All reviewed projects

Developer
xAI / CTC Property LLC
Operator
xAI (current site branded SpaceXSI)
Stage
Operating
Records as of
November 11, 2026
Scope
A campus

The operator is the company that runs the site. Its website describes a cluster (a group of computers that work together) that is running. The website also describes a scale-up in February 2025. The brand name used now differs from the name of the earlier permit applicant, the party that applied for the permit.

Source: xAI / SpaceXSI, Colossus project page, accessed November 11, 2026.

Water

Does the disclosed design cool the whole campus this record covers without evaporating water?

NoCompany statement

Slides from the local utility, Memphis Light, Gas and Water (MLGW), are dated July 9, 2024. They say xAI “will use two water systems”. One is a closed loop that cools the computers. A closed loop sends the same water around again and again. The slides say this water is cooled by “a water-cooled chiller and evaporative cooling tower”. An evaporative cooling tower removes heat by letting water evaporate. The slides set out the plan as of July 2024. They do not show how the site runs now.

Source: City of Memphis, MLGW Utility Support to xAI, slides for the MLGW Committee, July 9, 2024, July 9, 2024.

Is a number public for how much water the site or campus needs or consumes?

YesCompany statement

Slides from the local utility, Memphis Light, Gas and Water (MLGW), are dated July 9, 2024. They say the project “would add ~1 MGD” to the demand for MLGW water. MGD means million gallons a day. So the project would add about 1 million gallons a day. MLGW delivers 150 million gallons a day to its customers on average. The 1 million figure is a forecast (projected demand). It is not a meter reading. A diagram in the same slides shows the main water pipe (the distribution main). It labels 2 million gallons a day of available capacity. Pipe capacity is not what the campus needs (demand) or uses up (consumption).

Source: City of Memphis, MLGW Utility Support to xAI, slides for the MLGW Committee, July 9, 2024, July 9, 2024.

Power

Is clean power accounting for this project public, and does it clearly state the matching period?

Not known

The listed records do not answer this.

Generators

Is a final air permit for this project public in the listed records?

Not knownOfficial record

County records listed in search results mention permit 01156-01PC and an appeal (a formal request to review a decision). Their direct links now return a “not found” error (HTTP 404). The listed records that open do not show the final document, its current status or its conditions. Conditions are the rules a permit sets.

Sources: Shelby County Health Department, Construction permit evaluation, source 01156, July 2, 2025; Shelby County Health Department, Air-board meeting notice of December 15, 2025, December 15, 2025.

Noise

Do the listed records show enforceable noise limits, as numbers, for the site when it runs?

Not known

The listed records do not answer this.

Costs

Do public records show an adopted tariff or agreement that says who pays the project’s power costs?

Not knownOfficial record

The slides are from the local utility, Memphis Light, Gas and Water (MLGW). They are dated July 9, 2024. They say the utility will raise the power available to the site to 50 megawatts (MW). They say this will be “at an MLGW capital cost of $760,000”. They say the developer “will pay for construction of 150MW substation”. They say the utility will give a “margin allowance” on the monthly bill. They say this is “to recoup cost of construction of the substation (approximately $24M total)”. They say the power used will be paid for at the “prevailing commercial rate”. They say contracts for gas, water and “initial electric service” were arranged from April to June. At that date, the 150 MW request still needed approval. It had to come from the board of the Tennessee Valley Authority (TVA). The listed records do not include those contracts. They include no adopted rate schedule (a “tariff”).

Source: City of Memphis, MLGW Utility Support to xAI, slides for the MLGW Committee, July 9, 2024, July 9, 2024.

Promises

Does a public record show a local land-use decision?

Not known

The listed records do not answer this.

What is public

Is there a public disclosure or a government record about this project?

YesOfficial record

Slides from the local utility, Memphis Light, Gas and Water (MLGW), are dated July 9, 2024. Their title is “MLGW Utility Support to xAI”. They say xAI “will occupy the former Electrolux manufacturing facility”. They set out the water, gas and electric service for the site. The file is on the City of Memphis website. The operator also has a project page. It describes the computing site and its build timeline.

Sources: City of Memphis, MLGW Utility Support to xAI, slides for the MLGW Committee, July 9, 2024, July 9, 2024; xAI / SpaceXSI, Colossus project page, accessed November 11, 2026.

Are measured environmental results for the site or campus public, with the dates they cover?

Not knownCompany statement

GPUs (graphics processing units) are a kind of computer chip. GPU counts and the scale of computing are not environmental measurements from operations. The listed records give no site measurements of water, energy or emissions for a stated period.

Source: xAI / SpaceXSI, Colossus project page, accessed November 11, 2026.

Limits of these records

  • This record covers Colossus 1 in Memphis. It does not cover Colossus 2 or the related sites in Mississippi where power is made.
  • Advocates’ claims and documents that do not open do not show whether the law was broken or whether permit rules were followed.
  • Older records use the names of earlier applicants. Those names do not show who owns which company today.

Sources

  • Colossus project page

    Company statement xAI / SpaceXSI. Accessed November 11, 2026.

  • MLGW Utility Support to xAI, slides for the MLGW Committee, July 9, 2024

    Official record City of Memphis, July 9, 2024. Accessed November 11, 2026.

    These slides carry the logo of Memphis Light, Gas and Water (MLGW), the local utility. The file is on the City of Memphis website.

  • Construction permit evaluation, source 01156

    Official record Shelby County Health Department, July 2, 2025. Accessed November 10, 2026.

    Search results list this agency record. Its direct link now returns a “not found” error (HTTP 404). The Internet Archive holds no copy.

  • Air-board meeting notice of December 15, 2025

    Official record Shelby County Health Department, December 15, 2025. Accessed November 10, 2026.

    Search results list this notice. The listing mentions the issued construction permit and an appeal. Its direct link now returns a “not found” error (HTTP 404). The only Internet Archive capture, dated May 16, 2026, is also a “not found” page. The listed records do not show how the appeal ended.