved-on-ranchland-near-evanston-wyoming","label":"1.25GW data center approved on ranchland near Evanston, Wyoming","publisher":"KPCW","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","label":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-08-19"},{"url":"https://cowboystatedaily.com/2026/08/25/prometheus-pushes-ahead-on-32b-wyoming-data-centers-as-legal-challenge-fades/","label":"Prometheus Pushes Ahead On $32B Wyoming Data Centers As Legal Challenge Fades","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","label":"Wyoming Business Council Programs & Services Catalog — Data Center Sales Tax Exemption recipient reports","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"filing","retrievedAt":"2026-09-14"}]},{"id":"compute-prometheus-hyperscale-casper-wy","sourceRecordId":"prometheus-hyperscale-casper-wy","name":"Prometheus Hyperscale Falls Ranch Data Center Campus","operator":"Prometheus Hyperscale","city":"Glenrock","county":"Converse","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":42.87,"longitude":-106.15,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-casper-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cowboystatedaily.com/2025/10/09/casper-lands-massive-1-5-gigawatt-data-center-project-on-nearby-ranch/","label":"Casper Lands Massive 1.5-Gigawatt Data Center Project on Nearby Ranch","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-07-22"},{"url":"https://oilcity.news/community/business/2025/10/10/prometheus-hyperscale-plans-data-hall-energy-infrastructure-in-natrona-county/","label":"Prometheus Hyperscale plans data hall, energy infrastructure in Natrona County","publisher":"Oil City News","kind":"press","retrievedAt":"2026-07-22"},{"url":"https://oilcity.news/community/county-community/county/2026/07/08/commissioner-prometheus-data-center-developers-consider-new-natrona-county-site/","label":"Commissioners: Prometheus data center developers considering new Natrona County site","publisher":"Oil City News","kind":"press","retrievedAt":"2026-07-22"},{"url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","kind":"other","retrievedAt":"2026-07-23"},{"url":"https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-works-with-carbon-capture-firms-on-new-data-center-campus-in-wyoming/","label":"Prometheus Hyperscale works with carbon capture firms on new data center campus in Wyoming (Falls Ranch, Casper; up to 1.5 GW)","publisher":"DatacenterDynamics","kind":"press","retrievedAt":"2026-08-07"},{"url":"https://www.prnewswire.com/news-releases/prometheus-hyperscale-spiritus-and-casper-carbon-capture-announce-strategic-partnership-to-build-carbon-negative-data-halls-and-energy-infrastructure-in-wyoming-302576579.html","label":"Prometheus Hyperscale, Spiritus, and Casper Carbon Capture Announce Strategic Partnership to Build Carbon-Negative Data Halls and Energy Infrastructure in Wyoming","publisher":"PR Newswire","kind":"press","retrievedAt":"2026-08-07"},{"url":"https://www.prometheushyperscale.com/news/ph-spiritus-casper-carbon-capture-announce-strategic-partnership","label":"Prometheus Hyperscale, Spiritus, and Casper Carbon Capture Announce Strategic Partnership to Build Carbon-Negative Data Halls and Energy Infrastructure in Wyoming","publisher":"Prometheus Hyperscale","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","label":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-08-19"},{"url":"https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/","label":"Pitching 940-acre data center, Prometheus Hyperscale asks Natrona County to bypass state review","publisher":"WyoFile","kind":"press","retrievedAt":"2026-09-14"},{"url":"https://cowboystatedaily.com/2026/09/02/prometheus-data-center-developers-outline-natrona-county-project-to-commissioners/","label":"Natrona County Residents Pack Meeting To Hear Plans For Huge Data Center","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-ptolemy-data-systems-sheridan-wy","sourceRecordId":"ptolemy-data-systems-sheridan-wy","name":"Ptolemy Data Systems Sheridan Data Center","operator":"Ptolemy Data Systems","city":"Sheridan","county":"Sheridan","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":44.8284,"longitude":-106.9711,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/ptolemy-data-systems-sheridan-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.cityofdouglas.org/AgendaCenter/ViewFile/Item/1542?fileID=1449","label":"\"The Data Landscape\" — Ptolemy Data Systems capability document filed in a City of Douglas agenda packet","publisher":"City of Douglas, Wyoming","kind":"filing","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=2910+Russell+Drive%2C+Sheridan%2C+WY&format=json&addressdetails=1&limit=3","label":"OpenStreetMap/Nominatim geocode for Russell Drive, Sheridan, Sheridan County, Wyoming","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-range-act-gillette-campbell-county-wy","sourceRecordId":"range-act-gillette-campbell-county-wy","name":"Range (ACT) Gillette Data Center","operator":"Advanced Communications Technology (Range)","city":"Gillette","county":"Campbell","address":"845 Southern Drive","state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":44.2437,"longitude":-105.4846,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/range-act-gillette-campbell-county-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/datacenters/north-america/usa/wyoming","label":"Data Centers in Wyoming, United States — facility and address listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=845+Southern+Drive%2C+Gillette%2C+Wyoming&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode for Southern Drive Industrial Park, Gillette, Campbell County, Wyoming","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-range-act-wheatland-platte-county-wy","sourceRecordId":"range-act-wheatland-platte-county-wy","name":"Range (ACT) Wheatland Data Center","operator":"Advanced Communications Technology (Range)","city":"Wheatland","county":"Platte","address":"1651 