Google — The Dalles campuses
The Dalles, Oregon Operating
Google publishes location details and efficiency data for its campuses. Its water profile shows past water consumption, but not today’s highest demand (the “peak demand”).
- Developer
- Operator
- Stage
- Operating
- Records as of
- November 11, 2026
- Scope
- A group of campuses
Google’s current location page describes campuses in operation.
Sources: Google, The Dalles data center location, accessed November 11, 2026; Google, Campus power usage effectiveness reports, accessed November 11, 2026.
Water
Does the disclosed design cool the whole campus this record covers without evaporating water?
NoCompany statement
A photo on Google’s location page has this caption: “Steam rises above Google’s cooling towers in The Dalles data center in Oregon.” The caption has no date and does not name the campus. A cooling tower that gives off steam gets rid of heat by letting water evaporate into the air. This is called “evaporative cooling”. Google’s water profile, dated April 2023, says Google uses water to cool its data centers. It reports almost 275 million gallons consumed in The Dalles in 2021. So Google’s own records show this kind of cooling on at least part of its campuses in The Dalles. Neither record sets out the full design for getting rid of heat.
Sources: Google, The Dalles data center location, accessed November 11, 2026; Google, The Dalles water profile, April 2023.
Is a number public for how much water the site or campus needs or consumes?
YesMeasured result
The April 2023 water profile reports water consumed (used and not returned) in The Dalles in 2021. The figure is almost 275 million gallons. It is from the past and covers the local campuses together. It is not a current figure for a day when water use is highest (a “peak day”).
Source: Google, The Dalles water profile, April 2023.
Power
Is clean power accounting for this project public, and does it clearly state the matching period?
Not known
The listed records do not answer this.
Generators
Is a final air permit for this project public in the listed records?
Not known
The listed records do not answer this.
Noise
Do the listed records show enforceable noise limits, as numbers, for the site when it runs?
Not known
The listed records do not answer this.
Costs
Do public records show an adopted tariff or agreement that says who pays the project’s power costs?
Not known
The listed records do not answer this.
Promises
Does a public record show a local land-use decision?
Not known
The listed records do not answer this.
What is public
Is there a public disclosure or a government record about this project?
YesCompany statement
Google keeps a location page and a local water profile.
Sources: Google, The Dalles data center location, accessed November 11, 2026; Google, The Dalles water profile, April 2023.
Are measured environmental results for the site or campus public, with the dates they cover?
YesMeasured result
Google publishes a PUE figure for each campus. PUE (power usage effectiveness) measures the electricity a site uses beyond its computers. The figures are by quarter and for the latest twelve months (“trailing twelve months”). They run through the second quarter (Q2) of 2026. Google reports these efficiency measurements itself.
Source: Google, Campus power usage effectiveness reports, accessed November 11, 2026.
Limits of these records
- This record groups Google’s campuses in The Dalles. It must not be counted as one single building.
- PUE measures a site’s overhead, which is the electricity it uses beyond its computers. It does not measure total electricity demand, clean-power supply or effects on the community.
- The 2021 water measurement is evidence from that year. It is not an estimate of current water use.
Sources
-
Campus power usage effectiveness reports
Quarterly and trailing-twelve-month PUE are distinct. The page currently includes three The Dalles campus entries.