Cole Street","state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":42.0452,"longitude":-104.9579,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"operational","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/range-act-wheatland-platte-county-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-14","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://inflect.com/datacenters/north-america/usa/wyoming","label":"Data Centers in Wyoming, United States — facility and address listing","publisher":"Inflect","kind":"other","retrievedAt":"2026-09-14"},{"url":"https://nominatim.openstreetmap.org/search?q=1651+Cole+Street%2C+Wheatland%2C+Wyoming&format=json&limit=2","label":"OpenStreetMap/Nominatim geocode for Cole Street, Wheatland, Platte County, Wyoming","publisher":"OpenStreetMap","kind":"osm","retrievedAt":"2026-09-14"}]},{"id":"compute-related-digital-cheyenne-wy","sourceRecordId":"related-digital-cheyenne-wy","name":"Related Digital Cheyenne Data Center Campus","operator":"Related Digital","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.13,"longitude":-104.735,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"under_construction","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/related-digital-cheyenne-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.related-digital.com/news/related-digital-breaks-ground-on-302-mw-data-center-campus-in-cheyenne-wyoming","label":"Related Digital Breaks Ground on 302 MW Data Center Campus in Cheyenne, Wyoming","publisher":"Related Digital","kind":"press","retrievedAt":"2026-08-19"},{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","label":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-08-19"},{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","label":"Wyoming Business Council Programs & Services (Data Center Sales Tax Exemption Eligibility Certification recipient list)","publisher":"Wyoming Business Council / Wyoming Legislature","kind":"subsidy","retrievedAt":"2026-09-14"},{"url":"https://www.related.com/press-releases/2025-10-07/related-digital-breaks-ground-302-mw-data-center-campus-cheyenne-wyoming","label":"Related Digital breaks ground on 302 MW data center campus in Cheyenne, Wyoming","publisher":"Related Companies","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-site-layer-4-goshen-hole-platte-county-wy","sourceRecordId":"site-layer-4-goshen-hole-platte-county-wy","name":"Site Layer 4 Goshen Hole Data Center Campus","operator":"Site Layer 4, LLC","city":"Wheatland","county":"Platte","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":42.1,"longitude":-104.71,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"permitted","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/site-layer-4-goshen-hole-platte-county-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cowboystatedaily.com/2026/07/13/ranchlands-near-wheatland-eyed-for-26-billion-transformational-data-center/","label":"Ranchlands Near Wheatland Eyed For $26 Billion 'Transformational' Data Center","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://cowboystatedaily.com/2026/09/02/platte-county-commissioners-push-back-then-ok-industrial-zoning-for-data-center/","label":"Platte County Commissioners Push Back, Then OK Industrial Zoning For Data Center","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-10-17"}]},{"id":"compute-truss-energy-carpenter-wy","sourceRecordId":"truss-energy-carpenter-wy","name":"Truss Energy Carpenter Data Center","operator":"Truss Energy","city":"Carpenter","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41.0461861,"longitude":-104.3627365,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"reported","sourceUrl":"https://www.compute-atlas.com/facilities/truss-energy-carpenter-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-09-02","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://cowboystatedaily.com/2026/05/18/two-more-data-centers-possible-as-laramie-county-planners-ok-massive-man-camp/","label":"Two More Data Centers Possible As Laramie County Planners OK Massive Man Camp","publisher":"Cowboy State Daily","kind":"press","retrievedAt":"2026-09-02"}]},{"id":"compute-vantage-wyoming-campus-laramie-county-wy","sourceRecordId":"vantage-wyoming-campus-laramie-county-wy","name":"Vantage Wyoming Campus (Project Latigo)","operator":"Vantage Data Centers","city":"Cheyenne","county":"Laramie","address":null,"state":"WY","stateName":"Wyoming","jurisdictionType":"state","latitude":41,"longitude":-104.89,"coordinatePrecision":"approximate","recordUnit":"source-defined site or campus","status":"proposed","statusBasis":"Source-reported lifecycle; not independently verified by this site.","sourceConfidence":"confirmed","sourceUrl":"https://www.compute-atlas.com/facilities/vantage-wyoming-campus-laramie-county-wy","sourceName":"Compute Atlas by Edward Kubiak","sourceVersion":"v1.35.1","sourceUpdatedAt":"2026-10-17","retrievedAt":"2026-11-10","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0/","evidenceLevel":"inventory-only","sourceCitations":[{"url":"https://www.wyomingnews.com/rawlinstimes/vantage-hosts-open-house-for-proposed-data-center-in-southern-wyoming/article_f52c4a39-b229-4776-b6da-2032bfecee66.html","label":"Vantage hosts open house for proposed data center in southern Wyoming","publisher":"Wyoming Tribune Eagle / Rawlins Times","kind":"press","retrievedAt":"2026-10-17"},{"url":"https://cheyenneleads.org/wp-content/uploads/2026/08/LC-Data-Centers_8.4.2026.pdf","label":"Cheyenne LEADS Data Center Locations map (updated Aug 4, 2026): Planned P. Project Latigo/Vantage","publisher":"Cheyenne LEADS","kind":"other","retrievedAt":"2026-10-17"},{"url":"https://morethanjustparks.com/data-center-tracker/vantage-data-center-project-latigo-wy--bd62fca2-2e13-4e14-bba9-c2ba9645d2fb","label":"Vantage Data Center (Project Latigo) tracker listing","publisher":"More Than Just Parks / Public Lands Intelligence","kind":"other","retrievedAt":"2026-10-17"}]}]}